System, method and device for realizing operation decision processing of intelligent dust remover, processor and computer readable storage medium thereof

By designing an intelligent dust collector operation decision system, the problem of existing dust collector reliance on manual management is solved, efficient data collection and analysis is achieved, and the system's intelligence level and operational efficiency are improved.

CN119728744APending Publication Date: 2025-03-28SHANGHAI MCC ENVIRONMENTAL PROTECTION OPERATION MANAGEMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411766610.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The operation and management of existing dust removal systems relies on manual inspection, and there are problems such as low efficiency, lagging data collection, dispersed information and lack of intelligent decision-making.

Method used

An intelligent dust collector operation decision-making system is designed, including a firewall, source data preprocessing module, intelligent server deep storage module, data processing group development module, advanced application group development module and large-screen display module to realize data acquisition, analysis and optimization suggestions.

Benefits of technology

It significantly improves the digitalization and intelligence level of dust removal systems, optimizes operation and maintenance efficiency, reduces labor costs, realizes real-time data acquisition and analysis, and provides intelligent decision-making support and system operation status monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119728744A_ABST
    Figure CN119728744A_ABST
Patent Text Reader

Abstract

The invention relates to a system for realizing operation decision processing of an intelligent dust remover. The system comprises a firewall, a source data preprocessing module; the intelligent server deep storage module transmits an operation instruction to the centralized control server storage module, and the centralized control server storage module transmits basic information to the intelligent server deep storage module; a data processing group development module; an advanced application group development module; and a large screen display module. By adopting the system, the method, the device, the processor and the computer readable storage medium for realizing the operation decision processing of the intelligent dust remover, the intelligent level of a dust removal system is improved, the operation and maintenance efficiency is optimized, real-time data acquisition and analysis are realized, and centralized information management is realized; the centralized management and rapid acquisition of the information are realized, and the concentration degree and accessibility of the information are improved. Through the large-screen display module, a manager can monitor the operation condition of the system in real time, and it is ensured that system operation meets the management and control requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of air governance, and in particular to the field of environmental dust removal, and specifically refers to a system, method, device, processor and computer-readable storage medium thereof for realizing intelligent dust collector operation decision processing. Background Art

[0002] With the rapid development of my country's economy, the impact of severe environmental degradation on people's lives is becoming increasingly significant, especially the impact of atmospheric dust, which is widely criticized by the public. According to data released by the Ministry of Environmental Protection, areas with relatively serious air pollution in my country include more than 10 provinces such as Beijing, Tianjin, Shanghai, Anhui, Hebei, Shandong, Shanxi, Henan, and Liaoning, involving more than 60 cities. Its scope has covered most of my country's territory, bringing severe challenges to national economic development, people's daily life and health. Under the logic of my country's new economic normal, the growth rate, economic structure, growth mode and growth momentum will all undergo profound changes, and new requirements will be put forward for environmental management, with opportunities and challenges coexisting.

[0003] my country has put forward a series of digital and intelligent strategic requirements, such as "Made in China 2025" and "New Generation Artificial Intelligence Development Plan". At the same time, with the development of the Internet, the combination of information technology and environmental protection technology has given rise to the concept of "intelligent dust collector".

[0004] As an important dust control equipment in industrial production, the environmental dust removal system performs efficient dust removal through different filter media (such as filter bags and filter cartridges) to meet emission requirements. At present, the digitalization and intelligence level of steel dust removal systems is still relatively low. Most dust removal systems only realize basic digital signal transmission and centralized control functions, and the operation and maintenance of dust removal systems still rely on manual inspection. The operation and management of traditional dust removal systems have problems such as low labor efficiency, delayed data collection, scattered information, and lack of intelligent decision-making. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a system, method, device, processor and computer-readable storage medium thereof for realizing intelligent dust collector operation decision processing with high efficiency, high intelligence level and wide application range.

[0006] In order to achieve the above objectives, the system, method, device, processor and computer-readable storage medium for realizing intelligent dust collector operation decision processing of the present invention are as follows:

[0007] The main features of the system for realizing intelligent dust collector operation decision processing are that the system includes a firewall, a source data preprocessing module, an intelligent server deep storage module, a data processing group development module, an advanced application group development module and a large screen display module.

[0008] The input end of the firewall is connected to the centralized control central switch to block unauthorized external access and perform strict access control and filtering on data;

[0009] The input end of the source data preprocessing module is connected to the firewall, and is used to perform preliminary screening, cleaning and format conversion on the original data from the firewall, and convert the data into a unified format;

[0010] The input end of the intelligent server deep storage module is connected to the source data preprocessing module, the intelligent server deep storage module transmits operation instructions to the centralized control server storage module, and the centralized control server storage module transmits basic information to the intelligent server deep storage module for deep storage and management of the preprocessed data;

[0011] The input end of the data processing group development module is connected to the deep storage module of the intelligent server, which is used to perform complex calculations and analyses on the stored data and extract useful information and features;

[0012] The input end of the advanced application group development module is connected to the data processing group development module and is connected to the centralized control system for terminal operation;

[0013] The input end of the large-screen display module is connected to the advanced application group development module, and is used to display the parameters of the dust removal system and the operation status of the entire system in a graphical form.

[0014] Preferably, the system further includes a newly added monitoring channel, the output end of which is connected to the firewall for obtaining more environmental dust removal system related data.

[0015] Preferably, the system further comprises an ironmaking system, the output end of which is connected to a firewall to provide data of the ironmaking process, which is integrated and analyzed with data of an environmental dust removal system.

[0016] Preferably, the system further comprises a superior energy environment system, and the superior energy environment system is connected to the advanced application group development module to realize the intercommunication of data and information.

[0017] Preferably, the large-screen display module includes a login management unit, a comprehensive dashboard unit, a system overview unit, a system information display unit, a data monitoring unit, a performance trend unit and a report display unit. The login management unit is used to verify the login information. The comprehensive dashboard unit is used to display the area information and jump. The system overview unit is used to display charts, the operating status of the dust removal system, suction point details and the transfer production line suction point information. The system information display unit is used to display coke trough information, ore trough information, dust removal system information and system comprehensive information. The data monitoring unit is used to display dust removal system component information, as well as query suction points, modify suction point openings and suction point details. The performance trend unit is used to display charts, query time intervals and switch measuring points. The report display unit is used to display reports, perform time queries and export reports.

[0018] Preferably, the large-screen display module also includes a data management unit and a user management unit, the data management unit is used for data query, data addition, data editing, data deletion and log modification, and the user management unit is used to implement user query, user addition, user editing, user deletion and password reset functions.

[0019] The method for realizing intelligent dust collector operation decision processing by using the above system is mainly characterized in that the method comprises the following steps:

[0020] (1) Collect and filter data through a firewall;

[0021] (2) The source data preprocessing module performs preliminary processing on the collected data, removes outliers and noise, and converts data in different formats into a standard format;

[0022] (3) storing the processed data in the deep storage module of the intelligent server and classifying and storing them according to time series and data types;

[0023] (4) The data processing group development module conducts in-depth analysis of the stored data, calculates the daily, monthly and annual average values ​​of dust emissions, analyzes the frequency and causes of equipment failures, and evaluates the dust removal effect;

[0024] (5) The advanced application group development module develops intelligent decision-making models based on data analysis results;

[0025] (6) The large-screen display module displays the system's operating status and data analysis results in an intuitive graphical manner.

[0026] The main feature of the device for realizing intelligent dust collector operation decision processing is that the device comprises:

[0027] a processor configured to execute computer executable instructions;

[0028] The memory stores one or more computer executable instructions. When the computer executable instructions are executed by the processor, the various steps of the method for realizing the operation decision processing of the intelligent dust collector are implemented.

[0029] The processor for implementing intelligent dust collector operation decision processing has the main feature that the processor is configured to execute computer executable instructions. When the computer executable instructions are executed by the processor, the various steps of the above-mentioned method for implementing intelligent dust collector operation decision processing are implemented.

[0030] The main feature of the computer-readable storage medium is that a computer program is stored thereon, and the computer program can be executed by a processor to implement the various steps of the above-mentioned method for realizing intelligent dust collector operation decision processing.

[0031] The system, method, device, processor and computer-readable storage medium for realizing intelligent dust collector operation decision processing of the present invention are adopted to improve the intelligence level of the dust removal system: This technical solution realizes data collection, analysis and optimization suggestions of the environmental dust removal system through the intelligent dust collector operation decision system, and significantly improves the digitalization and intelligence level of the dust removal system. Optimize operation and maintenance efficiency: Through systematic data collection and analysis, the need for manual inspection is reduced, the efficiency of operation and maintenance is improved, and the labor cost is reduced. Real-time data collection and analysis: This technical solution can realize real-time data collection and analysis, avoid the problem of data collection lag, and improve the timeliness of information. Centralized information management: Through graphical display and multi-module integration, centralized management and rapid acquisition of information are realized, and the centralization and accessibility of information are improved. Intelligent decision support: This technical solution provides optimization suggestions to help managers make smarter decisions and improve the scientificity and accuracy of decisions. System operation status monitoring: Through the large-screen display module, managers can monitor the system operation status in real time to ensure that the system operation meets the management and control requirements. Scalability and compatibility: The system is designed with new monitoring channels and connections with the ironmaking system and the upper energy and environmental system to improve the scalability and compatibility of the system. User-friendly operation interface: The large-screen display module contains multiple functional units and provides a user-friendly operation interface to facilitate users to perform operations such as data query, report display and user management. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 The present invention is a schematic diagram of the working system of the intelligent dust collector operation decision-making process.

[0033] Figure 2 A schematic diagram of a system overview of a system for implementing intelligent dust collector operation decision processing according to the present invention.

[0034] Figure 3 A schematic diagram of the dust collector monitoring function of the system for realizing intelligent dust collector operation decision processing of the present invention. DETAILED DESCRIPTION

[0035] In order to more clearly describe the technical content of the present invention, further description is given below in conjunction with specific embodiments.

[0036] The system for realizing intelligent dust collector operation decision processing of the present invention includes a firewall, a source data preprocessing module, an intelligent server deep storage module, a data processing group development module, an advanced application group development module and a large screen display module.

[0037] The input end of the firewall is connected to the centralized control central switch to block unauthorized external access and perform strict access control and filtering on data;

[0038] The input end of the source data preprocessing module is connected to the firewall, and is used to perform preliminary screening, cleaning and format conversion on the original data from the firewall, and convert the data into a unified format;

[0039] The input end of the intelligent server deep storage module is connected to the source data preprocessing module, the intelligent server deep storage module transmits operation instructions to the centralized control server storage module, and the centralized control server storage module transmits basic information to the intelligent server deep storage module for deep storage and management of the preprocessed data;

[0040] The input end of the data processing group development module is connected to the deep storage module of the intelligent server, which is used to perform complex calculations and analyses on the stored data and extract useful information and features;

[0041] The input end of the advanced application group development module is connected to the data processing group development module and is connected to the centralized control system for terminal operation;

[0042] The input end of the large-screen display module is connected to the advanced application group development module, and is used to display the parameters of the dust removal system and the operation status of the entire system in a graphical form.

[0043] As a preferred embodiment of the present invention, the system further includes a newly added monitoring channel, and the output end of the newly added monitoring channel is connected to the firewall for obtaining more environmental dust removal system related data.

[0044] As a preferred embodiment of the present invention, the system also includes an ironmaking system, and the output end of the ironmaking system is connected to the firewall to provide data during the ironmaking process, which is integrated and analyzed with the data of the environmental dust removal system.

[0045] As a preferred embodiment of the present invention, the system further comprises an upper-level energy environment system, and the upper-level energy environment system is connected to the high-level application group development module to realize the intercommunication of data and information.

[0046] As a preferred embodiment of the present invention, the large-screen display module includes a login management unit, a comprehensive dashboard unit, a system overview unit, a system information display unit, a data monitoring unit, a performance trend unit and a report display unit. The login management unit is used to verify the login information, the comprehensive dashboard unit is used to display the area information and jump, the system overview unit is used to display charts, the operation status of the dust removal system, the suction point details and the transfer production line suction point information, the system information display unit is used to display the coke trough information, the ore trough information, the dust removal system information and the system comprehensive information, the data monitoring unit is used to display the dust removal system component information, as well as to query the suction point, modify the suction point opening and the suction point details, the performance trend unit is used to display charts, query the time interval and switch the measuring point, and the report display unit is used to display the report, perform time query and export the report.

[0047] As a preferred embodiment of the present invention, the large-screen display module also includes a data management unit and a user management unit. The data management unit is used for data query, data addition, data editing, data deletion and log modification. The user management unit is used to implement user query, user addition, user editing, user deletion and password reset functions.

[0048] The method of the present invention for realizing intelligent dust collector operation decision processing by using the above system has the main feature that the method comprises the following steps:

[0049] (1) Collect and filter data through a firewall;

[0050] (2) The source data preprocessing module performs preliminary processing on the collected data, removes outliers and noise, and converts data in different formats into a standard format;

[0051] (3) storing the processed data in the deep storage module of the intelligent server and classifying and storing them according to time series and data types;

[0052] (4) The data processing group development module conducts in-depth analysis of the stored data, calculates the daily, monthly and annual average values ​​of dust emissions, analyzes the frequency and causes of equipment failures, and evaluates the dust removal effect;

[0053] (5) The advanced application group development module develops intelligent decision-making models based on data analysis results;

[0054] (6) The large-screen display module displays the system's operating status and data analysis results in an intuitive graphical manner.

[0055] The main feature of the device for realizing intelligent dust collector operation decision processing of the present invention is that the device comprises:

[0056] a processor configured to execute computer executable instructions;

[0057] The memory stores one or more computer executable instructions. When the computer executable instructions are executed by the processor, the various steps of the method for realizing the operation decision processing of the intelligent dust collector are implemented.

[0058] The processor for realizing intelligent dust collector operation decision processing of the present invention has the main feature that the processor is configured to execute computer executable instructions, and when the computer executable instructions are executed by the processor, the various steps of the above-mentioned method for realizing intelligent dust collector operation decision processing are realized.

[0059] The computer-readable storage medium of the present invention has the main feature that a computer program is stored thereon, and the computer program can be executed by a processor to implement the various steps of the above-mentioned method for realizing intelligent dust collector operation decision processing.

[0060] In a specific embodiment of the present invention, the intelligent dust collector operation decision system belongs to the field of dust removal in the atmosphere treatment environment, and is mainly used for data collection, analysis, and optimization suggestions during the dust removal operation process. It aims to achieve more efficient intelligent dust removal operations. Provide various data reports to help managers understand the current system status during the operation process. This system aims to graphically display the parameters of the dust removal system, with multiple production lines as the main body, combined with dust collectors, to fully display the operation of the entire system. Ensure that the system operation status meets the management and control requirements.

[0061] The system includes a firewall, a source data preprocessing module, an intelligent server deep storage module, a data processing group development module, an advanced application group development module and a large-screen display module.

[0062] 1) Firewall: The input end of the firewall is connected to the centralized control central switch.

[0063] Working principle: Firewalls are used to block unauthorized external access and protect the security of internal system data. Strict access control and filtering are performed on incoming and outgoing data, allowing only legitimate data packets to pass through.

[0064] 2) Source data preprocessing module: The input end of the source data preprocessing module is connected to the firewall.

[0065] Operating principle: Perform preliminary screening, cleaning and format conversion on the raw data from the firewall, remove invalid and erroneous data, and convert the data into a unified format for subsequent module processing.

[0066] 3) Intelligent server deep storage module: The input end of the intelligent server deep storage module is connected to the source data preprocessing module, the intelligent server deep storage module transmits operation instructions to the centralized control server storage module, and the centralized control server storage module transmits basic information to the intelligent server deep storage module.

[0067] Operating principle: Store pre-processed data for a long time and in large quantities, send operation instructions to the storage module of the centralized control server as needed, and receive basic information from the storage module of the centralized control server.

[0068] 4) Data processing group development module: The input end of the data processing group development module is connected to the deep storage module of the intelligent server.

[0069] Operating principle: Perform complex calculations and analyses on stored data to extract useful information and features, such as counting dust emissions in different time periods, equipment operating time, etc.

[0070] 5) Advanced application group development module: The input end of the advanced application group development module is connected to the data processing group development module.

[0071] Operating principle: Based on the results of the data processing group development module, various advanced applications are developed, such as intelligent decision-making models, optimization algorithms, etc., to provide suggestions for the optimal operation of the system.

[0072] 6) Large screen display module: The input end of the large screen display module is connected to the advanced application group development module.

[0073] Operation principle: The system's operating status, data analysis results, etc. are displayed on the large screen in an intuitive and clear graphical manner for managers to view.

[0074] 7) New monitoring channel: The output end of the new monitoring channel is connected to the firewall.

[0075] Operating principle: It is used to obtain more data related to the environmental dust removal system and supplement the deficiencies of existing monitoring data.

[0076] 8) Ironmaking system: The output end of the ironmaking system is connected to the firewall.

[0077] Operating Principle: Provide relevant data in the ironmaking process and integrate and analyze data with the environmental dust removal system.

[0078] 9) Superior energy environment system: The superior energy environment system is connected to the advanced application group development module.

[0079] How it works: Receives data analysis results and optimization suggestions from the advanced application group development module, and provides the system with information such as macro-environmental policies and requirements.

[0080] The process of the method for realizing intelligent dust collector operation decision processing of the present invention is as follows:

[0081] Step 1: Data Collection:

[0082] Data from the centralized control central switch, newly added monitoring channels and ironmaking systems are received through the firewall, including dust concentration, equipment operating status, air volume, air pressure and other parameters. The collection frequency is set to once per minute to ensure the timeliness of the data.

[0083] Step 2: Source data preprocessing:

[0084] The source data preprocessing module performs preliminary processing on the collected data, removes outliers and noise, and converts data in different formats into a standard format. For example, the unit of temperature data is unified into Celsius, and the unit of pressure data is unified into Pascal.

[0085] Step 3: Deep Storage:

[0086] The processed data is stored in the deep storage module of the intelligent server and classified and stored according to time series and data type for subsequent query and analysis. The stored data is retained for no less than 5 years.

[0087] Step 4: Data Analysis:

[0088] The data processing group development module conducts in-depth analysis on the stored data, calculates the daily, monthly and annual average values ​​of dust emissions, analyzes the frequency and causes of equipment failures, and evaluates the dust removal effects of different production lines.

[0089] Step 5: Advanced Application Development:

[0090] The advanced application group development module develops intelligent decision-making models based on data analysis results, such as predicting equipment maintenance time, optimizing dust collector operating parameters, etc. At the same time, it develops optimization algorithms to reduce system energy consumption and operating costs.

[0091] Step 6: Result display:

[0092] The large-screen display module displays the system's operating status, data analysis results and optimization suggestions in an intuitive graphical way. For example, it uses a line graph to show the changing trend of dust concentration and a bar graph to show the energy consumption comparison of different production lines.

[0093] The large-screen display module of the present invention mainly includes the following functions:

[0094] 1. Login:

[0095] This function is the first step for users to enter the system. It provides a secure authentication channel for users. Through the user's identity input, the account and password are verified to confirm the legitimacy of the current login. When the account or password is not filled in, a prompt will be given. When the account and password are entered incorrectly, a prompt will be given to confirm the correctness. After the verification is passed, the system will create a session and keep the user logged in while using the system.

[0096] The user fills in the user name and password to verify the legitimacy of the identity, and can log in to the system interface after passing.

[0097] 2. Comprehensive dashboard:

[0098] The comprehensive dashboard interface is a dashboard that centrally displays key production data and equipment status, providing users with an intuitive, real-time overview. By displaying the distribution and status of different production areas, it helps managers quickly identify the current activities and performance of each area. Through detailed data of the dust removal process and monitoring indicators such as emission concentration and other parameters, it helps managers evaluate the effectiveness of environmental control measures. When it is detected that key parameters exceed the preset range or equipment fails, alarm and notification functions are provided so that users can take timely action. An operation button is provided. Only after the manager clicks this button can he jump to the system homepage for subsequent operations and management.

[0099] 3. Jump function:

[0100] Through this function, managers can enter the specific operation interface to view information and perform complex operations on the designated area.

[0101] 4. System Overview:

[0102] This system displays the data in the dust removal system in a graphical form. The various types of data obtained are sorted and displayed in the form of corresponding reports. Managers can observe the corresponding data information by selecting different reports. The model with the factory as a reference can intuitively reflect the current operating status of the entire dust removal system. And through the displayed parameter information, you can intuitively understand the specific situation of each link, and you can make optimization decisions based on them. The system overview page must reflect the key indicators of equipment status monitoring, dynamically display the analysis results, and display the analysis results of energy efficiency analysis, pressure loss, etc. The unique system overview page is embedded in the large screen, and the page cannot use titles and other content.

[0103] 4.1 Chart display function:

[0104] According to the collected data, the results are updated regularly after the model calculation. The relevant data are presented to the managers in the form of charts.

[0105] 4.2 Dust removal system operation display function:

[0106] It shows managers the operating status of the dust removal system and the parameter information of each link, providing intuitive data support for optimization decisions of related links.

[0107] 4.3 Suction point details display function:

[0108] Display the selected suction point and corresponding parameter information to the manager to help the manager intuitively understand the status of the suction point.

[0109] 4.4 Transfer production line suction point information display function:

[0110] Show managers all the suction point information on the transfer production line and the parameter information corresponding to each suction point, helping managers to understand the operation status of the transfer production line in real time.

[0111] 5. System information display unit:

[0112] Summarize the data of the coke trough and ore trough in the dust removal system, and display the data information of each trough. At the same time, display the pressure difference, operation rate and other data of the dust collector, the air volume, total pressure, internal efficiency and other data of the fan. Count the accumulated energy consumption and current energy consumption of the entire system. Display the overall efficiency of the system, including the accumulated average value and the current value. Display the system's collection and discharge data. Display the corresponding data of each link in the form of a report for managers to observe intuitively.

[0113] 6. Data monitoring

[0114] Aggregate, organize and display relevant data sets such as dust collectors and suction points.

[0115] 6.1 Dust collector monitoring:

[0116] The dust removal system consists of a pre-processor, ash bin, dust collector, fan, chimney, etc. The important parameters of the ash bin, dust collector, fan, chimney, etc. are collected and sorted, and updated at a fixed time. The operating status of the dust removal system is intuitively displayed in a graphical way.

[0117] 6.2 Suction point monitoring:

[0118] Modify suction point details: Administrators can use this interface to modify some parameter information of the suction point and update the suction point information by modifying the time, negative pressure, and suction point name.

[0119] 7. Performance trend unit:

[0120] The data obtained by docking is sorted and presented in the form of a report. It is divided into a dust removal fan power consumption allocation table, a suction point allocation table, a dust removal operation trend table, a system unit consumption table, a system efficiency table, a dust removal trend table, a blowing volume pressure loss table, and a blowing length pressure loss table. The dust removal fan power consumption allocation table shows the power ratio between the fan body, the dust collector, the main line, and the dust removal suction point. The suction point allocation table shows the number of suction points between the coke trough, the ore trough, the transfer 1, and the transfer 2. The dust removal operation trend table shows the values ​​of parameters such as power, output, and emission concentration at each measuring point. The system unit consumption table shows the relationship between energy consumption and output. The system efficiency table shows the relationship between efficiency and output. The dust removal trend table shows the relationship between the collection and drainage effect and time of the transfer 1 and transfer 2 production lines. The blowing volume pressure loss table shows the relationship between pressure loss and flow rate. The blowing length pressure loss table shows the relationship between pressure difference and blowing length. It supports selecting a time interval for filtering and displays the corresponding data. Add the dust collector energy consumption trend prediction function to predict the energy consumption trend of the month.

[0121] Time interval selection function:

[0122] Managers can select the corresponding time interval to observe the data changes of each chart in different time periods.

[0123] Measuring point switching function:

[0124] Click to switch the measuring point, call out the measuring point list, and display the corresponding measuring point data to the manager for observation.

[0125] Operation suggestions:

[0126] This function aims to conduct a comprehensive analysis of the collaborative relationship between various processes within the enterprise to identify efficiency bottlenecks and optimization opportunities. By collecting and processing key data such as time consumption, resource usage, information flow and quality control of each process, the system can automatically generate process visualization charts to help managers clearly understand the interaction and impact of each link. Based on the data analysis model, the system will provide customized optimization suggestions, including process adjustments, resource optimization configuration, information system suggestions and employee skill improvement plans, etc., aiming to improve the coordination and efficiency between processes, reduce operating costs, shorten production cycles, and ultimately achieve comprehensive optimization of enterprise operations and enhance competitiveness.

[0127] Data source:

[0128] The data of this system is collected in real time by collecting data uploaded by intelligent devices in the production system. PLC and OPC protocols are used for data communication.

[0129] Data format:

[0130] The data collected by this system is divided into two parts, namely dust removal process data and equipment status data. They are obtained through PLC and OPC protocols respectively. Dust removal process data is obtained through PLC protocol, and equipment status data is obtained through OPC protocol. Describes detailed information such as data reading rules, data types, and data specifications.

[0131] Suction point monitoring interface:

[0132] All suction point information in the dust removal system is sorted and displayed, and a setting function is provided for adjusting the parameters of related calculation functions. Multiple dimensions such as suction point area, suction point location, suction point name, position number, and effect are provided for query.

[0133] Opening modification interface:

[0134] By clicking on the opening information and opening the editing mode, you can modify the opening value directly on the interface. Press Enter to update the opening information and obtain the latest effect value (good, average, poor) based on the effect status calculation formula. At the same time, update the effect status display parameters.

[0135] External interface, connected with the data of dust removal system. Access the designated server IP address and obtain dust removal process data and dust removal equipment status data through communication protocols such as PLC and OPC.

[0136] The specific implementation scheme of this embodiment can refer to the relevant description in the above embodiment, which will not be repeated here.

[0137] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0138] It should be noted that, in the description of the present invention, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0139] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0140] The system, method, device, processor and computer-readable storage medium for realizing intelligent dust collector operation decision processing of the present invention are adopted to improve the intelligence level of the dust removal system: This technical solution realizes data collection, analysis and optimization suggestions of the environmental dust removal system through the intelligent dust collector operation decision system, and significantly improves the digitalization and intelligence level of the dust removal system. Optimize operation and maintenance efficiency: Through systematic data collection and analysis, the need for manual inspection is reduced, the efficiency of operation and maintenance is improved, and the labor cost is reduced. Real-time data collection and analysis: This technical solution can realize real-time data collection and analysis, avoid the problem of data collection lag, and improve the timeliness of information. Centralized information management: Through graphical display and multi-module integration, centralized management and rapid acquisition of information are realized, and the centralization and accessibility of information are improved. Intelligent decision support: This technical solution provides optimization suggestions to help managers make smarter decisions and improve the scientificity and accuracy of decisions. System operation status monitoring: Through the large-screen display module, managers can monitor the system operation status in real time to ensure that the system operation meets the management and control requirements. Scalability and compatibility: The system is designed with new monitoring channels and connections with the ironmaking system and the upper energy and environmental system to improve the scalability and compatibility of the system. User-friendly operation interface: The large-screen display module contains multiple functional units and provides a user-friendly operation interface to facilitate users to perform operations such as data query, report display and user management.

[0141] In this specification, the present invention has been described with reference to specific embodiments thereof. However, it is apparent that various modifications and variations may be made without departing from the spirit and scope of the present invention. Therefore, the specification and drawings should be regarded as illustrative rather than restrictive.

Claims

1. A system for realizing intelligent dust collector operation decision processing, characterized in that: The system includes a firewall, a source data preprocessing module, an intelligent server deep storage module, a data processing group development module, an advanced application group development module and a large screen display module. The input end of the firewall is connected to the centralized control central switch to block unauthorized external access and perform strict access control and filtering on data; The input end of the source data preprocessing module is connected to the firewall, and is used to perform preliminary screening, cleaning and format conversion on the original data from the firewall, and convert the data into a unified format; The input end of the intelligent server deep storage module is connected to the source data preprocessing module, the intelligent server deep storage module transmits operation instructions to the centralized control server storage module, and the centralized control server storage module transmits basic information to the intelligent server deep storage module for deep storage and management of the preprocessed data; The input end of the data processing group development module is connected to the deep storage module of the intelligent server, which is used to perform complex calculations and analyses on the stored data and extract useful information and features; The input end of the advanced application group development module is connected to the data processing group development module and is connected to the centralized control system for terminal operation; The input end of the large-screen display module is connected to the advanced application group development module, and is used to display the parameters of the dust removal system and the operation status of the entire system in a graphical form.

2. The system for realizing intelligent dust collector operation decision processing according to claim 1 is characterized in that: The system also includes a newly added monitoring channel, the output end of which is connected to the firewall for obtaining more data related to the environmental dust removal system.

3. The system for realizing intelligent dust collector operation decision processing according to claim 1 is characterized in that: The system also includes an ironmaking system, the output end of which is connected to a firewall to provide data during the ironmaking process, which is integrated and analyzed with data from an environmental dust removal system.

4. The system for realizing intelligent dust collector operation decision processing according to claim 1 is characterized in that: The system also includes an upper-level energy environment system, which is connected to the high-level application group development module to achieve the intercommunication of data and information.

5. The system for realizing intelligent dust collector operation decision processing according to claim 1 is characterized in that: The large-screen display module includes a login management unit, a comprehensive dashboard unit, a system overview unit, a system information display unit, a data monitoring unit, a performance trend unit and a report display unit. The login management unit is used to verify the login information. The comprehensive dashboard unit is used to display the area information and jump. The system overview unit is used to display charts, the operation status of the dust removal system, the suction point details and the transfer production line suction point information. The system information display unit is used to display the coke trough information, the ore trough information, the dust removal system information and the system comprehensive information. The data monitoring unit is used to display the dust removal system component information, as well as to query the suction point, modify the suction point opening and suction point details. The performance trend unit is used to display charts, query time intervals and switch measuring points. The report display unit is used to display reports, perform time queries and export reports.

6. The system for realizing intelligent dust collector operation decision processing according to claim 5 is characterized in that: The large-screen display module also includes a data management unit and a user management unit. The data management unit is used to perform data query, data addition, data editing, data deletion and log modification. The user management unit is used to implement user query, user addition, user editing, user deletion and password reset functions.

7. A method for implementing intelligent dust collector operation decision processing based on the system of claim 1, characterized in that: The method comprises the following steps: (1) Collect and filter data through a firewall; (2) The source data preprocessing module performs preliminary processing on the collected data, removes outliers and noise, and converts data in different formats into a standard format; (3) storing the processed data in the deep storage module of the intelligent server and classifying and storing them according to time series and data types; (4) The data processing group development module conducts in-depth analysis of the stored data, calculates the daily, monthly and annual average values ​​of dust emissions, analyzes the frequency and causes of equipment failures, and evaluates the dust removal effect; (5) The advanced application group development module develops intelligent decision-making models based on data analysis results; (6) The large-screen display module displays the system's operating status and data analysis results in an intuitive graphical manner.

8. A device for realizing intelligent dust collector operation decision processing, characterized in that: The device comprises: a processor configured to execute computer executable instructions; A memory stores one or more computer executable instructions, and when the computer executable instructions are executed by the processor, the various steps of the method for realizing intelligent dust collector operation decision processing as described in claim 7 are implemented.

9. A processor for implementing intelligent dust collector operation decision processing, characterized in that: The processor is configured to execute computer executable instructions. When the computer executable instructions are executed by the processor, the various steps of the method for realizing intelligent dust collector operation decision processing described in claim 7 are implemented.