Self-climbing operation platform for construction of concrete tower drum of wind turbine
By designing a self-climbing operation platform for wind turbine concrete tower construction, and using automatic lifting and connecting components, the problems of multiple lifting operations during construction are solved, construction efficiency and safety are improved, and dependence on lifting equipment is reduced.
Patent Information
- Application Number
- CN202510190926.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-20
- Publication Date
- 2025-04-18
AI Technical Summary
During the construction of existing wind turbines, multiple lifting operations are required during the lifting process of concrete towers, which increases the construction cycle, increases safety hazards and equipment utilization costs, and is complex and has high risks.
A self-climbing operation platform for construction of a wind turbine concrete tower is designed, including a lower platform assembly, an upper platform assembly and a lifting drive assembly. It is detachably connected to the concrete tower through the first and second connecting components, and combines the fence and safety cage to realize automatic lifting and reduce the number of lifting times.
The platform can efficiently lift and lower the platform in complex construction environments, reduce dependence on large lifting equipment, improve construction efficiency, reduce the complexity and safety risks of lifting operations, and optimize the construction environment.
Smart Images

Figure CN119843856A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind turbine generator sets, and in particular to a self-climbing operating platform for the construction of a wind turbine concrete tower. Background Art
[0002] The construction of wind turbine towers is a key link in the installation of wind power generation facilities, especially the construction process of concrete towers, which usually requires the use of large-scale lifting equipment to hoist each section of the tower. In traditional construction methods, after each section of the tower is hoisted, a crane is needed to lift the operating platform to the height of the new tower. This process not only increases the construction period, but also increases safety hazards and equipment utilization costs. The hoisting process usually needs to be operated in a complex construction environment, and because the platform lifting and hoisting need to be coordinated, the cumbersome operation and high risk put higher demands on construction personnel. With the development of the wind power industry, higher requirements are put forward for construction efficiency, construction period and safety. Therefore, seeking a new operating platform that can reduce the number of hoisting times, improve construction efficiency and improve safety has become an urgent need in the industry. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a self-climbing operating platform for wind turbine concrete tower construction that does not require multiple lifting operations, is conducive to improving construction efficiency and construction safety, reduces dependence on large lifting equipment, and optimizes the construction environment.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0005] A self-climbing operating platform for wind turbine concrete tower construction includes a lower platform assembly, an upper platform assembly, and a lifting drive assembly for driving the lower platform assembly and the upper platform assembly to rise and fall relative to each other. The lower platform assembly is provided with a first connecting assembly for detachably connecting to the concrete tower and a fence for climbing to the upper platform assembly. The upper platform assembly is provided with a second connecting assembly for detachably connecting to the concrete tower.
[0006] As a further improvement of the above technical solution: the lower platform assembly is also provided with a safety cage.
[0007] As a further improvement of the above technical solution: the safety cage is provided with an openable and closable safety door.
[0008] As a further improvement of the above technical solution: the lower platform assembly includes a lower platform, the fence is arranged along the edge of the lower platform, the safety cage is arranged in the middle of the lower platform, the upper platform assembly includes an annular upper platform, the upper platform is located on the inner side of the fence, and the safety cage is located on the inner side of the upper platform.
[0009] As a further improvement of the above technical solution: the lifting drive assembly includes a rack arranged on the lower platform, a rotating drive member arranged on the upper platform and a gear connected to the rotating drive member, the rack is located on the inner side of the upper platform, and the gear is meshed with the rack.
[0010] As a further improvement of the above technical solution: the lifting drive assembly is provided with two groups and is arranged oppositely on two sides of the safety cage.
[0011] As a further improvement of the above technical solution: the first connecting assembly includes a plurality of lower chains, and the plurality of lower chains are arranged at intervals along the circumference of the lower platform assembly.
[0012] As a further improvement of the above technical solution: the second connecting assembly includes a plurality of upper locking chains, and the plurality of upper locking chains are arranged at intervals along the circumference of the upper platform assembly.
[0013] Compared with the prior art, the advantages of the present invention are:
[0014] The self-climbing operating platform for wind turbine concrete tower construction disclosed in the present invention can be fixed to the concrete tower by the first connecting assembly and the second connecting assembly respectively, and can be automatically lifted and lowered efficiently in a complex construction environment in cooperation with the driving force of the lifting drive assembly, eliminating the need for multiple lifting operations in traditional construction, reducing the reliance on large lifting equipment, improving the efficiency of concrete tower construction, and reducing the complexity and safety risks of lifting operations. The fence can protect the safety of the workers on the lower platform assembly on the one hand, and can also serve as a convenient climbing passage, making it convenient for the workers to climb to the upper platform assembly, thereby optimizing the use function of the platform; the upper platform assembly is not only an important component for achieving self-climbing, but can also effectively block sunlight, etc., thereby improving the construction environment of the workers on the lower platform assembly and providing more comfortable working conditions.
[0015] Other features and advantages of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a three-dimensional structural schematic diagram of a self-climbing operating platform for wind turbine concrete tower construction according to the present invention.
[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of the lower platform assembly in the present invention.
[0018] Figure 3 It is a schematic diagram of the three-dimensional structure of the upper platform assembly in the present invention.
[0019] Figure 4It is a schematic diagram of the three-dimensional structure of the present invention when it is in the first tower section position.
[0020] Figure 5 This is a schematic diagram of the three-dimensional structure after the second section of the tower is hoisted.
[0021] Figure 6 It is a schematic diagram of the three-dimensional structure when the lower platform assembly in the present invention rises to the second tower section.
[0022] Figure 7 It is a schematic diagram of the three-dimensional structure of the upper platform assembly after it is raised in the present invention.
[0023] The symbols in the figure represent:
[0024] 10. Lower platform assembly; 11. Lower platform; 12. Fence; 13. Safety cage; 14. Rack; 15. Lower chain;
[0025] 20. Upper platform assembly; 21. Upper platform; 22. Rotating drive member; 23. Gear; 24. Upper chain;
[0026] 30. Concrete tower. DETAILED DESCRIPTION
[0027] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] In the present invention, unless otherwise clearly specified and limited, the terms "assemble", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0031] Figures 1 to 3 An embodiment of a self-climbing operating platform for wind turbine concrete tower construction of the present invention is shown. The self-climbing operating platform for wind turbine concrete tower construction of this embodiment includes a lower platform assembly 10, an upper platform assembly 20, and a lifting drive assembly for driving the lower platform assembly 10 and the upper platform assembly 20 to rise and fall relative to each other. The lower platform assembly 10 is provided with a first connecting assembly for detachably connecting to a concrete tower 30 and a fence 12 for climbing to the upper platform assembly 20, and the upper platform assembly 20 is provided with a second connecting assembly for detachably connecting to the concrete tower 30.
[0032] The self-climbing operating platform for wind turbine concrete tower construction in this embodiment, the lower platform assembly 10 and the upper platform assembly 20 can be fixed to the concrete tower 30 through the first connecting assembly and the second connecting assembly respectively, and can be automatically lifted and lowered efficiently in a complex construction environment with the driving force of the lifting drive assembly, eliminating the need for multiple lifting operations in traditional construction, reducing the reliance on large lifting equipment, improving the efficiency of concrete tower 30 construction, and reducing the complexity and safety risks of lifting operations. The fence 12 can protect the safety of the workers on the lower platform assembly 10 on the one hand, and can also serve as a convenient climbing passage, making it convenient for the workers to climb to the upper platform assembly 20, thereby optimizing the use function of the platform; the upper platform assembly 20 is not only an important component for achieving self-climbing, but can also effectively block sunlight, etc., thereby improving the construction environment of the workers on the lower platform assembly 10 and providing more comfortable working conditions.
[0033] Furthermore, in this embodiment, the lower platform assembly 10 is further provided with a safety cage 13. The safety cage 13 can be used as a protective facility under special circumstances, which can effectively prevent workers from falling during the lifting process, further improving the safety guarantee in high-altitude operations.
[0034] As a preferred embodiment, the safety cage 13 is provided with a closable safety door (not shown in the figure). After the staff enters the safety cage 13, the safety door is closed to form a relatively closed protection structure, further improving safety.
[0035] Further, in this embodiment, the lower platform assembly 10 includes a lower platform 11, the fence 12 is arranged along the edge of the lower platform 11, the safety cage 13 is arranged in the middle of the lower platform 11, and the upper platform assembly 20 includes a ring-shaped upper platform 21, the upper platform 21 is located on the inner side of the fence 12, and the safety cage 13 is located on the inner side of the upper platform 21. This arrangement ensures that the upper platform 21 will not hinder the fence 12 and the safety cage 13 from rising and falling with the lower platform 11, and the structure is reasonable and effective.
[0036] Furthermore, in this embodiment, the lifting drive assembly includes a rack 14 provided on the lower platform 11, a rotating drive member 22 provided on the upper platform 21, and a gear 23 connected to the rotating drive member 22, the rack 14 is located on the inner side of the upper platform 21, and the gear 23 is meshed with the rack 14. The rotating drive member 22 can be, for example, an electric motor or a hydraulic motor, which can drive the gear 23 to rotate forward and reverse. When the upper platform 21 is connected and fixed to the concrete tower 30 through the second connecting assembly, the rotating driving member 22 drives the gear 23 to rotate, which can drive the rack 14 to rise, and the rack 14 then drives the lower platform 11, the fence 12 and the safety cage 13 to rise as a whole; on the contrary, when the lower platform 11 is connected and fixed to the concrete tower 30 through the first connecting assembly, the rotating driving member 22 drives the gear 23 to rotate in the opposite direction, which can rise along the rack 14, and then drives the upper platform 21 to rise as a whole. By controlling the rotation speed and the gear transmission ratio, it is possible to achieve efficient and accurate lifting (including lifting speed and position, etc.) in a complex construction environment, ensuring the safety and reliability of the platform during the construction process. Of course, in other embodiments, the relative lifting of the lower platform assembly 10 and the upper platform assembly 20 can also be achieved with the help of a cylinder, an oil cylinder, etc.
[0037] As a preferred embodiment, two groups of lifting drive components are provided and arranged relatively on both sides of the safety cage 13 , and the structure has good symmetry and balance, which is conducive to achieving smooth and stable lifting of the lower platform component 10 and the upper platform component 20 .
[0038] As a preferred embodiment, the first connection assembly includes a plurality of lower chains 15, which are arranged at intervals along the circumference of the lower platform assembly 10 (specifically, arranged at intervals along the circumference of the lower platform 11). Connectors such as hooks and rings can be provided on the inner wall of the concrete tower 30, and each lower chain 15 is connected to a corresponding hook, ring or other connector, respectively, so that the lower platform 11 can be reliably fixed and easily disassembled.
[0039] As a preferred embodiment, the second connection assembly includes a plurality of upper chains 24, which are arranged at intervals along the circumference of the upper platform assembly 20 (specifically, arranged at intervals along the circumference of the upper platform 21). Each upper chain 24 is connected to a corresponding hook, ring or other connecting member on the inner wall of the concrete tower 30, so that the upper platform 21 can be effectively fixed and easily disassembled.
[0040] like Figures 4 to 7 As shown, the process of self-climbing of the self-climbing operating platform for wind turbine concrete tower construction of the present invention comprises the following steps:
[0041] 1) If Figure 4As shown, when the entire operating platform is in the first section of the concrete tower 30, the entire operating platform is fixed to the inner wall of the first section of the concrete tower 30 through the lower chain 15. In this state, the staff can complete the relevant construction work of the first section of the concrete tower 30 on the lower platform 11. The upper platform 21 can effectively block the sunlight, etc., and provide a cool working environment for the staff.
[0042] 2) If Figure 5 As shown, after the relevant construction work of the first section concrete tower 30 is completed, the second section tower concrete 30 is hoisted using a crane. The staff climbs to the height of the second section concrete tower 30 through the fence 12 and fixes the upper chain 24 to the inner wall of the second section concrete tower 40.
[0043] 3) If Figure 6 As shown, after the upper chain 24 is fixed, the connection between the lower chain 15 and the first section of the concrete tower 30 is released. The staff enters the safety cage 13, closes the safety door, starts the rotary drive 22, and uses the gear 23 and rack 14 mechanism to pull the lower platform 11 to the height of the upper platform 21.
[0044] 4) The staff enters the upper platform 21, fixes the lower chain 15 to the inner wall of the second concrete tower 30, and releases the connection of the upper chain 24. After the operation is completed, the staff re-enters the safety cage 13 and closes the safety door.
[0045] 5) If Figure 7 As shown, the rotary drive member 22 rotates in the opposite direction, and the upper platform 21 is lifted to a predetermined height through the gear 23 and the rack 14 mechanism. After completion, the workers enter the lower platform 11 to carry out the relevant construction work of the second section of the concrete tower 30. The entire lifting process needs to ensure that the platform is lifted and lowered smoothly and remains stable, so as to ensure the safety of the workers.
[0046] 6) After the relevant construction work of the second section tower 30 is completed, repeat steps 2 to 5 until the construction of all concrete towers 30 is completed.
[0047] Through the above steps, the self-climbing operating platform for wind turbine concrete tower construction of the present invention can significantly improve the efficiency of concrete tower 30 construction, reduce dependence on lifting equipment, reduce safety risks during construction, optimize the working environment, and provide an efficient and safe solution for wind turbine tower construction.
[0048] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the technical content disclosed above without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.
Claims
1. A self-climbing operating platform for wind turbine concrete tower construction, characterized in that: The invention comprises a lower platform assembly (10), an upper platform assembly (20) and a lifting drive assembly for driving the lower platform assembly (10) and the upper platform assembly (20) to lift relative to each other, wherein the lower platform assembly (10) is provided with a first connection assembly for detachably connecting to a concrete tower (30) and a fence (12) for climbing to the upper platform assembly (20), and the upper platform assembly (20) is provided with a second connection assembly for detachably connecting to the concrete tower (30).
2. The self-climbing operating platform for wind turbine concrete tower construction according to claim 1 is characterized in that: The lower platform assembly (10) is also provided with a safety cage (13).
3. The self-climbing operating platform for wind turbine concrete tower construction according to claim 2 is characterized in that: The safety cage (13) is provided with a safety door which can be opened and closed.
4. The self-climbing operating platform for wind turbine concrete tower construction according to claim 2 is characterized in that: The lower platform assembly (10) comprises a lower platform (11), the fence (12) is arranged along the edge of the lower platform (11), the safety cage (13) is arranged in the middle of the lower platform (11), and the upper platform assembly (20) comprises an annular upper platform (21), the upper platform (21) is located on the inner side of the fence (12), and the safety cage (13) is located on the inner side of the upper platform (21).
5. The self-climbing operating platform for wind turbine concrete tower construction according to claim 4 is characterized in that: The lifting drive assembly comprises a rack (14) arranged on the lower platform (11), a rotating drive member (22) arranged on the upper platform (21), and a gear (23) connected to the rotating drive member (22); the rack (14) is located on the inner side of the upper platform (21), and the gear (23) is meshed with the rack (14).
6. The self-climbing operating platform for wind turbine concrete tower construction according to claim 5 is characterized in that: The lifting drive components are provided in two groups and are arranged oppositely on two sides of the safety cage (13).
7. The self-climbing operating platform for wind turbine concrete tower construction according to any one of claims 1 to 6, characterized in that: The first connection assembly comprises a plurality of lower chains (15), and the plurality of lower chains (15) are arranged at intervals along the circumference of the lower platform assembly (10).
8. The self-climbing operating platform for wind turbine concrete tower construction according to any one of claims 1 to 6, characterized in that: The second connection assembly includes a plurality of upper lock chains (24), and the plurality of upper lock chains (24) are arranged at intervals along the circumference of the upper platform assembly (20).
Citation Information
Cited By
Construction operation platform for tower drum of mixed tower
CN121381893A