Multi-AGV conflict solving scheduling method based on graph theory
By adopting a graph theory-based conflict resolution scheduling method in multi-AGV systems, the conflict graph is constructed and the AGV path is adjusted in real time, the problems of path conflict and deadlock in multi-AGV systems are solved, and the efficient operation and good scalability of the system are achieved.
Patent Information
- Application Number
- CN202411753593.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-02
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-12-02
AI Technical Summary
In multi-AGV systems, with the increase in the number of AGVs and the increase in task complexity, the problems of path conflict and deadlock are becoming increasingly prominent. The existing time-domain-based path search algorithm has high requirements for the real-time performance of AGVs, and traditional conflict detection and path planning methods are insufficient in dynamic and complex environments.
A multi-AGV conflict resolution scheduling method based on graph theory is used. By planning a path from the start point to the end point for each AGV and defining the conflict detection range, a conflict graph is constructed to represent the conflict relationship between AGVs. Identify deadlocks in the conflict graph and design unlock paths or conflict resolution strategies to adjust the paths of AGVs in real time to avoid conflicts.
It effectively solves the problem of path conflict and deadlock in multi-AGV systems, avoids deadlocks in advance, ensures efficient operation of the system, can handle complex conflict relationships, and has good scalability and robustness.