Equal-load deployment method and device of compressor station, electronic equipment and storage medium

Through an isoload deployment method of a compressor station, the compressor boost ratio and total load of each pipe section in the pipeline are automatically determined, which solves the problem of low manual deployment efficiency and achieves efficient compressor station deployment and system balance.

CN119720439AInactive Publication Date: 2025-03-28SHANSHU TECH (BEIJING) CO LTD +5
0 Cites 0 Cited by

Patent Information

Application Number
CN202411767127.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-03-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing methods of manually deploying compressed gas stations cannot ensure deployment efficiency, making it difficult to complete compressed gas station deployment tasks efficiently.

Method used

A method for equal load deployment of a compressor station is provided. By obtaining the estimated transport flow rate and initial compressor station deployment parameters of each pipe section in the pipeline to be deployed, the upper limit of the boost ratio and the target total load of the compressor of the compressor station to be deployed in the pipeline section is determined and the target total load is generated. If the target boost ratio is less than or equal to the upper limit of the boost ratio and the target total load is within the specified load range, the initial deployment parameter is determined as the target deployment parameter to generate the target deployment result.

Benefits of technology

The automatic deployment of compressor stations for deploying pipelines is realized. Compared with manual stations, the station efficiency is greatly improved, the compressor overload operation is avoided, the system is balanced and reliability is improved, and the risk of failure is reduced.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses an equal-load deployment method and device for a compressor station, electronic equipment and a storage medium, and relates to the technical field of natural gas transportation. The method comprises the following steps: firstly, acquiring predicted conveying flow of each pipe section in a to-be-deployed pipeline and initial compressor station deployment parameters of each pipe section; for each pipe section, according to the predicted conveying flow of the pipe section, the upper limit of the step-up ratio of a compressor of the to-be-deployed compressor station corresponding to the pipe section is determined; according to the initial compressor station deployment parameters of the pipe section, the target step-up ratio of each compressor in the pipe section and the target total load of all compressors in the pipe section are determined; if the target step-up ratio is smaller than or equal to the upper limit of the step-up ratio and the target total load is within a specified load range, determining the initial gas compression station deployment parameter as a target gas compression station deployment parameter; and generating a target deployment result of the to-be-deployed pipeline based on the target gas compression station deployment parameter corresponding to each pipe section, and outputting the target deployment result. In this way, automatic deployment of the compressor stations of the whole pipeline to be deployed is achieved.
Need to check novelty before this filing date? Find Prior Art