Intelligent compaction method for asphalt pavement
By adjusting the number of compaction times and rolling rate in real time at the asphalt pavement construction site, and using the functional relationship established by indoor and on-site experiments, the problem of difficult control of asphalt pavement compaction in the existing technology is solved, and higher quality asphalt pavement construction and extended service life are achieved.
Patent Information
- Application Number
- CN202411591432.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-11-08
AI Technical Summary
The existing asphalt pavement compaction method is difficult to ensure the rationality of compaction, resulting in diseases such as ruts and water damage. The core extraction test only represents the "point" result and cannot reflect the compaction of the "surface".
Through indoor rotation compaction experiments and construction site experiments, the functional relationship between the compaction degree, the number of rotation compaction times and the internal temperature of the asphalt mixture, as well as the functional relationship between the surface temperature and the internal temperature are established. Using these functional relationships, combined with the actual conditions at the construction site, the number of compaction times and rolling rate are adjusted in real time to ensure that the compaction degree reaches the standard.
It effectively solves the problem of unreasonable compaction times, avoids various diseases that appear later in the asphalt pavement, ensures the quality of the project and extends the service life of the asphalt pavement.
Smart Images

Figure CN119715670A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of asphalt pavement construction, and in particular to an intelligent compaction method for an asphalt pavement. Background Art
[0002] The degree of compaction seriously affects the performance and service life of asphalt pavement. Insufficient compaction can easily cause rutting, water damage and other diseases; on the contrary, excessive compaction can easily cause aggregate crushing, oiling of the road surface and other phenomena. Therefore, during its construction, it is necessary to ensure that the asphalt pavement has a reasonable degree of compaction to ensure that it has good service performance during the operation stage. In engineering practice, the number of rolling passes and other processes are determined by test roads and combined with engineering experience. The number of rolling passes determined by the test road is used for control, and a very small amount of coring tests are used as verification. However, as a temperature-sensitive viscoelastic material, the compaction characteristics of asphalt mixture are closely related to its rolling temperature and rate. When the temperature is high, it is easy to compact, and when the temperature is low, compaction is extremely difficult; on the other hand, from the perspective of energy conservation, when other conditions are constant, the work output by the roller per unit time is constant. Therefore, when the travel speed of the roller changes, the compaction work obtained by the mixture per unit area will inevitably change. In the actual construction process, the temperature of the mixture is affected by the production, transportation, paving and construction climate of the mixing station, and it is difficult to ensure stability, and the speed of the roller is also difficult to maintain constant. Therefore, it is difficult to ensure that the compaction degree meets the relevant requirements by simply controlling the number of passes. A very small amount of coring test only represents the results of the "point" and cannot reflect the compaction degree of the "surface". In addition, the coring test is a post-verification. Once the compaction degree is insufficient, it can only be reworked, resulting in great waste. Summary of the invention
[0003] The purpose of the present invention is to provide an intelligent compaction method for asphalt pavement, so as to solve the problem that the existing asphalt pavement compaction method is prone to unreasonable compaction times.
[0004] The present invention is achieved through the following technical solutions:
[0005] An asphalt pavement intelligent compaction method comprises the following steps:
[0006] Conducting indoor rotary compaction experiments to obtain the functional relationship between the compaction degree, rotary compaction times and internal temperature of the asphalt mixture, and establishing the first function;
[0007] Conducting construction site experiments to obtain the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establish the second function;
[0008] Substituting the actual surface temperature of the asphalt mixture at the construction site into the second function to obtain the actual internal temperature of the asphalt mixture, and substituting the actual internal temperature into the first function to obtain the standard number of rotary compaction times when the compaction degree reaches the standard compaction degree;
[0009] At the construction site, obtain the standard rolling rate and actual rolling rate of the compaction machinery;
[0010] According to the functional equivalence principle, the actual number of rotary compactions is obtained by using the standard rolling rate, the actual rolling rate and the standard number of rotary compactions;
[0011] Substituting the actual number of rotary compaction times and the actual internal temperature of the asphalt mixture at the construction site into the first function to obtain an actual degree of compaction;
[0012] When the actual compaction degree is greater than or equal to the standard compaction degree, the actual rolling rate is used for compaction operation;
[0013] When the actual compaction degree is less than the standard compaction degree, a supplementary compaction operation is performed.
[0014] Optionally, the step of obtaining the functional relationship between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture and establishing the first function comprises the following steps:
[0015] Obtain multiple portions of asphalt mixture and measure the internal temperature of each;
[0016] Each asphalt mixture is used to carry out indoor rotary compaction experiments to obtain a data set of the compaction degree of the asphalt mixture and the corresponding rotary compaction times at the corresponding internal temperature;
[0017] The first function is obtained by fitting all the data sets.
[0018] Optionally, the fitting of all the data sets to obtain the first function comprises the following steps:
[0019] Fitting the data set corresponding to each asphalt mixture to obtain a data curve of compaction degree and rotary compaction times at each internal temperature;
[0020] The first function is obtained by fitting all the data curves.
[0021] Optionally, the step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function comprises the following steps:
[0022] The surface temperature of multiple points of the asphalt mixture to be compacted is measured by infrared temperature sensors;
[0023] The internal temperature of each point of the asphalt mixture to be compacted is measured by an insertion thermometer;
[0024] The second function is obtained by fitting all surface temperatures and internal temperatures of all points of the asphalt mixture.
[0025] Optionally, the step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function comprises the following steps:
[0026] The surface temperature of any point of the asphalt mixture to be compacted is measured by an infrared temperature sensor;
[0027] The internal temperature of the asphalt mixture to be compacted at any point is measured by an insertion thermometer;
[0028] The temperature difference between the surface temperature and the internal temperature of the asphalt mixture is calculated to obtain the second function.
[0029] Optionally, the method of obtaining the actual number of rotary compactions according to the functional equivalence principle by using the standard rolling rate, the actual rolling rate and the standard number of rotary compactions comprises the following steps:
[0030] Establish the equivalent proportional relationship between the number of rotary compaction times and the rolling rate of the compaction machine when the asphalt mixture is at the same internal temperature, and obtain the equivalent proportional formula;
[0031] Substitute the standard rolling rate, the actual rolling rate and the standard number of rotary compaction times into the equivalent proportional formula to obtain the actual number of rotary compaction times.
[0032] Optionally, the equivalent ratio formula is:
[0033]
[0034] in:
[0035] n1 is the standard number of gyratory compaction;
[0036] n2 is the actual number of rotary compaction times;
[0037] v1 is the standard rolling rate;
[0038] v2 is the actual rolling rate.
[0039] Optionally, the pressure replenishing operation comprises the following steps:
[0040] Obtain the function between the compaction degree of the asphalt mixture and the number of compaction passes, and establish a third function;
[0041] Substitute the actual compaction degree and the standard compaction degree into the third function to obtain the number of times of compaction replenishment, and perform compaction replenishment operation using the actual rolling rate and the number of times of compaction replenishment.
[0042] Optionally, the step of obtaining a function between the degree of compaction of the asphalt mixture and the number of compaction passes to establish a third function comprises the following steps:
[0043] Obtaining existing experience data sets of compaction degree and compaction passes;
[0044] The third function is obtained by fitting the existing empirical data set.
[0045] Optionally, substituting the actual compaction degree and the standard compaction degree into the third function to obtain the number of compaction passes comprises the following steps:
[0046] Substituting the standard compaction degree into the third function to obtain the standard compaction passes;
[0047] Substituting the actual compaction degree into the third function to obtain the actual number of compaction passes;
[0048] The data difference between the actual compaction passes and the standard compaction passes is calculated to obtain the supplementary compaction passes.
[0049] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0050] The present invention provides an intelligent compaction method for asphalt pavement. Based on an indoor rotary compaction experiment, the functional relationship between the compaction degree, rotary compaction times and internal temperature of the asphalt mixture is obtained to establish a first function. On this basis, through a construction site experiment, the functional relationship between the surface temperature and the internal temperature of the asphalt mixture is obtained to establish a second function, thereby converting the internal temperature that is inconvenient to measure into the measured external temperature, and the external temperature can be associated with the compaction degree and the rotary compaction times. On this basis, by substituting the actual surface temperature of the asphalt mixture at the construction site into the second function, the actual internal temperature of the asphalt mixture is obtained, and the actual internal temperature is substituted into the first function to obtain the standard rotary compaction times when the compaction degree reaches the standard compaction degree. On this basis, by obtaining the standard rolling rate of the compaction machinery and the actual rolling rate at the construction site Rolling rate, using the principle of functional equivalence, can establish the relationship between the number of rotary compaction times and the rolling speed, so as to obtain the actual number of rotary compaction times; on this basis, by substituting the actual number of rotary compaction times and the actual internal temperature of the asphalt mixture at the construction site into the first function, the actual compaction degree can be obtained as a data reference for actual judgment. When the actual compaction degree ≥ the standard compaction degree, the actual rolling rate is used for compaction operation, and when the actual compaction degree < the standard compaction degree, a supplementary compaction operation is performed; through the mutual coordination of the above steps, the asphalt pavement intelligent compaction method can effectively solve the problem of unreasonable compaction times in the existing asphalt pavement compaction method, avoid various diseases of the asphalt pavement in the later stage caused by unreasonable compaction times, ensure the engineering quality of the asphalt pavement, and extend the service life of the asphalt pavement. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0052] Figure 1 A flow chart of an asphalt pavement intelligent compaction method provided by an embodiment of the present invention;
[0053] Figure 2 It is the first fitting diagram between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture in Example 1 of the present invention;
[0054] Figure 3 It is the second fitting diagram between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture in Example 1 of the present invention;
[0055] Figure 4 is a fitting diagram of the third function of the pressure compensation operation;
[0056] Figures 5 to 8 A schematic diagram of compaction operation provided by an embodiment of the present invention;
[0057] Fig. 9 A schematic diagram provided for an embodiment of the present invention. DETAILED DESCRIPTION
[0058] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0059] Please refer to Figure 1 This embodiment provides an asphalt pavement intelligent compaction method, comprising the following steps:
[0060] S1. Conducting an indoor rotary compaction experiment to obtain a functional relationship between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture, and establishing a first function;
[0061] S2. Conducting a construction site experiment to obtain a functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establish a second function;
[0062] S3, substituting the actual surface temperature of the asphalt mixture at the construction site into the second function to obtain the actual internal temperature of the asphalt mixture, substituting the actual internal temperature into the first function to obtain the standard rotary compaction times when the compaction degree reaches the standard compaction degree;
[0063] S4. Obtain the standard rolling rate and actual rolling rate of the compaction machinery at the construction site;
[0064] S5. According to the functional equivalence principle, the actual number of rotary compactions is obtained by using the standard rolling rate, the actual rolling rate and the standard number of rotary compactions;
[0065] S6, substituting the actual number of rotary compaction times and the actual internal temperature of the asphalt mixture at the construction site into the first function to obtain an actual degree of compaction;
[0066] When the actual compaction degree is greater than or equal to the standard compaction degree, the actual rolling rate is used for compaction operation;
[0067] When the actual compaction degree is less than the standard compaction degree, a supplementary compaction operation is performed.
[0068] The asphalt pavement intelligent compaction method provided in the present embodiment obtains the functional relationship between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture based on the indoor rotary compaction experiment through step S1, and establishes a first function; on this basis, obtains the functional relationship between the surface temperature and the internal temperature of the asphalt mixture through step S2 in the construction site experiment, and establishes a second function, thereby converting the internal temperature that is inconvenient to measure into the measured external temperature, and the external temperature can be associated with the compaction degree and the number of rotary compaction times; on this basis, substitutes the actual surface temperature of the asphalt mixture at the construction site into the second function through step S3 to obtain the actual internal temperature of the asphalt mixture, and substitutes the actual internal temperature into the first function to obtain the standard number of rotary compaction times when the compaction degree reaches the standard compaction degree; on this basis, obtains the standard rolling mill of the compaction machinery at the construction site through steps S4 and S5. The relationship between the number of rotary compaction times and the rolling speed can be established by using the functional equivalence principle, thereby obtaining the actual number of rotary compaction times. On this basis, through step S6, the actual number of rotary compaction times and the actual internal temperature of the asphalt mixture at the construction site are substituted into the first function to obtain the actual compaction degree, which is used as a data reference for actual judgment. When the actual compaction degree is ≥ the standard compaction degree, the roller enters the next area for rolling, and when the actual compaction degree is < the standard compaction degree, the roller continues to perform additional rolling in the area. Through the mutual coordination of the above steps, the intelligent compaction method for asphalt pavement can effectively solve the problem of unreasonable compaction times in the existing asphalt pavement compaction method, thereby avoiding various diseases of the asphalt pavement in the later stage caused by unreasonable compaction times, ensuring the engineering quality of the asphalt pavement, and extending the service life of the asphalt pavement.
[0069] Specifically, a GNSS antenna is installed on the top of the roller to receive Beidou signals, obtain the current position of the roller in real time, and obtain speed signals, temperature, compaction data, etc. in real time, and express them in the form of cloud maps. When the compaction is sufficient, record the current position information and compaction, such as Figure 5In the red area, the roller moves to the next area for rolling. Figure 5 The blue area) is immediately alarmed, and the roller continues to perform additional rolling in the area. As the number of rolling times increases, the cumulative compaction value is continuously updated until the compaction meets the requirements. At the same time, the roller position information is combined with the cumulative compaction information in the form of a cloud map, such as Figures 5 to 8 The uncompacted area is detected and displayed on the vehicle terminal, and it is remotely transmitted to the server via GPRS signal (such as Fig. 9 shown).
[0070] In order to further explain the method of establishing the first function, the acquisition of the functional relationship between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture and the establishment of the first function includes the following steps:
[0071] S1.1. Obtain multiple portions of asphalt mixture and measure the internal temperature of each portion;
[0072] S1.2. Conduct indoor rotary compaction experiments on each asphalt mixture to obtain a data set of the compaction degree of the asphalt mixture and the corresponding number of rotary compaction times at the corresponding internal temperature;
[0073] S1.3. Fitting the entire data set to obtain the first function.
[0074] In order to further explain the above fitting method, the fitting of all the data sets to obtain the first function includes the following steps:
[0075] S1.3.1. Fitting the data set corresponding to each asphalt mixture to obtain a data curve of compaction degree and rotary compaction times at each internal temperature;
[0076] S1.3.2. Fitting all the data curves to obtain the first function.
[0077] Optionally, in order to further explain the method of establishing the second function, the step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function includes the following steps:
[0078] S2.1. Measure the surface temperature of multiple points of the asphalt mixture to be compacted by infrared temperature sensors;
[0079] Specifically, an infrared temperature sensor is installed at the front end of the roller to obtain the surface temperature of the asphalt mixture within a certain range, and the surface temperature of multiple points of the asphalt mixture to be compacted is measured by the infrared temperature sensor;
[0080] S2.2. Measure the internal temperature of each point of the asphalt mixture to be compacted by an insertion thermometer;
[0081] S2.3. The second function is obtained by fitting all surface temperatures and internal temperatures of all points of the asphalt mixture.
[0082] Simplified, optionally, in order to further explain the method of establishing the second function, the step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function includes the following steps:
[0083] S2.1. Measure the surface temperature of any point of the asphalt mixture to be compacted by an infrared temperature sensor;
[0084] S2.2. Measure the internal temperature of any point of the asphalt mixture to be compacted by an insertion thermometer;
[0085] S2.3. Calculate the temperature difference between the surface temperature and the internal temperature of the asphalt mixture to obtain the second function.
[0086] In order to further explain the specific method of obtaining the actual number of rotary compaction, the actual number of rotary compaction is obtained according to the functional equivalence principle through the standard rolling rate, the actual rolling rate and the standard number of rotary compaction, including the following steps:
[0087] S5.1. Establish the equivalent proportional relationship between the number of rotary compaction times and the rolling rate of the compaction machine when the asphalt mixture is at the same internal temperature, and obtain the equivalent proportional formula;
[0088] S5.2. Substitute the standard rolling rate, the actual rolling rate and the standard number of rotary compaction times into the equivalent proportional formula to obtain the actual number of rotary compaction times.
[0089] It should be noted that the equivalent ratio formula is:
[0090]
[0091] Among them: n1 is the standard rotary compaction number; n2 is the actual rotary compaction number; v1 is the standard rolling rate; v2 is the actual rolling rate.
[0092] In order to further explain the specific method of the pressure replenishing operation, the pressure replenishing operation includes the following steps:
[0093] S6.1. Obtain a function between the compaction degree of the asphalt mixture and the number of compaction passes, and establish a third function;
[0094] S6.2. Substitute the actual compaction degree and the standard compaction degree into the third function to obtain the number of times of compaction supplementation, and perform compaction supplementation operation using the actual rolling rate and the number of times of compaction supplementation.
[0095] In order to further explain the specific method of establishing the third function, the method of obtaining the function between the compaction degree of the asphalt mixture and the number of compaction passes and establishing the third function includes the following steps:
[0096] S6.1.1. Obtain the existing empirical data set of compaction degree and compaction passes;
[0097] S6.1.2. Obtain the third function by fitting the existing empirical data set.
[0098] In order to further explain the specific method of obtaining the number of times of compaction replenishment, the actual degree of compaction and the standard degree of compaction are substituted into the third function to obtain the number of times of compaction replenishment, including the following steps:
[0099] S6.2.1. Substitute the standard compaction degree into the third function to obtain a standard number of compaction passes;
[0100] S6.2.2, substituting the actual compaction degree into the third function to obtain the actual number of compaction passes;
[0101] S6.2.3. Calculate the data difference between the actual number of compaction passes and the standard number of compaction passes to obtain the number of supplementary compaction passes.
[0102] S6.2.4. If the design compaction value is met, proceed to the next area for compaction. If not, continue compacting in the area until the requirements are met.
[0103] Example 1
[0104] The asphalt mixture used in the asphalt pavement construction site of a certain section was subjected to indoor rotational compaction test to obtain the relationship between the number of rotations n and the compaction degree at different temperatures. Figure 2 As shown, we further fit the function compaction = f(n,T), and the fitting results and surfaces are shown in Figure 3 Based on the correlation between the existing asphalt mixture surface and the internal temperature of the mixture obtained by the insertion thermometer, the internal rolling temperature of the on-site asphalt mixture is converted to 160°C. At this temperature, the number of rotations when the compaction degree of the indoor rotary compaction test meets the standard is n1=140 times.
[0105] The fitting function expression is as follows:
[0106] P=f(n,T)=p00+p10×n+p01×T+p20×n2+p11×n×T+p02×T2+p30×n3+p21×n2×T+p12×n×T2+p03×T3(1);
[0107] p00=-75.62; p10=0.1059; p01=2.697;
[0108] p20=-0.008319; p11=0.006753; p02=-0.0166;
[0109] p30=5.627×10 -5 ; p21 = -2.335 × 10 -5 ; p12 = -1.225 × 10 -5 ;
[0110] p03=3.424×10 -5 .
[0111] The standard compaction rate of compaction machinery v1 = 3m / min was determined through the test section;
[0112] Based on the principle of energy equivalence under indoor and on-site construction conditions, namely: (Under the same temperature conditions)(2);
[0113] The on-site compaction mechanical rate v2 = 5 m / min is further determined, and is substituted into equation (2) to obtain n2 = 84 times. Then n2 and the temperature during on-site compaction T = 160°C are substituted into equation (1) as independent variables to obtain that the compaction degree is approximately 93% when the compaction mechanical rate is v2 under this temperature condition.
[0114] Example 2
[0115] During the compaction process of the asphalt pavement in a certain section, in order to realize the intelligent compaction of the asphalt pavement, a rate sensor and an infrared temperature sensor are installed at the front end of the roller to obtain the movement rate of the roller and the compaction temperature of the asphalt pavement surface in real time. Based on the correlation between the existing asphalt mixture surface and the internal temperature of the mixture obtained by the insertion thermometer, it is converted to its internal temperature T, and transmitted to the computer in real time through 5G network technology for calculation, and the compaction degree of the roller rolling area is calculated. It has been clearly stated on site that the compaction rate of the asphalt pavement under the standard compaction degree is v1=3m / min, and the current compaction rate is v2=5m / min. The compaction degree is calculated to be about 93% using the algorithm provided by the present invention. If it does not meet the standard requirements, an alarm will be immediately issued, and the current roller will immediately perform a re-compression operation so that its compaction degree meets the standard requirements, and then continue to move forward to complete the work in other areas to be compacted.
[0116] Example 3
[0117] During the compaction process of a certain section of asphalt pavement, in order to realize intelligent compaction of the asphalt pavement, the compaction rate of the asphalt pavement under the standard compaction degree has been clearly defined on site as v1=3m / min, and the current compaction rate v2=5m / min. The compaction degree calculated by the algorithm provided by the present invention is about 93%, which does not meet the standard requirements. Based on the existing data, the relationship between the compaction passes and the compaction degree under the current working conditions is fitted with a function, and the expression is: Y=4.2116ln(x)+90.349;
[0118] Among them, Y is the compaction degree and x is the number of compaction passes.
[0119] Then substitute the current compaction degree to determine that when the standard compaction degree reaches 98%, about 4 more rollings are required. The current roller will make up the compaction 4 times in time to meet the standard compaction degree, and then move on to other areas to be rolled to continue working.
[0120] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An intelligent compaction method for asphalt pavement, characterized in that: The steps include: Conducting indoor rotary compaction experiments to obtain the functional relationship between the compaction degree, rotary compaction times and internal temperature of the asphalt mixture, and establishing the first function; Conducting construction site experiments to obtain the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establish the second function; Substituting the actual surface temperature of the asphalt mixture at the construction site into the second function to obtain the actual internal temperature of the asphalt mixture, and substituting the actual internal temperature into the first function to obtain the standard number of rotary compaction times when the compaction degree reaches the standard compaction degree; At the construction site, obtain the standard rolling rate and actual rolling rate of the compaction machinery; According to the functional equivalence principle, the actual number of rotary compactions is obtained by using the standard rolling rate, the actual rolling rate and the standard number of rotary compactions; Substituting the actual number of rotary compaction times and the actual internal temperature of the asphalt mixture at the construction site into the first function to obtain an actual degree of compaction; When the actual compaction degree is greater than or equal to the standard compaction degree, the actual rolling rate is used for compaction operation; When the actual compaction degree is less than the standard compaction degree, a supplementary compaction operation is performed.
2. The asphalt pavement intelligent compaction method according to claim 1, characterized in that: The method of obtaining the functional relationship between the compaction degree, the number of rotary compaction times and the internal temperature of the asphalt mixture and establishing the first function comprises the following steps: Obtain multiple portions of asphalt mixture and measure the internal temperature of each; Each asphalt mixture is used to carry out indoor rotary compaction experiments to obtain a data set of the compaction degree of the asphalt mixture and the corresponding rotary compaction times at the corresponding internal temperature; The first function is obtained by fitting all the data sets.
3. The asphalt pavement intelligent compaction method according to claim 2, characterized in that: The fitting of all the data sets to obtain the first function comprises the following steps: Fitting the data set corresponding to each asphalt mixture to obtain a data curve of compaction degree and rotary compaction times at each internal temperature; The first function is obtained by fitting all the data curves.
4. The asphalt pavement intelligent compaction method according to claim 1, characterized in that: The step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function comprises the following steps: The surface temperature of multiple points of the asphalt mixture to be compacted is measured by infrared temperature sensors; The internal temperature of each point of the asphalt mixture to be compacted is measured by an insertion thermometer; The second function is obtained by fitting all surface temperatures and internal temperatures of all points of the asphalt mixture.
5. The asphalt pavement intelligent compaction method according to claim 4, characterized in that: The step of obtaining the functional relationship between the surface temperature and the internal temperature of the asphalt mixture and establishing the second function comprises the following steps: The surface temperature of any point of the asphalt mixture to be compacted is measured by an infrared temperature sensor; The internal temperature of the asphalt mixture to be compacted at any point is measured by an insertion thermometer; The temperature difference between the surface temperature and the internal temperature of the asphalt mixture is calculated to obtain the second function.
6. The asphalt pavement intelligent compaction method according to claim 1, characterized in that: The method according to the functional equivalence principle, obtaining the actual number of rotary compaction times through the standard rolling rate, the actual rolling rate and the standard number of rotary compaction times, comprises the following steps: Establish the equivalent proportional relationship between the number of rotary compaction times and the rolling rate of the compaction machine when the asphalt mixture is at the same internal temperature, and obtain the equivalent proportional formula; Substitute the standard rolling rate, the actual rolling rate and the standard number of rotary compaction times into the equivalent proportional formula to obtain the actual number of rotary compaction times.
7. The asphalt pavement intelligent compaction method according to claim 6, characterized in that: The equivalent ratio formula is: in: n1 is the standard number of gyratory compaction; n2 is the actual number of rotary compaction times; v1 is the standard rolling rate; v2 is the actual rolling rate.
8. The asphalt pavement intelligent compaction method according to claim 1, characterized in that: The pressure replenishing operation comprises the following steps: Obtain the function between the compaction degree of the asphalt mixture and the number of compaction passes, and establish a third function; Substitute the actual compaction degree and the standard compaction degree into the third function to obtain the number of times of compaction replenishment, and perform compaction replenishment operation using the actual rolling rate and the number of times of compaction replenishment.
9. The asphalt pavement intelligent compaction method according to claim 8, characterized in that: The method of obtaining a function between the compaction degree of the asphalt mixture and the number of compaction passes and establishing a third function comprises the following steps: Obtaining existing experience data sets of compaction degree and compaction passes; The third function is obtained by fitting the existing empirical data set.
10. The asphalt pavement intelligent compaction method according to claim 8, characterized in that: Substituting the actual compaction degree and the standard compaction degree into the third function to obtain the number of times of compaction supplementation comprises the following steps: Substituting the standard compaction degree into the third function to obtain the standard compaction passes; Substituting the actual compaction degree into the third function to obtain the actual number of compaction passes; The data difference between the actual compaction passes and the standard compaction passes is calculated to obtain the supplementary compaction passes.
Citation Information
Patent Citations
Real-time asphalt road compactness monitoring method
CN103487351A
Test detection method for equivalent compaction function of asphalt mixture and application
CN106442058A
Method for detecting compaction quality of asphalt pavement based on thermal infrared imager
CN108287022A
Intelligent pavement compaction monitoring method
CN117026743A
Pavement compactness real-time prediction system and method based on big data analysis
CN117744858A