By using cantilever beams and mobile positioning piles to fix the scaffolding during the construction of the drainage gate opening and closing machine room, the problem of difficult to ensure the stability of the scaffolding structure foundation during flood season is solved, and the stability and construction safety of the scaffolding under high water levels are achieved.
Patent Information
- Application Number
- CN202510018986.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-30
- Publication Date
- 2025-03-28
AI Technical Summary
During the construction of the tide barrier opening and closing machine room, the stability of the scaffolding structure foundation is difficult to ensure during flood season.
A drain gate drainage frame is used to pass through long cantilever scaffolding, including cantilever beams, mobile positioning piles and scaffolding. The cantilever beam is mounted above the bridge deck, with both ends extending to both sides of the bridge deck and scaffolding is fixed. The mobile positioning pile includes a U-shaped plate and a pressing plate. The cantilever beam is arranged in the U-shaped plate. The protrusions of the pressing plate can press the cantilever beam to ensure its fixation. The scaffolding includes a vertical pole, a transverse horizontal pole, a longitudinal horizontal pole and a trapped rod. The trapped rod is fixed with a cantilever beam through a U-shaped pull-up piece, and the other end is trapped with the superstructure structure.
By being located above the bridge deck and scaffolding is fixed at both ends, the force on the cantilever beam can be more uniform, ensuring that the scaffolding has strong structural foundation and stability during flood season, and avoiding the problem of difficult to determine the stability of the foundation caused by flooding parts.
Smart Images

Figure CN119711730A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, in particular to a drainage gate rack full-length cantilever scaffold. Background Art
[0002] Cantilever scaffolding refers to a scaffolding whose structure unloads on a rigid cantilever beam attached to the building structure. It is used for main construction or decoration engineering operations and their safety protection needs.
[0003] Cantilever scaffolding can be divided into two types: one-cantilever per layer and one-cantilever per multiple layers. For the one-cantilever per layer method, the bottom of the vertical pole is placed on the floor, beam or wall and other building parts. After being tilted outward and fixed, a horizontal pole is set up on the upper part and a scaffolding board is laid to form a construction layer. The construction is completed at one layer height. After entering the upper layer, the scaffolding is re-erected to provide construction for the next layer. For the multi-layer cantilever scaffolding method, the full-height scaffolding is divided into several sections, with each section having a height of no more than 20m. The cantilever beam or cantilever frame is used as the scaffolding foundation to erect the scaffolding in sections. This method can be used to erect scaffolding of more than 50m. The facade of the cantilever scaffolding must be fully equipped with scissor braces.
[0004] During the construction of the tide gate opening and closing machine room, scaffolding is also required, and the scaffolding needs to be erected from the bottom plate of the gate to the upper part. However, it was found during the implementation process that there are at least the following defects in the existing technology: when encountering the flood season, due to the high water level of the river, it will cause the existing scaffolding to be difficult to ensure the stability of its structural foundation. Summary of the invention
[0005] The purpose of the present invention is to provide a full-length cantilever scaffolding for a drainage gate, which solves the technical problem that the stability of the scaffolding structure foundation is difficult to ensure during the flood season during the construction of a tide gate opening and closing machine room.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0007] The present invention discloses a cantilever scaffolding for drainage gate rack, comprising a cantilever beam, a movable positioning pile and a scaffolding, wherein the cantilever beam is installed above a bridge deck, and the two ends of the cantilever beam extend to the two sides of the bridge deck respectively, and the two ends of the cantilever beam are respectively fixed with the scaffolding; the movable positioning pile is installed at the two ends of the cantilever beam, and the movable positioning pile comprises a U-shaped plate and a pressure plate located above the U-shaped plate, the cantilever beam is arranged in the U-shaped plate, and the two sides of the U-shaped plate have outer edges, and the lower plate surface of the pressure plate is provided with a convex part, and after the outer edges of the two sides of the U-shaped plate are fixed to the pressure plate by bolts, the convex part can be pressed tightly against the cantilever beam; the scaffolding comprises a vertical pole, a horizontal horizontal pole, a horizontal horizontal pole, a vertical pole and a horizontal horizontal pole. Rod, longitudinal horizontal rod and diagonal rod, the vertical rod is vertically fixed on the pressure plate, the vertical rod is fixed with the transverse horizontal rod perpendicular to the cantilever beam, the transverse horizontal rod is fixed with a plurality of longitudinal horizontal rods, the longitudinal horizontal rod is parallel to the cantilever beam, U-shaped upper pull pieces are respectively provided near the two ends of the cantilever beam, one end of the diagonal rod is fixed to the cantilever beam through the U-shaped upper pull piece, and the other end is diagonally connected to the superstructure structure, the diagonal rod includes a tubular flower basket, the two axial ends of the flower basket have internal threads, the internal threads at the two ends of the flower basket are respectively connected with a positive wire pull rod and a negative wire pull rod, and the tension of the diagonal rod can be adjusted by rotating the flower basket.
[0008] Since the cantilever beam is located above the bridge deck and scaffolding is fixed at both ends of the cantilever beam, the cantilever beam can be stressed more evenly. When encountering flood season, the scaffolding can be guaranteed to have a strong structural foundation and stability.
[0009] Furthermore, the cantilever beam is installed on the bridge deck through U-shaped bolts, the bottom of the U-shaped bolts is embedded in the bridge deck, the opening of the U-shaped bolts faces upward and the cantilever beam is located in the opening of the U-shaped bolts, and a cover plate is installed at the opening of the U-shaped bolts through bolts, and the cover plate can press the cantilever beam to facilitate the fixation of the cantilever beam.
[0010] Furthermore, a pad is provided at the clamping and fixing position of the cantilever beam and the U-shaped bolt, and two sides of the pad are respectively fitted with the U-shaped bolt and the cantilever beam.
[0011] Furthermore, structural reinforcement ribs are symmetrically embedded in the bridge deck, and the structural reinforcement ribs penetrate the bottom contour of the U-shaped bolt and contact the bottom of the U-shaped bolt, which can make the U-shaped bolt more reliably fixed, thereby improving the stability of the overall structure.
[0012] Furthermore, a thread protection sleeve capable of protecting the thread is embedded in the exposed thread threads of the positive thread pull rod and the reverse thread pull rod connected to the flower basket.
[0013] Furthermore, the thread protection sleeve is made of rubber.
[0014] Furthermore, the cantilever beam is an I-beam.
[0015] Compared with the prior art, the beneficial technical effects of the present invention are:
[0016] The drainage gate frame full-length cantilever scaffolding of the present invention can make the cantilever beam bear the force more evenly because the cantilever beam is located above the bridge deck and scaffolds are fixed at both ends of the cantilever beam. When encountering the flood season, it can ensure that the scaffolding has a strong structural foundation and stability; at the same time, it avoids the factor of being unable to determine the stability of the scaffolding foundation due to the flooded part, and meets the needs of construction and structural maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a structural schematic diagram of a full-length cantilever scaffolding of a drainage gate rack of the present invention;
[0019] Figure 2 for Figure 1 A partial enlarged schematic diagram of
[0020] Figure 3 It is a schematic diagram of fixing U-bolts in the full-length cantilever scaffolding of the drainage gate rack of the present invention;
[0021] Figure 4 It is a schematic structural diagram of the inclined tie rod in the full-length cantilever scaffolding of the drainage gate rack of the present invention;
[0022] Figure 5 It is a schematic diagram of the cross-sectional structure of the inclined rods in the full-length cantilever scaffolding of the drainage gate rack of the present invention.
[0023] Explanation of the reference numerals: 1. Cantilever beam; 2. Vertical pole; 3. Transverse horizontal pole; 4. Longitudinal horizontal pole; 5. Bridge deck; 6. U-shaped bolt; 7. Cover plate; 8. Pad; 9. U-shaped plate; 10. Pressure plate; 11. Protrusion; 12. Diagonal tie rod; 13. U-shaped upper pull piece; 14. Flower basket; 15. Positive thread tie rod; 16. Negative thread tie rod; 17. Thread protection sleeve. DETAILED DESCRIPTION
[0024] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0025] In the description of the present invention, it should be understood that the terms "length", "width", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] The technical solution provided by the embodiments of the present invention is described in detail below with reference to the accompanying drawings.
[0028] like Figures 1 to 3 As shown, the full-length cantilever scaffolding of the drainage gate frame of this embodiment includes a cantilever beam 1, the end of the cantilever beam 1 extends to the outside of the bridge body and is fixed with a scaffolding, the scaffolding includes a vertical pole 2, a transverse horizontal rod 4 perpendicular to the cantilever beam 1 is fixed on the vertical pole 2, a plurality of longitudinal horizontal rods are fixed on the transverse horizontal rod 4, and the longitudinal horizontal rods are parallel to the cantilever beam 1, the cantilever beam 1 is located above the bridge deck 5, and the two ends of the cantilever beam 1 extend to the two sides of the bridge body respectively, and the two ends of the cantilever beam 1 are fixed with scaffolding.
[0029] Among them, since the cantilever beam 1 is located above the bridge deck 5 and the cantilever beam 1 adopts a conventional design, scaffolding is fixed at both ends of the cantilever beam 1, so that the cantilever beam 1 can be more evenly stressed. When encountering the flood season, the scaffolding can be guaranteed to have a strong structural foundation and stability.
[0030] Specifically, the cantilever beam 1 is an I-beam, located above the bridge deck 5, and fixed by a U-bolt 6. The profile of the U-bolt 6 is "U", the bottom of the U-bolt 6 is pre-buried in the bridge deck 5, the opening of the U-bolt 6 faces upward, and a cover plate 7 is installed at the opening of the U-bolt by bolts. The cantilever beam 1 is located in the U-shaped profile of the U-bolt 6 and is pressed by the cover plate 7. Such an arrangement can facilitate the fixing and disassembly of the cantilever beam 1.
[0031] Preferably, a pad 8 is provided at the fixing place of the cantilever beam 1 and the U-bolt 6. The pad 8 is located at the position where the U-bolt 6 and the cantilever beam 1 are clamped, and the two sides of the pad 8 are respectively fitted with the U-bolt 6 and the cantilever beam 1, thereby making the cantilever beam 1 and the U-bolt 6 more reliably fixed. In addition, structural reinforcement ribs are also pre-embedded in the bridge deck 5, and the structural reinforcement ribs penetrate the bottom profile of the U-bolt 6 and contact the bottom of the U-bolt 6, so that the U-bolt 6 is fixed on the bridge deck 5 more reliably.
[0032] In addition, movable positioning piles are installed at both ends of the cantilever beam 1. The movable positioning piles include a U-shaped plate 9 and a pressure plate 10. The U-shaped plate 9 has outer edges on both sides. The outer edges on both sides of the U-shaped plate 9 are fixed to the pressure plate 10 by bolts, and the vertical pole 2 is vertically fixed on the pressure plate 10. The pressure plate 10 is located above the U-shaped plate 9. The pressure plate 10 has a convex portion 11 facing downward. The convex portion 11 of the pressure plate 10 can cooperate with the opening at the upper end of the U-shaped plate 9 and can contact the cantilever beam 1. When the U-shaped plate 9 and the pressure plate 10 are fastened by bolts, the convex portion 11 of the pressure plate 10 can press the cantilever beam 1, so that the movable positioning pile can be fixed on the cantilever beam 1 more reliably, thereby ensuring that the stability of the vertical pole 2 is stronger.
[0033] In this embodiment, if Figure 4 , Figure 5 As shown, the scaffolding also includes a diagonal tie rod 12. Correspondingly, U-shaped upper pull members 13 are respectively provided on the cantilever beam 1 near its two ends. One end of the diagonal tie rod 12 is fixed to the cantilever beam 1 through the U-shaped upper pull member 13, and the other end of the diagonal tie rod 12 is diagonally connected to the superstructure structure, which can further ensure the stability of the cantilever beam 1 and the scaffolding.
[0034] The inclined tie rod 12 includes a tubular flower basket 14, a positive thread tie rod 15 and a negative thread tie rod 16. The two axial ends of the flower basket 14 have internal threads. The positive thread tie rod 15 and the negative thread tie rod 16 are respectively connected to the two axial ends of the flower basket 14. At this time, the tension of the inclined tie rod 12 can be adjusted by rotating the flower basket 14. In addition, a thread protection sleeve 17 made of rubber material is embedded in the thread exposed by the connection between the positive thread tie rod 15, the negative thread tie rod 16 and the flower basket 14, and the thread protection sleeve 17 can protect the thread.
[0035] The drainage gate frame full-length cantilever scaffolding of the present invention can make the cantilever beam bear the force more evenly because the cantilever beam is located above the bridge deck and scaffolds are fixed at both ends of the cantilever beam. When encountering the flood season, it can ensure that the scaffolding has a strong structural foundation and stability; at the same time, it avoids the factor of being unable to determine the stability of the scaffolding foundation due to the flooded part, and meets the needs of construction and structural maintenance.
[0036] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A full-length cantilever scaffolding for a drainage gate, characterized in that: The invention comprises a cantilever beam (1), a movable positioning pile and a scaffolding, wherein the cantilever beam (1) is installed above a bridge deck (5), and the two ends of the cantilever beam (1) respectively extend to the two sides of the bridge deck (5), and the two ends of the cantilever beam (1) are respectively fixed with the scaffolding; the movable positioning pile is installed at the two ends of the cantilever beam (1), and the movable positioning pile comprises a U-shaped plate (9) and a pressure plate (10) located above the U-shaped plate (9); the cantilever beam (1) is arranged in the U-shaped plate (9), and the two sides of the U-shaped plate (9) have outer edges, and the lower plate surface of the pressure plate (10) is provided with a convex portion (11), and after the outer edges of the two sides of the U-shaped plate (9) are fixed to the pressure plate (10) by bolts, the convex portion (11) can be pressed tightly against the cantilever beam (1); the scaffolding comprises a vertical pole (2), a horizontal horizontal pole (3), a horizontal horizontal pole (4) and a diagonal tie rod (12) The vertical rod (2) is vertically fixed on the pressure plate (10); the vertical rod (2) is fixed with the horizontal transverse rod (3) perpendicular to the cantilever beam (1); the horizontal transverse rod (3) is fixed with a plurality of the longitudinal horizontal rods (4); the longitudinal horizontal rods (4) are parallel to the cantilever beam (1); the cantilever beam (1) is provided with U-shaped upper pull pieces (13) at positions near both ends; one end of the inclined brace (12) is fixed to the cantilever beam (1) through the U-shaped upper pull piece (13); the other end is obliquely connected to the superstructure structure; the inclined brace (12) includes a tubular flower basket (14); the two axial ends of the flower basket (14) have internal threads; the internal threads at the two ends of the flower basket (14) are respectively connected with a positive wire pull rod (15) and a negative wire pull rod (16); the tension of the inclined brace (12) can be adjusted by rotating the flower basket (14).
2. The full-length cantilever scaffolding for drainage gate rack according to claim 1 is characterized in that: The cantilever beam (1) is installed on the bridge deck (5) via a U-shaped bolt (6); the bottom of the U-shaped bolt (6) is pre-buried in the bridge deck (5); the opening of the U-shaped bolt (6) faces upward and the cantilever beam (1) is located in the opening of the U-shaped bolt (6); a cover plate (7) is installed at the opening of the U-shaped bolt via bolts; the cover plate (7) can press the cantilever beam (1).
3. The full-length cantilever scaffolding for drainage gate rack according to claim 2 is characterized in that: A pad (8) is provided at the clamping and fixing position of the cantilever beam (1) and the U-shaped bolt (6), and two sides of the pad (8) are respectively in contact with the U-shaped bolt (6) and the cantilever beam (1).
4. The full-length cantilever scaffolding for drainage gate rack according to claim 2 is characterized in that: Structural reinforcement ribs are symmetrically pre-embedded in the bridge deck (5), and the structural reinforcement ribs penetrate the bottom profile of the U-shaped bolt (6) and contact the bottom of the U-shaped bolt (6).
5. The full-length cantilever scaffolding for drainage gate rack according to claim 1 is characterized in that: A thread protection sleeve (17) capable of protecting the thread is embedded in the thread threads exposed when the positive thread pull rod (15) and the reverse thread pull rod (16) are connected to the flower basket (14).
6. The full-length cantilever scaffolding for drainage gate rack according to claim 5 is characterized in that: The thread protection sleeve (17) is made of rubber.
7. A full-length cantilever scaffolding for drainage gates according to any one of claims 1 to 6, characterized in that: The cantilever beam (1) is an I-beam.
Citation Information
Cited By
Overhanging type scaffold installation and safety monitoring device
CN120867506A