Line planning simulation system and method of power distribution system
Through the line planning simulation system of the distribution system, the data acquisition and power load prediction modules are used to determine the appropriate wire type, which solves the problem of excessive wire selection in the existing distribution plan, and achieves cost reduction and resource optimization.
Patent Information
- Application Number
- CN202411910450.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-24
AI Technical Summary
In the existing distribution plan, the choice of laying wires is often much greater than the actual load carrying capacity, resulting in increased costs and waste of resources.
It provides a line planning simulation system for power distribution systems, including a data acquisition module, a power load prediction module, a main path simulation laying module and a wire type determination module. By obtaining user distribution and historical power load data, it predicts future power loads and determines appropriate wire types.
It effectively reduces the cost of laying wires, avoids waste of resources, and ensures the normal power consumption needs of the area to be planned.
Smart Images

Figure CN119720586A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of power distribution planning, and in particular to a line planning simulation system and method for a power distribution system. Background Art
[0002] Distribution planning is a development plan for the distribution system of a region based on the forecast of power load development in a certain region in the next few years, power supply layout, geographical environment and other conditions. The distribution system refers to all the feeding network parts in the power system from distribution substation to each distribution point or large user. Compared with the transmission system, the voltage level of the distribution system is lower, but it has the characteristics of wide distribution, complex structure, large number of electrical equipment, and close relationship with urban construction and beautification.
[0003] In addition to the site selection of important distribution nodes, power distribution planning also includes the selection of the best path and the best model for laying cables, which is related to the ability to ensure the normal power demand of the area when the subsequent distribution lines are put into use. However, in order to ensure the effective work of laying cables, the cables selected in conventional distribution planning are often much larger than the actual load-bearing capacity, which not only increases costs but also wastes resources. Summary of the invention
[0004] The embodiment of the present invention provides a line planning simulation system and method for a power distribution system, which solves the problem that in order to ensure the effective work of laying wires, the wires selected for laying in the power distribution planning are often far greater than the actual load-bearing capacity, which leads to increased costs and waste of resources.
[0005] In a first aspect, an embodiment of the present invention provides a line planning simulation system for a power distribution system, including a data acquisition module, a power load prediction module, a main path simulation laying module, and a wire type determination module;
[0006] The data acquisition module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the data acquisition module is used to obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned;
[0007] The main path simulation laying module is used to determine the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulate laying along the main path;
[0008] The power load prediction module is used to determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned;
[0009] The wire type determination module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the wire type determination module is used to determine the type of laying wire corresponding to the main path based on at least the predicted power load data.
[0010] Optionally, the data collection module includes a user distribution collection unit, a user historical electricity consumption collection unit, a population growth rate collection unit and an economic growth rate collection unit;
[0011] The user distribution collection unit is electrically connected to the main path simulation laying module, and the user distribution collection unit is used to obtain the user distribution situation in the area to be planned;
[0012] The user historical electricity consumption collection unit is electrically connected to the electricity load prediction module and the main path simulation laying module respectively, and the user historical electricity consumption collection unit is used to obtain the historical electricity load data of each user in the area to be planned;
[0013] The population growth rate acquisition unit is electrically connected to the power load prediction module, and the population growth rate acquisition unit is used to obtain the population growth rate of the area to be planned;
[0014] The economic growth rate acquisition unit is electrically connected to the power load prediction module, and the economic growth rate acquisition unit is used to obtain the economic growth rate of the area to be planned.
[0015] Optionally, the power load prediction module includes a regional historical power consumption determination unit and a power load prediction unit;
[0016] The data acquisition module is electrically connected to the regional historical electricity consumption determination unit and the power load prediction unit respectively, and the regional historical electricity consumption determination unit is used to determine the historical power load data of the entire area to be planned according to the historical power load data of each user in the area to be planned;
[0017] The power load prediction unit is also electrically connected to the regional historical power consumption determination unit and the wire type determination module respectively. The power load prediction unit is used to calculate the power load according to the calculation formula L t =L0×(1+G p ) t×α ×(1+G e ) t, determine the predicted power load data L of the planned area within the target safe working period t t ; Wherein, L0 represents the historical power load data of the entire area to be planned, G p represents the population growth rate of the area to be planned, G e represents the economic growth rate of the area to be planned, and α represents the influence weight of the population growth rate of the area to be planned on the power load.
[0018] Optionally, the main path simulation laying module includes a node power supply area division unit, a transit node determination unit and a main path simulation laying unit;
[0019] The node power supply area division unit is electrically connected to the data acquisition module and the transit node determination unit respectively, and is used to divide the area to be planned into multiple node power supply areas according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, according to the preset power load threshold; wherein the difference between the overall historical power load data of each node power supply area and the preset power load threshold satisfies the first difference range;
[0020] The transit node determination unit is used to determine the transit node corresponding to each node power supply area according to the user distribution in each node power supply area;
[0021] The main path simulation laying unit is electrically connected to the transit node determination unit and the wire type determination module respectively, and is used to simulate the sequential connection of all the transit nodes, determine the main path of the distribution line corresponding to the area to be planned, and perform simulated laying along the main path.
[0022] Optionally, the main path simulation laying unit includes a simulation connection distance acquisition subunit, a simulation connection distance comparison subunit and a main path simulation laying subunit;
[0023] The simulated connection distance acquisition subunit is electrically connected to the transfer node determination unit and the simulated connection distance comparison subunit respectively, and the simulated connection distance acquisition subunit is used to simulate all the transfer nodes to be connected in sequence, and obtain the distances of the simulated connection paths corresponding to multiple simulated connections;
[0024] The simulated connection distance comparison subunit is used to compare the distances of the simulated connection paths corresponding to multiple simulated connections, and define the simulated connection path corresponding to the minimum distance as the main path of the distribution line corresponding to the area to be planned;
[0025] The main path simulation laying subunit is electrically connected to the simulated connection distance comparison subunit and the wire type determination module respectively, and is used to perform simulated laying along the main path according to the main path of the distribution line corresponding to the area to be planned.
[0026] Optionally, the wire type determination module includes a bearing load comparison unit and a wire type determination unit;
[0027] The load comparison unit is electrically connected to the wire type determination unit and the power load prediction module, respectively, and is used to compare the predicted power load data with the maximum load data of multiple types of wires to be laid;
[0028] The wire type determination unit is also electrically connected to the main path simulation laying module, and is used to determine the type of wire to be laid corresponding to the second difference range whose difference between the maximum bearing load data and the predicted power load data satisfies the type of wire to be laid as the type of laying wire corresponding to the main path.
[0029] Optionally, the wire type determination module further includes a historical climate acquisition unit and a historical climate association unit;
[0030] The historical climate acquisition unit is used to acquire the historical climate data of the area to be planned;
[0031] The historical climate association unit is electrically connected to the historical climate acquisition unit and the load comparison unit respectively, and the historical climate association unit is used to determine the maximum fluctuation impact value of the historical climate data on the maximum load data of the wire to be laid according to the historical climate data of the area to be planned;
[0032] The load comparison unit is further used to compare the sum of the predicted power load data and the maximum fluctuation impact value with the maximum load data of multiple types of wires to be laid;
[0033] The wire type determination unit is also used to determine the type of wire to be laid corresponding to the main path as the type of wire to be laid corresponding to the difference between the maximum bearing load data and the sum of the predicted power load data and the maximum fluctuation impact value that satisfies the second difference range.
[0034] Optionally, it also includes an auxiliary path simulation laying module;
[0035] The data acquisition module is electrically connected to the auxiliary path simulation laying module, and the data acquisition module is also used to obtain the future migration direction and future migration area of the user cluster in the area to be planned;
[0036] The auxiliary path simulation laying module is used to determine the auxiliary path of the distribution line corresponding to the future migration area according to the future migration direction and future migration area of the user cluster in the area to be planned, and simulate laying along the auxiliary path; wherein the auxiliary path is connected to the main path;
[0037] The wire type determination module is also electrically connected to the auxiliary path simulation laying module, and the wire type determination module is also used to determine the type of laying wire corresponding to the auxiliary path according to preset additional power load data.
[0038] Optionally, the line planning simulation system further includes a wire carrying capacity determination module;
[0039] The wire carrying capacity determination module is electrically connected to the wire type determination module, and the wire carrying capacity determination module is used to determine the sum of the wire carrying capacities in the to-be-planned area and the future migration area according to the carrying capacity of the type of laid wire corresponding to the main path, the allocation weight of the type of laid wire corresponding to the main path, the carrying capacity of the type of laid wire corresponding to the auxiliary path, and the allocation weight of the type of laid wire corresponding to the auxiliary path.
[0040] In a second aspect, an embodiment of the present invention further provides a line planning simulation method for a power distribution system, comprising:
[0041] Obtaining the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned;
[0042] Determine the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulate laying along the main path;
[0043] Determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned;
[0044] The type of laying wire corresponding to the main path is determined based on at least the predicted power load data.
[0045] The embodiment of the present invention provides a line planning simulation system and method for a power distribution system, wherein the line planning simulation system includes a data acquisition module, a power load prediction module, a main path simulation laying module and a wire type determination module; the data acquisition module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the data acquisition module is used to obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate in the area to be planned and the economic growth rate in the area to be planned; the main path simulation laying module is used to determine the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulate the laying along the main path; the power load prediction module is used to determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate in the area to be planned and the economic growth rate in the area to be planned; the wire type determination module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the wire type determination module is used to determine the type of laying wire corresponding to the main path according to at least the predicted power load data. The line planning simulation system uses a data acquisition module to obtain historical information and user information of the area to be planned, uses a main path simulation laying module to determine the main path of the distribution line corresponding to the area to be planned, uses a power load prediction module to predict the predicted power load data of the area to be planned within the target safe working period, and uses a wire type determination module to determine the type of laid wire corresponding to the main path. In this way, the future power load required is predicted in combination with historical data, the carrying capacity of the laid wire is effectively judged, and then the type of laid wire that meets the carrying capacity is selected, which ensures normal power consumption in the area to be planned while effectively reducing the laying cost of the wire, avoiding waste of resources, and providing convenience for the path simulation of the distribution line in the area to be planned. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0047] Figure 1 It is a structural schematic diagram of a line planning simulation system for a power distribution system provided by an embodiment of the present invention;
[0048] Figure 2 is a structural schematic diagram of another line planning simulation system for a power distribution system provided by an embodiment of the present invention;
[0049] Figure 3It is a structural schematic diagram of another line planning simulation system of a power distribution system provided by an embodiment of the present invention;
[0050] Figure 4 It is a flow chart of a line planning simulation method for a power distribution system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0051] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0052] Figure 1 FIG. 1 is a schematic diagram of a line planning simulation system for a power distribution system provided by an embodiment of the present invention. Figure 1 As shown, the line planning simulation system of the power distribution system includes a data acquisition module 10, a power load prediction module 20, a main path simulation laying module 30 and a wire type determination module 40; the data acquisition module 10 is electrically connected to the power load prediction module 20 and the main path simulation laying module 30 respectively, and the data acquisition module 10 is used to obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; the main path simulation laying module 30 is used to determine the line planning of the power distribution system according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned The historical power load data of each user in the area to be planned, the main path of the distribution line corresponding to the area to be planned is determined, and the laying is simulated along the main path; the power load prediction module 20 is used to determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; the wire type determination module 40 is electrically connected to the power load prediction module 20 and the main path simulation laying module 30 respectively, and the wire type determination module 40 is used to determine the type of laying wire corresponding to the main path according to at least the predicted power load data.
[0053] Specifically, the line planning simulation system of the power distribution system includes a data acquisition module 10, a power load prediction module 20, a main path simulation laying module 30 and a wire type determination module 40. Among them, the data acquisition module 10 can obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate in the area to be planned and the economic growth rate in the area to be planned. Exemplarily, the data acquisition module 10 can obtain the user distribution in the area to be planned, the historical power load data of each user, the population growth rate and the economic growth rate in the area to be planned in units of years or months. Exemplarily, a two-dimensional coordinate system or a three-dimensional coordinate system can be established in the area to be planned, and the distribution of each user in the area to be planned can be determined in the form of coordinates, so as to determine the specific laying of the path of the distribution line according to the distribution of each user in the area to be planned. Exemplarily, the historical power load data of each user in the area to be planned can be obtained by means of electric energy meter records, visits and inquiries. In addition, it should be noted that the sum of the historical power load data corresponding to each user in the area to be planned is the historical power load data of the entire area to be planned. For example, the population growth rate and economic growth rate of the area to be planned can be obtained based on the record information of the relevant departments, so as to determine the predicted future power load data of the area to be planned based on the overall historical power load data, population growth rate and economic growth rate of the area to be planned. This embodiment is only an example and is not limited here.
[0054] The data acquisition module 10 is electrically connected to the main path simulation laying module 30, and the data acquisition module 10 can transmit the user distribution in the area to be planned and the historical power load data of each user to the main path simulation laying module 30. The main path simulation laying module 30 can analyze and process the received user distribution in the area to be planned and the historical power load data of each user, determine the main path of the distribution line corresponding to the area to be planned, and simulate laying along the main path. It can be understood that the main path can be implemented to distribute power to each user in the area to be planned to ensure the normal power consumption of each user in the area to be planned. And, the data acquisition module 10 is also electrically connected to the power load prediction module 20, and the data acquisition module 10 can transmit the historical power load data, population growth rate and economic growth rate of each user in the area to be planned to the power load prediction module 20, and the power load prediction module 20 can analyze and process the received historical power load data, population growth rate and economic growth rate of each user in the area to be planned, and determine the predicted power load data of the area to be planned within the target safe working period. It can be understood that the predicted power load data can ensure the normal power demand of each user in the planned area within the target safe working period.
[0055] The wire type determination module 40 is electrically connected to the power load prediction module 20 and the main path simulation laying module 30 respectively, and the wire type determination module 40 can receive the predicted power load data of the area to be planned within the target safe working period transmitted by the power load prediction module 20, and the main path of the distribution line corresponding to the area to be planned transmitted by the main path simulation laying module 30, and then the wire type determination module 40 can analyze and process the predicted power load data, and select the type of laying wire corresponding to the main path accordingly, so as to ensure that the load carrying capacity of the selected type of laying wire is greater than or equal to the predicted power load data, so that during the normal use of the laying wire, the normal power demand of each user in the area to be planned within the target safe working period is further guaranteed. In this way, after determining the main path of the distribution line corresponding to the simulated laying and the type of laying wire corresponding to the main path, the subsequent actual construction process can be carried out. This embodiment effectively improves the construction efficiency and ensures the power demand of the area to be planned.
[0056] According to the technical solution in the embodiment of the present invention, the line planning simulation system uses a data acquisition module to obtain historical information and user information of the area to be planned, uses a main path simulation laying module to determine the main path of the distribution line corresponding to the area to be planned, uses a power load prediction module to predict the predicted power load data of the area to be planned within the target safe working period, and uses a wire type determination module to determine the type of laid wire corresponding to the main path. In this way, the power load required in the future is predicted in combination with historical data, the carrying capacity of the laid wire is effectively judged, and then the type of laid wire that meets the carrying capacity is selected, which ensures normal power consumption in the area to be planned while effectively reducing the laying cost of the wire, avoiding waste of resources, and providing convenience for the path simulation of the distribution line in the area to be planned.
[0057] Optionally, Figure 2 FIG. 1 is a schematic diagram of the structure of another line planning simulation system for a power distribution system provided by an embodiment of the present invention. Figure 2As shown, the data acquisition module 10 includes a user distribution acquisition unit 11, a user historical electricity consumption acquisition unit 12, a population growth rate acquisition unit 13 and an economic growth rate acquisition unit 14; the user distribution acquisition unit 11 is electrically connected to the main path simulation laying module 30, and the user distribution acquisition unit 11 is used to obtain the user distribution in the area to be planned; the user historical electricity consumption acquisition unit 12 is electrically connected to the power load prediction module 20 and the main path simulation laying module 30 respectively, and the user historical electricity consumption acquisition unit 12 is used to obtain the historical power load data of each user in the area to be planned; the population growth rate acquisition unit 13 is electrically connected to the power load prediction module 20, and the population growth rate acquisition unit 13 is used to obtain the population growth rate of the area to be planned; the economic growth rate acquisition unit 14 is electrically connected to the power load prediction module 20, and the economic growth rate acquisition unit 14 is used to obtain the economic growth rate of the area to be planned.
[0058] Specifically, the data acquisition module 10 includes a user distribution acquisition unit 11, a user historical electricity consumption acquisition unit 12, a population growth rate acquisition unit 13, and an economic growth rate acquisition unit 14. Among them, the user distribution acquisition unit 11 can obtain the user distribution in the area to be planned. For example, a two-dimensional coordinate system or a three-dimensional coordinate system can be established in the area to be planned, and the distribution of each user in the area to be planned is determined in the form of coordinates. The user distribution acquisition unit 11 is electrically connected to the main path simulation laying module 30, and the user distribution acquisition unit 11 can transmit the user distribution in the area to be planned to the main path simulation laying module 30 to facilitate the subsequent determination of the main path of the distribution line. The user historical electricity consumption acquisition unit 12 can obtain the historical electricity load data of each user in the area to be planned. For example, the historical electricity load data of each user in the area to be planned can be obtained by means of electric energy meter records, visits and inquiries, etc. The user historical electricity collection unit 12 is electrically connected to the power load prediction module 20, and the user historical electricity collection unit 12 can transmit the historical power load data of each user in the area to be planned to the power load prediction module 20, so as to facilitate the subsequent determination of the predicted power load data. And, the user historical electricity collection unit 12 is electrically connected to the main path simulation laying module 30, and the user historical electricity collection unit 12 can transmit the historical power load data of each user in the area to be planned to the main path simulation laying module 30, so as to facilitate the subsequent determination of the main path of the distribution line. The population growth rate collection unit 13 can obtain the population growth rate of the area to be planned. For example, the population growth rate of the area to be planned can be obtained according to the record information of the relevant departments. The population growth rate collection unit 13 is electrically connected to the power load prediction module 20, and the population growth rate collection unit 13 can transmit the population growth rate of the area to be planned to the power load prediction module 20, so as to facilitate the subsequent determination of the predicted power load data. The economic growth rate collection unit 14 can obtain the economic growth rate of the area to be planned. For example, the economic growth rate of the area to be planned can be obtained according to the record information of the relevant departments. The economic growth rate collection unit 14 is electrically connected to the power load prediction module 20, and the economic growth rate collection unit 14 can transmit the economic growth rate of the area to be planned to the power load prediction module 20 to facilitate the subsequent determination of the predicted power load data.
[0059] Optionally, continue to refer to Figure 2The power load prediction module 20 includes a regional historical power consumption determination unit 21 and a power load prediction unit 22; the data acquisition module 10 is electrically connected to the regional historical power consumption determination unit 21 and the power load prediction unit 22 respectively, and the regional historical power consumption determination unit 21 is used to determine the historical power load data of the entire area to be planned according to the historical power load data of each user in the area to be planned; the power load prediction unit 22 is also electrically connected to the regional historical power consumption determination unit 21 and the wire type determination module 40 respectively, and the power load prediction unit 22 is used to calculate the power load data of the entire area to be planned according to the calculation formula L t =L0×(1+G p ) t×α ×(1+G e ) t , determine the predicted power load data L of the planned area within the target safe working period t t ; Where L0 represents the historical power load data of the entire area to be planned, G p represents the population growth rate of the area to be planned, G e It represents the economic growth rate of the area to be planned, and α represents the weight of the impact of the population growth rate of the area to be planned on the electricity load.
[0060] Specifically, the power load prediction module 20 includes a regional historical power consumption determination unit 21 and a power load prediction unit 22. Among them, the regional historical power consumption determination unit 21 is electrically connected to the data acquisition module 10, so the data acquisition module 10 can transmit the acquired historical power load data of each user in the area to be planned to the regional historical power consumption determination unit 21, and the regional historical power consumption determination unit 21 can determine the historical power load data of the entire area to be planned based on the historical power load data of each user in the area to be planned. Exemplarily, the regional historical power consumption determination unit 21 can sum the historical power load data corresponding to each user in the area to be planned, and the sum of the historical power load data corresponding to each user in the area to be planned is the historical power load data of the entire area to be planned. The power load prediction unit 22 is electrically connected to the data acquisition module 10 and the regional historical power consumption determination unit 21 respectively. The data acquisition module 10 can transmit the acquired population growth rate and economic growth rate to the power load prediction unit 22, and the regional historical power consumption determination unit 21 can also transmit the determined historical power load data of the entire planned area to the power load prediction unit 22. The power load prediction unit 22 can analyze and process the historical power load data, population growth rate and economic growth rate of the entire planned area, and determine the predicted power load data of the planned area within the target safe working period. Further, the power load prediction unit 22 can calculate the power load data of the planned area according to the calculation formula L t =L0×(1+G p ) t×α ×(1+Ge ) t , determine the predicted power load data L of the planned area within the target safe working period t t ; Where L0 represents the historical power load data of the entire area to be planned, G p represents the population growth rate of the area to be planned, G e Represents the economic growth rate of the area to be planned, and α represents the weight of the impact of the population growth rate of the area to be planned on the power load. In other words, the power load prediction unit 22 calculates the future predicted power load by analyzing the historical power load data, population growth rate and economic growth rate of the area to be planned. In addition, the power load prediction unit 22 is also electrically connected to the wire type determination module 40, and the power load prediction unit 22 can transmit the determined predicted power load data to the wire type determination module 40, so that the subsequent wire type determination module 40 can analyze and process the predicted power load data, and correspondingly select the type of wire laid corresponding to the main path of the distribution line.
[0061] Optionally, continue to refer to Figure 2 The main path simulation laying module 30 includes a node power supply area division unit 31, a transit node determination unit 32 and a main path simulation laying unit 33; the node power supply area division unit 31 is electrically connected to the data acquisition module 10 and the transit node determination unit 32 respectively, and the node power supply area division unit 31 is used to divide the area to be planned into multiple node power supply areas according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, according to the preset power load threshold; wherein the difference between the overall historical power load data of each node power supply area and the preset power load threshold satisfies the first difference range; the transit node determination unit 32 is used to determine the transit node corresponding to each node power supply area according to the user distribution in each node power supply area; the main path simulation laying unit 33 is electrically connected to the transit node determination unit 32 and the wire type determination module 40 respectively, and the main path simulation laying unit 33 is used to simulate all the transit nodes to be connected in sequence, determine the main path of the distribution line corresponding to the area to be planned, and simulate laying along the main path.
[0062] Specifically, the main path simulation laying module 30 includes a node power supply area division unit 31, a transit node determination unit 32 and a main path simulation laying unit 33. Among them, the node power supply area division unit 31 is electrically connected to the data acquisition module 10, and the data acquisition module 10 can transmit the user distribution in the area to be planned and the historical power load data of each user in the area to be planned to the node power supply area division unit 31. The node power supply area division unit 31 can analyze and process the received user distribution in the area to be planned and the historical power load data of each user, and divide the area to be planned into multiple node power supply areas according to the preset power load threshold, and the difference between the overall historical power load data of each node power supply area and the preset power load threshold satisfies the first difference range. Exemplarily, the historical power load data corresponding to the user can be the average value within the month or the average value within the year, etc. Exemplarily, at least two users with similar locations can be divided into the same node power supply area according to the limitation of the preset power load threshold, the number of users in the node power supply area is not limited, and the difference between the sum of the historical power load data corresponding to each user in the node power supply area and the preset power load threshold should satisfy the first difference range. That is, the historical power load data of each node power supply area as a whole is the same or similar. Exemplarily, the preset power load threshold can be determined according to the actual power load situation of the area to be planned, and the first difference range can also be determined according to the actual power load situation of the area to be planned. The node power supply area division unit 31 is also electrically connected to the transit node determination unit 32, and the node power supply area division unit 31 can transmit the relevant information of the multiple node power supply areas obtained by the division (exemplarily, the number of node power supply areas, the distribution of users in each node power supply area, the historical power load data of each node power supply area as a whole, etc.) to the transit node determination unit 32, and the transit node determination unit 32 can determine the transit node corresponding to each node power supply area according to the distribution of users in each node power supply area. Exemplarily, in any node power supply area, a two-dimensional coordinate system or a three-dimensional coordinate system can be established, and the distribution of each user in the area to be planned can be determined in the form of coordinates, and then the center of gravity of the coordinates of all users in the node power supply area can be obtained, and the center of gravity of the coordinates can be determined as the transit node corresponding to the node power supply area to which it belongs. Exemplarily, the horizontal coordinate of the center of gravity of the coordinates of all users in the node power supply area can be the result of dividing the sum of the horizontal coordinates of the coordinates of all users in the node power supply area by the number of users in the node power supply area, and the vertical coordinate of the center of gravity of the coordinates of all users in the node power supply area can be the result of dividing the sum of the vertical coordinates of the coordinates of all users in the node power supply area by the number of users in the node power supply area.The transfer node determination unit 32 is also electrically connected to the main path simulation laying unit 33, and the transfer node determination unit 32 can transmit the relevant information of the determined multiple transfer nodes (for example, the coordinate data of each transfer node, etc.) to the main path simulation laying unit 33, and the main path simulation laying unit 33 can simulate all the transfer nodes to be connected in sequence, determine the main path of the distribution line corresponding to the area to be planned, and simulate laying along the main path. Exemplarily, the main path simulation laying unit 33 can connect all the transfer nodes in series in a certain order and connection method, and simulate a variety of sequentially connected paths accordingly, so as to determine the main path of the distribution line corresponding to the area to be planned, and simulate laying along the main path. And, the main path simulation laying unit 33 is also electrically connected to the wire type determination module 40, then the main path simulation laying unit 33 can transmit the main path of the distribution line corresponding to the area to be planned to the wire type determination module 40, so that the subsequent wire type determination module 40 can analyze and process the predicted power load data, and select the type of laying wire corresponding to the main path accordingly. In this way, the main path simulation laying module 30 can realize the simulation of regular and orderly cable laying in the area to be planned, divide the node power supply area according to the historical power load data corresponding to each user in the area to be planned, and facilitate the calculation of the optimal laying path of the main path corresponding to the distribution line. At the same time, the type of laying wire is selected in combination with the predicted power load data, while ensuring the normal power consumption in the area to be planned, effectively reducing the laying cost of the wire.
[0063] Further, continue to refer to Figure 2 The main path simulation laying unit 33 includes a simulated connection distance acquisition subunit 331, a simulated connection distance comparison subunit 332 and a main path simulation laying subunit 333; the simulated connection distance acquisition subunit 331 is electrically connected to the transit node determination unit 32 and the simulated connection distance comparison subunit 332 respectively, and the simulated connection distance acquisition subunit 331 is used to simulate all transit nodes to be connected in sequence, and obtain the distance of the simulated connection path corresponding to multiple simulated connections; the simulated connection distance comparison subunit 332 is used to compare the distances of the simulated connection paths corresponding to multiple simulated connections, and define the simulated connection path corresponding to the minimum distance as the main path of the distribution line corresponding to the area to be planned; the main path simulation laying subunit 333 is electrically connected to the simulated connection distance comparison subunit 332 and the wire type determination module 40 respectively, and the main path simulation laying subunit 333 is used to simulate laying along the main path according to the main path of the distribution line corresponding to the area to be planned.
[0064] Specifically, the simulated connection distance acquisition subunit 331 is electrically connected to the transfer node determination unit 32, and the transfer node determination unit 32 can transmit the relevant information of the determined multiple transfer nodes (for example, the coordinate data of each transfer node, etc.) to the simulated connection distance acquisition subunit 331, and the simulated connection distance acquisition subunit 331 can simulate all the transfer nodes to be connected in sequence, and obtain the distance of the simulated connection path corresponding to the multiple simulated connections. The connection order and connection distance of the simulated connection path in different simulation processes are different. The simulated connection distance acquisition subunit 331 is also electrically connected to the simulated connection distance comparison subunit 332, and the simulated connection distance acquisition subunit 331 can transmit the distance of the simulated connection path corresponding to the multiple simulated connections to the simulated connection distance comparison subunit 332. The simulated connection distance comparison subunit 332 can compare the distances of the simulated connection paths corresponding to the multiple simulated connections, and define the simulated connection path corresponding to the minimum distance as the main path of the distribution line corresponding to the area to be planned. The simulated connection distance comparison subunit 332 is also electrically connected to the main path simulation laying subunit 333, so the simulated connection distance comparison subunit 332 can transmit the main path of the distribution line corresponding to the area to be planned to the main path simulation laying subunit 333, and the main path simulation laying subunit 333 can simulate laying along the main path according to the main path of the distribution line corresponding to the area to be planned. In addition, the main path simulation laying subunit 333 is also electrically connected to the wire type determination module 40, so the main path simulation laying subunit 333 can transmit the main path of the distribution line corresponding to the area to be planned to the wire type determination module 40, so that the subsequent wire type determination module 40 can analyze and process the predicted power load data and select the type of laying wire corresponding to the main path. That is, after obtaining the information of all transfer nodes in the area to be planned, the main path simulation laying unit 33 connects all transfer nodes, takes the shortest connection distance as the optimal path for laying the main path corresponding to the distribution line, and simulates the laying of wires along the optimal path.
[0065] Optionally, continue to refer to Figure 2 The wire type determination module 40 includes a load comparison unit 41 and a wire type determination unit 42; the load comparison unit 41 is electrically connected to the wire type determination unit 42 and the power load prediction module 20 respectively, and the load comparison unit 41 is used to compare the predicted power load data with the maximum load data of multiple types of wires to be laid; the wire type determination unit 42 is also electrically connected to the main path simulation laying module 30, and the wire type determination unit 42 is used to determine the type of wire to be laid corresponding to the second difference range as the type of laying wire corresponding to the main path.
[0066] Specifically, the wire type determination module 40 includes a load comparison unit 41 and a wire type determination unit 42. Among them, the load comparison unit 41 is electrically connected to the power load prediction module 20, and the power load prediction module 20 can transmit the predicted power load data of the area to be planned within the target safe working period to the load comparison unit 41, and the load comparison unit 41 can compare the predicted power load data with the maximum load data of multiple types of wires to be laid under the limitation of the target safe working period. The predicted power load data can also be understood as the maximum power load of the area to be planned. The load comparison unit 41 is also electrically connected to the wire type determination unit 42, and the wire type determination unit 42 can determine the type of wire to be laid corresponding to the main path based on the comparison results of the predicted power load data with the maximum load data of multiple types of wires to be laid, and the difference between the maximum load data and the predicted power load data satisfies the type of wire to be laid corresponding to the second difference range. In other words, when the maximum load-bearing data of the wire to be laid is greater than the predicted power load data, this type of wire to be laid can be used as the type of wire to be laid corresponding to the main path, that is, the wire to be laid that meets the standards is selected according to the predicted power load data as the wire to be laid for the above-mentioned optimal path.
[0067] Further, continue to refer to Figure 2 The wire type determination module 40 also includes a historical climate acquisition unit 43 and a historical climate association unit 44; the historical climate acquisition unit 43 is used to obtain the historical climate data of the area to be planned; the historical climate association unit 44 is electrically connected to the historical climate acquisition unit 43 and the load comparison unit 41 respectively, and the historical climate association unit 44 is used to determine the maximum fluctuation impact value of the historical climate data on the maximum load data of the wire to be laid according to the historical climate data of the area to be planned; the load comparison unit 41 is also used to compare the sum of the predicted power load data and the maximum fluctuation impact value with the maximum load data of multiple types of wires to be laid; the wire type determination unit 42 is also used to determine the type of wire to be laid corresponding to the second difference range as the type of wire to be laid corresponding to the main path.
[0068] First of all, it should be noted that the present embodiment additionally introduces the consideration of the impact of climate change on the power transmission capacity of the wires to be laid corresponding to the distribution lines. In this way, the impact of climate change on the power transmission capacity of the wires to be laid can be further reduced, providing practical and effective guarantee for normal electricity consumption in the area to be planned.
[0069] Specifically, the wire type determination module 40 includes a load comparison unit 41, a wire type determination unit 42, a historical climate acquisition unit 43, and a historical climate association unit 44. Among them, the historical climate acquisition unit 43 can obtain the historical climate data of the area to be planned, so as to optimize the type of wire to be laid according to the influence of the historical climate data of the area to be planned on the power transmission capacity of the wire to be laid, which can further improve the anti-climatic interference ability of the wire to be laid, and provide further guarantee for the normal power consumption of the area to be planned. The historical climate association unit 44 is electrically connected to the historical climate acquisition unit 43, and the historical climate acquisition unit 43 can transmit the acquired historical climate data of the area to be planned to the historical climate association unit 44. The historical climate association unit 44 can determine the maximum fluctuation influence value of the historical climate data on the maximum load data of the wire to be laid according to the historical climate data of the area to be planned, that is, determine the numerical value corresponding to the degree of influence of the historical climate data on the power transmission capacity of the cable. Exemplarily, the maximum fluctuation impact value can also be understood as an error value, so as to facilitate the subsequent reasonable adjustment of the predicted power load data, so that the selected wire to be laid can carry the predicted power load data and the maximum fluctuation impact value at the same time, effectively avoiding the impact of climate change on the power transmission capacity of the wire to be laid, resulting in the situation where normal power supply cannot be provided in the planned area. Exemplarily, the rated power transmission performance can be determined by collecting the specifications, materials, resistivity, permittivity and other basic parameters of the wire to be laid (exemplarily, it can be a cable), obtaining the historical climate data of the area where the cable is located, recording the actual power transmission performance of the cable under different climatic conditions, and calculating the absolute difference between the actual power transmission performance and the rated power transmission performance, which is the degree of influence of the historical climate on the cable, that is, the error value, that is, the maximum fluctuation impact value. The historical climate association unit 44 is also electrically connected to the load comparison unit 41, and the historical climate association unit 44 can transmit the determined maximum fluctuation impact value to the load comparison unit 41, and the load comparison unit 41 can also compare the sum of the predicted power load data and the maximum fluctuation impact value with the maximum load data of multiple types of wires to be laid, and the sum of the predicted power load data and the maximum fluctuation impact value can also be understood as the maximum power load of the planned area under the premise of considering climate change. And, the load comparison unit 41 is electrically connected to the wire type determination unit 42, and the wire type determination unit 42 can also predict the comparison results of the sum of the power load data and the maximum fluctuation impact value with the maximum load data of multiple types of wires to be laid, and determine the type of wire to be laid corresponding to the main path as the difference between the maximum load data and the sum of the predicted power load data and the maximum fluctuation impact value.In other words, when the maximum load-bearing data of the wire to be laid is greater than the sum of the predicted power load data and the maximum fluctuation impact value, this type of wire to be laid can be used as the type of wire to be laid corresponding to the main path, that is, the wire to be laid that meets the standards is selected according to the predicted power load data as the wire to be laid for the above-mentioned optimal path.
[0070] Optionally, Figure 3 FIG. 1 is a schematic diagram of the structure of another line planning simulation system for a power distribution system provided by an embodiment of the present invention. Figure 3 As shown, the line planning simulation system also includes an auxiliary path simulation laying module 50; the data acquisition module 10 is electrically connected to the auxiliary path simulation laying module 50, and the data acquisition module 10 is also used to obtain the future migration direction and future migration area of the user cluster in the area to be planned; the auxiliary path simulation laying module 50 is used to determine the auxiliary path of the distribution line corresponding to the future migration area according to the future migration direction and future migration area of the user cluster in the area to be planned, and simulate the laying along the auxiliary path; wherein the auxiliary path is connected to the main path; the wire type determination module 40 is also electrically connected to the auxiliary path simulation laying module 50, and the wire type determination module 40 is also used to determine the type of laying wire corresponding to the auxiliary path according to the preset additional power load data.
[0071] Specifically, the line planning simulation system includes a data acquisition module 10, a power load prediction module 20, a main path simulation laying module 30, a wire type determination module 40 and an auxiliary path simulation laying module 50. Among them, the data acquisition module 10 can also obtain the future migration direction and future migration area of the user cluster in the area to be planned. For example, the future migration direction and future migration area of the user cluster in the area to be planned can be obtained based on the record information of the relevant departments, so as to determine the specific laying of the distribution line path in the future migration area based on the future migration direction and future migration area of the user cluster in the area to be planned. For example, before planning an area, it is necessary to draft a regional planning document. The regional planning document is a strategy document, and the specific analysis and determination of the future migration direction and future migration area of the user cluster can be fully realized from the regional planning document. The auxiliary path simulation laying module 50 is electrically connected to the data acquisition module 10, and the data acquisition module 10 can transmit the future migration direction and future migration area of the user cluster in the area to be planned to the auxiliary path simulation laying module 50. The auxiliary path simulation laying module 50 can determine the auxiliary path of the distribution line corresponding to the future migration area according to the future migration direction and future migration area of the user cluster in the area to be planned, and simulate laying along the auxiliary path, wherein the auxiliary path is connected to the main path. It can be understood that the auxiliary path can be used to distribute electricity to each user in the future migration area, and ensure the normal power consumption of each user in the area to be planned and the future migration area. Exemplarily, the entire future migration area can be understood as a node power supply area, and the backup node corresponding to the node power supply area can be determined based on the user distribution in the future migration area (that is, the transit node. These two names are only related to the areas to which they belong, and are essentially the same meaning). That is, the future migration area is regarded as the node power supply area, and its center of gravity is used as the transit node, i.e., the backup node, of the corresponding node power supply area, and the optimal backup laying path between the main path and the backup node is obtained as the auxiliary path of the distribution line corresponding to the future migration area.
[0072] The auxiliary path simulation laying module 50 is also electrically connected to the wire type determination module 40, so the wire type determination module 40 can receive the auxiliary path of the distribution line corresponding to the future migration area transmitted by the auxiliary path simulation laying module 50, and then the wire type determination module 40 can also analyze and process according to the preset additional power load data, and select the type of laying wire corresponding to the auxiliary path accordingly to ensure that the load carrying capacity of the selected laying wire type is greater than or equal to the preset additional power load data, so that during the normal use of the laying wire, the normal power demand of each user in the future migration area within the target safe working period is further guaranteed. Exemplarily, the preset additional power load data can be understood as the maximum power load of the future migration area. Exemplarily, the future migration direction and future migration area of the user cluster can be determined by referring to the construction and development plan of the area to be planned, that is, the regional planning book, that is, the estimation of the power load of the corresponding future migration area can be achieved according to the construction and development plan, that is, the preset additional power load data, and the load carrying capacity of the above-mentioned auxiliary path should meet the requirements of the preset additional power load data, that is, the load carrying capacity of the above-mentioned auxiliary path is greater than the requirements of the preset additional power load data, so as to ensure the normal power demand of each user in the future migration area. In this way, the setting of the auxiliary path simulation laying module 50 introduces the consideration of the migration and change of user clusters in the planned area, and the consideration of the future development in the planned area, which is more comprehensive, and further ensures the normal power consumption of users in the planned area and the future migration area within the target safe working period.
[0073] Optionally, continue to refer to Figure 3 The line planning simulation system also includes a wire carrying capacity determination module 60; the wire carrying capacity determination module 60 is electrically connected to the wire type determination module 40, and the wire carrying capacity determination module 60 is used to determine the sum of the wire carrying capacities in the to-be-planned area and the future migration area according to the carrying capacity of the type of laid wire corresponding to the main path, the allocation weight of the type of laid wire corresponding to the main path, the carrying capacity of the type of laid wire corresponding to the auxiliary path, and the allocation weight of the type of laid wire corresponding to the auxiliary path.
[0074] Specifically, the wire carrying capacity determination module 60 is electrically connected to the wire type determination module 40, and the wire type determination module 40 can transmit the type of laid wires corresponding to the main path and the type of laid wires corresponding to the auxiliary path to the wire carrying capacity determination module 60. The wire carrying capacity determination module 60 can determine the sum of the wire carrying capacities in the to-be-planned area and the future migration area according to the carrying capacity of the type of laid wires corresponding to the main path, the allocation weight of the type of laid wires corresponding to the main path, the carrying capacity of the type of laid wires corresponding to the auxiliary path, and the allocation weight of the type of laid wires corresponding to the auxiliary path. It should be noted that the present embodiment determines the predicted power load required for laying wires corresponding to the auxiliary path as one of the feasible solutions. The average value of the power load of the current users is used as a single-household load reference. Combined with the planning of the regional planning book, the number of households of the migrated users is determined. The product of the number of households and the single-household load reference is the predicted value of the predicted power load required for the standby node, that is, the preset additional power load data. The preset additional power load data is used as the maximum power load required to be carried by the laying wires corresponding to the auxiliary path, and the type of wire that meets the maximum power load is selected. In this process, a type of wire that can just carry the maximum power load (that is, the preset additional power load data) can be selected, further avoiding the waste of resources. Exemplarily, the wire carrying capacity is measured in kilowatts or megawatts.
[0075] Further, the wire carrying capacity determination module 60 can determine the sum C of the wire carrying capacity in the area to be planned and the future migration area according to the calculation formula C=W1×L1+W2×L2; wherein L1 represents the carrying capacity of the type of laying wire corresponding to the main path, W1 represents the allocation weight of the type of laying wire corresponding to the main path, L2 represents the carrying capacity of the type of laying wire corresponding to the auxiliary path, and W2 represents the allocation weight of the type of laying wire corresponding to the auxiliary path. In this way, after calculating the predicted power load required for laying wires corresponding to the best backup laying path (that is, the auxiliary path), and the minimum future bearing wire (the wire that can just carry the maximum power load (that is, the preset additional power load data)) that can be provided for the predicted power load, the type of laying wire is weighted again to obtain the final type of laying wire used in the main path. In this way, a more comprehensive development consideration of the area to be planned can be achieved, and normal power supply to the area to be planned can be achieved within the target safe working period.
[0076] Based on the same inventive concept, an embodiment of the present invention further provides a line planning simulation method for a power distribution system. Figure 4 is a flow chart of a line planning simulation method for a power distribution system provided by an embodiment of the present invention. The line planning simulation method is applied to a line planning simulation system for a power distribution system provided by any one of the embodiments of the present invention. Figure 4 As shown, the line planning simulation method includes:
[0077] S110, obtaining the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate in the area to be planned, and the economic growth rate in the area to be planned.
[0078] Specifically, continue to refer to Figure 1 , the data acquisition module 10 can obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate in the area to be planned and the economic growth rate in the area to be planned. Exemplarily, the data acquisition module 10 can obtain the user distribution in the area to be planned, the historical power load data of each user, the population growth rate and the economic growth rate in the area to be planned in units of years or months. Exemplarily, a two-dimensional coordinate system or a three-dimensional coordinate system can be established in the area to be planned, and the distribution of each user in the area to be planned can be determined in the form of coordinates, so as to determine the specific laying of the distribution line path according to the distribution of each user in the area to be planned. Exemplarily, the historical power load data of each user in the area to be planned can be obtained by means of electric energy meter records, visits and inquiries. In addition, it should be noted that the sum of the historical power load data corresponding to each user in the area to be planned is the historical power load data of the entire area to be planned. For example, the population growth rate and economic growth rate of the area to be planned can be obtained based on the record information of the relevant departments, so as to determine the predicted future power load data of the area to be planned based on the overall historical power load data, population growth rate and economic growth rate of the area to be planned. This embodiment is only an example and is not limited here.
[0079] S120, determining the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and performing simulated laying along the main path.
[0080] Specifically, continue to refer to Figure 1 , the data acquisition module 10 is electrically connected to the main path simulation laying module 30, then the data acquisition module 10 can transmit the obtained user distribution in the area to be planned and the historical power load data of each user to the main path simulation laying module 30, and the main path simulation laying module 30 can analyze and process the received user distribution in the area to be planned and the historical power load data of each user, determine the main path of the distribution line corresponding to the area to be planned, and simulate laying along the main path. It can be understood that the main path can be implemented to distribute power to each user in the area to be planned to ensure the normal power consumption of each user in the area to be planned.
[0081] S130. Determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned.
[0082] Specifically, continue to refer to Figure 1 , the data acquisition module 10 is also electrically connected to the power load prediction module 20, then the data acquisition module 10 can transmit the historical power load data, population growth rate and economic growth rate of each user in the area to be planned to the power load prediction module 20, and the power load prediction module 20 can analyze and process the received historical power load data, population growth rate and economic growth rate of each user in the area to be planned, and determine the predicted power load data of the area to be planned within the target safe working period. It can be understood that the predicted power load data can ensure the normal power demand of each user in the area to be planned within the target safe working period.
[0083] It should be noted that S120 is a step for determining the main path of the distribution line corresponding to the area to be planned, and S130 is a step for determining the predicted power load data of the area to be planned within the target safe working period. In this embodiment, the sequence of S120 and S130 is only for example and not for limitation. By way of example, S120 may be executed first and then S130, or S130 may be executed first and then S120, or S120 and S130 may be executed simultaneously.
[0084] S140. Determine the type of wires to be laid corresponding to the main path based at least on the predicted power load data.
[0085] Specifically, continue to refer to Figure 1 , the wire type determination module 40 is electrically connected to the power load prediction module 20 and the main path simulation laying module 30 respectively, then the wire type determination module 40 can receive the predicted power load data of the area to be planned within the target safe working period transmitted by the power load prediction module 20, and the main path of the distribution line corresponding to the area to be planned transmitted by the main path simulation laying module 30, and then the wire type determination module 40 can analyze and process the predicted power load data, and select the type of laying wire corresponding to the main path accordingly, so as to ensure that the load carrying capacity of the selected laying wire type is greater than or equal to the predicted power load data, so that in the normal use of the laying wire, the normal power demand of each user in the area to be planned within the target safe working period is further guaranteed. In this way, after determining the main path of the distribution line corresponding to the simulated laying and the type of laying wire corresponding to the main path, the subsequent actual construction process can be carried out. This embodiment effectively improves the construction efficiency and ensures the power demand of the area to be planned.
[0086] According to the technical solution in the embodiment of the present invention, the line planning simulation method first obtains the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned, and then determines the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulates the laying along the main path, and then determines the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned, and finally determines the type of laying wire corresponding to the main path at least according to the predicted power load data. Using the above method, the data acquisition module is used to obtain historical information and user information of the area to be planned, the main path simulation laying module is used to determine the main path of the distribution line corresponding to the area to be planned, the power load prediction module is used to predict the predicted power load data of the area to be planned within the target safe working period, and the wire type determination module is used to determine the type of laid wire corresponding to the main path. In this way, the historical data is combined to predict the power load required in the future, the carrying capacity of the laid wire is effectively judged, and then the type of laid wire that meets the carrying capacity is selected. While ensuring normal power supply in the area to be planned, the laying cost of the wire is effectively reduced, and the waste of resources is avoided, which provides convenience for the path simulation of the distribution line in the area to be planned.
[0087] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments, combinations and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A line planning simulation system for a power distribution system, characterized in that: It includes data acquisition module, power load prediction module, main path simulation laying module and wire type determination module; The data acquisition module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the data acquisition module is used to obtain the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; The main path simulation laying module is used to determine the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulate laying along the main path; The power load prediction module is used to determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; The wire type determination module is electrically connected to the power load prediction module and the main path simulation laying module respectively, and the wire type determination module is used to determine the type of laying wire corresponding to the main path based on at least the predicted power load data.
2. The route planning simulation system according to claim 1, characterized in that: The data collection module includes a user distribution collection unit, a user historical electricity consumption collection unit, a population growth rate collection unit and an economic growth rate collection unit; The user distribution collection unit is electrically connected to the main path simulation laying module, and the user distribution collection unit is used to obtain the user distribution situation in the area to be planned; The user historical electricity consumption collection unit is electrically connected to the electricity load prediction module and the main path simulation laying module respectively, and the user historical electricity consumption collection unit is used to obtain the historical electricity load data of each user in the area to be planned; The population growth rate acquisition unit is electrically connected to the power load prediction module, and the population growth rate acquisition unit is used to obtain the population growth rate of the area to be planned; The economic growth rate acquisition unit is electrically connected to the power load prediction module, and the economic growth rate acquisition unit is used to obtain the economic growth rate of the area to be planned.
3. The route planning simulation system according to claim 1, characterized in that: The power load prediction module includes a regional historical power consumption determination unit and a power load prediction unit; The data acquisition module is electrically connected to the regional historical electricity consumption determination unit and the power load prediction unit respectively, and the regional historical electricity consumption determination unit is used to determine the historical power load data of the entire area to be planned according to the historical power load data of each user in the area to be planned; The power load prediction unit is also electrically connected to the regional historical power consumption determination unit and the wire type determination module respectively. The power load prediction unit is used to calculate the power load according to the calculation formula L t =L0×(1+G p ) t×α ×(1+G e ) t , determine the predicted power load data L of the planned area within the target safe working period t t ; Wherein, L0 represents the historical power load data of the entire area to be planned, G p represents the population growth rate of the area to be planned, G e represents the economic growth rate of the area to be planned, and α represents the influence weight of the population growth rate of the area to be planned on the power load.
4. The route planning simulation system according to claim 1, characterized in that: The main path simulation laying module includes a node power supply area division unit, a transfer node determination unit and a main path simulation laying unit; The node power supply area division unit is electrically connected to the data acquisition module and the transit node determination unit respectively, and is used to divide the area to be planned into multiple node power supply areas according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, according to the preset power load threshold; wherein the difference between the overall historical power load data of each node power supply area and the preset power load threshold satisfies the first difference range; The transit node determination unit is used to determine the transit node corresponding to each node power supply area according to the user distribution in each node power supply area; The main path simulation laying unit is electrically connected to the transit node determination unit and the wire type determination module respectively, and is used to simulate the sequential connection of all the transit nodes, determine the main path of the distribution line corresponding to the area to be planned, and perform simulated laying along the main path.
5. The route planning simulation system according to claim 4, characterized in that: The main path simulation laying unit includes a simulation connection distance acquisition subunit, a simulation connection distance comparison subunit and a main path simulation laying subunit; The simulated connection distance acquisition subunit is electrically connected to the transfer node determination unit and the simulated connection distance comparison subunit respectively, and the simulated connection distance acquisition subunit is used to simulate all the transfer nodes to be connected in sequence, and obtain the distances of the simulated connection paths corresponding to multiple simulated connections; The simulated connection distance comparison subunit is used to compare the distances of the simulated connection paths corresponding to multiple simulated connections, and define the simulated connection path corresponding to the minimum distance as the main path of the distribution line corresponding to the area to be planned; The main path simulation laying subunit is electrically connected to the simulated connection distance comparison subunit and the wire type determination module respectively, and is used to perform simulated laying along the main path according to the main path of the distribution line corresponding to the area to be planned.
6. The route planning simulation system according to claim 1, characterized in that: The wire type determination module includes a load comparison unit and a wire type determination unit; The load comparison unit is electrically connected to the wire type determination unit and the power load prediction module, respectively, and is used to compare the predicted power load data with the maximum load data of multiple types of wires to be laid; The wire type determination unit is also electrically connected to the main path simulation laying module, and is used to determine the type of wire to be laid corresponding to the second difference range whose difference between the maximum bearing load data and the predicted power load data satisfies the type of wire to be laid as the type of laying wire corresponding to the main path.
7. The route planning simulation system according to claim 6, characterized in that: The wire type determination module also includes a historical climate acquisition unit and a historical climate association unit; The historical climate acquisition unit is used to acquire the historical climate data of the area to be planned; The historical climate association unit is electrically connected to the historical climate acquisition unit and the load comparison unit respectively, and the historical climate association unit is used to determine the maximum fluctuation impact value of the historical climate data on the maximum load data of the wire to be laid according to the historical climate data of the area to be planned; The load comparison unit is further used to compare the sum of the predicted power load data and the maximum fluctuation impact value with the maximum load data of multiple types of wires to be laid; The wire type determination unit is also used to determine the type of wire to be laid corresponding to the main path as the type of wire to be laid corresponding to the difference between the maximum bearing load data and the sum of the predicted power load data and the maximum fluctuation impact value that satisfies the second difference range.
8. The route planning simulation system according to claim 1, characterized in that: It also includes auxiliary path simulation paving module; The data acquisition module is electrically connected to the auxiliary path simulation laying module, and the data acquisition module is also used to obtain the future migration direction and future migration area of the user cluster in the area to be planned; The auxiliary path simulation laying module is used to determine the auxiliary path of the distribution line corresponding to the future migration area according to the future migration direction and future migration area of the user cluster in the area to be planned, and simulate laying along the auxiliary path; wherein the auxiliary path is connected to the main path; The wire type determination module is also electrically connected to the auxiliary path simulation laying module, and the wire type determination module is also used to determine the type of laying wire corresponding to the auxiliary path according to preset additional power load data.
9. The route planning simulation system according to claim 8, characterized in that: The line planning simulation system also includes a wire load capacity determination module; The wire carrying capacity determination module is electrically connected to the wire type determination module, and the wire carrying capacity determination module is used to determine the sum of the wire carrying capacities in the to-be-planned area and the future migration area according to the carrying capacity of the type of laid wire corresponding to the main path, the allocation weight of the type of laid wire corresponding to the main path, the carrying capacity of the type of laid wire corresponding to the auxiliary path, and the allocation weight of the type of laid wire corresponding to the auxiliary path.
10. A line planning simulation method for a power distribution system, characterized in that: include: Obtaining the user distribution in the area to be planned, the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; Determine the main path of the distribution line corresponding to the area to be planned according to the user distribution in the area to be planned and the historical power load data of each user in the area to be planned, and simulate laying along the main path; Determine the predicted power load data of the area to be planned within the target safe working period according to the historical power load data of each user in the area to be planned, the population growth rate of the area to be planned and the economic growth rate of the area to be planned; The type of laying wire corresponding to the main path is determined based on at least the predicted power load data.
Citation Information
Patent Citations
Power grid line planning method and system based on artificial intelligence
CN112580886A
Power distribution network wiring intelligent planning method based on dynamic geographic features
CN117610214A
Power grid line planning system based on artificial intelligence
CN118504917A
Pharmaceutical composition for preventing or treating cancer comprising upconversion nanoparticles
KR1020250085387A
Automatic following system for unmanned vehicle
TWI741807B