Tile type oyster reef ecological slope protection precast block structure and construction method thereof
Through the prefabricated block structure of the tile-type oyster reef ecological slope protection, the problem of insufficient structural stability and biological adhesion performance of oyster reef in the prior art is solved, and higher resistance to wave flow stability and biodiversity are achieved, and the construction efficiency is high.
Patent Information
- Application Number
- CN202411860655.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-17
- Publication Date
- 2025-04-04
AI Technical Summary
The existing artificial oyster reefs have shortcomings in structural type and stability, poor resistance to wave flow, poor ability to eliminate waves and slow flow, and poor biological adhesion performance.
The tile-type oyster reef ecological slope protection prefabricated block structure includes wave-proof slope protection arranged at an inclined angle and prefabricated slope protection block arranged side by side. Each prefabricated slope protection block consists of arc plates, toe plates and insert plates. The adjacent blocks are connected by insert plates, and shell fragments are embedded on the surface, and the concrete contains shell aggregate.
It enhances the overall stability of the ecological slope protection structure of the oyster reef, improves the ability to reduce waves and water flow energy, promotes biological adhesion and diversity, and has a simple structure and high construction efficiency.
Smart Images

Figure CN119754216A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ecological transformation of seawalls, and in particular to a tile-type oyster reef ecological slope protection prefabricated block structure and a construction method thereof. Background Art
[0002] Oyster reefs are a type of biological reef formed by a large number of oyster species attached to the surface of hard substrates and accumulated over a long period of time. They are widely distributed in the intertidal and shallow subtidal zones of temperate and subtropical regions. Oyster reefs can provide shelter, foraging, reproduction and growth environments for many marine organisms. In addition, oyster reefs also have functions such as water purification, energy coupling, coastal protection, and carbon sequestration, playing an important role in maintaining the stability of coastal ecosystems. However, due to factors such as overfishing, coastal development, and deterioration of the marine environment, 85% of the world's oyster reefs have degraded and disappeared, and most of my country's oyster reefs are facing the dilemma of functional extinction.
[0003] At present, artificial oyster reefs have been widely used in intertidal ecosystem restoration and seawall ecological transformation at home and abroad, and have achieved good results. However, the existing artificial oyster reefs have certain shortcomings in terms of structure and stability. For example, after construction, the reef body has poor stability against waves and currents, weak wave-breaking and flow-slowing capabilities, and poor biological attachment performance.
[0004] Therefore, the applicant has found a solution to the above-mentioned problem through beneficial exploration and research, and the technical solution to be introduced below is produced in this context. Summary of the invention
[0005] One of the purposes to be solved by the present invention is to provide a tile-type oyster reef ecological slope protection prefabricated block structure to solve the above problems in view of the shortcomings and defects of the prior art.
[0006] The second purpose to be solved by the present invention is to provide a construction method of the above-mentioned tile-type oyster reef ecological slope protection prefabricated block structure.
[0007] The technical problem to be solved by the present invention can be achieved by adopting the following technical solutions:
[0008] A tile-type oyster reef ecological slope protection prefabricated block structure is characterized in that it includes a wave-breaking slope protection arranged at an inclined angle and a plurality of prefabricated slope protection blocks arranged side by side on the wave-breaking slope protection, each prefabricated slope protection block includes an arc-shaped plate and a toe plate arranged at one end of the arc-shaped plate and a plug plate arranged at the other end of the arc-shaped plate, and the toe plate is provided with a groove that cooperates with the plug plate of another prefabricated slope protection block.
[0009] In a preferred embodiment of the present invention, each prefabricated slope protection block is a concrete component, and the concrete component is made of shell concrete, which is concrete made of shells as aggregates, and the shell content in the concrete component is 10 to 80% of the total volume of the concrete component.
[0010] In a preferred embodiment of the present invention, a proper amount of shell crushed is embedded in the surface of the concrete component.
[0011] In a preferred embodiment of the present invention, the arc plate is arranged in a semicircular structure, and a plurality of connecting holes are arranged on the arc plate, each connecting hole is in an annular structure and is distributed at intervals on the surface of the arc plate.
[0012] In a preferred embodiment of the present invention, one end of the toe plate is integrally formed with one end of the arc-shaped plate, and the other end of the toe plate is provided with a protrusion for limiting the sliding of the plug plate.
[0013] In a preferred embodiment of the present invention, the plug plate is in a long strip structure, and the plug plate and the other end of the arc plate are integrally formed.
[0014] In a preferred embodiment of the present invention, the wave-breaking slope protection is a dry-stone, mortar-stone or cast-stone structure, and its top elevation is located near the average high tide level.
[0015] In a preferred embodiment of the present invention, two adjacent prefabricated slope protection blocks are connected to form a whole by engaging a plug plate in a groove on the toe plate.
[0016] In a preferred embodiment of the present invention, the plurality of prefabricated slope protection blocks are arranged in a tile-like structure.
[0017] A construction method of a tile-type oyster reef ecological slope protection prefabricated block structure as described in any of the above technical solutions, characterized in that it comprises the following steps:
[0018] 1) Production of prefabricated slope protection blocks: According to the design strength grade of the prefabricated slope protection block concrete, cement type, aggregate characteristics, etc., the shell concrete mix ratio is reasonably selected, and the mixture is poured into the pre-assembled combined steel formwork brushed with a release agent after mixing on site according to the mix ratio. Vibration equipment is used for vibration. When the concrete pouring reaches more than 24 hours and its surface and edges are not damaged by demolding, demolding is carried out to produce prefabricated slope protection blocks that meet the design;
[0019] 2) Maintenance of prefabricated slope protection blocks: Use geotextile covering and spraying maintenance, and require moisturizing and covering maintenance for at least 7 days. When the strength of the prefabricated slope protection blocks reaches 70% of the design strength, they can be hoisted and stored, and when they reach 100% of the design strength, they can be transported to the construction site;
[0020] 3) Slope leveling for wave protection and slope protection: Slope leveling for wave protection and slope protection, requiring the slope flatness to be ≤30mm;
[0021] 4) Construction control network layout: According to the size of the prefabricated slope protection blocks, use the total station and level to measure and locate on the wave-breaking slope protection slope surface, establish the construction control network for the laying of prefabricated blocks, and make easy-to-identify marks on the control points to determine the specific laying location and quantity of the prefabricated slope protection blocks;
[0022] 5) Installation of prefabricated slope protection blocks: Prefabricated slope protection blocks should be installed according to the pre-arranged construction control network. The laying should be carried out from bottom to top. The two adjacent prefabricated slope protection blocks should be tightly fastened and the seams should be aligned. After laying, the slope surface should be flat and beautiful.
[0023] Due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0024] 1. The present invention adopts a snap-fit connection method between adjacent prefabricated slope protection blocks to enhance the overall stability of the oyster reef ecological slope protection structure under the combined action of waves and water flow.
[0025] 2. The present invention can fully utilize the cavity structure of the prefabricated block to reduce wave and water flow energy by arranging connecting holes on the surface of the prefabricated slope protection block to communicate with the internal cavity.
[0026] 3. The present invention adopts concrete with shells as aggregates. The surface of the prefabricated slope protection block is made rougher by embedding a proper amount of shell fragments, making it easier for oysters and other organisms to attach and grow. At the same time, the cavity structure of the prefabricated slope protection block also provides a rich habitat for organisms such as oysters, which is conducive to increasing the biodiversity of the area.
[0027] 4. The present invention has a simple structure and can be prefabricated in a prefabrication yard and directly installed on site. The quality of the blocks is easy to control and the construction efficiency is high. After laying, the blocks are connected by their own weight, which is neat and beautiful and convenient for later maintenance and replacement. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 It is a structural schematic diagram of the present invention.
[0030] Figure 2 It is a side view of the present invention.
[0031] Figure 3It is a top view of the present invention.
[0032] Figure 4 It is a cross-sectional view of the present invention.
[0033] Figure 5 It is a usage state diagram of the present invention. DETAILED DESCRIPTION
[0034] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific diagrams.
[0035] See also Figures 1 to 5 The tile-like oyster reef ecological slope protection prefabricated block structure shown includes a wave-breaking slope protection 1 arranged at an inclined angle and a plurality of prefabricated slope protection blocks 2 arranged side by side on the wave-breaking slope protection 1. The wave-breaking slope protection 1 in this embodiment is preferably a dry block stone, mortar block stone or cast block stone structure, and its top elevation is located near the average high tide level. The plurality of prefabricated slope protection blocks 2 in this embodiment are arranged in a tile-like structure.
[0036] Each prefabricated slope protection block 2 includes an arc plate 10, a toe plate 20 arranged at one end of the arc plate 10, and a plug plate 30 arranged at the other end of the arc plate 10. The toe plate 20 is provided with a groove 21 that matches with the plug plate of another prefabricated slope protection block 2. In this embodiment, each prefabricated slope protection block 2 is preferably a concrete member, and the concrete member is made of shell concrete, which is a concrete made of shells as aggregates, and the shell content in the concrete member 2 is 10-80% of the total volume of the concrete member. The use of shell concrete is easy for oysters and other organisms to attach and grow; at the same time, the cavity structure of the prefabricated slope protection block also provides a rich habitat for organisms such as oysters, which is conducive to increasing the biodiversity of the area.
[0037] In order to make the surface of each prefabricated slope protection block 2 rougher and increase the biological attachment performance, a proper amount of shell fragments 3 are embedded in the surface of the concrete component 2.
[0038] The arc plate 10 is arranged in a semicircular structure, and a plurality of connecting holes 11 are arranged on the arc plate 10, each of which is annular and spaced apart on the surface of the arc plate. One end of the toe plate 20 is integrally formed with one end of the arc plate 10, and the other end of the toe plate 20 is provided with a protrusion 22 for limiting the sliding of the plug plate 30. The plug plate 30 in this embodiment is in a long strip structure, and the plug plate 30 is integrally formed with the other end of the arc plate 10.
[0039] The two adjacent prefabricated slope protection blocks 2 are connected to form a whole by engaging the plug plate 30 in the groove 21 on the toe plate 20. Specifically, the two adjacent prefabricated slope protection blocks 2 are laid end to end on the wave-breaking slope protection 1, and the plug plate 30 of the upper prefabricated slope protection block 2 is engaged in the groove 21 of the lower prefabricated slope protection block 2 to form a whole.
[0040] A construction method of a tile-type oyster reef ecological slope protection prefabricated block structure as described in any of the above technical solutions comprises the following steps:
[0041] 1) Production of prefabricated slope protection blocks: According to the design strength grade of the prefabricated slope protection block concrete, cement type, aggregate characteristics, etc., the shell concrete mix ratio is reasonably selected, and the mixture is poured into the pre-assembled combined steel formwork brushed with a release agent after mixing on site according to the mix ratio. Vibration equipment is used for vibration. When the concrete pouring reaches more than 24 hours and its surface and edges are not damaged by demolding, demolding is carried out to produce prefabricated slope protection blocks that meet the design;
[0042] 2) Maintenance of prefabricated slope protection blocks: Use geotextile covering and spraying maintenance, and require moisturizing and covering maintenance for at least 7 days. When the strength of the prefabricated slope protection blocks reaches 70% of the design strength, they can be hoisted and stored, and when they reach 100% of the design strength, they can be transported to the construction site;
[0043] 3) Slope leveling for wave protection and slope protection: Slope leveling for wave protection and slope protection, requiring the slope flatness to be ≤30mm;
[0044] 4) Construction control network layout: According to the size of the prefabricated slope protection blocks, use the total station and level to measure and locate on the wave-breaking slope protection slope surface, establish the construction control network for the laying of prefabricated blocks, and make easy-to-identify marks on the control points to determine the specific laying location and quantity of the prefabricated slope protection blocks;
[0045] 5) Installation of prefabricated slope protection blocks: Prefabricated slope protection blocks should be installed according to the pre-arranged construction control network. The laying should be carried out from bottom to top. The two adjacent prefabricated slope protection blocks should be tightly fastened and the seams should be aligned. After laying, the slope surface should be flat and beautiful.
[0046] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A tile-type oyster reef ecological slope protection prefabricated block structure, characterized in that: It includes a wave-breaking slope protection arranged at an inclined angle and a plurality of prefabricated slope protection blocks arranged side by side on the wave-breaking slope protection, each prefabricated slope protection block includes an arc-shaped plate, a toe plate arranged at one end of the arc-shaped plate, and a plug plate arranged at the other end of the arc-shaped plate, and the toe plate is provided with a groove that cooperates with the plug plate of another prefabricated slope protection block.
2. A tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1, characterized in that: Each prefabricated slope protection block is a concrete component, which is made of shell concrete. The shell concrete is concrete made of shells as aggregates. The shell content in the concrete component is 10-80% of the total volume of the concrete component.
3. A tile-type oyster reef ecological slope protection prefabricated block structure according to claim 2, characterized in that: An appropriate amount of shell crushed is embedded in the surface of the concrete component.
4. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: The arc plate is arranged in a semicircular structure, and a plurality of connecting holes are arranged on the arc plate. Each connecting hole is in an annular structure and is distributed at intervals on the surface of the arc plate.
5. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: One end of the toe plate is integrally formed with one end of the arc-shaped plate, and the other end of the toe plate is provided with a protrusion for limiting the sliding of the plug plate.
6. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: The plug plate is in a long strip structure, and the plug plate and the other end of the arc plate are integrally formed.
7. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: The wave-breaking slope protection is a dry-stone, mortar-stone or cast-stone structure, and its top elevation is located near the average high tide level.
8. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: Two adjacent prefabricated slope protection blocks are connected to form a whole by engaging the plug plates in the grooves on the toe plate.
9. The tile-type oyster reef ecological slope protection prefabricated block structure according to claim 1 is characterized in that: The plurality of prefabricated slope protection blocks are arranged in a tile-like structure.
10. A construction method of a tile-type oyster reef ecological slope protection prefabricated block structure according to any one of claims 1 to 9, characterized in that: The following steps are involved: 1) Make precast slope protection blocks: According to the design strength grade of precast slope protection block concrete, cement type, aggregate characteristics, etc., reasonably select the shell concrete mix ratio, mix it on site according to the mix ratio, pour the mixture into the pre-assembled combined steel formwork brushed with release agent, and vibrate it with a vibrating device. When the concrete pouring reaches more than 24 hours and its surface and edges are not damaged by demolding, demold it to make precast slope protection blocks that meet the design; 2) Prefabricated block slope protection maintenance: Use geotextile covering and spraying maintenance, requiring moisturizing covering maintenance for at least 7 days. When the strength of the prefabricated slope protection blocks reaches 70% of the design strength, they can be hoisted and stored, and when they reach 100% of the design strength, they can be transported to the construction site; 3) Slope leveling for wave protection and slope protection: Slope leveling for wave protection and slope protection, requiring the slope flatness to be ≤30mm; 4) Construction control network layout: According to the size of the prefabricated slope protection blocks, use the total station and level to measure and locate on the slope surface of the wave protection slope protection, establish the construction control network for the laying of prefabricated blocks, and make easy-to-identify marks on the control points to determine the specific laying position and quantity of the prefabricated slope protection blocks; 5) Installation of prefabricated slope protection blocks: Install prefabricated slope protection blocks according to the pre-arranged construction control network. The laying should be carried out from bottom to top. The two adjacent prefabricated slope protection blocks should be tightly fastened and the seams should be aligned. After laying, the slope surface should be flat and beautiful.