Modularized steel structure wedge nail tenon type connection node structure

By setting "cross" grooves and perforations on the side walls of the steel structure module, and using the tenon plate and dowel to connect the tenon, the problems of steel labor-intensive, low safety and poor flexibility in the traditional bolt connection method are solved, and the fastening and easy disassembly and assembly connection between the steel structure modules is achieved.

CN119686452AActive Publication Date: 2025-03-25CHINA CONSTR SCI & IND CORP LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510002480.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-03-25
Estimated Expiration
2045-01-02

AI Technical Summary

Technical Problem

In existing steel structure buildings, the traditional bolt connection method has problems such as labor-intensive steel, low safety and poor flexibility, making it difficult to achieve fastening and easy disassembly and assembly connection between steel structure modules.

Method used

The modular steel structure is adopted to connect the node structure with wedge-spike and tenon. By setting "cross" grooves and perforations on the side walls of the steel structure module, and using tenon plates and dowels to connect the mortise and tenon, the tightening and easy disassembly between the modules are achieved.

Benefits of technology

The fastening connection between steel structure modules is realized without welding or screwing, which reduces the labor intensity and labor costs of workers, and is easy to disassemble and reuse, improving flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686452A_ABST
    Figure CN119686452A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel structure buildings, and discloses a modular steel structure wedge nail tenon type connection node structure which is applied to connection of a first steel structure module and a second steel structure module, and a first cross-shaped groove and a second cross-shaped groove are formed in the end faces, facing each other, of the first steel structure module and the second steel structure module correspondingly. A first penetrating hole and a second penetrating hole are formed in the positions, corresponding to the first cross-shaped groove and the second cross-shaped groove, of the two side walls of the first steel structure module and the second steel structure module respectively in a penetrating mode. The connecting joint structure comprises a tenon plate, and the first end and the second end of the tenon plate are used for being inserted into the first cross-shaped groove and the second cross-shaped groove correspondingly. A first connecting hole and a second connecting hole are formed in the positions, corresponding to the first penetrating hole and the second penetrating hole, of the tenon plate in a penetrating mode. According to the connecting structure, welding or screwing is not needed in the whole assembling process, and the labor intensity of workers is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structure buildings, and in particular to a modular steel structure wedge-nail-mortise and tenon type connection node structure. Background Art

[0002] Prefabricated steel structure building is a new type of construction technology, which is characterized by the use of prefabricated steel structure modules, which are assembled on site. The main connection method between traditional steel structure modules is bolt connection. Bolt connection requires a large operating space on site, and the number of bolts required is large, which is labor-intensive, low in safety, and poor in flexibility. The reasons are as follows: 1) The forces between the components of the bolt connection node are complex. Therefore, when designing the connection node, for safety reasons, more bolts need to be set. Too many bolts consume more bolts, increase steel costs, extend construction time, and increase labor costs. 2) Too many bolts are set at the connection, indicating that there are too many openings. Too many openings lead to stress concentration and uneven force at the node, and low safety; 3) Bolt connection nodes are difficult to install and disassemble, and have poor flexibility. Therefore, there is an urgent need for a connection structure that can connect steel structure modules tightly and is easy to disassemble. Summary of the invention

[0003] In view of this, the present invention provides a modular steel structure wedge-nail-tenon type connection node structure to solve the problem of lack of a connection structure that can connect steel structure modules tightly and easily be disassembled.

[0004] The present invention provides a modular steel structure wedge-nail-tenon type connection node structure, which is used to connect modular steel structures, wherein the modular steel structure comprises a first steel structure module and a second steel structure module arranged in sequence along a first direction, wherein a first cross groove is arranged in one end of the first steel structure module facing the second steel structure module, and first through-holes are penetrated in both side walls of the first steel structure module corresponding to the transverse portion of the first cross groove, and a second cross groove is arranged in one end of the second steel structure module facing the first steel structure module, and second through-holes are penetrated in both side walls of the second steel structure module corresponding to the transverse portion of the second cross groove; the wedge-nail-tenon type connection node structure comprises:

[0005] The tenon plate has a first end along the first direction for inserting into the transverse portion of the first cross groove, and a second end for inserting into the transverse portion of the second cross groove; a first connection hole is provided through the side wall of the first end of the tenon plate at a position corresponding to the first through hole; a second connection hole is provided through the side wall of the second end of the tenon plate at a position corresponding to the second through hole;

[0006] a first tenon, tenoned to the first through hole and the first connecting hole;

[0007] The second tenon is tenon-joined with the second through hole and the second connecting hole.

[0008] A modular steel structure wedge-nail-tenon connection node structure according to the present invention has at least the following beneficial effects:

[0009] The first through-hole and the second through-hole are respectively provided on the side walls of the first steel structure module and the second steel structure module corresponding to the transverse part of the first cross groove and the transverse part of the second cross groove, and the first connecting hole and the second connecting hole are respectively provided at the positions of the tenon plate corresponding to the first through-hole and the second through-hole. When the first steel structure module and the second steel structure module need to be assembled, it is only necessary to first insert the first end of the tenon plate into the transverse part of the first cross groove so that the first connecting hole and the first through-hole are aligned, and then the first tenon is inserted into the first through-hole and the first connecting hole in a mortise and tenon connection manner, and then the second end of the tenon plate is inserted into the second cross groove. The second connecting hole and the second through hole are aligned with each other, and finally the second tenon is inserted into the second through hole and the second connecting hole in a mortise and tenon connection manner, so that the first steel structure module and the second steel structure module can be assembled into one. The whole assembly process does not require welding or screwing, which reduces the labor intensity of workers and saves labor costs. When the first steel structure module and the second steel structure module need to be separated, only the first tenon needs to be pulled out from the first through hole and the first connecting hole, and the second tenon needs to be pulled out from the second through hole and the second connecting hole to achieve lossless disconnection. It is easy to disassemble and reuse, and has high flexibility.

[0010] In an optional embodiment, both side walls of the first steel structure module are penetrated with third holes at positions corresponding to the longitudinal portion of the first cross groove, and the third holes are used for the mortise and tenon joints of the first tenon; both side walls of the second steel structure module are penetrated with fourth holes at positions corresponding to the longitudinal portion of the second cross groove, and the fourth holes are used for the mortise and tenon joints of the second tenon; the first end of the tenon plate is also used to be inserted into the longitudinal portion of the first cross groove, and the second end of the tenon plate is also used to be inserted into the longitudinal portion of the second cross groove.

[0011] In an optional embodiment, two of the first steel structure modules and the second steel structure modules are provided, and the two first steel structure modules are arranged in sequence along the second direction, and the first direction and the second direction are perpendicular to each other; the end surfaces of the two first steel structure modules facing the second steel structure modules are penetrated along the second direction to form a first installation groove, and the first installation groove is connected with the transverse part of the first "cross" groove; the end surfaces of the two second steel structure modules facing the first steel structure modules are penetrated along the second direction to form a second installation groove, and the second installation groove is connected with the transverse part of the second "cross" groove, and the second installation groove and the first installation groove are correspondingly arranged and enclosed to form a first installation hole; the first ends of the two tenon plates are respectively inserted into the two first "cross" grooves, and the two tenon plates are arranged in an "I" shape, and the tenon plates are penetrated with a fifth through-hole along the length direction of the tenon plates; the wedge-nail-tenon type connection node structure also includes a third tenon arranged parallel to the second direction, and the third tenon is used for coaxial tenoning with the first mounting hole and the fifth through-hole.

[0012] In an optional embodiment, two of the first steel structure modules and the second steel structure modules are provided, and the two first steel structure modules are arranged in sequence along the second direction; the end surfaces of the two first steel structure modules facing the second steel structure modules are penetrated along the second direction to form a first installation groove, and the first installation groove is connected to the transverse part of the first "cross" groove; the end surfaces of the two second steel structure modules facing the first steel structure modules are penetrated along the second direction to form a second installation groove, and the second installation groove is connected to the transverse part of the second "cross" groove, and the second installation groove and the first installation groove are correspondingly arranged and enclosed to form a first installation hole; the first ends of the two tenon plates are respectively inserted into the two first "cross" grooves, and the two tenon plates are arranged in a "T" shape, and the tenon plates are penetrated along the length direction of the tenon plates. A fifth through hole is penetrated, and a sixth through hole is penetrated along the width direction of the tenon plates, and the sixth through hole has the same height as the fifth through hole; the wedge-pin-tenon type connection node structure also includes a third tenon arranged parallel to the second direction, and the third tenon is coaxially tenoned with the first installation hole, the fifth through hole and the sixth through hole.

[0013] In an optional embodiment, a third mounting groove is provided through the end surface of each first steel structure module facing the second steel structure module along the third direction, and the third mounting groove is connected to the longitudinal portion of the first "cross" groove; a fourth mounting groove is provided through the end surface of each second steel structure module facing the first steel structure module along the third direction, and the fourth mounting groove is connected to the longitudinal portion of the second "cross" groove, and the fourth mounting groove is arranged corresponding to the third mounting groove and encloses a second mounting hole; the wedge-nail-tenon type connection node structure also includes a fourth tenon arranged parallel to the third direction, and the fourth tenon is used for coaxial tenoning with the second mounting hole and the fifth through-hole of the tenon plate arranged parallel to the third direction, and / or for coaxial tenoning with the second mounting hole and the sixth through-hole of the tenon plate arranged parallel to the second direction.

[0014] In an optional embodiment, two of the first steel structure modules arranged sequentially along the second direction are set as a first module assembly, and two of the second steel structure modules arranged sequentially along the second direction are set as a second module assembly, and two groups of the first module assemblies and the second module assemblies are provided, and the two groups of the first module assemblies are arranged sequentially along the third direction, and the third mounting grooves of the two groups of the first module assemblies are aligned along the third direction; two of the third dowels and the fourth dowels are provided respectively, and during assembly, the two third dowels are coaxially mortised to the two first mounting holes and the corresponding fifth through-hole and the sixth through-hole, and the two fourth dowels are coaxially mortised to the two second mounting holes and the corresponding fifth through-hole and the sixth through-hole, respectively.

[0015] In an optional embodiment, the third tenon includes a first part and a second part which are separately arranged, the first part is arranged on the end face of the second part which is relatively close to the second end of the tenon plate along the first direction, and are connected as a whole by a first locking assembly; the fourth tenon includes a third part and a fourth part which are separately arranged, the third part is arranged on the end face of the fourth part which is relatively close to the second end of the tenon plate along the first direction, and are connected as a whole by a second locking assembly; the third tenon is provided with a first through groove on the end face of the first end of the tenon plate which is relatively close to the tenon plate along the first direction, the first through groove penetrates the third tenon along the third direction, and the first through groove is used for the corresponding fourth part to movably pass through; the third tenon is relatively far away from the first through groove along the first direction A second through groove is formed at one end of the first tenon, the second through groove penetrates the third tenon along the third direction, the second through groove and the first through groove are spaced apart along the second direction, and the second through groove is used for allowing the corresponding third part to movably pass through; a third through groove is formed at an end surface of the first end of the tenon plate relatively close to the first direction, the third through groove penetrates the fourth tenon along the second direction, and the third through groove is used for allowing the corresponding second part to movably pass through; a fourth through groove is formed at one end of the fourth tenon relatively far from the third through groove along the first direction, the fourth through groove penetrates the fourth tenon along the second direction, the fourth through groove and the third through groove are spaced apart along the third direction, and the fourth through groove is used for allowing the corresponding first part to movably pass through.

[0016] In an optional embodiment, one end of the first portion along the second direction extends to the outside of the second portion, and a first protrusion is protruded along the first direction toward the direction close to the second portion, the projection of the second portion along the second direction overlaps with the first protrusion, the first protrusion and the second portion are spaced apart along the second direction, and the end surfaces of the first protrusion and the second portion facing each other along the second direction and the end surface of the first portion facing the second portion enclose the first through groove; one end of the second portion along the second direction relatively away from the first protrusion extends to the outside of the first portion, and a second protrusion is protruded along the first direction toward a position close to the first portion, the projection of the first portion along the second direction overlaps with the second protrusion, the second protrusion and the first portion are spaced apart along the second direction, and the end surfaces of the second protrusion and the first portion facing each other along the second direction and the end surface of the second portion facing the first portion enclose the The second through groove; one end of the third portion along the third direction extends to the outside of the fourth portion, and a third protrusion is protruded along the first direction toward the direction close to the fourth portion, the projection of the fourth portion along the third direction overlaps with the third protrusion, the third protrusion and the fourth portion are spaced apart along the third direction, the third protrusion and the end surfaces of the fourth portion facing each other along the third direction and the end surface of the third portion facing the fourth portion together form the third through groove; one end of the fourth portion relatively away from the third protrusion along the third direction extends to the outside of the third portion, and a fourth protrusion is protruded along the first direction toward a position close to the third portion, the projection of the third portion along the third direction overlaps with the fourth protrusion, the fourth protrusion and the third portion are spaced apart along the third direction, the fourth protrusion and the end surfaces of the third portion facing each other along the third direction and the end surface of the fourth portion facing the third portion together form the fourth through groove.

[0017] In an optional embodiment, the first part is provided with a first tenon groove along a first direction, the second part is provided with a second tenon groove along the first direction corresponding to the position of the first tenon groove, and the projections of the first tenon groove and the second tenon groove along the first direction do not fall within the range of the tenon plate; the first locking assembly includes a first locking dowel pin, and the first locking dowel pin is coaxially mortised to the first tenon groove and the second tenon groove.

[0018] In an optional embodiment, the third part is provided with a third tenon groove along the first direction, the fourth part is provided with a fourth tenon groove along the first direction corresponding to the position of the third tenon groove, and the projections of the third tenon groove and the fourth tenon groove along the first direction do not fall within the range of the tenon plate; the second locking assembly includes a second locking dowel pin, and the second locking dowel pin is coaxially mortised to the third tenon groove and the fourth tenon groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a schematic diagram of an exploded structure of a modular steel structure wedge-nail-tenon type connection node structure assembled with four first steel structure modules and four second steel structure modules according to an embodiment of the present invention;

[0021] Figure 2 for Figure 1 Structural schematic diagram of the four first steel structure modules;

[0022] Figure 3 It is a structural schematic diagram of an embodiment of the present invention;

[0023] Figure 4 for Figure 3 Schematic diagram of the decomposition of

[0024] Figure 5 for Figure 3 A schematic diagram of the assembly structure of the two third dowels and the fourth dowel;

[0025] Figure 6 for Figure 5 Schematic diagram of the decomposition structure;

[0026] Figure 7 It is a schematic diagram of the structure of an embodiment of the present invention applied to a beam.

[0027] Description of reference numerals:

[0028] 100-first steel structure module, 110-first cross groove, 120-first through hole, 130-third through hole, 140-first installation groove, 150-third installation groove;

[0029] 200 - second steel structure module, 210 - second through hole, 220 - fourth through hole, 230 - second installation slot, 240 - fourth installation slot;

[0030] 300 - tenon plate, 310 - first connecting hole, 320 - second connecting hole, 330 - fifth through hole, 340 - sixth through hole;

[0031] 400 - first dowel;

[0032] 500 - second dowel;

[0033] 600 - third dowel, 610 - first portion, 611 - first protrusion, 620 - second portion, 621 - second protrusion, 630 - first through-slot, 640 - second through-slot, 650 - first locking dowel;

[0034] 700-fourth tenon, 710-third portion, 711-third protrusion, 720-fourth portion, 721-fourth protrusion, 730-third through-slot, 740-fourth through-slot, 750-second locking tenon;

[0035] 800-crossbeam, 810-installation cavity, 811-reserved opening, 820-limiting strip. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0037] In the description of this embodiment, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing this embodiment and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting this embodiment. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0038] In the description of this embodiment, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this embodiment can be understood according to specific circumstances.

[0039] Combine the following Figures 1 to 7 , describing an embodiment of the present invention.

[0040] According to an embodiment of the present invention, a modular steel structure wedge-nail-tenon connection node structure is provided, which is used to connect modular steel structures. The modular steel structure includes a first steel structure module 100 and a second steel structure module 200 arranged in sequence along a first direction, wherein the first steel structure module 100 is provided with a first cross groove 110 at one end thereof facing the second steel structure module 200, and both side walls of the first steel structure module 100 are provided with first through holes 120 at positions corresponding to the transverse portions of the first cross groove 110, and the second steel structure module 200 is provided with a second cross groove at one end thereof facing the first steel structure module 100, and both side walls of the second steel structure module 200 are provided with second through holes 120 at positions corresponding to the transverse portions of the second cross groove A second through hole 210 is provided through it; the wedge-nail-mortise-and-tenon connection node structure includes a tenon plate 300, a first tenon 400 and a second tenon 500, the first end of the tenon plate 300 along the first direction is used to be inserted into the horizontal part of the first "cross" groove 110, and the second end is used to be inserted into the horizontal part of the second "cross" groove; a first connection hole 310 is provided through the first end side wall of the tenon plate 300 corresponding to the position of the first through hole 120; a second connection hole 320 is provided through the second end side wall of the tenon plate 300 corresponding to the position of the second through hole 210; the first tenon 400 is mortised in the first through hole 120 and the first connection hole 310, and the second tenon 500 is mortised in the second through hole 210 and the second connection hole 320.

[0041] The wedge-nail-tenon-type connection node structure of the present embodiment is provided with a first through-hole 120 and a second through-hole 210 respectively corresponding to the transverse part of the first cross groove 110 and the transverse part of the second cross groove on the side walls of the first steel structure module 100 and the second steel structure module 200, and a first connecting hole 310 and a second connecting hole 320 are respectively provided at positions of the tenon plate 300 corresponding to the first through-hole 120 and the second through-hole 210. When the first steel structure module 100 and the second steel structure module 200 need to be assembled, it is only necessary to first insert the first end of the tenon plate 300 into the transverse part of the first cross groove 110 so that the first connecting hole 310 and the first through-hole 120 are aligned, and then the first tenon 400 is inserted into the first through-hole 120 and the first connecting hole 310 in a mortise and tenon connection manner, and then the tenon The second end of the plate 300 is inserted into the horizontal part of the second "cross" groove, so that the second connecting hole 320 and the second through hole 210 are aligned, and finally the second dowel 500 is inserted into the second through hole 210 and the second connecting hole 320 in a mortise and tenon connection manner, so that the first steel structure module 100 and the second steel structure module 200 can be assembled into one. The entire assembly process does not require welding or screwing, which reduces the labor intensity of workers and saves labor costs; when the first steel structure module 100 and the second steel structure module 200 need to be disassembled, it is only necessary to pull out the first dowel 400 from the first through hole 120 and the first connecting hole 310, and pull out the second dowel 500 from the second through hole 210 and the second connecting hole 320 to achieve lossless disconnection, easy to disassemble and reuse, and high flexibility.

[0042] It should be noted that the first connection hole 310, the second connection hole 320, the first through hole 120 and the second through hole 210 have the same aperture, and the first dowel 400 and the second dowel 500 are the same dowels, which reduces the types of components for easy procurement and assembly. More specifically, the first steel structure module 100 and the second steel structure module 200 are the same modules, and the length of the first dowel 400 is equal to or less than the size of the first steel structure module 100 along the second direction, so that after assembly, the first dowel 400 is not protruding from the outer surface of the first steel structure module 100, and the second dowel 500 is not protruding from the outer surface of the second steel structure module 200.

[0043] It can be understood that the transverse portion of the first cross groove 110 and the transverse portion of the second cross groove are arranged in parallel, and the longitudinal portion of the first cross groove 110 and the longitudinal portion of the second cross groove are arranged in parallel; the first direction mentioned in the text refers to the length direction of the tenon plate 300, the second direction refers to the arrangement direction of the transverse portion of the first cross groove 110, and the third direction refers to the arrangement direction of the longitudinal portion of the first cross groove 110. The first direction, the second direction and the third direction are perpendicular to each other; for the convenience of description, this embodiment is described in detail. Figure 1The first direction, the second direction and the third direction shown in the figure are respectively described as the length direction of the tenon plate 300, the arrangement direction of the transverse part of the first cross groove 110 and the arrangement direction of the longitudinal part of the first cross groove 110, but should not be understood as a clear limitation on the length direction of the tenon plate 300, the arrangement direction of the transverse part of the first cross groove 110 and the arrangement direction of the longitudinal part of the first cross groove 110.

[0044] In some embodiments, both side walls of the first steel structure module 100 are penetrated with third through holes 130 corresponding to the longitudinal position of the first cross groove 110, and the third through holes 130 are used for the mortise and tenon connection of the first dowel 400; both side walls of the second steel structure module 200 are penetrated with fourth through holes 220 corresponding to the longitudinal position of the second cross groove, and the fourth through holes 220 are used for the mortise and tenon connection of the second dowel 500; the first end of the tenon plate 300 is also used to be inserted into the longitudinal portion of the first cross groove 110, and the second end of the tenon plate 300 is also used to be inserted into the longitudinal portion of the second cross groove. When assembling the first steel structure module 100 and the second steel structure module 200, you can choose to insert the first end and the second end of the tenon plate 300 into the horizontal part of the first "cross" groove 110 and the horizontal part of the second "cross" groove respectively, and then use the first dowel 400 and the second dowel 500 to make mortise and tenon connections. You can also choose to insert the first end and the second end of the tenon plate 300 into the vertical part of the first "cross" groove 110 and the vertical part of the second "cross" groove respectively, and then use the first dowel 400 and the second dowel 500 to make mortise and tenon connections. The assembly options are more flexible.

[0045] It can be understood that the third through hole 130 and the first through hole 120 have the same aperture, and the fourth through hole 220 and the second through hole 210 have the same aperture.

[0046] In some embodiments, two of the first steel structure modules 100 and the second steel structure modules 200 are provided, the two first steel structure modules 100 and the two second steel structure modules 200 are arranged opposite to each other along the first direction, and the two first steel structure modules 100 are arranged in sequence along the second direction; the end surfaces of the two first steel structure modules 100 facing the second steel structure modules 200 are penetrated along the second direction to form a first installation groove 140, and the first installation groove 140 is connected to the horizontal part of the first "cross" groove 110; the end surfaces of the two second steel structure modules 200 facing the first steel structure module 100 are penetrated along the second direction to form a A second mounting groove 230, wherein the second mounting groove 230 is connected to the horizontal portion of the second cross groove, and the second mounting groove 230 and the first mounting groove 140 are arranged correspondingly and enclosed to form a first mounting hole; the first ends of two tenon plates 300 are respectively inserted into the two first cross grooves 110, and the two tenon plates 300 are arranged in an "I" shape, and the tenon plates 300 are penetrated by a fifth through hole 330 along the length direction of the tenon plates 300; the wedge-nail-tenon type connection node structure also includes a third tenon 600 arranged parallel to the second direction, and the third tenon 600 is used for coaxial tenoning with the first mounting hole and the fifth through hole 330. In the process of assembling the two first steel structure modules 100 and the two second steel structure modules 200, when the first end and the second end of the tenon plate 300 arranged in an "I" shape are respectively inserted into the horizontal part of the first "cross" groove 110 and the horizontal part of the second "cross" groove, so that the first connecting hole 310 and the first through hole 120 are aligned and the second connecting hole 320 and the second through hole 210 are aligned, the end faces of the two first steel structure modules 100 and the two second steel structure modules 200 facing each other are abutted, and at this time, the first installation groove 140 and the second installation groove 230 enclose the first installation hole, and the first installation hole The mounting hole is aligned with the fifth through-hole 330, and then the third dowel 600 is coaxially inserted into the first mounting hole and the fifth through-hole 330 of the two tenon plates 300 in a mortise and tenon connection manner, so that the two tenon plates 300 arranged in an "I" shape are connected into one, and the first dowel 400 is inserted into the first through-hole 120 and the first connecting hole 310 in a mortise and tenon connection manner, and the second dowel 500 is inserted into the second through-hole 210 and the second connecting hole 320 in a mortise and tenon connection manner, so that the two first steel structure modules 100 and the two second steel structure modules 200 are assembled and connected into one, and the assembly and construction are simple.

[0047] In some embodiments, two of the first steel structure modules 100 and the second steel structure modules 200 are provided, the two first steel structure modules 100 and the two second steel structure modules 200 are arranged opposite to each other along the first direction, and the two first steel structure modules 100 are arranged in sequence along the second direction; the end surfaces of the two first steel structure modules 100 facing the second steel structure modules 200 are penetrated with a first installation groove 140 along the second direction, and the first installation groove 140 is connected to the horizontal part of the first "cross" groove 110; the end surfaces of the two second steel structure modules 200 facing the first steel structure module 100 are penetrated with a second installation groove 230 along the second direction, and the second installation groove 230 is connected to the horizontal part of the second "cross" groove The second mounting groove 230 and the first mounting groove 140 are connected, and the second mounting groove 230 and the first mounting groove 140 are correspondingly arranged and enclosed to form a first mounting hole; the first ends of the two tenon plates 300 are respectively inserted into the two first "cross" grooves 110, and the two tenon plates 300 are arranged in a "T" shape. The tenon plate 300 is penetrated by a fifth through hole 330 along the length direction of the tenon plate 300, and the tenon plate 300 is penetrated by a sixth through hole 340 along the width direction of the tenon plate 300, and the sixth through hole 340 and the fifth through hole 330 have the same height; the wedge-nail-tenon-type connection node structure also includes a third tenon 600 arranged parallel to the second direction, and the third tenon 600 is coaxially tenoned with the first mounting hole, the fifth through hole 330 and the sixth through hole 340. In the process of assembling the two first steel structure modules 100 and the two second steel structure modules 200, when the first end and the second end of the tenon plate 300 arranged in a "T" shape are respectively inserted into the first "cross" groove 110 and the second "cross" groove, so that the first connecting hole 310 is aligned with the first through hole 120 and the second connecting hole 320 is aligned with the fourth through hole 220, the end faces of the two first steel structure modules 100 and the two second steel structure modules 200 facing each other are abutted, and the first mounting groove 140 and the second mounting groove 230 are enclosed to form a first mounting hole, and the first mounting hole is aligned with the fifth through hole 330 of the tenon plate 300 arranged parallel to the second direction. 0 and the sixth through hole 340 of the tenon plate 300 arranged parallel to the third direction, and then the third dowel 600 is coaxially inserted into the first mounting hole, the fifth through hole 330 and the sixth through hole 340 in a mortise and tenon connection manner, so that the two tenon plates 300 arranged in a "T" shape are connected into one, and the first dowel 400 is inserted into the first through hole 120 and the first connecting hole 310 in a mortise and tenon connection manner, and the second dowel 500 is inserted into the second through hole 210 and the second connecting hole 320 in a mortise and tenon connection manner, so that the two first steel structure modules 100 and the two second steel structure modules 200 are assembled and connected into one, and the assembly and construction are simple.It can be understood that when the tenon plate 300 is set parallel to the second direction, the length direction of the tenon plate 300 mentioned here refers to the second direction, and the width direction of the tenon plate 300 mentioned here refers to the third direction; when the tenon plate 300 is set parallel to the third direction, the length direction of the tenon plate 300 mentioned here refers to the third direction, and the width direction of the tenon plate 300 mentioned here refers to the second direction.

[0048] Specifically, each of the first steel structure modules 100 has a third mounting groove 150 extending through the end surface facing the second steel structure module 200 along the third direction, and the third mounting groove 150 is connected to the longitudinal portion of the first "cross" groove 110; each of the second steel structure modules 200 has a fourth mounting groove 240 extending through the end surface facing the first steel structure module 100 along the third direction, and the fourth mounting groove 240 is connected to the longitudinal portion of the second "cross" groove, and the fourth mounting groove 240 is arranged corresponding to the third mounting groove 150, and encloses to form a second mounting hole; the wedge-nail-tenon type connection node structure also includes a fourth tenon 700 arranged parallel to the third direction, and the fourth tenon 700 is used for coaxial tenoning with the second mounting hole and the fifth through hole 330 of the tenon plate 300 arranged parallel to the third direction, and is also used for coaxial tenoning with the second mounting hole and the sixth through hole 340 of the tenon plate 300 arranged parallel to the second direction. In the process of assembling the two first steel structure modules 100 and the two second steel structure modules 200, when the first end and the second end of the tenon plate 300 arranged in a "T" shape are respectively inserted into the first "cross" groove 110 and the second "cross" groove, so that the first connecting hole 310 is aligned with the first through hole 120 and the second connecting hole 320 is aligned with the fourth through hole 220, the end faces of the two first steel structure modules 100 and the two second steel structure modules 200 facing each other are abutted, at this time, the first mounting groove 140 and the second mounting groove 230 are enclosed to form a first mounting hole, and the first mounting hole is aligned with the fifth through hole 330 of the tenon plate 300 set parallel to the second direction and the sixth through hole 340 of the tenon plate 300 set parallel to the third direction; at the same time, the third mounting groove 150 and the fourth mounting groove 240 are enclosed to form a second mounting hole, and one of the second mounting holes is aligned with the fifth through hole 330 of the tenon plate 300 set parallel to the third direction, and the other second mounting hole is aligned with The sixth through hole 340 arranged parallel to the second direction is aligned, and then the third dowel 600 is used to be coaxially inserted into the first mounting hole, the fifth through hole 330 and the sixth through hole 340 in a mortise and tenon connection manner, so as to connect the two tenon plates 300 arranged in a "T" shape into one; then a fourth dowel 700 is used to be coaxially inserted into the second mounting hole and the fifth through hole 330 of the tenon plate 300 arranged parallel to the third direction in a mortise and tenon connection manner, and another fourth dowel 700 is used to be coaxially inserted into the second mounting hole and the sixth through hole 340 of the tenon plate 300 arranged parallel to the second direction in a mortise and tenon connection manner; and the first dowel 400 is inserted into the first through hole 120 and the first connecting hole 310 in a mortise and tenon connection manner, and the second dowel 500 is inserted into the second through hole 210 and the second connecting hole 320 in a mortise and tenon connection manner, so as to realize a more tightly assembled connection of the two first steel structure modules 100 and the two second steel structure modules 200 into one, and the assembly construction is simple.

[0049] It should be noted that the method of connecting the two first steel structure modules 100 and the two second steel structure modules 200 by using the wedge-nail-tenon connection node structure of the present embodiment only requires that a first through hole 120 be provided through the side wall of the first steel structure module 100 along the second direction, and a first installation groove 140 be provided through the first steel structure module 100 along the second direction, and a third installation groove 150 be provided through the third direction, and a second through hole 210 be provided through the side wall of the second steel structure module 200 along the second direction, and a second installation groove 230 be provided through the second direction, and a third installation groove 150 be provided through the third direction, so that the first steel structure module 100 and the second steel structure module 200 are connected to the tenon plate 300 by a mortise and tenon structure similar to a "cross", which can not only reduce the number of openings and thus reduce the phenomenon of node stress concentration, but also make the force distribution more reasonable and safer.

[0050] Specifically, the two first steel structure modules 100 arranged in sequence along the second direction are set as the first module assembly, and the two second steel structure modules 200 arranged in sequence along the second direction are set as the second module assembly. The first module assembly and the second module assembly are both provided with two groups, and the two groups of the first module assemblies and the two groups of the second module assemblies are arranged relatively along the first direction; the two groups of the first module assemblies are arranged in sequence along the third direction, and the third mounting grooves 150 of the two groups of the first module assemblies are aligned along the third direction; the third dowels 600 and the fourth dowels 700 are respectively provided with two, and during assembly, the two third dowels 600 are respectively coaxially mortised to the two first mounting holes and the corresponding fifth through-holes 330 and the sixth through-holes 340, and the two fourth dowels 700 are respectively coaxially mortised to the two second mounting holes and the corresponding fifth through-holes 330 and the sixth through-holes 340. In the process of assembling the four first steel structure modules 100 and the four second steel structure modules 200, two tenon plates 300 arranged in a "T" shape are set as a group of tenon plate assemblies. When the tenon plates 300 of the two groups of tenon plate assemblies are respectively inserted into the first "cross" groove 110 of the corresponding group of the first module assembly and the second "cross" groove of the corresponding group of the second module assembly, so that the first connecting hole 310 is aligned with the first through hole 120 and the second connecting hole 320 is aligned with the fourth through hole 220, the two groups of first The module assembly is abutted against the end faces of the two groups of second module assemblies facing each other. At this time, the first mounting groove 140 and the second mounting groove 230 are enclosed to form a first mounting hole, and the third mounting groove 150 and the fourth mounting groove 240 are enclosed to form a second mounting hole. At this time, four first dowels 400 and four second dowels 500 are used to perform preliminary mortise and tenon connection respectively, and then two third dowels 600 are used to coaxially insert into the corresponding first mounting hole, the fifth through hole 330 and the sixth through hole 340 in a mortise and tenon connection manner. The two tenon plates 300 arranged in a "T" shape in each group of tenon plate assemblies are connected into one piece; then a fourth tenon nail 700 is coaxially inserted into the corresponding second mounting hole, the fifth through hole 330 of the tenon plate 300 arranged parallel to the third direction, and the sixth through hole 340 of the tenon plate 300 arranged parallel to the second direction in a mortise and tenon connection manner, and another fourth tenon nail 700 is coaxially inserted into the corresponding second mounting hole, the sixth through hole 330 of the tenon plate 300 arranged parallel to the second direction in a mortise and tenon connection manner. The hole 340 and the fifth through hole 330 of the tenon plate 300 arranged parallel to the third direction respectively connect the two adjacent tenon plates 300 along the third direction into one; and cooperate with the first tenon 400 to be inserted into the first through hole 120 and the first connecting hole 310 in a mortise and tenon connection manner, and the second tenon 500 to be inserted into the second through hole 210 and the second connecting hole 320 in a mortise and tenon connection manner, so as to realize a more tightened assembly connection of the two groups of first module components and the two groups of second module components into one, and the assembly construction is simple.

[0051] It should be noted that the wedge-nail-tenon connection node structure of this embodiment is used to connect two groups of first module components and two groups of second module components, so that the two third dowels 600 and the two fourth dowels 700 are projected along the first direction to form a "well" shape structure, which makes the force distribution more reasonable and the safety higher.

[0052] Specifically, the third dowel 600 includes a first portion 610 and a second portion 620 which are separately arranged, the first portion 610 being arranged on an end surface of the second portion 620 which is relatively close to the second end of the tenon plate 300 along the first direction, and being connected as a whole by a first locking assembly; the fourth dowel 700 includes a third portion 710 and a fourth portion 720 which are separately arranged, the third portion 710 being arranged on an end surface of the fourth portion 720 which is relatively close to the second end of the tenon plate 300 along the first direction, and being connected as a whole by a second locking assembly; the end surface of the first end of the third dowel 600 which is relatively close to the tenon plate 300 along the first direction is provided with a first through-groove 630, the first through-groove 630 penetrates the third dowel 600 along the third direction, and the first through-groove 630 is used for the corresponding fourth portion 720 to movably pass through; the end of the third dowel 600 which is relatively far away from the first through-groove 630 along the first direction is provided with a second through-groove A second through groove 640, wherein the second through groove 640 penetrates the third tenon 600 along the third direction, the second through groove 640 and the first through groove 630 are spaced apart along the second direction, and the second through groove 640 is used for allowing the corresponding third part 710 to movably pass through; a third through groove 730 is provided on the end surface of the first end of the fourth tenon 700 relatively close to the tenon plate 300 along the first direction, the third through groove 730 penetrates the fourth tenon 700 along the second direction, and the third through groove 730 is used for allowing the corresponding second part 620 to movably pass through; a fourth through groove 740 is provided on one end of the fourth tenon 700 relatively far away from the third through groove 730 along the first direction, the fourth through groove 740 penetrates the fourth tenon 700 along the second direction, the fourth through groove 740 and the third through groove 730 are spaced apart along the third direction, and the fourth through groove 740 is used for allowing the corresponding first part 610 to movably pass through.By splitting the third dowel 600 into the first part 610 and the second part 620, and splitting the fourth dowel 700 into the third part 710 and the fourth part 720, in the process of assembling the four first steel structure modules 100 and the four second steel structure modules 200, the first parts 610 and the second parts 620 of the two third dowels 600 are firstly mortise-joined to the corresponding positions, and the first through-grooves 630 and the second through-grooves 640 are respectively formed between the first parts 610 and the second parts 620, and then locked by the first locking assembly; then, the third part 710 of one of the fourth dowels 700 is inserted from the first side of the second mounting hole along the third direction and passes through the second through-grooves 640 of one of the third dowels 600 relatively close to the first side to abut against the side wall of the other third dowel 600 along the third direction, and at the same time, the fourth part 720 of the fourth dowel 700 is inserted from the second side of the second mounting hole along the third direction and passes through its The first through slot 630 of one of the third dowels 600 relatively close to the second side is inserted into the side wall along the third direction of another third dowel 600, and the second locking assembly is used for locking at this time; then the third part 710 of the remaining fourth dowel 700 is inserted from the second mounting hole along the second side of the third direction and passes through the second through slot 640 of one of the third dowels 600 relatively close to the second side to abut against the side wall along the third direction of another third dowel 600, and at the same time, the fourth part 720 of the fourth dowel 700 is inserted from the second mounting hole along the first side of the third direction and passes through the first through slot 630 of one of the third dowels 600 relatively close to the first side to abut against the side wall along the third direction of another third dowel 600, and the other second locking assembly is used for locking at this time; the two groups of first module components and the two groups of second module components can be assembled and connected more tightly into one, and the assembly construction is simple.

[0053] like Figures 3 to 6As shown, specifically, one end of the first portion 610 along the second direction extends outside the second portion 620, and a first protrusion 611 is protruded along the first direction toward the direction close to the second portion 620, the projection of the second portion 620 along the second direction overlaps with the first protrusion 611, the first protrusion 611 and the second portion 620 are spaced apart along the second direction, and the end surfaces of the first protrusion 611 and the second portion 620 facing each other along the second direction and the end surface of the first portion 610 facing the second portion 620 enclose the first through groove 630; The second portion 620 extends from one end of the first protrusion 611 along the second direction to the outside of the first portion 610, and a second protrusion 621 is protruded toward a position close to the first portion 610 along the first direction, the projection of the first portion 610 along the second direction overlaps with the second protrusion 621, the second protrusion 621 and the first portion 610 are spaced apart along the second direction, and the second protrusion 621 and the end faces of the first portion 610 facing each other along the second direction and the end face of the second portion 620 facing the first portion 610 enclose the second through groove 640; one end of the third portion 710 along the third direction extends to the outside of the fourth portion 720, and a third protrusion 711 is protruded along the first direction toward the direction close to the fourth portion 720, the projection of the fourth portion 720 along the third direction overlaps with the third protrusion 711, the third protrusion 711 and the fourth portion 720 are spaced apart along the third direction, the end surfaces of the third protrusion 711 and the fourth portion 720 facing each other along the third direction and the end surface of the third portion 710 facing the fourth portion 720 enclose the third through groove 730; the fourth One end of the portion 720 that is relatively far away from the third protrusion 711 along the third direction extends to the outside of the third portion 710, and a fourth protrusion 721 is protruded along the first direction toward a position close to the third portion 710, the projection of the third portion 710 along the third direction overlaps with the fourth protrusion 721, the fourth protrusion 721 and the third portion 710 are spaced apart along the third direction, the fourth protrusion 721 and the end surfaces of the third portion 710 that face each other along the third direction and the end surface of the fourth portion 720 that faces the third portion 710 form the fourth through groove 740.In the process of assembling the four first steel structure modules 100 and the four second steel structure modules 200, the first parts 610 and the second parts 620 of the two third dowels 600 are first connected to the corresponding positions by mortise and tenon joints, and after respectively enclosing the first through grooves 630 and the second through grooves 640 at the positions aligned with the two second mounting holes along the third direction, they are locked into one piece using the first locking assembly; then the third part 710 of one of the fourth dowels 700 is inserted from the first side of the second mounting hole along the third direction and passes through the second through groove 640 of one of the third dowels 600 relatively close to the first side to abut against the side wall of the other third dowel 600 along the third direction, and at the same time, the fourth part 720 of the fourth dowel 700 is inserted from the second side of the second mounting hole along the third direction and passes through the first through groove 640 of one of the third dowels 600 relatively close to the second side A through slot 630 is inserted into the side wall along the third direction of another third dowel 600, and the second locking assembly is used to lock it. Then, the third part 710 of the remaining fourth dowel 700 is inserted from the second side of the second mounting hole along the third direction and passes through the second through slot 640 of one of the third dowels 600 relatively close to the second side to abut against the side wall along the third direction of another third dowel 600. At the same time, the fourth part 720 of the fourth dowel 700 is inserted from the first side of the second mounting hole along the third direction and passes through the first through slot 630 of one of the third dowels 600 relatively close to the first side to abut against the side wall along the third direction of another third dowel 600. At this time, another second locking assembly is used to lock it. The two groups of first module components and the two groups of second module components can be more tightly assembled and connected into one, and the assembly construction is simple.

[0054] Specifically, after the assembly of the four first steel structure modules 100 and the four second steel structure modules 200 is completed, one of the third dowels 600 can be rotated 180° around the first direction to obtain another third dowel 600, and one of the fourth dowels 700 can be rotated 180° around the first direction to obtain another fourth dowel 700.

[0055] In a specific application, in order to reduce the types of components of this embodiment, the third dowel 600 and the fourth dowel 700 are configured to be the same dowel.

[0056] like Figure 5 and Figure 6As shown, specifically, the first part 610 is provided with a first tenon groove along the first direction, and the second part 620 is provided with a second tenon groove along the first direction corresponding to the position of the first tenon groove, and the projections of the first tenon groove and the second tenon groove along the first direction do not fall within the range of the tenon plate 300; the first locking assembly includes a first locking dowel 650, and the first locking dowel 650 is coaxially mortised to the first tenon groove and the second tenon groove. During the process of assembling the four first steel structure modules 100 and the four second steel structure modules 200, when the spacing space along the second direction between the second part 620 of the third dowel 600 and the first protrusion 611 is aligned with the corresponding second mounting hole along the third direction to form the first through groove 630, and the spacing space along the second direction between the first part 610 and the second protrusion 621 of the third dowel 600 is aligned with the corresponding second mounting hole along the third direction to form the second through groove 640, the first tenon groove and the second tenon groove are aligned along the first direction. At this time, the first locking dowel 650 can be inserted into the first tenon groove and the second tenon groove in a mortise and tenon connection manner to complete the locking. The whole process does not require screwing, and the assembly is simple.

[0057] Specifically, the third portion 710 is provided with a third tenon groove along the first direction, and the fourth portion 720 is provided with a fourth tenon groove along the first direction corresponding to the position of the third tenon groove, and the projections of the third tenon groove and the fourth tenon groove along the first direction do not fall within the range of the tenon plate 300; the second locking assembly includes a second locking dowel 750, and the second locking dowel 750 is coaxially tenoned with the third tenon groove and the fourth tenon groove. In the process of assembling the four first steel structure modules 100 and the four second steel structure modules 200, when the third portion 710 of the fourth tenon 700 is abutted against the side wall of the third tenon 600 relatively far from the first side, and the fourth portion 720 of the fourth tenon 700 is abutted against the side wall of the third tenon 600 relatively close to the first side, the third tenon groove and the fourth tenon groove are aligned along the first direction, and at this time, the second locking dowel 750 is inserted into the third tenon groove and the fourth tenon groove in a mortise and tenon connection manner to complete the locking, and the whole process does not require screwing, and the assembly is simple.

[0058] like Figure 7As shown, specifically, a crossbeam 800 is fixed in the steel structure building, and an installation cavity 810 is opened in the crossbeam 800 at a position corresponding to the first steel structure module 100 and the second steel structure module 200, and a reserved opening 811 is provided through the side wall of the installation cavity 810 at a position corresponding to the first through hole 120 of the first steel structure module 100 and the second through hole 210 of the second steel structure module 200; so that after the first steel structure module 100 and the second steel structure module 200 are embedded in the corresponding installation cavity 810, the reserved opening 811 is used for the first dowel 400 or the second dowel 500 to pass through for mortise and tenon connection. In a specific application, a limit strip 820 is provided on the inner side wall of the installation cavity 810, and a limit groove is provided on the outer side wall of the first steel structure module 100 and the second steel structure module 200 at a position corresponding to the limit strip 820.

[0059] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the present invention.

Claims

1. A modular steel structure wedge-nail-tenon connection node structure, used for connecting modular steel structures, the modular steel structure comprising a first steel structure module (100) and a second steel structure module (200) arranged in sequence along a first direction, a first cross groove (110) being arranged in one end of the first steel structure module (100) facing the second steel structure module (200), first through holes (120) being arranged on both side walls of the first steel structure module (100) corresponding to the transverse portion of the first cross groove (110), a second cross groove being arranged in one end of the second steel structure module (200) facing the first steel structure module (100), and second through holes (210) being arranged on both side walls of the second steel structure module (200) corresponding to the transverse portion of the second cross groove; characterized in that: The wedge-nail-tenon type connection node structure comprises: The tenon plate (300) has a first end along a first direction for inserting into the transverse portion of the first cross groove (110), and a second end for inserting into the transverse portion of the second cross groove; a first connection hole (310) is provided through a position of a side wall of the first end of the tenon plate (300) corresponding to the first through hole (120); a second connection hole (320) is provided through a position of a side wall of the second end of the tenon plate (300) corresponding to the second through hole (210); A first dowel (400) mortised to the first through hole (120) and the first connecting hole (310); The second dowel (500) is mortised to the second through hole (210) and the second connecting hole (320).

2. A modular steel structure wedge-nail-tenon connection node structure according to claim 1, characterized in that: The two side walls of the first steel structure module (100) are penetrated with third through holes (130) at positions corresponding to the longitudinal portion of the first cross groove (110), and the third through holes (130) are used for the first tenon (400) to be mortised; the two side walls of the second steel structure module (200) are penetrated with fourth through holes (220) at positions corresponding to the longitudinal portion of the second cross groove, and the fourth through holes (220) are used for the second tenon (500) to be mortised; the first end of the tenon plate (300) is also used for being inserted into the longitudinal portion of the first cross groove (110), and the second end of the tenon plate (300) is also used for being inserted into the longitudinal portion of the second cross groove.

3. A modular steel structure wedge-nail-tenon connection node structure according to claim 2, characterized in that: The first steel structure module (100) and the second steel structure module (200) are both provided with two, and the two first steel structure modules (100) are arranged in sequence along the second direction, and the first direction and the second direction are perpendicular to each other; the end surfaces of the two first steel structure modules (100) facing the second steel structure module (200) are penetrated along the second direction to form a first installation groove (140), and the first installation groove (140) is connected to the horizontal part of the first "cross" groove (110); the end surfaces of the two second steel structure modules (200) facing the first steel structure module (100) are penetrated along the second direction to form a second installation groove (230), and the second installation groove (2 30) is connected to the horizontal part of the second "cross" groove, the second installation groove (230) and the first installation groove (140) are arranged correspondingly and enclosed to form a first installation hole; the first ends of two tenon plates (300) are respectively inserted into the two first "cross" grooves (110), the two tenon plates (300) are arranged in a "one" shape, and the tenon plates (300) are penetrated by a fifth through hole (330) along the length direction of the tenon plates (300); the wedge-pin-tenon type connection node structure also includes a third tenon (600) arranged parallel to the second direction, and the third tenon (600) is used for coaxial tenoning with the first installation hole and the fifth through hole (330).

4. A modular steel structure wedge-nail-tenon connection node structure according to claim 2, characterized in that: The first steel structure module (100) and the second steel structure module (200) are both provided with two, and the two first steel structure modules (100) are arranged in sequence along the second direction; the end surfaces of the two first steel structure modules (100) facing the second steel structure modules (200) are penetrated along the second direction to form a first installation groove (140), and the first installation groove (140) is communicated with the transverse part of the first "cross" groove (110); the end surfaces of the two second steel structure modules (200) facing the first steel structure module (100) are penetrated along the second direction to form a second installation groove (230), and the second installation groove (230) is communicated with the transverse part of the second "cross" groove, and the second installation groove (230) and the first installation groove (140) are aligned. A first mounting hole should be provided and enclosed to form the first mounting hole; the first ends of the two tenon plates (300) are respectively inserted into the two first "cross" grooves (110); the two tenon plates (300) are arranged in a "T" shape; the tenon plates (300) are provided with a fifth through hole (330) along the length direction of the tenon plates (300); the tenon plates (300) are provided with a sixth through hole (340) along the width direction of the tenon plates (300); the sixth through hole (340) and the fifth through hole (330) are at the same height; the wedge-pin-tenon-type connection node structure further comprises a third tenon (600) arranged parallel to the second direction; the third tenon (600) is coaxially tenoned with the first mounting hole, the fifth through hole (330) and the sixth through hole (340).

5. A modular steel structure wedge-nail-tenon connection node structure according to claim 4, characterized in that: Each of the first steel structure modules (100) has a third installation groove (150) extending through the end surface facing the second steel structure module (200) along the third direction, and the third installation groove (150) is communicated with the longitudinal portion of the first cross groove (110); each of the second steel structure modules (200) has a fourth installation groove (240) extending through the end surface facing the first steel structure module (100) along the third direction, and the fourth installation groove (240) is communicated with the longitudinal portion of the second cross groove, and the fourth The mounting groove (240) is arranged corresponding to the third mounting groove (150), and encloses a second mounting hole; the wedge-pin-tenon type connection node structure also includes a fourth tenon (700) arranged parallel to the third direction, and the fourth tenon (700) is used for coaxially tenoning with the second mounting hole and a fifth through-hole (330) of the tenon plate (300) arranged parallel to the third direction, and / or for coaxially tenoning with the second mounting hole and a sixth through-hole (340) of the tenon plate (300) arranged parallel to the second direction.

6. A modular steel structure wedge-nail-tenon connection node structure according to claim 5, characterized in that: The two first steel structure modules (100) arranged in sequence along the second direction are set as a first module assembly, and the two second steel structure modules (200) arranged in sequence along the second direction are set as a second module assembly. The first module assembly and the second module assembly are both provided with two groups, and the two groups of the first module assemblies are arranged in sequence along the third direction. The third mounting grooves (150) of the two groups of the first module assemblies are aligned along the third direction; the third dowels (600) and the fourth dowels (700) are respectively provided with two, and during assembly, the two third dowels (600) are respectively coaxially mortised to the two first mounting holes and the corresponding fifth through-holes (330) and the sixth through-holes (340), and the two fourth dowels (700) are respectively coaxially mortised to the two second mounting holes and the corresponding fifth through-holes (330) and the sixth through-holes (340).

7. A modular steel structure wedge-nail-tenon connection node structure according to claim 6, characterized in that: The third dowel (600) comprises a first portion (610) and a second portion (620) which are separately arranged, wherein the first portion (610) is arranged on an end surface of the second portion (620) relatively close to the second end of the tenon plate (300) along a first direction, and the first portion (610) and the first portion (610) are connected as a whole through a first locking assembly; the fourth dowel (700) comprises a third portion (710) and a fourth portion (720) which are separately arranged, wherein the third portion (710) is arranged on an end surface of the fourth portion (720) relatively close to the tenon plate (300) along the first direction. ) and are connected as a whole through a second locking assembly; the end surface of the first end of the third dowel (600) relatively close to the tenon plate (300) along the first direction is provided with a first through groove (630), the first through groove (630) penetrates the third dowel (600) along the third direction, and the first through groove (630) is used for allowing the corresponding fourth part (720) to movably pass through; the end of the third dowel (600) relatively far from the first through groove (630) along the first direction is provided with a second through groove ( The third tenon (600) is provided with a third through-groove (640), the second through-groove (640) penetrates the third tenon (600) along the third direction, the second through-groove (640) and the first through-groove (630) are arranged at intervals along the second direction, and the second through-groove (640) is used for allowing the corresponding third part (710) to movably pass through; the fourth tenon (700) is provided with a third through-groove (730) on the end surface of the first end relatively close to the tenon plate (300) along the first direction, and the third through-groove (730) penetrates the fourth tenon (700) along the second direction. 0), the third through-slot (730) is used for allowing the corresponding second part (620) to movably pass through; the fourth tenon (700) is provided with a fourth through-slot (740) at one end relatively away from the third through-slot (730) along the first direction, the fourth through-slot (740) penetrates the fourth tenon (700) along the second direction, the fourth through-slot (740) and the third through-slot (730) are arranged at intervals along the third direction, and the fourth through-slot (740) is used for allowing the corresponding first part (610) to movably pass through.

8. A modular steel structure wedge-nail-tenon connection node structure according to claim 7, characterized in that: One end of the first portion (610) along the second direction extends outside the second portion (620), and a first protrusion (611) is protruded in the direction close to the second portion (620) along the first direction, a projection of the second portion (620) along the second direction overlaps with the first protrusion (611), the first protrusion (611) and the second portion (620) are arranged at intervals along the second direction, and the end surfaces of the first protrusion (611) and the second portion (620) facing each other along the second direction and the end surface of the first portion (610) facing the second portion (620) enclose the first through groove (630); the second portion (6 20) one end relatively far away from the first protrusion (611) along the second direction extends to the outside of the first part (610), and a second protrusion (621) is protruded toward the position close to the first part (610) along the first direction, the projection of the first part (610) along the second direction overlaps with the second protrusion (621), the second protrusion (621) and the first part (610) are arranged at intervals along the second direction, and the end surfaces of the second protrusion (621) and the first part (610) facing each other along the second direction and the end surface of the second part (620) facing the first part (610) enclose the second through groove (640); One end of the third portion (710) along the third direction extends outside the fourth portion (720), and a third protrusion (711) is protruded in the first direction toward the direction close to the fourth portion (720), the projection of the fourth portion (720) along the third direction overlaps with the third protrusion (711), the third protrusion (711) and the fourth portion (720) are arranged at intervals along the third direction, the end surfaces of the third protrusion (711) and the fourth portion (720) facing each other along the third direction and the end surface of the third portion (710) facing the fourth portion (720) enclose the third through groove (730); the fourth portion (7 20) extends from one end relatively far away from the third protrusion (711) along the third direction to the outside of the third part (710), and a fourth protrusion (721) is protruded along the first direction toward a position close to the third part (710), the projection of the third part (710) along the third direction overlaps with the fourth protrusion (721), the fourth protrusion (721) and the third part (710) are arranged at intervals along the third direction, and the end surfaces of the fourth protrusion (721) and the third part (710) facing each other along the third direction and the end surface of the fourth part (720) facing the third part (710) enclose the fourth through groove (740).

9. A modular steel structure wedge-nail-tenon connection node structure according to claim 7 or 8, characterized in that: The first part (610) is provided with a first tenon groove penetrating along a first direction, and the second part (620) is provided with a second tenon groove penetrating along the first direction at a position corresponding to the first tenon groove, and the projections of the first tenon groove and the second tenon groove along the first direction do not fall within the range of the tenon plate (300); the first locking assembly includes a first locking dowel (650), and the first locking dowel (650) is coaxially mortised to the first tenon groove and the second tenon groove.

10. A modular steel structure wedge-nail-tenon connection node structure according to claim 9, characterized in that: The third part (710) is provided with a third tenon groove along the first direction, and the fourth part (720) is provided with a fourth tenon groove along the first direction corresponding to the position of the third tenon groove, and the projections of the third tenon groove and the fourth tenon groove along the first direction do not fall within the range of the tenon plate (300); the second locking assembly includes a second locking dowel (750), and the second locking dowel (750) is coaxially mortised to the third tenon groove and the fourth tenon groove.

Citation Information

Patent Citations

  • H-shaped steel structure mortise and tenon self-locking connecting system and construction method thereof

    CN113789858A

  • Mortise and tenon joint structure and beam column connecting method

    CN118704615A

  • Connecting Structure of Slanting Steel Pipe Strut

    KR200412812Y1