Pulse cooperative self-adaptive control type road and bridge geological efficient piling device
By designing a pulse collaborative adaptive regulation road and bridge geological high-efficiency pile driving device, intermittent pulse current assisted pile driving, the problem of low pile driving efficiency in hard formations is solved, and an efficient, stable and safe pile driving process is achieved.
Patent Information
- Application Number
- CN202510234272.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-28
- Publication Date
- 2025-03-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing pile drivers have low pile efficiency in hard formations, resulting in slow construction progress and increased costs.
A pulse coordinated adaptive and regulated road and bridge geological high-efficiency pile driving device is designed, using pile driving frequency and intermittent pulse current to generate electromagnetic force and shock waves inside the rock through the pulse current, which helps the pile driver reduce the difficulty of pile driving and improve pile driving efficiency.
It effectively improves the efficiency of pile driving, reduces the difficulty of pile driving in hard formations, reduces construction time and cost, and extends the service life of the equipment, improving construction stability and safety.
Smart Images

Figure CN119711925A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile drivers, and in particular to a pulse coordinated adaptive control type road and bridge geological high-efficiency pile driving device. Background Art
[0002] In the construction of road and bridge projects, pile drivers are a very critical piece of machinery. With the continuous advancement of transportation infrastructure construction, whether it is highways, railway bridges, or urban road viaducts, the construction quality and efficiency requirements for foundation piles are becoming increasingly stringent.
[0003] According to the Chinese patent publication number CN119244154A, the patent provides a pulse coordinated adaptive control type road and bridge geological efficient piling device and its use method, including a mobile vehicle and a piling frame installed at the end of the mobile vehicle, the piling frame is equipped with a high-pressure rotary power head, and the high-pressure rotary power head is equipped with a drill rod assembly, the drill rod assembly includes a first drill rod assembly, a second drill rod assembly, and a third drill rod assembly; the first drill rod assembly includes a first outer sleeve that is sleeved together from the outside to the inside, effectively combining the advantages of rotary drilling rig equipment and drilling equipment specifically for hard rock formations, and modifying the existing rotary drilling rig equipment. It is very convenient to use one device to switch the drilling construction mode, and adopt a suitable drilling process according to the characteristics of different stratum structures, which effectively solves the technical problem of using the same drilling equipment to complete two drilling construction operations in two different stratum structures in succession, which not only reduces the purchase, maintenance and transportation costs of the equipment, but also avoids the situation where the construction progress is affected by frequent replacement of drilling equipment, improves construction efficiency, and greatly reduces construction costs.
[0004] Hard strata have high hardness and strength, such as rock strata. Pile hammers need greater impact force to drive piles into the strata, which will significantly slow down the speed of piling and greatly reduce the depth of piles in the soil per unit time, greatly affecting the construction progress and increasing the construction time cost. Therefore, a pulse coordinated adaptive control type road and bridge geological efficient piling device is proposed to solve the above problems. Summary of the invention
[0005] 1. Technical issues to be resolved In view of the shortcomings of the prior art, the present invention provides a pulse coordinated adaptive control type road and bridge geological efficient piling device, which solves the problem of low efficiency of pile driving into hard strata and increased construction time cost.
[0006] (II) Technical solution To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a pulse coordinated adaptive control type road and bridge geological efficient piling device, comprising a vertical guide rail, a mounting part mounted on the side wall of the vertical guide rail, for mounting a ground pulse tool, a pulse part mounted on the mounting part, for automatically and intermittently emitting pulse current to break rock formations, a piling part mounted on the vertical guide rail, for piling holes on the road surface, and a buffer part mounted on the piling part, for buffering the piling vibration force received by the pulse part.
[0007] Preferably, the mounting portion includes two mounting feet, and the two mounting feet are both mounted on one side of the vertical guide rail. The ends of the two mounting feet are fixedly connected to a U-shaped frame, and two sockets are provided on the two ear ends of the U-shaped frame. A support rod is fixedly connected to the top surface of one ear end of the U-shaped frame. There are six support rods in total, and every three support rods are respectively arranged around the outside of a socket, and the top ends of every three adjacent support rods are fixedly connected to a limiting cover, and the side wall of the U-shaped frame is fixedly connected to a threading frame, and a frame is fixedly connected between the two mounting feet.
[0008] Preferably, there are two mounting parts, and two mounting feet of another mounting part are mounted on the other side of the vertical guide rail, and the two mounting parts are symmetrically arranged with respect to each other.
[0009] Preferably, the pulse part includes two insulating columns, which are respectively inserted into the inner walls of two sockets aligned with each other between the ear ends of the U-shaped frame of the mounting part on one side, and the bottoms of the two insulating columns are provided with rod grooves, and each inner wall of the rod groove is fixedly connected to an electrode, and the tops of the two insulating columns are fixedly connected to shock-absorbing pads, and a high-voltage generator is installed on the frame, and high-voltage insulated cables are connected between the high-voltage generator and the two insulating columns, and the two high-voltage insulated cables pass through the wire threading frame and are respectively electrically connected to the two electrodes.
[0010] Preferably, there are two pulse parts, another pulse part is mounted on another mounting part, and the two pulse parts are symmetrically arranged with respect to each other.
[0011] Preferably, the piling part includes a pile frame, which is installed on the mover end of the vertical guide rail, and the inner wall of the pile frame is slidably connected with a hammer head. A lifting cylinder is installed in the pile frame, and the telescopic end of the lifting cylinder is fixedly connected to the hammer head. A pile head is inserted into the bottom of the pile frame, and the end of the pile head is in contact with the hammer head.
[0012] Preferably, the buffer part includes a T-shaped plate, the T-shaped plate is fixedly connected to one side of the pile frame, two buffer columns are slidably penetrated on the T-shaped plate, the top ends of the two buffer columns are fixedly connected to limiting plates, tension springs are elastically connected between the two limiting plates and the T-shaped plate, the two tension springs are movably mounted on the two buffer columns, and a positioning plate is fixedly connected to one side of the outer wall of the pile frame, and a distance sensor is installed on the positioning plate.
[0013] Preferably, there are two buffer parts, the T-shaped plate of the other buffer part is fixedly connected to the other side of the pile frame, and the two buffer parts are symmetrically arranged with each other.
[0014] Preferably, the two buffer columns in each of the buffer parts are respectively aligned with the two insulating columns on the same side, the top of each insulating column is respectively located between the three support rods adjacent to itself, the bottom end of each buffer column is an arc surface structure, and each buffer column passes through the corresponding limit cover and abuts against the aligned shock-absorbing pad.
[0015] Preferably, both of the two high-voltage generators are electrically connected to a microcontroller, the distance sensors in each buffer portion are electrically connected to the microcontroller located on the same side, and each distance sensor is aligned with the T-shaped plate adjacent to itself.
[0016] (III) Beneficial effects Compared with the prior art, the present invention provides a pulse coordinated adaptive control type road and bridge geological efficient piling device, which has the following beneficial effects: 1. The pulse coordinated adaptive control type road and bridge geological efficient piling device adopts the piling frequency combined with the intermittent emission of pulse current to improve the piling efficiency. When facing hard formations such as rock formations, the pulse current automatically emitted intermittently by the pulse part can generate electromagnetic force and shock waves inside the rock, causing cracks in the rock, effectively assisting the pile driver to reduce the difficulty of piling and improve the efficiency of piling.
[0017] 2. This pulse coordinated adaptive control type road and bridge geological efficient piling device, when applied to soil pavement, uses a high-voltage generator to adjust the current size for intermittent discharge, which can make the soil particles periodically stressed under the action of the electric field, change the charge distribution and the force between the particles, and make the soil structure loose and the pores increase after multiple actions. Compared with continuous discharge, it is more conducive to drilling operations and provides good conditions for subsequent piling.
[0018] 3. The pulse coordinated adaptive control type road and bridge geological efficient piling device adopts the working mode of intermittent pulse current emission to protect equipment and improve stability. Compared with the continuous emission current, it allows the equipment to have time to dissipate heat and rest, which can reduce the damage caused by overheating, excessive work, etc., and extend the service life of the equipment, such as protecting the key electronic components in the pulse current emission device and the mechanical parts related to piling.
[0019] 4. The pulse coordinated adaptive control type road and bridge geological efficient piling device adopts the design of the buffer part to effectively improve the stability and safety of the piling operation. The buffer column can first enter the limit cover during the piling process, abut the shock-absorbing pad, and use the tension spring to buffer the impact vibration generated by the piling, thereby reducing the damage to the components caused by the vibration. At the same time, it ensures the stability of the high-voltage pulse and prevents the electrode from bouncing up due to vibration and causing pulse current leakage.
[0020] 5. The pulse coordinated adaptive control type road and bridge geological efficient piling device optimizes the construction environment and saves energy. The intermittent emission of pulse current can reduce the electromagnetic interference at the construction site, make the electromagnetic field distributed discretely in time, reduce the continuous interference to other electronic equipment at the construction site, and ensure smooth communication and accurate monitoring data during the construction process.
[0021] 6. The pulse coordinated adaptive control type road and bridge geological efficient piling device can flexibly adjust the pulse current emission frequency and intensity according to the actual crushing conditions of the rock or soil, avoid unnecessary energy consumption, and achieve energy saving while ensuring the construction effect. It is especially suitable for construction scenarios where electricity costs need to be controlled. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the overall structure of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention; Figure 2 This is a connection diagram of the vertical guide rail and the mounting part of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention; Figure 3 This is a connection diagram of the installation part and the pulse part of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention; Figure 4 This is a structural schematic diagram of the installation part of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention; Figure 5 This is a connection diagram of the piling part and the buffer part of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention; Figure 6 This is a schematic diagram of the structure of a pulse coordinated adaptive control type road and bridge geological efficient piling device distance sensor proposed by the present invention; Figure 7 This is a structural schematic diagram of the buffer part and the pulse part of a pulse coordinated adaptive control type road and bridge geological efficient piling device proposed by the present invention.
[0023] In the figure: 1. vertical guide rail; 2. mounting part; 21. mounting foot; 22. U-shaped frame; 23. support rod; 24. limit cover; 25. threading rack; 26. rack; 3. pulse part; 31. insulating column; 32. electrode; 33. shock-absorbing pad; 34. high-voltage generator; 35. high-voltage insulated cable; 4. pile driving part; 41. pile frame; 42. hammer head; 43. lifting cylinder; 44. pile head; 5. buffer part; 51. T-plate; 52. buffer column; 53. limit plate; 54. tension spring; 55. positioning plate; 56. distance sensor. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1-7 The present invention provides a technical solution: a pulse coordinated adaptive control type road and bridge geological efficient piling device, including a vertical guide rail 1, the vertical guide rail 1 is one of the components of the pile driver body in the prior art, and no further details are given in this case. The mounting part 2 of this case is mounted on the side wall of the vertical guide rail 1, and is used to install a ground pulse tool. The pulse part 3 of this case is mounted on the mounting part 2, and is used to automatically and intermittently emit pulse current to break rock formations. The piling part 4 of this case is mounted on the vertical guide rail 1, and is used for piling holes on the road surface. The buffer part 5 of this case is mounted on the piling part 4, and is used to buffer the piling vibration force received by the pulse part 3.
[0026] In the present invention, in order to more easily adapt to the pulse tools related to this case, the mounting portion 2 of this case includes two mounting feet 21, both mounting feet 21 are mounted on one side of the vertical guide rail 1, the ends of the two mounting feet 21 are fixedly connected with a U-shaped frame 22, and two ear ends of the U-shaped frame 22 are provided with two sockets, and the top surface of one ear end of the U-shaped frame 22 is fixedly connected with a support rod 23, and there are six support rods 23 in total, and every three support rods 23 are respectively arranged around the outside of a socket, and the tops of every three adjacent support rods 23 are fixedly connected with a limiting cover 24, and the side wall of the U-shaped frame 22 is fixedly connected with a threading frame 25, and the threading frame 25 is used to thread the cable to avoid entanglement, and a frame 26 is fixedly connected between the two mounting feet 21. There are two mounting parts 2, and the two mounting feet 21 of the other mounting part 2 are mounted on the other side of the vertical guide rail 1, and the two mounting parts 2 are symmetrically arranged with each other.
[0027] In this embodiment, in order to use the pile driving frequency to call the pulse current in real time to process the road surface, the pulse part 3 of this case includes two insulating columns 31, and the two insulating columns 31 are respectively inserted into the inner walls of the two jacks aligned with each other between the ear ends of the U-shaped frame 22 of the mounting part 2 on one side. The bottoms of the two insulating columns 31 are provided with rod grooves, and the inner walls of each rod groove are fixedly connected with electrodes 32. The tops of the two insulating columns 31 are fixedly connected with shock-absorbing pads 33. A high-voltage generator 34 is installed on the frame 26, and a TP3020 high-voltage pulse power supply is used to connect to the city power during road and bridge construction. A high-voltage insulated cable 35 is connected between the high-voltage generator 34 and the two insulating columns 31. The two high-voltage insulated cables 35 pass through the threading frame 25 and are electrically connected to the two electrodes 32 respectively. There are two pulse parts 3, and another pulse part 3 is installed on another mounting part 2. The two pulse parts 3 are symmetrically arranged with each other.
[0028] It is worth noting that the piling part 4 in this case includes a pile frame 41, which is installed on the mover end of the vertical guide rail 1, and the inner wall of the pile frame 41 is slidably connected with a hammer head 42, and a lifting cylinder 43 is installed in the pile frame 41, and the telescopic end of the lifting cylinder 43 is fixedly connected to the hammer head 42, and a pile head 44 is inserted at the bottom of the pile frame 41, and the end of the pile head 44 is in contact with the hammer head 42.
[0029] In order to further improve the stability and safety of piling, the buffer part 5 in this case includes a T-shaped plate 51, which is fixedly connected to one side of the pile frame 41. Two buffer columns 52 are slidably penetrated on the T-shaped plate 51. The top ends of the two buffer columns 52 are fixedly connected to limit plates 53. Tension springs 54 are elastically connected between the two limit plates 53 and the T-shaped plate 51. The two tension springs 54 are movably mounted on the two buffer columns 52 respectively. A positioning plate 55 is fixedly connected to one side of the outer wall of the pile frame 41. A distance sensor 56 is installed on the positioning plate 55. The LD80X laser infrared ranging module is adopted. There are two buffer parts 5. The T-shaped plate 51 of the other buffer part 5 is fixedly connected to the other side of the pile frame 41. The two buffer parts 5 are symmetrically arranged with each other.
[0030] It is worth noting that the two buffer columns 52 in each buffer part 5 are respectively aligned with the two insulating columns 31 on the same side, the top of each insulating column 31 is respectively located between the three support rods 23 adjacent to itself, and the bottom end of each buffer column 52 is a curved surface structure. Each buffer column 52 passes through the corresponding limit cover 24 and abuts against the aligned shock-absorbing pad 33. The support rod 23 and the limit cover 24 can further ensure the stability of the lifting and lowering of the pile frame 41 and improve the work safety. The two high-voltage generators 34 are electrically connected to the microcontroller, and the distance sensor 56 in each buffer part 5 is respectively electrically connected to the microcontroller located on the same side, and each distance sensor 56 is respectively aligned with the T-plate 51 adjacent to itself.
[0031] Working principle: the mover end of the vertical guide rail 1 lifts the pile frame 41 to a high position, and the insulating columns 31 on the U-shaped frames 22 on both sides are perpendicular to the road surface, prompting the electrode 32 to contact the road surface, and the lifting cylinder 43 drives the hammer head 42 to rise and fall back and forth, prompting the hammer head 42 to repeatedly hit the pile head 44, thereby drilling the road surface. Each time the hammer head 42 rises and falls, the distance between the T-plate 51 and the positioning plate 55 changes, and then the distance is measured in real time by the distance sensor 56. When the hammer head 42 descends and hits the pile head 44, the distance sensor 56 detects that the distance of the T-plate 51 is reduced to the threshold and sends a feedback signal, and then activates the high-voltage generator 34 through the microcontroller. The high-voltage generator 34 transmits current to the electrode 32 through the high-voltage insulated cable 35, and sends a pulse current to the road surface at the drilling position through the electrode 32, generating electromagnetic force and shock waves inside the rock, which helps to break the rock and assist the pile driver to improve the efficiency of pile driving. When facing hard formations, cracks are generated in the rock to reduce the difficulty of pile driving.
[0032] When the hammer head 42 rises, the distance sensor 56 detects that the T-plate 51 is away from the detection threshold and stops the high-voltage generator 34 through the microcontroller. Therefore, during the reciprocating pile driving process, the pulse current can be automatically emitted intermittently according to the frequency of the pile driving. Compared with the continuous emission current, it can give the equipment time to dissipate heat and rest, which can cause fatigue effect in the rock formation and make it easier to further break the rock along these already extended cracks, thereby improving the crushing efficiency of the rock formation. The intermittent emission of pulse current can reduce electromagnetic interference at the construction site and flexibly adjust the emission frequency and intensity according to the actual crushing situation of the rock formation.
[0033] The buffer column 52 in the buffer part 5 moves up and down with the hammer head 42. When descending, the bottom end of the buffer column 52 is longer than the pile frame 41, so it will first enter the limit cover 24 to avoid deviation, so that the buffer column 52 abuts the shock-absorbing pad 33, and tightens the limit plate 53 through the tension of the tension spring 54, so that the insulating column 31 is stably pressed against the ground. At the same time, the impact vibration generated during piling can be transmitted to the buffer column 52 through the shock-absorbing pad 33 and then to the tension spring 54 for buffering, thereby reducing the damage to the components caused by the vibration, further ensuring the stability of the high-voltage pulse, avoiding the hidden danger of pulse current leakage caused by the electrode 32 bouncing up due to vibration, and further improving the safety of the pulse part 3 by coordinating with the piling frequency.
[0034] Similarly, when dealing with soil roads, the current size can be adjusted through the high-voltage generator 34, so that through intermittent discharge, the soil particles can be periodically subjected to attraction and repulsion under the action of the electric field. Each time the discharge occurs, the charge distribution on the surface of the soil particles changes, and the force between the particles also changes accordingly. After multiple intermittent discharges, the soil structure will become loose, and the pores between the particles will increase. Compared with continuous discharge, it is easier to loosen the soil, making the drilling operation more efficient, and providing safer and more efficient protection for subsequent pile driving.
[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
Claims
1. A pulse coordinated adaptive control type road and bridge geological efficient piling device, characterized in that: include: Vertical guide rail (1); A mounting portion (2) mounted on a side wall of the vertical guide rail (1) and used for mounting a ground pulse tool; A pulse part (3) is mounted on the mounting part (2) and is used for automatically and intermittently emitting pulse current to break rock formations; A piling unit (4) is mounted on the vertical guide rail (1) and is used for piling and drilling holes on the road surface; The buffer part (5) is mounted on the piling part (4) and is used to buffer the piling vibration force exerted on the pulse part (3).
2. According to claim 1, a pulse coordinated adaptive control type road and bridge geological efficient piling device is characterized by: The mounting portion (2) comprises two mounting feet (21), the two mounting feet (21) are both mounted on one side of the vertical guide rail (1), the ends of the two mounting feet (21) are fixedly connected to a U-shaped frame (22), two ear ends of the U-shaped frame (22) are provided with two plug holes, a support rod (23) is fixedly connected to the top surface of one ear end of the U-shaped frame (22), there are six support rods (23) in total, every three support rods (23) are respectively arranged around the outside of a plug hole, the top ends of every three adjacent support rods (23) are fixedly connected to a limiting cover (24), the side wall of the U-shaped frame (22) is fixedly connected to a threading frame (25), and a frame (26) is fixedly connected between the two mounting feet (21).
3. According to claim 2, a pulse coordinated adaptive control type road and bridge geological efficient piling device is characterized by: There are two mounting parts (2), and two mounting feet (21) of another mounting part (2) are mounted on the other side of the vertical guide rail (1), and the two mounting parts (2) are arranged symmetrically with each other.
4. According to claim 3, a pulse coordinated adaptive control type road and bridge geological efficient piling device is characterized by: The pulse part (3) comprises two insulating columns (31), the two insulating columns (31) are respectively inserted into the inner walls of two mutually aligned jacks between the ear ends of the U-shaped frame (22) of the mounting part (2) on one side, the bottoms of the two insulating columns (31) are provided with rod grooves, the inner walls of each rod groove are fixedly connected to an electrode (32), the tops of the two insulating columns (31) are fixedly connected to a shock-absorbing pad (33), a high-voltage generator (34) is installed on the frame (26), a high-voltage insulating cable (35) is connected between the high-voltage generator (34) and the two insulating columns (31), and the two high-voltage insulating cables (35) pass through the threading frame (25) and are respectively electrically connected to the two electrodes (32).
5. According to claim 4, a pulse coordinated adaptive control type road and bridge geological efficient piling device is characterized by: There are two pulse parts (3), another pulse part (3) is mounted on another mounting part (2), and the two pulse parts (3) are arranged symmetrically with each other.
6. According to claim 5, a pulse coordinated adaptive control type road and bridge geological efficient piling device is characterized by: The pile driving part (4) comprises a pile frame (41), the pile frame (41) is mounted on the mover end of the vertical guide rail (1), a hammer head (42) is slidably connected to the inner wall of the pile frame (41), a lifting cylinder (43) is installed in the pile frame (41), the telescopic end of the lifting cylinder (43) is fixedly connected to the hammer head (42), a pile head (44) is inserted at the bottom of the pile frame (41), and the end of the pile head (44) is in contact with the hammer head (42).
7. The pulse coordinated adaptive control type road and bridge geological efficient piling device according to claim 6 is characterized by: The buffer portion (5) comprises a T-shaped plate (51), the T-shaped plate (51) being fixedly connected to one side of the pile frame (41), two buffer columns (52) slidingly passing through the T-shaped plate (51), the top ends of the two buffer columns (52) being fixedly connected to a limiting plate (53), tension springs (54) being elastically connected between the two limiting plates (53) and the T-shaped plate (51), the two tension springs (54) being movably sleeved on the two buffer columns (52), and a positioning plate (55) being fixedly connected to one side of the outer wall of the pile frame (41), the positioning plate (55) being mounted with a distance sensor (56).
8. The pulse coordinated adaptive control type road and bridge geological efficient piling device according to claim 7 is characterized by: There are two buffer parts (5), the T-shaped plate (51) of the other buffer part (5) is fixedly connected to the other side of the pile frame (41), and the two buffer parts (5) are symmetrically arranged with respect to each other.
9. The pulse coordinated adaptive control type road and bridge geological efficient piling device according to claim 8, characterized in that: The two buffer columns (52) in each buffer portion (5) are respectively aligned with the two insulating columns (31) on the same side, the top end of each insulating column (31) is respectively located between three adjacent support rods (23), the bottom end of each buffer column (52) is a curved surface structure, and each buffer column (52) passes through a corresponding limiting cover (24) and abuts against the aligned shock-absorbing pad (33).
10. The pulse coordinated adaptive control type road and bridge geological efficient piling device according to claim 9, characterized in that: The two high-voltage generators (34) are electrically connected to a microcontroller, the distance sensors (56) in each buffer portion (5) are electrically connected to the microcontroller located on the same side, and each distance sensor (56) is aligned with the adjacent T-shaped plate (51).
Citation Information
Patent Citations
Pile driver for road and bridge construction and using method thereof
CN119244154A
Cited By
Pulse cooperative self-adaptive control type road and bridge geological efficient piling device
CN120083445A
Pulse cooperative self-adaptive regulation type road-bridge geological efficient piling device
CN120083445B