Power transmission control method and system

By creating power transmission operations and generating power transmission tasks, the problems of low power transmission efficiency and lack of real-time monitoring in the existing technology are solved, and remote control and real-time monitoring of automatic and manual power transmission are realized, which improves the operating efficiency of the power grid.

CN119813538AInactive Publication Date: 2025-04-11新疆准能投资有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510017301.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-06
Publication Date
2025-04-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing power transmission method requires manual transmission from department to department to department, with low efficiency and lack of real-time monitoring, resulting in equipment not sending power on time, affecting the operation efficiency of the power grid.

Method used

By creating power transmission operations, we obtain the power transmission type, planned time and power transmission equipment input by the power transmission applicant, generate power transmission tasks, and perform execution and judgment and issuance of tasks. Perform the corresponding power transmission operation according to the task type (automatic or manual), and feedback the power transmission information after completion.

Benefits of technology

It avoids manual communication by department, improves power transmission efficiency, and realizes real-time monitoring of the power transmission process, ensuring the smooth completion of each power transmission task, and improving the grid operation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119813538A_ABST
    Figure CN119813538A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of electric power systems, and discloses a power transmission control method and system, and the method comprises the steps: generating a power transmission task, and transmitting the power transmission task to a task receiver and a task guardian related to the task receiver according to an operation region corresponding to the power transmission task if the power transmission task is allowed to be executed; the corresponding power transmission operation is executed based on different task types of the power transmission task, and the power transmission information is fed back to the power transmission applicant after the power transmission task is completed, so that the power transmission operation is prevented from being manually conveyed step by step, the power transmission efficiency is improved, the whole power transmission operation process can be monitored in real time, and the power transmission efficiency is improved. It is ensured that each power transmission task can be completed smoothly, and the operation efficiency of a power grid is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to a power transmission control method and system. Background Art

[0002] As the scale of the power grid continues to expand, ensuring the safe operation of the power grid is the responsibility of the grid dispatching and operating personnel. However, no matter how diligent the dispatching personnel are, misoperation due to carelessness will still occur during the dispatching process.

[0003] Power transmission is an important part of ensuring the operation of the power grid. The current power transmission method is to issue power transmission notices to departments at all levels through temporary notifications. However, this method requires manual power transmission communication from department to department and level to level, and there is no real-time monitoring of the entire power transmission process. Not only is the power transmission efficiency low, but there are also equipment that should have supplied power but did not supply power on time, affecting the operating efficiency of the entire power grid system.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of the present invention is to provide a power transmission control method and system, which aims to solve the problem that the current power transmission method requires manual power transmission from department to department and level to level, and there is no real-time monitoring of the entire power transmission process. Not only is the power transmission efficiency low, but there is also a technical problem that the equipment that should be transmitting power does not transmit power on time, affecting the operating efficiency of the entire power grid system.

[0006] To achieve the above object, the present invention provides a power transmission control method, which comprises the following steps:

[0007] Creating a power transmission job, obtaining the power transmission type, the power transmission plan time, and the equipment to be transmitted input by the power transmission applicant, and inputting the power transmission type, the power transmission plan time, and the equipment to be transmitted into the power transmission job to generate a power transmission task;

[0008] Performing an execution judgment on the power transmission task, if the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task;

[0009] Determining the task type of the power transmission task;

[0010] If the task type is an automatic power transmission task, obtaining the task guardian's click operation in the mobile terminal, and executing remote power transmission to the device to be powered when the button corresponding to the click operation is an automatic power transmission button;

[0011] If the task type is a manual power transmission task, the power distribution room is remotely opened through the access control system to enable the task guardian to manually transmit power to the power transmission equipment;

[0012] After the power transmission task is completed, the power transmission information is fed back to the power transmission applicant so that the power transmission applicant can start executing the post-power transmission operation process.

[0013] Optionally, the determining of execution of the power transmission task includes:

[0014] Extracting a power transmission type and a device to be powered from the power transmission task, wherein the power transmission type includes high-voltage power transmission and low-voltage power transmission;

[0015] Determine whether the power transmission type matches the device type of the device to be powered. If so, determine that the power transmission task is allowed to be executed; if not, determine that the power transmission task is prohibited to be executed, wherein the device type includes high-voltage equipment and low-voltage equipment.

[0016] Optionally, the method further comprises:

[0017] If the judgment result is that execution is prohibited, the power transmission task is rejected and a rejection reason is generated. The rejection reason and the rejection notification information of the power transmission task are sent to the mobile terminal corresponding to the power transmission applicant, so that the power transmission applicant can view the rejected power transmission task through the mobile terminal, wherein the rejection reason is that the power transmission type does not match the equipment type of the equipment to be powered.

[0018] Optionally, the method further comprises:

[0019] If the task type is manual power transmission, obtaining a first power transmission completion judgment result fed back by the task recipient, and judging whether the power transmission task is completed based on the first power transmission completion judgment result;

[0020] If the task type is automatic power supply, the second power supply completion judgment result fed back by the multimedia terminal of the distribution room and the third power supply completion judgment result fed back by the task recipient are obtained, and whether the power supply task is completed is judged based on the second power supply completion judgment result and the third power supply completion judgment result.

[0021] Optionally, judging whether the power transmission task is completed based on the second power transmission completion judgment result and the third power transmission completion judgment result includes:

[0022] determining whether the second power transmission completion determination result is consistent with the third power transmission completion determination result;

[0023] If they are consistent, determining whether the second power transmission completion judgment result and the third power transmission completion judgment result are both power transmission completion;

[0024] If the power transmission is completed, it is determined that the power transmission task is completed.

[0025] Optionally, the method further comprises:

[0026] When the second power transmission completion judgment result and the third power transmission completion judgment result are inconsistent, if the second power transmission completion judgment result is that power transmission is completed and the third power transmission completion judgment result is that power transmission is not completed, notifying the task recipient to perform manual power transmission;

[0027] If the second power transmission completion judgment result is that the power transmission is not completed, and the third power transmission completion judgment result is that the power transmission is completed, the task recipient is notified to perform a second confirmation of the power transmission completion.

[0028] Optionally, the method further comprises:

[0029] If the automatic power transmission is not completed, the task type of the power transmission task is converted to manual power transmission, and the status of the power transmission task after the task type conversion is adjusted from the received status to the unreceived status, and added to the list of power transmission tasks to be received.

[0030] In addition, to achieve the above-mentioned purpose, the present invention also proposes a power transmission control system, the power transmission control system comprising:

[0031] A creation module, used to create a power transmission job, obtain the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, and input the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task;

[0032] A sending module is used to make an execution judgment on the power transmission task. If the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task;

[0033] A judgment module, used to determine the task type of the power transmission task;

[0034] An execution module, for obtaining a click operation of the task guardian in the mobile terminal if the task type is an automatic power transmission task, and executing remote power transmission to the device to be powered when the button corresponding to the click operation is an automatic power transmission button;

[0035] The execution module is used to remotely open the power distribution room through the access control system if the task type is a manual power transmission task, so that the task guardian can manually transmit power to the power transmission equipment;

[0036] The feedback module is used to feed back the power transmission information to the power transmission applicant after the power transmission task is completed, so that the power transmission applicant can start the post-power transmission operation process.

[0037] In some embodiments, the sending module is used to extract the power transmission type and the equipment to be powered from the power transmission task, and the power transmission type includes high-voltage power transmission and low-voltage power transmission;

[0038] Determine whether the power transmission type matches the device type of the device to be powered. If so, determine that the power transmission task is allowed to be executed; if not, determine that the power transmission task is prohibited to be executed, wherein the device type includes high-voltage equipment and low-voltage equipment.

[0039] In some embodiments, the sending module is used to reject the power transmission task and generate a rejection reason if the first judgment result is that execution is prohibited, and send the rejection reason and the rejection notification information of the power transmission task to the mobile terminal corresponding to the power transmission applicant, so that the power transmission applicant can view the rejected power transmission task through the mobile terminal, wherein the rejection reason is that the power transmission type does not match the equipment type of the equipment to be powered.

[0040] The present invention creates a power transmission job, obtains the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, inputs the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task; makes an execution judgment on the power transmission task, and if the execution judgment result is that the execution is allowed, sends the power transmission task to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; determines the task type of the power transmission task; if the task type is an automatic power transmission task, obtains the task guardian's click operation in the mobile terminal, and When the corresponding button is the automatic power supply button, remote power supply to the equipment to be supplied is executed; if the task type is a manual power supply task, the distribution room is remotely opened through the access control system, so that the task guardian can manually supply power to the equipment to be supplied; after the power supply task is completed, the power supply information is fed back to the power supply applicant, so that the power supply applicant can start the post-power supply operation process. The above method avoids the manual communication of power supply operations from department to department and level to level, thereby improving the power supply efficiency. At the same time, the entire power supply operation process can be monitored in real time to ensure that each power supply task can be completed smoothly, thereby ensuring the efficiency of power grid operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a flowchart of a first embodiment of a power transmission control method of the present invention;

[0042] Figure 2It is a structural block diagram of the first embodiment of the power transmission control system of the present invention.

[0043] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0044] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0045] The embodiment of the present invention provides a power transmission control method, referring to Figure 1 , Figure 1 It is a flowchart diagram of a first embodiment of a power transmission control method of the present invention.

[0046] In this embodiment, the power transmission control method includes the following steps:

[0047] Step S10: Create a power transmission job, obtain the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, and input the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task.

[0048] In this embodiment, the executor of this embodiment is a power transmission control device, wherein the power transmission control device has functions such as data processing, data communication and program running. The power transmission control device can be a computer terminal device or other network device, and of course it can also be other devices with similar functions, and this embodiment does not limit this.

[0049] It should be noted that power transmission is an important part of ensuring the operation of the power grid. The current power transmission method is to issue power transmission notices to departments at all levels through temporary notifications. However, this method requires manual power transmission from department to department and level to level, and there is no real-time monitoring of the entire power transmission process. Not only is the power transmission efficiency low, but there are also equipment that should have supplied power but did not supply power on time, affecting the operating efficiency of the entire power grid system.

[0050] In order to solve the above technical problems, this embodiment creates a power transmission job, obtains the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, and inputs the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task; makes an execution judgment on the power transmission task, and if the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; determines the task type of the power transmission task; if the task type is an automatic power transmission task, obtains the click operation of the task guardian in the mobile terminal, and When the button is the automatic power supply button, remote power supply to the equipment to be supplied is executed; if the task type is a manual power supply task, the distribution room is remotely opened through the access control system, so that the task guardian can manually supply power to the equipment to be supplied; after the power supply task is completed, the power supply information is fed back to the power supply applicant, so that the power supply applicant can start the post-power supply operation process. The above method avoids the manual communication of power supply operations from department to department and level to level, thereby improving the power supply efficiency. At the same time, the entire power supply operation process can be monitored in real time to ensure that each power supply task can be completed smoothly and the efficiency of power grid operation is guaranteed. Specifically, it can be achieved in the following way.

[0051] In the specific implementation, in this embodiment, before performing power transmission control, it is necessary to first create a corresponding power transmission operation, and then obtain the power transmission type, power transmission plan time and equipment to be transmitted, and add this information to the power transmission operation to generate the corresponding power transmission task. In this embodiment, this information is input by the power transmission applicant through a mobile terminal, and an application for power transmission operations is installed in the mobile terminal, wherein the power transmission type includes high-voltage power transmission and low-voltage power transmission, the power transmission plan time includes the start time of power transmission, and the equipment to be transmitted includes high-voltage equipment and low-voltage equipment.

[0052] It should be noted that, in this embodiment, the initial task status of all generated power transmission tasks will be adjusted to a waiting-for-collection status, and each time a newly generated power transmission task appears, the newly generated power transmission task will be added to the waiting-for-collection power transmission task list.

[0053] Step S20: Perform an execution judgment on the power transmission task. If the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task.

[0054] In order to ensure the accuracy of the power transmission task, the power transmission task needs to be judged in this embodiment to determine whether the power transmission task is allowed to be executed. The judgment process is to extract the power transmission type and the device to be powered from the power transmission task; determine whether the power transmission type matches the device type of the device to be powered. If they match, it is determined that the power transmission task is allowed to be executed; if they do not match, it is determined that the power transmission task is prohibited from being executed.

[0055] It should be noted that the judgment detection is performed to determine whether the power transmission type matches the device to be powered, which can effectively avoid the initiation of erroneous power transmission tasks due to human factors.

[0056] If the execution judgment result is that execution is allowed, the power transmission task can be issued. Specifically, the power transmission task can be issued to the task recipient of the corresponding work area and the task guardian associated with the task. After the task recipient and the task guardian complete the receipt of the power transmission task, the task status of the power transmission task is changed from the waiting status to the received status, and it is removed from the list of waiting power transmission tasks.

[0057] Furthermore, if the execution judgment result is that execution is prohibited, the power transmission task is rejected, and a rejection reason is generated, and the rejection reason and the rejection notification information of the power transmission task are sent to the mobile terminal corresponding to the power transmission applicant, wherein the rejection reason corresponding to the prohibition of execution is that the power transmission type does not match the device type of the device to be transmitted. The power transmission applicant can view the rejected power transmission application and the rejection reason corresponding to the power transmission application through the mobile terminal.

[0058] Step S30: Determine the task type of the power transmission task.

[0059] Step S40: If the task type is an automatic power transmission task, the click operation of the task guardian in the mobile terminal is obtained, and when the button corresponding to the click operation is an automatic power transmission button, remote power transmission is performed to the device to be powered.

[0060] Furthermore, in this embodiment, when the power transmission task is issued to the task guardian, the task type of the power transmission task can be determined so that the task guardian performs the power transmission task according to the corresponding task type. Specifically, if the task type is an automatic power transmission task, the task guardian's click operation in the mobile terminal is obtained, and when the button corresponding to the click operation is an automatic power transmission button, remote power transmission to the device to be powered is performed.

[0061] Step S50: If the task type is a manual power transmission task, the power distribution room is remotely opened through the access control system so that the task guardian can manually transmit power to the power transmission equipment.

[0062] If the task type is a manual power supply task, the power distribution room is remotely opened through the access control system so that the task guardian can manually supply power to the power supply equipment.

[0063] It should be noted that when the task guardian performs the automatic power transmission task, he can click the automatic power transmission button on the mobile terminal to realize remote automatic power transmission. When the task guardian performs the manual power transmission task, the task guardian needs to manually perform the power transmission operation. Among them, when the task guardian performs the manual power transmission task, it is necessary to detect whether the task guardian has an operation ticket. If there is an operation ticket, the task guardian can perform the manual power transmission operation.

[0064] In some embodiments, if the task type is manual power transmission, it is sufficient to obtain only the first power transmission completion judgment result fed back by the task recipient. If the first power transmission completion judgment result is that the power transmission has been completed, it is determined that the automatic power transmission at this time is completed. If the task type is automatic power transmission, it is necessary to simultaneously obtain the second power transmission completion judgment result fed back by the multimedia terminal of the distribution room and the third power transmission completion judgment result fed back by the task recipient, and judge whether the power transmission task is completed based on the second power transmission completion judgment result and the third power transmission completion judgment result. Specifically, determine whether the second power transmission completion judgment result and the third power transmission completion judgment result are consistent; if they are consistent, determine whether the second power transmission completion judgment result and the third power transmission completion judgment result are both power transmission completion; if both are power transmission completion, determine that the power transmission task is completed.

[0065] Further, when the second power transmission completion judgment result and the third power transmission completion judgment result are inconsistent, if the second power transmission completion judgment result is that the power transmission is completed, and the third power transmission completion judgment result is that the power transmission is not completed, the task recipient is notified to perform manual power transmission; if the second power transmission completion judgment result is that the power transmission is not completed, and the third power transmission completion judgment result is that the power transmission is completed, the task recipient is notified to perform a second confirmation of the power transmission completion.

[0066] Furthermore, compared with the manual power transmission method, the automatic power transmission method may have the situation that the power transmission is unsuccessful, that is, the automatic power transmission is not completed. When this happens, in this embodiment, the task type of the power transmission task is converted to manual power transmission, and the status of the power transmission task after the task type conversion is adjusted from the received status to the unreceived status, and it is added to the list of power transmission tasks to be received, and then the above steps are repeated. At this time, it can be sent to a new task recipient or the same task recipient.

[0067] Step S60: After the power transmission task is completed, the power transmission information is fed back to the power transmission applicant, so that the power transmission applicant starts executing the post-power transmission operation process.

[0068] By real-time monitoring of the entire process of the power transmission task in the above manner, it is possible to ensure that the power transmission task is effectively completed. Then, after it is determined that the power transmission task is completed, the power transmission information can be fed back to the power transmission applicant of the power transmission task. Specifically, the power transmission information can be sent to the mobile terminal of the power transmission applicant and corresponding voice or sound prompts can be made. After receiving the power transmission information, the power transmission applicant can start the subsequent work process. This method can improve the timeliness of power transmission and ensure the safety of the subsequent operations of the power transmission applicant.

[0069] This embodiment creates a power transmission job, obtains the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, inputs the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task; makes an execution judgment on the power transmission task, and if the execution judgment result is that the execution is allowed, sends the power transmission task to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; determines the task type of the power transmission task; if the task type is an automatic power transmission task, obtains the task guardian's click operation in the mobile terminal, and in the click operation When the corresponding button is the automatic power supply button, remote power supply to the equipment to be supplied is executed; if the task type is a manual power supply task, the distribution room is remotely opened through the access control system to enable the task guardian to manually supply power to the equipment to be supplied; after the power supply task is completed, the power supply information is fed back to the power supply applicant to enable the power supply applicant to start the post-power supply operation process. The above method avoids the manual communication of power supply operations from department to department and level to level, thereby improving the power supply efficiency. At the same time, the entire power supply operation process can be monitored in real time to ensure that each power supply task can be completed smoothly and the efficiency of power grid operation is guaranteed.

[0070] Reference Figure 2 , Figure 2 It is a structural block diagram of the first embodiment of the power transmission control system of the present invention.

[0071] like Figure 2 As shown, the power transmission control system proposed in the embodiment of the present invention includes:

[0072] The creation module 10 is used to create a power transmission job, obtain the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, and input the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task.

[0073] The sending module 20 is used to make an execution judgment on the power transmission task. If the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task.

[0074] The judging module 30 is used to determine the task type of the power transmission task.

[0075] The execution module 40 is used to obtain the click operation of the task guardian in the mobile terminal if the task type is an automatic power transmission task, and execute remote power transmission to the device to be powered when the button corresponding to the click operation is an automatic power transmission button.

[0076] The execution module 40 is used to remotely open the power distribution room through the access control system if the task type is a manual power transmission task, so that the task guardian can manually transmit power to the power transmission equipment.

[0077] The feedback module 50 is used to feed back the power transmission information to the power transmission applicant after the power transmission task is completed, so that the power transmission applicant can start executing the post-power transmission operation process.

[0078] This embodiment creates a power transmission job, obtains the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, inputs the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task; makes an execution judgment on the power transmission task, and if the execution judgment result is that the execution is allowed, sends the power transmission task to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; determines the task type of the power transmission task; if the task type is an automatic power transmission task, obtains the task guardian's click operation in the mobile terminal, and in the click operation When the corresponding button is the automatic power supply button, remote power supply to the equipment to be supplied is executed; if the task type is a manual power supply task, the distribution room is remotely opened through the access control system to enable the task guardian to manually supply power to the equipment to be supplied; after the power supply task is completed, the power supply information is fed back to the power supply applicant to enable the power supply applicant to start the post-power supply operation process. The above method avoids the manual communication of power supply operations from department to department and level to level, thereby improving the power supply efficiency. At the same time, the entire power supply operation process can be monitored in real time to ensure that each power supply task can be completed smoothly and the efficiency of power grid operation is guaranteed.

[0079] In some embodiments, the sending module 20 is used to extract the power transmission type and the device to be powered from the power transmission task, the power transmission type including high-voltage power transmission and low-voltage power transmission; determine whether the power transmission type matches the device type of the device to be powered, if so, determine that the power transmission task is allowed to be executed, if not, determine that the power transmission task is prohibited to be executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment.

[0080] In some embodiments, the sending module 20 is used to reject the power transmission task and generate a rejection reason if the first judgment result is that execution is prohibited, and send the rejection reason and the rejection notification information of the power transmission task to the mobile terminal corresponding to the power transmission applicant, so that the power transmission applicant can view the rejected power transmission task through the mobile terminal, wherein the rejection reason is that the power transmission type does not match the equipment type of the equipment to be powered.

[0081] In some embodiments, the feedback module 50 is used to obtain a first power transmission completion judgment result fed back by the task recipient if the task type is manual power transmission, and judge whether the power transmission task is completed based on the first power transmission completion judgment result; if the task type is automatic power transmission, obtain a second power transmission completion judgment result fed back by the multimedia terminal of the distribution room and a third power transmission completion judgment result fed back by the task recipient, and judge whether the power transmission task is completed based on the second power transmission completion judgment result and the third power transmission completion judgment result.

[0082] In some embodiments, the feedback module 50 is used to determine whether the second power transmission completion judgment result and the third power transmission completion judgment result are consistent; if they are consistent, it is determined whether the second power transmission completion judgment result and the third power transmission completion judgment result are both power transmission completion; if both are power transmission completion, it is determined that the power transmission task is completed.

[0083] In some embodiments, the feedback module 50 is used to notify the task recipient to perform manual power transmission when the second power transmission completion judgment result and the third power transmission completion judgment result are inconsistent. If the second power transmission completion judgment result is that the power transmission is completed and the third power transmission completion judgment result is that the power transmission is not completed, the task recipient is notified to perform a second confirmation of the power transmission completion if the second power transmission completion judgment result is that the power transmission is not completed and the third power transmission completion judgment result is that the power transmission is completed.

[0084] In some embodiments, the execution module 40 is used to convert the task type of the power delivery task to manual power delivery if the automatic power delivery is not completed, and adjust the status of the power delivery task after the task type conversion from a received status to an unreceived status, and add it to the list of power delivery tasks to be received.

[0085] An embodiment of the present application also provides a power transmission control device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus, and the memory is used to store the power transmission control program; the processor is used to implement the above-mentioned power transmission control method when executing the program stored in the memory.

[0086] The communication bus mentioned in the above power transmission control device can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc.

[0087] The communication interface is used for communication between the above-mentioned power transmission control device and other devices.

[0088] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0089] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, and discrete hardware components.

[0090] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions may be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive Solid State Disk (SSD)), etc.

[0091] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0092] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0093] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

[0094] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.

[0095] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.

[0096] In addition, for technical details that are not described in detail in this embodiment, reference can be made to the power transmission control method provided in any embodiment of the present invention, and will not be repeated here.

[0097] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0098] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0099] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0100] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

[0101] It is understandable that the system provided by the embodiment of the present invention corresponds to the method provided by the embodiment of the present invention, and the explanation, examples and beneficial effects of the relevant contents can refer to the corresponding parts in the above method.

Claims

1. A power transmission control method, characterized in that: The power transmission control method comprises: Creating a power transmission job, obtaining the power transmission type, the power transmission plan time, and the equipment to be transmitted input by the power transmission applicant, and inputting the power transmission type, the power transmission plan time, and the equipment to be transmitted into the power transmission job to generate a power transmission task; Performing an execution judgment on the power transmission task, if the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; Determining the task type of the power transmission task; If the task type is an automatic power transmission task, obtaining the task guardian's click operation in the mobile terminal, and executing remote power transmission to the device to be powered when the button corresponding to the click operation is an automatic power transmission button; If the task type is a manual power transmission task, the power distribution room is remotely opened through the access control system to enable the task guardian to manually transmit power to the power transmission equipment; After the power transmission task is completed, the power transmission information is fed back to the power transmission applicant so that the power transmission applicant can start executing the post-power transmission operation process.

2. The power transmission control method according to claim 1, characterized in that: The performing of the execution judgment on the power transmission task comprises: Extracting a power transmission type and a device to be powered from the power transmission task, wherein the power transmission type includes high-voltage power transmission and low-voltage power transmission; Determine whether the power transmission type matches the device type of the device to be powered. If so, determine that the power transmission task is allowed to be executed; if not, determine that the power transmission task is prohibited to be executed, wherein the device type includes high-voltage equipment and low-voltage equipment.

3. The power transmission control method according to claim 2, wherein: The method further comprises: If the judgment result is that execution is prohibited, the power transmission task is rejected and a rejection reason is generated. The rejection reason and the rejection notification information of the power transmission task are sent to the mobile terminal corresponding to the power transmission applicant, so that the power transmission applicant can view the rejected power transmission task through the mobile terminal, wherein the rejection reason is that the power transmission type does not match the equipment type of the equipment to be powered.

4. The power transmission control method according to claim 1, wherein: The method further comprises: If the task type is manual power transmission, obtaining a first power transmission completion judgment result fed back by the task recipient, and judging whether the power transmission task is completed based on the first power transmission completion judgment result; If the task type is automatic power supply, the second power supply completion judgment result fed back by the multimedia terminal of the distribution room and the third power supply completion judgment result fed back by the task recipient are obtained, and whether the power supply task is completed is judged based on the second power supply completion judgment result and the third power supply completion judgment result.

5. The power transmission control method according to claim 4, characterized in that: The determining whether the power transmission task is completed based on the second power transmission completion determination result and the third power transmission completion determination result includes: determining whether the second power transmission completion determination result is consistent with the third power transmission completion determination result; If they are consistent, determining whether the second power transmission completion judgment result and the third power transmission completion judgment result are both power transmission completion; If the power transmission is completed, it is determined that the power transmission task is completed.

6. The power transmission control method according to claim 5, characterized in that: The method further comprises: When the second power transmission completion judgment result and the third power transmission completion judgment result are inconsistent, if the second power transmission completion judgment result is that power transmission is completed and the third power transmission completion judgment result is that power transmission is not completed, notifying the task recipient to perform manual power transmission; If the second power transmission completion judgment result is that the power transmission is not completed, and the third power transmission completion judgment result is that the power transmission is completed, the task recipient is notified to perform a second confirmation of the power transmission completion.

7. The power transmission control method according to claim 4, characterized in that: The method further comprises: If the automatic power supply is not completed, the task type of the power supply task is converted to manual power supply, and the status of the power supply task after the task type conversion is adjusted from the received status to the unreceived status, and added to the list of power supply tasks to be received.

8. A power transmission control system, characterized in that: The power transmission control system comprises: A creation module, used to create a power transmission job, obtain the power transmission type, power transmission plan time and the equipment to be transmitted input by the power transmission applicant, and input the power transmission type, the power transmission plan time and the equipment to be transmitted into the power transmission job to generate a power transmission task; A sending module is used to make an execution judgment on the power transmission task. If the execution judgment result is that the execution is allowed, the power transmission task is sent to the task recipient and the task guardian associated with the task recipient according to the operation area corresponding to the power transmission task; A judgment module, used to determine the task type of the power transmission task; An execution module, for obtaining a click operation of the task guardian in the mobile terminal if the task type is an automatic power transmission task, and executing remote power transmission to the device to be powered when the button corresponding to the click operation is an automatic power transmission button; The execution module is used to remotely open the power distribution room through the access control system if the task type is a manual power transmission task, so that the task guardian can manually transmit power to the power transmission equipment; The feedback module is used to feed back the power transmission information to the power transmission applicant after the power transmission task is completed, so that the power transmission applicant can start the post-power transmission operation process.

9. The power transmission control system according to claim 1, characterized in that: The sending module is used to extract the power transmission type and the equipment to be powered from the power transmission task, and the power transmission type includes high-voltage power transmission and low-voltage power transmission; Determine whether the power transmission type matches the device type of the device to be powered. If so, determine that the power transmission task is allowed to be executed; if not, determine that the power transmission task is prohibited to be executed, wherein the device type includes high-voltage equipment and low-voltage equipment.

10. The power transmission control system according to claim 9, characterized in that: The sending module is used to reject the power transmission task and generate a rejection reason if the first judgment result is that execution is prohibited, and send the rejection reason and the rejection notification information of the power transmission task to the mobile terminal corresponding to the power transmission applicant, so that the power transmission applicant can view the rejected power transmission task through the mobile terminal, wherein the rejection reason is that the power transmission type does not match the equipment type of the equipment to be powered.