Self-checking method and device of beam position monitoring system

By implementing an automated self-test method in the beam position monitoring system, the problem of frequent manual inspection and testing in the prior art is solved, the reliability and accuracy of the system are improved, and labor costs are reduced.

CN119805535AActive Publication Date: 2025-04-11INST OF MODERN PHYSICS CHINESE ACADEMY OF SCI
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202510295920.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-13
Publication Date
2025-04-11
Estimated Expiration
2045-03-13

AI Technical Summary

Technical Problem

The inspection of existing beam position monitoring systems requires frequent manual inspections and testing by maintenance personnel, which increases labor costs and may introduce new problems due to errors in manual operations.

Method used

It provides a self-test method and device for a beam position monitoring system. After receiving the self-test trigger information, the signal transmission path formed between the various plates of the analog-to-digital converter and the beam position detector and the beam position monitoring system are sequentially conducted to determine whether it is working normally, and the self-test result is output.

Benefits of technology

This method can ensure the reliability and accuracy of the beam position monitoring system, reduce labor costs, and reduce errors introduced by manual operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119805535A_ABST
    Figure CN119805535A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear electronics, in particular to a self-checking method and device for a beam position monitoring system, and the method comprises the steps: obtaining a self-checking signal if self-checking triggering information is received; inputting the self-checking signal into an analog-to-digital converter of the beam position monitoring system, and judging whether the analog-to-digital converter works normally; under the condition that the analog-to-digital converter works normally, inputting the self-checking signal to each polar plate of a beam position detector of the beam position monitoring system, and judging whether a signal transmission path formed between each polar plate of the beam position detector and beam position monitoring electronics of the beam position monitoring system works normally or not; and outputting a self-inspection result under the condition that the signal transmission paths formed between the polar plates of the beam position detector and the beam position monitoring electronics work normally. The reliability and the accuracy of the beam position monitoring system can be ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear systems, and in particular to a self-checking method and device for a beam position monitoring system. Background Art

[0002] In the prior art, the analysis and processing of the beam position signal in the accelerator is achieved through the beam position monitoring system. Therefore, the health status of each channel of the beam position monitoring system and the reliability of the channel self-test results are particularly important.

[0003] However, the existing detection of the beam position monitoring system requires maintenance personnel to frequently perform manual inspections and tests to confirm the operating status of the beam position monitoring system. This not only increases labor costs, but may also introduce new problems due to manual operation errors. Summary of the invention

[0004] Based on the above problems, the present invention provides a self-checking method and device for a beam position monitoring system.

[0005] According to one aspect of the present invention, a self-checking method of a beam position monitoring system is provided, comprising: If the signal acquisition module of the beam position monitoring system receives the self-test trigger information, it obtains the self-test signal; inputs the self-test signal into the analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter is working normally; when the analog-to-digital converter is working normally, inputs the self-test signal into each plate of the beam position detector of the beam position monitoring system to determine whether the signal transmission path formed between each plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is working normally; when the signal transmission path formed between each plate of the beam position detector and the beam position monitoring system is working normally, outputs the self-test result; wherein the beam position monitoring system includes multiple front-end analog amplifiers, multiple analog-to-digital converters and a main control module, each plate is connected in turn to a front-end analog amplifier, an analog-to-digital converter, and finally connected to the main control module to form a signal transmission path.

[0006] Furthermore, according to a self-test method of a beam position monitoring system of one aspect of the present invention, a self-test signal is input to an analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter is operating normally, including: inputting a self-test signal to a multi-channel analog-to-digital converter of the beam position monitoring system; Transmitting the digital signal output by each analog-to-digital converter to the main control module of the beam position monitoring system, obtaining the channel amplitude quantization signal output by the main control module corresponding to the digital signal output by each analog-to-digital converter; checking whether the channel amplitude quantization signal corresponding to the digital signal output by each analog-to-digital converter is greater than a preset first threshold; If all channel amplitude quantization signals are greater than the first threshold, each analog-to-digital converter is judged to be working normally; if the channel amplitude quantization signal corresponding to the digital signal output by at least one analog-to-digital converter is less than or equal to the first threshold, the analog-to-digital converter of the beam position monitoring system is judged to be working abnormally.

[0007] In addition, according to a self-test method of a beam position monitoring system of one aspect of the present invention, when the analog-to-digital converter is operating normally, a self-test signal is input into each electrode plate of a beam position detector of the beam position monitoring system to determine whether a signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally, including: when the analog-to-digital converter is operating normally, the self-test signal is input into the left electrode plate, the upper electrode plate, the right electrode plate and the lower electrode plate which are sequentially arranged in a circumferential direction on the beam position detector in sequence; the induction signal generated by other electrodes adjacent to the electrode plate to which the self-test signal is input is obtained; the induction signal is input into the corresponding analog-to-digital converter; the induction signal is input into the corresponding device, and transmit it to the main control module of the beam position monitoring system; obtain the channel amplitude quantization signal corresponding to each sensing signal output by the main control module; check whether the channel amplitude quantization signal corresponding to each sensing signal is greater than a preset second threshold; if the channel amplitude quantization signal corresponding to each sensing signal is greater than the second threshold, it is determined that the signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system is working normally; if the channel amplitude quantization signal corresponding to at least one sensing signal is less than or equal to the second threshold, it is determined that there is an abnormality in the signal transmission path formed between the electrode plate of the beam position detector and the beam position monitoring system involving the channel amplitude quantization signal.

[0008] In addition, according to one aspect of the present invention, in a self-test method for a beam position monitoring system, when a channel amplitude quantization signal corresponding to at least one sensing signal is less than or equal to a second threshold, it is determined that there is an abnormality in a signal transmission path formed between a plate of a beam position detector involving the channel amplitude quantization signal and a beam position monitoring system, the method further comprises: step one: re-inputting the self-test signal to the plate corresponding to the beam position detector having the abnormality in the signal transmission path; step two: re-acquiring sensing signals generated by other plates adjacent to the plate to which the self-test signal is re-input; step three: inputting the re-acquired sensing signals to the corresponding analog-to-digital converter, and transmitting them to the main control module; step four: obtaining the main control module output and the signal transmission path of each re-input; and step five: obtaining the signal transmission path of each re-input; and step six: obtaining the signal transmission path of each re-input; and step seven: obtaining the signal transmission path of each re-input; and step seven: obtaining the signal transmission path of each re-input; and step eight ... The channel amplitude quantization signal corresponding to the newly acquired sensing signal; Step five: Check whether the channel amplitude quantization signal corresponding to each re-acquired sensing signal is greater than a preset second threshold; Step six: If the channel amplitude quantization signals corresponding to all the re-acquired sensing signals are greater than the second threshold, it is determined that the signal transmission path formed between the plate of the beam position detector and the beam position monitoring system where there is an abnormality in the signal transmission path is operating normally; Step seven: If the channel amplitude quantization signal corresponding to at least one re-acquired sensing signal is still less than or equal to the second threshold, repeat the above steps one to five until the signal transmission path formed between the plate of the beam position detector and the beam position monitoring system where there is an abnormality in the signal transmission path is operating normally.

[0009] In addition, according to the self-checking method of the beam position monitoring system in one aspect of the present invention, after the self-checking signal is converted by the analog-to-digital converter, the value of the signal is within the range of 10000-25000.

[0010] In addition, according to one aspect of the present invention, a self-test method for a beam position monitoring system inputs a self-test signal to a multi-channel analog-to-digital converter of the beam position monitoring system, including: adjusting the attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter to the maximum gear, and simultaneously inputting a self-test signal to multiple analog-to-digital converters of the beam position monitoring system.

[0011] In addition, according to a self-test method of a beam position monitoring system of one aspect of the present invention, a self-test signal is sequentially input into a left pole plate, an upper pole plate, a right pole plate and a lower pole plate which are sequentially arranged in a circumferential direction on the beam position detector, including: adjusting the attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter to a through state, and simultaneously inputting the self-test signal sequentially into a left pole plate, an upper pole plate, a right pole plate and a lower pole plate which are sequentially arranged in a circumferential direction on the beam position detector.

[0012] In addition, according to one aspect of the self-test method of the beam position monitoring system of the present invention, if the signal acquisition module of the beam position monitoring system receives self-test trigger information, it obtains a self-test signal, including: obtaining the self-test signal after the signal acquisition module of the beam position monitoring system is powered on; and / or, when the signal acquisition module receives an execution instruction input by the user, obtaining the self-test signal.

[0013] In addition, according to the self-checking method of the beam position monitoring system in one aspect of the present invention, before executing step one, an execution instruction input by a user is received.

[0014] According to another aspect of the present invention, there is provided a self-test device for a beam position monitoring system, comprising: a signal acquisition module, configured to acquire a self-test signal if self-test trigger information is received; A first judgment module is configured to input the self-test signal to the analog-to-digital converter of the beam position monitoring system to judge whether the analog-to-digital converter is working normally; The second judgment module is configured to input the self-test signal to each electrode plate of the beam position detector of the beam position monitoring system when the analog-to-digital converter is operating normally, and judge whether the signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally; A self-test result output module is configured to output a self-test result when the signal transmission paths formed between the plates of the beam position detector and the beam position monitoring system are operating normally; Among them, the beam position monitoring system includes multiple front-end analog amplifiers, multi-channel analog-to-digital converters and a main control module. Each electrode is connected to a front-end analog amplifier, an analog-to-digital converter in turn, and finally connected to the main control module to form a signal transmission path.

[0015] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, a self-checking method for a beam position monitoring system as described above is implemented.

[0016] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the self-checking method of any of the above-mentioned beam position monitoring systems is implemented.

[0017] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements any of the above-mentioned self-checking methods for the beam position monitoring system.

[0018] The self-check method and device of the beam position monitoring system provided by the present invention, after receiving the self-check trigger information, sequentially perform self-checks on the signal transmission path formed between the analog-to-digital converter and each electrode plate of the beam position detector and the beam position monitoring system to determine whether they are working normally, and finally output the self-check result, which can not only ensure the reliability and accuracy of the beam position monitoring system, but also eliminate the need for frequent manual inspection and testing by maintenance personnel, thereby reducing labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a flowchart of a self-checking method of a beam position monitoring system provided according to an embodiment of the present invention.

[0021] Figure 2 Schematic diagram of a beam position monitoring system provided by an embodiment of the present invention.

[0022] Figure 3 It is a schematic diagram of signal transmission of the plate of the beam position detector provided in the self-test working mode according to the embodiment of the present invention.

[0023] Figure 4 It is a functional block diagram of a beam position monitoring system self-test device provided according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] With the advancement of science and technology, accelerators are also developing in the direction of high current and high power, with the total beam power reaching the megawatt (MW) level. The proton and heavy ion accelerators currently in operation and under construction in the world all contain a proton or heavy ion linear accelerator as the main accelerator or injector, because the linear accelerator has a more compact structure and higher acceleration efficiency; and the superconducting linear accelerator has a higher acceleration electric field gradient due to the integration of low-temperature superconducting technology, and the overall length of the linear accelerator is greatly reduced. In this context, the beam diagnostic system of high-current and high-power proton and heavy ion linear accelerators and their related system technologies highlight their important position.

[0026] The existing beam position monitoring system mainly includes a beam position detector, a connecting cable and a beam position monitoring system. The beam position monitoring system also includes multiple front-end analog amplifiers, a multi-channel analog-to-digital converter and a main control module. The beam position detector is used to detect the position and phase of the beam. When the beam passes through the beam position detector, an induction signal will be generated on the plate of the beam position detector, and the induction signal is an analog signal. The beam position detector is usually composed of four plates. According to the size of the induction signal generated by the four plates with the size of the beam, the horizontal position and vertical position of the beam and the phase of the beam can be calculated. The connecting cable is used to transmit the analog signal generated by the beam position detector to the front-end analog amplifier through the connecting cable. The front-end analog amplifier is used to amplify or attenuate the analog signal generated by the beam position detector for subsequent analog-to-digital conversion. The front-end analog amplifier receives the analog signal transmitted from the connecting cable, and transmits the analog signal processed by the front-end analog amplifier to the analog-to-digital converter. The analog-to-digital converter is used to convert the analog signal into a digital signal for processing and analysis by the main control module. The analog-to-digital converter receives the amplified or attenuated analog signal from the front-end analog amplifier, converts it into a digital signal, and then transmits it to the main control module. The main control module is responsible for processing the digital signal converted by the analog-to-digital converter, performing data analysis and variable control, and outputting the final beam position measurement results. The main control module receives the digital signal from the analog-to-digital converter, outputs information such as beam position and phase after algorithm processing, and controls the operation of the entire monitoring system. Thus, the analysis and processing of the beam position and phase signals are realized, which is an important part of the accelerator beam monitoring system. Therefore, the health status of the entire signal transmission link between the beam position detector of the beam position monitoring system and the main control module and the reliability of the self-test results of the signal transmission path between each plate of the detector and the beam position monitoring system are particularly important for the beam position monitoring system. Among them, each plate of the beam position detector is connected to a front-end analog amplifier and an analog-to-digital converter in turn, and finally connected to the main control module. The induction signal generated by each plate is transmitted to the front-end amplifier through the connecting cable, then to the analog-to-digital converter, and finally to the main control module, forming a signal transmission path.

[0027] Figure 1 It is a flowchart of a self-checking method of a beam position monitoring system provided according to an embodiment of the present invention.

[0028] like Figure 1 As shown, the self-checking method of the beam position monitoring system provided in the embodiment of the present invention can be executed by the beam position monitoring system, and the method includes the following steps: Step 101: If the signal acquisition module of the beam position monitoring system receives self-test trigger information, a self-test signal is acquired.

[0029] In one embodiment of the present invention, a self-test signal is input from a self-test port of a beam position monitoring system, which is a manually set test signal used to simulate a beam signal under actual working conditions, i.e., a simulation signal, so as to facilitate checking the functions of various parts of the beam position monitoring system. The beam position monitoring system detects an internal or external self-test trigger information, which may be due to user operation, a predetermined self-test time, power-on of the beam position monitoring system, or an abnormality detected by the beam position monitoring system, and then starts to receive a self-test signal from the self-test port.

[0030] Step 102 , input the self-test signal to the analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter works normally.

[0031] In one embodiment of the present invention, after receiving the self-test signal, the beam position monitoring system will send the self-test signal to the analog-to-digital converter. The task of the analog-to-digital converter is to convert the self-test signal into a digital signal, so that the beam position monitoring system checks whether the digital signal output by the analog-to-digital converter meets expectations, thereby determining whether the analog-to-digital converter is working normally.

[0032] Step 103, when the analog-to-digital converter is operating normally, input the self-test signal to each electrode plate of the beam position detector of the beam position monitoring system to determine whether the signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally.

[0033] In one embodiment of the present invention, a plurality of signal transmission paths are formed between each electrode plate of the beam position detector and the beam position monitoring system. When the analog-to-digital converter is operating normally, a self-test signal is input into each electrode plate of the beam position detector. Based on the corresponding induction signal generated by the adjacent electrode plate of the beam position detector to which the self-test signal is input in response to the self-test signal, it is judged whether the signal transmission path formed between the adjacent electrode plates of the detector and the beam position monitoring system is operating normally.

[0034] Step 104, outputting a self-test result when the signal transmission paths formed between the plates of the beam position detector and the beam position monitoring system are working normally; Among them, the beam position monitoring system includes multiple front-end analog amplifiers, multi-channel analog-to-digital converters and a main control module. Each electrode is connected to a front-end analog amplifier, an analog-to-digital converter in turn, and finally connected to the main control module to form a signal transmission path.

[0035] In one embodiment of the present invention, the beam position monitoring system includes a plurality of front-end analog amplifiers, a multi-channel analog-to-digital converter and a main control module, each plate is sequentially connected to a front-end analog amplifier, a channel analog-to-digital converter, and finally connected to the main control module to form a signal transmission path. After the self-test signal is input into each plate of the beam position detector, the induction signal generated by the adjacent plate of each plate is detected, and it is determined that the signal transmission path between each plate of the beam position detector and the beam position monitoring system is working normally, the self-test process is completed, and the self-test result is output.

[0036] Exemplarily, the user may be notified of the self-check result through user interface display, log recording, or other means.

[0037] In summary, according to the technical solution provided in the embodiment of the present invention, after receiving the self-test trigger information, the signal transmission path formed between the analog-to-digital converter and each electrode of the beam position detector and the beam position monitoring system is self-checked in turn to determine whether it is working normally, and finally the self-test result is output, which not only ensures the reliability and accuracy of the beam position monitoring system, but also eliminates the need for frequent manual inspection and testing by maintenance personnel, thereby reducing labor costs.

[0038] Furthermore, the self-test signal is input into an analog-to-digital converter of a beam position monitoring system to determine whether the analog-to-digital converter is working properly, including: inputting a self-test signal to a multi-channel analog-to-digital converter of a beam position monitoring system; Transmitting the digital signal output by each analog-to-digital converter to the main control module of the beam position monitoring system, obtaining the channel amplitude quantization signal output by the main control module corresponding to the digital signal output by each analog-to-digital converter; checking whether the channel amplitude quantization signal corresponding to the digital signal output by each analog-to-digital converter is greater than a preset first threshold; If all channel amplitude quantization signals are greater than the first threshold, each analog-to-digital converter is judged to be working normally; if the channel amplitude quantization signal corresponding to the digital signal output by at least one analog-to-digital converter is less than or equal to the first threshold, the analog-to-digital converter of the beam position monitoring system is judged to be working abnormally.

[0039] Specifically, the beam position monitoring system has multiple analog-to-digital converters, and the self-test signal is sent to each analog-to-digital converter in the beam position monitoring system. These analog-to-digital converters are responsible for converting analog signals into digital signals for further processing. After processing the self-test signal, each analog-to-digital converter will output a corresponding digital signal. These digital signals are then transmitted to the main control module of the beam position monitoring system, which is responsible for receiving and processing signals from all analog-to-digital converters and outputting channel amplitude quantization signals corresponding to each analog-to-digital converter. The beam position monitoring system checks the value of each channel amplitude quantization signal to determine whether they are all greater than a preset first threshold. The first threshold can be determined by considering system performance, historical data or self-test signals, or by the professional knowledge and experience of technicians. If the channel amplitude quantization signals output by all analog-to-digital converters are greater than the first threshold, then it can be determined that all analog-to-digital converters are working normally because they can correctly convert the self-test signal and ensure accuracy. If the channel amplitude quantization signal output by at least one analog-to-digital converter is less than or equal to the first threshold, then the system will determine that at least one analog-to-digital converter is working abnormally. This may mean that the ADC cannot convert the signal correctly or there is another fault. If the ADC is detected to be working abnormally, the system may trigger an alarm, record the error information, and take further diagnostic measures, such as recalibration, replacement of the faulty ADC, or other necessary maintenance operations. Among them, the channel amplitude quantization signal is obtained by the main control module after filtering, down-converting, and normalizing the digital signal.

[0040] Exemplarily, by setting a relay, the self-test signal provided by the signal source is directly input into the multi-channel analog-to-digital converter through the self-test port without passing through the beam position detector, and then the digital signal output by the analog-to-digital converter is transmitted to the main control module of the beam position monitoring system, and the main control module outputs the channel amplitude quantization signal corresponding to the digital signal output by each analog-to-digital converter. Check all channel amplitude quantization signals to determine whether the amplitude quantization signal of each channel exceeds a preset first threshold. If the amplitude quantization signal of each channel exceeds the first threshold, it is determined that the analog-to-digital converter of the beam position monitoring system is working normally. If at least one channel amplitude quantization signal is less than the first threshold, it is determined that the analog-to-digital converter of the beam position monitoring system is working abnormally, and it may be necessary to trigger an alarm, record error information, and take further diagnostic measures, such as recalibrating, replacing the faulty analog-to-digital converter, or performing other necessary maintenance operations. Figure 2 As shown, Figure 2Schematic diagram of the beam position monitoring system provided by an embodiment of the present invention. The analog-to-digital converter is self-checked, i.e., ADC Check, and the channel amplitude quantization signals corresponding to the corresponding multi-channel analog-to-digital converters are output by channels A, B, C, and D, and the channel amplitude quantization signal output by each channel is compared with the first threshold value (i.e., Threshold1).

[0041] Figure 2 In the example, Att.=-30dB means that the signal is amplified by 30dB. In signal processing, a negative attenuation value usually means that the signal is amplified rather than attenuated. Here, "-30dB" means that the signal strength is increased by 30 decibels.

[0042] Att.=0dB means that the signal is neither attenuated nor amplified, and the signal strength remains unchanged. An attenuation value of 0dB means that the signal is transmitted and processed at its original strength.

[0043] Exemplarily, the beam position monitoring system has four signal transmission paths, and the corresponding channel amplitude quantization signals also have four.

[0044] In summary, according to the technical solution provided by the embodiment of the present invention, the beam position monitoring system can automatically detect and verify the working status of each analog-to-digital converter, ensuring that the entire system can provide accurate measurement results in actual operation. This self-checking mechanism is crucial to maintaining the reliability and stability of the system.

[0045] Furthermore, when the analog-to-digital converter works normally, the self-test signal is input to each electrode plate of the beam position detector of the beam position monitoring system to judge whether the signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system works normally, including: When the analog-to-digital converter works normally, the self-test signal is sequentially inputted into the left plate, the upper plate, the right plate and the lower plate which are sequentially arranged on the beam position detector in the circumferential direction; Acquire the induction signals generated by other plates adjacent to the plate to which the self-test signal is input; input the induction signals into the corresponding analog-to-digital converters, and transmit them to the main control module of the beam position monitoring system; The main control module outputs a channel amplitude quantization signal corresponding to each sensing signal; Check whether the channel amplitude quantization signal corresponding to each sensing signal is greater than a preset second threshold; If the channel amplitude quantization signals corresponding to all the sensing signals are greater than the second threshold, it is determined that the beam position detector is working normally; if the channel amplitude quantization signal corresponding to at least one sensing signal is less than or equal to the second threshold, it is determined that there is an abnormality in the signal transmission path formed between the electrode plate of the beam position detector involving the channel amplitude quantization signal and the beam position monitoring system.

[0046] Specifically, the beam position detector is sequentially provided with a left plate, an upper plate, a right plate and a lower plate in the circumferential direction. When the analog-to-digital converter is working normally, the self-test signal is sequentially input into the four plates (i.e., the left plate, the upper plate, the right plate and the lower plate) of the beam position detector. When the self-test signal is input into a certain plate, due to physical effects (such as electromagnetic induction), the adjacent plates will generate an induction signal. The induction signal is an analog signal, and the generated induction signal is transmitted to the corresponding analog-to-digital converter, converted into a digital signal by the analog-to-digital converter, and the converted signal is transmitted to the main control module by the analog-to-digital converter. Thus, the main control module receives the digital signal from the multi-channel analog-to-digital converter and outputs the channel amplitude quantization signal corresponding to each induction signal. The channel amplitude quantization signal of each channel is compared with a preset second threshold. The preset second threshold can be determined by considering the system performance, historical data or self-test signal, or by the professional knowledge and experience of the technician. If all channel amplitude quantization signals are greater than the second threshold, it is considered that the signal transmission path formed between each detector plate and the beam position monitoring system is working properly, because all channel amplitude quantization signals can reach a certain intensity. If any channel amplitude quantization signal is less than or equal to the second threshold, it is considered that there is a problem in the signal transmission path formed between the plate of the beam position detector and the beam position monitoring system involving the channel amplitude quantization signal, and further inspection and maintenance are required.

[0047] For example, Figure 2 As shown, checking the beam position detector is to check whether the installation between the plates has reached the installation accuracy and the contact of the signal connection cable is good. For details, please refer to the following methods: 1. Through the relay, the self-test signal is directly input from the A port to the left plate of the beam position detector, and then the sensing signals of the adjacent upper plate and lower plate are respectively input to the corresponding channel B (such as the upper plate corresponds to channel B) and channel D (such as the lower plate corresponds to channel D) through the corresponding front-end analog amplifier, analog-to-digital converter, and main control module. It is judged whether the channel amplitude quantization signals VB and VD output by channel B and channel D are greater than the second threshold (ie, Threshold2), and the user interface directly displays the self-test results. That is, when both are greater than the preset second threshold, the self-test is displayed as passed, indicating that the coupling degree between the left plate and the upper plate and the lower plate, and the signal transmission path formed between the left plate and the beam position monitoring system are appropriate. When at least one is less than or equal to the second threshold, the self-test is displayed as failed. The corresponding AtoBD self-test option in the figure.

[0048] Exemplarily, if the channel amplitude quantization signal output by channel B is less than or equal to the second threshold, it indicates that there is a problem in the signal transmission path formed between the upper board corresponding to channel B and the beam position monitoring system.

[0049] 2. Use the relay to input the self-test signal directly from port B to the upper plate of the beam position detector, and then input the sensing signals of the adjacent left and right plates into channel A (such as the left plate corresponds to channel A) and channel C (such as the right plate corresponds to channel C) through the corresponding front-end analog amplifier, analog-to-digital converter, and main control module in turn. Determine whether the channel amplitude quantization signals VA and VC output by channel A and channel C are greater than the second threshold, and the user interface directly displays the self-test results. That is, when both are greater than the preset second threshold, the self-test is displayed as passed, indicating that the coupling degree between the upper plate and the left and right plates, as well as the signal transmission path formed between the upper plate and the beam position monitoring system are appropriate. When at least one is less than or equal to the second threshold, the self-test is displayed as failed. Corresponding Figure 2 BtoAC self-test option.

[0050] 3. Use the relay to input the self-test signal directly from the C port to the right plate of the beam position detector, and then input the sensing signals of the adjacent upper plate and lower plate to channel B and channel D through the corresponding front-end analog amplifier, analog-to-digital converter, and main control module in turn. Determine whether the channel amplitude quantization signals VB and VD output by channel B and channel D are greater than the second threshold, and the user interface directly displays the self-test results. That is, when both are greater than the preset second threshold, the self-test is displayed as passed, indicating that the coupling degree between the right plate and the upper plate and the lower plate, as well as the signal transmission path formed between the right plate and the beam position monitoring system are appropriate. When at least one is less than or equal to the second threshold, the self-test is displayed as failed. Corresponding Figure 2 CtoBD self-test option.

[0051] 4. Use the relay to input the self-test signal directly from the D port to the lower plate of the beam position detector, and then input the sensing signals of the adjacent left and right plates into channels A and C through the corresponding front-end analog amplifier, analog-to-digital converter, and main control module in turn. Determine whether the channel amplitude quantization signals VA and VC output by channels A and C are greater than the second threshold, and the user interface directly displays the self-test results. That is, when it exceeds the preset second threshold, the self-test is displayed as passed, indicating that the coupling degree between the lower plate and the left and right plates, as well as the signal transmission path formed between the lower plate and the beam position monitoring system are appropriate. When at least one is less than or equal to the second threshold, the self-test is displayed as failed. Corresponding Figure 2 DtoAC self-test option in.

[0052] 5. If the above 1-4 all show that the self-test has passed, the interlock protection function will be activated when the user interface shows that the self-test has passed; if some items have not passed, it is necessary to conduct targeted inspections and then self-test again until they pass.

[0053] For example, see Figure 3 , Figure 3 It is a schematic diagram of signal transmission of the plate of the beam position detector provided in the self-test working mode according to the embodiment of the present invention.

[0054] Specifically, the signal source in the figure ( Figure 3 The upper left corner) can be used to provide a reference signal or self-test signal required for self-test. During the self-test process, the self-test signal can be directly input into the beam position monitoring system through the self-test port (such as the calibration port shown in the figure), which is used to detect the signal transmission path formed between the analog-to-digital converter and each plate of the beam position detector and the beam position monitoring system. KT1-1 and KT1-2 represent the relays connected on both sides of the left plate A. KT2-1 and KT2-2 represent the relays connected on both sides of the upper plate B. KT3-1 and KT3-2 represent the relays connected on both sides of the right plate C. KT4-1 and KT4-2 represent the relays connected on both sides of the lower plate D.

[0055] To automatically detect again, please refer to the following steps: Step 1: input the self-test signal again to the plate corresponding to the beam position detector where the signal transmission path has an abnormality; Step 2: reacquire the induction signal generated by the plate adjacent to the plate that inputs the self-test signal again; Step 3: Input the reacquired sensing signal into the corresponding analog-to-digital converter and transmit it to the main control module; Step 4: Obtain the channel amplitude quantization signal output by the main control module corresponding to each channel of the re-acquired sensing signal; Step 5: Check whether the channel amplitude quantization signal corresponding to each re-acquired sensing signal is greater than a preset second threshold; Step 6: If the channel amplitude quantization signals corresponding to all the re-acquired sensing signals are greater than the second threshold, it is determined that the signal transmission path formed between the plate with abnormal beam signal transmission path and the beam position monitoring system is working normally; Step 7: If the channel amplitude quantization signal corresponding to at least one of the reacquired sensing signals is still less than or equal to the second threshold, repeat the above steps 1 to 5 until the signal transmission path formed between the plate of the beam position detector with the abnormal signal transmission path and the beam position monitoring system operates normally.

[0056] Specifically, for the plate whose signal transmission path is found to be abnormal in the previous self-test, the self-test signal is re-input. This is to verify whether the problem still exists, or whether the self-test can be completed by re-inputting the signal after the detector is reinstalled and the connection cable is checked. When the self-test signal is input to the plate with abnormal signal transmission path again, the sensing signal generated by the plate adjacent to the plate where the self-test signal is input is obtained. These sensing signals reflect the response of the beam position detector to the self-test signal. The re-acquired sensing signal is input to the corresponding analog-to-digital converter, and the analog-to-digital converter converts the analog signal into a digital signal, and the analog-to-digital converter transmits the digital signal to the main control module of the system. The main control module receives the digital signal from the analog-to-digital converter and outputs the channel amplitude quantization signal corresponding to each re-acquired sensing signal. The channel amplitude quantization signal corresponding to each re-acquired sensing signal is checked to determine whether they are greater than the preset second threshold. In order to determine whether the signal transmission path formed between the plate with abnormal signal transmission path and the beam position monitoring system is working normally. If the channel amplitude quantization signals corresponding to all the reacquired sensing signals are greater than the second threshold, then it can be considered that the signal transmission path formed between the plate with the abnormal signal transmission path and the beam position monitoring system is working normally. This means that the previous abnormality may be only temporary or has been resolved in some way. If at least one channel amplitude quantization signal corresponding to the reacquired sensing signal is still less than or equal to the second threshold, it indicates that the problem still exists. In this case, self-checking is required again until all channel amplitude quantization signals are greater than the second threshold, thereby confirming that the signal transmission path formed between the four plates of the beam position detector and the beam position monitoring system is in normal working condition, and the beam position monitoring system can work online.

[0057] In summary, according to the technical solution provided in the embodiment of the present invention, effective troubleshooting and recovery operations can be performed when an abnormality occurs in the beam position detector. Through continuous testing and inspection, it can be ensured that the signal transmission path formed between the various plates of the beam position detector and the beam position monitoring system will not continue to be used before it fails to work normally, thereby ensuring the safety and reliability of the system.

[0058] Furthermore, after the self-test signal is converted by the analog-to-digital converter, the value of the signal is within the range of 10000-25000.

[0059] Specifically, after the self-test signal is converted by the analog-to-digital converter, the value is within 10000-25000, because this range ensures that it is within the linear working range of the analog-to-digital converter and can ensure the accuracy and reliability of the signal during the self-test process. Among them, between 10000 and 25000 is the analog-to-digital conversion value of the analog-to-digital converter.

[0060] Further, inputting a self-test signal to a multi-channel analog-to-digital converter of the beam position monitoring system includes: The attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter is adjusted to the maximum gear, and a self-test signal is input to the multi-channel analog-to-digital converters of the beam position monitoring system.

[0061] Specifically, the attenuator of the front-end analog amplifier is set to the maximum gear to prevent the analog-to-digital converter from burning out components when operating in a saturated state. At the same time, the self-test signal is input to the analog-to-digital converter through the front-end analog amplifier.

[0062] Further, the self-test signal is sequentially inputted into the left plate, the upper plate, the right plate and the lower plate sequentially arranged in the circumferential direction on the beam position detector, including: The attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter is adjusted to a through state, and the self-test signal is input into the left plate, upper plate, right plate and lower plate arranged in circumferential order on the beam position detector in sequence.

[0063] Specifically, since the coupling degree between the beam position detector plates is very small, the front-end analog amplifier is directly set to a through state without attenuation. The self-test signal is then sequentially input to the left plate, upper plate, right plate and lower plate arranged circumferentially on the beam position detector.

[0064] Further, after the beam position monitoring system is powered on, the self-test signal is obtained; and / or, When receiving an execution instruction input by the user, a self-test signal is obtained.

[0065] Specifically, after receiving an execution instruction input by a user (ie, the user starts a self-test in the user interface) or the beam position monitoring system is powered on, the self-test signal is started to be obtained.

[0066] When restarting the self-test, it can be performed according to the execution instructions input by the user.

[0067] In summary, the self-test method of the beam position monitoring system can be used in the power-on fully automatic self-test mode, the online real-time fully automatic self-test mode, and the online sub-item self-test mode. The power-on fully automatic self-test mode is to perform a fully automatic test on the signal transmission path formed between the analog-to-digital converter, each electrode of the beam position detector and the beam position monitoring system after the beam position monitoring system is powered on and the embedded system of the beam position monitoring is started, and a pass or fail result is given; the online real-time fully automatic self-test mode is to perform a fully automatic test on the signal transmission path formed between the analog-to-digital converter, each electrode of the beam position detector and the beam position monitoring system when the equipment is running online but has not yet received the actual beam, and a self-test result is given; the online sub-item self-test mode mainly performs automatic inspections on different sub-items online, such as checking the analog-to-digital converter, etc.

[0068] Exemplarily, when performing a self-test, a self-test signal is connected through the self-test port, and at the same time, the induction signals of the four plates of the beam position detector are amplified or attenuated by the front-end simulator, and then converted into digital signals by the analog-to-digital converter, and finally transmitted to the main control module, and then the main control module filters, down-converts, and normalizes the digital signals to obtain a channel amplitude quantization signal. The channel amplitude quantization signal can be obtained by any technology known to those skilled in the art, and the present invention is not limited here.

[0069] Compared with the traditional self-checking platform and method of beam position monitoring system, the present invention has the following characteristics and advantages: A self-check method for a beam position monitoring system provided by the present invention can realize self-check work on the system to be tested. There is no need to use equipment such as a vector network analyzer to perform manual self-check on all channels, and there is no need to use complex signal processing algorithms. High-precision automatic detection can be achieved by only using waveform data of the beam position.

[0070] The power-on fully automatic self-test mode is that after power-on, the system automatically executes the above steps 1-5 and gives the self-test results after startup; the online real-time fully automatic self-test mode is that when the user needs it, the execution button is pressed to automatically execute the above steps 1-5 and give the self-test results; the online sub-item self-test mode is that the user performs a targeted check of a certain function in a certain step of the above steps 1-5 based on prejudgment.

[0071] Exemplarily, the preset first threshold and second threshold can be set in advance according to the size of the self-test signal. The parameter will be automatically downloaded when the system starts, and can also be adjusted at any time according to the theoretical value of the designed isolation between the connected self-test signal and the connected beam position detector plate.

[0072] In summary, the user only needs to input and output the self-test signal to the beam position monitoring system, connect the connecting cable between the beam position monitoring system and the beam position detector, input the preset threshold value on the user interface to start the self-test, and the program will be automatically executed. Finally, the self-test result will be displayed on the user interface without excessive operation. It can automatically determine the test results of the beam position monitoring system, obtain the system working integrity status, and master the working health status of the system channel, reducing the difficulty of troubleshooting for maintenance personnel. It has the advantages of simple method, intelligence, and strong practicality.

[0073] Figure 4 It is a functional block diagram of a beam position monitoring system self-test device provided according to an embodiment of the present invention.

[0074] like Figure 4 As shown, a beam position monitoring system self-test device 400 provided according to an embodiment of the present invention includes: a signal acquisition module 401 , a first judgment module 402 , a second judgment module 403 and a self-test result output module 404 .

[0075] Specifically, the signal acquisition module 401 is configured to acquire a self-test signal if self-test trigger information is received.

[0076] Specifically, the first judgment module 402 is configured to input the self-test signal to the analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter is operating normally; Specifically, the second judgment module 403 is configured to input the self-test signal to each plate of the beam position detector of the beam position monitoring system when the analog-to-digital converter is operating normally, and judge whether the signal transmission path formed between each plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally; Specifically, the self-test result output module 404 is configured to output the self-test result when the signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system works normally.

[0077] Among them, the beam position monitoring system includes multiple front-end analog amplifiers, multi-channel analog-to-digital converters and a main control module. Each electrode is connected to a front-end analog amplifier, an analog-to-digital converter in turn, and finally connected to the main control module to form a signal transmission path.

[0078] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the self-test method of the above-mentioned beam position monitoring system.

[0079] In yet another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which is implemented when the computer program is executed by a processor to perform the self-checking method of the beam position monitoring system.

[0080] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0081] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0082] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A self-checking method for a beam position monitoring system, characterized in that: include: If the signal acquisition module of the beam position monitoring system receives the self-test trigger information, a self-test signal is acquired; Inputting the self-test signal into the analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter is working normally; When the analog-to-digital converter is operating normally, the self-test signal is input to each electrode plate of the beam position detector of the beam position monitoring system to determine whether a signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally; outputting a self-test result when the signal transmission paths formed between the respective plates of the beam position detector and the beam position monitoring system are operating normally; Among them, the beam position monitoring system includes multiple front-end analog amplifiers, multi-channel analog-to-digital converters and a main control module. Each electrode is connected to a front-end analog amplifier, an analog-to-digital converter in turn, and finally connected to the main control module to form the signal transmission path.

2. The self-test method of the beam position monitoring system according to claim 1, characterized in that: Inputting the self-test signal to the analog-to-digital converter of the beam position monitoring system to determine whether the analog-to-digital converter operates normally includes: inputting the self-test signal to a multi-channel analog-to-digital converter of the beam position monitoring system; Transmitting the digital signal output by each analog-to-digital converter to the main control module of the beam position monitoring system, and acquiring a channel amplitude quantization signal output by the main control module corresponding to the digital signal output by each analog-to-digital converter; Check whether the channel amplitude quantization signal corresponding to the digital signal output by each analog-to-digital converter is greater than a preset first threshold; If all the channel amplitude quantization signals are greater than the first threshold, it is determined that each analog-to-digital converter works normally; If the channel amplitude quantization signal corresponding to the digital signal output by at least one of the analog-to-digital converters is less than or equal to the first threshold, it is determined that the analog-to-digital converter of the beam position monitoring system is operating abnormally.

3. The self-test method of the beam position monitoring system according to claim 1, characterized in that: When the analog-to-digital converter is operating normally, the self-test signal is input to each electrode plate of the beam position detector of the beam position monitoring system to determine whether a signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally, including: When the analog-to-digital converter works normally, the self-test signal is sequentially inputted into the left plate, the upper plate, the right plate and the lower plate sequentially arranged in the circumferential direction of the beam position detector; Acquire induction signals generated by other plates adjacent to the plate to which the self-test signal is input; Inputting the sensing signal into the corresponding analog-to-digital converter and transmitting it to the main control module of the beam position monitoring system; Obtain a channel amplitude quantization signal output by the main control module corresponding to each of the sensing signals; Check whether the channel amplitude quantization signal corresponding to each of the sensing signals is greater than a preset second threshold; If the channel amplitude quantization signals corresponding to all the sensing signals are greater than the second threshold, it is determined that the signal transmission paths formed between the plates of the beam position detector and the beam position monitoring system are working normally; If the channel amplitude quantization signal corresponding to at least one of the sensing signals is less than or equal to the second threshold, it is determined that there is an abnormality in the signal transmission path formed between the plate of the beam position detector and the beam position monitoring system involving the channel amplitude quantization signal.

4. The self-test method of the beam position monitoring system according to claim 3, characterized in that: When the channel amplitude quantization signal corresponding to at least one of the sensing signals is less than or equal to the second threshold, it is determined that there is an abnormality in the signal transmission path formed between the plate of the beam position detector and the beam position monitoring system involving the channel amplitude quantization signal, the method further includes: Step 1: inputting the self-test signal again into the electrode plate corresponding to the beam position detector where the signal transmission path has an abnormality; Step 2: reacquire the induction signals generated by other plates adjacent to the plate that inputs the self-test signal again; Step 3: inputting the reacquired sensing signal into the corresponding analog-to-digital converter and transmitting it to the main control module; Step 4: Obtain a channel amplitude quantization signal output by the main control module corresponding to each of the re-acquired sensing signals; Step 5: Check whether the channel amplitude quantization signal corresponding to each of the reacquired sensing signals is greater than a preset second threshold; Step 6: If the channel amplitude quantization signals corresponding to all the re-acquired sensing signals are greater than the second threshold, it is determined that the signal transmission path formed between the plate with abnormality in the signal transmission path and the system of the beam position monitoring system is working normally; Step seven: If the channel amplitude quantization signal corresponding to at least one of the reacquired sensing signals is still less than or equal to the second threshold, repeat steps one to five above until the signal transmission path formed between the plate of the beam position detector where the signal transmission path has an abnormality and the beam position monitoring system operates normally.

5. The self-test method of the beam position monitoring system according to claim 1, characterized in that: After the self-test signal is converted by an analog-to-digital converter, the value of the signal is within the range of 10000-25000.

6. The self-test method of the beam position monitoring system according to claim 2, characterized in that: The step of inputting the self-test signal to the multi-channel analog-to-digital converter of the beam position monitoring system comprises: The attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter is adjusted to the maximum gear, and the self-test signal is input to the multi-channel analog-to-digital converters of the beam position monitoring system at the same time.

7. The self-test method of the beam position monitoring system according to claim 3, characterized in that: The step of sequentially inputting the self-test signal into the left plate, the upper plate, the right plate and the lower plate sequentially arranged circumferentially on the beam position detector comprises: The attenuator of the front-end analog amplifier of the beam position monitoring system connected to each analog-to-digital converter is adjusted to a through state, and the self-test signal is input into the left plate, the upper plate, the right plate and the lower plate sequentially arranged circumferentially on the beam position detector in sequence.

8. The self-test method of the beam position monitoring system according to claim 3, characterized in that: If the signal acquisition module of the beam position monitoring system receives the self-test trigger information, obtaining the self-test signal includes: After the signal acquisition module of the beam position monitoring system is powered on, the self-test signal is acquired; and / or, when the signal acquisition module receives an execution instruction input by a user, the self-test signal is acquired.

9. The self-test method of the beam position monitoring system according to claim 4, characterized in that: Before executing the step 1, an execution instruction input by a user is received.

10. A beam position monitoring system self-test device, characterized in that: include: A signal acquisition module is configured to acquire a self-test signal if self-test trigger information is received; A first judgment module is configured to input the self-test signal into the analog-to-digital converter of the beam position monitoring system to judge whether the analog-to-digital converter works normally; A second judgment module is configured to, when the analog-to-digital converter is operating normally, input the self-test signal to each electrode plate of the beam position detector of the beam position monitoring system to judge whether a signal transmission path formed between each electrode plate of the beam position detector and the beam position monitoring system of the beam position monitoring system is operating normally; A self-test result output module is configured to output a self-test result when the signal transmission paths formed between the plates of the beam position detector and the beam position monitoring system are operating normally; Among them, the beam position monitoring system includes multiple front-end analog amplifiers, multi-channel analog-to-digital converters and a main control module. Each electrode is connected to a front-end analog amplifier, an analog-to-digital converter in turn, and finally connected to the main control module to form the signal transmission path.

Citation Information

Patent Citations

  • X-ray inspection system

    CN104515781A

  • Equipment for detecting beam loss

    CN109597115A

  • High-speed acquisition electronics system of beam position detector and use method of high-speed acquisition electronics system