Real-time engineering progress supervision device for construction site and supervision system thereof

By designing a real-time engineering progress supervision device including computer body and support components, the problems of measurement instability and angle adjustment in traditional devices are solved, and higher stability, accuracy and mobility are achieved, and real-time supervision needs at the construction site are met.

CN119802425AInactive Publication Date: 2025-04-11NANJING YAOSHI HENGZE TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411897322.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-04-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional project progress supervision device is not perfect enough, and the lack of convenient facilities to support positioning project progress measurement equipment for level monitoring, resulting in unstable measurement, inaccurate measurement angle, and difficulty in moving the computer body, which reduces safety and functionality.

Method used

A real-time engineering progress supervision device including a computer body and a support assembly is designed. The support assembly provides stable horizontal positioning support for the project progress measurement equipment through side plates, connecting rods, and struts, and accurately adjusts the measurement angle through rotating bearings and thread systems. At the same time, through the design of elastic bands and grip plates, it is convenient for staff to move the computer body.

Benefits of technology

It improves the stability and measurement accuracy of the project progress measurement equipment, simplifies the process of adjusting the measurement angle, enhances the mobility and safety of the computer body, and meets the needs of real-time project progress supervision on the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119802425A_ABST
    Figure CN119802425A_ABST
Patent Text Reader

Abstract

The invention discloses a real-time project progress supervision device for a construction site, which comprises a computer main body, and a supporting assembly is mounted on the right side of the computer main body and is used for providing positioning support for project progress measurement equipment. According to the engineering construction measuring equipment, the supporting and fixing assembly is installed, the computer main body can provide support for the side plates in the supporting and fixing assembly, and a worker needs to horizontally position and support the engineering construction measuring equipment through the supporting and fixing assembly under the supporting of the computer main body; the engineering construction measuring equipment can more stably measure real-time engineering progress data of a construction site during horizontal angle measurement, and the stability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering progress monitoring devices, in particular to a real-time engineering progress monitoring device for a construction site and a monitoring system thereof. Background Art

[0002] The project progress monitoring device is a computer-based device that uses a project progress measuring device (laser rangefinder) to measure the real-time progress of the construction site, transmits the measured data to the monitoring system in the computer body for processing, and uses the computer body to process it so that the display screen displays it for people's reference. In view of this, the traditional device is not perfect enough, and there is no facility that can conveniently support and position the project progress measuring equipment for horizontal monitoring. It is usually measured manually by hand, which is not stable enough. A real-time project progress monitoring device and its monitoring system for construction sites can provide convenience for project progress supervision work.

[0003] The defects of the existing engineering progress monitoring device are:

[0004] 1. Patent document: CN217899330U, discloses a monitoring device based on information engineering "including a protection box and a mounting seat, the mounting seat is fixedly connected to the bottom of the protection box, a rotating monitoring device is arranged inside the protection box, a mobile support device is fixedly connected to the bottom of the mounting seat, the rotating monitoring device includes an information monitoring device, a rotating disc, a rotating trough, a rotating column, a buffer plate, and the mobile support device includes a connecting column, a hydraulic column, a hydraulic trough, a hydraulic rod, a universal wheel, and a support column. The monitoring device based on information engineering, through the coordinated use of the hydraulic column and the hydraulic rod in the mobile support device, can push out the universal wheel on the hydraulic rod when it needs to be moved, so that the movement of the entire device is more convenient and the physical strength of the workers is saved. When it needs to be fixed, the universal wheel is retracted, and the four support columns cooperate to improve the stability of the machine." Traditional monitoring devices are not complete and there is no facility that can conveniently support and position engineering progress measurement equipment for horizontal monitoring. Usually, manual handheld measurement is performed, which is not stable enough.

[0005] 2. The traditional engineering progress monitoring device is not perfect, and it is not convenient to adjust the measurement angle of the supporting and positioned engineering progress measurement equipment, which reduces the accuracy and functionality.

[0006] 3. The traditional engineering progress monitoring device is not perfect enough, and it is not convenient to fine-tune the measuring angle of the engineering progress measuring equipment more accurately. The angle adjustment is troublesome and not accurate enough.

[0007] 4. Traditional engineering progress monitoring devices are not perfect. There is no facility for workers to lift the computer body and move it around the construction site for real-time monitoring. The computer body is prone to slipping out of the hands and falling, which reduces safety. Summary of the invention

[0008] The purpose of the present invention is to provide a real-time engineering progress monitoring device and a monitoring system for a construction site to solve the problems raised in the above-mentioned background technology.

[0009] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: A real-time engineering progress monitoring device for a construction site, comprising a computer body, a support assembly is installed on the right side of the computer body, and the support assembly is used to provide positioning support for an engineering progress measurement device;

[0010] The supporting assembly includes a side plate, a connecting rod is installed on the right side of the side plate, a supporting rod is placed on the top of the connecting rod, a fixing hole is penetrated inside the supporting rod, a connecting block is penetrated inside the fixing hole, a screw rod is installed on the right side of the connecting block through a bearing, a movable block is threadedly installed on the outer side of the screw rod, a dynamic clamping plate is installed on the top of the movable block, a static clamping plate is installed on the top of the connecting block, a supporting plate is installed on the front side of the dynamic clamping plate, a guide plate is installed on the front side of the static clamping plate, a guide rod is installed on the left side of the supporting plate, clamping pads are installed on the inner sides of the dynamic clamping plate and the static clamping plate, a card slot is penetrated inside the clamping pad, the dynamic clamping plate and the static clamping plate, and positioning grooves are opened on the opposite sides of the two clamping pads.

[0011] Preferably, a touchpad is embedded on the top of the computer body, a keyboard is installed on the top of the computer body, and the keyboard is located on the back of the touchpad, a movable groove is opened on the top of the computer body, and the movable groove is located on the back of the keyboard, a rotating rod is installed on the inner side of the movable groove, a display screen is installed on the outer side of the rotating rod, and a data interface is embedded on the right side of the computer body.

[0012] Preferably, a rotary sleeve is installed on the outer side of the screw rod, and the rotary sleeve is located on the right side of the movable block, and push handles are installed on the top and bottom of the rotary sleeve.

[0013] Preferably, a transparent plate is installed on the outer side of the connecting rod through a bearing, a through hole is opened inside the support rod, a pointer is installed on the left side of the transparent plate, and the pointer is located on the outer side of the connecting rod, a square is installed on the right side of the connecting rod, and the square is located on the outer side of the connecting rod, a support rod is installed on the back of the side plate, a guide rod is installed on the right side of the support rod, and the guide rod passes through the through hole.

[0014] Preferably, the top of the transparent plate is connected to the bottom of the support rod.

[0015] Preferably, two push rings are sleeved on the outer side of the guide rod, and an N-plate is installed on the right sides of the two push rings and connected to each other, a push rod is installed on the right side of the N-plate, a frame rod is installed on the top of the support rod, a threaded rod is installed on the front side of the frame rod, a nut is installed on the outer side of the threaded rod, a rotating ring is installed on the outer side of the nut through a bearing, a slide plate is installed on the bottom of the rotating ring, and the slide plate is located on the outer side of the push rod.

[0016] Preferably, a movable hole is opened through the inside of the side panel, a grip plate is installed on the back of the side panel, and the grip plate is connected to the back of the computer body, two arc support plates are installed on the bottom of the grip plate, a connecting plate is installed between the two arc support plates, two arc plates are installed on the bottom of the connecting plate, an inner plate is installed between the arc plates and the connecting plates, an elastic band is installed between the two arc plates, a draw rope is installed at the bottom of the elastic band, the draw rope passes through the movable hole, and a limiting ball is installed on the front end of the draw rope.

[0017] Preferably, the operation method of the engineering progress monitoring device is as follows:

[0018] S1. First, the staff needs to place the computer body at the work location and make the arc plate contact the ground, so that the arc plate provides support for the computer body through the connecting plate and the arc support plate, and fully charges the computer body. Then, with the support of the computer body, push the display screen to rotate clockwise on the inner side of the movable slot with the rotating rod as the center of the circle to open, adjust the angle of the display screen, start the computer body, and run the monitoring system in the computer body by operating the touch pad and keyboard;

[0019] S2. Then the staff needs to place the engineering progress measurement equipment on the inner side of the card slot and the positioning slot under the support of the static clamping plate to contact the clamping pad. Then the staff needs to push the rotary sleeve through the push handle, so that the rotary sleeve pushes the screw rod to rotate under the action of external force, so that the screw rod uses the rotational power and the thread action to push the movable block to move left and right according to the rotation direction. At the same time, the movable block will drive the movable clamping plate and the support plate to move to the left under the action of the external force, so that the support plate drives the guide rod to penetrate the guide plate and move to the left under the moving guide action of the guide plate and the guide rod, so that the movable clamping plate drives its inner installation under the action of external force. The clamping pads are moved to the left side, so that the two clamping pads are close to each other, and squeezed and deformed to fit and clamp the engineering progress measurement equipment placed inside the positioning groove and the card slot, so that the engineering progress measurement equipment can be placed horizontally under the support of the support rod, transparent plate, connecting rod and side plate through the clamping pads, dynamic clamping plates, static clamping plates and connecting blocks, and the engineering construction measurement equipment is started to monitor and measure the distance, length, width and height data of the engineering construction, and the engineering construction measurement equipment is connected to the computer body from the data interface through the data line, so that the monitoring data can be transmitted to the computer body;

[0020] S3. During monitoring and measurement, the staff can pull the pull rope to the front through the limit ball, so that the pull rope passes through the movable hole and pulls the elastic band to the right under the resistance of the side plate to deform, so that the elastic band uses elasticity to expand the gap between the elastic band and the connecting plate. Then the staff needs to put his hand through the gap between the elastic band and the connecting plate, and move the forearm to fit between the elastic band, the two inner plates and the two arc plates, and then connect the connecting plate with the staff's arm under the rebound force of the elastic band and the positioning effect of the inner plate and the arc plate. Then the staff needs to hold the grip plate, and then lift the computer body to move it under the connection support of the grip plate, the arc support plate and the side plate, so as to prevent the computer body from accidentally falling off from the hand, making it more convenient for people to move the computer body at the construction site for monitoring and supervision;

[0021] S4. During monitoring, the support rod will rotate around the bearing installed on its outer side with the connecting rod as the center under the action of external force and according to the direction of the external force and the support of the side plate. When the support rod rotates, it will drive the transparent plate and the connecting block to rotate together, and the transparent plate will drive the pointer to rotate together. At the same time, people can observe the relative position of the pointer on the front of the angle ruler through the transparent plate made of transparent material under the support of the side plate to judge the rotation angle of the support rod, so that the support rod drives the rotation angle of the engineering progress measurement device fixed between the two clamping pads through the connecting block and the moving clamping plate under the action of external force;

[0022] S5. When adjusting the angle of the strut, the staff can rotate the nut under the support of the frame rod and the support rod, so that the nut can move forward and backward along the threaded rod according to the rotation direction using the thread under the action of external force, so that the nut can drive the rotating ring to move together through the bearing under the action of external force, and the rotating ring will rotate with the bearing as the center under the action of the gravity of the slide plate, so as to achieve not following the rotation of the nut, and then the nut can drive the slide plate to move forward and backward through the rotating ring. When the slide plate moves, it will push the push rod to move together under the action of external force. The push rod will drive the push ring to move along the guide rod under the support of the support rod through the N plate under the action of external force. At the same time, the push ring will push the strut to rotate with the connecting rod as the center under the action of external force, and the strut will move along the outside of the guide rod using the perforation. At the same time, the push rod will move up and down along the inside of the slide plate during the movement, so as to use the threaded action of the nut and the threaded rod to achieve precise fine-tuning of the angle of the strut, so that the engineering progress measurement equipment clamped and positioned between the two clamping pads can accurately rotate at an angle for measurement and monitoring.

[0023] Preferably, the supervision system is as follows:

[0024] D1. Create a construction Gantt chart: Use the touchpad and keyboard to create a construction progress Gantt chart of the construction site using the computer body;

[0025] D2. Collect data: Use the support assembly to fix and support the project progress measurement device, and adjust the angle of the project progress measurement device by rotating the nut with the pointer and the angle ruler as reference. At the same time, according to the actual situation, put the arm through the gap between the inner plate and the elastic band, and hold the grip plate to lift the computer body to move the position, so that the project progress measurement device can monitor and measure the real-time project data progress of the construction site, and transmit the measurement data to the computer body through the data line and data interface for collection;

[0026] D3. Data storage and processing: Store the collected data in the computer body, and compare the stored data with the construction progress Gantt chart;

[0027] D4. Analysis and reporting: Compare the stored data with the construction progress Gantt chart to generate statistics on the overlapping data, difference data and uninvolved data, and generate detailed reports and charts;

[0028] D5. Visual interface: used to present and interact with project progress data.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. The present invention is equipped with a support assembly, so that the computer body can provide support for the side panels in the support assembly. The staff needs to use the support assembly to horizontally position and support the engineering construction measurement equipment with the support of the computer body, so that the engineering construction measurement equipment can measure the real-time engineering progress data of the construction site more stably at a horizontal angle, thereby improving stability.

[0031] 2. The present invention is equipped with a supporting assembly, in which the side plates can provide rotational support for the transparent plate through the connecting plates and bearings. The transparent plate is made of transparent material and can stably support the supporting rod. During monitoring, the supporting rod will rotate around the bearing installed on its outer side with the connecting rod as the center under the action of external force and according to the direction of the external force and the support of the side plates. When the supporting rod rotates, it will drive the transparent plate and the connecting block to rotate together, and the transparent plate will drive the pointer to rotate together. At the same time, people can observe the relative position of the pointer on the front of the angle ruler through the transparent plate made of transparent material under the support of the side plates to judge the rotation angle of the supporting rod, so that the supporting rod can drive the rotation angle of the engineering progress measuring equipment fixed between the two clamping pads through the connecting block and the movable clamping plate under the action of external force, so that the device can conveniently adjust the angle of the engineering construction measuring equipment and improve functionality.

[0032] 3. The present invention is equipped with a support assembly, which can provide support for the support rod, and the support rod arranged in the support assembly can provide a space for the perforation. When adjusting the angle of the support rod, the staff can rotate the nut under the support of the frame rod and the support rod, so that the nut can move forward and backward along the threaded rod according to the rotation direction by using the thread under the action of external force, so that the nut can drive the rotating ring to move together through the bearing under the action of external force, and the rotating ring can rotate with the bearing as the center under the action of the gravity of the slide plate, so as to achieve the rotation without following the nut, and then the nut can drive the slide plate to move forward and backward through the rotating ring, and when the slide plate moves, it will push the pusher under the action of external force. The push rod will move together with the guide rod, and the push rod will drive the push ring to move along the guide rod under the support of the support rod through the N plate under the action of external force. At the same time, the push ring will push the support rod to rotate with the connecting rod as the center under the action of external force, and the support rod will move along the outside of the guide rod by using the through hole. At the same time, the push rod will move up and down along the inside of the slide during the movement, so as to use the threaded action of the nut and the threaded rod to accurately fine-tune the angle of the support rod, so that the engineering progress measuring equipment clamped and positioned between the two clamping pads can be measured and monitored at a precise rotation angle, so that the device can easily fine-tune the monitoring angle of the engineering progress measuring equipment and improve the accuracy.

[0033] 4. The present invention is equipped with a supporting assembly. The side panels arranged in the supporting assembly can cooperate with the computer body to provide stable support for the gripping plate. During monitoring and measurement, the staff can pull the pull rope toward the front through the limit ball, so that the pull rope passes through the movable hole and pulls the elastic band to the right side to deform under the resistance of the side panel, so that the elastic band uses its elasticity to expand the gap between the elastic band and the connecting plate. Then, the staff needs to pass the hand through the gap between the elastic band and the connecting plate, and move the forearm to fit between the elastic band, the two inner plates and the two arc plates, and then, under the action of the rebound force of the elastic band and the positioning action of the inner plate and the arc plate, the connecting plate is connected to the staff's arm. Then, the staff needs to hold the gripping plate, and then lift the computer body to move it under the connection and support of the gripping plate, the arc support plate and the side plate, thereby preventing the computer body from accidentally falling off from the hand, and making it more convenient for people to move the computer body at the construction site for monitoring and supervision. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 is an axonometric view of the present invention;

[0035] Figure 2 It is a schematic diagram of the three-dimensional structure of the support rod of the present invention;

[0036] Figure 3 It is a schematic diagram of the three-dimensional structure of the skateboard of the present invention;

[0037] Figure 4 It is a schematic diagram of the three-dimensional structure of the connecting plate of the present invention;

[0038] Figure 5It is a schematic diagram of the three-dimensional structure of the threaded rod of the present invention;

[0039] Figure 6 It is a schematic diagram of the three-dimensional structure of the screw rod of the present invention;

[0040] Figure 7 It is a schematic diagram of the three-dimensional structure of the push ring of the present invention;

[0041] Figure 8 It is a schematic diagram of the planar structure of the active hole of the present invention;

[0042] Fig. 9 is a flow chart of the present invention;

[0043] Fig.10 It is a flow chart of the supervision system of the present invention.

[0044] In the figure: 1. Computer body; 2. Touchpad; 3. Keyboard; 4. Movable slot; 5. Rotating rod; 6. Display screen; 7. Data interface; 8. Side panel; 9. Connecting rod; 10. Transparent plate; 11. Support rod; 12. Fixing hole; 13. Connecting block; 14. Screw rod; 15. Movable block; 16. Rotating sleeve; 17. Push handle; 18. Moving clamping plate; 19. Static clamping plate; 20. Supporting plate; 21. Guide plate; 22. Guide rod; 23. Clamping pad; 24. Card slot; 25, positioning slot; 26, through hole; 27, pointer; 28, angle ruler; 29, support rod; 30, guide rod; 31, push ring; 32, N plate; 33, push rod; 34, support rod; 35, threaded rod; 36, nut; 37, rotating ring; 38, slide plate; 39, movable hole; 40, grip plate; 41, arc support plate; 42, connecting plate; 43, arc plate; 44, inner plate; 45, elastic band; 46, pull rope; 47, limit ball. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0047] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" means fixed connection, detachable connection, or integral connection; mechanical connection, electrical connection; direct connection, indirect connection through an intermediate medium, and internal communication between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention are understood according to specific circumstances.

[0048] See also Figure 1 The present invention provides an embodiment: a real-time engineering progress monitoring device and a monitoring system for a construction site, comprising a computer body 1, a touch panel 2 is embedded on the top of the computer body 1, a keyboard 3 is installed on the top of the computer body 1, and the keyboard 3 is located on the back of the touch panel 2, a movable groove 4 is opened on the top of the computer body 1, and the movable groove 4 is located on the back of the keyboard 3, a rotating rod 5 is installed on the inner side of the movable groove 4, and a display screen 6 is installed on the outer side of the rotating rod 5, and a data interface 7 is embedded on the right side of the computer body 1. The computer body 1 can provide a stable support for the touch panel 2, and the staff can use their fingers to touch the touch panel 2 and stick to it. The top of the touchpad 2 is slid or pressed to operate and control the computer body 1. At the same time, the staff needs to press the keyboard 3 to cooperate with the touchpad 2 to control the computer body 1. The computer body 1 can provide a space for the movable slot 4, and the movable slot 4 can firmly support the rotating rod 5. The rotating rod 5 can provide a rotating support for the display screen 6. The computer body 1 can transmit the processed data information and pictures to the display screen 6, so that the display screen 6 displays the data pictures for people's reference, and the staff can use external force to push the display screen 6, so that the display screen 6 rotates on the inner side of the movable slot 4 with the rotating rod 5 as the center under the action of the external force, thereby achieving the function of adjusting the angle of the display screen 6.

[0049] See also Figure 1 , Figure 2 , Figure 6 and Figure 7An embodiment of the present invention is as follows: a real-time engineering progress monitoring device and a monitoring system for a construction site, including a support assembly, a support assembly is installed on the right side of a computer body 1, and the support assembly is used to provide positioning support for an engineering progress measuring device, and the support assembly includes a side plate 8, a connecting rod 9 is installed on the right side of the side plate 8, a support rod 11 is placed on the top of the connecting rod 9, a fixing hole 12 is penetrated in the inside of the support rod 11, a connecting block 13 is penetrated in the inside of the fixing hole 12, a screw rod 14 is installed on the right side of the connecting block 13 through a bearing, a movable block 15 is installed on the outer side of the screw rod 14, a movable clamping plate 18 is installed on the top of the movable block 15, a static clamping plate 19 is installed on the top of the connecting block 13, a support plate 20 is installed on the front of the movable clamping plate 18, and a static clamping plate 19 is installed on the front of the movable clamping plate 18. A guide plate 21 is installed on the front side, a guide rod 22 is installed on the left side of the support plate 20, a clamping pad 23 is installed on the inner side of the dynamic clamping plate 18 and the static clamping plate 19, a card slot 24 is opened through the inside of the clamping pad 23, the dynamic clamping plate 18 and the static clamping plate 19, and a positioning slot 25 is opened on the opposite sides of the two clamping pads 23. A rotary sleeve 16 is installed on the outer side of the screw rod 14, and the rotary sleeve 16 is located on the right side of the movable block 15. Push handles 17 are installed on the top and bottom of the rotary sleeve 16. The side plate 8 can stably support the connecting rod 9 under the support of the computer body 1, and the connecting rod 9 can provide rotation support for the transparent plate 10 through the bearing, and the transparent plate 10 can stably support the support rod 11, and the push ring 31, N plate 32, push rod 33, slide plate 38, rotary ring 37, nut 36 and threaded rod 35 can cooperate to provide The support rod 11 provides a positioning function to prevent the support rod 11 and the transparent plate 10 from rotating together with the connecting rod 9 as the center of the circle. The connecting block 13 can firmly support the static clamping plate 19 under the support of the support rod 11, and can provide rotation support for the screw rod 14 through the bearing. The screw rod 14 can cooperate with the movable block 15 threadedly, and the clamping pad 23 has a certain elasticity. The staff needs to place the engineering progress measurement equipment under the support of the static clamping plate 19 to the inner side of the card slot 24 and the positioning slot 25 to contact the clamping pad 23. Then the staff needs to push the rotary sleeve 16 through the push handle 17, so that the rotary sleeve 16 pushes the screw rod 14 to rotate under the action of external force, so that the screw rod 14 uses the rotational power and the thread action to push the movable block 15 to move left and right according to the rotation direction. At the same time, the movable block 15 will move under the action of external force. The movable clamping plate 18 and the support plate 20 of the belt move to the left side, so that the support plate 20 drives the guide rod 22 to penetrate the guide plate 21 and move to the left side under the moving and guiding action of the guide plate 21 and the guide rod 22, and then the movable clamping plate 18 drives the clamping pad 23 installed on its inner side to move to the left side under the action of external force, so that the two clamping pads 23 are close to each other, squeezed and deformed, and fit to the engineering progress measurement equipment placed on the inner side of the positioning groove 25 and the card groove 24, and clamped and fixed, so that the engineering progress measurement equipment can be placed horizontally through the clamping pad 23, the movable clamping plate 18, the static clamping plate 19 and the connecting block 13 under the support of the support rod 11, the transparent plate 10, the connecting rod 9 and the side plate 8, and the engineering construction measurement equipment is started to monitor and measure the distance, length, width and height data of the engineering construction.The engineering construction measurement equipment is connected to the computer main body 1 through the data interface 7 by using a data line, so that the monitoring data can be transmitted to the computer main body 1.

[0050] See also Figure 1 , Figure 2 and Figure 8 An embodiment of the present invention is as follows: a real-time engineering progress monitoring device and a monitoring system for a construction site, comprising a supporting assembly, a transparent plate 10 is installed on the outer side of a connecting rod 9 arranged in the supporting assembly through a bearing, a through hole 26 is penetrated through the inside of the supporting rod 11, a pointer 27 is installed on the left side of the transparent plate 10, and the pointer 27 is located on the outer side of the connecting rod 9, a square 28 is installed on the right side of the connecting rod 9, and the square 28 is located on the outer side of the connecting rod 9, a support rod 29 is installed on the back of the side plate 8, a guide rod 30 is installed on the right side of the support rod 29, and the guide rod 30 penetrates the through hole 26, the top of the transparent plate 10 is connected to the bottom of the supporting rod 11, the connecting rod 9 can provide rotation support for the transparent plate 10 through the bearing under the support of the side plate 8, and the transparent plate 10 is made of transparent material, which can facilitate the staff to observe through the transparent plate 10 whether the pointer 27 is located at the angle The relative position of the angle ruler 28, there is an angle scale line on the right side of the angle ruler 28, which can be used as a reference for people to adjust the angle. The guide rod 30 can provide a moving guide for the support rod 29 through the through hole 26. During monitoring, the support rod 11 will rotate around the bearing installed on its outer side with the connecting rod 9 as the center under the action of external force and according to the direction of the external force and the support of the side plate 8. When the support rod 11 rotates, it will drive the transparent plate 10 and the connecting block 13 to rotate together, and the transparent plate 10 will drive the pointer 27 to rotate together. At the same time, people can observe the relative position of the pointer 27 on the front of the angle ruler 28 through the transparent plate 10 made of transparent material under the support of the side plate 8 to judge the rotation angle of the support rod 11, so that the support rod 11 drives the rotation angle of the engineering progress measurement equipment fixed between the two clamping pads 23 through the connecting block 13 and the movable clamping plate 18 under the action of external force.

[0051] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 , Figure 7 and Figure 8An embodiment of the present invention is as follows: a real-time engineering progress monitoring device and a monitoring system for a construction site, comprising a guide rod 30, two push rings 31 are sleeved on the outer side of the guide rod 30, an N plate 32 is installed on the right side of the two push rings 31, a push rod 33 is installed on the right side of the N plate 32, a frame rod 34 is installed on the top of the support rod 29, a threaded rod 35 is installed on the front side of the frame rod 34, a nut 36 is installed on the outer side of the threaded rod 35, a rotating ring 37 is installed on the outer side of the nut 36 through a bearing, and a slide plate 38 is installed on the bottom of the rotating ring 37, The slide plate 38 is located on the outside of the push rod 33, and the guide rod 30 can provide movement guidance and support for the push ring 31. The two push rings 31 can push the support rod 11 in the clockwise and counterclockwise directions respectively under the action of external force. The N plate 32 can connect the two push rings 31 to each other and move synchronously. At the same time, the N plate 32 can firmly support the push rod 33. The push rod 33 can move up and down along the slide plate 38 while following the movement of the N plate 32 and the push ring 31 along the guide rod 30. When adjusting the angle of the support rod 11, the staff can adjust the angle of the support rod 11 under the support of the frame rod 34 and the support rod 29. The nut 36 is rotated downward, so that the nut 36 moves forward and backward along the threaded rod 35 according to the rotation direction by the thread under the action of external force, so that the nut 36 drives the rotating ring 37 to move together through the bearing under the action of external force, and the rotating ring 37 rotates with the bearing as the center under the action of gravity of the slide plate 38, so as to achieve the rotation without following the nut 36, and then the nut 36 can drive the slide plate 38 to move forward and backward together through the rotating ring 37. When the slide plate 38 moves, it will push the push rod 33 to move together under the action of external force, and the push rod 33 will be driven by the N plate 32 under the action of external force. The push ring 31 moves along the guide rod 30 with the support of the support rod 29. At the same time, the push ring 31 will push the support rod 11 to rotate with the connecting rod 9 as the center under the action of external force, and the support rod 11 will move along the outer side of the guide rod 30 using the through hole 26. At the same time, the push rod 33 will move up and down along the inner side of the slide plate 38 during the movement, so as to use the threaded action of the nut 36 and the threaded rod 35 to accurately fine-tune the angle of the support rod 11, so that the engineering progress measurement equipment clamped and positioned between the two clamping pads 23 can perform measurement and monitoring work at a precise rotation angle.

[0052] See also Figure 1 , Figure 4 and Figure 8, an embodiment of the present invention is: a real-time engineering progress monitoring device and a monitoring system for a construction site, including a supporting component, a side panel 8 provided in the supporting component has an active hole 39 formed therein, a gripping plate 40 is installed on the back of the side panel 8, and the gripping plate 40 is connected to the back of the computer body 1, two arc supporting plates 41 are installed at the bottom of the gripping plate 40, a connecting plate 42 is installed between the two arc supporting plates 41, two arc plates 43 are installed at the bottom of the connecting plate 42, an inner plate 44 is installed between the arc plates 43 and the connecting plate 42, an elastic band 45 is installed between the two arc plates 43, a pull rope 46 is installed at the bottom of the elastic band 45, the pull rope 46 passes through the active hole 39, a limiting ball 47 is installed at one end of the front side of the pull rope 46, the side panel 8 can provide a space for the active hole 39, the active hole 39 can provide a through channel and a moving guide for the pull rope 46, and the active hole 39 cooperates with the side panel 8 to provide a resistance for the limiting ball 47, so that the limiting The ball 47 can limit the moving length of the pull rope 46 and prevent the pull rope 46 from completely moving out of the movable hole 39. During monitoring and measurement, the staff can pull the pull rope 46 toward the front through the limit ball 47, so that the pull rope 46 passes through the movable hole 39 and pulls the elastic band 45 to the right to deform under the resistance of the side plate 8, so that the elastic band 45 uses its elasticity to expand the gap between the elastic band 45 and the connecting plate 42. Then, the staff needs to pass the hand through the gap between the elastic band 45 and the connecting plate 42, and move the forearm to the elastic band 45, the two inner plates 44 and the two arc plates 43 to fit together, and then, under the action of the rebound force of the elastic band 45 and the positioning action of the inner plates 44 and the arc plates 43, the connecting plate 42 is connected to the staff's arm, and then the staff needs to hold the grip plate 40, and then lift the computer body 1 to move it under the connection and support of the grip plate 40, the arc support plate 41 and the side plate 8, thereby preventing the computer body 1 from accidentally falling off the hand, making it more convenient for people to move the computer body 1 at the construction site for monitoring and supervision.

[0053] Further, the operation method of the project progress monitoring device is as follows:

[0054] S1. First, the staff needs to place the computer body 1 at the work location and make the arc plate 43 contact the ground, so that the arc plate 43 provides support for the computer body 1 through the connecting plate 42 and the arc support plate 41, and fully charges the computer body 1. Then, with the support of the computer body 1, the display screen 6 is pushed to rotate clockwise around the rotating rod 5 on the inner side of the movable slot 4 to open, and the display screen 6 is adjusted in angle, and then the computer body 1 is started, and the monitoring system in the computer body 1 is operated by operating the touch pad 2 and the keyboard 3;

[0055] S2. Subsequently, the staff needs to place the engineering progress measurement device under the support of the static clamping plate 19 to the inner side of the card slot 24 and the positioning slot 25 to contact the clamping pad 23. Subsequently, the staff needs to push the rotary sleeve 16 through the push handle 17, so that the rotary sleeve 16 pushes the screw rod 14 to rotate under the action of external force, so that the screw rod 14 uses the rotational power and the thread action to push the movable block 15 to move left and right according to the rotation direction. At the same time, the movable block 15 will drive the movable clamping plate 18 and the support plate 20 to move to the left under the action of the external force, so that the support plate 20 drives the guide rod 22 to penetrate the guide plate 21 and move to the left under the movement and guidance of the guide plate 21 and the guide rod 22, so that the movable clamping plate 18 is driven by the external force. The clamping pad 23 installed inside the clamping pad 23 is moved to the left side, so that the two clamping pads 23 are close to each other, and squeezed and deformed to fit the engineering progress measurement equipment placed inside the positioning groove 25 and the clamping groove 24 and clamp it to fix it, so that the engineering progress measurement equipment can be placed horizontally under the support of the support rod 11, the transparent plate 10, the connecting rod 9 and the side plate 8 through the clamping pad 23, the moving clamping plate 18, the static clamping plate 19 and the connecting block 13, and the engineering construction measurement equipment is started to monitor and measure the distance, length, width and height data of the engineering construction, and the engineering construction measurement equipment is connected to the computer body 1 through the data interface 7 by a data line, so that the monitoring data can be transmitted to the computer body 1;

[0056] S3. During monitoring and measurement, the staff can pull the pull rope 46 toward the front through the limit ball 47, so that the pull rope 46 passes through the movable hole 39 and pulls the elastic band 45 to the right side under the resistance of the side plate 8 to deform, so that the elastic band 45 uses elasticity to expand the gap between the elastic band 45 and the connecting plate 42. Then the staff needs to put his hand through the gap between the elastic band 45 and the connecting plate 42, and move the forearm to fit between the elastic band 45, the two inner plates 44 and the two arc plates 43, and then connect the connecting plate 42 with the staff's arm under the rebound force of the elastic band 45 and the positioning effect of the inner plates 44 and the arc plates 43. Then the staff needs to hold the grip plate 40, and then lift the computer body 1 to move it under the connection and support of the grip plate 40, the arc support plate 41 and the side plate 8, so as to prevent the computer body 1 from accidentally falling off from the hand, making it more convenient for people to move the computer body 1 at the construction site for monitoring and supervision.

[0057] S4. During monitoring, the support rod 11 will rotate around the bearing installed on the outside thereof with the connecting rod 9 as the center under the action of external force and according to the direction of the external force and the support of the side plate 8. When the support rod 11 rotates, it will drive the transparent plate 10 and the connecting block 13 to rotate together, and the transparent plate 10 will drive the pointer 27 to rotate together. At the same time, people can observe the relative position of the pointer 27 on the front of the angle ruler 28 through the transparent plate 10 made of transparent material under the support of the side plate 8 to judge the rotation angle of the support rod 11, so that the support rod 11 drives the rotation angle of the engineering progress measurement equipment fixed between the two clamping pads 23 through the connecting block 13 and the movable clamping plate 18 under the action of external force;

[0058] S5. When adjusting the angle of the support rod 11, the staff can rotate the nut 36 under the support of the frame rod 34 and the support rod 29, so that the nut 36 can move forward and backward along the threaded rod 35 according to the rotation direction by using the thread under the action of external force, so that the nut 36 can drive the rotating ring 37 to move together through the bearing under the action of external force, and the rotating ring 37 can rotate with the bearing as the center under the action of the gravity of the slide plate 38, so as to achieve not following the rotation of the nut 36, and then the nut 36 can drive the slide plate 38 to move forward and backward together through the rotating ring 37. When the slide plate 38 moves, it will push the push rod 33 to move together under the action of external force, and the push rod 33 can be pushed together. Under the action of external force, the push ring 31 will be driven by the N plate 32 to move along the guide rod 30 under the support of the support rod 29. At the same time, the push ring 31 will push the support rod 11 to rotate with the connecting rod 9 as the center under the action of external force, and the support rod 11 will move along the outer side of the guide rod 30 by using the through hole 26. At the same time, the push rod 33 will move up and down along the inner side of the slide plate 38 during the movement, so that the angle of the support rod 11 can be precisely fine-tuned by using the threaded action of the nut 36 and the threaded rod 35, so that the engineering progress measurement equipment clamped and positioned between the two clamping pads 23 can be accurately rotated to perform measurement and monitoring work.

[0059] Further, the regulatory system is as follows:

[0060] D1. Create a construction Gantt chart: Use the touchpad 2 and keyboard 3 to use the computer body 1 to create a construction progress Gantt chart of the construction site. The Gantt chart is a chart used to show the time arrangement and relationship of various tasks in a project. It can clearly show the start date and end date of each task and the dependency relationship between tasks, thereby helping to monitor and manage the progress of the project construction;

[0061] D2. Collecting data: The project progress measurement equipment can help determine the completion status of each stage of the project. By measuring the actual amount of work completed and comparing it with the plan, accurate progress data can be obtained. The project progress measurement equipment is fixed and supported by the support assembly, and the angle of the project progress measurement equipment is adjusted by rotating the nut 36 with the pointer 27 and the angle ruler 28 as reference. At the same time, according to the actual situation, the arm is passed through the gap between the inner plate 44 and the elastic band 45, and the grip plate 40 is held to lift the computer body 1 to move the position, so that the project progress measurement equipment monitors and measures the real-time project data progress of the construction site, and transmits the measurement data to the computer body 1 through the data line and the data interface 7 for collection. The collected data needs to be stored and processed through the cloud storage library, and the data verification, cleaning and sorting are performed;

[0062] D3. Data storage and processing: The collected data is stored in the computer body 1, and the project management software in the computer body 1 is used to create, track and update the Gantt chart of the stored data, and the data is compared with the construction progress Gantt chart, which is helpful for real-time monitoring of the project progress;

[0063] D4. Analysis and reporting: Compare the stored data with the construction progress Gantt chart to generate statistics on overlapping data, difference data and uninvolved data. Perform statistics, trend analysis and correlation analysis on the collected data, and generate detailed reports and charts on the project progress.

[0064] D5. Visual interface: used to present and interact with project progress data. With the support of the computer body 1, the construction progress Gantt chart and the detailed reports and charts produced by statistics are displayed on the display screen 6 for reference by the staff, making it convenient for users to view and understand the project progress.

[0065] Working principle: Before using the device, it is necessary to check whether there are any problems that affect the use of the device. When the staff needs to use the device, they should first place the computer body 1 at the workplace using the arc plate 43 and start the computer body 1. Then operate the touch pad 2 and keyboard 3 to control the computer body 1 to start the supervision system with the picture displayed on the display screen 6 as a reference. Then, the engineering construction measurement equipment is horizontally supported and positioned using the supporting assembly, so that the engineering construction measurement equipment can measure the real-time engineering progress data of the construction site in the horizontal direction. Then, according to the actual situation, the nut 36 is rotated with the pointer 27 and the protractor 28 as a reference to adjust the angle of the engineering construction measurement equipment to perform measurements at other angles. When performing the above operations, you can flexibly use your arm to pass through the gap between the elastic band 45 and the inner plate 44 to hold the grip plate 40 and move the computer body 1 to a suitable position, so that the engineering construction measurement equipment can transmit the monitored and measured data to the supervision system for data processing and analysis reporting.

[0066] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention may be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered in all respects as exemplary and non-restrictive, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations within the meaning and range of equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered to limit the claim to which it relates.

Claims

1. A real-time engineering progress monitoring device for a construction site, comprising a computer main body (1), characterized in that: A support assembly is installed on the right side of the computer body (1), and the support assembly is used to provide positioning support for the engineering progress measurement equipment; The supporting assembly comprises a side plate (8), a connecting rod (9) is installed on the right side of the side plate (8), a supporting rod (11) is placed on the top of the connecting rod (9), a fixing hole (12) is penetrated in the inside of the supporting rod (11), a connecting block (13) is penetrated in the inside of the fixing hole (12), a screw rod (14) is installed on the right side of the connecting block (13) through a bearing, a movable block (15) is installed on the outer side of the screw rod (14) through a thread, a movable clamping plate (18) is installed on the top of the movable block (15), and the connecting A static clamping plate (19) is installed on the top of the block (13), a support plate (20) is installed on the front of the dynamic clamping plate (18), a guide plate (21) is installed on the front of the static clamping plate (19), a guide rod (22) is installed on the left side of the support plate (20), and a clamping pad (23) is installed on the inner side of the dynamic clamping plate (18) and the static clamping plate (19). A card slot (24) is provided through the inside of the clamping pad (23), the dynamic clamping plate (18) and the static clamping plate (19), and a positioning slot (25) is provided on the opposite sides of the two clamping pads (23).

2. A real-time engineering progress monitoring device for a construction site according to claim 1, characterized in that: A touch panel (2) is embedded and installed on the top of the computer body (1); a keyboard (3) is installed on the top of the computer body (1), and the keyboard (3) is located on the back of the touch panel (2); a movable groove (4) is opened on the top of the computer body (1), and the movable groove (4) is located on the back of the keyboard (3); a rotating rod (5) is installed on the inner side of the movable groove (4), and a display screen (6) is installed on the outer side of the rotating rod (5); and a data interface (7) is embedded and installed on the right side of the computer body (1).

3. A real-time engineering progress monitoring device for a construction site according to claim 1, characterized in that: A rotary sleeve (16) is installed on the outer side of the screw rod (14), and the rotary sleeve (16) is located on the right side of the movable block (15). Push handles (17) are installed on the top and bottom of the rotary sleeve (16).

4. A real-time engineering progress monitoring device for a construction site according to claim 3, characterized in that: A transparent plate (10) is installed on the outer side of the connecting rod (9) through a bearing, a through hole (26) is penetrated inside the support rod (11), a pointer (27) is installed on the left side of the transparent plate (10), and the pointer (27) is located on the outer side of the connecting rod (9), a square (28) is installed on the right side of the connecting rod (9), and the square (28) is located on the outer side of the connecting rod (9), a support rod (29) is installed on the back of the side plate (8), a guide rod (30) is installed on the right side of the support rod (29), and the guide rod (30) penetrates the through hole (26).

5. A real-time engineering progress monitoring device for a construction site according to claim 4, characterized in that: The top of the transparent plate (10) is connected to the bottom of the support rod (11).

6. A real-time engineering progress monitoring device for a construction site according to claim 4, characterized in that: The outer side of the guide rod (30) is sleeved with two push rings (31), the right sides of the two push rings (31) are connected to each other and an N plate (32) is installed, the right side of the N plate (32) is installed with a push rod (33), the top of the support rod (29) is installed with a frame rod (34), the front side of the frame rod (34) is installed with a threaded rod (35), the outer side of the threaded rod (35) is threadedly installed with a nut (36), the outer side of the nut (36) is installed with a rotating ring (37) through a bearing, the bottom of the rotating ring (37) is installed with a slide plate (38), and the slide plate (38) is located on the outer side of the push rod (33).

7. A real-time engineering progress monitoring device for a construction site according to claim 2, characterized in that: The inside of the side panel (8) is provided with a movable hole (39), the back of the side panel (8) is installed with a grip panel (40), and the grip panel (40) is connected to the back of the computer body (1), the bottom of the grip panel (40) is installed with two arc support panels (41), a connecting panel (42) is installed between the two arc support panels (41), two arc panels (43) are installed at the bottom of the connecting panel (42), an inner panel (44) is installed between the arc panels (43) and the connecting panel (42), an elastic band (45) is installed between the two arc panels (43), a pull rope (46) is installed at the bottom of the elastic band (45), the pull rope (46) passes through the movable hole (39), and a limiting ball (47) is installed at the front end of the pull rope (46).

8. According to any one of claims 1 to 7, the operation method of the real-time engineering progress monitoring device for a construction site is as follows: S1. First, the staff needs to place the computer body (1) at the work site and make the arc plate (43) contact the ground, so that the arc plate (43) provides support for the computer body (1) through the connecting plate (42) and the arc support plate (41), and fully charges the computer body (1). Then, with the support of the computer body (1), the display screen (6) is pushed to rotate clockwise on the inner side of the movable groove (4) with the rotating rod (5) as the center of the circle to open, and the display screen (6) is adjusted in angle, and then the computer body (1) is started, and the monitoring system in the computer body (1) is operated by operating the touch pad (2) and the keyboard (3); S2. Subsequently, the staff needs to place the engineering progress measuring device under the support of the static clamping plate (19) to the inner side of the clamping groove (24) and the positioning groove (25) to contact the clamping pad (23). Subsequently, the staff needs to push the rotary sleeve (16) through the push handle (17), so that the rotary sleeve (16) pushes the screw rod (14) to rotate under the action of external force, so that the screw rod (14) uses the rotational power and the thread action to push the movable block (15) to move left and right according to the rotation direction. At the same time, the movable block (15) will drive the movable clamping plate (18) and the support plate (20) to move to the left under the action of the external force, so that the support plate (20) drives the guide rod (22) to penetrate the guide plate (21) and move to the left under the movement and guidance of the guide plate (21) and the guide rod (22), thereby causing the movable clamping plate (18) to move left under the external force. Under the action, the clamping pad (23) installed inside thereof is driven to move to the left side, so that the two clamping pads (23) are close to each other, and are squeezed and deformed to fit and clamp the engineering progress measuring device placed inside the positioning groove (25) and the clamping groove (24), so that the engineering progress measuring device can be placed horizontally under the support of the support rod (11), the transparent plate (10), the connecting rod (9) and the side plate (8) through the clamping pad (23), the moving clamping plate (18), the static clamping plate (19) and the connecting block (13), and the engineering construction measuring device is started to monitor and measure the distance, length, width and height data of the engineering construction, and the engineering construction measuring device is connected to the computer body (1) through the data line from the data interface (7), so that the monitoring data can be transmitted to the computer body (1); S3. During monitoring and measuring, the staff can pull the pull rope (46) to the front through the stop ball (47), so that the pull rope (46) passes through the movable hole (39) and is pulled to the right side by the side plate (8) to deform the elastic band (45), so that the elastic band (45) can expand the gap between the elastic band (45) and the connecting plate (42) by elasticity. Then, the staff needs to put the hand through the gap between the elastic band (45) and the connecting plate (42), and move the forearm to the gap between the elastic band (45), the two inner plates (44) and the two arc plates (43). The connecting plate (42) is connected to the worker's arm under the action of the rebound force of the elastic band (45) and the positioning action of the inner plate (44) and the arc plate (43). The worker then needs to hold the grip plate (40) and then lift the computer body (1) to move it under the connection and support of the grip plate (40), the arc support plate (41) and the side plate (8), thereby preventing the computer body (1) from accidentally falling off the hand, making it more convenient for people to move the computer body (1) at the construction site for monitoring and supervision. S4. During monitoring, the support rod (11) will rotate around the bearing installed on its outer side with the connecting rod (9) as the center under the action of external force and according to the direction of the external force and the support of the side plate (8). When the support rod (11) rotates, it will drive the transparent plate (10) and the connecting block (13) to rotate together, and the transparent plate (10) will drive the pointer (27) to rotate together. At the same time, people can observe the relative position of the pointer (27) on the front of the angle ruler (28) through the transparent plate (10) made of transparent material under the support of the side plate (8) to judge the rotation angle of the support rod (11), so that the support rod (11) drives the rotation angle of the engineering progress measurement equipment fixed between the two clamping pads (23) through the connecting block (13) and the movable clamping plate (18) under the action of external force; S5. When adjusting the angle of the support rod (11), the staff can rotate the nut (36) under the support of the frame rod (34) and the support rod (29), so that the nut (36) can move forward and backward along the threaded rod (35) according to the rotation direction by using the thread under the action of external force, so that the nut (36) can drive the rotating ring (37) to move together through the bearing under the action of external force, and the rotating ring (37) can rotate with the bearing as the center under the action of the gravity of the slide plate (38), so as to achieve the rotation without following the nut (36), so that the nut (36) can drive the slide plate (38) to move forward and backward together through the rotating ring (37), and when the slide plate (38) moves, it will push the push rod (33) to move together under the action of external force, and the push rod (33) can be pushed together. 3) Under the action of external force, the push ring (31) will be driven by the N plate (32) to move along the guide rod (30) under the support of the support rod (29). At the same time, the push ring (31) will push the support rod (11) to rotate around the connecting rod (9) under the action of external force, and the support rod (11) will move along the outer side of the guide rod (30) by using the through hole (26). At the same time, the push rod (33) will move up and down along the inner side of the slide plate (38) during the movement, so as to achieve precise fine-tuning of the angle of the support rod (11) by using the threaded action of the nut (36) and the threaded rod (35), so that the engineering progress measurement equipment clamped and positioned between the two clamping pads (23) can be accurately rotated to perform measurement and monitoring work.

9. A supervision system for a real-time engineering progress supervision device for a construction site according to any one of claims 1 to 7, wherein the supervision system is as follows: D1. Create a construction Gantt chart: operate the touch panel (2) and the keyboard (3) to use the computer body (1) to create a construction progress Gantt chart of the construction site; D2. Collecting data: The project progress measuring device is fixedly supported by the supporting assembly, and the angle of the project progress measuring device is adjusted by rotating the nut (36) with the pointer (27) and the angle ruler (28) as references. At the same time, the arm is passed through the gap between the inner plate (44) and the elastic band (45) according to the actual situation, and the grip plate (40) is held to lift the computer body (1) to move the position, so that the project progress measuring device monitors and measures the real-time project data progress of the construction site, and the measurement data is transmitted to the computer body (1) through the data line and the data interface (7) for collection; D3. Data storage and processing: The collected data is stored in the computer body (1), and the stored data is compared with the construction progress Gantt chart; D4. Analysis and reporting: Compare the stored data with the construction progress Gantt chart to generate statistics on the overlapping data, difference data and uninvolved data, and generate detailed reports and charts; D5. Visual interface: used to present and interact with project progress data.

Citation Information

Patent Citations

  • Supervision device based on informatization engineering

    CN217899330U