Ceramic membrane bioreactor

By introducing adjustment and material replacement mechanisms into the ceramic membrane bioreactor, the problems of membrane blockage and biofilm formation during sewage treatment are solved, and more efficient sewage treatment and more convenient operation are achieved.

CN119797680AActive Publication Date: 2025-04-11BEIJING CLP JIAMEI ENVIRONMENTAL PROTECTION TECH
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510163824.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2025-04-11
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

Ceramic membrane bioreactors are easily blocked due to accumulation of impurities during the wastewater treatment process, and microorganisms grow on the surface or inside of the membrane to form biofilms, resulting in a decrease in membrane flux and affecting the performance of the reactor.

Method used

A ceramic membrane bioreactor is designed, including a regulating mechanism and a material exchange mechanism. Through the regulating mechanism, the reaction mechanism can be lifted and separated, the inner and outer walls of the load room can be cleaned, and the scraping and suction of sludge scale can be promoted; the material exchange mechanism can be automatically replaced, which improves the operation convenience.

Benefits of technology

Effectively remove impurities in membrane pores, prevent clogging, improve membrane flux, extend the service life of the reactor, and improve processing efficiency and operation convenience through automatic replacement of fillers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119797680A_ABST
    Figure CN119797680A_ABST
Patent Text Reader

Abstract

The invention provides a ceramic membrane bioreactor which comprises a base, a reaction tank body is fixedly mounted at the top of the base, a filtering mechanism is fixedly mounted on the base on one side of the reaction tank body, and an aeration chamber, a settling chamber, a reaction chamber and a storage chamber are respectively arranged in the reaction tank body. An adjusting mechanism and a material changing mechanism are respectively assembled on the support frame, a reaction mechanism is hoisted at the bottom of the adjusting mechanism, a load room is fixedly mounted in the reaction chamber below the reaction mechanism, the bottom end of the material changing mechanism extends into the load room, and a back-flushing assembly is assembled at the top of the reaction chamber. The adjusting mechanism and the reaction mechanism are matched with each other, the inner wall and the outer wall of the load room are cleaned during lifting, dirt on the load room is removed, the back flushing assembly is matched for butt joint flushing during separation, the reaction mechanism in the separated state can be cleaned more thoroughly, and the good dredging effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention application with the application date of September 3, 2024, the Chinese application number of 2024112248656, and the invention name of "A kind of anti-blocking self-cleaning sewage ceramic membrane bioreactor". Technical Field

[0002] The invention relates to the technical field of sewage treatment, and in particular to a ceramic membrane bioreactor. Background Art

[0003] The sewage treatment process usually includes a series of physical, chemical and biological reactions, the purpose of which is to remove pollutants from the water and make it reach the standard for safe discharge or reuse. The main one is biological treatment, which uses microorganisms to decompose organic matter in sewage, which is usually achieved through the activated sludge method or biofilm method. In the activated sludge method, microorganisms are multiplied in large numbers in the aeration tank, consuming organic matter and converting it into carbon dioxide, water and cellular substances. In the biofilm method, microorganisms are cultivated on the filler to form a biofilm. When the sewage flows through, the microorganisms on the biofilm adsorb and decompose the organic matter.

[0004] Among them, ceramic membrane wastewater treatment is an advanced wastewater treatment method that combines biological treatment and membrane separation technology. Combined with biological treatment technology, such as membrane bioreactor (MBR), ceramic membrane can provide an efficient solid-liquid separation environment, increase the biomass in the bioreactor, and improve wastewater treatment efficiency; however, as the wastewater is filtered, the ceramic membrane may capture and accumulate suspended particles, organic matter, inorganic salts and other impurities. If these substances are not cleaned in time, they may clog the membrane pores, and when treating liquids containing microorganisms, microorganisms may grow on the surface or inside the membrane to form a biofilm, resulting in a decrease in membrane flux and a decrease in the operating performance of the reactor;

[0005] Therefore, the present application proposes a ceramic membrane bioreactor. Summary of the invention

[0006] In view of the deficiencies of the prior art, the present invention provides a ceramic membrane bioreactor to solve the problems mentioned in the background technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A ceramic membrane bioreactor comprises a base, a reaction tank body is fixedly mounted on the top of the base, a filtering mechanism is fixedly mounted on the base on one side of the reaction tank body, an aeration chamber, a sedimentation chamber, a reaction chamber, and a storage chamber are respectively arranged inside the reaction tank body, a first water guide hole is arranged between the aeration chamber and the sedimentation chamber, and a second water guide hole is arranged between the sedimentation chamber and the reaction chamber, an aeration component is assembled on the base, and the working end of the aeration component extends to the aeration chamber and the reaction chamber respectively, a plurality of collecting tanks are arranged at the bottom of the storage chamber, and the top of the base The top of the reaction tank is equipped with a mud pumping assembly, and the working end of the mud pumping assembly extends into the collecting tank. A support frame is fixedly installed on the top of the reaction tank body, and an adjustment mechanism and a material changing mechanism are respectively installed on the support frame. A reaction mechanism is suspended at the bottom of the adjustment mechanism. A load room is fixedly installed in the reaction chamber below the reaction mechanism. The bottom end of the material changing mechanism extends into the load room. A recoil assembly is installed on the top of the reaction chamber, and the input end of the recoil assembly is arranged in the storage chamber; the adjustment mechanism includes an electric telescopic cylinder, an installation cavity, an n-type hanger, a guide seat, a wire Rod, motor; the material changing mechanism includes a material changing component and a collecting net frame; the reaction mechanism includes a bearing component, a guide component, a filtering component, a liquid guiding component, a scraping component, a positioning joint, and a positioning plate. An electric telescopic cylinder is fixedly installed on the top of the support frame, and an installation cavity is butt-jointedly installed at the output end of the electric telescopic cylinder, a screw rod is butt-jointedly installed inside the installation cavity, and a motor is fixedly installed on the side of the installation cavity, the output end of the motor is connected to the screw rod, a guide seat is mounted on the screw rod, an n-type hanger is fixedly installed at the bottom of the guide seat, and a guide component is fixedly installed at the bottom of the n-type hanger , a bearing assembly is docked and installed at the bottom of the guide assembly, a number of filter assemblies are docked and installed between the bearing assembly and the guide assembly, a liquid guide assembly is docked and installed at the top of the guide assembly, a scraping assembly is fixedly installed at the bottom of the bearing assembly, and the scraping assembly and the load room are assembled with each other, two sets of positioning plates are fixedly installed on the inner wall of the reaction chamber, a positioning joint is fixedly installed on the top of the guide assembly, and the positioning joint and the positioning plate correspond to each other, a collecting net frame is clamped on the top of the support frame, a material changing assembly is assembled on the top of the support frame, and the operating end of the material changing assembly extends into the load room;

[0009] The backflushing assembly includes a water branch pipe, a support seat, a first flushing joint, and a second flushing joint. The support seat is fixedly installed on the top of the reaction chamber, and a water branch pipe is set up on the top of the support seat. The bottom of the water branch pipe is respectively connected with a first flushing joint and a second flushing joint, and the first flushing joint is longer than the second flushing joint. The first flushing joint and the second flushing joint are docked and matched with the filtering assembly.

[0010] Furthermore, the filtering mechanism includes a filter tank body, a lifting pump, a first water inlet, a lifting pipe, a water guide plate, and a water guide port. The filter tank body is fixedly installed on the top of the base, and a cover plate and a filter mesh plate are fixedly installed on the top of the filter tank body. The first water inlet extending into the filter tank body is docked and installed on the top of the cover plate, and the water guide plate is docked and installed on the bottom of the first water inlet, and the water guide ports are evenly distributed on the bottom of the water guide plate. A filter mesh plate is fixedly installed inside the filter tank body, and a lifting pump is arranged at the bottom of the filter tank body. The output end of the lifting pump is docked with a lifting pipe, and the lifting pipe is connected to the aeration chamber.

[0011] Furthermore, the aeration assembly includes an aerator, a main air pipe, a first branch pipe, an air guide plate, and aeration holes. The aerator is fixedly installed on the top of the base, the main air pipe is butt-connected to the output end of the aerator, and the main air pipe extends to the top of the reaction tank body, two groups of first branch pipes are butt-connected to the end of the main air pipe, and the two groups of first branch pipes extend to the aeration chamber and the reaction chamber respectively, the bottom end of the first branch pipe is butt-connected to the air guide plate, and aeration holes are evenly distributed on the top of the air guide plate, and the aeration chamber and the reaction chamber are aerated through the aeration holes on the air guide plate.

[0012] Furthermore, the mud pumping assembly includes a mud pump, a mud pumping main pipe, and a mud pumping auxiliary pipe. The mud pump is fixedly installed on the top of the base, the mud pumping main pipe is butt-connected to the output end of the mud pump, and a plurality of mud pumping auxiliary pipes are butt-connected to the mud pumping main pipe. The mud pumping auxiliary pipes extend into the collecting tank, and the mud pumping auxiliary pipes extract the sludge in the collecting tank through the suction holes at the bottom.

[0013] Furthermore, the adjustment mechanism also includes guide rods and sliding components. Two groups of guide rods are installed on the support frame, and the bottom ends of the guide rods are installed and connected to the installation cavity. The interior of the installation cavity is equipped with a sliding component, and the installation cavity is slidably connected to the guide seat through the sliding component.

[0014] Further, the material changing assembly includes a material changing barrel, a sealing cover, a material guiding pipe, an input pipe 1, an output pipe 2, an input pipe 2, a first electric valve, an output pipe 1, a liquid extraction pipe, a second electric valve, and a circulating pump. The material guiding pipe is installed through the support frame, and the liquid extraction pipe is installed through the support frame. The bottom ends of the material guiding pipe and the liquid extraction pipe extend into the load room. A circulating pump is fixedly installed on the top of the support frame. The output end of the circulating pump is butt-connected with the output pipe 1, and the end of the output pipe 1 is butt-connected with the output pipe 2, one end of the output pipe 2 is located above the collecting net frame, and the other end is connected with the material changing barrel. Both ends of the output pipe 2 are equipped with the second electric valve. The input end of the circulating pump is butt-connected with the input pipe 1, and the input pipe 1 is connected with the material changing barrel. The input pipe 2 is butt-connected with the input pipe 1, and the end of the input pipe 2 is connected with the liquid extraction pipe. The first electric valve is installed on both the input pipe 2 and the input pipe 1.

[0015] Further, the bearing assembly includes a download plate, a spring, a support sheet, a guide member, and a pull rod. The bottom of the filter assembly is equipped with a download plate, the download plate is evenly distributed with guide openings, and the guide openings correspond to the filter assembly. The guide openings are clamped with guide members, and a pull rod is installed through the guide member. A support sheet is fixedly installed at the bottom of the pull rod, and a spring is sleeved on the pull rod between the guide member and the support sheet.

[0016] The guide assembly includes an upper loading plate, an outer sleeve rod, an inner sleeve rod, a connecting plate, and a scraper plate. The upper loading plate is docked at the top of the filter assembly, the top of the pull rod is fixedly connected to the bottom of the upper loading plate, the outer sleeve rod is fixedly installed on one side of the upper loading plate, the inner sleeve rod is sleeved inside the outer sleeve rod, and the bottom of the inner sleeve rod is fixedly installed with a connecting plate, and a number of scraper plates are fixedly installed on the connecting plate, and the scraper plates are in contact with the bottom surface of the reaction chamber.

[0017] Further, the filter assembly includes a lower shell, a first ceramic filter membrane, a lower docking piece, an upper shell, a second ceramic filter membrane, a second water inlet, and an upper docking piece. The lower shell is docked and installed on the top of the download plate, and the second water inlet that penetrates the download plate is docked and installed on the bottom of the lower shell. The lower shell is fixedly installed on the top of the lower shell, and the upper docking piece is docked and installed inside the lower docking piece. The lower shell is docked and installed with the upper shell through the lower docking piece and the upper docking piece. The second ceramic filter membrane is installed in the upper shell, and the first ceramic filter membrane is docked and installed inside the lower shell. The first ceramic filter membrane and the second ceramic filter membrane are docked and connected with each other.

[0018] The liquid guiding assembly includes a clean water branch pipe, a clean water main pipe, a liquid guiding square pipe, a sewage outlet, and a one-way water injection port. The top of the upper shell is butt-jointed with a clean water main pipe that penetrates the upper loading plate, and the clean water main pipe is connected to the second ceramic filter membrane. The top of the clean water main pipe is butt-jointed with a liquid guiding square pipe, the top of the liquid guiding square pipe is butt-jointed with a one-way water injection port, and the end face of the liquid guiding square pipe is butt-jointed with a sewage outlet. A clean water branch pipe is butt-jointed with one side of the upper shell, and the clean water branch pipe penetrates the upper loading plate, and the top of the clean water branch pipe is butt-jointed with the clean water main pipe.

[0019] Furthermore, the scraping assembly includes a connecting rod, an upper connecting frame, a lower connecting frame, an external scraping plate, and an internal scraping plate. Two sets of connecting rods are fixedly installed on the bottom of the lower plate, and the connecting rods extend into the load room. The upper connecting frame is fixedly installed on the connecting rod outside the load room, and the end of the upper connecting frame is fixedly installed with the external scraping plate, and the external scraping plate is located around the outside of the load room. The lower connecting frame is fixedly installed on the connecting rod inside the load room, and the end of the lower connecting frame is butt-jointed with the internal scraping plate, and the internal scraping plate is located around the inside of the load room.

[0020] Furthermore, the recoil assembly includes a water main pipe, a water suction pipe, and a water pump. The water pump is installed at the bottom of the storage chamber, the output end of the water pump is docked with the water suction pipe, one end of the water branch pipe is docked with the connected water main pipe, and the top of the water suction pipe is installed and connected to the water main pipe.

[0021] The present invention provides a ceramic membrane bioreactor. Compared with the prior art, it has the following beneficial effects:

[0022] 1. The lifting and separation of the reaction mechanism can be realized by using the cooperation between the regulating mechanism and the reaction mechanism. When lifting, the inner and outer walls of the load room are cleaned to remove the dirt on the load room. When separating, the reaction mechanism can be prompted to enter the cleaning state and cooperate with the recoil component for docking and flushing. The reaction mechanism in the separated state can be cleaned more thoroughly, which has a good dredging effect. The dirt deposited at the bottom of the reaction chamber can also be scraped, prompting the dirt to be pushed into the collection tank for centralized suction, ensuring that the dirt is sucked out more efficiently.

[0023] 2. Through the cooperation between the material changing mechanism and the load room, the reactor can realize automatic replacement of fillers. The load fillers in the load room can be sucked out by suction, and the state can be switched to reversely transport the new fillers to the load room, making it more convenient for personnel to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 A schematic diagram of the structure of the ceramic membrane bioreactor of the present invention from a first viewing angle is shown;

[0026] Figure 2 A second perspective structural schematic diagram of the ceramic membrane bioreactor of the present invention is shown;

[0027] Figure 3 The schematic diagram of the internal assembly structure of the ceramic membrane bioreactor of the present invention is shown;

[0028] Figure 4 The schematic diagram of the internal structure of the reaction chamber of the present invention is shown;

[0029] Figure 5 The schematic diagram of the structure of the filter mechanism of the present invention is shown;

[0030] Figure 6A schematic diagram of the assembly structure of the dirt scraping assembly and the load room of the present invention is shown;

[0031] Figure 7 A schematic diagram of the assembly structure of the reaction mechanism and the recoil assembly of the present invention is shown;

[0032] Figure 8 A schematic diagram of the first component structure of the reaction mechanism of the present invention is shown;

[0033] Fig. 9 A schematic diagram of a second component structure of the reaction mechanism of the present invention is shown;

[0034] Fig.10 A third schematic diagram of the reaction mechanism of the present invention is shown;

[0035] Fig.11 A schematic diagram of the assembly structure of the bearing assembly and the filter assembly of the present invention is shown;

[0036] Fig.12 A schematic diagram of the assembly structure of the filter assembly and the liquid guide assembly of the present invention is shown;

[0037] Fig.13 A schematic diagram of the structure of the regulating mechanism of the present invention is shown;

[0038] Fig.14 The schematic diagram of the assembly structure of the material changing mechanism and the regulating mechanism of the present invention is shown;

[0039] Fig.15 The schematic diagram of the composition structure of the material replacement assembly of the present invention is shown;

[0040] As shown in the figure: 1. Base; 2. Filter mechanism; 21. Filter tank; 22. Lifting pump; 23. First water inlet; 24. Lifting pipe; 25. Water guide plate; 26. Water guide port; 27. Cover plate; 28. Filter screen plate; 3. Aeration assembly; 31. Aerator; 32. Main air pipe; 33. First branch pipe; 34. Air guide plate; 35. Aeration hole; 4. Reaction tank; 41. Aeration chamber; 411. First water guide hole; 42. Sedimentation chamber; 421. Second water guide hole; 43. Reaction chamber; 44. Storage chamber; 45. Collection tank; 5. Mud extraction assembly; 51. Mud extraction pump; 5 2. Mud pumping main pipe; 53. Mud pumping auxiliary pipe; 6. Adjustment mechanism; 61. Electric telescopic cylinder; 62. Guide rod; 63. Mounting chamber; 64. Sliding component; 65. N-type hanger; 66. Guide seat; 67. Screw rod; 68. Motor; 7. Material changing mechanism; 71. Material changing assembly; 711. Material changing cylinder; 712. Sealing cover; 713. Material guide pipe; 714. Input pipe 1; 715. Output pipe 2; 716. Input pipe 2; 717. First electric valve; 718. Output pipe 1; 719. Liquid pumping pipe; 7110. Second electric valve; 7111. Circulation pump; 72. Collect Frame; 8, reaction mechanism; 81, bearing assembly; 811, download plate; 8111, guide port; 812, spring; 813, support plate; 814, guide piece; 815, pull rod; 82, guide assembly; 821, upper loading plate; 822, outer sleeve rod; 823, inner sleeve rod; 824, connecting plate; 825, scraper; 83, filter assembly; 831, lower shell; 832, first ceramic filter membrane; 833, lower docking piece; 834, upper shell; 835, second ceramic filter membrane; 836, second water inlet; 837, upper docking piece; 84, liquid guide assembly; 8 41. Clean water branch pipe; 842. Clean water main pipe; 843. Liquid guiding square pipe; 844. Sewage outlet; 845. One-way water injection port; 85. Scraping assembly; 851. Connecting rod; 852. Upper connecting frame; 853. Lower connecting frame; 854. External scraping plate; 855. Internal scraping plate; 86. Positioning joint; 87. Positioning plate; 9. Load room; 10. Backwash assembly; 101. Water guiding main pipe; 102. Water guiding branch pipe; 103. Support seat; 104. First flushing joint; 105. Second flushing joint; 106. Suction pipe; 107. Water pump; 11. Support frame. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Embodiment 1

[0043] In order to solve the technical problems in the background technology, the following ceramic membrane bioreactor is provided:

[0044] Combination Figure 1-Figure 15 As shown, a ceramic membrane bioreactor provided by the present invention comprises a base 1, a reaction tank body 4 is fixedly installed on the top of the base 1, a filtering mechanism 2 is fixedly installed on the base 1 on one side of the reaction tank body 4, an aeration chamber 41, a sedimentation chamber 42, a reaction chamber 43, and a storage chamber 44 are respectively arranged inside the reaction tank body 4, and a first water guide hole 411 is arranged between the aeration chamber 41 and the sedimentation chamber 42, and a second water guide hole 421 is arranged between the sedimentation chamber 42 and the reaction chamber 43, an aeration component 3 is assembled on the base 1, and the operating ends of the aeration component 3 extend into the aeration chamber 41 and the reaction chamber 43, respectively, and the storage chamber 44 is provided with a first water guide hole 411 between the aeration chamber 41 and the sedimentation chamber 42, and a second water guide hole 421 is arranged between the sedimentation chamber 42 and the reaction chamber 43. A plurality of collecting troughs 45 are provided at the bottom of the storage chamber 44, a mud pumping assembly 5 is installed at the top of the base 1, and the working end of the mud pumping assembly 5 extends into the collecting trough 45, a support frame 11 is fixedly installed at the top of the reaction tank body 4, and an adjustment mechanism 6 and a material changing mechanism 7 are respectively installed on the support frame 11, a reaction mechanism 8 is suspended at the bottom of the adjustment mechanism 6, a load room 9 is fixedly installed in the reaction chamber 43 below the reaction mechanism 8, and the bottom end of the material changing mechanism 7 extends into the load room 9, a recoil assembly 10 is installed at the top of the reaction chamber 43, and the input end of the recoil assembly 10 is arranged in the storage chamber 44;

[0045] During the operation of the reactor, the sewage will first be initially filtered through the filter mechanism 2, and the filter mechanism 2 will filter the large particles of impurities and substances in the sewage, and then it will be lifted to the aeration chamber 41 to wait for aeration. The oxygen in the air will be dissolved into the sewage through the aeration component 3 to increase the dissolved oxygen content of the water body, and the bubbles generated during the aeration process will stir the sewage when they rise, so that the sewage and microorganisms are fully in contact and evenly distributed, thereby improving the reaction efficiency. After precipitation in the sedimentation chamber 42, it enters the reaction chamber 43 to wait for reaction, and the microorganisms in the sewage are loaded and retained by the filler in the load room 9. The reaction mechanism 8 uses a ceramic membrane to complete the filtration and purification of the sewage, and the clean water is analyzed out. The adjustment mechanism 6 and the reaction mechanism 8 cooperate with each other to realize the reaction mechanism. 8 is lifted and separated. During the lifting and separation, the inner and outer walls of the load room 9 are cleaned to remove the dirt on the load room 9. During the separation, the reaction mechanism 8 can be prompted to enter the cleaning state and cooperate with the recoil component 10 for docking and flushing. The reaction mechanism 8 in the separated state can be cleaned more thoroughly, which has a good dredging effect. The dirt deposited at the bottom of the reaction chamber 43 can be scraped, and the dirt is pushed into the collection tank 45 for centralized suction, ensuring that the dirt is more efficiently sucked out. The material changing mechanism 7 cooperates with the load room 9 to enable the reactor to realize automatic replacement of fillers. The load fillers in the load room 9 can be sucked out by suction, and the state can be switched to reversely transport the new fillers to the load room 9, making it more convenient for personnel to operate.

[0046] The adjusting mechanism 6 includes an electric telescopic cylinder 61, an installation cavity 63, an n-type hanger 65, a guide seat 66, a screw 67, and a motor 68; the material changing mechanism 7 includes a material changing assembly 71 and a collecting net frame 72; the reaction mechanism 8 includes a bearing assembly 81, a guide assembly 82, a filtering assembly 83, a liquid guiding assembly 84, a scraping assembly 85, a positioning joint 86, and a positioning plate 87. The electric telescopic cylinder 61 is fixedly installed on the top of the support frame 11, and the output end of the electric telescopic cylinder 61 is docked with the installation cavity 63, and the inside of the installation cavity 63 is docked with the screw 67, and the side of the installation cavity 63 is fixedly installed with a motor 68, and the output end of the motor 68 is connected to the screw 67, and the screw 67 is sleeved with a guide seat 66, and the bottom of the guide seat 66 is fixedly installed with an n-type Hanger 65, a guide assembly 82 is fixedly installed at the bottom of the n-type hanger 65, a bearing assembly 81 is docked and installed at the bottom of the guide assembly 82, a plurality of filter assemblies 83 are docked and installed between the bearing assembly 81 and the guide assembly 82, a liquid guide assembly 84 is docked and installed at the top of the guide assembly 82, a scraping assembly 85 is fixedly installed at the bottom of the bearing assembly 81, and the scraping assembly 85 and the load room 9 are assembled with each other, two groups of positioning plates 87 are fixedly installed on the inner wall of the reaction chamber 43, a positioning joint 86 is fixedly installed at the top of the guide assembly 82, and the positioning joint 86 and the positioning plate 87 correspond to each other, a collecting net frame 72 is clamped on the top of the support frame 11, a material changing assembly 71 is assembled on the top of the support frame 11, and the working end of the material changing assembly 71 extends into the load room 9;

[0047] The backflushing assembly 10 includes a water branch pipe 102, a support seat 103, a first flushing joint 104, and a second flushing joint 105. The support seat 103 is fixedly installed on the top of the reaction chamber 43, and the water branch pipe 102 is set on the top of the support seat 103. The bottom of the water branch pipe 102 is respectively connected with the first flushing joint 104 and the second flushing joint 105, and the first flushing joint 104 is longer than the second flushing joint 105. The first flushing joint 104 and the second flushing joint 105 are docked and matched with the filter assembly 83;

[0048] During this period, the n-type hanger 65 is used to complete the lifting of the filter assembly 83, and the top and bottom of the filter assembly 83 are clamped by the bearing assembly 81 and the guide assembly 82, and the liquid filtered by the filter assembly 83 will be diverted and discharged through the liquid guide assembly 84, and the guide assembly 82 and the scraping assembly 85 cooperate with each other to drive the scraping assembly 85 to scrape the inner and outer walls of the load room 9 to reduce the attached objects; when the load filler is replaced, it is only necessary to introduce the old filler into the collection net frame 72, and use the material replacement assembly 71 to replace the old and new load fillers;

[0049] When backwashing is performed, the filter assembly 83 is separated, and the separated filter assembly 83 is caused to connect with the first flushing joint 104 and the second flushing joint 105 after rising. The filter assembly 83 can be backwashed with purified water to clean and dredge the inside of the filter assembly 83.

[0050] Embodiment 2

[0051] like Figure 1 and Fig.15 As shown, based on the above embodiment, this embodiment further provides the following contents:

[0052] In this embodiment, the filtering mechanism 2 includes a filter tank body 21, a lifting pump 22, a first water inlet 23, a lifting pipe 24, a water guide plate 25, and a water guide port 26. The filter tank body 21 is fixedly installed on the top of the base 1, and a cover plate 27 and a filter screen plate 28 are fixedly installed on the top of the filter tank body 21. The top of the cover plate 27 is docked with the first water inlet 23 extending into the filter tank body 21, and the bottom of the first water inlet 23 is docked with the water guide plate 25, and the bottom of the water guide plate 25 is evenly distributed with water guide ports 26. The inside of the filter tank body 21 is fixedly installed with a filter screen plate 28, and a lifting pump 22 is arranged at the bottom of the filter tank body 21. The output end of the lifting pump 22 is docked with the lifting pipe 24, and the lifting pipe 24 is connected to the aeration chamber 41.

[0053] During this period, the sewage enters the water guide plate 25 through the first water inlet 23, and then is discharged through the water guide port 26 on the water guide plate 25. At that time, the sewage will flow into the filter screen plate 28 for filtration. At that time, large particles of impurities will be retained on the filter screen plate 28, and then enter the filter tank body 21 for collection. Then, the lifting pump 22 is started, and the aeration chamber 41 is aerated using the lifting pipe 24.

[0054] In this embodiment, the aeration assembly 3 includes an aerator 31, a main air pipe 32, a first branch pipe 33, an air guide plate 34, and an aeration hole 35. The aerator 31 is fixedly installed on the top of the base 1, and the main air pipe 32 is butt-connected to the output end of the aerator 31, and the main air pipe 32 extends to the top of the reaction tank body 4. Two groups of first branch pipes 33 are butt-connected to the end of the main air pipe 32, and the two groups of first branch pipes 33 extend into the aeration chamber 41 and the reaction chamber 43 respectively. The bottom end of the first branch pipe 33 is butt-connected to the air guide plate 34, and the aeration holes 35 are evenly distributed on the top of the air guide plate 34. The aeration chamber 41 and the reaction chamber 43 are aerated through the aeration holes 35 on the air guide plate 34.

[0055] During this period, the aerator 31 is started, and the aerator 31 delivers the gas to the main air pipe 32, and then delivers the gas to the first branch pipe 33 through the main air pipe 32;

[0056] The gas is introduced into the air guide plate 34 through the first branch pipe 33, and then discharged through the aeration holes 35 on the air guide plate 34, and the gas performs aeration operation on the sewage;

[0057] Aeration operations are performed on the sewage in the aeration chamber 41 and the reaction chamber 43 respectively.

[0058] In this embodiment, the mud pumping assembly 5 includes a mud pump 51, a mud pumping main pipe 52, and a mud pumping auxiliary pipe 53. The mud pump 51 is fixedly installed on the top of the base 1, and the mud pumping main pipe 52 is docked with the output end of the mud pump 51. A plurality of mud pumping auxiliary pipes 53 are docked with the mud pumping main pipe 52. The mud pumping auxiliary pipes 53 extend into the collecting tank 45, and the mud pumping auxiliary pipes 53 extract the sludge in the collecting tank 45 through the suction holes at the bottom.

[0059] Dirt needs to be cleaned regularly;

[0060] When the cleaning time is reached, the mud pump 51 can be started, and the mud pump main pipe 52 and the mud pump auxiliary pipe 53 are used to complete the extraction under the action of negative pressure. Since the mud pump auxiliary pipes 53 extend into the collection tank 45 one by one, the mud and dirt in the collection tank 45 can be extracted.

[0061] Embodiment 3

[0062] like Figure 1-Figure 15 As shown, based on the above embodiment, this embodiment further provides the following contents:

[0063] In this embodiment, the material changing assembly 71 includes a material changing barrel 711, a sealing cover 712, a material guide pipe 713, an input pipe 1 714, an output pipe 2 715, an input pipe 2 716, a first electric valve 717, an output pipe 1 718, a liquid extraction pipe 719, a second electric valve 7110, and a circulation pump 7111. The material guide pipe 713 is installed through the support frame 11, and the liquid extraction pipe 719 is installed through the support frame 11. The bottom ends of the material guide pipe 713 and the liquid extraction pipe 719 extend into the load room 9. The top of the support frame 11 is fixedly installed with a circulation pump 7111, and the output end of the circulation pump 7111 is connected to the output end of the circulation pump 7111. Tube 1 718, output tube 2 715 is docked with the end of output tube 1 718, one end of output tube 2 715 is located above the collecting net frame 72, and the other end is connected to the material changing barrel 711, and both ends of output tube 2 715 are equipped with second electric valves 7110, input end of circulating pump 7111 is docked with input tube 1 714, and input tube 1 714 is connected to the material changing barrel 711, input tube 1 714 is docked with input tube 2 716, and the end of input tube 2 716 is connected to the liquid extraction tube 719, and input tube 2 716 and input tube 1 714 are both equipped with first electric valves 717.

[0064] The material changing component 71 switches the operation state according to the actual operation requirements;

[0065] First, the circulation pump 7111 is started, and the circulation pump 7111 performs negative pressure suction. At this time, the first electric valve 717 on the second input pipe 716 is in a closed state; the second electric valve 7110 at the upper end of the second output pipe 715 is in a closed state, and then the filler in the sewage will be connected to the sewage to be extracted and discharged downward through the bottom end of the second output pipe 715, and the filler will be collected by the collection net frame 72, while the sewage will pass through the collection net frame 72 and automatically introduced into the reaction chamber 43, so as to realize the extraction of the loaded filler;

[0066] When replacing, open the sealing cover 712, inject new load filler into the material changing barrel 711, and then seal the material changing barrel 711 again. At this time, the first electric valve 717 on the input pipe 1 714 is in a closed state, and the second electric valve 7110 at the lower end of the output pipe 2 715 is in a closed state. At this time, the sewage can be extracted through the suction pipe 719 and then injected into the material changing barrel 711. Under the action of water pressure, the new filler is pressed into the load room 9 to complete the injection of the new filler.

[0067] In this embodiment, the bearing assembly 81 includes a download plate 811, a spring 812, a support sheet 813, a guide member 814, and a pull rod 815. The bottom of the filter assembly 83 is equipped with the download plate 811. The download plate 811 is evenly distributed with guide openings 8111, and the guide openings 8111 correspond to the filter assembly 83. The guide openings 8111 are clamped with the guide member 814, and the pull rod 815 is installed through the guide member 814. The support sheet 813 is fixedly installed at the bottom of the pull rod 815, and the spring 812 is sleeved on the pull rod 815 between the guide member 814 and the support sheet 813.

[0068] The guide assembly 82 includes an upper loading plate 821, an outer rod 822, an inner rod 823, a connecting plate 824, and a scraper 825. The upper loading plate 821 is docked with the top of the filter assembly 83, the top of the pull rod 815 is fixedly connected to the bottom of the upper loading plate 821, the outer rod 822 is fixedly installed on one side of the upper loading plate 821, the inner rod 823 is sleeved inside the outer rod 822, and the bottom of the inner rod 823 is fixedly installed with a connecting plate 824, a plurality of scrapers 825 are fixedly installed on the connecting plate 824, and the scrapers 825 are in contact with the bottom surface of the reaction chamber 43.

[0069] The downloading plate 811 and the loading plate 821 cooperate with each other to complete the loading operation of the filter assembly 83;

[0070] During this period, when the filter assembly 83 is separated, it needs to be lifted and lowered first. When rising, the download plate 811 and the upper loading plate 821 rise synchronously. Since the area of ​​the download plate 811 is larger than that of the upper loading plate 821, the positioning joint 86 on the download plate 811 will rise synchronously with the rise until the positioning joint 86 and the positioning plate 87 are docked, and the positioning plate 87 is used to limit the download plate 811. However, the upper loading plate 821 continues to rise, and the pull rod 815 will squeeze the spring 812 through the supporting piece 813 as it rises, causing the spring 812 to enter a compressed state, so that the filter assembly 83 is separated from each other. When the filter assembly 83 is misaligned, the guide member 814 will perform auxiliary guidance in the guide port 8111, so that the lower half of the filter assembly 83 will be completely exposed, waiting for the flushing operation;

[0071] When lifting, the outer sleeve rod 822 and the inner sleeve rod 823 are telescoped to avoid interference;

[0072] When misaligned, the upper loading plate 821 will synchronously drive the outer sleeve rod 822 and the inner sleeve rod 823 to move, and the connecting plate 824 and the scraper plate 825 will move synchronously, and the scraper plate 825 will be used to scrape the dirt on the bottom surface of the reaction chamber 43, causing the dirt to be scraped into the collection tank 45 and wait for extraction.

[0073] In this embodiment, the filter assembly 83 includes a lower shell 831, a first ceramic filter membrane 832, a lower docking piece 833, an upper shell 834, a second ceramic filter membrane 835, a second water inlet 23, and an upper docking piece 837. The lower shell 831 is docked with the top of the download plate 811, and the second water inlet 23 that runs through the download plate 811 is docked with the bottom of the lower shell 831. The lower docking piece 833 is fixedly installed on the top of the lower shell 831, and the upper docking piece 837 is docked with the lower docking piece 833. The lower shell 831 is docked with the upper shell 834 through the lower docking piece 833 and the upper docking piece 837. The second ceramic filter membrane 835 is installed in the upper shell 834. The first ceramic filter membrane 832 is docked with the inside of the lower shell 831, and the first ceramic filter membrane 832 and the second ceramic filter membrane 835 are docked and connected with each other.

[0074] The liquid guiding assembly 84 includes a clean water branch pipe 841, a clean water main pipe 842, a liquid guiding square pipe 843, a sewage outlet 844, and a one-way water injection port 845. The top of the upper shell 834 is docked with the clean water main pipe 842 that passes through the upper loading plate 821, and the clean water main pipe 842 is connected to the second ceramic filter membrane 835. The top of the clean water main pipe 842 is docked with the liquid guiding square pipe 843, the top of the liquid guiding square pipe 843 is docked with the one-way water injection port 845, and the end face of the liquid guiding square pipe 843 is docked with the sewage outlet 844. The clean water branch pipe 841 is docked with one side of the upper shell 834, and the clean water branch pipe 841 passes through the upper loading plate 821. The top of the clean water branch pipe 841 is docked with the clean water main pipe 842.

[0075] The second ceramic filter membrane 835 and the first ceramic filter membrane 832 are mounted together through their respective housings, and the sewage enters the second ceramic filter membrane 835 and the first ceramic filter membrane 832 through the second water inlet 23 for filtration and purification. After passing through the second ceramic filter membrane 835 and the first ceramic filter membrane 832, the sewage is dialyzed, and the purified water enters the gap between the membrane and the housing, and is discharged through the clean water branch pipe 841 and the clean water main pipe 842, and the clean water main pipe 842 is installed and connected to an external water pump;

[0076] The sewage will be circulated and discharged through the sewage outlet 844. The sewage outlet 844 is connected to a pump through a pipeline. The pump then introduces the extracted sewage into the reaction chamber 43 again to achieve a cyclic operation.

[0077] When the second ceramic filter membrane 835 is separated from the first ceramic filter membrane 832, the lower docking piece 833 and the upper docking piece 837 are separated. When backwashing is performed, the first flushing joint 104 and the second flushing joint 105 are respectively docked with the lower shell 831 and the upper shell 834 to perform backwashing operations;

[0078] The one-way water injection port 845 is a water injection port, and a one-way water inlet valve is arranged on the water injection port. When filtering sewage, the one-way water injection port 845 on the liquid guiding square tube 843 can only allow one-way water inlet and cannot allow drainage.

[0079] In this embodiment, the scraping assembly 85 includes a connecting rod 851, an upper connecting frame 852, a lower connecting frame 853, an external scraping plate 854, and an internal scraping plate 855. Two groups of connecting rods 851 are fixedly installed at the bottom of the lower plate 811, and the connecting rods 851 extend into the load room 9. The upper connecting frame 852 is fixedly installed on the connecting rod 851 outside the load room 9, and the end of the upper connecting frame 852 is fixedly installed with an external scraping plate 854, and the external scraping plate 854 is located around the outside of the load room 9. The lower connecting frame 853 is fixedly installed on the connecting rod 851 inside the load room 9, and the end of the lower connecting frame 853 is docked with the internal scraping plate 855, and the internal scraping plate 855 is located around the inside of the load room 9.

[0080] The connecting rod 851 extends into the load room 9 and performs telescopic movement with the load room 9. When the connecting rod 851 performs lifting movement in the load room 9, it will drive the upper connecting frame 852 and the lower connecting frame 853 to move synchronously. The upper connecting frame 852 moves on the outside of the load room 9, and the lower connecting frame 853 moves on the inside of the load room 9, each driving the external scraper plate 854 and the internal scraper plate 855 to scrape the inner and outer walls of the load room 9 to remove attached substances.

[0081] In this embodiment, the recoil assembly 10 includes a water main pipe 101, a water suction pipe 106, and a water pump 107. The water pump 107 is installed at the bottom of the storage chamber 44, and the output end of the water pump 107 is docked with the water suction pipe 106. One end of the water branch pipe 102 is docked with the connected water main pipe 101, and the top of the water suction pipe 106 is installed and connected to the water main pipe 101.

[0082] During backwashing, the water pump 107 is started, and the water pump 107 lifts the purified water to the pumping pipe 106, and then transports the clean water to the water pipe 101 through the pumping pipe 106, and guides the water to each sub-pipe through the water pipe 101 to achieve the backwashing operation of the filter assembly 83.

[0083] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0084] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A ceramic membrane bioreactor, characterized in that: It comprises a base, a reaction tank body is fixedly installed on the top of the base, a filtering mechanism is fixedly installed on the base on one side of the reaction tank body, an aeration chamber, a sedimentation chamber, a reaction chamber, and a storage chamber are respectively arranged inside the reaction tank body, and a first water guide hole is arranged between the aeration chamber and the sedimentation chamber, and a second water guide hole is arranged between the sedimentation chamber and the reaction chamber, an aeration component is installed on the base, and the working end of the aeration component extends to the aeration chamber and the reaction chamber respectively, a plurality of collecting tanks are arranged at the bottom of the storage chamber, a mud pumping component is installed on the top of the base, and the working end of the mud pumping component extends into the collecting tank, a supporting frame is fixedly installed on the top of the reaction tank body, an adjusting mechanism and a material changing mechanism are respectively installed on the supporting frame, a reaction mechanism is hoisted at the bottom of the adjusting mechanism, a load room is fixedly installed in the reaction chamber below the reaction mechanism, the bottom end of the material changing mechanism extends into the load room, a recoil component is installed on the top of the reaction chamber, and the input end of the recoil component is arranged in the storage chamber; The adjusting mechanism comprises an electric telescopic cylinder, an installation cavity, an n-type hanger, a guide seat, a screw rod, and a motor; the material changing mechanism comprises a material changing assembly and a collecting net frame; the reaction mechanism comprises a bearing assembly, a guide assembly, a filtering assembly, a liquid guiding assembly, a dirt scraping assembly, a positioning joint, and a positioning plate. The electric telescopic cylinder is fixedly installed on the top of the support frame, and the output end of the electric telescopic cylinder is docked with the installation cavity, and the inside of the installation cavity is docked with the screw rod, and the side of the installation cavity is fixedly installed with a motor, and the output end of the motor is connected to the screw rod, and the guide seat is mounted on the screw rod, and the bottom of the guide seat is fixedly installed with the n-type hanger, the n-type A guide assembly is fixedly installed on the bottom of the hanger, a bearing assembly is dockedly installed on the bottom of the guide assembly, a number of filter assemblies are dockedly installed between the bearing assembly and the guide assembly, a liquid guide assembly is dockedly installed on the top of the guide assembly, a scraping assembly is fixedly installed on the bottom of the bearing assembly, and the scraping assembly and the load room are assembled with each other, two groups of positioning plates are fixedly installed on the inner wall of the reaction chamber, a positioning joint is fixedly installed on the top of the guide assembly, and the positioning joint and the positioning plate correspond to each other, a collecting net frame is clamped on the top of the support frame, a material changing assembly is assembled on the top of the support frame, and the operating end of the material changing assembly extends into the load room.

2. A ceramic membrane bioreactor according to claim 1, characterized in that: The filtering mechanism comprises a filter tank body, a lifting pump, a first water inlet, a lifting pipe, a water guide plate, and a water guide port. The filter tank body is fixedly installed on the top of the base, a cover plate and a filter screen plate are fixedly installed on the top of the filter tank body, the first water inlet extending into the filter tank body is butt-jointedly installed on the top of the cover plate, a water guide plate is butt-jointedly installed on the bottom of the first water inlet, and water guide ports are evenly distributed on the bottom of the water guide plate, a filter screen plate is fixedly installed inside the filter tank body, a lifting pump is arranged at the bottom of the filter tank body, the output end of the lifting pump is butt-jointedly installed with the lifting pipe, and the lifting pipe is connected to the aeration chamber.

3. A ceramic membrane bioreactor according to claim 2, characterized in that: The aeration assembly includes an aerator, a main air pipe, a first branch pipe, an air guide plate, and aeration holes. The aerator is fixedly installed on the top of the base, the main air pipe is butt-jointed with the output end of the aerator, and the main air pipe extends to the top of the reaction tank body, two groups of first branch pipes are butt-jointed with the end of the main air pipe, and the two groups of first branch pipes extend to the aeration chamber and the reaction chamber respectively, the bottom end of the first branch pipe is butt-jointed with the air guide plate, and aeration holes are evenly distributed on the top of the air guide plate, and the aeration chamber and the reaction chamber are aerated through the aeration holes on the air guide plate.

4. A ceramic membrane bioreactor according to claim 3, characterized in that: The mud pumping assembly includes a mud pump, a mud pumping main pipe, and a mud pumping auxiliary pipe. The mud pump is fixedly installed on the top of the base, the mud pumping main pipe is butt-connected to the output end of the mud pump, and a plurality of mud pumping auxiliary pipes are butt-connected to the mud pumping main pipe. The mud pumping auxiliary pipes extend into the collecting tank, and the mud pumping auxiliary pipes extract the sludge in the collecting tank through the suction holes at the bottom.

5. A ceramic membrane bioreactor according to claim 4, characterized in that: The adjustment mechanism also includes guide rods and sliding components. Two groups of guide rods are installed on the support frame, and the bottom ends of the guide rods are installed and connected to the installation cavity. The interior of the installation cavity is equipped with a sliding component, and the installation cavity is slidably connected to the guide seat through the sliding component.

6. A ceramic membrane bioreactor according to claim 5, characterized in that: The material changing assembly comprises a material changing barrel, a sealing cover, a material guiding pipe, an input pipe 1, an output pipe 2, an input pipe 2, a first electric valve, an output pipe 1, a liquid extraction pipe, a second electric valve and a circulation pump. The material guiding pipe is installed through the support frame, the liquid extraction pipe is installed through the support frame, the bottom ends of the material guiding pipe and the liquid extraction pipe extend into the load room, a circulation pump is fixedly installed on the top of the support frame, the output end of the circulation pump is butt-jointed with the output pipe 1, the end of the output pipe 1 is butt-jointed with the output pipe 2, one end of the output pipe 2 is located above the collecting net frame, and the other end is connected with the material changing barrel, both ends of the output pipe 2 are equipped with the second electric valve, the input end of the circulation pump is butt-jointed with the input pipe 1, and the input pipe 1 is connected with the material changing barrel, the input pipe 2 is butt-jointed with the input pipe 1, and the end of the input pipe 2 is connected with the liquid extraction pipe, and the first electric valve is installed on both the input pipe 2 and the input pipe 1.

7. A ceramic membrane bioreactor according to claim 6, characterized in that: The bearing assembly includes a download plate, a spring, a support sheet, a guide member, and a pull rod. The bottom of the filter assembly is equipped with a download plate. The download plate is evenly distributed with guide openings, and the guide openings correspond to the filter assembly. The guide openings are clamped with guide members, and a pull rod is installed through the guide members. A support sheet is fixedly installed at the bottom of the pull rod, and a spring is sleeved on the pull rod between the guide member and the support sheet. The guide assembly includes an upper loading plate, an outer sleeve rod, an inner sleeve rod, a connecting plate, and a scraper plate. The upper loading plate is docked at the top of the filter assembly, the top of the pull rod is fixedly connected to the bottom of the upper loading plate, the outer sleeve rod is fixedly installed on one side of the upper loading plate, the inner sleeve rod is sleeved inside the outer sleeve rod, and the bottom of the inner sleeve rod is fixedly installed with a connecting plate, and a number of scraper plates are fixedly installed on the connecting plate, and the scraper plates are in contact with the bottom surface of the reaction chamber.

8. A ceramic membrane bioreactor according to claim 7, characterized in that: The filter assembly includes a lower shell, a first ceramic filter membrane, a lower docking piece, an upper shell, a second ceramic filter membrane, a second water inlet, and an upper docking piece. The lower shell is docked and installed on the top of the download plate, and the second water inlet that penetrates the download plate is docked and installed on the bottom of the lower shell. The lower shell is fixedly installed on the top of the lower shell, and the upper docking piece is docked and installed inside the lower docking piece. The lower shell is docked and installed with the upper shell through the lower docking piece and the upper docking piece. The second ceramic filter membrane is installed in the upper shell, and the first ceramic filter membrane is docked and installed inside the lower shell. The first ceramic filter membrane and the second ceramic filter membrane are docked and connected with each other. The liquid guiding assembly includes a clean water branch pipe, a clean water main pipe, a liquid guiding square pipe, a sewage outlet, and a one-way water injection port. The top of the upper shell is butt-jointed with a clean water main pipe that penetrates the upper loading plate, and the clean water main pipe is connected to the second ceramic filter membrane. The top of the clean water main pipe is butt-jointed with a liquid guiding square pipe, the top of the liquid guiding square pipe is butt-jointed with a one-way water injection port, and the end face of the liquid guiding square pipe is butt-jointed with a sewage outlet. A clean water branch pipe is butt-jointed with one side of the upper shell, and the clean water branch pipe penetrates the upper loading plate, and the top of the clean water branch pipe is butt-jointed with the clean water main pipe.

9. A ceramic membrane bioreactor according to claim 8, characterized in that: The scraping assembly includes a connecting rod, an upper connecting frame, a lower connecting frame, an external scraping plate, and an internal scraping plate. Two groups of connecting rods are fixedly installed on the bottom of the lower plate, and the connecting rods extend into the load room. The upper connecting frame is fixedly installed on the connecting rod outside the load room, and the end of the upper connecting frame is fixedly installed with the external scraping plate, and the external scraping plate is located around the outside of the load room. The lower connecting frame is fixedly installed on the connecting rod inside the load room, and the end of the lower connecting frame is butt-jointed with the internal scraping plate, and the internal scraping plate is located around the inside of the load room.

Citation Information

Patent Citations

  • Automatic elevating device of rotary filter

    CN103316527A

  • Hollow plate type ceramic membrane bioreactor and wastewater treatment method

    CN112320932A

  • Animals and plants are cultivateed and use enzyme reactor

    CN205874446U

  • Precision filter with transparent window

    CN207980630U

  • Biochemical section energy-saving equipment for industrial wastewater purification

    CN212559863U