Building building machine integration platform

By designing accurate positioning and pre-connection welding technology in the integrated platform of the building machine, the problems of low installation efficiency and inaccurate alignment of the existing building machine are solved, and more efficient steel platform installation and more stable structural construction are achieved.

CN119737060AActive Publication Date: 2025-04-01GUANGDONG NANAL CONSTR ROBOT TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411731207.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-04-01
Estimated Expiration
2044-11-29

AI Technical Summary

Technical Problem

The existing steel platform and support system of the building machine lack pre-fixation and adjustment mechanism during the installation process, resulting in inaccurate alignment, low installation efficiency, extended construction time, and affected structural strength and stability.

Method used

An integrated platform for building machines is designed, including a steel platform system, a support system and a hanger system. The steel platform system includes a roof panel assembly, a positioning component and a connecting rod assembly. The positioning component realizes precise positioning of the first walkway plate through the positioning block and the fixing plate. The connecting rod assembly is pre-connected and welded through the connecting block and the positioning column to improve welding accuracy.

Benefits of technology

It improves the convenience and accuracy of steel platform installation, improves installation efficiency, shortens construction time, and enhances the overall structural strength and stability of the building machine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119737060A_ABST
    Figure CN119737060A_ABST
Patent Text Reader

Abstract

The invention discloses a building machine integration platform which comprises a steel platform system, a supporting system supporting the steel platform and a hanging frame system connected with the steel platform, and the steel platform system comprises a top plate assembly, a positioning assembly used for positioning the top plate assembly and a plurality of connecting rod assemblies used for fixing the top plate assembly. The supporting system comprises an upper supporting assembly and a lower supporting assembly, the hanging frame system comprises a connecting frame and a plurality of second walkway plates arranged on the connecting frame in a layered mode, the top plate assembly comprises a plurality of first walkway plates, and the first walkway plates are connected with one another and arranged on the connecting rod assembly. A connecting block is further arranged between the first connecting rod and the second connecting rod, and positioning columns on the two sides of the connecting block can be connected with the first connecting rod and the second connecting rod respectively. By adopting the method, the convenience and accuracy of steel platform installation can be improved, the installation efficiency is improved, and the construction time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction machines, and in particular to an integrated platform for building construction machines. Background Art

[0002] In modern construction, building machines are widely used in the construction of high-rise and super-high-rise buildings as an efficient and fast construction equipment. Building machines generally include a steel platform system, a support system and a rack system. Construction equipment is installed in the steel platform system. The support system is used to support and lift the steel platform system and the rack system as a whole. The rack system is set under the steel platform for workers to work. Most of the existing steel platforms and support systems of building machines use traditional connection methods such as bolt fastening, snap-on locking or direct welding. Although these connection methods meet the connection requirements to a certain extent, the overall installation efficiency is not high. During the installation process, due to the lack of pre-fixing and adjustment mechanisms, it is often difficult for the steel platform and support system to achieve accurate alignment, resulting in the gradual accumulation of errors, which in turn increases the complexity and difficulty of installation. This will not only lead to extended construction time and delayed project progress, but may also affect the overall structural strength and stability of the building machine due to loose connections, thereby adversely affecting the construction quality. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an integrated platform for a building construction machine, which can improve the convenience and accuracy of steel platform installation, improve installation efficiency, and shorten construction time.

[0004] In order to solve the above technical problems, the present invention provides an integrated platform for a building construction machine, including a steel platform system, a support system for supporting the steel platform, and a hanging rack system connected to the steel platform, the steel platform system including a top plate assembly, the top plate assembly including a plurality of first walkway plates, the support system including an upper support assembly and a lower support assembly, the upper support assembly including an upper support plate and an upper support frame, the lower support assembly including a lower support plate and a lower support frame, the upper support plate is connected to the upper support frame, the upper support frame is connected to the lower support plate, the lower support plate is connected to the lower support frame, and the hanging rack system includes a connecting frame and a plurality of second walkway plates layered on the connecting frame.

[0005] The steel platform system further comprises a positioning assembly for positioning the top plate assembly and a plurality of connecting rod assemblies for fixing the top plate assembly, a plurality of the first walkway plates are interconnected and arranged on the connecting rod assembly, the connecting rod assembly comprises a first connecting rod and a second connecting rod, a connecting block is further arranged between the first connecting rod and the second connecting rod, positioning columns are respectively arranged on both sides of the connecting block, and the positioning columns on both sides of the connecting block can be respectively connected to the first connecting rod and the second connecting rod;

[0006] The connecting block includes a first folded edge, the first folded edge is flush with the upper surfaces of the first connecting rod and the second connecting rod, a connecting hole is provided on the first folded edge, the positioning assembly includes a fixing plate and a positioning block, the positioning block can slide on the fixing plate along a direction perpendicular to the length of the first walkway plate, the fixing plate is provided with a fixing hole, the fixing hole can be fixed in the connecting hole, the side of the positioning block can abut against the side edge of the first walkway plate and can slide along the length direction of the first walkway plate to form an installation positioning for the first walkway plate;

[0007] The rack system also includes a connecting component, which includes a connecting steel bar, the top of which is connected to the bottom of the steel platform system, and the bottom of which is connected to the connecting frame.

[0008] As an improvement of the above scheme, the connecting block also includes a second folded edge and a middle folded edge, the first folded edge and the second folded edge are arranged in parallel, the middle folded edge is arranged vertically and is located between the first folded edge and the second folded edge, the second folded edge is flush with the lower surface of the first connecting rod and the second connecting rod, the same side of the first folded edge and the second folded edge is abutted against the first connecting rod, and the other side of the first folded edge and the second folded edge is abutted against the second connecting rod; one side of the middle folded edge is abutted against the first connecting rod, and the other side is abutted against the second connecting rod.

[0009] As an improvement of the above-mentioned scheme, the positioning assembly also includes an adjusting platform and an adjusting screw. The adjusting platform is fixed to a side of the fixed plate away from the walkway plate. The end of the adjusting screw passes through the adjusting platform and is rotatably connected to the positioning block. The external thread of the adjusting screw can engage with the internal thread of the adjusting platform. When the adjusting screw rotates, it can move relative to the adjusting platform and drive the positioning block to move.

[0010] As an improvement of the above scheme, the fixed plate includes an upper plate, a vertical plate and a lower plate, the upper plate, the vertical plate and the lower plate form a groove, the side of the first connecting rod or the second connecting rod can be inserted into the groove, the positioning block is arranged on the upper plate, a sliding groove is provided on the upper plate, a sliding table is provided at the bottom of the positioning block, the sliding table can be inserted into the sliding groove and slide in the sliding groove, and a scale bar is also provided on the side of the sliding groove.

[0011] As an improvement of the above-mentioned solution, a pre-positioning mechanism is provided on the lower support plate, and the pre-positioning mechanism includes a positioning bar provided on the lower support plate, and the positioning bar is provided on the side of the connection between the upper support frame and the lower support plate. When the upper support frame is connected to the lower support plate, the upper support frame can abut against the positioning bar.

[0012] As an improvement of the above-mentioned solution, a through hole is provided on the lower support plate, and a connecting platform is provided at the bottom of the upper support frame, and the connecting platform can be connected to the through hole. The positioning strip is provided on the side of the through hole, and the positioning strip protrudes from the surface of the lower support plate, and the side of the connecting platform can abut against the side of the positioning strip.

[0013] As an improvement of the above solution, a positioning groove is further provided on the lower support plate, and the positioning groove is surrounded by two or more positioning strips, and the connecting platform can be inserted into the positioning groove.

[0014] As an improvement of the above scheme, the connecting assembly includes a first connecting buckle and a second connecting buckle, the second connecting buckle is fixed to the bottom of the first connecting buckle, and first buckling arms are respectively provided on both sides of the first connecting buckle, the first buckling arms extend toward the inner side of the first connecting buckle and can be buckled on both sides of the connecting rod assembly, and second buckling arms are respectively provided on both sides of the second connecting buckle, the second buckling arms extend toward the inner side of the second connecting buckle and can be buckled on both sides of the connecting steel bar.

[0015] As an improvement of the above-mentioned scheme, the connecting frame includes a frame support rod and a frame connecting buckle, the frame connecting buckle is fixed to the top of the frame support rod, and third buckling arms are respectively provided on both sides of the frame connecting buckle. The third buckling arms extend toward the inner side of the frame connecting buckle and can be buckled on both sides of the connecting steel bar.

[0016] As an improvement to the above solution, the frame support rods are vertically arranged, the second walkway boards are divided into multiple layers and horizontally fixed on the connecting frame, and the multiple layers of the second walkway boards are arranged at intervals.

[0017] The implementation of the present invention has the following beneficial effects:

[0018] The integrated platform of the building construction machine of the present invention is provided with a steel platform system, a support system and a hanging frame system, wherein the steel platform system includes a top plate assembly, a positioning assembly and a connecting rod assembly, the top plate assembly includes a plurality of first walkway plates, the plurality of first walkway plates are interconnected and arranged on the connecting rod assembly, the connecting rod assembly includes a first connecting rod and a second connecting rod, which are used to be combined and connected to form a stronger support, and in order to facilitate the connection between the first connecting rod and the second connecting rod, a connecting block is further provided between the first connecting rod and the second connecting rod, positioning columns are respectively provided on both sides of the connecting block, and the positioning columns on both sides of the connecting block can be connected to the first connecting rod and the second connecting rod respectively, and the connecting block can be used to pre-connect the first connecting rod and the second connecting rod, so as to facilitate the subsequent welding of the first connecting rod and the second connecting rod with high welding accuracy. The connecting block includes a first folded edge, a connecting hole is provided on the first folded edge, a fixing hole is provided on the fixing plate of the positioning assembly, and the fixing hole can be fixed in the connecting hole. The side of the positioning block of the positioning assembly can abut against the side edge of the first walkway plate and can slide along the length direction of the first walkway plate, and the positioning block can slide on the fixing plate along a direction perpendicular to the length of the first walkway plate. By sliding the positioning block, the edge position of the first walkway plate can be limited, thereby positioning the first walkway plate, which is convenient for subsequent connection with the connecting rod assembly. Therefore, the integrated platform of the building construction machine of the present invention can improve the convenience and accuracy of the installation of the steel platform, improve the installation efficiency, and shorten the construction time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the integrated platform of the building construction machine of the present invention;

[0020] Figure 2 It is a structural schematic diagram of the steel platform of the present invention;

[0021] Figure 3 It is a structural schematic diagram of the positioning assembly and the connecting rod assembly of the present invention;

[0022] Figure 4 is a structural schematic diagram of a connecting rod assembly of the present invention;

[0023] Figure 5 It is a structural schematic diagram of the positioning assembly of the present invention;

[0024] Figure 6 It is a structural schematic diagram of the support system of the present invention;

[0025] Figure 7 It is a structural schematic diagram of the lower support plate of the present invention;

[0026] Figure 8 It is a structural schematic diagram of the rack system of the present invention. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. It is hereby stated that the directional terms such as up, down, left, right, front, back, inside, outside, etc. that appear or will appear in the text of the present invention are only based on the accompanying drawings of the present invention, and are not specific limitations of the present invention.

[0028] See also Figure 1-Figure 5 The embodiment of the present invention discloses an integrated platform for a building construction machine, including a steel platform system 100, a support system 200 supporting the steel platform, and a hanger system 300 connected to the steel platform. The steel platform system 100 is used to support construction personnel, construction equipment, materials, etc. The support system 200 can support the steel platform, and the steel platform system 100 and the hanger system 300 can be lifted by using a cylinder system. The steel platform system 100 includes a top plate assembly 1, and the top plate assembly 1 includes a plurality of first walkway plates 11. The first walkway plates 11 can be used to place construction equipment, materials, etc., and can also be used for construction personnel to walk. The support system 200 includes an upper support assembly 4 and a lower support assembly 5. The upper support assembly 4 includes an upper support plate 41 and an upper support frame 42. The lower support assembly 5 includes a lower support plate 51 and a lower support frame 52. The upper support plate 41 is connected to the upper support frame 42, the upper support frame 42 is connected to the lower support plate 51, and the lower support plate 51 is connected to the lower support frame 52. During installation, the upper support assembly 4 is first connected to the bottom of the steel platform system 100, and then the lower support assembly 5 is connected to the upper support assembly 4, specifically, the upper support frame 42 is connected to the lower support plate 51. The hanging frame system 300 includes a connecting frame 7 and a plurality of second walkway plates 9 arranged in layers on the connecting frame 7. The second walkway plates 9 are hung below the steel platform and have multiple layers corresponding to different building layers, so that construction workers can perform construction on different building layers.

[0029] The steel platform system 100 also includes a positioning assembly 2 for positioning the top plate assembly 1 and a plurality of connecting rod assemblies 3 for fixing the top plate assembly 1. The positioning assembly 2 can pre-position the top plate assembly 1, thereby improving the subsequent welding efficiency and accuracy. A plurality of the first walkway plates 11 are interconnected and arranged on the connecting rod assembly 3 to form a coherent construction space. The connecting rod assembly 3 includes a first connecting rod 31 and a second connecting rod 32. The length direction of the first walkway plate 11 is parallel to the length direction of the first connecting rod 31 and the second connecting rod 32. The first connecting rod 31 and the second connecting rod 32 can support the first walkway plate 11 after being connected.

[0030] See also Figure 4 In order to facilitate the connection between the first connecting rod 31 and the second connecting rod 32, a connecting block 33 is further provided between the first connecting rod 31 and the second connecting rod 32. The connecting block 33 is welded between the first connecting rod 31 and the second connecting rod 32, so that the first connecting rod 31 and the second connecting rod 32 can be integrated. In order to facilitate positioning and welding, positioning columns 3312 are respectively provided on both sides of the connecting block 33. The positioning columns 3312 on both sides of the connecting block 33 can be connected to the first connecting rod 31 and the second connecting rod 32 respectively. Before welding, the positioning columns 3312 are respectively connected to the first connecting rod 31 and the second connecting rod 32 to form a pre-positioning, and then welding is performed, which can reduce the probability of the connecting block 33 being offset and improve the welding accuracy and welding quality.

[0031] See also Figure 4 The connecting block 33 also includes a first folded edge 331, which is flush with the upper surface of the first connecting rod 31 and the second connecting rod 32, so that interference with the installation of the walkway board can be avoided during installation. The first folded edge 331 is provided with a connecting hole 3311, and the positioning assembly 2 includes a fixing plate 21 and a positioning block 22. The fixing plate 21 is fixed in the connecting hole 3311 to achieve fixation. The positioning block 22 can slide on the fixing plate 21 along a direction perpendicular to the length of the first walkway board 11. When in use, the fixing plate 21 is first fixed in the connecting hole 3311, and then the positioning block 22 is slid to a preset position. The side of the positioning block 22 can abut against the side edge of the walkway board and can slide along the length direction of the first walkway board 11, so that it can limit the installation position of the walkway board and form a pre-positioning to form an installation positioning for the walkway board, so as to avoid errors or offsets in the subsequent installation of the walkway board.

[0032] The hanging frame system 300 also includes a connecting component 8, which includes a connecting steel bar 83. The top of the connecting steel bar 83 is connected to the bottom of the steel platform system 100, and the bottom of the connecting steel bar 83 is connected to the connecting frame 7. By utilizing the connecting steel bar 83, the connecting frame 7 can be connected to the steel platform system 100, and the second walkway plates 9 on each floor can be hung under the steel platform.

[0033] The beneficial effects of the embodiments of the present invention are as follows:

[0034] The integrated platform of the building construction machine according to the embodiment of the present invention is provided with a steel platform system 100, a support system 200 and a hanger system 300, wherein the steel platform system 100 includes a top plate assembly 1, a positioning assembly 2 and a connecting rod assembly 3, the top plate assembly 1 includes a plurality of first walkway plates 11, the plurality of first walkway plates 11 are interconnected and arranged on the connecting rod assembly 3, the connecting rod assembly 3 includes a first connecting rod 31 and a second connecting rod 32, which are used to be combined and connected to form a stronger support, and in order to facilitate the connection between the first connecting rod 31 and the second connecting rod 32, a connecting block 33 is further provided between the first connecting rod 31 and the second connecting rod 32, positioning columns 3312 are respectively provided on both sides of the connecting block 33, and the positioning columns 3312 on both sides of the connecting block 33 can be connected to the first connecting rod 31 and the second connecting rod 32 respectively, and the connecting block 33 can be used to pre-connect the first connecting rod 31 and the second connecting rod 32, so as to facilitate the subsequent welding of the first connecting rod 31 and the second connecting rod 32, and the welding precision is high. The connecting block 33 includes a first folded edge 331, a connecting hole 3311 is provided on the first folded edge 331, a fixing hole 211 is provided on the fixing plate 21 of the positioning assembly 2, and the fixing hole 211 can be fixed in the connecting hole 3311, and the side of the positioning block 22 of the positioning assembly 2 can abut against the side edge of the first walkway plate 11 and can slide along the length direction of the first walkway plate 11, and the positioning block 22 can slide on the fixing plate 21 along the direction perpendicular to the length of the first walkway plate 11, and by sliding the positioning block 22, the edge position of the first walkway plate 11 can be limited, so as to position the first walkway plate 11, which is convenient for subsequent connection with the connecting rod assembly 3. Therefore, the integrated platform of the building construction machine of the present invention can improve the convenience and accuracy of the installation of the steel platform, improve the installation efficiency, and shorten the construction time.

[0035] Specifically, see Figure 4, the connecting block 33 also includes a second folded edge 332 and a middle folded edge 333, the first folded edge 331 and the second folded edge 332 are arranged in parallel, and the middle folded edge 333 is arranged vertically and located between the first folded edge 331 and the second folded edge 332. When performing pre-positioning, after the positioning column 3312 is connected, the first folded edge 331 is flush with the upper surface of the first connecting rod 31 and the second connecting rod 32, and the second folded edge 332 is flush with the lower surface of the first connecting rod 31 and the second connecting rod 32. By controlling the flushing effect of the upper and lower surfaces, the quality of positioning can be controlled, and the first folded edge 331 and the second folded edge 332 can be avoided from being offset, thereby ensuring the welding quality. Among them, the same side of the first folded edge 331 and the second folded edge 332 abuts against the first connecting rod 31, and the other side of the first folded edge 331 and the second folded edge 332 abuts against the second connecting rod 32 to achieve a positioning effect.

[0036] The middle fold 333 is vertically arranged, the first fold 331 and the second fold 332 are respectively arranged at the upper and lower ends of the middle fold 333, one side of the middle fold 333 is in contact with the first connecting rod 31, and the other side is in contact with the second connecting rod 32. The middle fold 333 not only improves the connection strength between the first fold 331 and the second fold 332, but also connects the first fold 331 and the second fold 332 into a whole, which is convenient for placing the connecting block 33 as a whole between the first connecting rod 31 and the second connecting rod 32, saving the placement steps, and also facilitating the overall pre-positioning, improving the positioning effect. Moreover, compared with a single connecting piece, the connecting block 33 has a larger volume, which is convenient for installation and welding, and is not easy to shift after pre-positioning. The setting of the middle folded edge 333 also facilitates the setting of the positioning column 3312. The first folded edge 331 and the second folded edge 332 are located at the upper and lower parts of the first connecting rod 31 and the second connecting rod 32. The first connecting rod 31 and the second connecting rod 32 are usually channel steels, and their upper and lower parts have wing plates. It is not easy to set positioning holes on the wing plates. After the middle folded edge 333 is set, the positioning column 3312 can be set on the middle folded edge 333.

[0037] The positioning posts 3312 are arranged on both sides of the middle fold 333, and the positioning posts 3312 on both sides of the middle fold 333 protrude toward the side where the first connecting rod 31 and the second connecting rod 32 are located respectively. The first connecting rod 31 and the second connecting rod 32 are both provided with positioning holes, and the positioning holes are arranged in the middle position of the first connecting rod 31 and the second connecting rod 32, avoiding the position of the wing plate, and the positioning posts 3312 can be inserted into the positioning holes to form pre-positioning.

[0038] See also Figure 5 In order to meet the requirements of various specifications of the first walkway board 11 and adjust the pre-positioned position, the positioning assembly 2 further includes an adjusting platform 23 and an adjusting screw 24. The adjusting platform 23 is fixed to the side of the fixed plate 21 away from the first walkway board 11. The adjusting platform 23 protrudes upward from the surface of the fixed plate 21. The adjusting screw 24 can be an ordinary screw. The rod body of the adjusting screw 24 is provided with a thread. The adjusting platform 23 is also provided with a meshing thread. The end of the adjusting screw 24 passes through the adjusting platform 23 and is engaged with the positioning block 22. Rotational connection, the adjustment platform 23 is fixed on the fixed plate 21, and can be stationary relative to the fixed plate 21, while the positioning block 22 can slide relative to the fixed plate 21, the external thread of the adjustment screw 24 can mesh with the internal thread of the adjustment platform 23, and the end of the adjustment screw 24 is rotationally connected with the positioning block 22. When the adjustment screw 24 rotates, it can only rotate relative to the positioning block 22 and will not separate from the positioning block 22. When the adjustment screw 24 rotates, it can move relative to the adjustment platform 23 and drive the positioning block 22 to move. During adjustment, by rotating the adjustment screw 24, the positioning block 22 can be pushed to move on the fixed plate 21, thereby adjusting the position of the side portion of the first walkway plate 11, achieving the effect of adjusting the pre-positioned position, and it can also be applicable to first walkway plates 11 of different specifications.

[0039] Furthermore, in order to enable the fixing plate 21 to be fixedly connected to the connecting rod assembly 3, the fixing plate 21 includes an upper plate 212, a vertical plate 213 and a lower plate 214. The upper plate 212, the vertical plate 213 and the lower plate 214 form a groove 215. The side of the first connecting rod 31 or the second connecting rod 32 can be inserted into the groove 215. The upper plate 212, the vertical plate 213 and the lower plate 214 form a limit, which, combined with the fixation of the connecting hole 3311, can play a role of firm fixing. The positioning block 22 is arranged on the upper plate 212, a slide groove 2121 is provided on the upper plate 212, a slide platform 221 is provided at the bottom of the positioning block 22, the slide platform 221 can be inserted into the slide groove 2121 and slide in the slide groove 2121, the slide groove 2121 limits the moving direction of the positioning block 22, and further, a scale bar 216 is also provided on the side of the slide groove 2121, and the scale bar 216 can be used to know the adjustment distance, and the position can be adjusted according to the scale bar 216.

[0040] See also Figure 6In order to facilitate the connection between the upper support assembly 4 and the lower support assembly 5, a pre-positioning mechanism 6 is provided on the lower support plate 51, and the pre-positioning mechanism 6 includes a positioning bar 61 provided on the lower support plate 51, and the positioning bar 61 is provided on the side of the connection between the upper support frame 42 and the lower support plate 51. When the upper support frame 42 is connected to the lower support plate 51, the upper support frame 42 can abut against the positioning bar 61, and the positioning bar 61 forms a pre-positioning effect on the upper support frame 42, thereby facilitating the centering of the hole position between the upper support frame 42 and the lower support frame 52, and then facilitating the installation and connection.

[0041] Specifically, see Figure 6 and Figure 7 The lower support plate 51 is provided with a through hole 511, and the bottom of the upper support frame 42 is provided with a connecting platform 421. The connecting platform 421 can be connected to the through hole 511 by fasteners such as bolts, and the positioning strip 61 is provided on the side of the through hole 511. During installation, the positioning strip 61 on the side of the through hole 511 can be used for pre-positioning so that the through hole 511 can be aligned with the connection position of the connecting platform 421.

[0042] The positioning bar 61 protrudes from the surface of the lower support plate 51 , so that the side of the connecting platform 421 can abut against the side of the positioning bar 61 .

[0043] In order to further improve the pre-positioning effect, a positioning groove 512 is further provided on the lower support plate 51. The positioning groove 512 is surrounded by two or more positioning strips 61. Two or more positioning strips 61 are surrounded in a groove shape to form the positioning groove 512. The notch of the positioning groove 512 faces upward or toward the side, so that when installing, the connecting platform 421 can be inserted into the positioning groove 512. The positioning groove 512 and the positioning strip 61 have different pre-positioning directions, and can form a good limiting effect on the connecting platform 421 from multiple directions.

[0044] See also Figure 8In order to connect the connecting rod assembly 3 and the connecting steel bar 83, the connecting assembly 8 also includes a first connecting buckle 81 and a second connecting buckle 82, wherein the second connecting buckle 82 is fixed to the bottom of the first connecting buckle 81, and the first connecting buckle 81 and the second connecting buckle 82 are in opposite directions, wherein the first connecting buckle 81 is respectively provided with a first buckling arm 811 on both sides, and the first buckling arm 811 is in the shape of a "7", and the first buckling arm 811 extends toward the inner side of the first connecting buckle 81 and can be buckled on both sides of the connecting rod assembly 3, so that the first connecting buckle 81 is connected to the connecting rod assembly 3, and the second connecting buckle 82 is respectively provided with a second buckling arm 821 on both sides, and the second buckling arm 821 is in the shape of a "7", and the second buckling arm 821 extends toward the inner side of the second connecting buckle 82 and can be buckled on both sides of the connecting steel bar 83, so that the second connecting buckle 82 is connected to the connecting steel bar 83.

[0045] In addition, the connecting frame 7 includes a frame support rod 71 and a frame connecting buckle 72, the frame connecting buckle 72 is fixed to the top of the frame support rod 71, and third buckling arms 721 are respectively provided on both sides of the frame connecting buckle 72. The shape of the third buckling arm 721 is "7" shape, and the third buckling arm 721 extends toward the inner side of the frame connecting buckle 72 and can be buckled on both sides of the connecting steel bar 83, so that the frame connecting buckle 72 can be connected to the connecting steel bar 83.

[0046] The frame support rod 71 is vertically arranged, and the second walkway board 9 is divided into multiple layers and horizontally fixed on the connecting frame 7. The multiple layers of the second walkway boards 9 are arranged at intervals, and each layer of the second walkway boards 9 corresponds to a different building layer, so that workers can carry out construction on different building layers.

[0047] The above are preferred embodiments of the present invention. It should be noted that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A building construction machine integrated platform, characterized in that: It comprises a steel platform system, a support system supporting the steel platform, and a hanging rack system connected to the steel platform, wherein the steel platform system comprises a top plate assembly, the top plate assembly comprises a plurality of first walkway plates, the support system comprises an upper support assembly and a lower support assembly, the upper support assembly comprises an upper support plate and an upper support frame, the lower support assembly comprises a lower support plate and a lower support frame, the upper support plate is connected to the upper support frame, the upper support frame is connected to the lower support plate, the lower support plate is connected to the lower support frame, and the hanging rack system comprises a connecting frame and a plurality of second walkway plates layered on the connecting frame; The steel platform system further comprises a positioning assembly for positioning the top plate assembly and a plurality of connecting rod assemblies for fixing the top plate assembly, a plurality of the first walkway plates are interconnected and arranged on the connecting rod assembly, the connecting rod assembly comprises a first connecting rod and a second connecting rod, a connecting block is further arranged between the first connecting rod and the second connecting rod, positioning columns are respectively arranged on both sides of the connecting block, and the positioning columns on both sides of the connecting block can be respectively connected to the first connecting rod and the second connecting rod; The connecting block includes a first folded edge, the first folded edge is flush with the upper surfaces of the first connecting rod and the second connecting rod, a connecting hole is provided on the first folded edge, the positioning assembly includes a fixing plate and a positioning block, the positioning block can slide on the fixing plate along a direction perpendicular to the length of the first walkway plate, the fixing plate is provided with a fixing hole, the fixing hole can be fixed in the connecting hole, the side of the positioning block can abut against the side edge of the first walkway plate and can slide along the length direction of the first walkway plate to form an installation positioning for the first walkway plate; The rack system also includes a connecting component, which includes a connecting steel bar, the top of which is connected to the bottom of the steel platform system, and the bottom of which is connected to the connecting frame.

2. The building construction machine integrated platform according to claim 1, characterized in that: The connecting block also includes a second folded edge and a middle folded edge, the first folded edge and the second folded edge are arranged in parallel, the middle folded edge is arranged vertically and is located between the first folded edge and the second folded edge, the second folded edge is flush with the lower surfaces of the first connecting rod and the second connecting rod, the same side of the first folded edge and the second folded edge is abutted against the first connecting rod, and the other side of the first folded edge and the second folded edge is abutted against the second connecting rod; one side of the middle folded edge is abutted against the first connecting rod, and the other side is abutted against the second connecting rod.

3. The integrated platform for building construction machines according to claim 1, characterized in that: The positioning assembly also includes an adjusting platform and an adjusting screw. The adjusting platform is fixed to a side of the fixed plate away from the walkway plate. The end of the adjusting screw passes through the adjusting platform and is rotatably connected to the positioning block. The external thread of the adjusting screw can engage with the internal thread of the adjusting platform. When the adjusting screw rotates, it can move relative to the adjusting platform and drive the positioning block to move.

4. The building construction machine integrated platform according to claim 1, characterized in that: The fixed plate includes an upper plate, a vertical plate and a lower plate, and the upper plate, the vertical plate and the lower plate form a groove, and the side of the first connecting rod or the second connecting rod can be inserted into the groove. The positioning block is arranged on the upper plate, and a sliding groove is provided on the upper plate. A sliding platform is provided at the bottom of the positioning block, and the sliding platform can be inserted into the sliding groove and slide in the sliding groove. The side of the sliding groove is also provided with a scale bar.

5. The building construction machine integrated platform according to claim 1, characterized in that: The lower support plate is provided with a pre-positioning mechanism, which includes a positioning bar provided on the lower support plate, and the positioning bar is provided on the side of the connection between the upper support frame and the lower support plate. When the upper support frame is connected to the lower support plate, the upper support frame can abut against the positioning bar.

6. The integrated platform for building construction machines according to claim 5, characterized in that: The lower support plate is provided with a through hole, and the bottom of the upper support frame is provided with a connecting platform, which can be connected to the through hole. The positioning strip is provided on the side of the through hole, and the positioning strip protrudes from the surface of the lower support plate. The side of the connecting platform can abut against the side of the positioning strip.

7. The integrated platform for building construction machines according to claim 6, characterized in that: The lower support plate is also provided with a positioning groove, which is surrounded by two or more positioning strips, and the connecting platform can be inserted into the positioning groove.

8. The integrated platform for building construction machines according to claim 1, characterized in that: The connecting assembly includes a first connecting buckle and a second connecting buckle, the second connecting buckle is fixed to the bottom of the first connecting buckle, and first buckling arms are respectively provided on both sides of the first connecting buckle, the first buckling arms extend toward the inner side of the first connecting buckle and can be buckled on both sides of the connecting rod assembly, and second buckling arms are respectively provided on both sides of the second connecting buckle, the second buckling arms extend toward the inner side of the second connecting buckle and can be buckled on both sides of the connecting steel bar.

9. The integrated platform for building construction machines according to claim 1, characterized in that: The connecting frame includes a frame support rod and a frame connecting buckle, the frame connecting buckle is fixed to the top of the frame support rod, and third buckling arms are respectively provided on both sides of the frame connecting buckle. The third buckling arms extend toward the inner side of the frame connecting buckle and can be buckled on both sides of the connecting steel bar.

10. The building construction machine integrated platform according to claim 9, characterized in that: The frame support rods are vertically arranged, the second walkway boards are divided into multiple layers and are horizontally fixed on the connecting frame, and the multiple layers of the second walkway boards are arranged at intervals.

Citation Information

Patent Citations

  • Intelligent integrated high-rise building machine

    CN110886488A

  • Building building machine and building construction method

    CN118029705A

  • Steel platform for building system

    CN119641103A

  • Intelligent construction integrated platform and factory building construction method based on same

    WO2024065964A1