Method and device for estimating weight of exploited sea sand, medium and product
By obtaining the volume, density, moisture content and mud content of the seabed sand ore, calculating the weight of dry sea sand ore and estimating the actual mining weight, the problems of sea sand mining control and ecological environment protection are solved, and the scientific management of sea sand mining is achieved.
Patent Information
- Application Number
- CN202411880831.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-19
- Publication Date
- 2025-04-15
AI Technical Summary
How to convert the volume of seabed raw ore into ore dressing weight to supervise the sea sand mining volume and solve the problems of resource loss and ecological environment damage caused by excessive mining.
By obtaining the volume, natural density, moisture content and mud content of the seabed sand ore in multiple geological block sections, the weight of the dry sea sand ore in the target block is calculated, and the weight of the actual mined sea sand is calculated based on the average water content of the sea sand and the weight of the dry sea sand ore to control the mining volume.
It is possible to accurately estimate the actual weight of sea sand before sea sand mining, avoid excessive mining, and protect natural conditions under the sea.
Smart Images

Figure CN119829904A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of sea sand weight estimation, and in particular to a method, device, medium and product for estimating the weight of sea sand after mining. Background Art
[0002] Sea sand is a valuable marine resource and the second largest marine mineral resource after oil and natural gas, with abundant reserves in the nearshore and continental shelf areas. With the shortage of terrestrial sand resources, stricter regulatory policies and increased attention to marine environmental protection, sea sand mining has gradually become legalized and normalized.
[0003] At present, before the auction of sea sand resources, it is necessary to explore the scale of sea sand resource reserves, determine the resource range and elevation, that is, the recoverable resource reserves (measured in volume). When auctioning sea sand, blocks are usually designated and volume reserves are determined. How to control the amount of mining has become a key issue. Excessive exploitation of sea sand will not only cause the loss of mineral resources, but also change the natural conditions of the seabed, causing imbalance and damage to the ecological environment.
[0004] The actual weight of sea sand varies with storage conditions and various unforeseen factors. After the auction is completed, the transfer and settlement weight of the sea sand will be based on the actual measured weight without considering factors such as moisture, and the buyer must unconditionally agree to the measured quantity. The reserves of sea sand auctioned are usually calculated based on the seabed ore, which contains mud and moisture. The sea sand mined ashore is washed and becomes ore dressing, and its water content is also different from the original state on the seabed. How to convert the volume of seabed ore into ore dressing weight (actual weight of mined sea sand) for the purpose of supervising the amount of sea sand mined is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The purpose of the present invention is to provide a method, device, medium and product for estimating the weight of sea sand after mining, which can control the mining amount according to the actual weight of the mined sea sand.
[0006] To achieve the above object, the present invention provides the following solutions:
[0007] A method for estimating the weight of sea sand after mining, the method comprising:
[0008] Obtaining the volume, natural density, water content and mud content of seabed sand deposits in multiple geological blocks; wherein the multiple geological blocks are obtained by dividing the target blocks according to preset rules;
[0009] Calculate the weight of dry sea sand ore in the target area according to the volume, natural density, water content and mud content of the seabed sand ore in each geological block;
[0010] Obtaining the average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block;
[0011] According to the average water content of the sea sand and the weight of the dry sea sand ore at the time of transfer and settlement of the seabed sand ore in the target block, the actual mined sea sand weight of the seabed sand ore in the target block is calculated.
[0012] Optionally, the volume, natural density, water content and mud content of seabed sand deposits in multiple geological blocks are obtained, including:
[0013] According to the area and elevation of the seabed sand mine in each geological block, the volume of the seabed sand mine in each geological block is obtained;
[0014] The geological block method is used to test the natural density and water content of the seabed sand ore in each geological block.
[0015] The mud content of the seabed sand mine in each geological block is obtained by testing the mud content of the dried sea sand samples of the seabed sand mine in each geological block.
[0016] Optionally, the weight of dry sea sand ore in the target block is calculated according to the volume, natural density, water content and mud content of the seabed sand ore in each of the geological blocks, including:
[0017] Apply the formula Calculate the weight of dry sea sand ore of each geological block; where m i V is the weight of dry sea sand ore in the i-th geological block; i is the volume of seafloor sand deposits in the ith geological block; ρ i is the density of the sea sand ore layer in the i-th block; C wi is the water content of the sea sand ore layer in the i-th block; C mi is the mud content of the sea sand ore layer in the i-th block.
[0018] The weight of the dry sea sand ore of the seabed sand ore in each of the geological blocks is added together to obtain the weight of the dry sea sand ore in the target block.
[0019] Optionally, obtaining the average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block includes:
[0020] Obtaining the initial water content of each layer of sea sand during the transfer and settlement of the seabed sand mine in the target block;
[0021] According to the initial sea sand water content of each layer, the average water content of the sea sand at the time of handover and settlement of the seabed sand mine in the target block is calculated.
[0022] Optionally, according to the average water content of the sea sand and the weight of the dry sea sand at the time of the transfer and settlement of the seabed sand mine in the target block, the actual weight of the mined sea sand of the seabed sand mine in the target block is calculated, including:
[0023] Apply the formula M=m×(1+C wm ) calculating the actual weight of mined sea sand in the seabed sand mine of the target block;
[0024] Wherein, M is the actual weight of the mined sea sand of the seabed sand mine in the target block; m is the weight of the dry sea sand mine of the seabed sand mine in the target block; C wm The average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block.
[0025] A computer device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the above-mentioned methods for estimating the weight of sea sand after mining.
[0026] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements any of the above-mentioned methods for estimating the weight of sea sand after mining.
[0027] A computer program product comprises a computer program, which, when executed by a processor, implements any of the above-mentioned methods for estimating the weight of sea sand after mining.
[0028] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0029] The present invention discloses a method, device, medium and product for estimating the weight of sea sand after mining. The method obtains the volume, natural density, water content and mud content of seabed sand mines in multiple geological blocks, calculates the weight of dry sea sand mines in a target block according to the volume, natural density, water content and mud content of the seabed sand mines in each geological block, and calculates the actual mining weight of sea sand in the seabed sand mines of the target block according to the average water content of sea sand and the weight of dry sea sand mines at the time of transfer and settlement of the seabed sand mines in the target block. According to the detection results of the volume, natural density, water content and mud content of the seabed sand mine, the actual mining weight of sea sand in the seabed sand mines of the target block can be obtained before the seabed sand mines in the target block are mined. During the mining process, when the weight of the mined sea sand reaches the actual mining weight of sea sand, the mining of the seabed sand mines in the target block is stopped to avoid excessive mining of sea sand, and further, the protection of the natural conditions of the seabed of the target block is realized. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 A schematic flow chart of a method for estimating the weight of sea sand after mining provided in Example 1 of the present invention;
[0032] Figure 2 This is a diagram of the internal structure of a computer device. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] The purpose of the present invention is to provide a method, device, medium and product for estimating the weight of sea sand after mining, aiming to control the mining volume according to the actual weight of the mined sea sand.
[0035] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0036] Example 1
[0037] like Figure 1 As shown, the method for estimating the weight of sea sand after mining in this embodiment includes:
[0038] Step S1: Obtain the volume, natural density, water content and mud content of seabed sand mines in multiple geological blocks; wherein the multiple geological blocks are obtained by dividing the target blocks according to preset rules.
[0039] As a specific implementation method, the volume of the seabed sand mine in each geological block is obtained according to the area and elevation of the seabed sand mine in each geological block. The natural density and water content of the seabed sand mine in each geological block are tested by the geological block method. The mud content of the seabed sand mine in each geological block is obtained by testing the mud content of the dried sea sand sample of the seabed sand mine in each geological block.
[0040] In practical applications, during the resource exploration stage, the natural density of seabed sand ore (kg / m 3) and water content C wi (%).
[0041] Specifically, the method for determining the natural density is as follows:
[0042] (1) Cut the original sample with a thickness greater than the height of the ring knife by 0.3 cm to 0.5 cm. Apply a thin layer of vaseline to the ring knife and place it on the soil sample, with the center of the circle aligned with the center of the soil sample;
[0043] (2) Press the knife ring vertically downward, and use a wire saw to cut off the outer sample until the sample sticks out of the knife ring. Cut off the remaining sample at both ends of the knife ring, wipe the outer wall of the knife ring clean, and weigh it with a balance with a sensitivity of 0.01g;
[0044] The formula for calculating the natural density of sediment is: Where ρ is the original sample density, in g / cm 3 , m w is the weight of the wet sample, in g; V is the volume of the cutter ring, in cm 3 .
[0045] Specifically, the method for determining the water content includes:
[0046] (1) Take 15 to 30 g of a representative sample and place it in a weighing box. Close the box lid and weigh the box plus the moistened soil to an accuracy of 0.01 g.
[0047] (2) Open the box cover, place the sample in the box into the oven, and dry it at a temperature of 100-105°C until it reaches a constant weight. The drying time for clay and silt shall not be less than 8 hours, and for sandy soil shall not be less than 6 hours. For soil containing organic matter exceeding 5% of the dry soil weight, the temperature should be controlled at 65-70°C and dried until it reaches a constant weight.
[0048] (3) Take the dried sample out of the oven, cover the box, place it in a drying container and cool it to room temperature. Weigh the box plus dry soil to an accuracy of 0.01 g.
[0049] The formula for calculating the water content of sediment is: Among them, C w is the water content, in %; m w is the weight of the wet (original) sample, in g; m d is the dry sample weight in g.
[0050] Take samples from various geological blocks and test the mud content C of dry samples (dried sea sand samples) m (%) specifically include:
[0051] (1) Sampling: When sampling on the sea sand pile, the sampling locations should be evenly distributed. The minimum sampling quantity is 4.4 kg.
[0052] (2) Sample processing: Place the sample on a flat plate, mix it evenly while it is wet, and pile it into a round cake with a thickness of about 20 mm. Then divide the round cake into four approximately equal parts along two mutually perpendicular diameters, take two of the diagonal parts, mix them again, and pile them into round cakes again.
[0053] (3) Drying: Reduce the sample to about 1100 g, place it in a drying oven at (105±5) to a constant weight, and after cooling to room temperature, divide it into two approximately equal portions for later use.
[0054] (4) Weigh the sample: Weigh 500g of the sample, accurate to 0.1g. Pour the sample into a washing container, add clean water, make the water level about 150mm higher than the sample surface, mix thoroughly, soak for 2h, and then wash the sample in water by hand to separate the sediment, silt and clay from the sand. Slowly pour the turbid water onto the 1.18mm and 75μm sieves (1.18mm sieve on top of the 75μm sieve) to filter out particles smaller than 75μm. Both sides of the sieve should be moistened with water before the test, and care should be taken to avoid the loss of sand during the entire process.
[0055] (5) Repeat the washing: Pour clean water into the water container and repeat the above steps until the water in the container is clear.
[0056] (6) Drying: Shake to fully wash away particles smaller than 75 μm. Then put the particles remaining on the two sieves and the cleaned sample in the container into an enamel tray and place it in a drying oven at (105±5)℃ to dry to constant weight. Take it out and cool it to room temperature before weighing the sample.
[0057] The formula for the mud content of sea sand is: C m =(G0-G1) / G0×100%; where C m is the mud content of sea sand; G0 is the drying weight of sand before the test (g); G1 is the drying weight of sand after the test (g).
[0058] The block method is to divide the ore body into different small blocks according to the geological characteristics and conditions of the ore deposit (such as ore grade, natural type, reserve category, technical conditions for ore mining and hydrogeological conditions, etc.) or exploration projects. For each block, the reserves can be estimated by the arithmetic average method.
[0059] Sea sand resources are generally estimated using the geological block method (original ore), usually in terms of volume V (m 3 ) indicates that its calculation formula is as follows:
[0060] V i =S i ×h i ;
[0061] V=∑V i ;
[0062] Where: V i ——Sea sand resources / reserves (original ore) in block i (m 3 );
[0063] S i ——The area of the sea sand ore layer in the i-th block (m 2 );
[0064] h i ——Thickness of sea sand layer in block i (m);
[0065] V——Sea sand resources / reserves (original ore) (m 3 ).
[0066] Step S2: Calculate the weight of dry sea sand in the target area according to the volume, natural density, water content and mud content of the seabed sand in each geological block.
[0067] As a specific implementation method, the formula
[0068] Calculate the weight of dry sea sand ore of each geological block, that is, the weight of dry sea sand ore (m) after desludging in each geological block.
[0069] The weight of dry sea sand ore of the seabed sand ore in each geological block is added together to obtain the weight of dry sea sand ore in the target block.
[0070] Specifically, the formula for adding the weight of dry sea sand ore of each geological block is: m = ∑m i .
[0071] Where: m i ——Sea sand resources / reserves of block i (dry sea sand ore) (kg);
[0072] V i ——Sea sand resources / reserves (original ore) in block i (m 3 );
[0073] ρ i ——Density of sea sand layer in block i (kg / m 3 );
[0074] C wi ——Water content of sea sand ore layer in block i (%);
[0075] C mi ——Mud content of sea sand ore layer in the ith block (%).
[0076] Step S3: Obtain the average water content of the sea sand at the time of transfer and settlement of the seabed sand mine in the target block.
[0077] As a specific implementation method, the initial water content of the sea sand in each layer at the time of handover and settlement of the seabed sand mine in the target block is obtained; based on the initial water content of the sea sand in each layer, the average water content of the sea sand at the time of handover and settlement of the seabed sand mine in the target block is calculated.
[0078] Step S4: Calculate the actual mined sea sand weight of the seabed sand mine in the target block according to the average water content of the sea sand and the weight of the dry sea sand mine at the time of transfer and settlement of the seabed sand mine in the target block.
[0079] As a specific implementation method, the formula M=(1+C wm )×m is used to calculate the actual weight of the mined sea sand of the seabed sand mine in the target block; where M is the actual weight of the mined sea sand of the seabed sand mine in the target block; m is the weight of the dry sea sand ore of the seabed sand mine in the target block; C wm The average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block.
[0080] In practical applications, when sea sand is transferred and settled, it is necessary to re-measure the water content because it has been placed for a period of time after being collected from the sea, resulting in water loss, and its average water content C is obtained. wm (%) (When the sea sand is transferred and settled, samples from different layers are taken to test the water content and the average value is taken). The weight of sea sand actually mined from a sea sand deposit with a volume reserve of V should be:
[0081]
[0082] According to the detection results of the volume, natural density, water content and mud content of the seabed sand ore, the present invention can obtain the actual mined sea sand weight of the seabed sand ore in the target block before the seabed sand ore in the target block is mined. During the mining process, when the weight of the mined sea sand reaches the actual mined sea sand weight, the mining of the seabed sand ore in the target block is stopped to avoid excessive mining of sea sand. Further, the protection of the natural conditions of the seabed of the target block is achieved.
[0083] Example 2
[0084] A computer device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for estimating the weight of sea sand after mining in Example 1.
[0085] Example 3
[0086] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the method for estimating the weight of sea sand after mining in Example 1.
[0087] Example 4
[0088] A computer program product includes a computer program, which, when executed by a processor, implements the method for estimating the weight of sea sand after mining in embodiment 1.
[0089] Example 5
[0090] A computer device, which may be a database, may have an internal structure as shown in Figure 2 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store pending transactions. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the method for estimating the weight of sea sand after mining in Example 1 is implemented.
[0091] It should be noted that the object information (including but not limited to object device information, object personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in the present invention are all information and data authorized by the object or fully authorized by all parties, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.
[0092] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided by the present invention can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided by the present invention may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited thereto. The processor involved in each embodiment provided by the present invention may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited thereto.
[0093] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0094] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for estimating the weight of sea sand after mining, characterized in that: The method comprises: Obtaining the volume, natural density, water content and mud content of seabed sand deposits in multiple geological blocks; wherein the multiple geological blocks are obtained by dividing the target blocks according to preset rules; Calculate the weight of dry sea sand ore in the target area according to the volume, natural density, water content and mud content of the seabed sand ore in each geological block; Obtaining the average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block; According to the average water content of the sea sand and the weight of the dry sea sand ore at the time of transfer and settlement of the seabed sand ore in the target block, the actual mined sea sand weight of the seabed sand ore in the target block is calculated.
2. The method for estimating the weight of sea sand after mining according to claim 1, characterized in that: Obtain the volume, natural density, water content, and mud content of seafloor placers for multiple geological blocks, including: According to the area and elevation of the seabed sand mine in each geological block, the volume of the seabed sand mine in each geological block is obtained; The geological block method is used to test the natural density and water content of the seabed sand ore in each geological block. The mud content of the seabed sand mine in each geological block is obtained by testing the mud content of the dried sea sand samples of the seabed sand mine in each geological block.
3. The method for estimating the weight of sea sand after mining according to claim 1, characterized in that: According to the volume, natural density, water content and mud content of the seabed sand ore in each of the geological blocks, the weight of the dry seabed sand ore in the target block is calculated, including: Apply the formula Calculate the weight of dry sea sand ore of each geological block; where m i V is the weight of dry sea sand ore in the i-th geological block; i is the volume of seafloor sand deposits in the ith geological block; ρ i is the density of the sea sand ore layer in the i-th block; C wi is the water content of the sea sand ore layer in the i-th block; C mi is the mud content of the sea sand ore layer in the i-th block. The weight of the dry sea sand ore of the seabed sand ore in each of the geological blocks is added together to obtain the weight of the dry sea sand ore in the target block.
4. The method for estimating the weight of sea sand after mining according to claim 1, characterized in that: The average water content of the sea sand in the target block at the time of the transfer and settlement of the seabed sand mine is obtained, including: Obtaining the initial water content of each layer of sea sand during the transfer and settlement of the seabed sand mine in the target block; According to the initial sea sand water content of each layer, the average water content of the sea sand at the time of handover and settlement of the seabed sand mine in the target block is calculated.
5. The method for estimating the weight of sea sand after mining according to claim 1, characterized in that: According to the average water content of the sea sand and the weight of the dry sea sand ore at the time of the transfer and settlement of the sea sand ore in the target block, the actual weight of the sea sand mined in the sea sand ore in the target block is calculated, including: Apply the formula M=m×(1+C w2 ) calculating the actual weight of mined sea sand in the seabed sand mine of the target block; Wherein, M is the actual weight of the mined sea sand of the seabed sand mine in the target block; m is the weight of the dry sea sand mine of the seabed sand mine in the target block; C wm The average water content of sea sand at the time of transfer and settlement of the seabed sand mine in the target block.
6. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for estimating the weight of sea sand after mining as described in any one of claims 1-5.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for estimating the weight of sea sand after mining as described in any one of claims 1 to 5 is implemented.
8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for estimating the weight of sea sand after mining as described in any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Sea sand roadbed construction compactness detection method
CN116223289A
Sand excavation amount estimation method and system of sand dredger, computer and storage medium
CN116384950A
Method and system for determining well spacing for in-situ leaching mining of high-permeability sandstone-type uranium / copper deposit
US20240026767A1