Control method of refrigerating and heating equipment

By setting up two refrigeration and heating devices in the refrigeration and heating equipment and designing automatic switching control methods, the problem of inability to continue to be used in the event of equipment failure is solved, automatic switching and continuous work in the event of equipment failure is realized, and user experience and equipment reliability are improved.

CN119755830APending Publication Date: 2025-04-04SHENZHEN ENTROPLUS INNOVATION TECHNOLOGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202510031027.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-07
Publication Date
2025-04-04

AI Technical Summary

Technical Problem

Existing refrigeration and heating equipment can only be replaced when it fails, resulting in users being unable to continue using it, affecting the user experience.

Method used

A control method is designed to utilize two refrigeration and heating devices, one as a working device and the other as a backup device. When the working device fails, automatically switch to the backup device to continue working to avoid replacing the equipment.

Benefits of technology

When the refrigeration and heating equipment fails, the work can continue without replacing the equipment, which improves the user experience and the reliability of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119755830A_ABST
    Figure CN119755830A_ABST
Patent Text Reader

Abstract

The invention provides a control method of refrigerating and heating equipment, which comprises the following steps: in the refrigerating and heating equipment with two refrigerating and heating devices, after a working refrigerating and heating device and a standby refrigerating and heating device are determined, controlling the working refrigerating and heating device to adjust the environment from a first temperature to a second temperature, and in the adjusting process, controlling the standby refrigerating and heating device to work; working parameters of the working refrigerating and heating device are collected, when it is determined that the working refrigerating and heating device breaks down according to the collected working parameters and the environment temperature does not reach the second temperature, the standby refrigerating and heating device is switched to continue executing the first control instruction, and therefore the two refrigerating and heating devices are arranged in the refrigerating and heating equipment; when one of the two refrigerating and heating devices breaks down, the other refrigerating and heating device is started to work, under the condition that the refrigerating and heating equipment does not need to be replaced, it can be guaranteed that the refrigerating and heating equipment can continue to work when breaking down, and the use experience of a user is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of refrigeration and heating, and in particular to a control method for refrigeration and heating equipment. Background Art

[0002] At present, refrigeration and heating equipment with spring-loaded card materials uses the spring-loaded card materials as refrigeration and heating generators in the refrigeration and heating equipment. The working principle of such refrigeration and heating generators is: mechanically deforming the spring-loaded card materials to induce phase change in the elastic materials, resulting in latent heat release and absorption, thereby utilizing the refrigeration and heating equipment to achieve the purpose of regulating the temperature.

[0003] In the related art, when a refrigeration and heating device fails, the refrigeration and heating device can only be replaced. Before the refrigeration and heating device is replaced, the user cannot continue to use the refrigeration and heating device, which greatly affects the user experience. Summary of the invention

[0004] In order to solve the above problems, an object of the embodiments of the present application is to provide a control method for a refrigeration and heating device.

[0005] In a first aspect, an embodiment of the present application provides a control method for a refrigeration and heating device, which is used for a refrigeration and heating device using a spring card material, wherein the refrigeration and heating device comprises: a control unit and a first refrigeration and heating device and a second refrigeration and heating device, wherein the control unit is connected to the first refrigeration and heating device and the second refrigeration and heating device respectively; the control method comprises:

[0006] The control unit acquires a first control instruction, wherein the first control instruction includes: a current first temperature of an environment requiring temperature adjustment and a second temperature after the temperature adjustment;

[0007] Based on the temperature range where the first temperature and the second temperature are located, selecting a refrigeration and heating device with a higher refrigeration and heating power in the temperature range from the first refrigeration and heating device and the second refrigeration and heating device as the working refrigeration and heating device, and selecting a refrigeration and heating device with a lower refrigeration and heating power in the temperature range as the standby refrigeration and heating device;

[0008] Controlling the working cooling and heating device to execute the first control instruction, adjusting the environment requiring temperature adjustment from the first temperature to the second temperature, and collecting working parameters of the working cooling and heating device during the working process of the working cooling and heating device;

[0009] When it is determined based on the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment requiring temperature regulation does not reach the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

[0010] In the solution provided in the first aspect of the embodiment of the present application, in a refrigeration and heating device with two refrigeration and heating devices, after determining the working refrigeration and heating device and the standby refrigeration and heating device, the working refrigeration and heating device is controlled to execute the first control instruction, the environment requiring temperature adjustment is adjusted from the first temperature to the second temperature, and during the operation of the working refrigeration and heating device, the working parameters of the working refrigeration and heating device are collected. When it is determined according to the collected working parameters that the working refrigeration and heating device fails and the ambient temperature of the environment requiring temperature adjustment does not reach the second temperature, it is determined that the current working refrigeration and heating device has a fault and switches to the standby refrigeration and heating device to continue to execute the first control instruction. Compared with the method in the related art that the refrigeration and heating device can only be replaced when the refrigeration and heating device fails, two refrigeration and heating devices are set in the refrigeration and heating device. When one of the two refrigeration and heating devices fails, the other refrigeration and heating device is started to work. Without replacing the refrigeration and heating device, it can be ensured that the refrigeration and heating device can continue to work when it fails, thereby greatly improving the user experience.

[0011] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0013] Figure 1 A flow chart showing a method for controlling a cooling and heating device provided in Example 1 of the present application is shown;

[0014] Figure 2 A flow chart showing another method for controlling a refrigeration and heating device provided in Example 2 of the present application is shown;

[0015] Figure 3 A flow chart of another method for controlling a cooling and heating device provided in Example 3 of the present application is shown. DETAILED DESCRIPTION

[0016] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0017] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0018] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0019] At present, refrigeration and heating equipment with spring-loaded card materials uses the spring-loaded card materials as refrigeration and heating generators in the refrigeration and heating equipment. The working principle of such refrigeration and heating generators is: mechanically deforming the spring-loaded card materials to induce phase change in the elastic materials, resulting in latent heat release and absorption, thereby utilizing the refrigeration and heating equipment to achieve the purpose of regulating the temperature.

[0020] In the related art, when a refrigeration and heating device fails, the refrigeration and heating device can only be replaced. Before the refrigeration and heating device is replaced, the user cannot continue to use the refrigeration and heating device, which greatly affects the user experience.

[0021] Based on this, an embodiment of the present application proposes a control method for a refrigeration and heating equipment. In a refrigeration and heating equipment with two refrigeration and heating devices, after determining a working refrigeration and heating device and a standby refrigeration and heating device, the working refrigeration and heating device is controlled to execute a first control instruction to adjust the environment requiring temperature adjustment from a first temperature to a second temperature. During the operation of the working refrigeration and heating device, the working parameters of the working refrigeration and heating device are collected. When it is determined according to the collected working parameters that the working refrigeration and heating device fails and the ambient temperature of the environment requiring temperature adjustment does not reach the second temperature, it is determined that the current working refrigeration and heating device has a fault and switches to the standby refrigeration and heating device to continue to execute the first control instruction. Two refrigeration and heating devices are set in the refrigeration and heating equipment. When one of the two refrigeration and heating devices fails, the other refrigeration and heating device is started to work. Without replacing the refrigeration and heating equipment, it can be ensured that the refrigeration and heating equipment can continue to work when it fails, thereby greatly improving the user experience.

[0022] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below with reference to the accompanying drawings and embodiments.

[0023] Example 1

[0024] The execution subject of the control method of the cooling and heating equipment proposed in this embodiment is the control unit.

[0025] See also Figure 1 The flowchart of a control method of a refrigeration and heating device is shown. This embodiment provides a control method of a refrigeration and heating device, which is used for a refrigeration and heating device using a spring card material. The refrigeration and heating device includes: a control unit, a first refrigeration and heating device and a second refrigeration and heating device. The control unit is connected to the first refrigeration and heating device and the second refrigeration and heating device respectively; the control method includes the following specific steps:

[0026] Step 100: Obtain a first control instruction, wherein the first control instruction includes: a current first temperature of an environment requiring temperature adjustment and a second temperature after temperature adjustment.

[0027] Step 102: Based on the temperature range in which the first temperature and the second temperature are located, a refrigeration and heating device with a higher refrigeration and heating power in the temperature range is selected from the first refrigeration and heating device and the second refrigeration and heating device as the working refrigeration and heating device, and a refrigeration and heating device with a lower refrigeration and heating power in the temperature range is selected as the standby refrigeration and heating device.

[0028] In the above step 102, the cooling and heating generator in the above-mentioned first cooling and heating device and the cooling and heating generator in the second cooling and heating device respectively have a plurality of spring-cage material units arranged in series or in parallel; each of the plurality of spring-cage material units is composed of spring-cage materials, and different spring-cage materials have different cooling and heating capabilities.

[0029] Since the spring card material used in the spring card material unit of the first cooling and heating device is different from the spring card material used in the spring card material unit of the second cooling and heating device, the cooling and heating power of the spring card material unit in the first cooling and heating device is different from the cooling and heating power of the spring card material unit in the second cooling and heating device in different temperature ranges.

[0030] The control unit pre-stores the corresponding relationship between the first cooling and heating device, the temperature range and the cooling and heating power, and the corresponding relationship between the second cooling and heating device, the temperature range and the cooling and heating power.

[0031] Then, based on the temperature range in which the first temperature and the second temperature are located, the correspondence between the above-mentioned first cooling and heating device, the temperature range and the cooling and heating power, and the correspondence between the above-mentioned second cooling and heating device, the temperature range and the cooling and heating power, the control unit can select a cooling and heating device with higher cooling and heating power in the above-mentioned temperature range from the first cooling and heating device and the second cooling and heating device as the working cooling and heating device, and select a cooling and heating device with lower cooling and heating power in the temperature range as the standby cooling and heating device.

[0032] Step 104, control the working cooling and heating device to execute the first control instruction, adjust the environment requiring temperature adjustment from the first temperature to the second temperature, and collect the working parameters of the working cooling and heating device during the working process of the working cooling and heating device.

[0033] In the above step 104, in order to collect the working parameters of the above working cooling and heating devices, the above cooling and heating equipment also includes: power sensors respectively installed on the cooling and heating generators in the first cooling and heating device and the second cooling and heating device; the power sensors are connected to the control unit.

[0034] In order to collect the working parameters of the above-mentioned working cooling and heating devices, the above-mentioned cooling and heating equipment also includes: flow rate sensors respectively installed on the cooling and heating generators in the above-mentioned first cooling and heating device and the second cooling and heating device; the flow rate sensor is connected to the control unit.

[0035] In order to collect the working parameters of the above-mentioned working cooling and heating devices, the above-mentioned cooling and heating equipment further includes: microphones respectively installed in the above-mentioned first cooling and heating device and the second cooling and heating device; the above-mentioned microphones are connected to the above-mentioned control unit;

[0036] In order to collect the working parameters of the above-mentioned working cooling and heating devices, the above-mentioned cooling and heating equipment also includes: current sensors respectively installed in the above-mentioned first cooling and heating device and the second cooling and heating device; the above-mentioned current sensors are connected to the above-mentioned control unit.

[0037] The above working parameters include, but are not limited to: actual value of cooling and heating power, actual value of medium material flow rate, operating sound data, and current value.

[0038] In order to enable the working refrigeration and heating device to work normally, the control unit needs to first calculate the operating time of the working refrigeration and heating device, the quality of the spring card material, the driving cycle of the spring card material of the working refrigeration and heating device, the cooling and heating power calculation value of the spring card material unit of the working refrigeration and heating device, and the medium material flow rate calculation value of the medium material in the pipeline of the spring card material unit of the working refrigeration and heating device. After the calculation is completed, the control unit controls the working refrigeration and heating device to execute the first control instruction based on the parameters obtained by the above calculations, and adjusts the environment that requires temperature adjustment from the first temperature to the second temperature.

[0039] Among them, the spring-loaded material unit of the working cooling and heating device is used to generate cooling and heating amount to adjust the environment from the first temperature to the second temperature.

[0040] The dielectric material is used to carry away the cooling and heating amount generated by the pipeline of the card material unit so that the card material unit can work normally; the dielectric material can be but is not limited to: water, ethylene glycol and heat transfer oil.

[0041] The mass of the spring card material is obtained by multiplying the total mass of the spring card material in the working refrigeration and heating device by the mass coefficient. It is the mass of the spring card material that has just started working in the working refrigeration and heating device, and can be used to calculate the number of spring card units that have just started working in the working refrigeration and heating device.

[0042] Here, the quality coefficient is pre-set in the control unit, and the quality coefficient is any value between 0.6 and 0.8, which will not be described in detail here.

[0043] The number of the spring card units that have just started working in the working cooling and heating device can be obtained by multiplying the mass coefficient by the total number of spring card materials.

[0044] The total mass of the ejection material is calculated by the total volume and density of the ejection material. The total volume and density of the ejection material are preset in the control unit.

[0045] Since each of the spring card material units is formed by the spring card material, the driving cycle of the spring card material unit is the driving cycle of the spring card material.

[0046] The driving frequency of the spring card material is the inverse of the driving period of the spring card material. The driving frequency of the spring card material unit is the driving frequency of the spring card material.

[0047] The specific calculation process of the control unit for parameters such as the operating time of the working refrigeration and heating device, the mass of the spring card material, the driving cycle of the spring card material of the working refrigeration and heating device, the calculated value of the refrigeration and heating power of the spring card material unit of the working refrigeration and heating device, and the calculated value of the flow rate of the medium material in the pipeline of the spring card material unit of the working refrigeration and heating device is not the focus of this application, and reference may be made to other related patents.

[0048] Step 106: When it is determined based on the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment requiring temperature adjustment does not reach the second temperature, switch from the working cooling and heating device to the standby cooling and heating device, and control the standby cooling and heating device to continue to execute the first control instruction.

[0049] In the above step 106, when the working parameter is the actual value of the cooling and heating power, the following steps (1) to (5) may be performed:

[0050] (1) obtaining the actual cooling and heating power of the cooling and heating generator in the working cooling and heating device collected by the power sensor;

[0051] (2) obtaining a pre-calculated cooling and heating power calculation value of the above-mentioned working cooling and heating device;

[0052] (3) calculating a first ratio of the actual cooling and heating power to the calculated cooling and heating power;

[0053] (4) when the calculated first ratio is less than a first ratio threshold, determining that the working cooling and heating device fails, and obtaining the ambient temperature of the environment;

[0054] (5) When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

[0055] In the above step (2), the calculated cooling and heating power value of the working cooling and heating device is pre-calculated by the control unit before the working cooling and heating device starts working in order to control the working cooling and heating device to work.

[0056] In the above step (3), the first ratio threshold is pre-stored in the control unit.

[0057] In the above step (4), the control unit obtains the ambient temperature of the above environment in real time through a temperature sensor arranged in the above environment.

[0058] In the above step (5), "switching from the above working cooling and heating device to the above standby cooling and heating device, and controlling the above standby cooling and heating device to continue to execute the above first control instruction" means that the control unit stops the operation of the above working cooling and heating device, starts the above standby cooling and heating device and controls the above standby cooling and heating device to continue to execute the above first control instruction.

[0059] When the working parameter is the actual value of the flow rate of the medium material, the above step 106 can perform the following steps (6) to (10):

[0060] (6) obtaining an actual value of the flow rate of the medium material in the cooling and heating generator in the working cooling and heating device collected by the flow rate sensor;

[0061] (7) obtaining a pre-calculated value of the flow rate of the medium material of the above-mentioned working refrigeration and heating device;

[0062] (8) calculating a second ratio of the actual value of the medium material flow rate to the calculated value of the medium material flow rate;

[0063] (9) when the calculated second ratio is less than a second ratio threshold, determining that the working cooling and heating device fails, and obtaining the ambient temperature of the environment;

[0064] (10) When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

[0065] In the above step (9), the second ratio threshold is pre-cached in the control unit.

[0066] The control unit obtains the ambient temperature of the environment in real time through a temperature sensor arranged in the environment.

[0067] When the working parameter is the running sound data, the above step 106 may perform the following steps (11) to (15):

[0068] (11) obtaining the operating sound data of the working cooling and heating device collected by the microphone;

[0069] (12) parsing the acquired operation sound data to obtain the voiceprint features of the operation sound data;

[0070] (13) classifying the voiceprint features of the operating sound data using a pre-trained fault sound analysis model to obtain a classification result of the voiceprint features of the operating sound data;

[0071] (14) when the classification result indicates that the voiceprint feature of the operating sound data belongs to a fault sound, determining that the operating cooling and heating device has a fault, and obtaining the ambient temperature of the environment;

[0072] (15) When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

[0073] In the above step (12), the specific process of parsing the acquired operation sound data to obtain the voiceprint features of the above operation sound data is prior art and will not be repeated here.

[0074] In the above step (13), the voiceprint features of the above operating sound data are classified by a pre-trained fault sound analysis model. The specific process of obtaining the classification result of the voiceprint features of the above operating sound data is prior art and will not be repeated here.

[0075] The above classification results include: classification results of fault sounds and normal operation sounds.

[0076] In the above step (14), the control unit obtains the ambient temperature of the above environment in real time through a temperature sensor arranged in the above environment.

[0077] When the working parameter is a current value, the above step 106 may perform the following steps (16) to (19):

[0078] (16) obtaining the current value of the working cooling and heating device collected by the current sensor;

[0079] (17) calculating the current value difference between the current value and the current value obtained last time;

[0080] (18) when the calculated current value difference is greater than a preset current difference threshold, determining that the working cooling and heating device fails, and obtaining the ambient temperature of the environment;

[0081] (19) When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

[0082] In the above step (18), the above current difference threshold is pre-cached in the control unit.

[0083] The control unit obtains the ambient temperature of the environment in real time through a temperature sensor arranged in the environment.

[0084] In the above step 104, in order to increase the accuracy of temperature control in the process of controlling the above working cooling and heating device to execute the above first control instruction and adjusting the environment requiring temperature adjustment from the above first temperature to the above second temperature, the following steps (20) to (22) may be performed:

[0085] (20) calculating a temperature difference between the first temperature and the second temperature, and determining a matching cooling and heating amount according to the temperature difference;

[0086] (21) when the required cooling and heating capacity determined is less than or equal to the maximum cooling and heating capacity of the working cooling and heating device, controlling the working cooling and heating device to execute the first control instruction to adjust the environment requiring temperature adjustment from the first temperature to the second temperature;

[0087] (22) When the required cooling and heating capacity determined is greater than the maximum cooling and heating capacity of the working cooling and heating device, the working cooling and heating device and the standby cooling and heating device are controlled to operate simultaneously and execute the first control instruction together to adjust the environment requiring temperature adjustment from the first temperature to the second temperature.

[0088] In the above step (20), the control unit is pre-set with a corresponding relationship between the temperature difference and the cooling and heating amount. Then, according to the calculated temperature difference between the first temperature and the second temperature, the cooling and heating amount matching the temperature difference can be determined from the corresponding relationship between the temperature difference and the cooling and heating amount.

[0089] In the above step (22), the specific process of the control unit controlling the standby cooling and heating device is similar to the process of the control unit controlling the working cooling and heating device, which will not be repeated here.

[0090] Optionally, in order to increase the accuracy of temperature control during the process of adjusting the environment from the first temperature to the second temperature, the above step 104 may further continue to perform the following steps (23) to (26):

[0091] (23) collecting the current ambient temperature of the environment while controlling the working cooling and heating device and the standby cooling and heating device to operate simultaneously;

[0092] (24) determining whether the temperature difference between the current ambient temperature and the second temperature is greater than or equal to a first temperature threshold, if yes, executing step (25), if no, executing step (26);

[0093] (25) Return and execute the above step (23);

[0094] (26) Sending a stop operation instruction to the standby cooling and heating device, and controlling the working cooling and heating device to continue to operate, so as to adjust the environment from the current ambient temperature to the second temperature.

[0095] In the above step (23), the current ambient temperature of the above environment is collected by a temperature sensor set in the environment. The temperature sensor can interact with the control unit, so the temperature sensor can send the collected current ambient temperature to the control unit.

[0096] In the above step (24), the first temperature threshold is pre-stored in the control unit.

[0097] Optionally, in order to save energy consumption of the working refrigeration and heating device while accurately controlling the ambient temperature, the driving frequency of the spring material can be reduced. In addition to the above step (26), the following steps (27) to (31) can also be performed:

[0098] (27) obtaining a first driving frequency of the spring card material corresponding to the above-mentioned cooling and heating amount;

[0099] (28) obtaining a driving cycle of the ejection material according to the first driving frequency of the ejection material, wherein a single driving cycle includes: a loading time, a first waiting time, an unloading time, and a second waiting time;

[0100] (29) obtaining a first waiting time update value corresponding to a temperature difference between the current ambient temperature and the second temperature;

[0101] (30) using the acquired first waiting time update value, respectively incrementing the length of the first waiting time and the second waiting time, thereby extending the driving cycle of the ejection material;

[0102] (31) Controlling the spring-loaded material unit in the cooling and heating generator of the working cooling and heating device to continue to operate according to the extended driving cycle of the spring-loaded material, and adjusting the environment from the current ambient temperature to the second temperature.

[0103] In the above step (27), the control unit pre-stores the corresponding relationship between the cooling and heating amount and the driving frequency of the ejection material.

[0104] The control unit can query and obtain the first driving frequency of the spring card material corresponding to the cooling and heating amount based on the corresponding relationship between the cooling and heating amount and the driving frequency of the spring card material.

[0105] In the above step (29), the control unit pre-stores the corresponding relationship between the temperature difference value and the waiting time update value.

[0106] The control unit may first calculate the temperature difference between the current ambient temperature and the second temperature, and then query and obtain the first waiting time update value corresponding to the temperature difference between the current ambient temperature and the second temperature from the correspondence between the temperature difference and the waiting time update value.

[0107] In the above step (30), extending the driving period of the above spring-stuck material means reducing the driving frequency of the spring-stuck material.

[0108] Optionally, the precise temperature control of the ambient temperature can be achieved by increasing / decreasing the number of the spring material units in the working cooling and heating device. In the above step (26), the following steps (32) to (37) can also be performed:

[0109] (32) Obtaining the mass of the above-mentioned spring card material corresponding to the above-mentioned cooling and heating capacity;

[0110] (33) determining a first number of spring material units operating in the cooling and heating generator of the currently operating cooling and heating device according to the obtained mass of the spring material;

[0111] (34) obtaining a second number of spring material units corresponding to a temperature difference between the current ambient temperature and the second temperature;

[0112] (35) calculating the difference between the first quantity and the second quantity;

[0113] (36) When the quantity difference is a positive number, the number of the spring-loaded material units corresponding to the quantity difference is controlled to stop working, so that the second number of the spring-loaded material units in the cooling and heating generator of the working cooling and heating device continue to work, and the environment is adjusted from the current environment temperature to the second temperature;

[0114] (37) When the above-mentioned quantity difference is a negative number, the spring-loaded material units of the quantity controlled by the above-mentioned quantity difference start to work, so that the above-mentioned second quantity of spring-loaded material units in the cooling and heating generator of the above-mentioned working cooling and heating device continue to work, and adjust the above-mentioned environment from the above-mentioned current ambient temperature to the above-mentioned second temperature.

[0115] In the above step (32), the mass of the spring card material corresponding to the cooling and heating amount is the mass of the spring card material that can adjust the environment from the first temperature to the second temperature and emit the above cooling and heating amount during the operating time of the working cooling and heating device.

[0116] When the control unit controls the working cooling and heating device to start working, it will calculate the mass of the above-mentioned spring card material corresponding to the above-mentioned cooling and heating amount, and then cache the calculated mass of the above-mentioned spring card material corresponding to the above-mentioned cooling and heating amount.

[0117] In the above step (33), the first number of the ejection material units is equal to the mass of the ejection material divided by the mass of a single ejection material unit.

[0118] The control unit pre-buffers the mass of a single ejection material unit. In the above step (34), the control unit pre-sets a corresponding relationship between the temperature difference and the number of ejection material units.

[0119] The control unit can obtain the second number of the ejection material units corresponding to the temperature difference between the current ambient temperature and the second temperature from the corresponding relationship between the temperature difference and the number of the ejection material units.

[0120] In addition to the above-mentioned troubleshooting and precise temperature control methods, the control unit can also control the cooling and heating equipment through zone temperature control.

[0121] In the case where the environment in which the above-mentioned cooling and heating equipment is located is divided into two different temperature adjustment areas, the two cooling and heating devices can also be installed in the two different temperature adjustment areas respectively.

[0122] In order to perform zone temperature control on the cooling and heating equipment, the control method of the cooling and heating equipment proposed in this embodiment may further include the following steps (40) to (42):

[0123] (40) obtaining a required temperature adjustment instruction for each of the different temperature adjustment areas, wherein the temperature adjustment instruction for each of the temperature adjustment areas includes: a current fifth temperature and a sixth temperature after temperature adjustment for each of the temperature adjustment areas;

[0124] (41) determining the cooling and heating capacity of each temperature adjustment area according to the current fifth temperature of each temperature adjustment area and the sixth temperature after the temperature adjustment;

[0125] (42) Based on the determined cooling and heating capacity of each temperature control area, the cooling and heating devices installed in each temperature control area are controlled to adjust the temperature of each of the above temperature control areas, thereby performing different temperature control on each temperature control area.

[0126] In the above step (41), the temperature difference between the current fifth temperature and the sixth temperature after temperature adjustment of each temperature adjustment area is used to determine the cooling and heating capacity of each temperature adjustment area from the correspondence between the preset temperature difference and the cooling and heating capacity.

[0127] In the above step (42), in order to control the cooling and heating devices installed in each temperature control area to adjust the temperature of each temperature control area based on the determined cooling and heating capacity of each temperature control area, the following steps (421) to (423) may be performed:

[0128] (421) based on the determined cooling and heating capacity of each temperature control area, obtaining the operating time corresponding to the cooling and heating capacity of each temperature control area and the third driving frequency and mass of the ejection material in the cooling and heating device in each temperature control area;

[0129] (422) determining a fifth number of spring material units that need to be operated in the cooling and heating generator of the cooling and heating device in each of the temperature adjustment areas according to the obtained mass of the spring material;

[0130] (423) Control the fifth number of spring-loaded material units in the cooling and heating generators in each of the temperature adjustment areas to operate, and adjust the environment from the fifth temperature to the sixth temperature.

[0131] In the above step (421), the operating time corresponding to the cooling and heating capacity of each of the above temperature adjustment areas is equal to the cooling and heating capacity of each temperature adjustment area divided by the cooling and heating power of the card material.

[0132] The cooling and heating power of the spring card material=the cooling and heating power ratio per unit mass*the third driving frequency of the spring card material*the mass of the spring card material.

[0133] The cooling and heating power ratio per unit mass is pre-buffered in the control unit.

[0134] The third driving frequency of the ejection material is found by the control unit based on the cooling and heating amounts of each temperature adjustment area and from the corresponding relationship between the cooling and heating amounts and the driving frequency of the ejection material.

[0135] The mass of the card material = the total volume of the card material * density * mass coefficient.

[0136] In the above step (422), the fifth number of the ejection material units=the mass of the ejection material / the unit mass of the ejection material.

[0137] The unit mass of the ejection material refers to the mass of a single ejection material, which is pre-stored in the control unit.

[0138] After the above step (423), the above step (42) further includes the following steps (424) to (431):

[0139] (424) collecting the current temperature in each of the temperature adjustment areas;

[0140] (425) determining whether the temperature difference between the current temperature and the sixth temperature of each of the temperature adjustment areas is greater than or equal to a third temperature threshold; if so, executing step (426); if not, executing step (427);

[0141] (426) Return and execute the above step (424);

[0142] (427) obtaining a third driving cycle of the ejection material according to the third driving frequency of the ejection material, wherein the third driving cycle includes: a loading time, a fifth waiting time, an unloading time, and a sixth waiting time;

[0143] (428) obtaining a third waiting time update value corresponding to the temperature difference between the current temperature and the sixth temperature;

[0144] (429) using the acquired third waiting time update value, performing an increment operation on the length of the fifth waiting time and the sixth waiting time, thereby extending the third driving cycle of the ejection material;

[0145] (430) Controlling the spring-loaded material unit in the cooling and heating generator of the cooling and heating device in each of the temperature regulating areas to continue to operate according to the extended third driving cycle, maintaining the temperature in the temperature regulating area at the sixth temperature, and keeping the temperature in the temperature regulating area constant.

[0146] In the above step (424), a temperature sensor connected to the control unit is provided in each temperature adjustment area.

[0147] The temperature sensors arranged in each temperature regulating area respectively collect the current temperature in each temperature regulating area, and send the collected current temperature of each temperature regulating area to this unit.

[0148] In the above step (425), the third temperature threshold is pre-stored in the control unit.

[0149] In the above step (427), the inverse of the third driving frequency is taken to obtain the third driving period of the ejection material.

[0150] In the above step (428), the control unit can first calculate the temperature difference between the current ambient temperature and the sixth temperature, and then query the third waiting time update value corresponding to the temperature difference between the current ambient temperature and the sixth temperature from the correspondence between the temperature difference and the waiting time update value.

[0151] Furthermore, each of the above temperature adjustment areas is provided with a different area identification. The control method of the cooling and heating equipment proposed in this embodiment may also include the following steps (43) to (47):

[0152] (43) obtaining area type change information, wherein the area type change information includes: an area identifier of the temperature adjustment area to be changed and the area type after the change;

[0153] (44) based on the region identifier, determining the temperature adjustment region that needs to be changed in region type as the target temperature adjustment region, and determining the seventh temperature of the target temperature adjustment region after the region type is changed according to the changed region type;

[0154] (45) obtaining the current eighth temperature of the target temperature adjustment area;

[0155] (46) determining a cooling and heating capacity for adjusting the temperature of the target temperature adjustment area to the seventh temperature based on a temperature difference between the seventh temperature and the eighth temperature;

[0156] (47) Based on the cooling and heating amount adjusted to the seventh temperature, the cooling and heating device installed in the target temperature adjustment area is controlled to adjust the temperature in the target temperature adjustment area, so that the temperature of the target temperature adjustment area is adjusted to the seventh temperature.

[0157] In the above step (44), the corresponding relationship between the zone type and the temperature is pre-set in the control unit.

[0158] Based on the correspondence between the zone type and the temperature, the control unit can determine the seventh temperature of the target temperature adjustment zone after the zone type is changed.

[0159] In the above step (45), the eighth temperature is the current temperature in the target temperature adjustment area acquired by the temperature sensor in the target temperature adjustment area, and the temperature sensor transmits the acquired eighth temperature to the control unit.

[0160] In the above step (46), the control unit determines the cooling and heating amount of the target temperature adjustment area to be adjusted to the seventh temperature based on the correspondence between the temperature difference and the cooling and heating amount.

[0161] The cooling and heating amount when the temperature of the target temperature adjustment area is adjusted to the seventh temperature is the cooling and heating amount when the temperature of the target temperature adjustment area is adjusted from the eighth temperature to the seventh temperature.

[0162] In the above step (47), based on the cooling and heating capacity adjusted to the above seventh temperature, the cooling and heating device installed in the above target temperature adjustment area is controlled to adjust the temperature in the above target temperature adjustment area. The specific process of adjusting the temperature of the above target temperature adjustment area to the above seventh temperature is similar to the specific process of the above step (42), which will not be repeated here.

[0163] Furthermore, the objects in each of the temperature regulating areas may be determined by image recognition, and then the temperature of each of the temperature regulating areas may be adjusted according to the temperature matching the object type of the objects stored in each of the temperature regulating areas.

[0164] In order to identify the objects in each of the temperature control areas, an image acquisition device may be installed in each of the temperature control areas; and the image acquisition device installed in each of the temperature control areas is connected to the control unit.

[0165] Specifically, the control method of the cooling and heating equipment proposed in this embodiment may also include the following steps (50) to (56):

[0166] (50) when an object is placed in each of the temperature control areas, obtaining a regional image captured by each of the image acquisition devices, wherein the regional image is used to display an image of the temperature control area where the image acquisition device is located; and the regional image carries a regional identifier of the displayed temperature control area;

[0167] (51) processing the regional image to determine image features of objects placed in the temperature adjustment area;

[0168] (52) inputting the image features of the object into a preset object classification model, processing the image features of the object by the object classification model, and determining the object type of the object placed in the temperature adjustment area;

[0169] (53) determining a ninth temperature matching the above-mentioned item type;

[0170] (54) obtaining a tenth temperature within the temperature adjustment area;

[0171] (55) determining, based on the temperature difference between the ninth temperature and the tenth temperature, a cooling and heating capacity of the temperature adjustment area where the object is placed to be adjusted to the ninth temperature;

[0172] (56) Based on the cooling and heating amount adjusted to the ninth temperature, the cooling and heating device installed in the temperature adjustment area is controlled to adjust the temperature in the target temperature adjustment area, so that the temperature in the temperature adjustment area is adjusted to the ninth temperature.

[0173] In the above step (51), the control unit processes the above regional image and determines the specific process of the image features of the objects placed in the above temperature adjustment area, which is prior art and will not be described in detail here.

[0174] In the above step (52), an item classification model is pre-set in the control unit.

[0175] The specific process in which the control unit processes the image features of the above-mentioned object through the above-mentioned object classification model to determine the object type of the above-mentioned object placed in the above-mentioned temperature adjustment area is prior art and will not be repeated here.

[0176] In the above step (53), the corresponding relationship between the item type and the temperature is pre-set in the control unit.

[0177] The control unit determines a ninth temperature matching the above-mentioned object type from the corresponding relationship between the object type and the temperature.

[0178] In the above step (54), the tenth temperature is the current temperature in the temperature adjustment area collected by the temperature sensor in the temperature adjustment area, and the temperature sensor transmits the collected tenth temperature to the control unit.

[0179] In the above step (55), based on the correspondence between the above temperature difference and the cooling and heating capacity, the control unit determines that the temperature of the temperature adjustment area where the above object is placed is adjusted to the cooling and heating capacity of the above ninth temperature.

[0180] The temperature of the temperature regulating area where the above-mentioned articles are placed is adjusted to the cooling and heating capacity of the ninth temperature, that is, the temperature of the temperature regulating area where the above-mentioned articles are placed is adjusted from the tenth temperature to the cooling and heating capacity of the ninth temperature.

[0181] In the above step (56), based on the cooling and heating capacity adjusted to the above ninth temperature, the cooling and heating device installed in the above temperature adjustment area is controlled to adjust the temperature in the above target temperature adjustment area. The specific process of adjusting the temperature of the above temperature adjustment area to the above ninth temperature is similar to the specific process of the above step (42), which will not be repeated here.

[0182] In summary, the present embodiment proposes a control method for a cooling and heating device. In a cooling and heating device having two cooling and heating devices, after determining a working cooling and heating device and a standby cooling and heating device, the working cooling and heating device is controlled to execute a first control instruction, and an environment requiring temperature adjustment is adjusted from a first temperature to a second temperature. During the operation of the working cooling and heating device, working parameters of the working cooling and heating device are collected. When it is determined according to the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment requiring temperature adjustment does not reach the second temperature, it is determined that the current working cooling and heating device has a fault and switches to the standby cooling and heating device to continue to execute the first control instruction. Compared with the method in the related art that the cooling and heating device can only be replaced when the cooling and heating device fails, two cooling and heating devices are set in the cooling and heating device. When one of the two cooling and heating devices fails, the other cooling and heating device is started to work. Without replacing the cooling and heating device, it can be ensured that the cooling and heating device can continue to work when it fails, thereby greatly improving the user experience.

[0183] Example 2

[0184] The control method for cooling and heating equipment proposed in this embodiment is executed by a control module.

[0185] See also Figure 2 The flowchart of another control method of a refrigeration and heating device is shown. This embodiment provides a control method of a refrigeration and heating device, which is used for a refrigeration and heating device using a spring card material. The refrigeration and heating device includes: a control module and a third refrigeration and heating device and a fourth refrigeration and heating device. The control module is connected to the third refrigeration and heating device and the fourth refrigeration and heating device respectively; the method includes the following specific steps:

[0186] Step 200, obtaining a second control instruction, wherein the second control instruction includes: a current third temperature of the environment requiring temperature adjustment and a fourth temperature after the temperature adjustment;

[0187] Step 202: based on the temperature range where the third temperature and the fourth temperature are located, a refrigeration and heating device with a higher refrigeration and heating power in the temperature range is selected from the third refrigeration and heating device and the fourth refrigeration and heating device as a working refrigeration and heating device, and a refrigeration and heating device with a lower refrigeration and heating power in the temperature range is selected as a standby refrigeration and heating device; wherein the refrigeration and heating generator in the third refrigeration and heating device and the refrigeration and heating generator in the fourth refrigeration and heating device respectively have a plurality of spring-loaded material units arranged in parallel; the spring-loaded material units are formed by spring-loaded materials; in different temperature ranges, the refrigeration and heating power of the spring-loaded material unit in the third refrigeration and heating device is different from the refrigeration and heating power of the spring-loaded material unit in the fourth refrigeration and heating device;

[0188] Step 204: Control the working cooling and heating device to execute the second control instruction to adjust the environment requiring temperature adjustment from the third temperature to the fourth temperature.

[0189] Specifically, the above step 204 includes the following specific steps (60) to (62):

[0190] (60) calculating a temperature difference between the third temperature and the fourth temperature, and determining a required cooling and heating amount according to the temperature difference;

[0191] (61) when the required cooling and heating capacity determined is less than or equal to the maximum cooling and heating capacity of the working cooling and heating device, controlling the working cooling and heating device to execute the second control instruction to adjust the environment requiring temperature adjustment from the third temperature to the fourth temperature;

[0192] (62) When the required cooling and heating capacity determined is greater than the maximum cooling and heating capacity of the working cooling and heating device, the working cooling and heating device and the standby cooling and heating device are controlled to operate simultaneously and execute the second control instruction together to adjust the environment requiring temperature adjustment from the third temperature to the fourth temperature.

[0193] In the above step (62), the above control of the above working cooling and heating device and the above standby cooling and heating device to work simultaneously and execute the above second control instruction together to adjust the environment requiring temperature adjustment from the above third temperature to the above fourth temperature includes the following specific steps (621) to step (624):

[0194] (621) collecting the current ambient temperature of the environment while controlling the working cooling and heating device and the standby cooling and heating device to operate simultaneously;

[0195] (622) determining whether a temperature difference between the current ambient temperature and the fourth temperature is greater than or equal to a second temperature threshold;

[0196] (623) If yes, return to and execute the step of collecting the current ambient temperature of the environment in the process of controlling the working cooling and heating device and the standby cooling and heating device to work simultaneously;

[0197] (624) If not, a stop operation instruction is sent to the standby cooling and heating device, and the working cooling and heating device is controlled to continue to operate, so as to adjust the environment from the current ambient temperature to the fourth temperature.

[0198] Specifically, in the above step 624, the above control of the above working cooling and heating device to continue working and adjusting the above environment from the above current environment temperature to the above fourth temperature includes the following steps (63) to (67):

[0199] (63) obtaining a second driving frequency of the spring card material corresponding to the cooling and heating amount;

[0200] (64) obtaining a driving cycle of the ejection material according to the second driving frequency of the ejection material, wherein a single driving cycle includes: a loading time, a first waiting time, an unloading time, and a second waiting time; and the length of the first waiting time is the same as the length of the second waiting time;

[0201] (65) obtaining a second waiting time update value corresponding to the temperature difference between the current ambient temperature and the fourth temperature;

[0202] (66) using the acquired second waiting time update value, performing an increment operation on the length of the first waiting time and the second waiting time, thereby extending the driving cycle of the ejection material;

[0203] (67) Controlling the spring-loaded material in the cooling and heating generator of the working cooling and heating device to continue to work according to the extended driving cycle of the spring-loaded material, and adjusting the environment from the current ambient temperature to the fourth temperature.

[0204] Specifically, in the above step 624, the above working cooling and heating device is controlled to continue to work, and the above environment is adjusted from the above current environment temperature to the above second temperature, and the following steps (68) to (73) are also included:

[0205] (68) Obtaining the mass of the above-mentioned spring card material corresponding to the above-mentioned cooling and heating capacity;

[0206] (69) determining a third number of spring material units operating in the cooling and heating generator of the currently operating cooling and heating device according to the obtained mass of the spring material;

[0207] (70) a fourth number of ejection material units corresponding to a temperature difference between the current ambient temperature and the fourth temperature;

[0208] (71) calculating a difference between the third quantity and the fourth quantity;

[0209] (72) when the quantity difference is a positive integer, controlling the spring material units of the quantity difference to stop working, so that the fourth quantity of spring material units in the cooling and heating generator of the working cooling and heating device continue to work, and adjusting the environment from the current environment temperature to the fourth temperature;

[0210] (73) When the above-mentioned quantity difference is a negative integer, the spring-loaded material units of the quantity difference are controlled to start working, so that the above-mentioned fourth quantity of spring-loaded material units in the cooling and heating generator of the above-mentioned working cooling and heating device continue to work, and adjust the above-mentioned environment from the above-mentioned current ambient temperature to the above-mentioned fourth temperature.

[0211] The specific process implemented by the control method for the cooling and heating equipment proposed in this embodiment is similar to the process described in steps (20) to (22), (23) to (26), (27) to (31), and (32) to (37) in the above step 104 in the control method for the cooling and heating equipment in Example 1, and will not be repeated here.

[0212] To summarize, this embodiment proposes a control method for a refrigeration and heating equipment. In a refrigeration and heating equipment with two refrigeration and heating devices, based on the temperature range in which the temperature to be adjusted is located, a refrigeration and heating device with better refrigeration and heating power in the temperature range in which the temperature to be adjusted is determined from the two refrigeration and heating devices as the working refrigeration and heating device, and then the working refrigeration and heating device is controlled to work, and the ambient temperature that needs temperature adjustment is adjusted, thereby improving the working efficiency of the refrigeration and heating equipment and reducing the energy consumption of the refrigeration and heating equipment.

[0213] Example 3

[0214] This embodiment provides a control method for cooling and heating equipment, and the execution subject is a processor.

[0215] See also Figure 3 A flowchart of another control method of a refrigeration and heating device is shown. This embodiment provides a control method of a refrigeration and heating device, which is used for a refrigeration and heating device using a spring card material. The refrigeration and heating device includes: a processor and at least two refrigeration and heating devices, the processor is respectively connected to each of the at least two refrigeration and heating devices; each of the refrigeration and heating devices is respectively installed in a different temperature adjustment area of ​​the environment, and the method includes the following specific steps:

[0216] Step 300: Obtain the required temperature adjustment instructions for each temperature adjustment area in different temperature adjustment areas, wherein the temperature adjustment instructions for each temperature adjustment area include: the current fifth temperature and the sixth temperature after temperature adjustment of each temperature adjustment area.

[0217] Step 302: Determine the cooling and heating capacity of each temperature adjustment area according to the current fifth temperature and the sixth temperature after temperature adjustment of each temperature adjustment area.

[0218] Step 304: Based on the determined cooling and heating capacity of each temperature adjustment area, control the cooling and heating devices installed in each temperature adjustment area to adjust the temperature of each of the temperature adjustment areas, thereby performing different temperature control on each of the temperature adjustment areas.

[0219] In the above step 304, based on the determined cooling and heating capacity of each temperature adjustment area, the cooling and heating devices installed in each temperature adjustment area are controlled to adjust the temperature of each temperature adjustment area, including the following specific steps (80) to (82):

[0220] (80) based on the determined cooling and heating capacity of each temperature control area, obtaining the operating time corresponding to the cooling and heating capacity of each temperature control area and the third driving frequency and mass of the ejection material in the cooling and heating device in each temperature control area;

[0221] (81) determining a fifth number of spring material units that need to be operated in the cooling and heating generator of the cooling and heating device in each of the temperature adjustment areas according to the obtained mass of the spring material;

[0222] (82) Controlling the fifth number of spring-loaded material units in the cooling and heating generators in each of the temperature adjustment areas to operate, thereby adjusting the environment from the fifth temperature to the sixth temperature.

[0223] After the above step (82), the above method further includes the following steps (83) to (89):

[0224] (83) collecting the current temperature in each of the temperature adjustment areas;

[0225] (84) determining whether a temperature difference between the current temperature and the sixth temperature of each of the temperature adjustment zones is greater than or equal to a third temperature threshold;

[0226] (85) If yes, return to and execute the above step of collecting the current temperature in each of the above temperature adjustment areas;

[0227] (86) If not, then obtaining a third driving cycle of the ejection material according to the third driving frequency of the ejection material, wherein the third driving cycle includes: a loading time, a fifth waiting time, an unloading time, and a sixth waiting time;

[0228] (87) obtaining a third waiting time update value corresponding to the temperature difference between the current temperature and the sixth temperature;

[0229] (88) using the acquired third waiting time update value, performing an increment operation on the length of the fifth waiting time and the sixth waiting time, thereby extending the third driving cycle of the ejection material;

[0230] (89) Controlling the spring-loaded material unit in the cooling and heating generator of the cooling and heating device in each of the temperature regulating areas to continue to operate according to the extended third driving cycle, maintaining the temperature in the temperature regulating area at the sixth temperature, and keeping the temperature in the temperature regulating area constant.

[0231] Furthermore, each of the above-mentioned temperature adjustment areas is provided with a different area identification.

[0232] Specifically, the control method of the cooling and heating equipment proposed in this embodiment further includes the following steps (90) to (94):

[0233] (90) Acquiring area type change information, wherein the area type change information includes: an area identifier of the temperature adjustment area to be changed and the area type after the change;

[0234] (91) determining, based on the region identifier, a temperature adjustment region that needs to be changed in region type as a target temperature adjustment region, and determining, based on the region type after the change, a seventh temperature of the target temperature adjustment region after the region type is changed;

[0235] (92) obtaining the current eighth temperature of the target temperature adjustment area;

[0236] (93) determining a cooling and heating capacity for adjusting the temperature of the target temperature adjustment area to the seventh temperature based on a temperature difference between the seventh temperature and the eighth temperature;

[0237] (94) Based on the cooling and heating amount adjusted to the seventh temperature, the cooling and heating device installed in the target temperature adjustment area is controlled to adjust the temperature in the target temperature adjustment area, so that the temperature of the target temperature adjustment area is adjusted to the seventh temperature.

[0238] Furthermore, an image acquisition device is installed in each of the temperature adjustment areas.

[0239] The image acquisition devices installed in the temperature adjustment areas are respectively connected to the processors.

[0240] Specifically, the control method of the cooling and heating equipment proposed in this embodiment also includes the following steps (a) to (g):

[0241] (a) in the case where an object is placed in each of the temperature control areas, obtaining a regional image captured by each of the image acquisition devices, wherein the regional image is used to display an image of the temperature control area where the image acquisition device is located; and the regional image carries a regional identifier of the displayed temperature control area;

[0242] (b) processing the image of the area to determine image features of objects placed in the temperature adjustment area;

[0243] (c) inputting the image features of the object into a preset object classification model, processing the image features of the object by the object classification model, and determining the object type of the object placed in the temperature adjustment area;

[0244] (d) determining a ninth temperature matching the above-mentioned article type;

[0245] (e) obtaining a tenth temperature within the temperature adjustment area;

[0246] (f) determining, based on the temperature difference between the ninth temperature and the tenth temperature, a cooling and heating capacity of the temperature adjustment area where the article is placed to be adjusted to the ninth temperature;

[0247] (g) Based on the cooling and heating amount adjusted to the ninth temperature, the cooling and heating device installed in the temperature adjustment area is controlled to adjust the temperature in the target temperature adjustment area, so as to adjust the temperature in the temperature adjustment area to the ninth temperature.

[0248] The specific process implemented by the control method of the cooling and heating equipment proposed in this embodiment is similar to the process described in steps (40) to (42), (421) to (423), (424) to (431), (43) to (47), and (50) to (56) in the control method of the cooling and heating equipment in Example 1, and will not be repeated here.

[0249] To summarize, the present embodiment proposes a control method for cooling and heating equipment, obtains the required temperature adjustment instructions for each temperature adjustment area in different temperature adjustment areas, determines the cooling and heating capacity of each temperature adjustment area according to the current fifth temperature and the sixth temperature after temperature adjustment of each temperature adjustment area, and based on the determined cooling and heating capacity of each temperature adjustment area, controls the cooling and heating devices installed in each temperature adjustment area to adjust the temperature of each temperature adjustment area, thereby performing zoned temperature control on the cooling and heating equipment, thereby more specifically controlling the temperature of each temperature adjustment area in the cooling and heating equipment, and improving the user experience of the cooling and heating equipment.

[0250] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A control method for a refrigeration and heating device, characterized in that: A refrigeration and heating device for using a spring card material, the refrigeration and heating device comprising: a control unit, a first refrigeration and heating device and a second refrigeration and heating device, the control unit being connected to the first refrigeration and heating device and the second refrigeration and heating device respectively; the control method comprising: The control unit acquires a first control instruction, wherein the first control instruction includes: a current first temperature of an environment requiring temperature adjustment and a second temperature after the temperature adjustment; Based on the temperature range in which the first temperature and the second temperature are located, selecting a refrigeration and heating device with a higher refrigeration and heating power in the temperature range from the first refrigeration and heating device and the second refrigeration and heating device as the working refrigeration and heating device, and selecting a refrigeration and heating device with a lower refrigeration and heating power in the temperature range as the standby refrigeration and heating device; Controlling the working cooling and heating device to execute the first control instruction, adjusting the environment requiring temperature adjustment from the first temperature to the second temperature, and collecting working parameters of the working cooling and heating device during the working process of the working cooling and heating device; When it is determined based on the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment requiring temperature regulation does not reach the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

2. The method according to claim 1, characterized in that Also includes: Power sensors respectively installed on the cooling and heating generators in the first cooling and heating device and the second cooling and heating device; the power sensors are connected to the control unit; The working parameters include: actual value of cooling and heating power; When it is determined according to the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment does not reach the second temperature, switching from the working cooling and heating device to the standby cooling and heating device, and controlling the standby cooling and heating device to continue to execute the first control instruction, includes: Acquiring the actual cooling and heating power of the cooling and heating generator in the working cooling and heating device collected by the power sensor; Obtaining a pre-calculated cooling and heating power calculation value of the working cooling and heating device; Calculating a first ratio of the actual cooling and heating power value to the calculated cooling and heating power value; When the calculated first ratio is less than a first ratio threshold, determining that the working cooling and heating device fails, and obtaining the ambient temperature of the environment; When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

3. The method according to claim 1, characterized in that Also includes: flow rate sensors respectively mounted on the cooling and heating generators in the first cooling and heating device and the second cooling and heating device; The flow rate sensor is connected to the control unit; The working parameters also include: actual value of medium material flow rate; When it is determined according to the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment does not reach the second temperature, switching from the working cooling and heating device to the standby cooling and heating device, and controlling the standby cooling and heating device to continue to execute the first control instruction, further comprising: Acquiring an actual value of the flow rate of the medium material in the cooling and heating generator of the working cooling and heating device collected by the flow rate sensor; Obtaining a pre-calculated value of the flow rate of the medium material of the working refrigeration and heating device; Calculating a second ratio of the actual value of the medium material flow rate to the calculated value of the medium material flow rate; When the calculated second ratio is less than a second ratio threshold, determining that the working cooling and heating device fails, and obtaining the ambient temperature of the environment; When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

4. The method according to claim 1, characterized in that: Also includes: Microphones installed in the first cooling and heating device and the second cooling and heating device respectively; The microphone is connected to the control unit; The working parameters also include: operating sound data; When it is determined according to the collected working parameters that the working cooling and heating device fails and the ambient temperature of the environment does not reach the second temperature, switching from the working cooling and heating device to the standby cooling and heating device, and controlling the standby cooling and heating device to continue to execute the first control instruction, further comprising: Acquiring the operating sound data of the working cooling and heating device collected by the microphone; Analyzing the acquired operation sound data to obtain the voiceprint features of the operation sound data; Classifying the voiceprint features of the operating sound data using a pre-trained fault sound analysis model to obtain a classification result of the voiceprint features of the operating sound data; When the classification result indicates that the voiceprint feature of the operating sound data belongs to a fault sound, determining that the operating cooling and heating device has a fault, and obtaining the ambient temperature of the environment; When the acquired ambient temperature is different from the second temperature, the working cooling and heating device is switched to the standby cooling and heating device, and the standby cooling and heating device is controlled to continue to execute the first control instruction.

5. The method according to claim 1, characterized in that The controlling the working cooling and heating device to execute the first control instruction to adjust the environment requiring temperature adjustment from the first temperature to the second temperature includes: Calculating a temperature difference between the first temperature and the second temperature, and determining a matching cooling and heating amount according to the temperature difference; When the determined required cooling and heating capacity is less than or equal to the maximum cooling and heating capacity of the working cooling and heating device, controlling the working cooling and heating device to execute the first control instruction to adjust the environment requiring temperature adjustment from the first temperature to the second temperature; When the determined required cooling and heating amount is greater than the maximum cooling and heating amount of the working cooling and heating device, the working cooling and heating device and the standby cooling and heating device are controlled to work simultaneously and execute the first control instruction together to adjust the environment requiring temperature adjustment from the first temperature to the second temperature.

6. The method according to claim 5, characterized in that The controlling the working cooling and heating device and the standby cooling and heating device to work simultaneously and execute the first control instruction together to adjust the environment requiring temperature adjustment from the first temperature to the second temperature includes: In the process of controlling the working cooling and heating device and the standby cooling and heating device to work simultaneously, collecting the current ambient temperature of the environment; Determine whether a temperature difference between the current ambient temperature and the second temperature is greater than or equal to a first temperature threshold; If yes, return to and execute the step of collecting the current ambient temperature of the environment during the process of controlling the working cooling and heating device and the standby cooling and heating device to work simultaneously; If not, a stop operation instruction is sent to the standby cooling and heating device, and the working cooling and heating device is controlled to continue working, so as to adjust the environment from the current ambient temperature to the second temperature.

7. The method according to claim 6, characterized in that The controlling the working cooling and heating device to continue working and adjusting the environment from the current environment temperature to the second temperature includes: Acquire a first driving frequency of the spring card material corresponding to the cooling and heating amount; According to the first driving frequency of the ejection material, a driving cycle of the ejection material is obtained, wherein a single driving cycle includes: a loading time, a first waiting time, an unloading time, and a second waiting time; Acquire a first waiting time update value corresponding to a temperature difference between the current ambient temperature and the second temperature; Using the acquired first waiting time update value, respectively increment the length of the first waiting time and the second waiting time, thereby extending the driving cycle of the ejection material; The spring material unit in the cooling and heating generator of the working cooling and heating device is controlled to continue to work according to the extended driving cycle of the spring material, so as to adjust the environment from the current ambient temperature to the second temperature.

8. The method according to claim 6, characterized in that The cooling and heating generator in the first cooling and heating device and the cooling and heating generator in the second cooling and heating device respectively have a plurality of spring-loaded material units arranged in series or in parallel; in different temperature ranges, the cooling and heating power of the spring-loaded material unit in the first cooling and heating device is different from the cooling and heating power of the spring-loaded material unit in the second cooling and heating device; The controlling the working cooling and heating device to continue working and adjusting the environment from the current environment temperature to the second temperature also includes: Obtaining the mass of the card material corresponding to the cooling and heating amount; Determine, according to the acquired mass of the ejection material, a first quantity of the ejection material units working in the cooling and heating generator of the currently working cooling and heating device; Obtaining a second number of ejection material units corresponding to a temperature difference between the current ambient temperature and the second temperature; Calculating a quantity difference between the first quantity and the second quantity; When the quantity difference is a positive number, the ejection material units of the quantity difference are controlled to stop working, so that the second number of ejection material units in the cooling and heating generator of the working cooling and heating device continue to work, and adjust the environment from the current ambient temperature to the second temperature; When the quantity difference is a negative number, the number of ejection material units controlled by the quantity difference starts to work, so that the second number of ejection material units in the cooling and heating generator of the working cooling and heating device continue to work, and adjust the environment from the current ambient temperature to the second temperature.

9. The method according to claim 1, characterized in that: In the case where the environment of the cooling and heating equipment is divided into two different temperature adjustment areas, the two cooling and heating devices can also be installed in the two different temperature adjustment areas respectively; The method further comprises: Obtaining the required temperature adjustment instructions for each temperature adjustment area in different temperature adjustment areas, wherein the temperature adjustment instructions for each temperature adjustment area include: the current fifth temperature and the sixth temperature after temperature adjustment for each temperature adjustment area; Determine the cooling and heating capacity of each temperature adjustment area according to the current fifth temperature of each temperature adjustment area and the sixth temperature after temperature adjustment; Based on the determined cooling and heating amounts of each temperature adjustment area, the cooling and heating devices installed in each temperature adjustment area are controlled to adjust the temperature of each temperature adjustment area, thereby performing different temperature control on each temperature adjustment area.

10. The method according to claim 9, characterized in that The step of controlling the cooling and heating devices installed in each temperature adjustment area to adjust the temperature of each temperature adjustment area based on the determined cooling and heating amount of each temperature adjustment area includes: Based on the determined cooling and heating capacity of each temperature adjustment area, the operating time corresponding to the cooling and heating capacity of each temperature adjustment area and the third driving frequency and mass of the ejection material in the cooling and heating device in each temperature adjustment area are obtained; Determining, according to the obtained mass of the ejection material, a fifth number of ejection material units that need to be operated in the cooling and heating generators of the cooling and heating devices in each of the temperature adjustment areas; The fifth number of spring material units in the cooling and heating generators in each of the temperature adjustment areas are controlled to operate to adjust the environment from the fifth temperature to the sixth temperature.