Steel latticed column installation auxiliary device and construction method thereof

By inserting plug-in columns at the upper port of the steel lattice column, and adjusting the steering of the steel lattice columns through the cooperation of the hanging rod and the shoulder beam, the problem that the steering is difficult to control when the steel lattice column is installed is solved, the quality of foundation pit support construction is improved, and the construction period and labor costs are saved.

CN119824919AActive Publication Date: 2025-04-15CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510056655.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-14
Publication Date
2025-04-15
Estimated Expiration
2045-01-14

AI Technical Summary

Technical Problem

During the construction of pile foundations, the installation of steel lattice columns is not easy to control the steering, resulting in the main ribs supported by the foundation pit that cannot be continuously penetrated, and it is necessary to penetrate the plate and angle steel.

Method used

A steel lattice column installation auxiliary device is provided, including a plug-in column, a support frame and a suspender. The plug-in column is inserted at the upper port of the steel lattice column. The hanging rod is installed on the side of the plug-in column through a telescopic assembly. The lower end of the hanging rod is formed, and the first patch on one side of the steel lattice column is hung on the hook. Adjust the steering of the steel lattice column by rotating the shoulder pole beam.

Benefits of technology

It solves the problem that the main ribs supported by the foundation pit cannot be continuously connected when connected to the lattice column, avoids the decal plates and angle steel of the steel lattice columns being damaged, improves the construction quality of foundation pit support, saves the welding processing of the main ribs and decal plates of the support beam, and achieves the effect of saving construction period and reducing labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119824919A_ABST
    Figure CN119824919A_ABST
Patent Text Reader

Abstract

The invention discloses a steel latticed column installation auxiliary device and a construction method thereof, the steel latticed column installation auxiliary device comprises an insertion column, the lower end of the insertion column is detachably inserted into an upper port of a steel latticed column, and the upper end of the insertion column is provided with a lifting lug; the supporting frame is arranged at the upper end of the inserting column in a sleeving mode, the two opposite sides of the supporting frame are connected with carrying pole beams correspondingly, and the carrying pole beams are placed in orifices of the pile holes of the steel latticed column; the upper end of the hanging rod is installed on the side portion of the inserting column through a telescopic assembly, a lifting hook is formed at the lower end of the hanging rod, and a first batten plate on one side of the steel latticed column is hung on the lifting hook. The problems that in the pile foundation construction process, steering is not easy to control during steel latticed column installation, and main reinforcements for supporting a foundation pit cannot be continuously communicated easily are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a steel lattice column installation auxiliary device and a construction method thereof. Background Art

[0002] During the construction of pile foundation projects, the installation of steel lattice columns often fails to meet the design requirements due to the difficulty in controlling the rotation of the steel lattice columns due to the excessive depth of the empty piles. This results in the main reinforcement not being able to penetrate continuously during the construction of the support beam, and requiring the first tie plate and angle steel to be passed through.

[0003] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0004] In order to overcome the defects of the prior art, a steel lattice column installation auxiliary device and a construction method thereof are provided to solve the problem that the steel lattice column installation is difficult to control the steering during the pile foundation construction process, which may easily lead to the main reinforcement of the foundation pit support being unable to penetrate continuously.

[0005] In order to achieve the above object, a steel lattice column installation auxiliary device is provided, comprising:

[0006] A plug-in column, the lower end of which is detachably plugged into the upper end of the steel lattice column, and the upper end of which is provided with a lifting lug;

[0007] A support frame is sleeved on the upper end of the plug-in column, and opposite sides of the support frame are respectively connected with shoulder beams, and the shoulder beams are placed on the openings of the pile holes of the steel lattice column;

[0008] A suspension rod, the upper end of which is mounted on the side of the plug-in column through a telescopic assembly, a hook is formed at the lower end of the suspension rod, and a first gusset plate on one side of the steel lattice column is hung on the hook.

[0009] Furthermore, the plug-in column is a lattice column.

[0010] Furthermore, the suspension rods are respectively installed on the four sides of the plug-in column.

[0011] Furthermore, the telescopic assembly includes:

[0012] A screw rod, wherein a through hole is formed on the second connecting plate of the plug-in column, and the screw rod can be movably inserted into the shaft hole;

[0013] Two screw-on parts, the two screw-on parts are screwed on the screw rod, and the two screw-on parts are clamped on the second fixing plate.

[0014] Furthermore, the lifting ears are respectively provided on opposite sides of the upper end of the plug-in column.

[0015] Furthermore, the hook is U-shaped.

[0016] The present invention provides a construction method of a steel lattice column installation auxiliary device, comprising the following steps:

[0017] The lower end of the plug-in column is detachably inserted into the upper end of the steel lattice column;

[0018] Contracting the telescopic assembly to allow the first tie plate on one side of the steel lattice column to be hung on the hook at the lower end of the suspension rod;

[0019] The steel lattice column is hoisted and lowered into the pile hole, and the shoulder pole beam on the support frame is placed at the opening of the pile hole;

[0020] The shoulder beam is rotated to rotate the steel lattice column, so that the rotation direction of the steel lattice column meets the design requirements.

[0021] The beneficial effect of the present invention is that the steel lattice column installation auxiliary device of the present invention is an auxiliary device for the installation of steel lattice columns. A plug-in column is inserted into the upper port of the steel lattice column to be installed, and the plug-in column is then hooked to the connecting plate of the steel lattice column through the hook on the hanger. Finally, the shoulder beam is rotated to adjust the steering of the steel lattice column. This solves the problem that the main reinforcement of the foundation pit support cannot be continuously penetrated when connected to the lattice column and needs to be penetrated by the connecting plate and the angle steel, avoids the damage of the connecting plate and the angle steel of the steel lattice column, improves the construction quality of the foundation pit support, and saves the welding process of the main reinforcement and the connecting plate of the support beam, thereby achieving the effect of saving construction period and reducing labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0023] Figure 1 It is a schematic structural diagram of a steel lattice column installation auxiliary device according to an embodiment of the present invention.

[0024] Figure 2 It is a schematic structural diagram of the upper end of a steel lattice column according to an embodiment of the present invention. DETAILED DESCRIPTION

[0025] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.

[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0027] Reference Figure 1 and Figure 2 As shown, the present invention provides a steel lattice column installation auxiliary device, comprising: a plug-in column 1, a support frame 2, and a suspension rod 3.

[0028] In this embodiment, the shape of the cross section of the plug-in column is adapted to the shape of the inner column hole of the steel lattice column to be installed. The size of the cross section of the plug-in column is smaller than the size of the inner column hole of the steel lattice column to be installed. The lower end of the plug-in column 1 is detachably inserted into the upper end of the steel lattice column 4. The upper end of the plug-in column 1 is provided with a lifting lug 12.

[0029] As a preferred embodiment, the plug-in column 1 is a lattice column.

[0030] The support frame 2 is sleeved on the upper end of the plug-in column 1. The opposite sides of the support frame 2 are respectively connected with a shoulder beam 21. The shoulder beam 21 is placed on the hole of the pile hole of the steel lattice column 4.

[0031] In this embodiment, the support frame is a square frame formed by welding a plurality of steel pipes. The shoulder beams on both sides of the support frame are made of round steel pipes. The length of the shoulder beams is greater than the length of the support frame.

[0032] The upper end of the suspension rod 3 is mounted on the side of the plug-in column 1 through a telescopic assembly 31. A hook 32 is formed at the lower end of the suspension rod 3. In this embodiment, the hook 32 is U-shaped. A first gusset plate 41 on one side of the steel lattice column 4 is hung on the hook 32.

[0033] As a preferred embodiment, the four sides of the plug-in column 1 are respectively installed with suspension rods 3.

[0034] In this embodiment, the telescopic assembly 31 includes a screw rod and two screw-fitting parts.

[0035] A through hole is formed on the second fixing plate 11 of the plug-in column 1. The screw rod can be movably inserted into the shaft hole.

[0036] The two screw-in parts are screwed on the screw rod. The two screw-in parts are respectively arranged on the inner and outer sides of the second fixing plate, and the two screw-in parts are clamped on the second fixing plate 11.

[0037] The distance between the suspension rod and the second fixing plate can be adjusted by adjusting the positions of the two screw-fitting parts on the screw rod.

[0038] In this embodiment, two opposite sides of the upper end of the plug-in column 1 are provided with lifting ears 12. The lifting ears are semicircular. After adjusting the direction of the steel lattice column, the hook is separated from the first tie plate of the steel lattice column, and the steel lattice column installation auxiliary device of the present invention is hoisted for turnover use.

[0039] The present invention provides a construction method of a steel lattice column installation auxiliary device, comprising the following steps:

[0040] S1. The lower end of the plug-in column 1 is detachably inserted into the upper end of the steel lattice column 4.

[0041] S2, contract the telescopic assembly 31 to allow the first gusset plate 41 on one side of the steel lattice column 4 to be hung on the hook 32 at the lower end of the suspension rod 3.

[0042] Specifically, the distance between the suspension rod and the second gusset plate is adjusted by adjusting the positions of the two screwed parts on the screw rod. After the first gusset plate is arranged directly above the hook opening of the suspension hook, the plug-in column is lifted up so that the first gusset plate is hung in the suspension hook.

[0043] S3, hoist the steel lattice column 4 and lower it into the pile hole, and place the shoulder beam 21 on the support frame 2 at the opening of the pile hole.

[0044] S4. Rotate the shoulder beam 21 to rotate the steel lattice column 4, so that the rotation direction of the steel lattice column 4 meets the design requirements.

[0045] The steel lattice column installation auxiliary device of the present invention is an auxiliary device for the installation of steel lattice columns. A plug-in column is inserted into the upper port of the steel lattice column to be installed, and the plug-in column is then hooked to the connecting plate of the steel lattice column through the hook on the hanger. Finally, the steering of the steel lattice column is adjusted by rotating the shoulder beam. This solves the problem that the main reinforcement of the foundation pit support cannot be continuously penetrated when connected to the lattice column and needs to be penetrated by the connecting plate and the angle steel, avoids the damage of the connecting plate and the angle steel of the steel lattice column, improves the construction quality of the foundation pit support, and saves the welding process of the main reinforcement and the connecting plate of the support beam, thereby achieving the effect of saving construction time and reducing labor costs.

[0046] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.

Claims

1. A steel lattice column installation auxiliary device, characterized in that: include: A plug-in column, the lower end of which is detachably plugged into the upper end of the steel lattice column, and the upper end of which is provided with a lifting lug; A support frame is sleeved on the upper end of the plug-in column, and opposite sides of the support frame are respectively connected with shoulder beams, and the shoulder beams are placed on the openings of the pile holes of the steel lattice column; A suspension rod, the upper end of which is mounted on the side of the plug-in column through a telescopic assembly, a hook is formed at the lower end of the suspension rod, and a first gusset plate on one side of the steel lattice column is hung on the hook.

2. The steel lattice column installation auxiliary device according to claim 1, characterized in that: The plug-in column is a lattice column.

3. The steel lattice column installation auxiliary device according to claim 2, characterized in that: The four side portions of the plug-in column are respectively equipped with the suspension rods.

4. The steel lattice column installation auxiliary device according to claim 3, characterized in that: The telescopic assembly comprises: A screw rod, wherein a through hole is formed on the second connecting plate of the plug-in column, and the screw rod can be movably inserted into the shaft hole; Two screw-on parts, the two screw-on parts are screwed on the screw rod, and the two screw-on parts are clamped on the second fixing plate.

5. The steel lattice column installation auxiliary device according to claim 1, characterized in that: The lifting ears are respectively arranged on opposite sides of the upper end of the plug-in column.

6. The steel lattice column installation auxiliary device according to claim 1, characterized in that: The hook is U-shaped.

7. A construction method for the steel lattice column installation auxiliary device according to any one of claims 1 to 6, characterized in that: The following steps are involved: The lower end of the plug-in column is detachably inserted into the upper end of the steel lattice column; Contracting the telescopic assembly to allow the first tie plate on one side of the steel lattice column to be hung on the hook at the lower end of the suspension rod; The steel lattice column is hoisted and lowered into the pile hole, and the shoulder pole beam on the support frame is placed at the opening of the pile hole; The shoulder beam is rotated to rotate the steel lattice column, so that the rotation direction of the steel lattice column meets the design requirements.

Citation Information

Patent Citations

  • Telescopic suspender drilling mounting device capable of measuring depth and using method thereof

    CN112223555A

  • Camshaft lifting appliance

    CN112850461A

  • Lattice column hole opening formwork reinforcing and supporting system and construction method

    CN114961245A

  • Multifunctional floor type infusion support

    CN210145201U

  • Underwater placement device for asphalt or the like

    JP1994228961A