Underground comprehensive pipe gallery structure and rapid construction method thereof
By adopting prefabricated components and rapid construction equipment, the problems of long construction cycle, high cost and great environmental impact of traditional underground pipeline construction methods are solved, and construction efficiency and quality are improved, as well as the durability and service life of pipelines are improved.
Patent Information
- Application Number
- CN202411921053.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-04-18
AI Technical Summary
The traditional underground pipeline construction methods have problems such as long construction cycle, high cost, and great impact on the environment, which is difficult to meet the needs of rapid development of modern cities.
Prefabricated components and rapid construction equipment are adopted to achieve rapid and accurate installation of prefabricated components through lifting devices and positioning adjustment devices, and the connection device and sealing strips are used to ensure the stability and waterproof performance of the connection.
It significantly shortens the construction cycle, improves construction efficiency and quality, reduces environmental impact, and improves the durability and service life of the pipe corridor.
Smart Images

Figure CN119843710A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of underground integrated pipe gallery, in particular to an underground integrated pipe gallery structure and a rapid construction method thereof. Background Art
[0002] With the acceleration of urbanization, the development and utilization of underground space has received increasing attention. As an important part of urban underground infrastructure, the construction of underground comprehensive pipeline corridors is of great significance for improving urban functions, optimizing urban layout, and improving urban disaster prevention and mitigation capabilities. However, traditional underground pipeline corridor construction methods have problems such as long construction period, high cost, and great impact on the environment, which are difficult to meet the needs of the rapid development of modern cities.
[0003] Traditional underground pipe gallery construction usually adopts cast-in-place concrete or masonry structure. These construction methods require a lot of on-site operations, including formwork construction, concrete pouring, masonry, etc., which not only have a long construction period, but also require a lot of labor and materials. In addition, on-site operations will also generate a lot of noise, dust and construction waste, which will have adverse effects on the environment. In order to overcome the shortcomings of traditional construction methods, prefabricated component technology has gradually been applied to the construction of underground pipe galleries in recent years. Prefabricated components have the advantages of short production cycle, controllable quality, fast construction speed and small environmental impact, which can significantly improve the construction efficiency and quality of underground pipe galleries. However, there are still some problems with the prefabricated components and their construction methods on the market, such as loose connection, poor waterproof performance, and low construction accuracy. These problems limit the widespread application of prefabricated component technology in the construction of underground pipe galleries. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides an underground comprehensive pipe gallery structure and a rapid construction method thereof, which has the advantages of significantly improving construction efficiency, etc.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an underground comprehensive pipe gallery structure and a rapid construction method thereof, comprising a pipe gallery main body, prefabricated components, a connecting device and rapid construction equipment, wherein the pipe gallery main body is formed by splicing a plurality of prefabricated components, each prefabricated component is provided with a plurality of chambers for accommodating different pipelines, and the two ends of the prefabricated components are respectively provided with connecting grooves and connecting flanges, and the connecting device is used to realize rapid and stable connection between adjacent prefabricated components;
[0006] The rapid construction equipment includes a hoisting device and a positioning and adjusting device, which are used to accurately hoist the prefabricated components to a predetermined position and perform fine adjustments to ensure connection accuracy.
[0007] Furthermore, the prefabricated components are made of high-strength, corrosion-resistant concrete material, and a waterproof layer is provided on the surface thereof to improve the durability and service life of the pipe gallery structure.
[0008] Furthermore, the shapes and sizes of the connection groove and the connection flange match, and a sealing strip is provided in the connection groove. When the connection flange is inserted into the connection groove, the sealing strip is compressed to form a seal to prevent groundwater from seeping into the interior of the pipe gallery.
[0009] Furthermore, the connecting device includes a bolt and nut assembly and an embedded part for fixing the bolt. The embedded part is pre-installed on the connecting groove or connecting flange of the prefabricated component. The bolt passes through the connecting groove and connecting flange of the adjacent prefabricated component and cooperates with the embedded part, and a fastened connection is achieved by tightening the nut.
[0010] Furthermore, the lifting device includes a crane, a lifting tool and a lifting rope. The lifting tool is connected to the lifting point of the prefabricated component. The lifting rope is used to connect the lifting tool to the crane, and the lifting and movement of the prefabricated component are achieved through the operation of the crane.
[0011] Furthermore, the positioning and adjustment device includes a spirit level, a jack and a support frame. The spirit level is used to detect the horizontal position of the prefabricated component, and the jack and the support frame are used to adjust the vertical position and horizontal position of the prefabricated component to ensure accurate docking of the prefabricated components.
[0012] Furthermore, an inspection passage and a ventilation system are provided inside the main body of the pipe gallery. The inspection passage facilitates maintenance personnel to inspect and maintain the pipelines, and the ventilation system is used to maintain air circulation inside the pipe gallery to prevent moisture and mildew.
[0013] Furthermore, a bracket and a fixing device are provided in the cavity of the prefabricated component for fixing and supporting the pipeline to prevent the pipeline from being displaced or damaged during transportation and installation.
[0014] Furthermore, an entrance shaft is provided at one end of the pipe gallery body, and an exit shaft is provided at the other end. Stairs and lighting equipment are provided in the entrance shaft and the exit shaft respectively to facilitate personnel entry and exit and pipeline connection.
[0015] The rapid construction method of underground comprehensive pipe gallery includes the following steps:
[0016] 1) Dig the foundation pit of the pipeline gallery at the construction site;
[0017] 2) Use the lifting device to lift the prefabricated components to the predetermined positions in the foundation pit in sequence;
[0018] 3) Use the positioning and adjustment device to fine-tune the horizontal and vertical positions of the prefabricated components;
[0019] 4) Use connecting devices to connect and fix adjacent prefabricated components;
[0020] 5) Repeat steps 2-4 until the main body of the pipe gallery is spliced;
[0021] 6) Install maintenance passages, ventilation systems, pipeline supports and other ancillary facilities inside the main body of the pipe gallery;
[0022] 7) Waterproof the main body of the tunnel and backfill the outside to complete the construction.
[0023] Compared with the prior art, the present invention provides an underground comprehensive pipe gallery structure and a rapid construction method thereof, which has the following beneficial effects:
[0024] 1. The underground integrated pipe gallery structure and its rapid construction method greatly shorten the construction period by adopting prefabricated components and rapid construction equipment. The prefabricated components are produced in the factory with controllable quality, which reduces the amount of on-site work and greatly improves the construction speed. At the same time, the precise coordination of the lifting device and the positioning and adjustment device ensures the rapid and accurate installation of the prefabricated components, further shortening the construction period.
[0025] 2. The underground comprehensive pipe gallery structure and its rapid construction method, the inspection channel and ventilation system set inside the main body of the pipe gallery are convenient for maintenance personnel to inspect and maintain the pipelines, while ensuring air circulation inside the pipe gallery to prevent moisture and mildew. In addition, the multiple chambers set inside the prefabricated components are convenient for the classified arrangement of different pipelines, reducing interference between pipelines and improving the utilization efficiency and safety of the pipe gallery.
[0026] 3. The underground integrated pipe gallery structure and its rapid construction method adopt a modular design for prefabricated components, and the size and shape can be adjusted according to actual needs to adapt to different terrains and pipeline requirements. This flexibility enables the underground integrated pipe gallery structure of the present invention to be widely used in different types of urban underground space development and utilization projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a step diagram of the rapid construction method of the present invention;
[0028] Figure 2 It is a structural diagram of the prefabricated component in the present invention. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figures 1 to 2The underground comprehensive pipe gallery structure and the rapid construction method thereof in this embodiment include a pipe gallery main body, prefabricated components, connecting devices and rapid construction equipment. The pipe gallery main body is spliced by multiple prefabricated components. Each prefabricated component is provided with multiple chambers for accommodating different pipelines, and connecting grooves and connecting flanges are respectively provided at both ends of the prefabricated components. Rapid and stable connection between adjacent prefabricated components is achieved through the connecting device.
[0031] The rapid construction equipment includes a hoisting device and a positioning and adjustment device, which are used to accurately hoist the prefabricated components to the predetermined position and make fine adjustments to ensure the connection accuracy.
[0032] The prefabricated components are made of high-strength, corrosion-resistant concrete materials, and their surface is provided with a waterproof layer to improve the durability and service life of the corridor structure.
[0033] The shapes and sizes of the connection groove and the connection flange match, and a sealing strip is provided in the connection groove. When the connection flange is inserted into the connection groove, the sealing strip is compressed to form a seal to prevent groundwater from seeping into the interior of the pipe gallery.
[0034] The connecting device includes a bolt and nut assembly and an embedded part for fixing the bolt. The embedded part is pre-installed on the connecting groove or connecting flange of the prefabricated component. The bolt passes through the connecting groove and connecting flange of the adjacent prefabricated component and cooperates with the embedded part. The fastening connection is achieved by tightening the nut.
[0035] The lifting device includes a crane, a sling and a sling. The sling is connected to the lifting point of the prefabricated component, and the sling is used to connect the sling to the crane. The lifting and movement of the prefabricated component is achieved through the operation of the crane.
[0036] The positioning and adjustment device includes a spirit level, a jack and a support frame. The spirit level is used to detect the horizontal position of the prefabricated components. The jack and the support frame are used together to adjust the vertical and horizontal positions of the prefabricated components to ensure precise docking of the prefabricated components.
[0037] An inspection passage and ventilation system are set inside the main body of the tunnel. The inspection passage is convenient for maintenance personnel to inspect and maintain the pipelines. The ventilation system is used to maintain air circulation inside the tunnel to prevent moisture and mildew.
[0038] Brackets and fixtures are provided in the chamber of the prefabricated component to fix and support the pipeline to prevent displacement or damage during transportation and installation.
[0039] There is an entrance shaft at one end of the main body of the tunnel and an exit shaft at the other end. Stairs and lighting equipment are provided in the entrance shaft and exit shaft respectively to facilitate personnel entry and exit and pipeline connection.
[0040] In addition, the main body of the pipe gallery is the skeleton of the entire underground integrated pipe gallery, and its design needs to consider various factors such as soil pressure, groundwater pressure, and ground traffic load. The prefabricated components adopt a modular design, which is convenient for production, transportation and installation. At the same time, the size and shape can be adjusted according to actual needs to adapt to different terrains and pipeline requirements. The multiple chambers set inside each prefabricated component not only facilitate the classified layout of different pipelines, but also help reduce interference between pipelines and improve the utilization efficiency and safety of the pipe gallery.
[0041] High-strength, corrosion-resistant concrete is the preferred material for prefabricated components, which has good mechanical properties and durability. The design of the waterproof layer needs to consider factors such as material compatibility, construction convenience and waterproof effect, and can be in various forms such as coatings and rolls.
[0042] The design of the connection groove and the connection flange must take into account their shape, size and matching accuracy to ensure the stability and sealing of the connection. During the connection process, the cleanliness and matching clearance of the connection groove and the connection flange must be strictly controlled to prevent debris from entering the connection area and affecting the connection effect.
[0043] The design of the connection device needs to ensure a quick and stable connection between adjacent prefabricated components while meeting the waterproof requirements. In addition to bolt and nut assemblies, other connection methods such as welding and bonding can also be considered to improve the reliability and durability of the connection. The selection of sealing strips needs to consider their aging and corrosion resistance to ensure long-term and effective waterproofing.
[0044] Lifting devices and positioning and adjustment devices are key equipment for rapid construction. The lifting device must have sufficient lifting capacity and stability to ensure the safety of prefabricated components during the lifting process. The positioning and adjustment device must have high-precision measurement and adjustment capabilities to ensure the precise docking of prefabricated components. In addition, the use of automation and intelligent technologies, such as robots and drones, can also be considered to improve construction efficiency and safety.
[0045] During the hoisting process, it is necessary to ensure that the crane is operated smoothly and accurately to avoid collision or damage of prefabricated components during the hoisting process. The use of the positioning and adjustment device must be carried out strictly in accordance with the operating procedures to ensure that the horizontal and vertical positions of the prefabricated components meet the design requirements.
[0046] The setting of the inspection passage and ventilation system must take into account the passage and maintenance needs of personnel, as well as the air circulation inside the corridor. The width, height and lighting of the inspection passage must meet the requirements of personnel safety and comfort, and the ventilation system must be reasonably designed based on factors such as the length, width and height of the corridor to ensure the air quality and environmental humidity inside the corridor.
[0047] The design of pipeline supports and fixtures must take into account factors such as the type, size and weight of the pipeline to ensure the stability and safety of the pipeline. The materials of the supports and fixtures must have good mechanical properties and corrosion resistance, and the convenience of their installation and disassembly must also be considered.
[0048] The setting of entrance and exit wells must take into account the entry and exit of personnel and the connection requirements of pipelines. The configuration of stairs and lighting equipment must meet the requirements of personnel safety and comfort, and at the same time, the convenience of their maintenance and replacement must be considered. During the design and construction process, safety measures such as fire prevention and explosion prevention must also be considered.
[0049] In order to ensure the quality and safety of construction, professional training and guidance should be provided to construction personnel. The training content should include the operation skills of hoisting, positioning and adjustment, connection and fixation of prefabricated components, as well as knowledge of safety regulations and quality standards. Through training and guidance, the skill level and safety awareness of construction personnel can be improved to ensure the smooth progress of the construction process.
[0050] The rapid construction method of underground comprehensive pipe gallery includes the following steps:
[0051] 1) Dig the foundation pit of the pipeline gallery at the construction site;
[0052] 2) Use the lifting device to lift the prefabricated components to the predetermined positions in the foundation pit in sequence;
[0053] 3) Use the positioning and adjustment device to fine-tune the horizontal and vertical positions of the prefabricated components;
[0054] 4) Use connecting devices to connect and fix adjacent prefabricated components;
[0055] 5) Repeat steps 2-4 until the main body of the pipe gallery is spliced;
[0056] 6) Install maintenance passages, ventilation systems, pipeline supports and other ancillary facilities inside the main body of the pipe gallery;
[0057] 7) Waterproof the main body of the tunnel and backfill the outside to complete the construction.
[0058] The installation method, connection method or setting method disclosed in this embodiment are all common mechanical connection methods, and they can be implemented as long as they can achieve their beneficial effects. In addition, the electrical components appearing in this embodiment are all electrically connected to the main controller and the power supply. The main controller can be a conventional known device such as a computer that plays a control role. Technicians in this field can control the electrical components through simple programming, and the existing disclosed power connection technology is also common knowledge in this field, so the specific structural composition and working principle will not be described in detail in this embodiment.
[0059] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0060] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An underground comprehensive pipe gallery structure and a rapid construction method thereof, comprising a pipe gallery body, prefabricated components, a connecting device and rapid construction equipment, characterized in that: The main body of the pipe gallery is composed of a plurality of prefabricated components, each of which is provided with a plurality of chambers for accommodating different pipelines, and a connection groove and a connection flange are provided at both ends of the prefabricated component, so that a quick and stable connection between adjacent prefabricated components can be achieved through a connection device; The rapid construction equipment includes a hoisting device and a positioning and adjusting device, which are used to accurately hoist the prefabricated components to a predetermined position and perform fine adjustments to ensure connection accuracy.
2. The underground comprehensive pipe gallery structure and rapid construction method thereof according to claim 1 is characterized in that: The prefabricated components are made of high-strength, corrosion-resistant concrete materials, and a waterproof layer is provided on the surface thereof to improve the durability and service life of the pipe gallery structure.
3. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: The shapes and sizes of the connection groove and the connection flange match, and a sealing strip is provided in the connection groove. When the connection flange is inserted into the connection groove, the sealing strip is compressed to form a seal to prevent groundwater from seeping into the interior of the pipe gallery.
4. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: The connecting device includes a bolt and nut assembly and an embedded part for fixing the bolt. The embedded part is pre-installed on the connecting groove or connecting flange of the prefabricated component. The bolt passes through the connecting groove and connecting flange of the adjacent prefabricated component and cooperates with the embedded part, and a fastened connection is achieved by tightening the nut.
5. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: The hoisting device comprises a crane, a hoisting tool and a sling. The hoisting tool is connected to the hoisting point of the prefabricated component. The sling is used to connect the hoisting tool to the crane. The hoisting and movement of the prefabricated component is achieved through the operation of the crane.
6. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: The positioning and adjusting device includes a level, a jack and a support frame. The level is used to detect the horizontal position of the prefabricated component. The jack and the support frame are used to adjust the vertical position and horizontal position of the prefabricated component to ensure the precise docking of the prefabricated component.
7. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: An inspection passage and a ventilation system are provided inside the main body of the pipe gallery. The inspection passage facilitates maintenance personnel to inspect and maintain the pipelines, and the ventilation system is used to maintain air circulation inside the pipe gallery to prevent moisture and mildew.
8. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: The cavity of the prefabricated component is provided with a bracket and a fixing device for fixing and supporting the pipeline to prevent the pipeline from displacement or damage during transportation and installation.
9. The underground comprehensive pipe gallery structure and the rapid construction method thereof according to claim 1 are characterized in that: An entrance shaft is provided at one end of the pipe gallery body, and an exit shaft is provided at the other end. Stairs and lighting equipment are provided in the entrance shaft and the exit shaft respectively, so as to facilitate the entry and exit of personnel and the connection of pipelines.
10. The rapid construction method of underground comprehensive pipe gallery according to claim 1, characterized in that: The following steps are involved: 1) Digging the foundation pit of the pipeline gallery at the construction site; 2) Use the lifting device to lift the prefabricated components to the predetermined positions in the foundation pit in sequence; 3) Use the positioning and adjustment device to fine-tune the horizontal and vertical positions of the prefabricated components; 4) Use connecting devices to connect and fix adjacent prefabricated components; 5) Repeat steps 2-4 until the main body of the pipe gallery is spliced; 6) Install maintenance passages, ventilation systems, pipeline supports and other ancillary facilities inside the main body of the pipe gallery; 7) Waterproof the main body of the tunnel and backfill the outside to complete the construction.