Carbonization system

By designing a carbonization system with a multi-carbonization box sharing a thermal energy furnace, the problems of low thermal energy utilization and unrecycled waste gas in the prior art are solved, and a more efficient carbonization process and cost reduction are achieved.

CN119685043AActive Publication Date: 2025-03-25ZHEJIANG CARBON VALLEY MACHINERY CO LTD

Patent Information

Application Number
CN202411730517.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-03-25
Estimated Expiration
2044-11-29

AI Technical Summary

Technical Problem

The thermal energy utilization rate of existing carbonization furnaces or carbonization tanks is low, the exhaust gas of the thermal energy furnace has not been recycled, and the water vapor and nitrogen dioxide required for activation of the carbonization tank are provided through other equipment, which is relatively expensive.

Method used

A carbonization system is designed, in which a thermal energy furnace can be used for multiple carbonization boxes, and the carbon dioxide waste gas and steam generated by the thermal energy furnace are recycled and used as materials in the carbonization box.

Benefits of technology

The thermal energy utilization rate is improved, production costs are reduced, and a more efficient carbonization process is achieved by recycling waste gas and steam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119685043A_ABST
    Figure CN119685043A_ABST
Patent Text Reader

Abstract

The carbonization system comprises a heat energy furnace and at least one carbonization box body, a circulating hot air outlet of the heat energy furnace is communicated with a first main connecting pipe, one air outlet of the first main connecting pipe is communicated with a first main air inlet pipe of the carbonization box body through a control valve, and the other air outlet of the first main connecting pipe is communicated with a second main air inlet pipe of the carbonization box body through a control valve. The gas outlet end of a main gas outlet pipe of the carbonization box body is communicated with one gas inlet of a second main connecting pipe through a control valve, a gas outlet of the second main connecting pipe is communicated with the gas inlet end of a first ash remover, and the gas outlet end of the first ash remover is communicated with one end of a first gas return pipe; the other end of the first air return pipe is communicated with an air inlet of an air blower communicated with an air return port of the heat energy furnace; one heat energy furnace can provide heat for a plurality of carbonization box bodies, the utilization rate is high, carbon dioxide waste gas generated by the heat energy furnace and steam generated by the steam cylinder at the bottom can be used for carbonizing materials in the carbonization box bodies, the utilization rate is improved, the production cost is greatly reduced, and the use effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The present invention relates to the technical field of carbonization processing equipment, and more particularly to a carbonization system. Background technology:

[0002] Carbonization, also known as dry distillation, carbonization, and coking, refers to the reaction process of heating and decomposing solid or organic matter in an air-tight condition or a method of heating solid substances to produce liquid or gas (usually solid) products.

[0003] The existing carbonization of objects, such as wood or bamboo chips, is generally carried out in a carbonization furnace or a carbonization box. The existing carbonization furnace or the carbonization box requires a thermal energy furnace to provide hot air, and the existing thermal energy furnace is generally set one to one, that is, one thermal energy furnace corresponds to one carbonization furnace or carbonization box, and its utilization rate is not high. In addition, the exhaust gas of the existing thermal energy furnace is directly discharged without recycling, which makes it single in function and has limited energy-saving and environmental protection effects. In addition, the water vapor and nitrogen dioxide required for the subsequent activation of the carbonization box are provided by other equipment, which is costly. Summary of the invention:

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a carbonization system, which can use a thermal energy furnace to provide heat for multiple carbonization boxes, with high utilization rate, and the carbon dioxide waste gas generated by its thermal energy furnace and the steam generated by the steam cylinder at the bottom can be used for carbonization of materials in the carbonization box, thereby improving utilization rate, greatly reducing production costs, and having good use effect.

[0005] The solution of the present invention to solve the technical problem is:

[0006] A carbonization system comprises a heat energy furnace and at least one carbonization box, wherein a circulating hot gas outlet of the heat energy furnace is connected to a first main connecting pipe, an outlet of the first main connecting pipe is connected to a first main air inlet pipe of the carbonization box through a control valve, an outlet end of the main air outlet pipe of the carbonization box is connected to an air inlet of a second main connecting pipe through a control valve, an outlet of the second main connecting pipe is connected to an air inlet end of a first ash remover, an outlet end of the first ash remover is connected to one end of a first return air pipe, and the other end of the first return air pipe is connected to an air inlet of a blower connected to the return air outlet of the heat energy furnace;

[0007] A carbon dioxide gas storage tank is provided on one side of the carbonization box, the air inlet of the carbon dioxide gas storage tank is connected to the air outlet of the first blower, the air inlet of the first blower is connected to one end of the first connecting pipe, the other end of the first connecting pipe is fixed to the side plate of the main exhaust pipe of the thermal energy furnace and communicates with the side through hole on the side plate of the main exhaust pipe, and a control valve for controlling air intake is installed in the first connecting pipe;

[0008] The carbon dioxide gas storage tank is connected with an exhaust connector, which is fixed to the side wall of the first main air intake pipe through a second connecting pipe and communicates with the corresponding side through hole on the side wall of the first main air intake pipe, and a control valve for controlling the deflation is installed on the second connecting pipe;

[0009] A steam tank is fixed or placed on the ground at one side of the thermal energy furnace, a gas outlet is connected to the side wall of the steam cylinder at the lower part of the thermal energy furnace, the gas outlet is connected to the gas inlet of the steam tank through a third connecting pipe, a first angle seat valve with a solenoid valve is installed on the third connecting pipe, the gas outlet of the steam tank is connected to the steam inlet pipe of the carbonization box through a fourth connecting pipe, and a second angle seat valve with a solenoid valve is installed on the fourth connecting pipe;

[0010] An air intake pipe is connected to the side wall of the first main air intake pipe, a control valve is installed on the air intake pipe, and the air intake end of the air intake pipe is connected to an air source (the air source is an air storage tank connected to the air outlet end of the air compressor, and the air outlet of the air storage tank is connected to the air intake end of the air intake pipe).

[0011] Two carbonization boxes are fixed on the ground at the right side of the thermal energy furnace, and the first main connecting pipe is a three-way connecting pipe, and the two air outlets of the first main connecting pipe are respectively connected to the first main air inlet pipes of the two carbonization boxes through control valves;

[0012] The second main connecting pipe is a three-way connecting pipe, and the gas outlet ends of the main gas outlet pipes of the two carbonization boxes are connected to a corresponding gas inlet of the second main connecting pipe through a control valve.

[0013] The carbon dioxide gas storage tank is connected to two exhaust connectors, which are fixed to the side wall of the first main air intake pipe of the corresponding carbonization box through a second connecting pipe and communicated with the corresponding side through holes on the side wall of the first main air intake pipe of the corresponding carbonization box.

[0014] A plurality of upper through holes are formed on the bottom plate of the exhaust gas shell at the bottom of the thermal energy furnace, and the tops of the plurality of vertical exhaust pipes are inserted into the corresponding upper through holes, and the outer side walls thereof are welded and fixed on the inner side walls of the corresponding upper through holes. An exhaust gas transition shell is arranged below all the vertical exhaust pipes, and a plurality of lower through holes are formed on the top plate of the exhaust gas transition shell, and the bottoms of all the vertical exhaust pipes are inserted into the corresponding lower through holes, and the bottom outer side walls of all the vertical exhaust pipes are welded and fixed on the inner side walls of the corresponding lower through holes, a steam cylinder is welded and fixed on the bottom surface of the bottom plate of the bottom exhaust gas shell, and the bottom end of the steam cylinder is welded and fixed on the top surface of the top plate of the exhaust gas transition shell, and all the vertical exhaust pipes are in the steam cylinder, and an exhaust end is connected on one side wall of the steam cylinder, and a water inlet end is connected on the other side wall, and a main exhaust pipe is fixed on the top surface of the top plate of the exhaust gas transition shell, and the main exhaust pipe is connected to the through hole formed on the top plate of the exhaust gas transition shell.

[0015] A nitrogen inlet pipe is connected to the side wall of the first main inlet pipe, and the inlet end of the nitrogen inlet pipe is connected to the outlet end of the control valve connected to the outlet of the nitrogen tank on one side of the carbonization box, and a control valve is installed on the nitrogen inlet pipe.

[0016] A condenser and a dust collector are installed on one side of the two carbonizing boxes. The air outlet of the first circulating air outlet duct of the carbonizing box is connected to the air inlet of the corresponding dust collector through a connecting pipe. A control valve is connected between the connecting pipe and the air outlet of the first circulating air outlet duct. The air outlet of the dust collector is connected to the air inlet of the circulating fan through the connecting pipe. The air outlet of the circulating fan is connected to the total air inlet connecting pipe of the condenser through the connecting pipe. The total air outlet connecting pipe head of the condenser is connected to the air inlet of the first circulating air inlet duct of the corresponding carbonizing box through a connecting pipe. A control valve is connected between the air inlet of the first circulating air inlet pipe and the connecting pipe.

[0017] A negative pressure tank is arranged above the carbonization box body, and the outlet end of the cooling gas outlet pipe of the condenser is connected with the air inlet connector of the negative pressure tank through a connecting pipe, and a control valve is installed on the connecting pipe.

[0018] Both negative pressure tanks are connected with exhaust pipes, and control valves are installed on the exhaust pipes. The air outlet ends of the two exhaust pipes are connected to both ends of a three-way connector, and another end of the three-way connector is connected to one end of a fifth connecting pipe, and the other end of the fifth connecting pipe is connected to one end of a second three-way connector. The other two ends of the second three-way connector are respectively connected to the first branch exhaust pipe and the second branch exhaust pipe. The other end of the first branch exhaust pipe is connected to the air inlet of the first vacuum pump, and the air outlet of the first vacuum pump is connected to the outside world. The other end of the second branch exhaust pipe is connected to the air inlet of the second vacuum pump, and the air outlet of the second vacuum pump is connected to the air inlet of the first exhaust gas storage tank placed or fixed around the carbonization box through a connecting pipe. Control valves are installed on the first branch exhaust pipe and the second branch exhaust pipe.

[0019] A second waste gas storage tank is vertically arranged on one side of the first waste gas storage tank, and the gas outlet end of the first waste gas storage tank is connected to the gas inlet of the second waste gas storage tank through a connecting pipe, and the gas outlet end of the second waste gas storage tank is connected to the gas connecting pipe of the thermal energy furnace (omitted and not shown in the drawing).

[0020] The outstanding effects of the present invention are:

[0021] It can use one thermal energy furnace to provide heat for multiple carbonization boxes, with high utilization rate. The carbon dioxide waste gas generated by the thermal energy furnace and the steam generated by the steam cylinder at the bottom can be used for carbonization of materials in the carbonization boxes, thereby improving utilization rate, greatly reducing production costs, and achieving good use effect. Description of the drawings:

[0022] Figure 1 It is a partial structural schematic diagram of the present invention;

[0023] Figure 2 yes Figure 1 A partial top view of

[0024] Figure 3 It is a schematic diagram of the partial structure of the carbonization box;

[0025] Figure 4 yes Figure 3 A partial enlarged view of

[0026] Figure 5 yes Figure 3 Schematic diagram of the angle-changing structure;

[0027] Figure 6 It is a partial structural schematic diagram of the cross-section state of the carbonization box;

[0028] Figure 7 yes Figure 6 A partial enlarged view of

[0029] Figure 8 yes Figure 6 a partial enlarged view of another part;

[0030] Fig. 9 It is a partial cross-sectional view of the carbonization box;

[0031] Fig.10 It is a schematic diagram of the local structure at the annular pipe;

[0032] Fig.11 It is a schematic diagram of the local structure between the main air outlet pipe and the lower extension sleeve;

[0033] Fig.12 It is a schematic diagram of the local structure at the main outlet pipe;

[0034] Fig.13 It is a partial structural schematic diagram of the lower extension sleeve;

[0035] Fig.14 It is a partial structural diagram of the condenser;

[0036] Fig.15 This is a schematic diagram of the local structure of the condenser at a changed angle;

[0037] Fig.16 It is a partial cross-sectional view of the condenser;

[0038] Fig.17 It is a partial enlarged view of the condenser;

[0039] Fig.18 is a partial enlarged view of another part of the condenser;

[0040] Fig.19 It is a schematic diagram of the structure of the dust collector;

[0041] Fig. 20 It is a partial cross-sectional view of the dust collector;

[0042] Fig.21 yes Fig.19 A partial enlarged view of

[0043] Fig. 22 It is a schematic diagram of the local structure at the lower part of the thermal energy furnace;

[0044] Fig.23 It is a schematic diagram of the local structure where the box is placed inside;

[0045] Fig.24 yes Fig.23 Schematic diagram of the angle-changing local structure;

[0046] Fig.25 yes Figure 6 There is also a partial enlarged view of some parts;

[0047] Fig.26 It is a schematic diagram of the local structure at the frame plate;

[0048] Fig. 27 yes Fig.26 Schematic diagram of the local structure of changing angle. Specific implementation method:

[0049] For example, see Figures 1 to 27 As shown ( Figure 1 The air intake pipe and nitrogen intake pipe are omitted. Fig.19 The outer annular sleeve body 662 of one of the cooling ring assemblies 66 and other components are omitted), a carbonization system includes a thermal energy furnace 200 (which can adopt an existing common thermal energy furnace, or a structure similar to a high-efficiency hot air device with precise oxygen distribution in a tube and two-stage catalytic combustion disclosed in Chinese patent application No. 202110193078.X as a thermal energy furnace, which will not be described in detail here) and at least one carbonization box 1000, the circulating hot gas outlet of the thermal energy furnace 200 is connected to a first main connecting pipe 201, and one outlet of the first main connecting pipe 201 is connected to a control valve It is connected to the first main air inlet pipe 161 of the carbonization box 1000, and the air outlet end of the main air outlet pipe 13 of the carbonization box 1000 is connected to an air inlet of the second main connecting pipe 202 through a control valve. The air outlet of the second main connecting pipe 202 is connected to the air inlet end of the first ash remover 300, and the air outlet end of the first ash remover 300 is connected to one end of the first return air pipe 301, and the other end of the first return air pipe 301 is connected to the air inlet of the blower connected to the return air port of the thermal energy furnace 200; the bottom of the discharge control valve 67 at the bottom of the first ash remover 300 can be connected to a dust collection device such as a cloth bag to collect dust for treatment.

[0050] Furthermore, a carbon dioxide gas storage tank 400 is provided on one side of the carbonization box 1000, the air inlet of the carbon dioxide gas storage tank 400 is connected to the air outlet of the first blower, the air inlet of the first blower is connected to one end of the first connecting pipe, the other end of the first connecting pipe is fixed to the side plate of the main exhaust pipe 203 of the thermal energy furnace 200 and communicates with the side through hole on the side plate of the main exhaust pipe 203, and a control valve for controlling air intake is installed in the first connecting pipe;

[0051] The carbon dioxide gas storage tank 400 is connected to an exhaust connector 401, which is fixed to the side wall of the first main air intake pipe 161 through a second connecting pipe and communicates with a corresponding side through hole on the side wall of the first main air intake pipe 161. A control valve for controlling the deflation is installed on the second connecting pipe.

[0052] A steam tank 500 is fixed or placed on the ground at one side of the thermal energy furnace 200, and a gas outlet is connected to the side wall of the steam cylinder 205 at the lower part of the thermal energy furnace 200, and the gas outlet is connected to the gas inlet of the steam tank 500 through a third connecting pipe, and a first angle seat valve with a solenoid valve is installed on the third connecting pipe. The gas outlet of the steam tank 500 is connected to the steam inlet pipe 5 of the carbonization box 1000 through a fourth connecting pipe, and a second angle seat valve with a solenoid valve is installed on the fourth connecting pipe;

[0053] The side wall of the first main air intake pipe 161 is connected to an air intake pipe 600, on which a control valve is installed, and the air intake end of the air intake pipe 600 is connected to an air source (the air source is an air storage tank connected to the air outlet end of the air compressor 900, and the air outlet of the air storage tank is connected to the air intake end of the air intake pipe 600, which is a conventional structure and will not be described in detail).

[0054] Furthermore, two carbonization boxes 1000 are fixed on the ground at the right side of the thermal energy furnace 200, and the first main connecting pipe 201 is a three-way connecting pipe. The two air outlets of the first main connecting pipe 201 are respectively connected to the first main air inlet pipes 161 of the two carbonization boxes 1000 through control valves;

[0055] The second main connecting pipe 202 is a three-way connecting pipe, and the gas outlet ends of the main gas outlet pipes 13 of the two carbonization boxes 1000 are connected to a corresponding gas inlet of the second main connecting pipe 202 through a control valve.

[0056] Furthermore, the carbon dioxide storage tank 400 is connected to two exhaust connectors 401, which are fixed to the side wall of the first main air intake pipe 161 of the corresponding carbonization box 1000 through the second connecting pipe and communicate with the corresponding side through holes on the side wall of the first main air intake pipe 161 of the corresponding carbonization box 1000.

[0057] Furthermore, a plurality of upper through holes are formed on the bottom plate of the exhaust gas exhaust shell 206 at the bottom of the thermal energy furnace 200, and the tops of the plurality of vertical exhaust pipes 207 are inserted into the corresponding upper through holes, and the outer side walls thereof are welded and fixed to the inner side walls of the corresponding upper through holes, and an exhaust gas transition shell 208 is arranged below all the vertical exhaust pipes 207, and a plurality of lower through holes are formed on the top plate of the exhaust gas transition shell 208, and the bottoms of all the vertical exhaust pipes 207 are inserted into the corresponding lower through holes, and the outer side walls of the bottoms of all the vertical exhaust pipes 207 are welded and fixed to the inner side walls of the corresponding lower through holes, and the bottom exhaust gas A steam cylinder 209 is welded and fixed to the bottom surface of the bottom plate of the exhaust shell 206, and the bottom end of the steam cylinder 209 is welded and fixed to the top surface of the top plate of the exhaust gas transition shell 208. All the vertical air outlet pipes 207 are in the steam cylinder 209. An air outlet end is connected to one side wall of the steam cylinder 209, and a water inlet end is connected to the other side wall. A main exhaust pipe 203 is fixed to the top surface of the top plate of the exhaust gas transition shell 208. The main exhaust pipe 203 is connected to a through hole formed on the top plate of the exhaust gas transition shell 208, and the water inlet end is connected to a water pipe, which is connected to a water joint, and a control valve is installed on the water pipe. This structure allows that after the heat energy furnace 200 is running and heating, the control valve on the water pipe is opened, so that the water can enter the steam cylinder 209, and the exhaust gas flows downward from the top of all the outlet vertical pipes 207, thereby exchanging heat with the water, and the water becomes water vapor. At this time, it can be discharged through the outlet end, and the first angle seat valve on the third connecting pipe is opened, and the water vapor will enter the steam tank 500 for storage. Among them, the steam tank 500 is provided with a pressure gauge. When its pressure reaches a limited value, the first angle seat valve is closed, and at the same time, the control valve on the water pipe is also closed to stop water intake. The exhaust gas of the main exhaust pipe 203 is basically carbon dioxide, which can be opened by opening the control valve of the first connecting pipe and the first blower, so that the carbon dioxide is sucked into the carbon dioxide gas storage tank 400 for storage.

[0058] Furthermore, a nitrogen intake pipe 6 is connected to the side wall of the first main intake pipe 161, and an intake end of the nitrogen intake pipe 6 is connected to an outlet end of a control valve connected to an outlet of a nitrogen tank 80 on one side of the carbonization box 1000 (in order to make other parts obvious, the partial structure of the pipeline connecting the nitrogen intake pipe 6 and the nitrogen tank 80 is omitted in the accompanying drawings), and a control valve is installed on the nitrogen intake pipe 6.

[0059] Furthermore, a condenser 40 and a dust collector 60 are installed on one side of the two carbonizing boxes 1000. The air outlet of the first circulating air outlet pipe 17 of the carbonizing box 1000 is connected to the air inlet of the corresponding dust collector 60 through a connecting pipe, and a control valve is connected between the connecting pipe and the air outlet of the first circulating air outlet pipe 17. The air outlet of the dust collector 60 is connected to the air inlet of the circulating fan 61 through a connecting pipe, and the air outlet of the circulating fan 61 is connected to the total air inlet connecting pipe head 421 of the condenser 40 through a connecting pipe. The total air outlet connecting pipe head 431 of the condenser 40 is connected to the air inlet of the first circulating air inlet pipe 162 of the corresponding carbonizing box 1000 through a connecting pipe, and a control valve is connected between the air inlet of the first circulating air inlet pipe 162 and the connecting pipe.

[0060] Furthermore, a negative pressure tank 50 is provided above the carbonization box 1000, and the outlet end of the cooling gas outlet pipe 432 of the condenser 40 is connected to the air inlet connector of the negative pressure tank 50 through a connecting pipe, and a control valve is installed on the connecting pipe.

[0061] Furthermore, the two negative pressure tanks 50 are both connected with an exhaust pipe 55, and a control valve is installed on the exhaust pipe 55. The air outlet ends of the two exhaust pipes 55 are connected to the two ends of a three-way connector, and another end of the three-way connector is connected to one end of a fifth connecting pipe, and the other end of the fifth connecting pipe is connected to one end of a second three-way connector. The other two ends of the second three-way connector are respectively connected to the first branch exhaust pipe 56 and the second branch exhaust pipe 57. The other end of the first branch exhaust pipe 56 is connected to the air inlet of the first vacuum pump 58, and the air outlet of the first vacuum pump 58 is connected to the outside world. The other end of the second branch exhaust pipe 57 is connected to the air inlet of the second vacuum pump 59, and the air outlet of the second vacuum pump 59 is connected to the air inlet of the first waste gas storage tank 700 placed or fixed around the carbonization box 1000 through a connecting pipe. Control valves are installed on the first branch exhaust pipe 56 and the second branch exhaust pipe 57.

[0062] Furthermore, a second waste gas storage tank 800 is vertically arranged on one side of the first waste gas storage tank 700, and the gas outlet end of the first waste gas storage tank 700 is connected to the gas inlet of the second waste gas storage tank 800 through a connecting pipe, and the gas outlet end of the second waste gas storage tank 800 is connected to the gas connecting pipe of the thermal furnace 200 (omitted and not shown in the drawing) through a connecting pipe, and a control valve is installed on the connecting pipe.

[0063] The carbonization box 1000 in this embodiment includes a main box 10, an inner box 20 is provided inside the main box 10, the left ends of the inner box 20 and the main box 10 are fixed on the same left end plate 11, the left end plate 11 covers the left ends of the inner box 20 and the main box 10, the right ends of the inner box 20 and the main box 10 are fixed to the same right door frame 12, one side of the door body 30 is movably connected to the right door frame 12 through a hinge, the door body 30 is on the right side of the right door frame 12 and covers the middle through groove of the right door frame 12, and the edge of the door body 30 is pressed and fixed to the right door frame 12 by a plurality of door body locking devices 31;

[0064] A main air inlet through hole 111 is formed in the middle of the left end plate 11, and the outer side wall of the main air outlet pipe 13 is welded and fixed to the right top plate of the inner box body 20 and the inner side wall of the vertical through hole formed on the right top plate of the main box body 10. The top of the main air outlet pipe 13 extends out of the top surface of the top plate of the main box body 10, and the bottom end of the main air outlet pipe 13 extends out of the bottom surface of the top plate of the inner box body 20; a plurality of protrusions are formed on the outer side wall of the bottom end of the main air outlet pipe 13, and all the protrusions are evenly distributed on the bottom outer side wall of the main air outlet pipe 13 with the central axis of the main air outlet pipe 13 as the center. The lower extension sleeve 131 is at the lower part of the main air outlet pipe 13, which is in the inner box body 20, and the top outer side wall of the lower extension sleeve 131 is formed with a radial extension A ring body, an annular groove is formed on the inner wall of the radially extending ring body, and a plurality of upper protrusions are formed on the top inner wall of the annular groove. All the upper protrusions are evenly distributed on the top inner wall of the annular groove with the central axis of the lower extension sleeve 131 as the center, and a slot is formed between two adjacent upper protrusions. The protrusion is first inserted into the corresponding slot and then rotated so that the protrusion is between the corresponding upper protrusion and the bottom surface of the annular groove. At the same time, an upper extension portion is formed on the top surface of one side of the protrusion, and one side of the upper extension portion leans against one side of the corresponding slot to achieve positioning, thereby achieving communication between the lower extension sleeve 131 and the bottom end of the main air outlet pipe 13, and a plurality of side return air holes are formed on the side plate of the lower extension sleeve 131. When the inner material discharging box 100 placed in the inner box body 20 needs to be removed, the lower extension sleeve 131 is rotated so that the protrusion faces the corresponding slot. At this time, the upper extension is against the other side of the corresponding slot, so that it moves into place, ensuring that the protrusion is completely in the corresponding slot, and the lower extension sleeve 131 can be lowered and separated from the main air outlet pipe 13. At this time, the inner material discharging box 100 can be removed, and the lower extension sleeve 131 can be easily cleaned, repaired and maintained after being disassembled. The upper part of the outer side wall of the front and rear parts of the lower extension sleeve 131 is fixed with a gripping part for easy operation.

[0065] The inner box body 20 is provided with a plurality of inner material discharging boxes 100 arranged left and right, and the inner material discharging boxes 100 are provided with a plurality of middle ventilation connecting pipes 1001 extending left and right, and the left and right ends of the middle ventilation connecting pipe 1001 are fixed to the left and right side panels of the inner material discharging box 100 and communicate with the corresponding through holes on the left and right side panels of the inner material discharging box 100 (the end of the middle ventilation connecting pipe 1001 is inserted into the corresponding through hole, and the outer side wall of the end is welded and fixed to the inner side wall of the corresponding through hole), and a plurality of side air outlet through holes are formed on the side wall of the middle ventilation connecting pipe 1001;

[0066] A frame plate 2000 is provided between each two adjacent inner discharge boxes 100, and two frame sealing rings 2001 which are sleeved together are fixed on the left and right walls of the edge of the frame plate 2000 (that is, one frame sealing ring 2001 on the same side is smaller than the other frame sealing ring 2001, and the small frame sealing ring 2001 is sleeved in the large frame sealing ring 2001 to achieve double sealing). The frame sealing rings are made of mica, and the left side wall of the frame sealing ring on the left side is pressed against the right side wall of the right side plate of the inner discharge box 100 on the left, and the right side wall of the frame sealing ring on the right side is pressed against the left side wall of the left side plate of the inner discharge box 100 on the right, the left ends of all the middle ventilation connecting pipes 1001 of the inner discharge box 100 face the middle through groove of the small frame sealing ring on the left, and the right ends of all the middle ventilation connecting pipes 1001 of the inner discharge box 100 face the small frame sealing ring on the right. The middle through groove of the sealing ring, that is, the frame plate 2000 and the frame sealing rings 2001 on both sides between the two adjacent inner discharge boxes 100 are connected to each other and isolated from the outside, and the left side plate of the leftmost inner discharge box 100 is pressed against the right end surface of the left end plate 11, and the through hole on the left side plate of the leftmost inner discharge box 100 is connected to the main air inlet through hole 111 A right baffle plate 1004 is fixed to the right side wall of the rightmost inner discharge box 100, and two frame-type sealing rings 2001 are fixed to the left side wall of the right baffle plate 1004, and their left end faces are pressed against the right side wall of the rightmost inner discharge box 100, and the right ends of all the middle ventilation connecting pipes 1001 of the rightmost inner discharge box 100 are facing the middle through groove of the smaller frame-type sealing ring 2001 on the left side of the right baffle plate 1004.

[0067] In this embodiment, except for the leftmost inner material discharging box 100, the left side wall of the left side plate of each inner material discharging box 100 is fixed to the corresponding frame plate 2000 by bolts.

[0068] By using the frame plate 2000 and the frame sealing ring 2001, the hot air coming out of the main air inlet hole 111 can only flow into the middle ventilation connecting pipe 1001 of all the inner discharge boxes 100, and finally be discharged into the inner discharge boxes 100 from the side air outlet holes of the middle ventilation connecting pipe 1001. In addition, it can be ensured that sufficient hot air can flow from the middle ventilation connecting pipe 1001 of the inner discharge box 100 on the far left to the middle ventilation connecting pipe 1001 of the inner discharge box 100 on the far right, and be discharged from the corresponding side air outlet holes, thereby ensuring that the material in each inner discharge box 100 can be heated, burned and carbonized by the hot air.

[0069] Of course, the left side wall of the left side plate of each inner material discharge box 100 can also be fixed to the corresponding frame plate 2000 by bolts. At this time, the left side wall of the two frame sealing rings 2001 on the left side of the frame plate 2000 of the leftmost inner material discharge box 100 is pressed against the right end face of the left end plate 11 to achieve sealing and ensure that the through hole on the left side plate of the leftmost inner material discharge box 100 is connected to the main air inlet through hole 111.

[0070] A plurality of air ducts 1002 extending forward and backward are fixed in the inner material discharge box 100, and the front and rear ends of the air ducts 1002 are fixed to the front and rear side panels of the inner material discharge box 100 and communicate with corresponding through holes on the front and rear side panels (the ends of the air ducts 1002 are inserted into the corresponding through holes, and the outer side walls of the ends are welded and fixed to the inner side walls of the corresponding through holes), and a plurality of side air intake holes are formed on the side walls of the air ducts 1002.

[0071] Furthermore, the front and rear side walls of the inner discharge box 100 are close to the front and rear inner side walls of the inner box body 20, and all the middle ventilation connecting tubes 1001 and the air guide tubes 1002 are arranged alternately. That is, a plurality of middle ventilation connecting tubes 1001 form a row, and a plurality of air guide tubes 1002 form a row, and a row of air guide tubes 1002 is arranged between each two adjacent rows of middle ventilation connecting tubes 1001, and the middle ventilation connecting tubes 1001 are arranged in this interval.

[0072] The corresponding middle ventilation connecting pipes 1001 of all the inner material discharging boxes 100 are aligned left and right, and a plurality of circulation holes are formed on the bottom plate and the front and rear side plates of the inner material discharging boxes 100.

[0073] Furthermore, a plurality of partitions are fixed between the outer wall of the inner box body 20 and the inner wall of the main box body 10, and all the partitions form a spiral channel 1 between the outer wall of the inner box body 20 and the inner wall of the main box body 10;

[0074] A cooling air inlet pipe 14 is connected to a side plate on the left side of the main box body 10 , and the cooling air inlet pipe 14 is connected to the spiral channel 1 . An exhaust pipe 15 is connected to a side plate on the right side of the main box body 10 , and the exhaust pipe 15 is connected to the spiral channel 1 .

[0075] Furthermore, a left cover body 16 is fixed on the left side wall of the left end plate 11 of the main box body 10, the inner cavity of the left cover body 16 is communicated with the main air inlet hole 111, the rear side plate of the left cover body 16 is connected with the first main air inlet pipe 161, the front side plate of the left cover body 16 is connected with the first circulation air inlet pipe 162, and the first circulation air outlet pipe 17 is fixed to the side plate at the right end of the main box body 10, the inner end of the first circulation air outlet pipe 17 extends out of the inner side wall of the corresponding side plate of the main box body 10 and is fixed to the right part of the corresponding side plate of the inner box body 20 and is communicated with the inner box body 20.

[0076] Furthermore, guide rails 21 extending left and right are fixed to the front and rear of the top surface of the bottom plate of the inner box body 20, and guide wheel seats are fixed to the front and rear of the bottom surface of the bottom plate of the inner material discharge box 100. The guide wheel seats are movably connected with guide wheels 1003 through hinge shafts, and the guide wheels 1003 are on the corresponding guide rails 21.

[0077] Further, a support frame 163 is provided in the middle of the left cover body 16, and the outer side of the support frame 163 is fixed on the inner side wall of the left cover body 16, and a middle through hole extending left and right is formed in the middle of the support frame 163, and the transverse connecting shaft 18 extending left and right is inserted in the corresponding middle through hole, and the left end of the transverse connecting shaft 18 extends out of the left end of the corresponding middle through hole, and a radially extending edge is formed on the outer side wall of the left end of the transverse connecting shaft 18, and the right end face of the radially extending edge is pressed against the left side wall of the support frame 163, and the transverse connecting shaft 18 is inserted in the middle ventilation connecting pipe 1001 corresponding to the middle of all the inner discharge boxes 100, and its right end extends out of the through hole on the right side plate of the rightmost inner discharge box 100 and the middle through hole of the right baffle 1004 installed on the right side wall of the right side plate of the rightmost inner discharge box 100 (can be fixed by bolts) and can be detachably installed on the right baffle 1004.

[0078] Further, a guide sleeve 1005 is fixed on the right side wall of the middle part of the right baffle 1004, the left end of the guide sleeve 1005 is inserted into the middle through hole of the right baffle 1004, the right part of the transverse connecting shaft 18 is inserted into the guide sleeve 1005, and the side wall of the guide sleeve 1005 is formed with positioning pin through holes that are aligned and communicated with each other, the positioning pin through holes are communicated with the radial through holes formed in the middle part of the right part of the transverse connecting shaft 18, the pin 181 is inserted into the corresponding two positioning pin through holes and the radial through holes, the threaded portion formed in the middle part of the right end face of the transverse connecting shaft 18 extends out of the right end face of the guide sleeve 1005 and is threaded with two locking nuts pressed against each other, and the left end face of the locking nut on its left side is pressed against the right end face of the guide sleeve 1005;

[0079] A disassembly through hole is formed in the middle of the left end plate of the left cover body 16, and a disassembly through pipe 164 is fixed on the left side wall of the left end plate of the left cover body 16. The disassembly through pipe 164 is communicated with the disassembly through hole, and the disassembly through hole corresponds to the left end of the transverse connecting shaft 18. A flange connecting edge is formed on the outer wall of the left end of the disassembly through pipe 164, and one side of the door cover 165 is movably connected to one side of the flange connecting edge through a hinge, and the door cover 165 covers the left end of the disassembly through pipe 164. The edge of the door cover 165 is formed with multiple limit grooves, which correspond to the corresponding grooves at the side of the flange connection edge. The edge of the right side wall of the flange connection edge is fixed with multiple connecting seats. One end of the connecting rod is movably connected to the corresponding connecting seat, and the connecting rod is inserted into the corresponding limit groove and groove. The left end of the connecting rod extends out of the left side wall of the corresponding limit groove and is screwed with a handwheel. The right end face of the handwheel is pressed against the left side wall of the door cover 165. A sealing ring (which can be made of high-temperature resistant materials such as mica) is clamped between the right side wall of the edge of the door cover 165 and the left side wall of the flange connection edge.

[0080] Furthermore, a lower supporting frame is fixed on the bottom surface of the bottom plate of the main box body 10, a negative pressure tank 50 is provided above the main box body 10, a mounting support frame is fixed on the bottom surface of the negative pressure tank 50, the bottom of the mounting support frame is fixed on the ground, and the main box body 10 is inserted into the left and right through grooves of the lower part of the mounting support frame.

[0081] Further, a plurality of door locking devices 31 are fixed on the upper, lower, front and rear side walls of the door body 30, and the door locking device 31 includes a cylinder connecting seat 32 fixed on the upper, lower, front and rear side walls of the door body 30, a cylinder fixing plate is fixed on the cylinder connecting seat 32, a mica heat insulation layer is sandwiched between the cylinder fixing plate and the cylinder connecting seat 32, a pressing cylinder 33 is fixed on the cylinder fixing plate, a hook 34 is movably connected to the end of the push rod of the pressing cylinder 33, the middle part of the hook 34 is movably connected to a supporting part fixed at the left end of the cylinder fixing plate through a hinge shaft, and the hook part at the left end of the hook 34 presses against a corresponding pressing block 35 fixed on the left side wall of a radial extension part formed on the right side outer wall of the right door frame 12, and a mica heat insulation layer is sandwiched between the pressing block 35 and the left side wall of the radial extension part;

[0082] A frame-shaped mica heat insulation layer is sandwiched between the right side wall of the right door frame 12 and the left side wall of the door body 30 , and the frame-shaped mica heat insulation layer is fixed on the left side wall of the door body 30 .

[0083] A condenser 40, a dust collector 60 and a blowing device are installed at one side of the main box body 10; the condenser 40 and the dust collector 60 can be fixed on the lower support fixing frame, and the blowing device can be placed on the ground.

[0084] The air inlet of the first circulation air outlet duct 17 is connected to the air inlet of the dust collector 60 (the air inlet of the first circulation air outlet duct 17 is connected to a control valve), the air outlet of the dust collector 60 is connected to the air inlet of the circulation fan 61 through a connecting pipe, the air outlet of the circulation fan 61 is connected to the total air inlet connecting pipe head 421 of the condenser 40 through a connecting pipe, the total air outlet connecting pipe head 431 of the condenser 40 is connected to the air inlet of the first circulation air inlet duct 162 (the air inlet of the first circulation air inlet duct 162 is connected to a control valve), and the air outlet of the blowing device is connected to the air inlet of the cooling air inlet duct 14 through a connecting pipe. The blowing device can directly adopt the existing blower or other ventilation device known in the market, and the outside of the box is fixed, the top of the vertical air outlet pipe on the box is the air outlet, and the bottom of the vertical air outlet pipe is connected to the air outlet of the blower or other ventilation device, which will not be described in detail here. The box is provided with an air inlet that is connected to the air inlet of the blower or other ventilation device. The blower in the blowing device in this embodiment adopts a high-temperature magnetic suspension circulation fan with Chinese patent application number 202410001217.8, which will not be described in detail here.

[0085] A plurality of temperature sensors 3 and pressure sensors 4 are fixed to the front and rear of the left, middle and right parts of the top plate of the main box body 10. The sensing ends of the temperature sensors 3 and the pressure sensors 4 extend out of the bottom surface of the top plate of the inner box body 20 and detect the temperature and pressure of the inner box body 20.

[0086] The outlet end of the cooling gas outlet pipe 432 of the condenser 40 is connected to the air inlet connector of the negative pressure tank 50 through a connecting pipe, and a control valve for opening and closing is installed in the middle of the connecting pipe.

[0087] The dust collector 60 includes a dust collecting main box 62, a right air inlet connector 63 (the air inlet of the dust collector 60) is connected to the right side plate of the dust collecting main box 62, a left air outlet connector 64 (the air outlet of the dust collector 60) is connected to the left side plate of the dust collecting main box 62, a plurality of pyramid-shaped ash dropping cylinders 65 extending downward are connected to the bottom plate of the dust collecting main box 62, a cooling ring assembly 66 is connected to the bottom end of the ash dropping cylinder 65 at the discharge port, and a discharge control valve 67 is connected to the bottom end of the cooling ring assembly 66;

[0088] The outer side walls of the corresponding plurality of ash dropping cylinders 65 are fixed with a same connecting plate, on which a vibration motor 68 is fixed. In this embodiment, except for the ash dropping cylinder 65 at the leftmost end, the other ash dropping cylinders 65 are fixed with a same connecting plate.

[0089] In all ash dropping cylinders 65, the cross-section of their tops gradually decreases from right to left (the cross-sections of the tops of the two leftmost ash dropping cylinders 65 in this embodiment are basically the same or the leftmost one is slightly smaller than the cross-section of the bottom of the ash dropping cylinder 65 on its right), and a middle partition 621 is fixed in the dust removal main box 62 just above each ash dropping cylinder 65, and the front and rear side walls of the middle partition 621 are fixed on the inner side walls of the front and rear side plates of the dust removal main box 62, the top of the middle partition 621 is close to the bottom surface of the top plate of the dust removal main box 62, and the bottom of the middle partition 621 is close to the top of the corresponding ash dropping cylinder 65 (a plurality of Through hole), the top surface of the bottom plate of the dust removal main box 62 between each two adjacent dust dropping cylinders 65 is pressed against a filter screen plate 66, the front and rear parts of the filter screen plate 66 are inserted into the side guide grooves of the corresponding side support strips fixed on the inner side walls of the front and rear side plates of the dust removal main box 62, the top of the filter screen plate 66 is close to the bottom surface of the top plate of the dust removal main box 62, the middle part of the filter screen plate 66 is formed with a main middle through groove, the filter screen covers the main middle through groove and is fixed on the filter screen plate 66, the mesh number of all filter screen plates 66 gradually increases from right to left, that is, the mesh number of the filter screen on the right is less than that of the filter screen on the adjacent left part, and the aperture is larger. The filter screen plate 66 is set obliquely, and its upper part is inclined to the right. It can be replaced by opening the top plate and pulling the filter screen plate 66 upward, which is very convenient.

[0090] The top plate of the dust removal main box body 62 is fixedly connected to the outer annular edge fixed on the top outer wall of the dust removal main box body 62 by bolts, and a sealing strip is clamped between the outer annular edge and the bottom surface of the edge of the top plate of the dust removal main box body 62, which can be made of high-temperature resistant materials such as mica.

[0091] The cooling ring assembly 66 includes a main sleeve body 661, the top of which is fixed to the bottom of the bottom discharge port of the ash dropping cylinder 65 and communicated with the ash dropping cylinder 65, the bottom of which is fixed to the inlet of the discharge control valve 67 and communicated with the inlet of the discharge control valve 67, an outer annular sleeve body 662 is fixed to the outer side wall of the middle part of the main sleeve body 661 (the inner side wall of the middle through hole of the annular plate at the top and bottom of the outer annular sleeve body 662 is welded and fixed to the outer side wall of the main sleeve body 661), and the outer annular sleeve body 662 is fixed to the outer side wall of the middle part of the main sleeve body 661. The left and right walls are both connected with water connection heads, which are connected to the outer annular sleeve body 662. A plurality of heat-conducting copper sleeves 663 and a plurality of radially extending heat-conducting spacers 664 are inserted in the outer annular sleeve body 662. The inner side walls of all the heat-conducting copper sleeves 663 and the heat-conducting spacers 664 are clamped on the middle outer side wall of the main sleeve body 661. All the heat-conducting copper sleeves 663 and the heat-conducting spacers 664 are arranged at intervals, that is, the upper one is the heat-conducting copper sleeve 663, and the lower one is the heat-conducting spacer 664. Each heat-conducting spacer 664 is formed with a plurality of vertical through holes.

[0092] The first dust remover 300 and the dust remover 60 have the same structure and function, which will not be described in detail here.

[0093] A steam intake pipe 5 is fixed on the top plate of the left cover body 16 (four steam intake pipes 5 are provided in the accompanying drawings, and only one is required as needed, and the other three can be blocked when they are specifically connected), and the bottom end of the steam intake pipe 5 extends out of the bottom surface of the top plate of the left cover body 16, and an annular pipe 1631 is fixed to the middle part of the right side wall of the support frame 163 in the middle part of the left cover body 16, and extension pipes 1632 are fixed to the front side, the rear side, the top surface and the bottom surface of the annular pipe 1631, and the extension pipe 1632 is communicated with the annular pipe 1631, and the outer end of the extension pipe 1632 is closed, and each extension pipe 1632 is formed with a plurality of steam distribution holes, and a side connecting pipe is connected to one side of the annular pipe 1631, and the bottom end of the side connecting pipe is communicated with the bottom end of the corresponding steam intake pipe 5, and the transverse connecting shaft 18 is inserted into the annular pipe 1631.

[0094] Further, the condenser 40 includes a heat exchange body 410, a bottom air inlet shell 420 and an upper air outlet shell 430, wherein the heat exchange body 410 includes an upper shell 411 and a lower shell 412, a plurality of outer tubes 413 and a plurality of inner tubes 414 are located between the upper shell 411 and the lower shell 412, the inner tubes 414 are inserted into the corresponding outer tubes 413, and the top outer wall of the outer tube 413 is welded and fixed to the inner wall of the corresponding through hole on the bottom plate of the upper shell 411, and is connected to the bottom plate of the upper shell 411. The bottom end of the outer tube 413 is welded and fixed on the inner side wall of the corresponding through hole on the top plate of the lower shell 412, and is communicated with the corresponding through hole on the top plate of the lower shell 412. The top outer side wall of the inner tube 414 is welded and fixed on the inner side wall of the corresponding ventilation through hole formed on the top plate of the upper shell 411 and is communicated with the corresponding ventilation through hole. The bottom outer side wall of the inner tube 414 is welded and fixed on the inner side wall of the corresponding ventilation through hole formed on the bottom plate of the lower shell 412 and is communicated with the corresponding ventilation through hole.

[0095] An upper air outlet housing 430 is fixed on the top surface of the top plate of the upper housing 411, and the upper air outlet housing 430 is communicated with the ventilation hole of the upper housing 411. A bottom air inlet housing 420 is fixed on the bottom surface of the bottom plate of the lower housing 412, and the ventilation hole on the bottom plate of the lower housing 412 is communicated with the bottom air inlet housing 420.

[0096] A first heat exchange water outlet connecting pipe 4112 is connected to one side plate of the upper shell 411 , and a first heat exchange water inlet connecting pipe 4121 is connected to one side plate of the lower shell 412 .

[0097] Furthermore, a central through groove is formed in the middle of the bottom plate of the upper air outlet housing 430, and the central through groove is communicated with the inner cavity of the upper air outlet housing 30 and the ventilation through hole of the upper housing 411;

[0098] A central through groove is formed in the middle of the top plate of the bottom air intake shell 420 , and the central through groove is communicated with the inner cavity of the bottom air intake shell 420 and the ventilation through hole of the lower shell 412 .

[0099] Furthermore, a side plate of the upper air outlet shell 430 is connected with a total air outlet connecting pipe head 31, and the total air outlet connecting pipe head 431 is communicated with the inner cavity of the upper air outlet shell 430, and a side plate of the bottom air inlet shell 420 is connected with a total air inlet connecting pipe head 421, and the total air inlet connecting pipe head 421 is communicated with the inner cavity of the bottom air inlet shell 420.

[0100] Furthermore, a cooling gas outlet pipe 432 is connected to the middle of the bottom surface of the main outlet connecting pipe head 431 .

[0101] Furthermore, the cross-section of the inner cavity at the bottom of the bottom air intake shell 420 is triangular in shape, and the distance between the upper parts of the two inclined inner wall surfaces is smaller than the distance between the lower parts of the two inclined inner wall surfaces. The middle part of the bottom plate of the bottom air intake shell 420 is connected with a lower cylindrical body 422 extending downward, and the lower cylindrical body 22 is connected to the inner cavity of the bottom air intake shell 420. A lower conical discharge barrel portion 4221 is formed at the bottom end of the lower cylindrical body 422, and a liquid outlet connecting pipe 423 is connected to the bottom end of the lower conical discharge barrel portion 221, and an oil outlet pipe 424 is connected to the middle side plate of the lower cylindrical body 422.

[0102] Furthermore, a liquid level gauge 425 (which is a conventional structure and will not be described in detail here) is installed at the top of the lower cylindrical body 422 and the liquid outlet connecting pipe 23. The upper connecting pipe of the liquid level gauge 425 is fixed on the top outer wall of the lower cylindrical body 422 and communicates with the side through hole formed on the top outer wall of the lower cylindrical body 422, and the lower connecting pipe of the liquid level gauge 425 is fixed on the outer wall at the top of the liquid outlet connecting pipe 423 and communicates with the side through hole on the side wall at the top of the liquid outlet connecting pipe 423.

[0103] Furthermore, a liquid level sensor 426 is fixed on the outer side wall of the side plate of the lower cylindrical body 422 corresponding to the oil outlet pipe 424, and the sensing end of the liquid level sensor 426 extends into the lower cylindrical body 422. The horizontal position of the sensing end of the liquid level sensor 426 is slightly lower than the horizontal plane where the central axis of the oil outlet pipe 424 is located, generally lower than about 10 mm.

[0104] Furthermore, a first solenoid valve is installed in the middle of the oil outlet pipe 424 and the liquid outlet connecting pipe 423 .

[0105] All the oil cylinders in this embodiment are connected to the hydraulic system through connecting pipes, which is a conventional structure and will not be described in detail here.

[0106] All electrical equipment (including electrical components of the hydraulic system) are electrically connected to the control host through electrical connection lines, and are controlled and operated by the control host. This is a conventional structure and will not be described in detail here. All control valves in this embodiment can be electromagnetic control valves, which can achieve automatic control.

[0107] In this embodiment, asbestos insulation layers are fixed on the outer wall of the main box body 10 and the outer wall of the pipes and shells of all exposed components to ensure heat insulation and reduce heat loss during operation of the equipment.

[0108] The fans, blowers, etc. used in this embodiment are all high-temperature resistant fans, which can adopt a high-temperature magnetic levitation circulation fan with Chinese patent application number 202410001217.8, which will not be described in detail here.

[0109] When the present embodiment is in use, first, the push rods of all the clamping oil cylinders 33 are pushed so that all the hooks 34 are opened, and the door body 30 can be opened. Then, all the inner material discharging boxes 100 that need to be processed are moved to the left along the guide wheel 1003 on the corresponding guide rail 21, and all the inner material discharging boxes 100 are placed in the inner box body 20. The left side plate of the leftmost inner material discharging box 100 is pressed against the right end surface of the left end plate 11. Then, the door cover 165 is opened, and the transverse connecting shaft 18 is inserted into the corresponding middle through hole. The left end of the transverse connecting shaft 18 extends out of the left end of the corresponding middle through hole. A radially extending edge is formed on the outer side wall of the left end of the transverse connecting shaft 18. The right end surface of the radially extending edge is pressed against the left side wall of the support frame 163. The connecting shaft 18 is inserted into the middle ventilation connecting pipe 1001 corresponding to the middle part of all the inner discharge boxes 100, and its right end extends out of the through hole on the right side plate of the rightmost inner discharge box 100 and the middle through hole of the right baffle 1004 installed on the right side wall of the right side plate of the rightmost inner discharge box 100. Then, the pin 181 is inserted into the two corresponding positioning pin through holes and the radial through hole, and the pressing part formed on the top of the pin 181 presses on the top surface of the guide sleeve 1005. The screw connection part formed in the middle part of the right end face of the horizontal connecting shaft 18 extends out of the right end face of the guide sleeve 1005 and is screwed with two locking nuts pressed against each other, and the left end face of the locking nut on its left side presses against the right end face of the guide sleeve 1005 to achieve fixation;

[0110] Then, the control valve connected to the gas outlet of the nitrogen tank 80 is opened, and the control valve on the nitrogen inlet pipe 6 is opened, and the nitrogen enters the carbonization box 1000 from the gas inlet end of the nitrogen inlet pipe 6, and the gas in the inner box 20 of the carbonization box 1000 is discharged. Generally, the gas is inflated for a certain time (such as about 10 minutes), and then, after the door body 30 is closed, the push rods of all the pressing cylinders 33 will shrink, so that the hook 34 will flip back to its original position, and the door body 30 and the right door frame 12 are connected and fixed; at this time, the inner box 20 and the connected pipelines are filled with nitrogen, and then, the control valve connected to the gas outlet of the nitrogen tank 80 is closed, and the control valve on the nitrogen inlet pipe 6 is closed;

[0111] Then, the thermal energy furnace 200 is turned on, and the blower connected to its return air port is turned on to realize the circulation of nitrogen. Since the present application has two carbonization boxes 1000, the control valve at the first main connecting pipe 201 and the first main air inlet pipe 161 of the rear carbonization box 1000 is closed, and the control valve connecting the second main connecting pipe 202 and the air outlet end of the main air outlet pipe 13 of the rear carbonization box 1000 is closed, that is, the thermal energy furnace 200 at this time provides heat energy for the front carbonization box 1000.

[0112] It is heated by the thermal energy furnace 200, and the high-temperature nitrogen enters into the left cover body 16 from the first main air inlet pipe 161, and then enters into all the middle ventilation connecting pipes 1001, and then is discharged from the corresponding side air outlet holes and ends. The gas discharged from the side air outlet holes is blown onto the materials placed on the middle ventilation connecting pipe 1001 and the air guide pipe 1002, providing heat for heating, drying and carbonizing the materials. Then, part of it is discharged from the flow holes and the top of the inner discharge box 100, and part of it enters from the side air inlet holes of the air guide pipe 1002, and then is discharged from both ends of the air guide pipe 1002, thereby increasing the flow time of the hot air in the inner discharge box 100. Moreover, since the air guide pipe 1002 and the middle ventilation connecting pipe 1001 are staggered, the materials thereon are heated uniformly, thereby improving the uniformity of the carbonization and the effect.

[0113] During the heating process, nitrogen is passed through the spiral channel 1, and a control valve (which is a conventional structure and is omitted in the drawings) is connected to the top of the exhaust pipe 15. When it is closed, the blowing device stops running to ensure that the nitrogen in the spiral channel 1 does not flow. Of course, a control valve can be connected to the air outlet of the blowing device to communicate with the cooling air inlet pipe 14. When not in use, the control valve is closed (the control valve is not installed in this embodiment); when flushing nitrogen, nitrogen is introduced through the top of the exhaust pipe 15 (a connecting pipe on the nitrogen tank is connected to the control valve at the top of the exhaust pipe 15). When introducing nitrogen, the blowing device stops running. After the addition is completed, the control valve at the top of the exhaust pipe 15 is closed and the connected connecting pipe can be pulled out.

[0114] Then, the hot air in the inner box 20 flows back to the lower extension sleeve 131 from the side return air hole of the lower extension sleeve 131, and then flows into the main outlet pipe 13, and then flows from the main outlet pipe 13 to the first ash remover 300. After ash removal by the first ash remover 300, it returns from the first return air pipe 301 to the air inlet of the blower connected to the return air port of the thermal energy furnace 200, realizing a circulating flow, and then realizes circulating heating through the thermal energy furnace 200 to provide heat energy for the inner box 20; the bottom of the discharge control valve 67 at the bottom of the first ash remover 300 can be connected to a dust collection device such as a cloth bag to collect dust for treatment. This is a conventional structure and will not be described in detail here.

[0115] During this process, the control valve of the air intake pipe 600 is opened and closed at a fixed time, and oxygen is added to the inner box 20 at a fixed time and in a fixed quantity, so that the material can be burned fully.

[0116] After being heated to a certain temperature, such as 150° (the temperature is sensed by the temperature sensor 3 and the data is transmitted to the control host), the control valves provided at the main air outlet pipe 13 and the first main air inlet pipe 161 of the carbonization box 1000 at the front are closed, and the control valves provided at the main air outlet pipe 13 and the first main air inlet pipe 161 of the carbonization box 1000 at the rear are opened, so that the thermal energy furnace 200 provides heat for the carbonization box 1000 at the rear, and the remaining operations are the same as the heating process of the carbonization box 1000 at the front;

[0117] At this time, the control valve at the air inlet of the first circulation outlet pipe 17 of the front carbonization box 1000 is opened, and the control valve at the first circulation air inlet pipe 162 is opened. At the same time, the control valve of the air inlet pipe 600 continues to open and close regularly to quantitatively introduce oxygen into the left cover body 16, thereby providing oxygen to the inner box 20, so that the materials inside it are fully burned and carbonized. During the combustion process, the circulation fan 61 is operated to allow the hot air in the inner box 20 to enter the dust collector 60, and then enter the condenser 40 after dust removal. At this time, the cooling water in the condenser 40 does not flow, so the gas is not condensed, and then returns to the inner box 20 for combustion. When its temperature reaches 450°, the control valve of the air inlet pipe 600 is closed, oxygen stops being added, and the gas continues to flow;

[0118] During the entire heating process or gas circulation process, when the pressure is too high (when it exceeds 2 kPa, it is sensed by the pressure sensor 4), at this time, it is necessary to open the control valve on the connecting pipe connecting the outlet end of the cooling gas outlet pipe 432 of the condenser 40 and the air inlet connector of the negative pressure tank 50. At the same time, the cooling water in the condenser 40 flows. At this time, after the gas passes through the condenser 40, the gas temperature will be greatly reduced, and the water, oil and other substances in the hot gas will be discharged, and part of the gas discharged from the condenser 40 will enter the negative pressure tank 50 from the cooling gas outlet pipe 432 to be stored, thereby reducing the pressure of the inner box 20. When the pressure is less than 2 kPa, the control valve on the connecting pipe connecting the outlet end of the cooling gas outlet pipe 432 and the air inlet connector of the negative pressure tank 50 is closed. At this time, the control valve on the second branch exhaust pipe 57 is opened, and the second vacuum pump 59 is running, thereby sucking the gas absorbed in the negative pressure tank 50 into the first exhaust gas storage In the gas tank 700, when the first waste gas storage tank 700 is full, it will flow into the second waste gas storage tank 800. When the second waste gas storage tank 800 is full, the control valve on the connecting pipe connected to the gas connecting pipe of the thermal energy furnace 200 can be opened, so that the inhaled gas enters the gas connecting pipe of the energy furnace 200 and is used as an auxiliary fuel (the gas absorbed by the negative pressure tank 700 is the gas of material combustion, which contains a large amount of organic matter and other substances that can be used as auxiliary fuel), and also reduces emissions. At the same time, the operation of the second vacuum pump 59 can keep the negative pressure tank 50 in a negative pressure state. After running for a certain period of time, the second vacuum pump 59 stops running, the control valve on the connecting pipe connected to the gas connecting pipe of the thermal energy furnace 200 is closed, the control valve on the second branch exhaust pipe 57 is closed, and the control valve on the connecting pipe where the outlet end of the cooling gas outlet pipe 432 is connected to the air inlet connector of the negative pressure tank 50 is opened to continue to adsorb excess gas.

[0119] After running at 450° for a certain period of time, carbonization is basically completed, and the control valve at the second connecting pipe is opened, so that the carbon dioxide in the exhaust connector 401 of the carbon dioxide storage tank 400 can enter the corresponding first main air intake pipe 161, and then enter the inner box body 20). At the same time, steam is introduced into the steam intake pipe 5 (the steam is opened by the second angle seat valve of the corresponding fourth connecting pipe of the steam tank 500, and steam can be added to the steam intake pipe 5). The steam first enters the annular pipe 1631, and then is discharged from the multiple steam distribution holes on the extension pipe 1632 and enters the inner box body 20. Together with the carbon dioxide, the material in the inner discharge box 100 is activated. After a certain period of time, the activation is completed, and then the addition of steam and carbon dioxide is stopped.

[0120] Then, the temperature is lowered. When lowering the temperature, the control valve connected to the top of the exhaust pipe 15 is opened, the blowing device is turned on, the external gas is passed into the spiral channel 1, the nitrogen inside is discharged, and the main box body 10 and the inner box body 20 are quickly cooled. At this time, the control valves arranged at the main outlet pipe 13 and the first main air inlet pipe 161 are still closed. At the same time, the control valve at the air inlet of the first circulation outlet pipe 17 is still opened, the control valve at the first circulation air inlet pipe 162 is opened, and the circulation fan 61 is operated, so that the hot air in the inner box body 20 enters the dust collector 60, and after dust removal, enters the condenser 40 for condensation. At this time, the condenser 4 0 is still flowing, thereby continuing to cool the gas and materials in the inner box body 20 until the temperature drops to about 80°, then the door body 30 can be opened, and then the door cover 165 can be opened, the pin 181 can be pulled out, and the two locking nuts can be removed. Then, the transverse connecting shaft 48 can be pulled out to the left from the disassembly through-tube 164 (it is necessary to use a manipulator or a clamp to extend into the disassembly through-tube 164, and its end is screwed to the screwed portion at the left end of the transverse connecting shaft 48, and the transverse connecting shaft 48 can be pulled out by pulling outward). At this time, all the inner discharge boxes 100 can be removed from the inner box body 20. It is easy to operate and has a good use effect.

[0121] After one carbonization box 1000 is completed, the other carbonization box 1000 at the rear is operated in the same way. When the two carbonization boxes 1000 do not need the heat provided by the thermal energy furnace 200, the thermal energy furnace 200 can reduce the combustion volume, but it is still necessary to ensure that it is in a combustion state. Because, during the heating process from 150° to 450°, when the temperature in the carbonization box 1000 cannot be heated up any further, the corresponding two control valves need to be opened so that the gas in the inner box 20 of the corresponding carbonization box 1000 passes through the thermal energy furnace 200 again to achieve heating to increase its temperature. After running for a certain period of time, the corresponding two control valves are closed to achieve self-circulation of the carbonization box 1000 and the corresponding condenser 40 and dust collector 60 to continue heating.

[0122] In this embodiment, when the condenser 40 is in use, the first heat exchange water outlet connecting pipe 4112 is connected to the water return pipe, and the first heat exchange water inlet connecting pipe 4121 is connected to the cooling water outlet pipe, and the cooling water outlet pipe and the water return pipe are connected to a water-cooled chiller (which is a conventional structure and can be purchased directly, and will not be described in detail here), and the sum of the cross-sectional areas of the inner flow cavities of all inner tube bodies 414 is greater than or equal to the cross-sectional area of ​​the inner flow cavities of the total air outlet connecting pipe head 431 or the total air inlet connecting pipe head 421, and the cross-sectional areas of the inner flow cavities of the total air outlet connecting pipe head 431 and the total air inlet connecting pipe head 421 are equal.

[0123] The hot air from the furnace body enters from the main air inlet connecting pipe head 421, reaches the bottom air inlet shell 420, and then enters all the inner tube bodies 414. The cooling water enters the lower shell 412 from the first heat exchange water inlet connecting pipe 4121, and then enters the outer tube body 413, so that the gas in the inner tube body 414 and the water in the outer tube body 413 exchange heat, thereby cooling the gas. The cooled gas enters the upper air outlet shell 430, and then is discharged from the main air outlet connecting pipe head 431 and enters the inner box body 20.

[0124] The water after heat exchange enters the upper shell 411 and then flows out from the first heat exchange water outlet connecting pipe 4112;

[0125] Some water droplets or oil will be formed in the cooled gas, which will fall along the inner tube body 414 and enter the lower cylindrical body 422 from the lower part of the bottom air inlet shell 420. The liquid level in the lower cylindrical body 422 can be checked by the liquid level gauge 425. When the liquid exceeds the sensing end of the liquid level sensor 426 (the liquid level sensor 426 in this embodiment is a photoelectric liquid level sensor, which uses the principle of reflection and refraction of light at the interface of two different media to achieve sensing), the liquid is sensed by the sensing end of the liquid level sensor 426. When it senses the liquid, the control host receives the signal transmitted by the liquid level sensor 426 and processes it, and then opens the first solenoid valve at the oil outlet pipe 424 until the liquid level sensor 426 is filled. When liquid is sensed, the first solenoid valve at the oil outlet pipe 424 is closed, and then the control host controls the first solenoid valve at the liquid outlet connecting pipe 423 to open, so that water can flow out from the liquid outlet connecting pipe 423. It is usually opened for about 60 seconds. The liquid level gauge 425 is also manually observed. According to the decrease in the liquid level of the liquid level gauge 425, the first solenoid valve at the liquid outlet connecting pipe 423 is manually closed. The oil and part of the water above the sensing end of the liquid level sensor 426 can be discharged from the oil outlet pipe 424 (usually it is oil, and occasionally there will be part of water, but it will not affect the discharge); the rest of the water is discharged from the liquid outlet connecting pipe 423 (a small amount of oil may occasionally be mixed in the liquid outlet connecting pipe 423, but it will not affect the discharge).

[0126] The liquid discharged from the liquid outlet connecting pipe 423 and the oil outlet pipe 424 can be subsequently processed and reused.

[0127] It can automatically discharge the water and oil generated by cooling in real time, reduce accumulation, ensure the normal operation of the equipment, and have a good use effect. Among them, the oil outlet pipe 424 and the liquid outlet connecting pipe 423 can be connected to the discharge tank to store the discharged liquid.

[0128] When the dust collector 60 of this embodiment is in use, after the hot air enters from the right air inlet connector 63, it is blocked by multiple middle partitions 621 to increase the circulation time in the dust collector 60 (wherein, multiple through holes are formed on the middle partition 621, so as to ensure that the hot air can flow out from the through holes and achieve guidance), and then, after being filtered by the filter screens of all the filter screens 66 with gradually increasing mesh numbers, the dust particles of corresponding sizes can fall into the corresponding dust collection cylinder 65, and the discharge control valve 67 at the bottom thereof is opened, so that the dust can fall into the discharge control valve 67 at the bottom thereof. The storage bag is a conventional structure and will not be described in detail here. Before the dust is discharged from the discharge control valve 67, it passes through the cooling ring assembly 66. One end of the two water-passing connectors of the cooling ring assembly 66 is connected to the water inlet pipe and the other end is connected to the water outlet pipe (the water inlet pipe and the water outlet pipe are connected to a water-cooled chiller, which is a conventional structure and can be directly purchased and will not be described in detail here), so that cooling water passes through the cooling ring assembly 66, and the dust passing through the cooling ring assembly 66 is cooled to ensure that the temperature of the dust entering the storage bag is not high, and the safety is high.

[0129] At the same time, when in use, the timed vibration of the vibration motor 68 can prevent dust accumulation in the dust collection tube 65 and ensure normal material dropping. At the same time, the vibration is transmitted to the dust removal main box 62, and the corresponding filter screen plate 66 can also be vibrated, so that the accumulated dust placed thereon will not fall off, thereby improving the dust removal effect.

[0130] In this embodiment, the first vacuum pump 58 is used when the negative pressure tank 50 is repaired and maintained or is shut down. The control valve of the first sub-exhaust pipe 56 needs to be opened, and the first vacuum pump 58 is turned on to achieve air extraction, so as to discharge the gas in the negative pressure tank 50 and achieve negative pressure to ensure that there is no other gas inside. Then, the control valve of the first sub-exhaust pipe 56 is closed to complete the air extraction. This operation is to prevent the negative pressure tank 50 from mixing with the subsequent gas during subsequent use due to the mixture of air and combustion or even explosion, thereby improving the safety protection effect.

Claims

1. A carbonization system, comprising a thermal furnace (200) and at least one carbonization box (1000), characterized in that: The circulating hot gas outlet of the thermal energy furnace (200) is connected to a first main connecting pipe (201); an outlet of the first main connecting pipe (201) is connected to a first main air inlet pipe (161) of the carbonization box (1000) through a control valve; an outlet end of the main air outlet pipe (13) of the carbonization box (1000) is connected to an air inlet of a second main connecting pipe (202) through a control valve; an outlet of the second main connecting pipe (202) is connected to an air inlet end of a first ash remover (300); an outlet end of the first ash remover (300) is connected to one end of a first return air pipe (301); and the other end of the first return air pipe (301) is connected to an air inlet of a blower connected to the return air outlet of the thermal energy furnace (200); A carbon dioxide gas storage tank (400) is provided on one side of the carbonization box (1000), the air inlet of the carbon dioxide gas storage tank (400) is connected to the air outlet of the first blower, the air inlet of the first blower is connected to one end of a first connecting pipe, the other end of the first connecting pipe is fixed to the side plate of the main exhaust pipe (203) of the thermal energy furnace (200) and is connected to the side through hole on the side plate of the main exhaust pipe (203), and a control valve for controlling air intake is installed in the first connecting pipe; The carbon dioxide gas storage tank (400) is connected to an exhaust connector (401), which is fixed to the side wall of the first main air intake pipe (161) through a second connecting pipe and communicates with a corresponding side through hole on the side wall of the first main air intake pipe (161), and a control valve for controlling the exhaust is installed on the second connecting pipe; A steam tank (500) is fixed or placed on the ground at one side of the thermal energy furnace (200); a gas outlet is connected to the side wall of the steam cylinder (205) at the bottom of the thermal energy furnace (200); the gas outlet is connected to the gas inlet of the steam tank (500) via a third connecting pipe; a first angle seat valve with a solenoid valve is installed on the third connecting pipe; the gas outlet of the steam tank (500) is connected to the steam inlet pipe (5) of the carbonization box (1000) via a fourth connecting pipe; a second angle seat valve with a solenoid valve is installed on the fourth connecting pipe; An air intake pipe (600) is connected to the side wall of the first main air intake pipe (161), a control valve is installed on the air intake pipe (600), and an air intake end of the air intake pipe (600) is connected to an air source.

2. A carbonization system according to claim 1, characterized in that: Two carbonization boxes (1000) are fixed on the ground at the right side of the thermal energy furnace (200); the first main connecting pipe (201) is a three-way connecting pipe; the two air outlets of the first main connecting pipe (201) are respectively connected to the first main air inlet pipes (161) of the two carbonization boxes (1000) through control valves; The second main connecting pipe (202) is a three-way connecting pipe, and the gas outlet ends of the main gas outlet pipes (13) of the two carbonization boxes (1000) are connected to a corresponding gas inlet of the second main connecting pipe (202) through a control valve.

3. A carbonization system according to claim 2, characterized in that: The carbon dioxide gas storage tank (400) is connected to two exhaust connectors (401), and the exhaust connectors (401) are fixed to the side wall of the first main air intake pipe (161) of the corresponding carbonization box (1000) through a second connecting pipe and communicate with the corresponding side through holes on the side wall of the first main air intake pipe (161) of the corresponding carbonization box (1000).

4. A carbonization system according to claim 2, characterized in that: A plurality of upper through holes are formed on the bottom plate of the exhaust gas exhaust shell (206) at the bottom of the thermal energy furnace (200), the tops of a plurality of vertical exhaust pipes 207 are inserted into the corresponding upper through holes, and the outer side walls thereof are welded and fixed to the inner side walls of the corresponding upper through holes, an exhaust gas transition shell 208 is arranged below all the vertical exhaust pipes 207, a plurality of lower through holes are formed on the top plate of the exhaust gas transition shell 208, the bottoms of all the vertical exhaust pipes 207 are inserted into the corresponding lower through holes, and the outer side walls of the bottoms of all the vertical exhaust pipes 207 are welded and fixed to the inner side walls of the corresponding lower through holes A steam cylinder (209) is welded and fixed to the bottom surface of the bottom plate of the bottom exhaust gas exhaust shell (206), and the bottom end of the steam cylinder (209) is welded and fixed to the top surface of the top plate of the exhaust gas transition shell 208. All the vertical air outlet pipes 207 are in the steam cylinder (209). A gas outlet end is connected to one side wall of the steam cylinder (209), and a water inlet end is connected to the other side wall. A main exhaust pipe (203) is fixed to the top surface of the top plate of the exhaust gas transition shell 208, and the main exhaust pipe (203) is connected to a through hole formed on the top plate of the exhaust gas transition shell 208.

5. A carbonization system according to claim 1, characterized in that: A nitrogen inlet pipe (6) is connected to the side wall of the first main inlet pipe (161), and an inlet end of the nitrogen inlet pipe (6) is connected to an outlet end of a control valve connected to an outlet of a nitrogen tank (80) on one side of the carbonization box (1000), and a control valve is installed on the nitrogen inlet pipe (6).

6. A carbonization system according to claim 2, characterized in that: A condenser (40) and a dust collector (60) are installed on one side of the two carbonization boxes (1000); the air outlet of the first circulation air outlet pipe (17) of the carbonization box (1000) is connected to the air inlet of the corresponding dust collector (60) through a connecting pipe; a control valve is connected between the connecting pipe and the air outlet of the first circulation air outlet pipe (17); the air outlet of the dust collector (60) is connected to the air inlet of the circulation fan (61) through a connecting pipe; the air outlet of the circulation fan (61) is connected to the total air inlet connecting pipe head (421) of the condenser (40) through a connecting pipe; the total air outlet connecting pipe head (431) of the condenser (40) is connected to the air inlet of the first circulation air inlet pipe (162) of the corresponding carbonization box (1000) through a connecting pipe; and a control valve is connected between the air inlet of the first circulation air inlet pipe (162) and the connecting pipe.

7. A carbonization system according to claim 6, characterized in that: A negative pressure tank (50) is provided above the carbonization box (1000), and the outlet end of the cooling gas outlet pipe (432) of the condenser (40) is connected to the air inlet connector of the negative pressure tank (50) through a connecting pipe, and a control valve is installed on the connecting pipe.

8. A carbonization system according to claim 7, characterized in that: The two negative pressure tanks (50) are both connected to an air extraction pipe (55), and a control valve is installed on the air extraction pipe (55). The air outlet ends of the two air extraction pipes (55) are connected to two ends of a three-way connector, and another end of the three-way connector is connected to one end of a fifth connecting pipe, and the other end of the fifth connecting pipe is connected to one end of a second three-way connector. The other two ends of the second three-way connector are respectively connected to a first sub-extraction pipe (56) and a second sub-extraction pipe (57). The first sub-extraction pipe (56) The other end of the second branch exhaust pipe (57) is connected to the air inlet of the first vacuum pump (58), the air outlet of the first vacuum pump (58) is communicated with the outside, the other end of the second branch exhaust pipe (57) is connected to the air inlet of the second vacuum pump (59), the air outlet of the second vacuum pump (59) is communicated with the air inlet of the first waste gas storage tank (700) placed or fixed around the carbonization box (1000) through a connecting pipe, and control valves are installed on the first branch exhaust pipe (56) and the second branch exhaust pipe (57).

9. A carbonization system according to claim 8, characterized in that: A second waste gas storage tank (800) is vertically arranged on one side of the first waste gas storage tank (700), and the gas outlet end of the first waste gas storage tank (700) is connected to the gas inlet of the second waste gas storage tank (800) through a connecting pipe.

Citation Information

Patent Citations

  • Efficient hot air equipment with precise oxygen distribution in pipe and two-stage catalytic combustion

    CN113028419A

  • High-temperature magnetic suspension circulating fan

    CN117703795A

  • Process and system for manufacturing synthesis gas from biomass by carbonization

    CN101818081A

  • System and method for preparing activated carbon by energy cyclic utilization of waste tires

    CN106698421A

  • Internal-heated drum heat storage wall pulverized coal pyrolysis technology and device

    CN106753492A

Cited By

  • Carbonization box body

    CN119614216A

  • A carbonization chamber

    CN119614216B

  • Preparation method of biomass sodium ion battery hard carbon negative electrode material and product

    CN121823534A

  • Method for synergistically producing hard carbon and green methanol by moso bamboo carrying biomass solid waste

    CN122010088A