Water conservancy and hydropower engineering construction management system based on BIM

By adopting a BIM-based management system in the construction of water conservancy and hydropower projects, the problems of high management difficulties, high cost and poor results in the existing technology are solved, and intelligent management is realized, and management efficiency and effect are improved.

CN119721602APending Publication Date: 2025-03-28JIANGXI ZENGTAI CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411794571.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The existing water conservancy and hydropower project construction management methods have problems such as high management difficulties, high cost and poor results, and lack of intelligent management methods.

Method used

A water conservancy and hydropower engineering construction management system based on BIM (building information model) is adopted. The system includes a demand response module, a task configuration module, a data acquisition module and a task execution module. Through these modules, it responds to management requirements, configures tasks, data acquisition and work evaluation to achieve intelligent management methods.

Benefits of technology

Through intelligent management methods, the workload of manual configuration and on-site inspections is reduced, management efficiency is improved, the work efficiency of engineering managers is enhanced, and the management methods of water conservancy and hydropower engineering construction are improved and management results are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119721602A_ABST
    Figure CN119721602A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM-based water conservancy and hydropower engineering construction management system, and the system comprises a demand response module which is used for responding to a management demand, and building a new management task according to the management demand; the management task comprises management content and a management address; the task configuration module is used for acquiring management node data and inputting a management task according to a BIM model structure corresponding to the management content and the management address; the data acquisition module is used for acquiring field work data of a management address; and the task execution module is used for obtaining the work evaluation results of the working groups according to the field work data of the management addresses and the management node data and sending the work evaluation results to the management terminals of the working groups in a one-to-one correspondence manner. The technical problem of how to improve the management mode and improve the management effect in the water conservancy and hydropower engineering construction process in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction management of water conservancy and hydropower engineering, and in particular to a water conservancy and hydropower engineering construction management system based on BIM. Background Art

[0002] During the construction of large-scale hydropower projects, the same work surface often involves multiple tasks from multiple disciplines. There is a certain degree of overlap between the various tasks of each discipline, and the requirements for construction technology of water conservancy and hydropower projects are stricter than those of conventional projects. Therefore, the construction and management of water conservancy and hydropower projects are difficult.

[0003] At present, the construction management of water conservancy and hydropower projects still relies on the overall planning ability of project managers for the construction site and the coordination and cooperation ability between the persons in charge of various tasks. However, this method has the problems of difficult management, high cost and poor effect, and lacks intelligent management methods.

[0004] From this, we can see that the technical problem existing in the existing technology is how to improve the management method and enhance the management effect during the construction of water conservancy and hydropower projects. Summary of the invention

[0005] The purpose of the present invention is to provide a water conservancy and hydropower project construction management system based on BIM, which solves the technical problem of how to improve the management method and enhance the management effect in the process of water conservancy and hydropower project construction in the prior art.

[0006] A BIM-based water conservancy and hydropower project construction management system, the management system comprising:

[0007] A demand response module, which is used to respond to management demands and create new management tasks according to the management demands; the management tasks include management content and management address;

[0008] A task configuration module, which is used to obtain management node data and enter management tasks according to the BIM model structure corresponding to the management content and the management address;

[0009] A data collection module, the data collection module is used to collect on-site work data of the management address; the on-site work data includes construction data of several work groups;

[0010] The task execution module is used to obtain the work evaluation results of each work group according to the on-site work data and management node data of the management address and send them one by one to the management terminal of each work group.

[0011] Furthermore, the management demand includes a main task; the demand response module creates a new management task according to the management demand, including:

[0012] Acquire a water conservancy and hydropower engineering construction database, wherein the water conservancy and hydropower engineering construction database includes a plurality of engineering tasks and associations between the plurality of engineering tasks;

[0013] According to the water conservancy and hydropower engineering construction database, a task knowledge tree of water conservancy and hydropower engineering is constructed;

[0014] According to the main task, the main task, several subsequent tasks and constraints between the several subsequent tasks are obtained in the task knowledge tree; each subsequent task includes several execution nodes;

[0015] The main task and several subsequent tasks are used as management contents; the address data corresponding to the main task and several subsequent tasks are used as management addresses.

[0016] Furthermore, the task configuration module obtains management node data and enters management tasks according to the BIM model structure corresponding to the management content and the management address, including:

[0017] Determine whether the current main task is legal;

[0018] If yes, based on the constraints between several successor tasks, multiple management nodes are obtained; each management node corresponds to the execution nodes of multiple successor tasks;

[0019] Obtain the management address corresponding to each execution node and the corresponding BIM model structure;

[0020] The management address and BIM model structure corresponding to each execution node are associated with the corresponding management node and used as management node data.

[0021] Furthermore, there are several data acquisition modules, which are arranged at several management addresses in a one-to-one correspondence, and the data acquisition modules include:

[0022] An image acquisition module, the image acquisition module is used to acquire a number of on-site operation images at the management address;

[0023] A node confirmation module, which is used to cooperate with the management terminal to punch in and obtain punch-in data, where the punch-in data includes an execution node and an execution status of the execution node, where the execution status includes starting execution, executing, and ending execution;

[0024] The construction data of the work group includes the on-site operation images of the work group at each corresponding execution node, and the clock-in data with the node confirmation module.

[0025] Furthermore, the management terminal includes a paper work ticket with an RFID electronic tag; the node confirmation module includes:

[0026] An identification unit, which is used to identify the RFID electronic tag on the paper work ticket to obtain the work ticket information and verify it;

[0027] A visual operation unit is used to provide an operation interface for the person in charge of the work corresponding to the paper work ticket to operate after checking the work ticket information, so as to confirm the execution node and the execution status of the execution node.

[0028] Furthermore, the task execution module obtains the work evaluation results of each work group based on the on-site work data of the management address and the management node data, including:

[0029] When managing each management node, the task execution module obtains the construction process data corresponding to the work group at each execution node based on the on-site operation image of each work group in the on-site work data; the construction process data includes construction steps and construction scope;

[0030] Based on the BIM model structure of each management address, check the construction process data corresponding to each work group and generate process verification data;

[0031] The task execution module also verifies the punch-in data of each work group in the field work data based on the constraints between the subsequent tasks of the management node, and generates process verification data;

[0032] Based on the process verification data and process verification data of the same working group, the work evaluation results of the working group are obtained.

[0033] Furthermore, the task execution module obtains the construction process data corresponding to each execution node of the work group based on the on-site operation image of each work group in the on-site work data, including:

[0034] Acquire multiple on-site operation images corresponding to the same work group at the execution node;

[0035] sorting multiple field operation images based on the acquisition time of each field operation image;

[0036] Based on each on-site operation image, a number of construction feature data are obtained, wherein the construction feature data includes construction tools, construction surface, and construction personnel;

[0037] Based on the execution node and the construction feature data in the on-site operation image, the process sub-step corresponding to the on-site operation image is obtained;

[0038] The process sub-steps corresponding to multiple on-site operation images constitute the construction steps of the work group at the execution node;

[0039] The management addresses corresponding to multiple on-site operation images constitute the construction scope corresponding to the working group at the execution node.

[0040] Further, based on the execution node and the construction feature data in the field operation image, the process sub-steps corresponding to the field operation image are obtained, including:

[0041] Constructing a process relationship database, wherein the process relationship database includes execution nodes, construction tools, construction surfaces, construction personnel, process sub-steps, and mapping relationships between execution nodes, construction tools, construction surfaces, construction personnel, and process sub-steps;

[0042] Train the neural network model through the process relationship database to obtain the process analysis model;

[0043] The construction feature data in the current execution node and the on-site operation image are input into the process analysis model to obtain the process sub-steps.

[0044] Furthermore, the management terminal also includes a voice broadcast unit, and the voice broadcast unit includes multiple voice broadcast units, which are arranged in a one-to-one correspondence at multiple management addresses; and are used to voice broadcast failure information when the work ticket information fails to be checked.

[0045] Furthermore, the voice broadcast unit is also used to voice broadcast the failure information of the process verification data and the failure information of the process verification data.

[0046] Compared with the prior art, the present invention has the following beneficial effects:

[0047] In this embodiment, a new management task is created by setting a demand response module to respond to management needs, and the management task is configured by acquiring management node data through the task configuration module, which reduces the manual configuration process and makes the management task configuration more accurate; the field work data corresponding to the management address is collected through the data acquisition module, which reduces the workload of manual field inspection and collection, and improves management efficiency; the work of each working group is evaluated according to the field work data and management node data through the task execution module to obtain the work evaluation results, which further reduces the workload of engineering management personnel and improves management efficiency. It solves the technical problem of how to improve management methods and enhance management effects in the process of water conservancy and hydropower project construction in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 This is a principle block diagram of a water conservancy and hydropower project construction management system based on BIM in the present invention. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0050] like Figure 1 As shown, a BIM-based water conservancy and hydropower project construction management system includes:

[0051] A demand response module, which is used to respond to management needs and create new management tasks according to the management needs; the management tasks include management content and management address;

[0052] A task configuration module, which is used to obtain management node data and enter management tasks according to the BIM model structure corresponding to the management content and the management address;

[0053] A data collection module, the data collection module is used to collect on-site work data of the management address; the on-site work data includes construction data of several work groups;

[0054] The task execution module is used to obtain the work evaluation results of each work group according to the on-site work data and management node data of the management address and send them one by one to the management terminal of each work group.

[0055] The specific implementation process of this embodiment includes:

[0056] In this embodiment, a new management task is created by setting a demand response module to respond to management needs, and the management task is configured by acquiring management node data through the task configuration module, which reduces the manual configuration process and makes the management task configuration more accurate; the field work data corresponding to the management address is collected through the data acquisition module, which reduces the workload of manual field inspection and collection, and improves management efficiency; the work of each working group is evaluated according to the field work data and management node data through the task execution module to obtain the work evaluation results, which further reduces the workload of engineering management personnel and improves management efficiency. It solves the technical problem of how to improve management methods and enhance management effects in the process of water conservancy and hydropower project construction in the prior art.

[0057] In this embodiment, the management demand includes a main task; the demand response module creates a new management task according to the management demand, including:

[0058] Acquire a water conservancy and hydropower engineering construction database, wherein the water conservancy and hydropower engineering construction database includes a plurality of engineering tasks and associations between the plurality of engineering tasks;

[0059] According to the water conservancy and hydropower engineering construction database, a task knowledge tree of water conservancy and hydropower engineering is constructed;

[0060] According to the main task, the main task, several subsequent tasks and constraints between the several subsequent tasks are obtained in the task knowledge tree; each subsequent task includes several execution nodes;

[0061] The main task and several subsequent tasks are used as management contents; the address data corresponding to the main task and several subsequent tasks are used as management addresses.

[0062] In this embodiment, a water conservancy and hydropower engineering construction database is obtained through big data and expert experience, and a task knowledge tree corresponding to the current water conservancy and hydropower engineering is constructed based on the water conservancy and hydropower engineering construction database. All tasks after the current main task in the task knowledge tree are successor tasks. It should be noted that in this embodiment, all successor tasks are completed before the main task is completed in this embodiment. It should be noted that in this embodiment, there are successor tasks after the successor tasks, and they are all successor tasks of the main task.

[0063] In this embodiment, each subsequent task needs to issue at least one work ticket, and there is a constraint relationship between the subsequent tasks, and the constraint conditions are constructed according to the constraint relationship. For example, the subsequent task A cannot be carried out at the same time as the subsequent task B and the subsequent task C, and the subsequent task B must be completed within a preset time after the completion of the subsequent task A, etc.

[0064] In this embodiment, each subsequent task corresponds to a number of management addresses, and the work group needs to complete the corresponding work at each management address and receive acceptance before the subsequent task is considered completed.

[0065] In this embodiment, the task configuration module obtains management node data and enters management tasks according to the BIM model structure corresponding to the management content and the management address, including:

[0066] Determine whether the current main task is legal;

[0067] If yes, based on the constraints between several successor tasks, multiple management nodes are obtained; each management node corresponds to the execution nodes of multiple successor tasks;

[0068] Obtain the management address corresponding to each execution node and the corresponding BIM model structure;

[0069] The management address and BIM model structure corresponding to each execution node are associated with the corresponding management node and used as management node data.

[0070] In this embodiment, judging whether the current main task is legal includes: judging whether there are other tasks that have a construction conflict with the main task and have not been completed; if so, judging that the current main task is illegal; if not, judging that the current main task is legal.

[0071] According to the constraints between several subsequent tasks, the main task is divided into several management nodes; for each subsequent task, the management node means the execution node. In this embodiment, the management node includes the time node restricted by the constraints between the subsequent tasks, the time node when the management personnel accepts the task, and the time node when the management personnel performs safety operations.

[0072] According to another embodiment of the present invention, there are a plurality of data acquisition modules, and the plurality of data acquisition modules are arranged at a plurality of management addresses in a one-to-one correspondence, and the data acquisition modules include:

[0073] An image acquisition module, the image acquisition module is used to acquire a number of on-site operation images at the management address;

[0074] A node confirmation module, which is used to cooperate with the management terminal to punch in and obtain punch-in data, where the punch-in data includes an execution node and an execution status of the execution node, where the execution status includes starting execution, executing, and ending execution;

[0075] The construction data of the work group includes the on-site operation images of the work group at each corresponding execution node, and the clock-in data with the node confirmation module.

[0076] The specific implementation process of this embodiment includes:

[0077] In this embodiment, the management terminal includes a paper work ticket with an RFID electronic tag; the node confirmation module includes:

[0078] An identification unit, which is used to identify the RFID electronic tag on the paper work ticket to obtain the work ticket information and verify it;

[0079] A visual operation unit is used to provide an operation interface for the person in charge of the work corresponding to the paper work ticket to operate after checking the work ticket information, so as to confirm the execution node and the execution status of the execution node.

[0080] In this embodiment, the management terminal also includes a voice broadcast unit, and the voice broadcast unit includes multiple voice broadcast units, which are arranged at multiple management addresses in a one-to-one correspondence; and are used to voice broadcast the failure information when the work ticket information fails to be checked.

[0081] In this embodiment, the identification unit, the visual operation unit and the voice broadcast unit are integrated in a housing to form a node confirmation module. The housing is fixed on a movable fixing device, so as to facilitate switching between various management addresses.

[0082] During the construction of water conservancy and hydropower projects, the working group needs to issue corresponding paper work tickets during construction. After the paper work tickets are issued, the corresponding RFID electronic tags are attached to them for the identification unit to identify and obtain the work ticket information.

[0083] It also facilitates the subsequent inventory of work tickets.

[0084] In this embodiment, the task execution module obtains the work evaluation results of each work group according to the on-site work data of the management address and the management node data, including:

[0085] When managing each management node, the task execution module obtains the construction process data corresponding to the work group at each execution node based on the on-site operation image of each work group in the on-site work data; the construction process data includes construction steps and construction scope;

[0086] Based on the BIM model structure of each management address, check the construction process data corresponding to each work group and generate process verification data;

[0087] The task execution module also verifies the punch-in data of each work group in the field work data based on the constraints between the subsequent tasks of the management node, and generates process verification data;

[0088] Based on the process verification data and process verification data of the same working group, the work evaluation results of the working group are obtained.

[0089] In this embodiment, the BIM model structure includes the model components of each construction surface of the management address, the relationship between the model components, and the standard construction process.

[0090] In this embodiment, the task execution module obtains the construction process data corresponding to the work group at each execution node based on the on-site operation image of each work group in the on-site work data, including:

[0091] Acquire multiple on-site operation images corresponding to the same work group at the execution node;

[0092] sorting multiple field operation images based on the acquisition time of each field operation image;

[0093] Based on each on-site operation image, a number of construction feature data are obtained, wherein the construction feature data includes construction tools, construction surface, and construction personnel;

[0094] Based on the execution node and the construction feature data in the on-site operation image, the process sub-step corresponding to the on-site operation image is obtained;

[0095] The process sub-steps corresponding to multiple on-site operation images constitute the construction steps of the work group at the execution node;

[0096] The management addresses corresponding to multiple on-site operation images constitute the construction scope corresponding to the working group at the execution node.

[0097] In this embodiment, based on the execution node and the construction feature data in the on-site operation image, the process sub-steps corresponding to the on-site operation image are obtained, including:

[0098] Constructing a process relationship database, wherein the process relationship database includes execution nodes, construction tools, construction surfaces, construction personnel, process sub-steps, and mapping relationships between execution nodes, construction tools, construction surfaces, construction personnel, and process sub-steps;

[0099] Train the neural network model through the process relationship database to obtain the process analysis model;

[0100] The construction feature data in the current execution node and the on-site operation image are input into the process analysis model to obtain the process sub-steps.

[0101] In this embodiment, the voice broadcast unit is also used for voice broadcasting the failure information of the process verification data and the failure information of the process verification data.

[0102] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0103] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A BIM-based water conservancy and hydropower project construction management system, characterized by: The management system comprises: A demand response module, which is used to respond to management needs and create new management tasks according to the management needs; the management tasks include management content and management address; A task configuration module, which is used to obtain management node data and enter management tasks according to the BIM model structure corresponding to the management content and the management address; A data collection module, the data collection module is used to collect on-site work data of the management address; the on-site work data includes construction data of several work groups; The task execution module is used to obtain the work evaluation results of each work group according to the on-site work data and management node data of the management address and send them one by one to the management terminal of each work group.

2. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 1, characterized in that: The management requirements include main tasks; the demand response module creates new management tasks according to the management requirements, including: Acquire a water conservancy and hydropower engineering construction database, wherein the water conservancy and hydropower engineering construction database includes a plurality of engineering tasks and associations between the plurality of engineering tasks; According to the water conservancy and hydropower engineering construction database, a task knowledge tree of water conservancy and hydropower engineering is constructed; According to the main task, the main task, several subsequent tasks and constraints between the several subsequent tasks are obtained in the task knowledge tree; each subsequent task includes several execution nodes; The main task and several subsequent tasks are used as management contents; the address data corresponding to the main task and several subsequent tasks are used as management addresses.

3. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 2, characterized in that: The task configuration module obtains management node data and enters management tasks according to the BIM model structure corresponding to the management content and management address, including: Determine whether the current main task is legal; If yes, based on the constraints between several successor tasks, multiple management nodes are obtained; each management node corresponds to the execution nodes of multiple successor tasks; Obtain the management address corresponding to each execution node and the corresponding BIM model structure; The management address and BIM model structure corresponding to each execution node are associated with the corresponding management node and used as management node data.

4. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 3, characterized in that: There are several data acquisition modules, which are arranged at several management addresses in a one-to-one correspondence. The data acquisition modules include: An image acquisition module, the image acquisition module is used to acquire a number of on-site operation images at the management address; A node confirmation module, which is used to cooperate with the management terminal to punch in and obtain punch-in data, where the punch-in data includes an execution node and an execution status of the execution node, where the execution status includes starting execution, executing, and ending execution; The construction data of the work group includes the on-site operation images of the work group at each corresponding execution node, and the clock-in data with the node confirmation module.

5. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 4, characterized in that: The management terminal includes a paper work ticket with an RFID electronic tag; the node confirmation module includes: An identification unit, which is used to identify the RFID electronic tag on the paper work ticket to obtain the work ticket information and verify it; A visual operation unit is used to provide an operation interface for the person in charge of the work corresponding to the paper work ticket to operate after checking the work ticket information, so as to confirm the execution node and the execution status of the execution node.

6. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 4, characterized in that: The task execution module obtains the work evaluation results of each working group based on the on-site work data of the management address and the management node data, including: When managing each management node, the task execution module obtains the construction process data corresponding to the work group at each execution node based on the on-site operation image of each work group in the on-site work data; the construction process data includes construction steps and construction scope; Based on the BIM model structure of each management address, check the construction process data corresponding to each work group and generate process verification data; The task execution module also verifies the punch-in data of each work group in the field work data based on the constraints between the subsequent tasks of the management node, and generates process verification data; Based on the process verification data and process verification data of the same working group, the work evaluation results of the working group are obtained.

7. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 6, characterized in that: The task execution module obtains the construction process data corresponding to each work group at each execution node based on the on-site operation images of each work group in the on-site work data, including: Acquire multiple on-site operation images corresponding to the same work group at the execution node; sorting multiple field operation images based on the acquisition time of each field operation image; Based on each on-site operation image, a number of construction feature data are obtained, wherein the construction feature data includes construction tools, construction surface, and construction personnel; Based on the execution node and the construction feature data in the on-site operation image, the process sub-step corresponding to the on-site operation image is obtained; The process sub-steps corresponding to multiple on-site operation images constitute the construction steps of the work group at the execution node; The management addresses corresponding to multiple on-site operation images constitute the construction scope corresponding to the working group at the execution node.

8. A BIM-based water conservancy and hydropower project construction management system as claimed in claim 7, characterized in that: Based on the execution node and the construction feature data in the field operation image, the process sub-steps corresponding to the field operation image are obtained, including: Constructing a process relationship database, wherein the process relationship database includes execution nodes, construction tools, construction surfaces, construction personnel, process sub-steps, and mapping relationships between execution nodes, construction tools, construction surfaces, construction personnel, and process sub-steps; Train the neural network model through the process relationship database to obtain the process analysis model; The construction feature data in the current execution node and the on-site operation image are input into the process analysis model to obtain the process sub-steps.

9. The BIM-based water conservancy and hydropower project construction management system according to claim 5, characterized in that: The management terminal also includes a voice broadcast unit, which includes multiple voice broadcast units, and the multiple voice broadcast units are arranged at multiple management addresses in a one-to-one correspondence; and are used to voice broadcast failure information when the work ticket information fails to be checked.

10. A BIM-based water conservancy and hydropower project construction management system according to any one of claims 1 to 9, characterized in that: The voice broadcast unit is also used for voice broadcasting the failure information of the process verification data and the failure information of the process verification data.