Portable construction equipment and construction method for engineering transformation and reinforcement
By using portable construction equipment and construction methods in engineering transformation and reinforcement, and using support components and limiting components, the problems of difficult and safety hazards in the prior art are solved, and the simplicity, safety and efficiency of reinforcement construction are achieved.
Patent Information
- Application Number
- CN202510063242.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-04-04
AI Technical Summary
During the existing engineering renovation and reinforcement process, the original reinforced concrete structure is often subjected to cross-section reinforcement beams or reinforcement of new beams and externally adhesive steel plates, which leads to building safety hazards and is difficult to construct, and the purpose of reinforcement and renovation cannot be truly achieved.
It provides a portable construction equipment and construction method for engineering transformation and reinforcement. By setting support components and limit components on the floor board, using materials such as stirrups, steel bars and steel plates to penetrate and fix the support components to form a stable reinforcement structure, reducing construction steps and construction periods.
The addition of new beams or cross-sections on the original structure floor slab has been achieved, and the reinforcement construction process is simple, convenient to operate, and cost-saving, reducing construction difficulty and safety hazards, and improving reinforcement efficiency.
Smart Images

Figure CN119754596A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to a portable construction device and a construction method for engineering transformation and reinforcement. Background Art
[0002] With the improvement of people's living standards, higher requirements are put forward for housing construction. Land is a non-renewable resource. Building a conservation-oriented society does not allow unlimited stalls to occupy a large amount of arable land for construction. Old city renovation, maintenance and reinforcement of old buildings, and expanded application are one of the inevitable choices for urban construction. By reinforcing and renovating buildings to add floors, expand, and change their uses, old buildings can be revitalized. In the existing engineering renovation and reinforcement process, the original reinforced concrete structure is often treated with measures such as increasing the cross-section of reinforced beams or adding new beams, externally bonded steel plates for reinforcement, externally bonded steel sections and anchor bolts. In actual construction, a large number of reinforcement and renovation operations are carried out simultaneously, and some renovations also involve the demolition of the original main structure floor slabs, which leads to potential safety hazards in the building at any time, and the purpose of reinforcement and renovation cannot be truly achieved, resulting in great difficulty in reinforcement and renovation construction. To this end, the present invention proposes a portable construction equipment and construction method for engineering renovation and reinforcement. Summary of the invention
[0003] The purpose of the present invention is to address the problem that in the process of engineering renovation and reinforcement in the background technology, measures such as increasing the cross-section of reinforced beams or adding new beams, externally bonding steel plates for reinforcement, externally bonding steel sections and anchor bolts are often taken on the original reinforced concrete structure. In actual construction, a large number of reinforcement and renovation operations are carried out simultaneously, and some renovations also involve the demolition of the original main structure floor slabs. This leads to the possibility of safety hazards in the building at any time, and the purpose of reinforcement and renovation cannot be truly achieved, resulting in extremely difficult reinforcement and renovation construction. A portable construction equipment and construction method for engineering renovation and reinforcement are proposed.
[0004] On the one hand, the present invention provides a portable construction equipment for engineering transformation and reinforcement, including a floor slab, a first support beam for supporting the floor slab is arranged at the bottom, a second support beam is arranged between the first support beams; a plurality of support components for reinforcing the second support beams are arranged through the floor slab, and the support components are sleeved on the outer wall of the second support beam; and a plurality of groups of limit components are arranged through the second support beam for positioning the support components.
[0005] Optionally, the support assembly includes stirrups, a plurality of steel bars are arranged between the stirrups, a steel plate is penetrated through the upper end of the stirrups, and the steel plate is located on the upper surface of the floor slab, a limit block is fixedly provided at the upper end of the stirrups, and the limit block is located on the upper surface of the steel plate.
[0006] Optionally, the limiting assembly includes a clamping strip, and the clamping strip is sleeved with the stirrup, and a clamping block is fixedly sleeved on one end of the clamping strip.
[0007] Optionally, a plurality of first through holes are provided on the floor slab, and the first through holes and stirrups are movably penetrated.
[0008] Optionally, a plurality of second through holes are formed on the second support beam, and the second through holes and the clamping strips are movably interpenetrating each other.
[0009] Optionally, a first slot is provided on the upper surface of the floor plate, and the first slot is engaged with the steel plate.
[0010] Optionally, a plurality of second slots are provided on the upper surface of the steel plate, and the second slots are engaged with the limit blocks.
[0011] Optionally, adjacent sockets of the card strips are arranged opposite to each other.
[0012] On the other hand, the present invention provides a portable processing method for engineering transformation and reinforcement, which is applied to the above-mentioned portable construction equipment for engineering transformation and reinforcement, comprising the following steps:
[0013] S1. Remove the deteriorated concrete on the outer surface of the floor slab and the second support beam, and fully roughen the bonding surface, rinse the roughened bonding surface, and spray a layer of concrete interface binder;
[0014] S2. Drill holes on the floor plate and the second support beam to form a first through hole and a second through hole, and the holes are equidistantly arranged, and a first groove is formed on the upper surface of the floor plate;
[0015] S3. Place stirrups equidistantly corresponding to the first through hole, place the steel bars between the stirrups, and stabilize the binding with wire ties;
[0016] S4. Pass the stirrups through the first through hole and the steel plate from bottom to top, and connect the upper end of the stirrups to the bottom surface of the limit block;
[0017] S5. Stagger the openings of the card strips between the stirrups and pass through the second through hole, and then connect the card block to one end of the card strip so that the card strip can stabilize the stirrups;
[0018] S6. Lay formwork on the surface of the stirrups to seal the stirrups and the second support beam, pour concrete in the sealed formwork, and remove the formwork after solidification.
[0019] Compared with the prior art, the present invention has the following beneficial technical effects:
[0020] The invention allows the stirrups to be passed through the floor slab to the outer wall of the second support beam, and the stirrups are fixed by steel plates and limit blocks, so that the newly added beams or beams with increased cross-sections can be arranged on the original structural floor slab, and only the interface between the new and old concrete surfaces needs to be roughened. This not only makes the construction process of the reinforced beams with increased cross-sections or the newly added beams simple and convenient to operate on site, but also saves costs, is easy to operate and saves construction time;
[0021] Furthermore, the present invention staggers the openings of the clamping strips on the stirrups, passes the clamping strips through the second through holes and then fixes them with clamping blocks, thereby stably fixing the clamping strips and ensuring the stability of the stirrups, reducing complicated construction steps and improving reinforcement efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A structural schematic diagram of a portable construction equipment and construction method for engineering transformation and reinforcement according to the present invention is provided;
[0023] Figure 2 for Figure 1 A schematic cross-sectional structure diagram of ;
[0024] Figure 3 for Figure 1 A schematic diagram of the structure of the middle support assembly;
[0025] Figure 4 for Figure 3 Schematic diagram of the structure of the middle limit assembly.
[0026] Reference numerals:
[0027] 1. Floor slab; 2. First support beam; 3. Second support beam;
[0028] 4. Support assembly; 41. Stirrups; 42. Steel bars; 43. Steel plates; 44. Limit blocks;
[0029] 5. Limiting assembly; 51. Card strip; 52. Card block;
[0030] 6. First through hole; 7. Second through hole; 8. First card slot; 9. Second card slot. DETAILED DESCRIPTION
[0031] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0032] The components of the embodiments of the present invention generally described and shown in the drawings herein may be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention.
[0033] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present invention.
[0034] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation to the present invention. In addition, the terms "first", "second", "third" are only used for descriptive purposes and should not be construed as indicating or implying relative importance.
[0035] In the description of the present invention, it should be noted that unless otherwise clearly specified and limited, the terms "installed", "connected", "coupled" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] Embodiment 1
[0037] As Figure 1 and Figure 2 shown, a portable construction equipment for engineering renovation and reinforcement proposed by the present invention includes a floor slab 1. A first support beam 2 for supporting it is provided at the bottom of the floor slab 1. A second support beam 3 is provided between the first support beams 2, which can stably support the floor slab 1. A plurality of support assemblies 4 for reinforcing the second support beam 3 are arranged through the floor slab 1, and the support assemblies 4 are sleeved on the outer wall of the second support beam 3, which is convenient for providing stable support for the second support beam 3. A plurality of groups of limit assemblies 5 for positioning the support assemblies 4 are arranged through the second support beam 3, which can make the support assemblies 4 more stably connected to the second support beam 3.
[0038] As Figures 1 to 3 shown, the support assembly 4 includes stirrups 41, and the stirrups 41 are arranged in a "U" - shaped structure and can be sleeved on the outer wall of the second support beam 3. A plurality of steel bars 42 are arranged between the stirrups 41, and the stirrups 41 and the steel bars 42 are stably tied and connected by binding wires. A steel plate 43 is arranged through the upper end of the stirrups 41, and the steel plate 43 is located on the upper surface of the floor slab 1, which can stably limit the stirrups 41. A limit block 44 is fixedly arranged at the upper end of the stirrups 41, and the limit block 44 is located on the upper surface of the steel plate 43, which can stably limit the stirrups 41 and ensure the stability of the stirrups 41.
[0039] As Figures 1 to 4As shown, the limiting component 5 includes a clamping strip 51, which is a "U"-shaped structure, and the clamping strip 51 is sleeved with the stirrup 41, which can stably limit the stirrup 41, and one end of the clamping strip 51 is fixedly sleeved with a clamping block 52, which can stably fix the clamping strip 51 on the stirrup 41.
[0040] like Figure 1 and Figure 2 As shown, a plurality of first through holes 6 are provided on the floor slab 1 , and the first through holes 6 and the stirrups 41 are movably penetrated to facilitate the penetration of the stirrups 41 .
[0041] like Figure 3 As shown, a plurality of second through holes 7 are provided on the second support beam 3 , and the second through holes 7 and the clamping strips 51 are movably penetrated, so that the clamping strips 51 can penetrate and stably sleeved with the stirrups 41 .
[0042] Furthermore, a first clamping groove 8 is provided on the upper surface of the floor plate 1 , and the first clamping groove 8 is clamped with the steel plate 43 , so as to ensure that the floor plate 1 is flat.
[0043] Secondly, a plurality of second slots 9 are formed on the upper surface of the steel plate 43 , and the second slots 9 are engaged with the limit blocks 44 , so as to ensure the flatness of the upper surface of the steel plate 43 .
[0044] Furthermore, the adjacent sockets of the clamping strip 51 are arranged opposite to each other, which can increase the stability of the clamping strip 51 in fixing the stirrup 41 .
[0045] The working principle of this embodiment is: remove the deteriorated concrete on the outer surface of the floor slab 1 and the second support beam 3, and fully roughen the bonding surface, rinse the roughened bonding surface, and spray a layer of concrete interface binder. This step is to remove the bad parts of the structure surface so that the new and old concrete can be better combined, and at the same time, the bonding effect is enhanced by the interface binder, providing a good basic condition for subsequent reinforcement work.
[0046] Holes are drilled on the floor slab 1 and the second support beam 3 to form a first through hole 6 and a second through hole 7, and the holes are arranged equidistantly, and a first slot 8 is excavated on the upper surface of the floor slab 1. These holes and slots are arranged for the subsequent installation of the support assembly and the limit assembly. The equidistant arrangement can ensure uniform force and improve the stability of the overall structure. Subsequently, the stirrups 41 are placed equidistantly corresponding to the first through hole 6, and the steel bars 42 are placed between the stirrups 41 and stabilized by binding wire. In this way, the basic framework of the support assembly is constructed. The combination of steel bars and stirrups can provide good bending and shear resistance and enhance the bearing capacity of the structure. Afterwards, the stirrups 41 are passed through the first through hole 6 and the steel plate 43 from bottom to top, and the upper end of the stirrup 41 is clamped to the bottom surface of the limit block 44. During this process, the steel plate 43 is engaged with the first slot 8 on the floor plate 1, and the limit block 44 is engaged with the second slot 9 on the steel plate 43, ensuring the stability of the support assembly in the vertical direction and preventing it from vertical displacement, thereby providing effective vertical supporting force for the floor plate, enhancing the bearing capacity of the floor plate and preventing it from excessive deformation or damage due to force.
[0047] The openings of the clamping strips 51 are staggered and inserted between the stirrups 41, and penetrate through the second through hole 7, and then the clamping block 52 is clamped to one end of the clamping strips 51, so that the clamping strips 51 can stably limit the stirrups 41. Since the adjacent sockets of the clamping strips 51 are arranged oppositely, the clamping strips can limit the support assembly from different directions, effectively limiting the movement of the support assembly in the horizontal direction, ensuring that it always maintains a stable position when bearing a load, thereby ensuring the stability and reliability of the entire support structure.
[0048] A template is laid on the surface of the stirrup 41 to seal the stirrup 41 with the second support beam 3, and concrete is poured in the sealed template. The template is removed after solidification. Pouring concrete further enhances the connection strength and integrity between the support assembly and the second support beam 3, allowing the entire reinforcement structure to work better together, providing safe and efficient support guarantee for engineering renovation and reinforcement construction.
[0049] Embodiment 2
[0050] like Figures 1 to 4 As shown, based on the first embodiment, the following steps are included:
[0051] S1. Remove the deteriorated concrete on the outer surface of the floor plate 1 and the second support beam 3, and fully roughen the bonding surface, rinse the roughened bonding surface, and spray a layer of concrete interface binder;
[0052] S2. Drill holes on the floor plate 1 and the second support beam 3 to form a first through hole 6 and a second through hole 7, and the holes are equidistantly arranged, and a first card groove 8 is chiseled on the upper surface of the floor plate 1;
[0053] S3. The stirrups 41 are placed equidistantly corresponding to the first through hole 6, and then the steel bars 42 are placed between the stirrups 41, and are stabilized by tying wires;
[0054] S4. The stirrup 41 passes through the first through hole 6 and the steel plate 43 from bottom to top, and the upper end of the stirrup 41 is clamped with the bottom surface of the stop block 44;
[0055] S5. The openings of the card strip 51 are staggered and inserted between the stirrups 41, and pass through the second through hole 7, and then the card block 52 is connected to one end of the card strip 51, so that the card strip 51 stabilizes the stirrup 41;
[0056] S6. Lay a formwork on the surface of the stirrup 41 to seal the stirrup 41 and the second support beam 3, and pour concrete in the sealed formwork. After solidification, remove the formwork.
[0057] The above specific embodiments are only several optional embodiments of the present invention. Based on the technical solutions of the present invention and the relevant inspirations of the above embodiments, those skilled in the art can make various alternative improvements and combinations to the above specific embodiments.
Claims
1. A portable construction equipment for engineering transformation and reinforcement, comprising: A floor slab (1), wherein a first support beam (2) for supporting the floor slab (1) is arranged at the bottom thereof, and a second support beam (3) is arranged between the first support beams (2); A plurality of support components (4) for reinforcing the second support beam (3) are arranged through the floor slab (1), and the support components (4) are sleeved on the outer wall of the second support beam (3); A plurality of groups of position limiting components (5) are arranged through the second support beam (3) and are used to position the support component (4).
2. The portable construction equipment for engineering transformation and reinforcement according to claim 1 is characterized by: The support assembly (4) comprises stirrups (41), a plurality of steel bars (42) are arranged between the stirrups (41), a steel plate (43) is provided through the upper end of the stirrups (41), and the steel plate (43) is located on the upper surface of the floor slab (1), and a limit block (44) is fixedly provided at the upper end of the stirrups (41), and the limit block (44) is located on the upper surface of the steel plate (43).
3. The portable construction equipment for engineering transformation and reinforcement according to claim 2 is characterized by: The limiting assembly (5) comprises a clamping strip (51), and the clamping strip (51) is sleeved with the stirrup (41), and a clamping block (52) is fixedly sleeved on one end of the clamping strip (51).
4. The portable construction equipment for engineering transformation and reinforcement according to claim 2 is characterized by: The floor slab (1) is provided with a plurality of groups of first through holes (6), and the first through holes (6) and the stirrups (41) are movably interpenetrating.
5. The portable construction equipment for engineering transformation and reinforcement according to claim 3 is characterized by: The second support beam (3) is provided with a plurality of groups of second through holes (7), and the second through holes (7) and the clamping strip (51) are movably interpenetrating.
6. The portable construction equipment for engineering transformation and reinforcement according to claim 2 is characterized by: The upper surface of the floor plate (1) is provided with a first clamping groove (8), and the first clamping groove (8) is clamped with the steel plate (43).
7. The portable construction equipment for engineering transformation and reinforcement according to claim 2 is characterized by: A plurality of second slots (9) are provided on the upper surface of the steel plate (43), and the second slots (9) are engaged with the limiting blocks (44).
8. The portable construction equipment for engineering transformation and reinforcement according to claim 3 is characterized by: The clamping strips (51) are arranged opposite to each other in adjacent sockets.
9. A portable construction method for engineering transformation and reinforcement, applied to a portable construction device for engineering transformation and reinforcement as claimed in any one of claims 1 to 8, characterized in that: The following steps are involved: S1. Remove the deteriorated concrete on the outer surface of the floor plate (1) and the second support beam (3), and fully roughen the bonding surface, rinse the roughened bonding surface, and spray a layer of concrete interface binder; S2. Drill holes on the floor plate (1) and the second support beam (3) to form a first through hole (6) and a second through hole (7), and the holes are arranged equidistantly, and a first groove (8) is formed on the upper surface of the floor plate (1); S3. The stirrups (41) are placed equidistantly corresponding to the first through hole (6), and then the steel bars (42) are placed between the stirrups (41), and are stabilized by tying wires; S4. The stirrup (41) is passed through the first through hole (6) and the steel plate (43) from bottom to top, and the upper end of the stirrup (41) is clamped with the bottom surface of the stop block (44); S5. The opening of the card strip (51) is staggered and inserted between the stirrups (41), and passes through the second through hole (7), and then the card block (52) is connected to one end of the card strip (51), so that the card strip (51) can stably limit the stirrups (41); S6. Lay a formwork on the surface of the stirrup (41), seal the stirrup (41) and the second support beam (3), pour concrete in the sealed formwork, and remove the formwork after solidification.