Construction method of villa group internal road and garage ramp

By accurately measuring and adjusting the roads and garage ramps inside the villa group, the problem of mismatch between the road elevation and the villa elevation is solved, the reasonable design of the garage slope is achieved, and the convenience of vehicle entry and exit and the traffic safety of the community is improved.

CN119686183APending Publication Date: 2025-03-25CHINA MCC20 GRP CORP LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411914727.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

In the road planning and design of the villa group, the terrain characteristics were not fully considered, resulting in the mismatch between the road elevation and the villa elevation, resulting in the excessive slope of the underground garage and the inability to enter and exit the garage smoothly, affecting traffic flow and safety.

Method used

By measuring the elevation of the garage floor of each villa, adjusting the elevation and dimensions of the garage ramps, roads, and ensuring that the slope meets the preset conditions. If not, borrow the road in front of the garage ramp for slope, adjust the road elevation according to the positive and negative zero elevation of the villa, draw cross-sectional and floor plans of the road and garage ramps, establish construction wire networks and level control points, and conduct earth excavation and construction of cement concrete surface layers.

Benefits of technology

It achieves accurate matching between the road elevation and the villa elevation, reduces the steepness of the garage slope, improves the convenience and safety of vehicles entering and exiting the garage, and improves the overall traffic flow and safety of the community.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686183A_ABST
    Figure CN119686183A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a villa group internal road and garage ramp construction method, which comprises the following steps: measuring the elevation of the garage ground of each villa, adjusting the garage ramp and road elevation and size according to the measured data, judging whether the gradient of the adjusted garage ramp meets a preset gradient condition or not, and if yes, judging whether the gradient of the adjusted garage ramp meets the preset gradient condition; if not, a road in front of the garage ramp is used for slope making, meanwhile, the elevation of the road close to the borrowing road is adjusted according to the positive and negative zero elevation of each villa, and then the cross-section diagrams and planar diagrams of the internal road and the garage ramp are drawn; establishing a construction conductor network, laying level control points, releasing middle lines of roads and garage ramps, and setting elevation control points of a base layer surface; according to the construction method, the road elevation can be accurately matched with the villa elevation, and therefore a more convenient and safer travel environment is provided for residents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method for internal roads and garage ramps of a villa complex. Background Art

[0002] At present, many villa complexes, especially townhouse complexes, are built along the mountains and rivers, following the undulating terrain. Each villa has a different positive and negative zero elevation. However, in the process of road planning and design in the community, this terrain feature was not fully taken into account, resulting in the elevation of the road and the elevation of each villa not being scientifically and reasonably matched.

[0003] Specifically, due to the lack of accurate grasp and careful consideration of the terrain, the elevation of the internal road failed to form a smooth transition and connection with the elevation of the villa. This design defect directly led to the excessive slope of the underground garage ramp, which far exceeded the safe range for normal vehicle entry and exit. In actual use, many vehicles were unable to enter and exit the garage smoothly due to the steep slope, which not only brought great inconvenience to residents' daily travel, but also seriously affected the overall traffic fluency and safety of the community.

[0004] Therefore, in response to this problem, the present invention provides a construction method for internal roads and garage ramps of a villa complex. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention discloses a construction method for internal roads and garage ramps of a villa complex, so as to solve the problem that the elevation of the internal roads of the villa complex fails to form a smooth transition and connection with the elevation of the villas, resulting in the slope of the underground garage ramp being too large and vehicles being unable to smoothly enter and exit the garage.

[0006] A construction method for internal roads and garage ramps of a villa complex comprises the following steps:

[0007] Step S1, measuring the elevation of the garage floor of each villa, and adjusting the garage ramp, road elevation and size according to the measurement data, judging whether the slope of the adjusted garage ramp meets the preset slope condition, if not, using the road in front of the garage ramp for slope reduction, and adjusting the elevation of the road adjacent to the borrowed road according to the positive and negative zero elevation of each villa, and then drawing the cross-section and plan view of the internal road and garage ramp;

[0008] Step S2, after establishing a construction wire network on the internal road and garage ramp according to the cross-sectional view and the plan view, and arranging the leveling control points, the center line of the road and the garage ramp is laid out according to the construction wire network and the leveling control points, and a center pile and a pair of side piles are arranged at a first preset distance in the longitudinal direction, and the fill and excavation elevation lines are marked on the center pile and the side piles respectively, and the elevation control points of the base surface are arranged at a second preset distance according to the longitudinal slope and the transverse slope;

[0009] Step S3: excavate the earthwork, and construct a 18 cm thick graded crushed stone subbase on the internal road and garage ramp according to the elevation control points of the fill and excavation elevation line and the base surface;

[0010] Step S4, continuing the construction process of the cement concrete surface layer, and after performing two plastering constructions, grooving is performed to form a plurality of grooves on the cement concrete surface layer;

[0011] Step S5, maintaining the cement concrete surface layer.

[0012] Step S6, forming longitudinal joints, contraction joints and expansion joints on the surface of the cement concrete surface layer, applying asphalt in the longitudinal joints, and filling asphalt sand in the contraction joints and expansion joints.

[0013] In some of the embodiments, in the process of using the road in front of the garage ramp for slope reduction, the width of the borrowed road is 1m~1.5m.

[0014] In some of the embodiments, the preset slope condition is a slope less than 17%.

[0015] In some embodiments, the first preset distance and the second preset distance are both 8-12 m.

[0016] In some of the embodiments, a level is used to mark the fill and excavation elevation lines on the center pile and the side piles respectively.

[0017] In some of the embodiments, in step S4, a steel-wood composite formwork is used to construct the cement concrete surface layer, the steel-wood composite formwork is made of channel steel and wooden formwork, and the wooden formwork is used at the arc portion of the steel-wood composite formwork.

[0018] In some embodiments, the thickness of the cement concrete surface layer is 18 to 22 cm.

[0019] In some of the embodiments, during the two plastering construction processes:

[0020] The first plastering construction is carried out immediately after the concrete surface layer is leveled to remove the seepage water and press down the stones;

[0021] The second finishing work must be carried out when the concrete is in the initial setting state but the surface is still moist.

[0022] In some embodiments, the groove has a depth of 2-4 mm, a width of 3-5 mm, and a spacing between adjacent grooves of 15-25 mm.

[0023] In some of the embodiments, the curing time of the cement concrete surface layer is 14 to 21 days.

[0024] Compared with the prior art, the above invention has one of the following advantages or beneficial effects:

[0025] 1. The construction method of the internal roads and garage ramps of the villa complex in the present invention can accurately match the elevation of the road with the elevation of the villa, thereby providing residents with a more convenient and safe travel environment.

[0026] 2. The construction method provided by the present invention has the advantages of simple operation, fast construction speed and guaranteed quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.

[0028] Figure 1 It is a flow chart of the construction method of the internal road and garage ramp of the villa complex in the embodiment of the present invention;

[0029] Figure 2 It is a construction plan view of part of the road and garage ramp in an embodiment of the present invention.

[0030] Figure 3 A table of elevation and slope adjustment data of some roads in an embodiment of the present invention; DETAILED DESCRIPTION

[0031] The present invention is further described below with reference to the accompanying drawings and specific embodiments, but is not intended to be a limitation of the present invention.

[0032] like Figure 1 As shown, the present invention discloses a construction method for internal roads and garage ramps of a villa complex. Specifically, the construction method comprises the following steps:

[0033] Step S1, measure the elevation of the garage floor of each villa, and adjust the garage ramp, road elevation (focus on adjusting the road elevation in front of the garage) and size according to the measured data, and judge whether the slope of the adjusted garage ramp meets the preset slope condition. The preset slope condition is that the slope is less than 17%. If it does not meet the preset slope condition, the road in front of the garage ramp is used for slope reduction. Specifically, in the process of using the road in front of the garage ramp for slope reduction, the width of the borrowed road 1 is 1m~1.5m, such as Figure 2 As shown; at the same time, the elevation of the road adjacent to borrowed road 1 is adjusted according to the positive and negative zero elevation of each villa, specifically to determine the longitudinal slope and slope length of the road to change the slope ( Figure 22 is the slope change line), in order to reduce the driving safety hazards caused by excessive slope changes, a smooth transition section is set between different slopes, such as the slope change line 2 (point), by adjusting the elevation and using a gradual change method, the bumpy feeling when the vehicle passes through is reduced and the driving comfort is improved; so that other roads and the borrowed roads are smoothly transitioned, and the slope of each villa garage ramp meets the requirements. The table after adjusting the data is as follows Figure 3 As shown, then draw the cross-section and plan views of the internal roads and garage ramps.

[0034] Step S2, re-survey the survey points, and after establishing a construction wire network on the internal road and garage ramp according to the cross-section diagram and the plan view, and arranging the leveling control points, lay out the center line of the road and garage ramp according to the construction wire network and the leveling control points, and set a center pile and a pair of side piles every 8 to 12 m (for example, 8 m, 9 m, 10 m or 12 m) longitudinally, and use a level to mark the fill and excavation elevation lines on the center pile and the side pile respectively, and set the elevation control points of the base surface every 8 to 12 m (for example, 8 m, 9 m, 10 m or 12 m) according to the longitudinal slope and the transverse slope.

[0035] Step S3 is to carry out earth excavation, and to construct an 18 cm thick graded crushed stone subbase on the internal road and garage ramp according to the fill and excavation elevation line and the elevation control points of the base surface, and then use a roller to compact it.

[0036] Step S4, continue the construction process of cement concrete surface layer; wherein, C25 commercial concrete is poured with a horizontal slope of 1.5%; after concrete vibration and leveling, two surface finishing constructions are carried out, and after two surface finishing constructions, groove drawing operation (grooving in the horizontal direction) is carried out to form multiple grooves of a certain depth and width on the cement concrete surface layer, so as to improve the anti-skid performance of the road surface, improve the drainage performance, reduce noise, and extend the service life. The groove depth of the cement concrete surface layer is 2~4mm, the width is 3~5mm, and the spacing between adjacent grooves is 15~25mm. Specifically, the construction process of the cement concrete surface layer is carried out using a steel-wood composite formwork, which is made of channel steel and wooden formwork, and the arc of the steel-wood composite formwork adopts a wooden formwork; the thickness of the cement concrete surface layer is 18~22cm.

[0037] During the two-time plastering construction process: the first plastering construction is carried out immediately after the concrete surface layer is leveled, to remove the seepage water and press down the stones; the second plastering construction must be carried out when the concrete seepage water is in the initial setting state but the surface is still moist.

[0038] Step S5, curing the cement concrete surface layer; and the curing time of the cement concrete surface layer is 14 to 21 days.

[0039] Step S6, forming longitudinal joints, contraction joints and expansion joints on the surface of the cement concrete surface layer, wherein the contraction joint is 10 mm wide and is sawed every 4 m; the expansion joint is 20 mm wide and is set every 32 m, and asphalt is applied in the longitudinal joint, and asphalt sand is filled in the contraction joint and expansion joint.

[0040] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.

[0041] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.

Claims

1. A construction method for internal roads and garage ramps in a villa complex, characterized in that: The steps include: Step S1, measuring the elevation of the garage floor of each villa, and adjusting the garage ramp, road elevation and size according to the measured data, judging whether the slope of the adjusted garage ramp meets the preset slope condition, if not, using the road in front of the garage ramp for slope reduction, and adjusting the elevation of the road adjacent to the borrowed road according to the positive and negative zero elevation of each villa, and then drawing the cross-section and plan view of the internal road and garage ramp; Step S2, after establishing a construction wire network on the internal road and garage ramp according to the cross-sectional view and the plan view, and arranging the leveling control points, the center line of the road and the garage ramp is laid out according to the construction wire network and the leveling control points, and a center pile and a pair of side piles are arranged at a first preset distance in the longitudinal direction, and the fill and excavation elevation lines are marked on the center pile and the side piles respectively, and the elevation control points of the base surface are arranged at a second preset distance according to the longitudinal slope and the transverse slope; Step S3: excavate the earthwork, and construct a 18 cm thick graded crushed stone subbase on the internal road and garage ramp according to the elevation control points of the fill and excavation elevation line and the base surface; Step S4, continuing the construction process of the cement concrete surface layer, and after performing two plastering constructions, grooving is performed to form a plurality of grooves on the cement concrete surface layer; Step S5, maintaining the cement concrete surface layer; Step S6, forming longitudinal joints, contraction joints and expansion joints on the surface of the cement concrete surface layer, applying asphalt in the longitudinal joints, and filling asphalt sand in the contraction joints and expansion joints.

2. The construction method of the internal road and garage ramp of the villa complex as claimed in claim 1, characterized in that: In the process of slope reduction using the road in front of the garage ramp, the width of the borrowed road is 1m~1.5m.

3. The construction method of the internal road and garage ramp of the villa complex as claimed in claim 1, characterized in that: The preset slope condition is that the slope is less than 17%.

4. The construction method of the internal road and garage ramp of the villa complex as claimed in claim 1, characterized in that: The first preset distance and the second preset distance are both 8-12 m.

5. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: A level is used to mark the fill and excavation elevation lines on the center pile and the side piles respectively.

6. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: In the step S4, a steel-wood composite formwork is used to construct the cement concrete surface layer. The steel-wood composite formwork is made of channel steel and wooden formwork, and the wooden formwork is used at the arc portion of the steel-wood composite formwork.

7. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: The thickness of the cement concrete surface layer is 18 to 22 cm.

8. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: During the two plastering construction processes: The first plastering construction is carried out immediately after the concrete surface layer is leveled to remove the seepage water and press down the stones; The second finishing work must be carried out when the concrete is in the initial setting state but the surface is still moist.

9. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: The depth of the groove is 2-4 mm, the width is 3-5 mm, and the spacing between adjacent grooves is 15-25 mm.

10. The construction method of the internal road and garage ramp of a villa complex as claimed in claim 1, characterized in that: The curing time of cement concrete surface layer is 14 to 21 days.

Citation Information

Patent Citations

  • Variable-slope combined-type emergency escaping lane

    CN106012724A

  • A construction method for an underground garage

    CN107313454A

  • Urban road pedestrian passageway barrier-free structure

    CN110029547A

  • Excavation method for arranging deslagging shortcut in steep cliff skewback slope area

    CN112459076A

  • Underground garage floor drainage ditch construction method

    CN115419155A