Energy-saving air conditioner with waste heat recovery mechanism

By adding a water circulation heat exchange process in the HVAC assembly of the air conditioner, and using thermally conductive fluid and high-temperature and high-pressure gas for secondary heat exchange, the problem of heat waste during the air conditioner heating process is solved, and waste heat recovery and energy efficiency are achieved.

CN119826248AInactive Publication Date: 2025-04-15JIANGSU XINMINGJUN CONSTRUCTION ENGINEERING CO LTD

Patent Information

Application Number
CN202510239899.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-03
Publication Date
2025-04-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the heating process of air conditioners, due to the limitation of heat exchange distance/time, the gas after heat exchange still has a certain amount of heat, but this heat will not be directly transferred to the indoor space, resulting in heat waste and increased power loss.

Method used

An energy-saving air conditioner with a waste heat recovery mechanism is designed. By adding a water circulation heat exchange process in the HVAC assembly, a secondary heat exchange is performed using medium such as thermal fluid and high-temperature and high-pressure gas to perform secondary heat exchange, the remaining heat is transferred to the thermal fluid, and the warm thermal fluid is replenished into the heat exchange tank plate through the synchronous movement of the piston block, and the heat is replenished into the HVAC assembly.

Benefits of technology

It effectively reduces the heat waste of air conditioners during heating, reduces power loss, and improves the energy efficiency performance of air conditioners.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119826248A_ABST
    Figure CN119826248A_ABST
Patent Text Reader

Abstract

The invention discloses an energy-saving air conditioner with a waste heat recovery mechanism, relates to the technical field of air conditioning equipment, and aims at the operation process of heating and ventilation of an air conditioner, a water circulation heat exchange process is additionally added, and the water circulation heat exchange process is essentially based on media such as heat conduction liquid. High-temperature and high-pressure gas is subjected to secondary heat exchange with the heat conduction liquid through the spiral flow channel after being subjected to the heat exchange process of the heating and ventilation pipe, residual heat in the high-temperature and high-pressure gas is transferred into media such as the heat conduction liquid, and after the temperature in the heat conduction liquid rises to a numerical value meeting the requirement, the heat conduction liquid is subjected to synchronous movement through the two piston blocks; media such as heat conduction liquid which accumulates enough heat are supplemented into a heat exchange groove plate, the flowing mode of the media such as the heat conduction liquid is further limited, and the purpose is that heat left in the heat exchange process is supplemented into a heating and ventilation pipe assembly again, and the waste heat recovery purpose is achieved in a water circulation mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air-conditioning equipment, and in particular to an energy-saving air-conditioning device with a waste heat recovery mechanism. Background Art

[0002] Air conditioning equipment uses the compressor as its key structure to achieve dual effects of cooling or heating. Taking the heating process as an example, its essence is achieved through a reverse thermodynamic cycle, such as: the gas refrigerant is sucked into the compressor from the evaporator and compressed into a high-temperature, high-pressure gas. The high-temperature, high-pressure gas completes the heat exchange process with the indoor environment during the circulation process.

[0003] Because the overall volume of the air conditioner is relatively small and the gas transmission distance inside it is relatively short, the heat exchange time of the high-temperature and high-pressure gas is relatively short. However, the gas after heat exchange still has a certain amount of heat, and this part of the heat will not be "transferred" to the indoor space, but will flow back to the inside of the compressor again with the gas circulation process. As a result, there is a large amount of heat waste during continuous operation. The waste of heat can be understood as excessive loss of electrical energy.

[0004] This application proposes a solution to this problem. Summary of the Invention

[0005] The purpose of the present invention is to provide an energy-saving air conditioner with a waste heat recovery mechanism. Regarding the heating process in a commonly used air-conditioning structure, due to the limitations of heat exchange distance / time, the gas after heat exchange still has a certain amount of heat, but this part of the heat is not directly transferred to the indoor space. During its continuous operation, there is a problem of a large amount of heat waste, which indirectly increases the power loss.

[0006] The object of the present invention can be achieved by the following technical solution: an energy-saving air conditioner with a waste heat recovery mechanism, comprising a main unit housing, a heating component, and a HVAC pipe component, wherein an inner frame box is installed in an inner position of the main unit housing corresponding to the HVAC pipe component, and a first-order sleeve, a second-order sleeve, and a drive motor are installed in the inner frame box;

[0007] A piston block is slidably mounted on the inner wall of each of the first-stage sleeve and the second-stage sleeve, a piston assembly is provided in the piston block, a spiral flow tube is installed in the inner position of the first-stage sleeve corresponding to the lower side of the piston block, and the inner spaces of the first-stage sleeve and the second-stage sleeve corresponding to the upper side of the piston block are connected;

[0008] The HVAC pipe assembly includes a heat exchange slot plate and a HVAC pipe corresponding to the heating assembly. The first-section sleeve is provided with a return port on the outer wall corresponding to the lower side of the piston block, and the second-stage sleeve is provided with a water supply port on the outer wall corresponding to the lower side of the piston block.

[0009] It is further configured as follows: the HVAC pipe is U-shaped, and is linearly arranged along the outer wall of the heat exchange slot plate, and one end of the HVAC pipe is connected to the spiral flow pipe.

[0010] It is further configured that: both ends of the spiral flow tube respectively penetrate the external position of the first-order sleeve, and the both ends of the spiral flow tube are respectively configured as a commutation opening and a commutation outlet along the setting direction of the first-order sleeve.

[0011] It is further configured as follows: the setting direction of the heat exchange slot plate matches the setting direction of the HVAC pipe assembly, and the heat exchange slot plate is set to an upper port and a lower port along the setting direction of the HVAC pipe assembly, and the water supply port and the lower port, and the return port and the upper port are connected by a hose.

[0012] It is further configured as follows: a universal arm is installed on the upper end of the piston block, a movable curved rod is provided on the universal arm, the movable curved rod passes through the first-order sleeve and the second-order sleeve upward, and an arc-shaped curved arm is provided on the top end of the movable curved rod.

[0013] It is further configured as follows: the two end positions of the arc-shaped curved arm are movably connected to the top end position of the movable curved rod, and the end position of the driving motor transmission rod is connected to the middle end position of the arc-shaped curved arm.

[0014] It is further configured as follows: the piston assembly consists of a lead sinker block and a floating block, a guide rod is fixedly installed between the lead sinker block and the floating block, and a movable channel corresponding to the guide rod is opened in the piston block.

[0015] It is further configured as follows: the lead sinker and the floating block in the piston assembly in the first-stage casing are arranged in a direction from bottom to top, and the lead sinker and the floating block in the piston assembly in the second-stage casing are arranged in a direction from top to bottom.

[0016] The present invention has the following beneficial effects:

[0017] 1. A water circulation heat exchange process is added for the HVAC operation process. Its essence is to inject a medium such as a heat transfer fluid into the first-stage and second-stage casings. For the heat exchange process of high-temperature and high-pressure gas, the high-temperature and high-pressure gas after the heat exchange process "passes" through the spiral flow channel. The purpose is to transfer the residual heat in the high-temperature and high-pressure gas to the heat transfer fluid and other media through the heat exchange process, thereby achieving the process of waste heat recovery.

[0018] 2. Based on the above content, after the temperature of the heat transfer fluid and other media is raised to the required value through the residual heat in the high-temperature and high-pressure gas, the two piston blocks undergo a synchronous movement process. Its essence is to "separate" the heat transfer fluid and other media after the supplementary temperature, and use the piston blocks and the piston assemblies in two groups of positions to drive the directional flow process of the heat transfer fluid and other media. The key is to add the heat transfer fluid and other media after the supplementary temperature to the heat exchange slot plate, and further limit the flow mode of the heat transfer fluid and other media after the supplementary temperature in the heat exchange slot plate. The purpose is to: replenish the remaining heat in the heat exchange process into the HVAC pipe assembly, and achieve the purpose of waste heat recovery by water circulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0020] Figure 1 This is a structural schematic diagram of an energy-saving air conditioner with a waste heat recovery mechanism proposed by the present invention;

[0021] Figure 2 The present invention proposes an energy-saving air conditioner with a waste heat recovery mechanism Figure 1 The disassembly diagram;

[0022] Figure 3 This is a structural schematic diagram of a HVAC pipe assembly in an energy-saving air conditioner with a waste heat recovery mechanism proposed by the present invention;

[0023] Figure 4 This is a cross-sectional view of an inner frame box in an energy-saving air conditioner with a waste heat recovery mechanism proposed by the present invention;

[0024] Figure 5 This is a cross-sectional view of a first-stage casing and a second-stage casing in an energy-saving air conditioner with a waste heat recovery mechanism proposed by the present invention;

[0025] Figure 6 The present invention proposes an energy-saving air conditioner with a waste heat recovery mechanism Figure 5 Front view of .

[0026] In the figure: 1. Main unit casing; 2. Inner frame box; 3. HVAC pipe assembly; 4. Heating assembly; 5. Heat exchange trough plate; 6. Drive motor; 7. Arc-shaped curved arm; 8. First-order casing; 9. Second-order casing; 10. Movable curved rod; 11. Universal arm; 12. Water supply port; 13. Spiral flow tube; 14. Return port; 15. Piston block; 16. Lead weight; 17. Float. DETAILED DESCRIPTION

[0027] The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the embodiments described are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0028] Example 1: In the heating process of a common air conditioning structure, due to the limitations of heat exchange distance and time, the gas after heat exchange still has a certain amount of heat, but this part of the heat is not directly transferred to the indoor space. During its continuous operation, there is a large amount of heat waste, which indirectly increases power loss. The following technical solution is proposed:

[0029] Reference Figures 1 to 6 In this embodiment, an energy-saving air conditioner with a waste heat recovery mechanism includes a main unit housing 1, a heating component 4, and a HVAC pipe assembly 3. An inner frame box 2 is installed in a position inside the main unit housing 1 corresponding to the HVAC pipe assembly 3. The inner frame box 2 is installed with a first-stage sleeve 8, a second-stage sleeve 9, and a drive motor 6.

[0030] A piston block 15 is slidably mounted on the inner wall of each of the first-stage sleeve 8 and the second-stage sleeve 9. A piston assembly is provided in the piston block 15. A spiral flow tube 13 is installed in the inner position of the first-stage sleeve 8 corresponding to the lower side of the piston block 15. The inner spaces of the first-stage sleeve 8 and the second-stage sleeve 9 corresponding to the upper side of the piston block 15 are connected.

[0031] The HVAC pipe assembly 3 includes a heat exchange slot plate 5 and a HVAC pipe corresponding to the heating assembly 4. The first section of the sleeve 8 is provided with a return port 14 on the outer wall corresponding to the lower side of the piston block 15, and the second-stage sleeve 9 is provided with a water supply port 12 on the outer wall corresponding to the lower side of the piston block 15. The HVAC pipe is U-shaped and linearly arranged along the outer wall of the heat exchange slot plate 5. One end of the HVAC pipe is connected to the spiral flow tube 13. The two ends of the spiral flow tube 13 respectively penetrate the external position of the first-stage sleeve 8, and the two ends of the spiral flow tube 13 are respectively set as a commutation opening and a commutation outlet along the setting direction of the first-stage sleeve 8.

[0032] Solution Description: A brief description of air conditioning for heating is provided. Essentially, it is achieved through the circulation of refrigerant. When the air conditioner activates the heating function, the refrigerant is compressed into a high-temperature, high-pressure gas by the compressor. This process increases the temperature and pressure of the refrigerant. The high-temperature, high-pressure refrigerant gas enters the condenser (outdoor unit), exchanges heat with the outdoor air, releases heat, and condenses into a liquid. At this point, the refrigerant temperature drops, but the pressure remains high. For example, the relevant content of this invention: the heating component provides high-temperature, high-pressure gas, which is continuously transmitted through the HVAC pipe assembly 3 and exchanges heat with the indoor environment to achieve the purpose of heating.

[0033] It should be noted that the high-temperature and high-pressure gas will not transfer all its internal heat to the indoor environment after heat exchange. The gas after heat exchange still has a certain amount of heat and is returned to the compressor to be compressed into high-temperature and high-pressure gas again and perform the above-mentioned heating process. However, in the present invention, a first-stage casing 8 and a second-stage casing 9 are added for the flow process of the high-temperature and high-pressure gas to Figure 5 For example, the key is that the high-temperature and high-pressure gas after heat exchange continues to flow from the lower side of the spiral flow channel 13. For this purpose, it is necessary to add an appropriate amount of heat transfer fluid and other media to the first-order sleeve 8 and the second-order sleeve 9, so that the high-temperature and high-pressure gas after heat exchange will undergo secondary heat exchange with the heat transfer fluid and other media again, and the remaining heat in the high-temperature and high-pressure gas will be transferred to the heat transfer fluid and other media, so that the temperature of the heat transfer fluid and other media will rise to the required value. On this basis, the heat transfer fluid and other media after the secondary heat exchange will be added to the heat exchange slot plate 5, the purpose of which is to supplement the temperature of the HVAC pipe assembly 3 with the heat transfer fluid and other media.

[0034] Example 2: The overall water circulation process is described in combination with the technical solution in Example 1:

[0035] The setting direction of the heat exchange slot plate 5 matches the setting direction of the HVAC pipe assembly 3, and the heat exchange slot plate 5 is set to an upper port and a lower port along the setting direction of the HVAC pipe assembly 3. The water supply port 12 is connected to the lower port and the return port 14 is connected to the upper port through a hose. A universal arm 11 is installed on the upper end of the piston block 15. A movable crank arm 10 is provided on the universal arm 11. The movable crank arm 10 passes through the first-order sleeve 8 and the second-order sleeve 9 upward, and an arc-shaped crank arm 7 is provided at the top position of the movable crank arm 10. The two ends of the arc-shaped crank arm 7 are connected to the upper end of the piston block 15. The top positions of the movable curved rod 10 are movably connected, and the end position of the transmission rod of the drive motor 6 is connected to the middle position of the arc-shaped curved arm 7. The piston assembly is composed of a lead sinker 16 and a floating block 17. A guide rod is fixedly installed between the lead sinker 16 and the floating block 17. A movable channel corresponding to the guide rod is opened in the piston block 15. The lead sinker 16 and the floating block 17 in the piston assembly in the first-order sleeve 8 are arranged in a direction from bottom to top, and the lead sinker 16 and the floating block 17 in the piston assembly in the second-order sleeve 9 are arranged in a direction from top to bottom.

[0036] The following operation process is proposed for the technical content of Example 1:

[0037] S1: Figure 3 For example, the HVAC pipe is kept in contact with the heat exchange slot plate 5. On the one hand, it cannot affect the normal heat exchange process of the HVAC pipe. On the other hand, the heat in the heat transfer fluid and other media in the heat exchange slot plate can be used as a supplementary temperature in the heating process.

[0038] S2: The key point is Figure 5 and Figure 6 In the relevant content shown in the figure, in the initial state, the setting position of the piston block 15 in the first-order sleeve 8 is lower than the setting position of the piston block 15 in the second-order sleeve 9. During this process, it is necessary to ensure that the internal space of the heat exchange groove plate 5 and the first-order sleeve 8 and the second-order sleeve 9 corresponding to the lower side of the piston block 15 is completely filled with a heat transfer fluid or other medium. On this basis, the drive motor 6 is used as the power room to drive the arc-shaped crank arm 7 to deflect clockwise. The universal arm 11 and the movable crank rod 10 can refer to the crank arm structure in the automobile engine. No additional details are made in the present invention. It should be noted that: both the first-order sleeve 8 and the second-order sleeve 9 need to be kept vertically arranged;

[0039] This drives the piston block 15 in the first-stage casing 8 to move upward while the piston block 15 in the second-stage casing 9 to move downward. First, the piston assembly in the piston block 15 in the first-stage casing 8 will be explained: during its upward movement, the thermal fluid or other medium retained at the upper side of the piston block 15 in the first-stage casing 8 will generate a downward thrust on the float 17, thereby completely blocking the piston block 15 with the float 17, so that the thermal fluid or other medium retained at the upper side of the piston block 15 in the first-stage casing 8 can be replenished into the second-stage casing 9;

[0040] Similarly, when the piston block 17 in the second-stage sleeve 9 moves downward, the heat transfer fluid or other medium on the lower side of the corresponding piston block 15 of the second-stage sleeve 9 will generate an upward thrust on the floating block 17 inside it, causing the piston block 15 in the second-stage sleeve 15 to be in a blocked state, with the purpose of quickly injecting the heat transfer fluid or other medium in the second-stage sleeve 9 into the heat exchange slot plate 5;

[0041] S3: A temperature sensor is added to the space below the piston block 15 in the first-stage casing 8. Essentially, the heat exchange process in the first-stage casing 8 needs to be set in accordance with the heating temperature. After multiple heat exchange processes with high-temperature and high-pressure gas, the heat transfer fluid and other media are heated to a value that meets the requirements before being filled into the second-stage casing 9. It should also be noted that the flow of the heat transfer fluid and other media in the heat exchange slot 5 needs to be further restricted. The purpose is to ensure that the heat transfer fluid and other media that meet the requirements enter from the bottom side of the heat exchange slot 5, thereby increasing the heat exchange time of the heat transfer fluid and other media with the HVAC pipe assembly.

[0042] When the heat transfer fluid or other medium enters the first-stage sleeve 8, the heat transfer fluid or other medium flows upward through the active channel, which can be used to push away the floating block 17 in the piston assembly to ensure the flow process of the heat transfer fluid or other medium.

[0043] In summary: For the operation process of air conditioning and HVAC, an additional water circulation heat exchange process is added. Its essence is based on media such as heat transfer fluid. After the high-temperature and high-pressure gas passes through the heat exchange process of the HVAC pipe, it undergoes a secondary heat exchange with the heat transfer fluid through the spiral flow channel. The residual heat in the high-temperature and high-pressure gas is transferred to the heat transfer fluid and other media. After the temperature in the heat transfer fluid rises to the required value, the heat transfer fluid and other media that "accumulate enough heat" are replenished into the heat exchange slot plate through the synchronous movement process of the two piston blocks, and the flow mode of the heat transfer fluid and other media is further restricted. Its purpose is to: replenish the remaining heat in the heat exchange process into the HVAC pipe assembly and achieve the purpose of waste heat recovery in a water circulation manner.

[0044] The above contents are merely examples and explanations of the structure of the present invention. Those skilled in the art may make various modifications or additions to the described specific embodiments or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they shall fall within the scope of protection of the present invention.

[0045] Throughout this specification, references to terms such as "one embodiment," "example," or "specific example" indicate that the specific features, structures, materials, or characteristics described in conjunction with that embodiment or example are included in at least one embodiment or example of the present invention. In this specification, schematic representations of these terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

[0046] The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the present invention to specific embodiments. Obviously, many modifications and variations are possible based on the contents of this specification. These embodiments are selected and described in detail in this specification to better explain the principles and practical applications of the present invention, thereby enabling those skilled in the art to better understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. An energy-saving air conditioner with a waste heat recovery mechanism, comprising a main unit housing (1), a heating component (4) and a HVAC pipe component (3), characterized in that: An inner frame box (2) is installed in the internal position of the main engine housing (1) corresponding to the HVAC pipe assembly (3), and a first-order sleeve (8), a second-order sleeve (9) and a drive motor (6) are installed in the inner frame box (2); A piston block (15) is slidably mounted in the inner wall positions of the first-order sleeve (8) and the second-order sleeve (9), a piston assembly is arranged in the piston block (15), a spiral flow tube (13) is installed in the inner position of the first-order sleeve (8) corresponding to the lower side of the piston block (15), and the internal spaces of the first-order sleeve (8) and the second-order sleeve (9) corresponding to the upper side of the piston block (15) are connected; The HVAC pipe assembly (3) comprises a heat exchange slot plate (5) and a HVAC pipe corresponding to the heating assembly (4); the first-stage sleeve (8) is provided with a return port (14) at a position on the outer wall of the lower side of the piston block (15); and the second-stage sleeve (9) is provided with a water supply port (12) at a position on the outer wall of the lower side of the piston block (15).

2. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 1, characterized in that: The HVAC pipe is arranged in a U shape and is arranged linearly along the outer wall of the heat exchange slot plate (5); one end of the HVAC pipe is connected to the spiral flow tube (13).

3. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 2, characterized in that: The two end positions of the spiral flow tube (13) respectively penetrate to the external position of the first-order sleeve (8), and the two end positions of the spiral flow tube (13) are respectively arranged as a flow conversion opening and a flow conversion outlet along the setting direction of the first-order sleeve (8).

4. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 1, characterized in that: The arrangement direction of the heat exchange slot plate (5) matches the arrangement direction of the HVAC pipe assembly (3), and the heat exchange slot plate (5) is arranged as an upper opening and a lower opening along the arrangement direction of the HVAC pipe assembly (3), and the water replenishment port (12) and the lower opening, and the return port (14) and the upper opening are connected via a hose.

5. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 1, characterized in that: A universal arm (11) is installed at the upper end of the piston block (15), and a movable curved rod (10) is arranged on the universal arm (11). The movable curved rod (10) penetrates the first-order sleeve (8) and the second-order sleeve (9) upwards, and an arc-shaped curved arm (7) is arranged at the top end of the movable curved rod (10).

6. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 5, characterized in that: The two ends of the arc-shaped curved arm (7) are movably connected to the top end of the movable curved rod (10), and the end of the transmission rod of the driving motor (6) is connected to the middle end of the arc-shaped curved arm (7).

7. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 1, characterized in that: The piston assembly is composed of a lead sinker block (16) and a floating block (17). A guide rod is fixedly installed between the lead sinker block (16) and the floating block (17). A movable channel corresponding to the guide rod is opened in the piston block (15).

8. The energy-saving air conditioner with a waste heat recovery mechanism according to claim 7, characterized in that: The lead sinker (16) and the floating block (17) in the piston assembly in the first-stage sleeve (8) are arranged in a direction from bottom to top, and the lead sinker (16) and the floating block (17) in the piston assembly in the second-stage sleeve (9) are arranged in a direction from top to bottom.

Citation Information

Patent Citations

  • Heating and ventilation waste heat recovery energy-saving system and waste heat recovery method thereof

    CN116557938A

  • Waste heat recovery device for heating and ventilation equipment

    CN218627221U

  • Heat recovery device of heating ventilation air conditioning system

    CN219199431U

  • Methanol rectification waste heat recycling equipment

    CN222187922U

Cited By

  • Electrical control cabinet and operation temperature control method

    CN120657602A