Construction site surveying device and use method

By designing an automatic mechanical leveling device for total stations, the stable lifting of total stations is achieved using magnetic plates, connecting rods and piston systems, the measurement error problem caused by the inclination of total station support frame in the construction site is solved, the survey quality is improved and operation is simplified.

CN119802415AActive Publication Date: 2025-04-11NANTONG ROAD & BRIDGE ENG CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510291112.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2025-04-11
Estimated Expiration
2045-03-12

AI Technical Summary

Technical Problem

In construction sites, the lifting frame of the total station is prone to inclination, which affects the accuracy of the measurement data. The existing leveling methods have error problems caused by inexperienced operation or environmental interference.

Method used

A construction site survey device is designed, and the first magnetic plate and the second magnetic plate, connecting rod, bottom cylinder, inverted U-shaped rod and second piston are moved downward to move the first piston and top rod upward, realizing automatic mechanical leveling of the total station main body, and avoiding the influence of particle impurities through chamfering design.

Benefits of technology

It effectively reduces leveling errors caused by unproficient operation or environmental interference, ensures the survey quality of the total station main body, and simplifies the storage and deployment operation of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119802415A_ABST
    Figure CN119802415A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of surveying, in particular to a construction site surveying device and a using method.The device comprises a total station main body, a first universal joint is installed in the middle of the lower end of the total station main body, a supporting plate is arranged at the lower end of the first universal joint, a driving piece is installed in the middle of the lower end of the supporting plate, and the lower end of the driving piece is movably connected with a bottom cylinder; a plurality of first straight cylinders are installed at the lower end of the supporting plate at equal intervals, second straight cylinders are arranged at the rear ends of the first straight cylinders, second pistons are slidably connected into the second straight cylinders, vertical parts of a plurality of inverted-U-shaped rods are movably arranged at the upper end of the bottom cylinder at equal intervals, and the lower ends of the other vertical parts of the inverted-U-shaped rods are connected with the second pistons; the lower end of the first straight cylinder is communicated with a U-shaped pipe, a first piston is slidably connected in the first straight cylinder, and an ejector rod is mounted in the middle of the upper end of the first piston, so that the total station main body is automatically and mechanically leveled, the bottom cylinder is effectively contacted with a construction base plane, and the surveying quality of the total station main body is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction site surveying device and a use method thereof, belonging to the technical field of surveying. Background Art

[0002] The construction site does refer to the area designated for the specific construction activities of the project. In this area, advanced surveying and mapping equipment such as total stations are usually used for precise measurement and positioning. Total stations are high-end measuring instruments that integrate optics, electronic technology and modern computer technology. They are often used in various occasions such as construction, topographic measurement, deformation monitoring, etc. to ensure that all data during the construction process are accurate and reliable.

[0003] In practical applications, in order to ensure the working accuracy of the total station, it is first necessary to place it on a stable support frame and place the frame in a suitable position for observation in the construction site. However, due to possible deviations during the placement process, the support frame is prone to tilt, which will directly affect the horizontal state of the total station. In order to ensure that the total station can perform normal survey operations, the total station is generally required to be leveled. There are currently two main leveling operation methods: 1. Manual leveling: It depends on the operator's experience and skills. The operator observes and adjusts the bubble level or electronic level on the total station to reach a horizontal state. Novice operators may easily ignore the leveling steps or cause leveling errors due to lack of experience or unskilled operation, which may affect the accuracy of the final measurement data.

[0004] 2. Electronically controlled automatic leveling: Some advanced total stations are equipped with an automatic leveling system that uses built-in sensors to detect the relative relationship between the instrument and the ground, and adjusts the instrument's posture to horizontal in real time through complex algorithms. Although this method theoretically improves the efficiency and accuracy of leveling, in actual construction environments, the sensor may be affected by small stones and impurities on the ground, resulting in distortion of the collected distance information, which in turn affects the effect of electronically controlled leveling and may also have an adverse effect on the survey accuracy of the total station. Summary of the invention

[0005] In view of the problems in the prior art, the present invention provides a construction site surveying device and a use method thereof.

[0006] The technical solution adopted by the present invention to solve the technical problem is: a construction site survey device, including a total station body, a first universal joint is installed in the middle of the lower end of the total station body, a support plate is arranged at the lower end of the first universal joint, a driving member is installed in the middle of the lower end of the support plate, the lower end of the driving member is movably connected to a bottom cylinder, the outer edge and the inner edge of the lower end of the bottom cylinder are both chamfered, and a plurality of vertically arranged first straight cylinders are equidistantly installed at the lower end of the support plate, and the first straight cylinders are located above the bottom cylinder; A second straight cylinder arranged vertically is provided at the rear end of the first straight cylinder, the second straight cylinder is located at the lower side of the support plate and outside the driving member, the second straight cylinder is slidably connected to the second piston, a vertical portion of a plurality of inverted U-shaped rods is equidistantly movably provided at the upper end of the bottom cylinder, and the lower end of another vertical portion of the inverted U-shaped rod extends into the second straight cylinder and is connected to the second piston; The lower end of the first straight cylinder is connected to a U-shaped tube, and the other end of the U-shaped tube is connected to the lower end of the second straight cylinder. The first straight cylinder is slidably connected with a first piston, and a vertically arranged push rod is installed in the middle of the upper end of the first piston. The upper end of the push rod passes through a support plate and fits with the total station body, and the support plate is slidably connected to the push rod. A support member is installed at the lower end of the support plate, and the support member is located outside the bottom cylinder.

[0007] Furthermore, the support member includes three support brackets, which are equidistantly and movably arranged at the lower end of the support plate, and are located outside the bottom tube. The lower end surface of the support bracket coincides with the lower end surface of the bottom tube, and the three support brackets are arranged in a conical structure that is narrow at the top and wide at the bottom.

[0008] Furthermore, the driving member comprises a rectangular tube, which is mounted in the middle of the lower end of the support plate and is located directly above the bottom tube. The movable plate is slidably connected in the rectangular tube, and a vertically arranged connecting rod is mounted in the middle of the lower end of the movable plate. The lower end of the connecting rod extends out of the lower side of the rectangular tube and is movably connected to the bottom tube. A second magnetic plate is installed on the upper end of the movable plate, a first magnetic plate is arranged directly above the second magnetic plate, and the first magnetic plate and the second magnetic plate are arranged to repel each other, the first magnetic plate is located in the rectangular tube, an auxiliary component is installed on the outer end of the first magnetic plate, and the auxiliary component is movably arranged in the rectangular tube.

[0009] Furthermore, the auxiliary component includes a rectangular frame, a first magnetic plate is installed inside the rectangular frame, and the rectangular frame is located inside the rectangular tube. A rotating shaft is arranged in the middle of the rear end of the rectangular frame, and the rotating shaft is rotatably connected to the rear wall inside the rectangular tube; A connecting tube is installed in the middle of the front end of the rectangular frame, the connecting tube extends to the front end of the rectangular tube, and the connecting tube is rotatably connected to the rectangular tube, a second elastic member is installed on the inner rear wall of the connecting tube, a round rod is arranged at the front end of the second elastic member, and the front end surface of the round rod coincides with the front end surface of the connecting tube, an operating panel is installed at the front end of the round rod, and the operating panel is located inside the second straight tube, and the operating panel is attached to the front end of the rectangular tube; A plurality of clamping strips are installed at equal intervals on the inner wall of the connecting tube, and the clamping strips are arranged along the length direction of the connecting tube. The clamping strips are located outside the second elastic member. The outer end surface of the round rod is recessed inward to form a plurality of clamping grooves, and the clamping grooves extend to the rear end of the round rod. The clamping grooves are slidably connected to the outer ends of the clamping strips.

[0010] Furthermore, the front end of the operating plate is recessed backward to form two recessed holes, and the recessed holes penetrate the operating plate. Two fixing rods are symmetrically arranged at the front end of the rectangular tube, and the two fixing rods are located on the left and right sides of the connecting tube, and the fixing rods are located in the recessed holes.

[0011] Furthermore, a plurality of first elastic members are installed equidistantly between the support plate and the total station body, and the first elastic members are located outside the first universal joint, and the first elastic members are located outside the ejector rod.

[0012] A method for using a construction site survey device comprises the following steps: The first step is to carry and place the survey device to a suitable position on the construction site, and then use the operating panel to rotate the first magnetic plate, so that the first magnetic plate and the second magnetic plate are arranged to repel each other; Step 2: Under the action of the repulsive force generated between the first magnetic plate and the second magnetic plate, the second magnetic plate, the movable plate and the connecting rod are moved downward, thereby moving the bottom cylinder downward, and the multiple inverted U-shaped rods are moved downward synchronously, thereby moving the second piston downward, and the gas in the second straight cylinder is transported to the first straight cylinder through the U-shaped tube, thereby moving the first piston upward, thereby moving the ejector rod upward and contacting the lower end of the total station body. When the lower end of the bottom cylinder contacts the construction base surface under the action of the repulsive force, the multiple ejector rods will lift the total station body at multiple points, and make the total station body parallel to the construction base surface. The third step is to start the total station body, perform centering, rough leveling and fine leveling operations on the total station body to complete the survey work.

[0013] Beneficial effects of the present invention: 1. Utilize the first magnetic plate and the second magnetic plate to move the connecting rod, the bottom cylinder, the inverted U-shaped rod and the second piston downward, and move the first piston and the push rod upward. When the support plate is in an inclined state, the first pistons and the push rods in different first straight cylinders will move upward by different distances. With the assistance of the first universal joint, the total station body and the support plate will be parallel, thereby realizing automatic mechanical leveling of the total station body, effectively reducing the probability of errors caused by unskilled, improper or forgotten operations, and effectively ensuring the survey quality of the total station body. With the assistance of the chamfering of the bottom cylinder, the granular impurities will move outward along the chamfered surface, thereby making the bottom cylinder and the construction base surface effectively contact, effectively ensuring the leveling of the total station body, and further ensuring the survey quality of the total station body.

[0014] 2. The concave hole and the fixed rod can be separated, the operating plate and the round rod can be rotated, and with the cooperation of the card strip and the card slot, the connecting tube, the rectangular frame and the first magnetic plate can be rotated 180° to complete the mechanical storage or expansion of the bottom tube and other components. Under the action of the elastic force of the second elastic member, the fixed rod can be reinserted into the concave hole, and then the operating plate and the rectangular tube can be re-restricted and installed, so as to realize the convenient conversion operation of the magnetic pole of the first magnetic plate, and effectively ensure the stability of the first magnetic plate after the conversion, so that an effective force is formed between the first magnetic plate and the second magnetic plate, so that the bottom tube and other components can be effectively stored or expanded.

[0015] 3. During the up and down movement of the base tube, with the assistance of the L-shaped frame and the support arm, the support bracket is expanded outward or retracted inward, so that the up and down movement of the base tube and the retraction and expansion movement of the support bracket are linked, effectively reducing the operation procedures. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings: Figure 1 It is a structural schematic diagram of a construction site survey device of the present invention; Figure 2 A three-dimensional diagram of a construction site survey device according to the present invention; Figure 3 It is a front view of a construction site survey device of the present invention; Figure 4 A cross-sectional view of a construction site survey device according to the present invention; Figure 5 for Figure 4 Enlarged view of part A in the middle; Figure 6 for Figure 4 Enlarged view of middle part B; Figure 7 It is an assembly diagram of a support plate, a connecting rod, a bottom cylinder and a support bracket in a construction site survey device of the present invention; Figure 8 It is an assembly diagram of an inverted U-shaped rod, a first straight tube, a U-shaped tube, a second straight tube and a top rod in a construction site survey device of the present invention; Fig. 9 for Figure 8 A cross-sectional view of Fig.10 It is an assembly diagram of a rectangular tube, a first magnetic plate and a rectangular frame in a construction site survey device of the present invention; Fig.11 A three-dimensional diagram of an operating panel in a construction site survey device of the present invention; Fig.12The present invention is a three-dimensional diagram of a rectangular frame in a construction site survey device.

[0017] In the figure: 1, total station body, 2, support plate, 3, rectangular cylinder, 4, connecting rod, 5, bottom cylinder, 6, inverted U-shaped rod, 7, support bracket, 8, first straight cylinder, 11, first universal joint, 21, first elastic member, 22, push rod, 23, first piston, 31, operating panel, 32, first magnetic plate, 33, rectangular frame, 34, rotating shaft, 35, second elastic member, 36, connecting cylinder, 37, round rod, 38, fixed rod, 41, movable plate, 42, second magnetic plate, 51, L-shaped frame, 52, chamfer, 61, second piston, 71, support arm, 81, U-shaped tube, 82, second straight cylinder, 311, concave hole, 361, card strip, 371, card slot. DETAILED DESCRIPTION

[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0019] Embodiment 1:

[0020] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 6 and Figure 7 As shown, a construction site survey device is provided, including a total station body 1, a first universal joint 11 arranged at the middle of the upper end of a support plate 2 is installed at the middle of the lower end of the total station body 1, and the total station body 1 and the support plate 2 are movably connected through the first universal joint 11; Three support brackets 7 arranged in a tapered structure with a narrow upper part and a wide lower part are arranged equidistantly and movably on the lower end of the support plate 2. The three support brackets 7 are arranged in a tapered structure with a narrow upper part and a wide lower part. The three support brackets 7 are arranged on the outer side of the bottom tube 5 and the lower end surface of the bottom tube 5 overlaps with the lower end surface of the bottom tube 5. The three support brackets 7 are used together to lift the support plate 2. A plurality of first elastic members 21 located outside the first universal joint 11 and outside the push rod 22 are equidistantly installed between the support plate 2 and the total station body 1. The plurality of first elastic members 21 are used together to lift the total station body 1. The first elastic member 21 can be a spring.

[0021] When in use, first move the total station body 1 and other components to a suitable location on the construction site, then unfold the three support brackets 7, and place the unfolded three support brackets 7 on the construction base surface. At this time, the first elastic member 21 and the first universal joint 11 will lift the total station body 1 and install it on the upper end of the support plate 2, thereby completing the installation of the total station body 1, and then use the total station body 1 to survey the construction site.

[0022] Embodiment 2:

[0023] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 and Fig.12 As shown, the rectangular tube 3 located directly above the bottom tube 5 is installed on the middle part of the lower end of the support plate 2, and the rectangular tube 3 is used to provide installation space for components such as the movable plate 41, and the movable plate 41 is slidably connected in the rectangular tube 3, and the movable plate 41 is used to provide an installation carrier for components such as the connecting rod 4, and then the vertically arranged connecting rod 4 is installed on the middle part of the lower end of the movable plate 41; The bottom cylinder 5 is movably connected to the lower end of the connecting rod 4 extending from the lower side of the rectangular cylinder 3 through the second universal joint. The bottom cylinder 5 is connected to the movable plate 41 through the connecting rod 4. Chamfers 52 are provided on the outer edge and the inner edge of the lower end of the bottom cylinder 5. The chamfers 52 can be used to push obstacles such as stones. The second magnetic plate 42 is installed on the upper end of the movable plate 41, and the first magnetic plate 32 which is arranged to repel each other with the second magnetic plate 42 and is located in the rectangular tube 3 is arranged directly above the second magnetic plate 42. The first magnetic plate 32 and the second magnetic plate 42 are used in conjunction with each other to move the movable plate 41 downward, and the first magnetic plate 32 is installed inside the rectangular frame 33 located in the rectangular tube 3, and the rotating shaft 34 which is rotatably connected to the inner rear wall of the rectangular tube 3 is set in the middle of the rear end of the rectangular frame 33, and the rectangular frame 33 is rotatably connected to the rectangular tube 3 through the rotating shaft 34; A plurality of first straight cylinders 8 arranged vertically and located above the bottom cylinder 5 are equidistantly installed on the lower end of the support plate 2. Through the first straight cylinder 8, a mounting carrier is provided for the second straight cylinder 82 on the one hand, and a mounting space is provided for the first piston 23 and other components on the other hand. A second straight cylinder 82 located at the lower side of the support plate 2 and outside the rectangular cylinder 3 and arranged vertically is arranged on the rear end of the first straight cylinder 8. Through the second straight cylinder 82, a mounting space is provided for the second piston 61; The second piston 61 is slidably connected to the inside of the second straight cylinder 82, and a sealed space is formed inside the second straight cylinder 82 by using the second piston 61. A vertical portion of a plurality of inverted U-shaped rods 6 is equidistantly movably arranged on the upper end of the bottom cylinder 5 through a third universal joint, and then the lower end of another vertical portion of the inverted U-shaped rod 6 is extended into the second straight cylinder 82 and connected to the second piston 61. The bottom cylinder 5 is connected to the second piston 61 through the inverted U-shaped rod 6; The U-shaped tube 81 whose other end is connected to the lower end of the second straight cylinder 82 is connected and installed on the lower end of the first straight cylinder 8. The first straight cylinder 8 and the second straight cylinder 82 are connected through the U-shaped tube 81, and the first piston 23 is slidably connected in the first straight cylinder 8. A sealed space is formed in the first straight cylinder 8 through the first piston 23. Then, the push rod 22, whose upper end passes through the support plate 2 and fits with the total station body 1 and is slidably connected to the support plate 2 and is vertically arranged, is installed on the middle part of the upper end of the first piston 23. The total station body 1 can be lifted by the push rod 22.

[0024] When the total station body 1 is erected, the rectangular frame 33 and the first magnetic plate 32 are flipped 180 degrees, so that the first magnetic plate 32 and the second magnetic plate 42 are arranged to repel each other, thereby generating a repulsive force between the first magnetic plate 32 and the second magnetic plate 42, and under the action of the repulsive force, the second magnetic plate 42 moves downward, thereby causing the movable plate 41 to move downward along the rectangular tube 3, thereby causing the connecting rod 4 to move downward; Then the bottom cylinder 5 moves downward, so that the multiple inverted U-shaped rods 6 move downward synchronously, and then the second piston 61 moves downward along the second straight cylinder 82, so that the gas in the second straight cylinder 82 is transported to the first straight cylinder 8 through the U-shaped tube 81, and then the air pressure in the first straight cylinder 8 is increased, so that the first piston 23 moves upward along the first straight cylinder 8 under the action of the air pressure, and then the push rod 22 moves upward and contacts with the lower end of the total station body 1, so that the total station body 1 is lifted by the multiple push rods 22; When the support plate 2 is in an inclined state, after the bottom cylinder 5 is fully in contact with the construction base surface, an angle is formed between the bottom cylinder 5 and the support plate 2, so that under the action of the inverted U-shaped rod 6, the second pistons 61 in different second straight cylinders 82 are in different positions, and the air pressures in different first straight cylinders 8 are different, so that the first pistons 23 and the push rods 22 in different first straight cylinders 8 move upward by different distances, and then, with the assistance of the first universal joint 11, an angle is formed between the total station body 1 and the support plate 2, and the total station body 1 and the support plate 2 are parallel, so that the total station body 1 is automatically mechanically leveled, effectively reducing the probability of errors caused by unskilled, improper or forgotten operations, and effectively ensuring the survey quality of the total station body 1; During the contact process between the bottom cylinder 5 and the construction base surface, if there are granular impurities such as small stones at the contact position of the construction base surface, the granular impurities will first contact the chamfered corner 52 of the bottom cylinder 5, and under the thrust of the bottom cylinder 5 moving downward, the granular impurities will move outward along the chamfered corner 52, thereby effectively contacting the bottom cylinder 5 with the construction base surface, effectively ensuring the leveling operation of the total station body 1, and further ensuring the survey quality of the total station body 1; When the survey is completed, the rectangular frame 33 and the first magnetic plate 32 can be flipped 180° with the assistance of the rotating shaft 34, so that the first magnetic plate 32 and the second magnetic plate 42 are arranged to be adsorbed to each other, and an adsorption force is generated between the first magnetic plate 32 and the second magnetic plate 42. Under the action of the adsorption force, the second magnetic plate 42, the movable plate 41, the connecting rod 4 and the bottom tube 5 return to their original positions upward, thereby realizing mechanical storage of the bottom tube 5 and other components, and effectively ensuring subsequent normal handling operations.

[0025] Embodiment three:

[0026] In order to facilitate the flipping operation, a handle structure is generally used to easily flip the first magnetic plate 32. However, the first magnetic plate 32 is prone to self-rotation after flipping, resulting in poor stability of the first magnetic plate 32, which affects the force formed between the first magnetic plate 32 and the second magnetic plate 42, causing the storage or unfolding movement of components such as the bottom tube 5 to be affected.

[0027] In order to solve the above problems, Figure 2 , Figure 4 , Figure 5 , Fig.10 , Fig.11 and Fig.12 As shown, the connecting tube 36 extending to the front end of the rectangular tube 3 and rotatably connected to the rectangular tube 3 is installed on the middle part of the front end of the rectangular frame 33. Through the connecting tube 36, on the one hand, the rectangular frame 33 is rotatably connected to the rectangular tube 3, and on the other hand, an installation space is provided for the second elastic member 35 and other components. The second elastic member 35 is installed on the inner rear wall of the connecting tube 36, and the front end surface of the round rod 37 arranged at the front end of the second elastic member 35 is overlapped with the front end surface of the connecting tube 36. The second elastic member 35 is used to make the round rod 37 and the connecting tube 36 movably connected. The second elastic member 35 can be a spring. An operating plate 31 located inside the second straight tube 82 and attached to the front end of the rectangular tube 3 is installed on the front end of the round rod 37. The round rod 37 can be rotated by the operating plate 31. A plurality of clamping strips 361 arranged along the length direction of the connecting tube 36 and located outside the second elastic member 35 are equidistantly installed on the inner wall of the connecting tube 36. A plurality of clamping grooves 371 extending to the rear end of the round rod 37 and slidably connected to the outer ends of the clamping strips 361 are formed on the outer end surface of the round rod 37. The clamping grooves 371 are used in conjunction with the clamping strips 361 to clamp the round rod 37 and the connecting tube 36. The front end surface of the operating plate 31 is recessed backward to form two recessed holes 311 penetrating the operating plate 31. Two fixing rods 38 located on the left and right sides of the connecting tube 36 and in the recessed holes 311 are symmetrically arranged on the front end of the rectangular tube 3. The recessed holes 311 and the fixing rods 38 are used in conjunction with each other to restrict the installation between the operating plate 31 and the rectangular tube 3.

[0028] When in use, the operating panel 31 is first held and pulled forward, so that the round rod 37 moves toward the front end along the connecting tube 36, and the second elastic member 35 is stretched to generate elastic force, and the concave hole 311 and the fixing rod 38 are separated. Then, the operating panel 31 is rotated 180°, so that the round rod 37 is rotated, and the connecting tube 36 is rotated under the cooperation of the clamping strip 361 and the clamping groove 371, so that the rectangular frame 33 and the first magnetic plate 32 are rotated 180° with the assistance of the rotating shaft 34, so as to complete the mechanical storage or unfolding of the bottom tube 5 and other components. Then the operating plate 31 is released, and under the elastic force of the second elastic member 35, the round rod 37 will move backward along the connecting tube 36, so that the operating plate 31 will move backward and fit with the rectangular tube 3 again, so that the fixing rod 38 will be reinserted into the recessed hole 311, and the operating plate 31 and the rectangular tube 3 will be re-restricted and installed, so as to realize the convenient conversion operation of the magnetic pole of the first magnetic plate 32, and effectively ensure the stability of the first magnetic plate 32 after the conversion, so that an effective force is formed between the first magnetic plate 32 and the second magnetic plate 42, so that the bottom tube 5 and other components can be effectively stored or unfolded.

[0029] Embodiment 4:

[0030] During the use of the device, the support bracket 7 is first unfolded to complete the installation of the total station body 1, and then the total station body 1 is leveled, and then the total station body 1 is used for surveying. When the survey is completed, the leveling structure is first stored, and then the support bracket 7 is stored, and then the device is carried, which results in more operating procedures for the device.

[0031] In order to solve the above problems, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 7 As shown, the transverse parts of the three L-shaped frames 51 located on the inner side of the support bracket 7 are equidistantly installed on the outer end of the bottom tube 5, and the support arm 71 is movably installed on the upper side of the vertical part of the L-shaped frame 51 facing the outer end, and the other end of the support arm 71 is movably arranged on the lower side of the inner end of the support bracket 7. The L-shaped frame 51 and the support bracket 7 are movably connected through the support arm 71, and the three support arms 71 are arranged in a conical structure that is narrow at the top and wide at the bottom.

[0032] During the downward movement of the bottom tube 5, the three L-shaped frames 51 will move downward synchronously, thereby causing the support arm 71 to move downward inward, thereby causing the support arm 71 to move outward, thereby causing the support bracket 7 to expand outward. During the upward movement of the bottom tube 5, the three L-shaped frames 51 will move upward synchronously, and with the assistance of the support arm 71, the support bracket 7 will move inward to be retracted, thereby achieving linkage between the up and down movement of the bottom tube 5 and the retraction and expansion movement of the support bracket 7, effectively reducing the operating procedures.

[0033] A method for using a construction site survey device comprises the following steps: The first step is to carry and place the survey device to a suitable position on the construction site, and then use the operating panel 31 to rotate the first magnetic plate 32, so that the first magnetic plate 32 and the second magnetic plate 42 are arranged to repel each other; Step 2: Under the repulsive force generated between the first magnetic plate 32 and the second magnetic plate 42, the second magnetic plate 42, the movable plate 41 and the connecting rod 4 move downward, thereby moving the bottom cylinder 5 downward, and simultaneously moving the multiple inverted U-shaped rods 6 downward, thereby moving the second piston 61 downward, and transporting the gas in the second straight cylinder 82 to the first straight cylinder 8 through the U-shaped tube 81, thereby moving the first piston 23 upward, thereby moving the ejector rod 22 upward and contacting the lower end of the total station body 1. When the lower end of the bottom cylinder 5 contacts the construction base surface under the repulsive force, the multiple ejector rods 22 will lift the total station body 1 at multiple points, and make the total station body 1 parallel to the construction base surface; The third step is to start the total station body 1, and perform centering, rough leveling and fine leveling operations on the total station body 1 to complete the surveying operation.

[0034] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction site survey device, characterized in that: The invention comprises a total station body (1), a first universal joint (11) is installed at the middle of the lower end of the total station body (1), a support plate (2) is arranged at the lower end of the first universal joint (11), a driving member is installed at the middle of the lower end of the support plate (2), the lower end of the driving member is movably connected to a bottom cylinder (5), the outer edge and the inner edge of the lower end of the bottom cylinder (5) are both provided with chamfers (52), and a plurality of vertically arranged first straight cylinders (8) are equidistantly installed at the lower end of the support plate (2), and the first straight cylinders (8) are located above the bottom cylinder (5); A second straight cylinder (82) arranged vertically is disposed at the rear end of the first straight cylinder (8), the second straight cylinder (82) is located at the lower side of the support plate (2), and the second straight cylinder (82) is located outside the driving member, the second straight cylinder (82) is slidably connected to the second piston (61), and a vertical portion of a plurality of inverted U-shaped rods (6) is movably disposed at an equal distance at the upper end of the bottom cylinder (5), and the lower end of another vertical portion of the inverted U-shaped rod (6) extends into the second straight cylinder (82) and is connected to the second piston (61); The lower end of the first straight cylinder (8) is connected to a U-shaped tube (81), and the other end of the U-shaped tube (81) is connected to the lower end of the second straight cylinder (82). The first straight cylinder (8) is slidably connected to a first piston (23). A vertically arranged push rod (22) is installed in the middle of the upper end of the first piston (23). The upper end of the push rod (22) passes through the support plate (2) and fits with the total station body (1). The support plate (2) is slidably connected to the push rod (22). A support member is installed at the lower end of the support plate (2), and the support member is located outside the bottom cylinder (5).

2. The construction site survey device according to claim 1, characterized in that: The support member comprises three support brackets (7), the three support brackets (7) are equidistantly arranged at the lower end of the support plate (2), and the support brackets (7) are located outside the bottom tube (5). The lower end surface of the support bracket (7) overlaps with the lower end surface of the bottom tube (5), and the three support brackets (7) are arranged in a conical structure that is narrow at the top and wide at the bottom.

3. The construction site survey device according to claim 2, characterized in that: The driving member comprises a rectangular cylinder (3), the rectangular cylinder (3) being mounted at the middle of the lower end of the support plate (2), and the rectangular cylinder (3) being located directly above the bottom cylinder (5), the rectangular cylinder (3) being slidably connected to a movable plate (41), a vertically arranged connecting rod (4) being mounted at the middle of the lower end of the movable plate (41), the lower end of the connecting rod (4) extending out of the lower side of the rectangular cylinder (3) and being movably connected to the bottom cylinder (5); A second magnetic plate (42) is mounted on the upper end of the movable plate (41); a first magnetic plate (32) is arranged directly above the second magnetic plate (42); the first magnetic plate (32) and the second magnetic plate (42) are arranged to repel each other; the first magnetic plate (32) is located in the rectangular tube (3); an auxiliary component is mounted on the outer end of the first magnetic plate (32); and the auxiliary component is movably arranged in the rectangular tube (3).

4. The construction site survey device according to claim 3, characterized in that: The auxiliary component comprises a rectangular frame (33), a first magnetic plate (32) is installed inside the rectangular frame (33), and the rectangular frame (33) is located inside the rectangular tube (3). A rotating shaft (34) is provided in the middle of the rear end of the rectangular frame (33), and the rotating shaft (34) is rotatably connected to the inner rear wall of the rectangular tube (3); A connecting tube (36) is installed at the middle of the front end of the rectangular frame (33), the connecting tube (36) extends to the front end of the rectangular tube (3), and the connecting tube (36) is rotatably connected to the rectangular tube (3), a second elastic member (35) is installed on the inner rear wall of the connecting tube (36), a round rod (37) is arranged at the front end of the second elastic member (35), and the front end surface of the round rod (37) overlaps with the front end surface of the connecting tube (36), an operating panel (31) is installed at the front end of the round rod (37), and the operating panel (31) is located inside the second straight tube (82), and the operating panel (31) is attached to the front end of the rectangular tube (3); A plurality of clamping strips (361) are equidistantly mounted on the inner wall of the connecting tube (36), and the clamping strips (361) are arranged along the length direction of the connecting tube (36), and the clamping strips (361) are located outside the second elastic member (35), and the outer end surface of the round rod (37) is recessed inwardly to form a plurality of clamping grooves (371), and the clamping grooves (371) extend to the rear end of the round rod (37), and the clamping grooves (371) are slidably connected to the outer end of the clamping strip (361).

5. The construction site survey device according to claim 4, characterized in that: The front end of the operating plate (31) is recessed backward to form two recessed holes (311), and the recessed holes (311) penetrate the operating plate (31). Two fixing rods (38) are symmetrically arranged at the front end of the rectangular tube (3), and the two fixing rods (38) are located on the left and right sides of the connecting tube (36), and the fixing rods (38) are located in the recessed holes (311).

6. The construction site survey device according to claim 5, characterized in that: A plurality of first elastic members (21) are equidistantly installed between the support plate (2) and the total station body (1), and the first elastic members (21) are located outside the first universal joint (11), and the first elastic members (21) are located outside the top rod (22).

7. The method for using the construction site survey device according to claim 6, characterized in that: The following steps are involved: The first step is to carry and place the survey device at a suitable location on the construction site, and then use the operating panel (31) to rotate the first magnetic plate (32), thereby making the first magnetic plate (32) and the second magnetic plate (42) mutually repel each other; Step 2: Under the action of the repulsive force generated between the first magnetic plate (32) and the second magnetic plate (42), the second magnetic plate (42), the movable plate (41) and the connecting rod (4) are moved downward, thereby causing the bottom cylinder (5) to move downward, and causing the plurality of inverted U-shaped rods (6) to move downward synchronously, thereby causing the second piston (61) to move downward, and causing the gas in the second straight cylinder (82) to be transported to the first straight cylinder (8) through the U-shaped tube (81), thereby causing the first piston (23) to move upward, thereby causing the push rod (22) to move upward and contact the lower end of the total station body (1). When the lower end of the bottom cylinder (5) contacts the construction base surface under the action of the repulsive force, the plurality of push rods (22) will lift the total station body (1) at multiple points, and cause the total station body (1) to be parallel to the construction base surface; The third step is to start the total station main body (1), and perform centering, rough leveling and fine leveling operations on the total station main body (1), thereby completing the surveying operation.

Citation Information

Patent Citations

  • Complex ground self-balance adjustment simple platform

    CN102809034A

  • Adjustable supporting method and supporting parts of adjustable supporting method

    CN103807584A

  • Multifunctional water conservancy measurement equipment

    CN221991389U

  • Jack assembly

    US20150360653A1