Large-span space suspended ceiling unit module dividing construction method and device

By using a combination method of suspended ceiling steel frame and hoisting unit modules in large spaces and large span spaces, conflicts, construction period, cost and installation difficulty in construction are solved, and efficient ceiling and pipeline construction is achieved, suitable for complex shapes and multi-professional cross-construction.

CN119843818AActive Publication Date: 2025-04-18BEIJING CONSTRUCTION ENGINEERING GROUP CO LTD +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202510336064.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-21
Publication Date
2025-04-18
Estimated Expiration
2045-03-21

AI Technical Summary

Technical Problem

There is a conflict between large space and large span comprehensive pipelines and ceiling construction, with tight construction periods, high cost and high transportation loss rate, and it is difficult to install unit modules. The existing aluminum plate ceiling installation requirements are high and the flatness requirements are high. The plate styles are limited, making it difficult to adapt to electromechanical point adjustments.

Method used

The ceiling steel frame is used as a temporary guide rail. The ceiling steel frame system is formed through the horizontal rod and cross brace of the guide rail, and the lifting unit and lifting components are installed to realize the lifting and installation of unit modules. Combined with the mobile lifting unit and the toothed belt system, the lifting and construction are achieved efficiently.

Benefits of technology

It solves the construction period, cost, transportation loss and installation difficulty of large-space and large-span ceiling construction, and realizes efficient lifting and construction of ceilings and pipelines, and is suitable for complex downgrade modeling and multi-professional cross-construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119843818A_ABST
    Figure CN119843818A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method and device for dividing unit modules of a large-span space suspended ceiling, and the method comprises the following steps: 1, dividing the suspended ceiling into a plurality of unit modules based on the modeling of the suspended ceiling, installing guide rail horizontal rods below a structural plate, and connecting cross braces between the guide rail horizontal rods to form a suspended ceiling steel frame; 2, a hoisting unit capable of walking along the guide rail horizontal rod is installed on the guide rail horizontal rod, and a lifting assembly is arranged on the hoisting unit; and thirdly, the unit modules are assembled and connected with the lifting assemblies, the unit modules are hoisted to the installation positions through the lifting assemblies, the unit modules are connected with the guide rail horizontal rods, connection between the lifting assemblies and the unit modules is removed, and the hoisting units are moved to the next installation position along the guide rail horizontal rods. The suspended ceiling steel frame is used as a temporary guide rail, the requirements for large-span and large-space suspended ceilings and pipeline moving and hoisting are met at the same time, and the method is suitable for large-space and large-span complex stepped modeling suspended ceilings and multi-specialty cross construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of decoration and renovation, and in particular to a method and device for constructing a large-span space suspended ceiling unit module. Background Art

[0002] The decoration and renovation of large public buildings gradually presents the characteristics of large span, super height, and complex step-down shapes, which leads to the problems of large volume, tight construction period, low degree of assembly, large amount of high-altitude operations, and high labor costs faced by the decoration and construction of large public buildings during the construction process. Especially for large lecture halls, the construction is complex, with many specialties and cross-construction, including design, decoration, informatization, video conferencing, strong and weak electricity, HVAC smoke exhaust, etc. In addition, the current aluminum plate ceiling has high installation requirements and high installation flatness requirements, which has a great impact on the overall appearance and has limited plate styles; the manufacturer prefabricates the unit module parts, which has high cost, long cycle, high transportation damage rate, and difficulty in adapting to the adjustment of electromechanical points. The current traditional construction method is difficult to meet the requirements of special construction periods. At the same time, there are positioning problems and work interface division problems in the reservation and embedding of cross-professionals. In addition, a large number of on-site electromechanical pipelines and supports are arranged on the top, and the multi-functional use further compresses the space above the ceiling, making it difficult to construct conventional module hoisting. Summary of the invention

[0003] The present invention provides a method and device for constructing a large-span space suspended ceiling unit module, which can simultaneously meet the requirements of large-span, large-space suspended ceiling and pipeline movement and hoisting, and is suitable for large-space, large-span complex stepped ceiling and multi-professional cross-construction.

[0004] The technical problems to be solved are: solving the conflict problems between large-space, large-span integrated pipelines and suspended ceiling construction, construction period problems, cost problems, transportation damage problems and unit module installation problems.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: The present invention provides a large-span space ceiling unit module construction method, comprising the following steps: Step 1: Divide the ceiling into multiple unit modules based on the ceiling shape, install rail horizontal bars under the structural plate and connect cross braces between the rail horizontal bars to form a ceiling steel frame. The rail horizontal bars serve as the fixed frame and rail system of the unit modules. Step 2: Install a hoisting unit on the horizontal rail bar that can move along the horizontal rail bar, and the hoisting unit is provided with a lifting component for lifting the unit module; Step 3: Assemble the unit module and connect the unit module to the lifting assembly, lift the unit module to the installation position through the lifting assembly, connect the unit module to the horizontal rod of the guide rail, release the connection between the lifting assembly and the unit module, move the lifting unit along the horizontal rod of the guide rail to the next installation position, and install the next unit module.

[0006] The present invention provides a method for constructing a unit module for a large-span space ceiling. Further, the guide rail horizontal bar is a T-shaped steel horizontal bar, and the flange plate of the guide rail horizontal bar is arranged close to the unit module side; The hoisting unit comprises a roller assembly, the rollers of which are respectively arranged on both sides of the web of the guide rail horizontal rod and can move along the flange plate of the guide rail horizontal rod.

[0007] The present invention provides a method for constructing a large-span space ceiling unit module. Further, the roller assembly comprises a driving wheel group and a driven wheel group, and the driving wheel group is transmission-connected to a micro motor.

[0008] The present invention provides a method for constructing a unit module for a large-span space ceiling. Further, the lifting assembly includes an upper pulley, a lower pulley and a toothed belt. A base is installed on the outer side of the roller assembly, and the roller of the roller assembly is installed on the base. The upper pulley is installed between the two bases and is located below the roller assembly. The lower pulley is used to be installed on the unit module and used as a movable pulley. The toothed belt passes through the upper pulley and the lower pulley, and the lower pulley is driven to move upward by the toothed belt.

[0009] The present invention provides a method for constructing a unit module for a large-span space ceiling. Furthermore, the unit module is hoisted at four points, and each hoisting point is correspondingly installed with a group of hoisting units and lifting components. Two groups of hoisting units along the travel direction of the hoisting units are connected by a connecting steel frame.

[0010] The present invention provides a method for constructing unit modules for a large-span space ceiling. Further, after the unit modules are assembled, a mobile lifting unit is installed on the unit modules, and the unit modules are moved to a lifting position by the mobile lifting unit, and then lifted. The mobile lifting unit includes a base and a universal wheel installed on the bottom surface of the base, and the lower pulley is installed on the outer side of the base. Two sets of side-by-side mobile lifting units are connected by a connecting rod, and the unit modules are placed on the base.

[0011] The present invention provides a method for constructing a large-span space ceiling by dividing it into unit modules. Furthermore, before installing the unit modules, electromechanical pipelines are installed, and a plurality of construction units are divided according to the support brackets of the electromechanical pipelines. After the construction units are assembled, the hoisting units cooperate with the lifting components to hoist the construction units. After a period of construction of the construction units, the installation of the unit modules is interspersed.

[0012] The present invention provides a method for constructing a unit module for a large-span space ceiling. Further, the unit module comprises a secondary keel, a flame retardant board, a gypsum board and an inorganic coating layer arranged in sequence from top to bottom, and a transverse keel is connected between the secondary keels; Angle steel hangers are installed on the end faces of the unit modules, and the angle steel connectors are connected to the guide rail horizontal rods.

[0013] The present invention discloses a device, comprising a hoisting unit and a lifting assembly, wherein the hoisting unit comprises a pair of roller assemblies, and bases are respectively installed on opposite sides of the two roller assemblies; The lifting assembly includes an upper pulley, a lower pulley and a toothed belt. The upper pulley is installed between two bases and located below the roller assembly. The lower pulley is used to be installed on the unit module and used as a movable pulley. The toothed belt passes through the upper pulley and the lower pulley, and the toothed belt drives the lower pulley to move upward.

[0014] The device of the present invention further comprises a mobile lifting unit, wherein the mobile lifting unit comprises a base and a universal wheel installed on the bottom surface of the base, and the lower pulley is installed on the outer side of the base.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. This application uses the ceiling steel frame as a temporary guide rail, which can meet the needs of large-span, large-space ceiling and pipeline movement and hoisting. It is suitable for large-space, large-span complex drop-shaped ceilings and multi-professional cross-construction; 2. This application adopts the method of bottom assembly, overall hoisting, and interlaced construction of mechanical and electrical pipelines and suspended ceilings, which solves the conflict problems between large-space, large-span integrated pipelines and suspended ceiling construction, construction period problems, cost problems, transportation damage problems, and unit module installation problems.

[0016] The present invention will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a plan view schematic diagram of the division of the unit modules of the present invention; Figure 2 This is a schematic diagram of the front elevation of the ceiling steel frame of the present invention; Figure 3 It is a side elevation schematic diagram of the ceiling steel frame of the present invention; Figure 4 A top view of the hoisting unit of the present invention; Figure 5 It is a side view of the hanging unit of the present invention; Figure 6 It is a schematic diagram of the structure of the roller assembly of the present invention; Figure 7 It is a schematic diagram of the cooperation between the roller assembly and the guide rail horizontal rod of the present invention; Figure 8 It is a front view of the mobile lifting unit connected to the construction unit of the present invention; Fig. 9 It is a side view of the mobile lifting unit connected to the construction unit of the present invention; Fig.10 A top view of the mobile lifting unit connected to the construction unit of the present invention; Fig.11 It is a front view of the mobile lifting unit connection unit module of the present invention; Fig.12 A top view of a mobile lifting unit connection unit module of the present invention; Fig.13 This is a schematic diagram of transporting the unit modules of the present invention into position; Fig.14 This is a schematic diagram of the inspection before hoisting of the unit module of the present invention; Fig.15 This is a diagram of the hoisting and positioning of the unit module of the present invention; Fig.16 This is a schematic diagram of the connection of the unit modules of the present invention; Fig.17 This is a schematic diagram showing the completion of the installation of the unit module of the present invention; Fig.18 This is a schematic diagram of the back side of the unit module of the present invention; Fig.19 It is a cross-sectional view of a unit module of the present invention.

[0018] Reference numerals: 1. Unit module; 1.1. Secondary keel; 1.2. Flame retardant board; 1.3. Gypsum board; 1.4. Inorganic coating layer; 1.5. Horizontal keel; 1.6. Angle steel hanger; 2. Ceiling steel frame; 2.1. Horizontal guide rail; 2.2. Horizontal brace; 2.3. Reverse diagonal brace; 2.4. Hanging column; 3. Construction unit; 4. Support and hanger; 5. Hoisting unit; 5.1. Driving wheel set; 5.2. Driven wheel set; 5.3. Micro motor; 5.4. Base; 5.5. Upper pulley; 5.6. Lower pulley; 5.7. Toothed belt; 6. Mobile lifting unit; 6.1. Base; 6.2. Universal wheel; 6.3. Connecting rod; 7. Connecting steel frame; 8. Structural plate. DETAILED DESCRIPTION

[0019] like Figure 1-Figure 19 As shown, the present invention discloses a construction method and device for a large-span space ceiling partition unit module 1, the method comprising the following steps: Step 1: Divide the ceiling into multiple unit modules 1 based on the ceiling shape, and draw a layout diagram of the unit module 1. Arrange electromechanical lamps, fire sprinklers, vents, etc. on the layout diagram. The lamps and fire sprinklers are evenly and symmetrically arranged on the unit modules 1, and the vents are evenly and symmetrically arranged on the cover plates between the unit modules 1. On the one hand, uniform lighting is guaranteed, and on the other hand, the overall effect of the ceiling shape is guaranteed.

[0020] The electromechanical pipelines are comprehensively arranged using BIM technology based on design drawings, unit module 1 layout drawings, and ceiling steel frames 2. After BIM modeling is completed, the on-site situation is reviewed and then adjusted according to the actual on-site situation; multiple construction units 3 are divided according to the support and hanger 4 of the electromechanical pipelines, and the electromechanical pipeline construction sequence is formulated according to the arrangement sequence of the construction units 3. At the same time, the ceiling steel frame 2 is constructed as a guide rail system. The ceiling steel frame 2 includes hanging columns 2.4, reverse diagonal braces 2.3, guide rail horizontal bars 2.1, and cross braces 2.2. The hanging columns 2.4 are arranged at equal intervals and fixed at the bottom of the structural plate 8. The bottom end bolts are connected to the guide rail horizontal bars 2.1, and the guide rail horizontal bars 2.1 are connected to the cross braces 2.2 with horizontally equidistant bolts to form a ceiling hanging steel frame system, wherein the reverse diagonal braces 2.3 are connected between the structural plate 8 and the hanging columns 2.4, and the guide rail horizontal bars 2.1 are T-shaped steel horizontal bars.

[0021] Assemble the hoisting unit 5 and the mobile lifting unit 6 in advance. The hoisting unit 5 includes a roller assembly and a lifting assembly. The roller assembly includes a driving wheel group 5.1 and a driven wheel group 5.2. The driving wheel group 5.1 is transmission-connected to the micromotor 5.3. The driving wheel group 5.1 and the driven wheel group 5.2 each include a pair of rollers, and the opposite sides of the rollers are installed on the base 5.4; the lifting assembly includes an upper pulley 5.5, a lower pulley 5.6 and a toothed belt 5.7. The upper pulley 5.5 is installed between the two bases 5.4 and located below the roller assembly, and is used as a fixed pulley. The lower pulley 5.6 is used to be installed on the unit module 1 and used as a movable pulley. One end of the toothed belt 5.7 is connected to the upper pulley 5.5, and the other end bypasses the lower pulley 5.6 and the upper pulley 5.5, and drives the lower pulley 5.6 to move upward through the toothed belt 5.7.

[0022] The base 5.4 is provided with a micro motor 5.3 which is connected to the upper pulley 5.5. The micro motor 5.3 drives the upper pulley 5.5 to rotate, thereby assisting the lifting. The upper pulley 5.5 and the lower pulley 5.6 are provided with teeth which match the toothed belt 5.7.

[0023] During hoisting, a four-point synchronous hoisting method is adopted to ensure that the components can be hoisted to a position close to the ceiling steel frame 2 for installation. A group of hoisting units 5 is installed corresponding to each hoisting point. The two groups of hoisting units 5 along the travel direction of the hoisting units 5 are connected by connecting steel frames 7. The connecting steel frames 7 are assembled with steel sections with fixed-distance holes. The steel sections are bolted to facilitate the hoisting of unit modules 1 and electromechanical pipelines of different projects and different specifications. The design of the hoisting unit 5 takes into account the reduction of its own weight on the one hand, and avoids the conflict of the trolley in the height direction with the cross brace 2.2 of the top ceiling steel frame 2 and the position of the electromechanical pipelines.

[0024] The mobile lifting unit 6 includes a base 6.1 and a universal wheel 6.2 installed on the bottom surface of the base 6.1. The universal wheel 6.2 has a built-in locking function. The lower pulley 5.6 is installed on the outer side of the base 6.1. The mobile lifting unit 6 can be directly installed on the component for lifting, or two groups of mobile lifting units 6 distributed along the length direction of the cross brace 2.2 can be connected by a connecting rod 6.3, and the component is placed on the connecting rod 6.3 for lifting. The cross section of the connecting rod 6.3 is C-shaped, and bolt holes are evenly spaced on the side. The connecting rods 6.3 are connected by C-shaped connectors to lengthen the rods, which can be freely matched and assembled according to the on-site conditions.

[0025] Step 2: On the ground, the electromechanical pipelines are installed in advance on the support and hanger 4 according to the construction unit 3, and then the mobile lifting unit 6 is installed on the side of the support and hanger 4. The construction unit 3 of the assembly number is moved to the installation position by the mobile lifting unit 6. The installation position is positioned, and the lifting unit 5 on the guide rail horizontal rod 2.1 is moved to the corresponding construction unit 3 in place with the help of a laser plumb meter to wait for lifting and installation. The mobile lifting unit 6 is driven to rise to the installation position by pulling the toothed belt 5.7, and then the support and hanger 4 is connected and fixed with the structural plate 8. The connection between the mobile lifting unit 6 and the support and hanger 4 is released, and the lifting unit 5 is moved to the next installation position. The mobile lifting unit 6 transports and lifts the next construction unit 3; after installing a section of construction unit 3, the construction unit 3 module 1 is inserted.

[0026] Step 3: Draw a processing drawing of the unit module 1 according to the layout diagram, set up a processing area on the ground on site, and carry out prefabrication and processing of the unit module 1 and the sealing plate between the unit modules 1. The unit module 1 includes a secondary keel 1.1, a flame retardant board 1.2, a gypsum board 1.3 and an inorganic coating layer 1.4 arranged in sequence from top to bottom, and a transverse keel 1.5 is connected between the secondary keels 1.1; angle steel hangers 1.6 are installed on the end faces of the unit modules 1. In the embodiment of the present application, two angle steel hangers 1.6 are arranged on the front and rear sides of the unit module 1, and four angle steel hangers 1.6 are arranged on the left and right sides; in addition, the unit module 1 also includes reserved openings for electromechanical lighting points and inspection ports, and the sealing plate includes reserved openings for ventilation and smoke exhaust ports. The mobile lifting unit 6 is connected through the connecting rod 6.3, the assembled unit module 1 is placed on the mobile lifting unit 6, and the unit module 1 is moved to the installation position by the mobile lifting unit 6, and the toothed belt 5.7 is used to pass through the upper pulley 5.5 and the lower pulley 5.6 for lifting in place. Each time the unit module 1 is lifted, it is necessary to lift it 200mm off the ground and then check it. After the inspection is correct, it is officially lifted to the ceiling position. After it is in place, the four angle steel hangers 1.6 of the front and rear rows of the unit module 1 are fixed with the ceiling rods. After the mobile lifting unit 6 is placed on the ground, the lifting unit 5 is moved forward to the next lifting position, and finally the eight angle steel hangers 1.6 on both sides of the unit module 1 are fixed.

[0027] In the early stage of this application, comprehensive layout planning is carried out, and the long-span electromechanical pipelines are divided into construction units 3 according to the support brackets 4. Similarly, the long-span ceiling shape is also divided into unit modules 1 for construction. During construction, the ceiling steel frame 2 is first constructed as a guide rail system for hoisting, and the hoisting unit 5 and the mobile lifting unit 6 are assembled for the hoisting construction of the electromechanical pipelines and unit modules 1, and the unit modules 1 are processed on site at the same time. After a part of the electromechanical pipeline construction is completed, when it reaches the water flow insertion point, the ceiling construction is interspersed. The unit module 1 also uses the hoisting unit 5 and the mobile lifting unit 6 to move and hoist the processed unit module 1. The entire installation work is provided by a small mobile lifting vehicle to provide a working surface for the construction personnel.

[0028] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for constructing a large-span space ceiling unit module, characterized in that: The following steps are involved: Step 1: Divide the suspended ceiling into a plurality of unit modules (1) based on the suspended ceiling shape, install guide rail horizontal bars (2.1) below the structural plate (8) and connect cross braces (2.2) between the guide rail horizontal bars (2.1) to form a suspended ceiling steel frame (2), wherein the guide rail horizontal bars (2.1) serve as a fixed frame and guide rail system for the unit modules (1); Step 2: Installing a lifting unit (5) capable of moving along the guide rail horizontal rod (2.1) on the guide rail horizontal rod (2.1), wherein the lifting unit (5) is provided with a lifting component for lifting the unit module (1); Step 3: Assemble the unit module (1), and connect the unit module (1) to the lifting assembly, lift the unit module (1) to the installation position through the lifting assembly, connect the unit module (1) to the guide rail horizontal rod (2.1), release the connection between the lifting assembly and the unit module (1), move the lifting unit (5) along the guide rail horizontal rod (2.1) to the next installation position, and install the next unit module (1).

2. A large-span space ceiling unit module construction method according to claim 1, characterized in that: The guide rail horizontal bar (2.1) is a T-shaped steel horizontal bar, and the flange plate of the guide rail horizontal bar (2.1) is arranged close to the unit module (1); The hoisting unit (5) comprises a roller assembly, wherein the rollers of the roller assembly are respectively arranged on both sides of the web of the guide rail horizontal rod (2.1) and are capable of moving along the flange plate of the guide rail horizontal rod (2.1).

3. A large-span space ceiling unit module construction method according to claim 2, characterized in that: The roller assembly comprises a driving wheel set (5.1) and a driven wheel set (5.2), and the driving wheel set (5.1) is drivingly connected to a micro motor (5.3).

4. A method for constructing a large-span space ceiling unit module according to claim 2, characterized in that: The lifting assembly comprises an upper pulley (5.5), a lower pulley (5.6) and a toothed belt (5.7); a base (5.4) is installed on the outer side of the roller assembly; the roller of the roller assembly is installed on the base (5.4); the upper pulley (5.5) is installed between the two bases (5.4) and is located below the roller assembly; the lower pulley (5.6) is used to be installed on the unit module (1) and used as a movable pulley; the toothed belt (5.7) passes through the upper pulley (5.5) and the lower pulley (5.6), and drives the lower pulley (5.6) to move upwards through the toothed belt (5.7).

5. A method for constructing a large-span space ceiling unit module according to claim 4, characterized in that: The unit module (1) is hoisted at four points, with each hoisting point correspondingly installed with a set of hoisting units (5) and a lifting assembly, and two sets of hoisting units (5) along the travel direction of the hoisting units (5) are connected via a connecting steel frame (7).

6. A method for constructing a large-span space ceiling unit module according to claim 4, characterized in that: After the unit module (1) is assembled, a mobile lifting unit (6) is installed on the unit module (1), and the unit module (1) is moved to a lifting position by the mobile lifting unit (6), and then lifted; the mobile lifting unit (6) comprises a base (6.1) and a universal wheel (6.2) installed on the bottom surface of the base (6.1), the lower pulley (5.6) is installed on the outer side of the base (6.1), and two groups of mobile lifting units (6) arranged side by side are connected by a connecting rod (6.3), and the unit module (1) is placed on the base (6.1).

7. A large-span space ceiling unit module construction method according to claim 1, characterized in that: Before the unit module (1) is installed, the electromechanical pipelines are installed, and a plurality of construction units (3) are divided according to the support brackets (4) of the electromechanical pipelines. After the construction units (3) are assembled, the hoisting units (5) cooperate with the lifting components to hoist the construction units (3). After the construction units (3) are constructed for a period of time, the installation of the unit modules (1) is interspersed.

8. The method for constructing a large-span space ceiling unit module according to claim 1, characterized in that: The unit module (1) comprises secondary keels (1.1), a flame retardant board (1.2), a gypsum board (1.3) and an inorganic coating layer (1.4) which are arranged in sequence from top to bottom, and a transverse keel (1.5) is connected between the secondary keels (1.1); An angle steel hanger (1.6) is installed on the end surface of each unit module (1), and the angle steel connector is connected to the guide rail horizontal rod (2.1).

9. A device for constructing the large-span space ceiling partition unit module (1) according to any one of claims 1 to 8, characterized in that: It comprises a hoisting unit (5) and a lifting assembly, wherein the hoisting unit (5) comprises a pair of roller assemblies, and bases (5.4) are respectively installed on opposite sides of the two roller assemblies; The lifting assembly comprises an upper pulley (5.5), a lower pulley (5.6) and a toothed belt (5.7); the upper pulley (5.5) is installed between two bases (5.4) and is located below the roller assembly; the lower pulley (5.6) is used to be installed on the unit module (1) and used as a movable pulley; the toothed belt (5.7) passes through the upper pulley (5.5) and the lower pulley (5.6), and drives the lower pulley (5.6) to move upwards through the toothed belt (5.7).

10. The device according to claim 9, characterized in that It also comprises a mobile lifting unit (6), the mobile lifting unit (6) comprising a base (6.1) and a universal wheel (6.2) mounted on the bottom surface of the base (6.1), and the lower pulley (5.6) is mounted on the outer side of the base (6.1).

Citation Information

Patent Citations

  • Pulley yoke, concealed double-slideway-style sliding rails and concealed type sliding rail system

    CN106639116A

  • Construction method for suspended ceiling of empty space

    CN111794512A

  • Integral lifting installation construction method for steel structure inclined strut ceiling joist

    CN119122277A

  • Movable suspended ceiling

    CN210798023U

  • Unit type anodic aluminum oxide plate suspended ceiling mounting structure

    CN215858518U