Multifunctional outdoor modular living cabin
Through modular design and the use of efficient materials, the existing outdoor living cabins are solved, flexible installation is achieved, structural stability and living comfort are improved, and maintenance costs are reduced.
Patent Information
- Application Number
- CN202411734932.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-04-15
AI Technical Summary
Existing outdoor living cabins and camping facilities usually adopt an overall structure, resulting in increased transportation difficulty, higher transportation costs and cumbersome installation steps.
It adopts a multi-function outdoor modular living compartment design, and uses modular components such as thick sand and gravel layers, supporting columns, chassis, galvanized plates, triangular plates and assembly blocks to achieve flexible installation and disassembly, and improves thermal insulation and waterproofing through polyurethane foam insulation materials and titanium dioxide nanocoating.
It reduces transportation difficulty and cost, improves the adaptability and flexibility of the living compartment, enhances the stability of the structure and living comfort, and reduces maintenance frequency and cost.
Smart Images

Figure CN119825175A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of outdoor living facilities, in particular to a multifunctional outdoor modular living cabin. Background Art
[0002] As people's demand for outdoor activities and natural life continues to increase, outdoor living facilities that are convenient, environmentally friendly and adaptable to a variety of environments are becoming increasingly important. However, the current existing outdoor living cabins or camping facilities still have some obvious shortcomings and are difficult to meet the diverse outdoor living needs.
[0003] Existing outdoor living cabins and camping facilities usually adopt an integral structure and lack modular design, which makes the installation steps cumbersome and requires a lot of manpower and material resources. During transportation, due to the strong integrity of the structure and the large size of the facilities, the transportation difficulty increases and the transportation cost is high. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a multifunctional outdoor modular living cabin to solve the problem that the existing outdoor living cabins and camping facilities usually adopt an integral structure. During transportation, due to the strong integrity of the structure and the large size of the facilities, the transportation difficulty is increased and the transportation cost is high.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a multifunctional outdoor modular living cabin, comprising a thick sand and gravel layer, a supporting column is arranged on the upper surface of the thick sand and gravel layer, a base frame is arranged on the upper surface of the supporting column, a galvanized sheet is arranged on the upper surface of the base frame, a plywood is arranged on the upper surface of the galvanized sheet, an assembly block one is arranged on the upper surface of the plywood, an assembly block two is arranged on the upper surface of the plywood, the outer walls of the assembly block two are arranged on both sides of the assembly block one, an assembly block three is arranged on the upper surface of the thick sand and gravel layer, the outer wall of the assembly block three is arranged on the right side of the assembly block two, an assembly window block one is arranged on the upper surface of the assembly block three, the upper surface of the assembly window block one is arranged on the lower surface of the assembly block two, an assembly door block is arranged on the upper surface of the thick sand and gravel layer, the left outer wall of the assembly door block is arranged on the right outer wall of the assembly block three and the assembly window block one, and the right outer wall of the assembly door block is provided with the assembly window block two.
[0006] Preferably, the support columns and the base frame are both made of glass fiber reinforced composite material, the composite material includes glass fiber and epoxy resin matrix, the support columns are fixedly connected to the base frame by bolts, and the base frame adopts a splicing structure design.
[0007] Preferably, the galvanized sheet and the plywood are provided with heat insulating materials made of polyurethane foam, and the galvanized sheet and the plywood are compositely bonded by an adhesive layer.
[0008] Preferably, all assembly blocks on the outer surface of the living cabin are coated with a titanium dioxide nano-coating, and the thickness of the coating is 50-100 nanometers.
[0009] Preferably, the method for manufacturing the multifunctional outdoor modular living cabin comprises the following steps: S1. Manufacturing of support columns: Mix glass fiber and epoxy resin, manufacture support columns through pultrusion process, and perform cutting and fine grinding; S2. Manufacturing of chassis: Mix glass fiber and epoxy resin, manufacture chassis by pultrusion and perform splicing and fastening; S3. Processing of galvanized sheet: Select galvanized steel sheet for cutting, and make galvanized sheet after rust removal and anti-corrosion treatment; S4. Manufacture of polyurethane foam thermal insulation materials: prepare polyurethane thermal insulation materials by foaming and composite bonding with galvanized sheets and plywood.
[0010] Preferably, the method for manufacturing the support column comprises: S101, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S102, mixing treatment: evenly mixing the glass fiber and the epoxy resin for 10 to 20 minutes; S103, pultrusion: forming the support column by pultrusion process, the pultrusion temperature is controlled between 80° C. and 120° C., and the forming speed is 1 to 2 m / min; S104, cutting and processing: cutting the formed support columns, and the processing length is controlled between 1800 and 2500 mm; S105, end processing: The end of the supporting column is finely ground to match the shape of the chassis socket, and the processing tolerance is controlled within ±1 mm.
[0011] Preferably, the manufacturing method of the chassis includes: S201, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S202, molding process: using a pultrusion process to prepare the chassis, the pultrusion temperature is controlled between 80°C and 120°C; S203, splicing design: after the base frame is formed, it is spliced and designed, and slots are reserved for subsequent connection; S204, component splicing: splice the chassis components by slot combination, and fasten them with bolts of M8 to M12 specifications; S205, tightening operation: Use a torque wrench to tighten the bolts, and control the tightening torque within 40 to 60 Nm.
[0012] Preferably, the processing method of the galvanized sheet includes: S301, Plate selection: Select galvanized steel plate with a thickness of 1.0 to 2.0 mm; S302, cutting size: cutting the galvanized steel sheet, the tolerance is controlled within ±0.5 mm; S303, Surface rust removal: Prepare 5% dilute hydrochloric acid solution for surface rust removal, soak the galvanized sheet in the pickling tank for 5 to 10 minutes, use a plastic brush to gently scrub the surface of the steel sheet during this period, and rinse the galvanized sheet with plenty of clean water after pickling; S304, anti-corrosion treatment: Use a spray gun to evenly spray the anti-corrosion coating, and the coating thickness is controlled at 20 to 30 microns. After coating, place the steel plate in a dry and ventilated place and wait for the coating to cure naturally. The curing time is controlled at 1 to 2 hours.
[0013] Preferably, the method for manufacturing the polyurethane foam thermal insulation material comprises: S401, raw material ratio: Mix isocyanate and polyol in a ratio of 1:1.2 to 1:1.5; The amount of foaming agent added is controlled between 8% and 12% of the total volume of the raw materials, so that the final foam density is between 30 and 60 kg / m³; Preliminary mixing of all components in a reaction kettle for 1 to 2 minutes; S402, high pressure foaming: Use a high-pressure foaming machine to mix and foam the raw materials, and the foaming pressure is controlled at 10 to 15 MPa; Inject the mixed polyurethane raw materials into the mold, and control the mold temperature between 35℃ and 45℃; After injection, the polyurethane begins to expand, and the foaming time is controlled between 30 and 60 seconds; S403, Foam curing: After the foaming is completed, the mold is left to stand, the temperature is maintained between 40°C and 50°C, the curing time is 2 to 4 hours, and the thickness of the cured foam is controlled to be 20 to 50 mm; S404, Foam composite preparation: The adhesive needs to be evenly stirred for 2 to 3 minutes before use, and the adhesive coating amount should be controlled at 200 to 300 grams per square meter.
[0014] Preferably, the installation method of the multifunctional outdoor modular living cabin comprises the following steps: S1: Select an open space, make sure the ground is flat, and lay a 5 cm thick layer of gravel; S2: On the foundation of the gravel layer, install the supporting columns according to the design position on the drawing and fix them with bolts; S3: Install the base frame weldment on the supporting column. The base frame is the basic frame of the living cabin and is fastened to the supporting column by bolts; S4: Lay galvanized sheet on the base frame to form a bottom protective layer; S5: Lay the plywood on the galvanized sheet; S6: Take polyurethane foam insulation material with a thickness of 20 to 50 mm, and evenly apply environmentally friendly adhesive on the surface of galvanized sheet and plywood, with the coating amount of adhesive being 200 to 300 grams per square meter; Place the polyurethane foam sheet between the galvanized sheet and the plywood, and apply pressure using a mechanical pressing device, with the pressing pressure controlled at 0.2 to 0.4 MPa; S7: Module assembly Assembly block 1 and assembly block 2 are installed in sequence according to the designed positions; Assembly block three is installed on the right side of assembly block two; Install the assembly window block 1, which needs to be connected to the lower surface of the assembly block 2; Install the assembled door block on the right side of assembly block three; Install assembly window block two, which is located on the right side of the assembly door block and is tightly combined with it.
[0015] The present invention provides a multifunctional outdoor modular living cabin. It has the following beneficial effects: 1. The present invention adopts a modular design, and all parts can be disassembled and assembled. The supporting columns, base frames, galvanized sheets, plywood and various assembly blocks all adopt standardized interface designs, which are convenient for flexible installation and disassembly in different locations. The modular structure not only reduces the difficulty and cost of transportation, but also enables the living cabin to be functionally combined according to specific needs, greatly improving the adaptability and flexibility of the product.
[0016] 2. The present invention uses glass fiber reinforced composite materials as supporting columns and base frames, which have excellent strength and weather resistance and can maintain structural stability in harsh environments such as strong winds. The external components of the living cabin are coated with titanium dioxide nano-coatings, which can effectively improve the waterproof performance of the cabin, reduce the intrusion of rain and dust, and keep the cabin environment clean.
[0017] 3. The present invention compounds polyurethane foam insulation material between the galvanized sheet and the plywood of the cabin. The polyurethane foam has excellent thermal insulation properties, effectively reduces the heat exchange between the cabin and the outside world, maintains a suitable temperature in the cabin, significantly improves living comfort, and enables it to cope with temperature changes in different seasons.
[0018] 4. The present invention adopts a modular assembly design. Each functional block can be independently produced and freely combined, such as assembly block one, assembly block two, assembly door block, assembly window block, etc. Users can choose the type and quantity of modules according to specific usage requirements to achieve flexible adjustment of space. The modular design improves the utilization rate of space and makes the internal configuration of the living cabin more diverse to meet the needs of different numbers of people and purposes.
[0019] 5. The outer surface of the present invention is treated with a titanium dioxide nano-coating, which has a self-cleaning function and decomposes attached organic matter through photocatalysis, making it easier to keep the cabin clean in an outdoor environment, thereby reducing the frequency and cost of maintenance and extending the service life of the cabin. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A three-dimensional diagram of a multifunctional outdoor modular living cabin of the present invention; Figure 2 It is a schematic diagram of an assembly block of the present invention; Figure 3 It is a schematic diagram of the support column of the present invention; Figure 4 It is a schematic diagram of the chassis of the present invention; Figure 5 It is a schematic diagram of a galvanized sheet of the present invention; Figure 6 It is a schematic diagram of a plywood of the present invention.
[0021] Among them, 1. thick sand and gravel layer; 2. supporting columns; 3. base frame; 4. galvanized sheet; 5. plywood; 6. assembly block one; 7. assembly block two; 8. assembly block three; 9. assembly window block one; 10. assembly door block; 11. assembly window block two. DETAILED DESCRIPTION
[0022] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Please see attached Figure 1 - Attachment Figure 6The embodiment of the present invention provides a multifunctional outdoor modular living cabin, including a thick gravel layer 1, a supporting column 2 is arranged on the upper surface of the thick gravel layer 1, a base frame 3 is arranged on the upper surface of the supporting column 2, a galvanized sheet 4 is arranged on the upper surface of the base frame 3, a plywood 5 is arranged on the upper surface of the galvanized sheet 4, an assembly block 1 6 is arranged on the upper surface of the plywood 5, an assembly block 2 7 is arranged on the upper surface of the plywood 5, the outer wall of the assembly block 2 7 is arranged on both sides of the assembly block 1 6, an assembly block 3 8 is arranged on the upper surface of the thick gravel layer 1, the outer wall of the assembly block 3 8 is arranged on the right side of the assembly block 2 7, an assembly window block 1 9 is arranged on the upper surface of the assembly block 3 8, the upper surface of the assembly window block 1 9 is arranged on the lower surface of the assembly block 2 7, an assembly door block 10 is arranged on the upper surface of the thick gravel layer 1, the left outer wall of the assembly door block 10 is arranged on the right outer wall of the assembly block 3 8 and the assembly window block 1 9, and the right outer wall of the assembly door block 10 is provided with an assembly window block 2 11.
[0024] The support column 2 and the base frame 3 are both made of glass fiber reinforced composite material, the composite material includes glass fiber and epoxy resin matrix, the support column 2 is fixedly connected to the base frame 3 by bolts, and the base frame 3 adopts a splicing structure design.
[0025] The galvanized sheet 4 and the plywood 5 are provided with heat-insulating materials made of polyurethane foam, and the galvanized sheet 4 and the plywood 5 are compositely bonded by an adhesive layer.
[0026] All assembly blocks on the outer surface of the living cabin are coated with a titanium dioxide nanocoating with a thickness of 50-100 nanometers.
[0027] Specifically, the structure and material composition of the living cabin Infrastructure: Thick gravel layer 1: As the foundation of the living cabin, choose a suitable open space and lay a 5 cm thick gravel layer 1. The gravel layer is used to provide a stable foundation to ensure that the entire living cabin can adapt to uneven ground. The gravel layer uses screened gravel to ensure good drainage and compaction.
[0028] Support column 2: The upper surface of the thick gravel layer 1 is provided with support columns 2. The support columns are the main load-bearing structure of the living cabin, and the material thereof is a glass fiber reinforced composite material, which includes glass fiber and epoxy resin matrix. The advantages of this material are high strength and corrosion resistance, and light weight, which is easy to transport and install.
[0029] The support column 2 is fixedly connected to the base frame 3 by bolts, which are fastened using bolts with specifications of M12 to M16, and the tightening torque is controlled within 60 to 80 Nm to ensure the reliability and stability of the connection.
[0030] Bottom frame 3: The upper surface of the support column 2 is provided with a base frame 3. The base frame is made of glass fiber reinforced composite material, which is also a combination of glass fiber and epoxy resin matrix, ensuring the lightness and high strength of the base frame.
[0031] The chassis 3 adopts a splicing structure design, and each section of the chassis is spliced and connected through a reserved slot, and bolts are used to fasten after splicing. The splicing structure design makes the chassis more flexible during transportation and assembly, and is convenient for modular deployment.
[0032] Galvanized sheet 4 and plywood 5: The galvanized sheet 4 is laid on the top of the base frame 3 to protect the bottom structure and increase durability. The thickness of the galvanized sheet is 1.0 to 2.0 mm, and the surface is treated with anti-corrosion to resist the harsh outdoor environment.
[0033] The plywood 5 is laid on top of the galvanized sheet 4 and has a thickness of 10 to 20 mm, further improving the comfort and bearing capacity of the ground.
[0034] A polyurethane foam insulation material is compounded between the galvanized sheet 4 and the plywood 5, and the thickness of the foam is 20 to 50 mm. The insulation material is compounded and bonded by an environmentally friendly adhesive, and the adhesive coating amount is controlled at 200 to 300 grams per square meter to ensure the bonding strength and durability of the insulation material. The compounded sheet solidifies after standing for 24 to 48 hours to ensure the firmness of the bond.
[0035] Assembly block 1 6 and assembly block 2 7: The upper surface of the plywood 5 is provided with an assembly block 1 6 and an assembly block 2 7. The assembly block 2 7 is arranged on both sides of the assembly block 1 6 to enhance the integrity and rigidity of the cabin.
[0036] The surfaces of assembly block 1 6 and assembly block 2 7 are treated with an anti-corrosion coating to ensure their durability in outdoor environments.
[0037] Assembly Block Three 8: An assembly block three 8 is also provided on the upper surface of the thick gravel layer 1, and its outer wall is located on the right side of the assembly block two 7. The design of the assembly block three 8 enables it to achieve a good seal with the surrounding modules.
[0038] The assembly window block 1 9 is installed on the upper surface of the assembly block 3 8 and is closely connected with the lower surface of the assembly block 2 7 to ensure the stability and continuity of the cabin structure.
[0039] Assemble the door block 10 and assemble the window block 11: An assembly door block 10 is installed on the upper surface of the thick gravel layer 1, and its left outer wall is arranged on the right outer wall of the assembly block three 8 and the assembly window block one 9.
[0040] The right outer wall of the assembled door block 10 is connected to the assembled window block 11, and after the assembly is completed, the entrance and exit structure of the living cabin is formed to ensure the overall sealing and functionality of the cabin.
[0041] Cabin exterior coating: All assembly blocks, including assembly block 1 6, assembly block 2 7, assembly block 3 8, assembly window block 1 9, assembly door block 10 and assembly window block 2 11, are coated with titanium dioxide nano coating. The thickness of the coating is controlled at 50 to 100 nanometers, and high-pressure spraying equipment is used for spraying, and the spraying pressure is 10 to 15 MPa to ensure the uniformity and adhesion of the coating.
[0042] The titanium dioxide nano-coating has good weather resistance and can effectively improve the anti-fouling property of the cabin in outdoor environments and reduce the adhesion of dust and dirt on the surface.
[0043] A method for manufacturing a multifunctional outdoor modular living cabin comprises the following steps: S1. Manufacturing of support columns: Mix glass fiber and epoxy resin, manufacture support columns through pultrusion process, and perform cutting and fine grinding; S2. Manufacturing of chassis: Mix glass fiber and epoxy resin, manufacture chassis by pultrusion and perform splicing and fastening; S3. Processing of galvanized sheet: Select galvanized steel sheet for cutting, and make galvanized sheet after rust removal and anti-corrosion treatment; S4. Manufacture of polyurethane foam thermal insulation materials: prepare polyurethane thermal insulation materials by foaming and composite bonding with galvanized sheets and plywood.
[0044] The manufacturing method of the support column includes: S101, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S102, mixing treatment: evenly mixing the glass fiber and the epoxy resin for 10 to 20 minutes; S103, pultrusion: forming the support column by pultrusion process, the pultrusion temperature is controlled between 80° C. and 120° C., and the forming speed is 1 to 2 m / min; S104, cutting and processing: cutting the formed support columns, and the processing length is controlled between 1800 and 2500 mm; S105, end processing: The end of the supporting column is finely ground to match the shape of the chassis socket, and the processing tolerance is controlled within ±1 mm.
[0045] The manufacturing method of the chassis includes: S201, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S202, molding process: using a pultrusion process to prepare the chassis, the pultrusion temperature is controlled between 80°C and 120°C; S203, splicing design: after the base frame is formed, it is spliced and designed, and slots are reserved for subsequent connection; S204, component splicing: splice the chassis components by slot combination, and fasten them with bolts of M8 to M12 specifications; S205, tightening operation: Use a torque wrench to tighten the bolts, and control the tightening torque within 40 to 60 Nm.
[0046] The processing methods of galvanized sheet include: S301, Plate selection: Select galvanized steel plate with a thickness of 1.0 to 2.0 mm; S302, cutting size: cutting the galvanized steel sheet, the tolerance is controlled within ±0.5 mm; S303, Surface rust removal: Prepare 5% dilute hydrochloric acid solution for surface rust removal, soak the galvanized sheet in the pickling tank for 5 to 10 minutes, use a plastic brush to gently scrub the surface of the steel sheet during this period, and rinse the galvanized sheet with plenty of clean water after pickling; S304, anti-corrosion treatment: Use a spray gun to evenly spray the anti-corrosion coating, and the coating thickness is controlled at 20 to 30 microns. After coating, place the steel plate in a dry and ventilated place and wait for the coating to cure naturally. The curing time is controlled at 1 to 2 hours.
[0047] The method for manufacturing polyurethane foam insulation material comprises: S401, raw material ratio: Mix isocyanate and polyol in a ratio of 1:1.2 to 1:1.5; The amount of foaming agent added is controlled between 8% and 12% of the total volume of the raw materials, so that the final foam density is between 30 and 60 kg / m³; Preliminary mixing of all components in a reaction kettle for 1 to 2 minutes; S402, high pressure foaming: Use a high-pressure foaming machine to mix and foam the raw materials, and the foaming pressure is controlled at 10 to 15 MPa; Inject the mixed polyurethane raw materials into the mold, and control the mold temperature between 35℃ and 45℃; After injection, the polyurethane begins to expand, and the foaming time is controlled between 30 and 60 seconds; S403, Foam curing: After the foaming is completed, the mold is left to stand, the temperature is maintained between 40°C and 50°C, the curing time is 2 to 4 hours, and the thickness of the cured foam is controlled to be 20 to 50 mm; S404, Foam composite preparation: The adhesive needs to be evenly stirred for 2 to 3 minutes before use, and the adhesive coating amount should be controlled at 200 to 300 grams per square meter.
[0048] Specifically, S1, a method for manufacturing a supporting column: S101. Material preparation: Raw material selection: glass fiber and epoxy resin matrix, the glass fiber is alkali-free glass fiber, and the epoxy resin is two-component epoxy resin to ensure that the material meets the strength and weather resistance requirements.
[0049] Mixing ratio: Mix glass fiber and epoxy resin in a weight ratio of 50:50 to 70:30 to ensure the material achieves optimal mechanical properties.
[0050] S102, mixed processing: Evenly mix: Evenly mix the glass fiber and epoxy resin in a blender for 10 to 20 minutes. The stirring speed is controlled at 500 to 800 rpm to ensure even mixing without bubbles.
[0051] Preheating: After mixing, the mixed material is preheated at a temperature between 40°C and 50°C to ensure that the material has suitable fluidity during pultrusion.
[0052] S103, pultrusion: Molding process: The mixed materials are used to manufacture the support column through pultrusion molding process. The molding temperature of the pultrusion machine is controlled between 80℃ and 120℃, and the molding speed is 1 to 2 meters / minute.
[0053] Die maintenance: Before molding, the pultrusion die is oiled and heated to ensure the stability of pultrusion and reduce material adhesion.
[0054] S104, cutting and processing: Length cutting: The formed support columns are cut to length using an automatic cutting machine, with the length controlled between 1800 and 2500 mm to ensure cutting accuracy.
[0055] Surface finishing: Use a grinder to finish the surface of the cut support columns to ensure there are no burrs or other defects.
[0056] S105, end processing: Fine grinding: The ends of the support columns are finely ground to fit the sockets of the chassis. The end machining tolerance is controlled within ±1 mm to ensure the accuracy of subsequent connections.
[0057] Interface treatment: The ends are coated with epoxy primer to increase durability and protect the ends from moisture.
[0058] S2. Manufacturing method of chassis: S201. Material preparation: Raw material selection and ratio: Take glass fiber and epoxy resin matrix, mix them in a weight ratio of 50:50 to 70:30, and ensure that the material is clean and free of impurities.
[0059] Mixing and preheating: Similar to the supporting columns, the glass fiber and epoxy resin need to be evenly mixed and preheated to ensure the molding effect.
[0060] S202, molding process: Pultrusion: Use a pultrusion machine to form the chassis, the temperature is controlled at 80℃ to 120℃, and the forming speed is 1 to 2 meters / minute.
[0061] Dimension verification: After molding, the dimensions of the chassis are checked to ensure that they meet the design requirements, especially the accuracy of the slot position, to ensure smooth subsequent splicing.
[0062] S203, splicing design: Slot processing: Process the slots on the chassis according to the design requirements. The depth of the slots is controlled between 50 and 70 mm for subsequent splicing.
[0063] Positioning mark: Mark the slot position and direction on the splicing parts, using a laser marker to ensure the accuracy of the splicing.
[0064] S204, component splicing: Slot splicing: The components of the chassis are spliced through slots to ensure that there are no gaps between the components. After the slots are spliced, they are fastened with bolts of M8 to M12 specifications.
[0065] Bolt selection: Bolts are made of stainless steel to improve corrosion resistance. The length and number of bolts are determined according to the requirements of the chassis structure.
[0066] S205, tightening operation: Bolt tightening: Use a torque wrench to tighten the bolts, and control the tightening torque within 40 to 60 Nm to ensure the firmness and safety of the chassis after splicing.
[0067] S3. Processing method of galvanized sheet: S301, Plate selection: Selection of galvanized steel sheets: Choose galvanized steel sheets with a thickness of 1.0 to 2.0 mm. The thickness of the galvanized layer should be uniform and without obvious defects. Use a vernier caliper to measure the thickness of the steel sheet to ensure that it is within the specified range.
[0068] S302, cutting size: Precision cutting: Use CNC shearing machine to cut the galvanized steel sheet with a tolerance of ±0.5 mm. Keep the steel sheet flat during the cutting process to prevent edge deformation.
[0069] S303, surface rust removal: Pickling and rust removal: Prepare a 5% dilute hydrochloric acid solution and soak the galvanized sheet in the pickling tank for 5 to 10 minutes. During this time, use a plastic brush to gently scrub the surface of the steel sheet to remove oxides.
[0070] Rinse and dry: After pickling, rinse the surface of the galvanized sheet thoroughly with plenty of clean water and blow it dry with compressed air to ensure that there is no residual acid.
[0071] S304, anti-corrosion treatment: Apply anti-corrosion coating: Use a spray gun to evenly spray the anti-corrosion coating. The coating thickness is controlled at 20 to 30 microns to ensure no leaks.
[0072] Curing treatment: After coating, place the galvanized sheet in a dry and ventilated place for 1 to 2 hours to ensure the adhesion of the anti-corrosion layer.
[0073] S4. Method for manufacturing polyurethane foam insulation material: S401, raw material ratio: Component mixing: Mix isocyanate and polyol in a ratio of 1:1.2 to 1:1.5 to ensure uniform reaction of the materials. The amount of foaming agent added is controlled between 8% and 12% of the total volume of the raw materials, so that the density of the foam is between 30 and 60 kg / m³.
[0074] Mixing: All components are preliminarily mixed in a reactor for 1 to 2 minutes, using low speed stirring to prevent bubble generation.
[0075] S402, high pressure foaming: Foaming process: Use a high-pressure foaming machine to mix and foam the raw materials, and the foaming pressure is controlled at 10 to 15 MPa to ensure the uniformity of the foam.
[0076] Mold injection: Inject the mixed polyurethane raw materials into the mold, and control the mold temperature between 35℃ and 45℃ to ensure good foam expansion. The foaming time is controlled between 30 and 60 seconds, and the mold is kept airtight during the foaming process.
[0077] S403, Foam curing: Standing curing: After the foaming is completed, the mold is left standing, the temperature is controlled between 40℃ and 50℃, and the curing time is 2 to 4 hours. The thickness of the foam after curing is controlled between 20 and 50 mm to ensure the thermal insulation effect.
[0078] S404, Foam composite preparation: Adhesive stirring: The adhesive needs to be stirred evenly for 2 to 3 minutes before use to ensure uniform colloid viscosity and the coating amount is controlled at 200 to 300 grams per square meter.
[0079] The installation method of the multifunctional outdoor modular living cabin comprises the following steps: S1: Select an open space, make sure the ground is flat, and lay a 5 cm thick layer of gravel; S2: On the foundation of the gravel layer, install the supporting columns according to the design position on the drawing and fix them with bolts; S3: Install the base frame weldment on the supporting column. The base frame is the basic frame of the living cabin and is fastened to the supporting column by bolts; S4: Lay galvanized sheet on the base frame to form a bottom protective layer; S5: Lay the plywood on the galvanized sheet; S6: Take polyurethane foam insulation material with a thickness of 20 to 50 mm, and evenly apply environmentally friendly adhesive on the surface of galvanized sheet and plywood, with the coating amount of adhesive being 200 to 300 grams per square meter; Place the polyurethane foam sheet between the galvanized sheet and the plywood, and apply pressure using a mechanical pressing device, with the pressing pressure controlled at 0.2 to 0.4 MPa; S7: Module assembly Assembly block 1 and assembly block 2 are installed in sequence according to the designed positions; Assembly block three is installed on the right side of assembly block two; Install the assembly window block 1, which needs to be connected to the lower surface of the assembly block 2; Install the assembled door block on the right side of assembly block three; Install assembly window block two, which is located on the right side of the assembly door block and is tightly combined with it.
[0080] Specifically, S1: Basic preparation Select the installation site: Choose a suitable open area and make sure it is flat and free of obvious obstructions such as rocks or tree roots.
[0081] Use a bulldozer or hand tools to level the site, making sure the ground height difference does not exceed ±2 cm to ensure stability for subsequent installation.
[0082] Laying gravel layer: Lay a 5 cm thick layer of gravel with a particle size of 1 to 2 cm to ensure sufficient drainage and bearing capacity.
[0083] Use a compactor to compact the sand and gravel layer to ensure its density and prevent instability of the living cabin due to ground subsidence in the future.
[0084] S2: Installation of support columns Determine the location of the support posts: Determine the installation position of the supporting columns according to the design drawings, and mark the specific position of each column on the sand and gravel layer.
[0085] Use a tape measure and marking tools to ensure that each support post is spaced and positioned as designed.
[0086] Support column installation: Erect the support posts and place them vertically at the marked locations.
[0087] Use bolts of M12 to M16 specifications for fixing and connection. Each supporting column needs to be fastened with 4 bolts to ensure the firmness and verticality of the supporting column.
[0088] During the fixing process, use a level to correct the verticality of the supporting column, and use temporary supporting tools when necessary to ensure that the column does not tilt during the installation process.
[0089] S3: Installation of chassis weldments Installation of chassis weldments: Install the chassis weldment on the already fixed support columns. The chassis weldment is the basic framework of the living cabin and is responsible for connecting the entire structure together.
[0090] The base frame is fastened to the supporting columns by bolts, using stainless steel bolts of M12 to M16 specifications, and the tightening torque is controlled at 60 to 80 Nm to ensure the firmness of the structure.
[0091] Stitching and adjustment: Assemble the chassis, making sure the slots of each weldment are correctly aligned, and fasten each weldment to the support column with bolts.
[0092] After the splicing is completed, check the stability of each connection point again and use a torque wrench to check the tightening torque of the bolts to ensure that the design requirements are met.
[0093] S4: Galvanized sheet laying Galvanized sheet laying: Galvanized sheets with a thickness of 1.0 to 2.0 mm are laid on the base frame to form a protective layer on the bottom to enhance the durability and corrosion resistance of the bottom structure.
[0094] Place the galvanized sheets on the base frame manually or mechanically, ensuring that there is at least 5 cm overlap between each sheet to prevent dust and moisture penetration.
[0095] Fixing galvanized sheet: Use M8 stainless steel screws to fix the galvanized sheet to the base frame. Use at least 8 to 10 screws to fix each galvanized sheet to ensure that it is firmly fixed and does not shift.
[0096] Use an electric screwdriver to tighten the screws, making sure the screw heads are flush with the board surface and do not protrude to prevent impact on the superstructure.
[0097] S5: Plywood laying Laying of plywood: Plywood is laid on the galvanized sheet with a thickness of 10 to 20 mm. The plywood is used to improve the bearing capacity and comfort of the ground.
[0098] Lay the plywood evenly on the galvanized sheet, ensuring that each piece of plywood is tightly spliced together and the seam does not exceed 2 mm.
[0099] Plywood fixing: Use adhesive to bond the plywood to the galvanized sheet. The adhesive is environmentally friendly and the coating amount is controlled at 200 to 300 grams per square meter.
[0100] After the adhesive is applied, use an electric screwdriver to fix the plywood to the galvanized sheet with screws. The screw spacing is controlled at 30 to 50 cm to ensure a close bond between the plywood and the galvanized sheet.
[0101] S6: Composite polyurethane foam insulation Material preparation and coating: Take polyurethane foam insulation material with a thickness of 20 to 50 mm, making sure that the foam sheet is free from defects and contamination.
[0102] Use a roller coating device to evenly apply the environmentally friendly adhesive to the surface of the galvanized sheet and plywood, with a coating amount of 200 to 300 grams per square meter to ensure uniform coverage.
[0103] Foam lamination and lamination: Carefully place the polyurethane foam sheet between the galvanized sheet and the plywood, making sure the sheets are aligned.
[0104] The panels are pressed using a mechanical pressing device with a pressure of 0.2 to 0.4 MPa. The pressing time is controlled within 2 to 3 hours to ensure the firmness of the adhesive layer and the uniform compaction of the foam material.
[0105] S7: Module assembly Installation of assembly block 1 and assembly block 2: Install assembly block 1 and assembly block 2 in sequence according to the designed positions, ensuring that their outer walls are correctly aligned and fixed.
[0106] Use bolts to fix the assembly block to the plywood and base frame below. The bolt specification is M10 and the tightening torque is controlled between 50 and 70 Nm.
[0107] Installation of assembly block three: Assembly block three is installed on the right side of assembly block two, ensuring a tight fit. The installation of assembly block three requires the use of dowel pins and bolts to ensure precise alignment and a stable connection of the structure.
[0108] Installation of assembled window block one: Install the assembly window block 1, which needs to be connected to the lower surface of the assembly block 2. The window block 1 is connected to the assembly block 2 by welding or bolting, ensuring that the connection point is not loose.
[0109] Installation of assembled door blocks: Install the assembly door block on the right side of assembly block three. During installation, ensure that the door opens and closes smoothly.
[0110] The door block is connected to the frame with hinges. The hinges need to be lubricated after installation to ensure smooth opening and closing.
[0111] Installation of assembly window block 2: Install the second assembled window block, which is located on the right side of the assembled door block and is tightly combined with the door block.
[0112] Use bolts and sealant to fix the window block to the door block, ensuring the joint is airtight to prevent rain and dust from entering.
[0113] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A multifunctional outdoor modular living cabin, comprising a thick gravel layer (1), characterized in that: The upper surface of the thick gravel layer (1) is provided with a supporting column (2), the upper surface of the supporting column (2) is provided with a base frame (3), the upper surface of the base frame (3) is provided with a galvanized sheet (4), the upper surface of the galvanized sheet (4) is provided with a plywood (5), the upper surface of the plywood (5) is provided with an assembly block 1 (6), the upper surface of the plywood (5) is provided with an assembly block 2 (7), the outer walls of the assembly block 2 (7) are provided on both sides of the assembly block 1 (6), the upper surface of the thick gravel layer (1) is provided with an assembly block 3 (8), the outer wall of the assembly block three (8) is arranged on the right side of the assembly block two (7), the upper surface of the assembly block three (8) is provided with an assembly window block one (9), the upper surface of the assembly window block one (9) is provided on the lower surface of the assembly block two (7), the upper surface of the thick gravel layer (1) is provided with an assembly door block (10), the left outer wall of the assembly door block (10) is arranged on the right outer wall of the assembly block three (8) and the assembly window block one (9), and the right outer wall of the assembly door block (10) is provided with an assembly window block two (11).
2. The multifunctional outdoor modular living cabin according to claim 1 is characterized in that: The supporting column (2) and the base frame (3) are both made of glass fiber reinforced composite material, the composite material comprising glass fiber and an epoxy resin matrix, the supporting column (2) is fixedly connected to the base frame (3) by bolts, and the base frame (3) adopts a splicing structure design.
3. The multifunctional outdoor modular living cabin according to claim 1 is characterized in that: Heat insulation material made of polyurethane foam is provided in the galvanized sheet (4) and the plywood (5), and the galvanized sheet (4) and the plywood (5) are compositely bonded via an adhesive layer.
4. The multifunctional outdoor modular living cabin according to claim 1 is characterized in that: All assembly blocks on the outer surface of the living cabin are coated with a titanium dioxide nano-coating, and the thickness of the coating is 50-100 nanometers.
5. A method for manufacturing a multifunctional outdoor modular living cabin, characterized in that: The multifunctional outdoor modular living cabin according to any one of claims 1 to 4 comprises the following steps: S1. Manufacturing of support columns: Mix glass fiber and epoxy resin, manufacture support columns through pultrusion process, and perform cutting and fine grinding; S2. Manufacturing of chassis: Mix glass fiber and epoxy resin, manufacture chassis by pultrusion and perform splicing and fastening; S3. Processing of galvanized sheet: Select galvanized steel sheet for cutting, and make galvanized sheet after rust removal and anti-corrosion treatment; S4. Manufacture of polyurethane foam thermal insulation materials: prepare polyurethane thermal insulation materials by foaming and composite bonding with galvanized sheets and plywood.
6. The method for manufacturing a multifunctional outdoor modular living cabin according to claim 5, characterized in that: The manufacturing method of the support column comprises: S101, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S102, mixing treatment: evenly mixing the glass fiber and the epoxy resin for 10 to 20 minutes; S103, pultrusion: forming the support column by pultrusion process, the pultrusion temperature is controlled between 80° C. and 120° C., and the forming speed is 1 to 2 m / min; S104, cutting and processing: cutting the formed support columns, and the processing length is controlled between 1800 and 2500 mm; S105, end processing: The end of the supporting column is finely ground to match the shape of the chassis socket, and the processing tolerance is controlled within ±1 mm.
7. The method for manufacturing a multifunctional outdoor modular living cabin according to claim 5, characterized in that: The manufacturing method of the chassis comprises: S201, material preparation: glass fiber and epoxy resin matrix are mixed in a weight ratio of 50:50 to 70:30; S202, molding process: using a pultrusion process to prepare the chassis, the pultrusion temperature is controlled between 80°C and 120°C; S203, splicing design: after the base frame is formed, it is spliced and designed, and slots are reserved for subsequent connection; S204, component splicing: splice the chassis components by slot combination, and fasten them with bolts of M8 to M12 specifications; S205, tightening operation: Use a torque wrench to tighten the bolts, and control the tightening torque within 40 to 60 Nm.
8. The method for manufacturing a multifunctional outdoor modular living cabin according to claim 5, characterized in that: The processing method of the galvanized sheet comprises: S301, Plate selection: Select galvanized steel plate with a thickness of 1.0 to 2.0 mm; S302, cutting size: cutting the galvanized steel sheet, the tolerance is controlled within ±0.5 mm; S303, Surface rust removal: Prepare 5% dilute hydrochloric acid solution for surface rust removal, soak the galvanized sheet in the pickling tank for 5 to 10 minutes, use a plastic brush to gently scrub the surface of the steel sheet during this period, and rinse the galvanized sheet with plenty of clean water after pickling; S304, anti-corrosion treatment: Use a spray gun to evenly spray the anti-corrosion coating, and the coating thickness is controlled at 20 to 30 microns. After coating, place the steel plate in a dry and ventilated place and wait for the coating to cure naturally. The curing time is controlled at 1 to 2 hours.
9. The method for manufacturing a multifunctional outdoor modular living cabin according to claim 5, characterized in that: The manufacturing method of the polyurethane foam thermal insulation material comprises: S401, raw material ratio: Mix isocyanate and polyol in a ratio of 1:1.2 to 1:1.5; The amount of foaming agent added is controlled between 8% and 12% of the total volume of the raw materials, so that the final foam density is between 30 and 60 kg / m³; Preliminary mixing of all components in a reaction kettle for 1 to 2 minutes; S402, high pressure foaming: Use a high-pressure foaming machine to mix and foam the raw materials, and the foaming pressure is controlled at 10 to 15 MPa; Inject the mixed polyurethane raw materials into the mold, and control the mold temperature between 35℃ and 45℃; After injection, the polyurethane begins to expand, and the foaming time is controlled between 30 and 60 seconds; S403, Foam curing: After the foaming is completed, the mold is left to stand, the temperature is maintained between 40°C and 50°C, the curing time is 2 to 4 hours, and the thickness of the cured foam is controlled to be 20 to 50 mm; S404, Foam composite preparation: The adhesive needs to be evenly stirred for 2 to 3 minutes before use, and the adhesive coating amount should be controlled at 200 to 300 grams per square meter.
10. A method for installing a multifunctional outdoor modular living cabin, characterized in that: The multifunctional outdoor modular living cabin according to any one of claims 1 to 4 comprises the following steps: S1: Select an open space, make sure the ground is flat, and lay a 5 cm thick layer of gravel; S2: On the foundation of the gravel layer, install the supporting columns according to the design position on the drawing and fix them with bolts; S3: Install the base frame weldment on the supporting column. The base frame is the basic frame of the living cabin and is fastened to the supporting column by bolts; S4: Lay galvanized sheet on the base frame to form a bottom protective layer; S5: Lay the plywood on the galvanized sheet; S6: Take polyurethane foam insulation material with a thickness of 20 to 50 mm, and evenly apply environmentally friendly adhesive on the surface of galvanized sheet and plywood, with the coating amount of adhesive being 200 to 300 grams per square meter; Place the polyurethane foam sheet between the galvanized sheet and the plywood, and apply pressure using a mechanical pressing device, with the pressing pressure controlled at 0.2 to 0.4 MPa; S7: Module assembly Assembly block 1 and assembly block 2 are installed in sequence according to the designed positions; Assembly block three is installed on the right side of assembly block two; Install the assembly window block 1, which needs to be connected to the lower surface of the assembly block 2; Install the door assembly block on the right side of assembly block three; Install assembly window block two, which is located on the right side of the assembly door block and is tightly combined with it.