Construction settlement amount determination method and device, medium and equipment

By determining the first project volume in construction settlement and combining historical data, and using specific calculation formulas to determine the settlement amount, the problem of inadequate settlement amount in the existing method is solved, and the rapid and accurate settlement amount determination is achieved.

CN119784515AInactive Publication Date: 2025-04-08HUADIAN JINSHAJIANG UPSTREAM HYDROPOWER DEV CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411588854.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-04-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing method of determining the amount of construction settlement is not reasonable enough to measure the actual completed project volume quickly and accurately.

Method used

The first project volume is determined based on the construction drawings completed in this period of the target project, and the second project volume of the historical settled construction drawings, the total construction drawings, the total construction contract amount and the historical settlement amount are determined by using a specific calculation formula.

Benefits of technology

The construction settlement amount is determined reasonably and accurately, and the settlement amount in the existing methods is solved, and the actual completed project volume can be measured quickly and accurately.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119784515A_ABST
    Figure CN119784515A_ABST
Patent Text Reader

Abstract

The invention discloses a construction settlement amount determination method and device, a medium and equipment, and the method comprises the steps: determining a to-be-settled first project amount at present based on a construction drawing completed by a target project at present; obtaining a contract total amount of a construction contract corresponding to the target project, a total project amount of a total construction drawing corresponding to the target project, a second project amount of a historical settled construction drawing and a historical settlement amount; and based on the first project amount, the total contract amount, the total project amount, the second project amount and a historical settlement amount, determining a current settlement amount. The settlement amount can be reasonably and accurately determined, and a foundation is laid for subsequent accurate construction settlement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information processing technology, and in particular to a method, device, medium and equipment for determining a construction settlement amount. Background Art

[0002] In engineering construction projects, for the general contract (Engineering Procurement Construction, EPC), the contract bill of quantities items are formed in the bid of the winning bidder, and there are certain differences with the actual construction drawing budget bill of quantities. The costs of the same bill of quantities and the details under them may also be different. Therefore, when settling the progress payment of the contract according to the EPC contract bill of quantities, it is usually necessary to first determine the bill of quantities that are consistent between the two, and determine the actual completion amount corresponding to the actual engineering quantity based on the consistent bill of quantities, so as to determine the total construction drawing settlement amount based on the actual completion amount, the total amount of the EPC contract, the settled amount of the EPC contract, the total amount of the construction drawings, and the cumulative settlement amount of the construction drawings.

[0003] However, the above settlement amount is not reasonable enough to quickly and accurately measure the actual completed project volume. Summary of the invention

[0004] In view of this, the present invention provides a method, device, medium and equipment for determining the construction settlement amount, the main purpose of which is to solve the problem that the current settlement amount is not determined reasonably and the actual completed project volume cannot be quickly and accurately measured.

[0005] To solve the above problems, the present application provides a method for determining the construction settlement amount, including:

[0006] Based on the construction drawings of the target project completed in this period, determine the first project quantity to be settled;

[0007] Obtain the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount;

[0008] The current period settlement amount is determined based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

[0009] Optionally, determining the first engineering quantity to be settled based on the construction drawings of the target project completed in this period specifically includes:

[0010] Receive a settlement request initiated by a target user for the completed construction drawings of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawings of this period;

[0011] In response to the verification operation for the completed construction drawings and the engineering quantities applied for settlement in the current period, a verification result is obtained;

[0012] When the signature verification result is passed, the settlement application engineering quantity is determined as the first engineering quantity.

[0013] Optionally, before obtaining the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount, the method further includes:

[0014] In advance, in response to a contract creation operation for the target project, the construction contract is generated; the construction contract includes a first project item list; the first project item list includes a number of project items and a project item unit price corresponding to each project item;

[0015] The obtaining of the total contract amount of the construction contract corresponding to the target project specifically includes:

[0016] Based on the first engineering item list in the construction contract, obtaining each engineering item and the engineering item unit price corresponding to each engineering item;

[0017] The total contract amount is calculated based on each engineering item and the unit price corresponding to each engineering item.

[0018] Optionally, before obtaining the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount, the method further includes:

[0019] In advance, in response to a construction drawing creation operation for the target project, a general construction drawing corresponding to the target project is generated; the general construction drawing includes a second project item list;

[0020] The obtaining of the total engineering quantity of the total construction drawing corresponding to the target project specifically includes:

[0021] The total engineering quantity is determined based on the second engineering item list in the general construction drawing.

[0022] Optionally, determining the current period settlement amount based on the first engineering quantity, the total contract amount, the total engineering quantity, the second engineering quantity and the historical settlement amount specifically includes:

[0023] Determine the completion progress ratio of the currently completed engineering quantity based on the first engineering quantity, the second engineering quantity and the total engineering quantity;

[0024] Based on the completion progress ratio and the total contract amount, determining a total settlement amount corresponding to the completion progress ratio;

[0025] The current period settlement amount is determined based on the total settlement amount and the historical settlement amounts.

[0026] Optionally, before determining the current period settlement amount based on the first engineering quantity, the total contract amount, the total engineering quantity, the second engineering quantity and the historical settlement amount, the method further includes:

[0027] Determine the budget amount of the historical completed construction drawings based on the bill of quantities of the historical completed construction drawings;

[0028] Based on the budget amount and the total contract amount, determine whether a predetermined settlement condition is met, so as to determine the current period settlement amount when the predetermined settlement condition is met.

[0029] In order to solve the above problems, the present application provides a construction settlement amount determination device, comprising:

[0030] A project quantity determination module is used to determine the first project quantity to be settled based on the construction drawings of the target project completed in this period;

[0031] An acquisition module is used to acquire the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount;

[0032] The amount determination module is used to determine the current period settlement amount based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

[0033] Optionally, the engineering quantity determination module is specifically used for:

[0034] Receive a settlement request initiated by a target user for the completed construction drawings of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawings of this period;

[0035] In response to the verification operation for the completed construction drawings and the engineering quantities applied for settlement in the current period, a verification result is obtained;

[0036] When the signature verification result is passed, the settlement application engineering quantity is determined as the first engineering quantity.

[0037] In order to solve the above problems, the present application provides a storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of any of the above-mentioned methods for determining the construction settlement amount are implemented.

[0038] To solve the above problems, the present application provides an electronic device, comprising at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of any of the above-mentioned methods for determining the construction settlement amount when executing the computer program on the memory.

[0039] The method, device, medium and equipment for determining the construction settlement amount in this application can reasonably and accurately determine the settlement amount for this period by determining the first project quantity based on the completed construction drawings of this period, and combining the second project quantity of the historically settled construction drawings, the total project quantity of the total construction drawings, the total amount of the construction contract and the historical settlement amounts.

[0040] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0042] Figure 1 This is a flow chart of a method for determining a construction settlement amount according to an embodiment of the present application;

[0043] Figure 2 This is a structural block diagram of a device for determining a construction settlement amount according to another embodiment of the present application;

[0044] Figure 3 This is a structural block diagram of an electronic device according to another embodiment of the present application. DETAILED DESCRIPTION

[0045] Various aspects and features of the present application are described herein with reference to the accompanying drawings.

[0046] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of an embodiment. Other modifications within the scope and spirit of the present application will occur to those skilled in the art.

[0047] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present application and, together with the general description of the present application given above and the detailed description of the embodiments given below, serve to explain the principles of the present application.

[0048] These and other characteristics of the present application will become apparent from the following description of a preferred form of embodiment given as a non-limiting example with reference to the accompanying drawings.

[0049] It should also be understood that although the present application has been described with reference to some specific examples, those skilled in the art will be able to readily implement many other equivalent forms of the present application.

[0050] The above and other aspects, features and advantages of the present application will become more apparent in view of the following detailed description when taken in conjunction with the accompanying drawings.

[0051] Specific embodiments of the present application are described hereinafter with reference to the accompanying drawings; however, it should be understood that the embodiments applied for are merely examples of the present application, which may be implemented in a variety of ways. Well-known and / or repeated functions and structures are not described in detail to avoid unnecessary or redundant details that obscure the present application. Therefore, the specific structural and functional details applied for herein are not intended to be limiting, but merely serve as a basis and representative basis for the claims to teach those skilled in the art to use the present application in a variety of ways with substantially any suitable detailed structure.

[0052] This specification may use the phrases "in one embodiment," "in another embodiment," "in yet another embodiment," or "in other embodiments," all of which may refer to one or more of the same or different embodiments according to the present application.

[0053] When settling the progress payment of the contract according to the EPC contract bill of quantities, it is usually necessary to first determine the consistent bill of quantities between the two, and determine the actual completion amount Q corresponding to the actual engineering quantity based on the consistent bill of quantities. Then, according to the actual completion amount Q, the total amount of the EPC contract As, the settled amount of the EPC contract Aw, the total amount of the construction drawings, and the cumulative settlement amount of the construction drawings, the total settlement amount P of the construction drawings is determined. The calculation formula used is: settlement amount P = (As-Aw) × (Q / (Bs-Bw)). For the EPC general contract for photovoltaic power generation projects, the bill of quantities of the contract is formed on the basis of the bid price of the winning bidder, which is different from the actual budget bill of quantities of the construction drawings. The costs of the same bill of quantities and the details under them may also be different. The existing methods are mostly used in the construction of large-scale hydropower projects, but photovoltaic power generation projects have the characteristics of short construction period and rapid commissioning. When settling the progress payment of the contract according to the bill of quantities of the EPC contract, it is impossible to quickly and accurately measure the actual completed engineering quantity. Therefore, the present application embodiment provides a method for determining the construction settlement amount, which can be specifically applied to settlement devices such as terminals and servers. Figure 1 As shown, the method in this embodiment includes the following steps:

[0054] Step S101, determining the first engineering quantity to be settled based on the construction drawings of the target project completed in this period;

[0055] In the specific implementation process of this step, the construction contractor may initiate a settlement request based on the construction drawings completed in this period, and the settlement request at least includes the construction drawings completed in this period and the settlement application quantity corresponding to the construction drawings completed in this period. The acceptance party may conduct construction acceptance / construction quality inspection on the actual construction situation based on the construction drawings completed in this period in the settlement request, and verify the settlement application quantity based on the construction drawings completed in this period, and determine the settlement application quantity as the first quantity if the acceptance passes / construction quality inspection passes and the settlement application quantity verification passes.

[0056] Step S102, obtaining the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity Y of the historically settled construction drawings, and the historical settlement amount;

[0057] During the specific implementation of this step, the construction contracts corresponding to each project and the general construction drawings corresponding to each project can be created in advance and stored in the target storage area. Among them, the construction contract contains a first list of project items; the first list of project items contains several project items and the unit price of the project items corresponding to each project item. The general construction contract contains a second list of project items. And the target storage area also stores the historical settlement amounts corresponding to each project, and the second project quantity of the historical settled construction drawings. In this embodiment, the construction contract can specifically be an EPC contract. That is, the bill of quantities / first list of project items of the EPC contract can be established in the system / settlement device. The bottom item of the first list of project items of the EPC contract is the contract payment item, that is, the first list of project items contains several project items and the unit price of the project items corresponding to each project item.

[0058] Therefore, after determining the first project quantity to be settled of the target project, the first project item list of the construction contract corresponding to the target project can be obtained from the target storage area according to the project identification of the target project, and then the total contract amount can be determined according to the first project item list, and the second project item list of the total construction drawing corresponding to the target project can be obtained from the target storage area according to the project identification, and then the total project quantity corresponding to the construction drawing can be determined according to the second project item list. At the same time, the second project quantity and the historical settlement amount of the historical settled construction drawings corresponding to the target project can also be obtained from the target storage area.

[0059] Step S103, determining the current period settlement amount based on the first project amount, the total contract amount, the total project amount, the second project amount and the historical settlement amount.

[0060] During the specific implementation of this step, the completion progress ratio of the currently completed construction drawing project volume can be determined based on the first project volume X, the second project volume Y and the total project volume Z; and then the current period settlement amount can be determined based on the completion progress ratio, the total contract amount Q*K, and the historical settlement amount U.

[0061] The method for determining the construction settlement amount in this embodiment can reasonably and accurately determine the settlement amount for this period by determining the first project quantity based on the completed construction drawings of this period, and combining the second project quantity of the historically settled construction drawings, the total project quantity of the total construction drawings, the total amount of the construction contract and the historical settlement amounts.

[0062] Based on the above embodiment, another embodiment of the present application provides a method for determining a construction settlement amount, which specifically includes the following steps:

[0063] Step S201, in advance in response to the contract creation operation for the target project, generating the construction contract; the construction contract includes a first project item list; the first project item list includes a number of project items and a project item unit price corresponding to each project item;

[0064] In the specific implementation process of this step, the EPC contract bill of quantities can be created in advance, that is, the first engineering item list can be created. The bottom item of the contract bill of quantities is the contract payment item. By creating the first engineering item list, it is convenient to determine the total contract amount based on the first engineering item list later.

[0065] Step S202, in advance responding to the construction drawing creation operation of the target project, generating a general construction drawing corresponding to the target project; the general construction drawing includes a second project item list;

[0066] In this step, the construction drawings are usually based on the sub-items of the project, and based on this, the general construction drawings and the bill of quantities / second project item list corresponding to the general construction drawings can be established. Specifically, the EPC can be associated with the construction drawing budget at the sub-item level, that is, each project item in the EPC contract corresponds to a sub-construction drawing, and the sub-construction drawing also corresponds to a sub-project item list. Thus, the sub-construction drawings can be merged to obtain the general construction drawing corresponding to the EPC contract. At the same time, the sub-project item lists can be merged to obtain the second project item list corresponding to the general construction drawing. In fact, the second project item list can be understood as an extension of the sub-item engineering cost items in the EPC contract list.

[0067] In this embodiment, after the EPC contract and the general construction drawing are created and obtained, the EPC contract, the general construction drawing and the project identification can be associated and stored in the target storage area, and when each / period settlement is performed, the second project quantity and the historical settlement amount of the historical settled construction drawings will also be associated and stored.

[0068] Step S203, receiving a settlement request initiated by a target user for the completed construction drawings of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawings of this period;

[0069] In this step, the construction contractor can initiate a settlement request to the settlement device based on the construction drawings completed in this period. The settlement request at least includes the construction drawings completed in this period and the settlement application quantity corresponding to the construction drawings completed in this period. In the specific implementation process, the contractor can use the mobile terminal to fill in the inspection and evaluation materials (including construction drawings, settlement application quantity), and upload the construction location information, electronic signature or identity verification, pile number, elevation and other information, so as to initiate a settlement request based on the above information.

[0070] Step S204, in response to the verification operation for the completed construction drawings and the settlement application engineering quantities of the current period, obtaining the verification result;

[0071] In the specific implementation of this step, the established random approval mechanism can be used to send the settlement request to the initial inspector through the mobile terminal. After the initial inspector passes the on-site construction quality inspection and the settlement application engineering quantity inspection, if the audit is correct, he / she will feedback the initial inspection verification information to the settlement device by uploading a handwritten signature and a construction site photo. The settlement device forwards the settlement request to the re-inspector based on the initial inspection verification information. After the re-inspector passes the on-site construction quality inspection and the settlement application engineering quantity inspection, if the audit is correct, he / she will feedback the re-inspection verification information to the settlement device by uploading a handwritten signature and a construction site photo. The settlement device forwards the settlement request to the final inspector based on the re-inspection verification information. After the final inspector passes the on-site construction quality inspection and the settlement application engineering quantity inspection, if the audit is correct, he / she will feedback the final inspection verification information to the settlement device by uploading a handwritten signature and a construction site photo. The settlement device forwards the settlement request to the final inspector, the owner project group auditor, based on the final inspection verification information. After the owner project group passes the audit, the verification result is obtained, and the settlement device issues a measurement certification form to obtain the verification result. The measurement certificate issued includes the settlement application quantity, which is the first quantity expected to be settled.

[0072] In this embodiment, in the initial inspection, re-inspection, final inspection and owner project team review, if any of the signature verification links fails, the settlement device will feedback the signature verification failure information to the contractor for prompting.

[0073] Step S205, when the signature verification result is passed, determining the settlement application engineering quantity as the first engineering quantity step;

[0074] In this step, after the verification is passed, the settlement application quantity, that is, the first quantity obtained, can be obtained from the issued measurement certificate.

[0075] Step S206, based on the first engineering item list in the construction contract, obtain each engineering item and the corresponding engineering item unit price of each engineering item; based on each engineering item and the corresponding engineering item unit price of each engineering item, calculate the total contract amount; based on the second engineering item list in the general construction drawing, determine the total engineering quantity; and simultaneously obtain the second engineering quantity of the historical settled construction drawing and the historical settlement amount;

[0076] In this step, the settlement request may carry the project identification of the target project, so that if the verification is passed, the settlement device can obtain the EPC contract, general construction drawing, the second project quantity of the historical settled construction drawing and the historical settlement amount corresponding to the target project from the target storage area based on the project identification in the settlement request; and then the total contract amount of the construction contract can be calculated based on each project item in the first project item list in the EPC contract and the project item unit price corresponding to each project item. And the total project quantity is determined based on the second project item list in the general construction drawing.

[0077] Step S207, based on the first project quantity, the second project quantity and the total project quantity, determine the completion progress ratio of the currently completed project quantity; based on the completion progress ratio and the total contract amount, determine the total settlement amount corresponding to the completion progress ratio; based on the total settlement amount and the historical settlement amount, determine the current period settlement amount.

[0078] During the specific implementation of this step, the following formula can be used to calculate the current period settlement amount P.

[0079] W=Q*K

[0080]

[0081] Wherein, X represents the first project quantity, i.e., the first project quantity to be settled; Y represents the second project quantity, i.e., the second project quantity of the historically settled construction drawings; W=Q*K represents the total EPC contract amount, where Q represents the number of project items in the EPC contract, and K represents the unit price of each project item.

[0082] In this embodiment, the above calculation formula can be used to calculate the current settlement amount of the EPC contract using the settlement method based on the progress. In addition, by calculating the ratio of the settlement amount to the total construction amount of the construction drawing, the completion progress ratio is determined. Then multiply it by the total contract price W, and finally subtract the settled amount U. The calculation formula is simpler and more accurate. By adopting the settlement amount determination method in this application, even if the contract is changed, the calculation result can be more accurate because the result of the construction drawing ratio and the contract amount is calculated first, and the settled amount is unchanged. In addition, in the specific implementation process of this embodiment, while calculating the settlement amount, the construction completion progress ratio is determined, so the construction completion progress ratio can be displayed to provide a prompt for the progress of the construction.

[0083] In the specific implementation process of this embodiment, before determining the current settlement amount, the budget amount of the historical completed construction drawings can also be determined based on the bill of quantities of the historical completed construction drawings; based on the budget amount and the total contract amount, determine whether the predetermined settlement conditions are met, so that when the predetermined settlement conditions are met, the current settlement amount is determined. That is, when the budget amount is less than or equal to the total contract amount, it is determined that the predetermined settlement conditions are met; conversely, when the budget amount is greater than the total contract amount, it is determined that the predetermined settlement conditions are not met. In this embodiment, when determining the budget amount, specifically, according to the list of engineering items / bill of quantities of the historical completed construction drawings after the inspection batch is accepted, the engineering quantity and budget unit price of the corresponding project are determined, and the budget amount of the historical completed construction drawings is calculated based on the engineering quantity and budget unit price.

[0084] In this embodiment, a construction drawing is created to determine the first list item corresponding to the construction drawing, and a construction contract is created to determine the second list item corresponding to the construction contract. This facilitates the calculation of the first quantity corresponding to the first list item and the second quantity corresponding to the second list item, thereby achieving flexible calculation of the first quantity and the second quantity.

[0085] Another embodiment of the present application provides a construction settlement amount determination device, such as Figure 2 As shown, including:

[0086] A project quantity determination module is used to determine the first project quantity to be settled based on the construction drawings of the target project completed in this period;

[0087] An acquisition module is used to acquire the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount;

[0088] The amount determination module is used to determine the current period settlement amount based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

[0089] During the specific implementation of this embodiment, the engineering quantity determination module is specifically used to: receive a settlement request initiated by a target user for a completed construction drawing of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawing of this period; in response to the verification operation for the completed construction drawing of this period and the settlement application engineering quantity, obtain a verification result; if the verification result is passed, determine the settlement application engineering quantity as the first engineering quantity.

[0090] In the specific implementation of this embodiment, the construction settlement amount determination device also includes a first creation module, and the first creation module is used to: before obtaining the total contract amount of the construction contract corresponding to the target project, the total project quantity of the total construction drawing corresponding to the target project, the second project quantity of the historically settled construction drawing, and the historical settlement amount, in advance respond to the contract creation operation of the target project to generate the construction contract; the construction contract contains a first project item list; the first project item list contains a number of project items and the project item unit price corresponding to each project item; the acquisition module is specifically used to: based on the first project item list in the construction contract, obtain each project item and the project item unit price corresponding to each project item; based on each project item and the project item unit price corresponding to each project item, calculate and obtain the total contract amount.

[0091] The construction settlement amount determination device also includes a second creation module, which is used to: before obtaining the total contract amount of the construction contract corresponding to the target project, the total project quantity of the total construction drawing corresponding to the target project, the second project quantity of the historically settled construction drawings, and the historical settlement amount, in advance respond to the construction drawing creation operation of the target project, and generate a total construction drawing corresponding to the target project; the total construction drawing includes a second project item list; the acquisition module is specifically used to: determine the total project quantity based on the second project item list in the total construction drawing.

[0092] During the specific implementation of this embodiment, the amount determination module is specifically used to: determine the completion progress ratio of the currently completed project volume based on the first project volume, the second project volume and the total project volume; determine the total settlement amount corresponding to the completion progress ratio based on the completion progress ratio and the total contract amount; determine the current period settlement amount based on the total settlement amount and the historical settlement amount.

[0093] In the specific implementation process of this embodiment, the construction settlement amount determination device also includes: a settlement condition determination module, and the settlement condition determination module is used to: determine the budget amount of the historical completed construction drawings based on the bill of quantities of the historical completed construction drawings; based on the budget amount and the total contract amount, determine whether the predetermined settlement conditions are met, so as to determine the current period settlement amount when the predetermined settlement conditions are met.

[0094] The construction settlement amount determination device in this embodiment can reasonably and accurately determine the current period's settlement amount by determining the first project quantity based on the completed construction drawings of this period, and combining the second project quantity of the historically settled construction drawings, the total project quantity of the total construction drawings, the total construction contract amount and the historical settlement amounts.

[0095] Another embodiment of the present application provides a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a processor, the following method steps are implemented:

[0096] Step 1: Based on the construction drawings of the target project completed in this period, determine the first project quantity to be settled;

[0097] Step 2: Obtain the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount;

[0098] Step 3: Determine the current period settlement amount based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

[0099] The specific implementation process of the above method steps can be found in the embodiments of any of the above-mentioned methods for determining the construction settlement amount, and this embodiment will not be repeated here.

[0100] The storage medium in this application can reasonably and accurately determine the settlement amount for this period by determining the first project quantity based on the completed construction drawings for this period, and combining the second project quantity of the historically settled construction drawings, the total project quantity of the total construction drawings, the total amount of the construction contract, and the historical settlement amount.

[0101] Another embodiment of the present application provides an electronic device, such as Figure 3 As shown, at least a memory 1 and a processor 2 are included, the memory 1 stores a computer program, and the processor 2 implements the following method steps when executing the computer program on the memory 1:

[0102] Step 1: Based on the construction drawings of the target project completed in this period, determine the first project quantity to be settled;

[0103] Step 2: Obtain the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount;

[0104] Step 3: Determine the current period settlement amount based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

[0105] The specific implementation process of the above method steps can be found in the embodiments of any of the above-mentioned methods for determining the construction settlement amount, and this embodiment will not be repeated here.

[0106] The storage medium in this application can reasonably and accurately determine the settlement amount for this period by determining the first project quantity based on the completed construction drawings for this period, and combining the second project quantity of the historically settled construction drawings, the total project quantity of the total construction drawings, the total amount of the construction contract, and the historical settlement amount.

[0107] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.

Claims

1. A method for determining a construction settlement amount, characterized in that: include: Based on the construction drawings of the target project completed in this period, determine the first project quantity to be settled; Obtain the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount; The current period settlement amount is determined based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

2. The method according to claim 1, characterized in that The first engineering quantity to be settled is determined based on the construction drawings of the target project completed in this period, specifically including: Receive a settlement request initiated by a target user for the completed construction drawings of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawings of this period; In response to the verification operation for the completed construction drawings and the engineering quantities applied for settlement in the current period, a verification result is obtained; When the signature verification result is passed, the settlement application engineering quantity is determined as the first engineering quantity.

3. The method according to claim 1, characterized in that Before obtaining the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawing, and the historical settlement amount, the method further includes: In advance, in response to a contract creation operation for the target project, the construction contract is generated; the construction contract includes a first project item list; the first project item list includes a number of project items and a project item unit price corresponding to each project item; The obtaining of the total contract amount of the construction contract corresponding to the target project specifically includes: Based on the first engineering item list in the construction contract, obtaining each engineering item and the engineering item unit price corresponding to each engineering item; The total contract amount is calculated based on each engineering item and the unit price corresponding to each engineering item.

4. The method according to claim 1, characterized in that Before obtaining the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawing, and the historical settlement amount, the method further includes: In advance, in response to a construction drawing creation operation for the target project, a general construction drawing corresponding to the target project is generated; the general construction drawing includes a second project item list; The obtaining of the total engineering quantity of the total construction drawing corresponding to the target project specifically includes: The total engineering quantity is determined based on the second engineering item list in the general construction drawing.

5. The method according to claim 1, characterized in that The determining of the current period settlement amount based on the first engineering quantity, the total contract amount, the total engineering quantity, the second engineering quantity and the historical settlement amount specifically includes: Determine the completion progress ratio of the currently completed engineering quantity based on the first engineering quantity, the second engineering quantity and the total engineering quantity; Based on the completion progress ratio and the total contract amount, determining a total settlement amount corresponding to the completion progress ratio; The current period settlement amount is determined based on the total settlement amount and the historical settlement amounts.

6. The method according to any one of claims 1 to 5, characterized in that: Before determining the current period settlement amount based on the first engineering quantity, the total contract amount, the total engineering quantity, the second engineering quantity and the historical settlement amount, the method further includes: Determine the budget amount of the historical completed construction drawings based on the bill of quantities of the historical completed construction drawings; Based on the budget amount and the total contract amount, determine whether a predetermined settlement condition is met, so as to determine the current period settlement amount when the predetermined settlement condition is met.

7. A device for determining a construction settlement amount, characterized in that: include: A project quantity determination module is used to determine the first project quantity to be settled based on the construction drawings of the target project completed in this period; An acquisition module is used to acquire the total contract amount of the construction contract corresponding to the target project, the total engineering quantity of the total construction drawing corresponding to the target project, the second engineering quantity of the historically settled construction drawings, and the historical settlement amount; The amount determination module is used to determine the current period settlement amount based on the first project quantity, the total contract amount, the total project quantity, the second project quantity and the historical settlement amount.

8. The device according to claim 7, characterized in that The engineering quantity determination module is specifically used for: Receive a settlement request initiated by a target user for the completed construction drawings of this period, wherein the settlement request includes the settlement application engineering quantity corresponding to the completed construction drawings of this period; In response to the verification operation for the completed construction drawings and the engineering quantities applied for settlement in the current period, a verification result is obtained; When the signature verification result is passed, the settlement application engineering quantity is determined as the first engineering quantity.

9. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for determining the construction settlement amount described in any one of claims 1 to 6 are implemented.

10. An electronic device, characterized in that: The method at least comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for determining the construction settlement amount as described in any one of claims 1 to 6 when executing the computer program on the memory.

Citation Information

Patent Citations

  • Engineering amount processing method, system and equipment and readable storage medium

    CN114792232A

  • Automatic accreditation method, device and equipment for bank institution decoration spreading and selling and medium

    CN115082177A

  • Engineering construction monitoring method and device, computer equipment and storage medium

    CN118644037A

  • Procurement Brokerage System

    KR102509885B1