Shield tunneling machine simulation practical operation test scoring method and system, equipment and medium

By classifying and grouping the scoring items of the shield tunneling machine simulation exercise test, multiple answer sequences are generated and scored, the existing scoring methods are solved, and accurate and efficient real-time scoring is achieved.

CN119851534AActive Publication Date: 2025-04-18CHINA RAILWAY CONSTR HEAVY IND
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202510097185.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-22
Publication Date
2025-04-18
Estimated Expiration
2045-01-22

AI Technical Summary

Technical Problem

The existing shield tunneling machine simulation test scoring method is inefficient and inaccurate, especially when candidates experience irrelevant operations or re-answered questions from a certain step, it is difficult to accurately score.

Method used

By obtaining the current test questions and answers, classifying the scoring items, collecting and grouping the operation records of the candidates, generating multiple answer sequences according to the order of the scoring items, and scoring each sequence, selecting the highest score as the candidate's score.

Benefits of technology

It realizes accurate scoring of the actual operation test of the shield tunneling machine, can handle irrelevant operations and re-answering, improves scoring efficiency, and realizes instant scoring without human intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119851534A_ABST
    Figure CN119851534A_ABST
Patent Text Reader

Abstract

The invention discloses a shield tunneling machine simulation practical operation test scoring method and system, equipment and a medium, and the method comprises the steps: carrying out the classification processing of all scoring items in answers, obtaining a plurality of scoring item types, carrying out the grouping of an operation record sequence according to the scoring item types, and carrying out the classification processing of the scoring items in the answers, and traversing the operation record grouping sequence according to the grading item sequence to generate a plurality of answer sequences, so that the answer operation records of the examinee form the plurality of answer sequences in a grouping, arranging and combining manner, redundant operations are accurately eliminated, and even if the examinee answers the question from a certain step again after unrelated operations occur or operation errors are found, the answer efficiency is improved. The answer score of the examinee can still be accurately scored, and instant scoring can be realized after the examination of each question is completed without human intervention, so that the scoring efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of practical operation examination scoring, and in particular, to a shield tunneling machine simulation practical operation examination scoring method and system, electronic equipment, and a computer-readable storage medium. Background Art

[0002] In recent years, there are more and more tunnel projects, and shield construction is widely used in the tunnel industry. Due to the complex structure of shield equipment and complex geological conditions, shield drivers must undergo professional training before taking up their posts, and shield tunneling machine simulation training systems have also been applied. The shield tunneling machine simulation training system allows trainers to simulate the construction site to train and test shield drivers without entering the construction site. The shield tunneling machine simulation training test is mainly a practical test, which has the following characteristics compared to conventional practical tests: 1. The test questions are completed in multiple steps, and the operation steps have a sequence; 2. The same step in the question may appear multiple times, and the corresponding parameters are different each time; 3. During the practical test, candidates may have irrelevant operations and may have to answer questions from a certain step again after discovering an operation error; therefore, how to quickly and accurately score the shield tunneling machine simulation practical test is a technical problem in this field.

[0003] Conventional shield tunneling machine simulation training test scoring methods usually adopt manual scoring. For example, patent CN105513451B discloses a shield tunneling machine simulation training system, and examiners conduct on-site inspections and scoring through examiner evaluation stations. However, this manual scoring method is time-consuming and labor-intensive, has low efficiency, and the scoring results are greatly affected by the examiner's subjective judgment, making it difficult to ensure the accuracy and fairness of the scoring. In addition, there are also some practical test scoring methods that compare the operation steps with the corresponding scoring items in order, and calculate the test results based on the comparison results. For example, patent CN110634346B discloses a gas operation training assessment method, which collects the signals of the detection devices of each assessment unit during the candidate's operation, compares the operation steps with the corresponding scoring items in order, and calculates the candidate's score based on the comparison results. However, this scoring method uses the order of operating steps as the basic scoring rule, and examines the consistency and rationality of the operating steps. In the shield tunneling machine simulation training test, candidates often make irrelevant operations when answering questions, and have to start from a certain step again after discovering an operating error. Therefore, this scoring method will have the problem of inaccurate scoring when scoring the shield tunneling machine simulation training test. Summary of the invention

[0004] The present invention provides a shield tunneling machine simulation practical operation test scoring method and system, electronic equipment, and computer-readable storage medium, which can accurately score the examinee when he / she has irrelevant operations in answering questions or discovers an operation error and then starts to answer questions again from a certain step, without the need for human intervention, thereby improving scoring efficiency.

[0005] According to one aspect of the present invention, a shield tunneling machine simulation practical operation test scoring method is provided, comprising the following contents:

[0006] Get the current test questions and answers;

[0007] Classify all scoring items in the answer to obtain multiple scoring item categories;

[0008] Collect the operation records of the examinees answering questions and record the operation time to obtain the operation record sequence;

[0009] The operation record sequence is grouped according to the type of scoring item, and invalid operation records are eliminated to obtain the operation record grouping sequence;

[0010] Traverse the operation record grouping sequence according to the scoring items in the answer order to obtain multiple answer sequences;

[0011] Each answer sequence is scored and the highest score is selected as the candidate's score.

[0012] Furthermore, the process of scoring each answer sequence includes the following:

[0013] The order of operation records in each answer sequence is determined according to the operation time, and then the score of each operation record is determined according to the scoring criteria of the scoring item. The scores of all operation records are added together to obtain the score of the answer sequence.

[0014] Furthermore, if the scoring criteria for a certain scoring item have no order requirements, points can be obtained as long as there are corresponding operation records; if the scoring criteria for a certain scoring item have order requirements, the operation records must meet the operation order requirements to obtain points; if the scoring criteria for a certain scoring item also include parameter setting ranges, the parameters in the operation records must also meet the requirements to obtain points.

[0015] Furthermore, the process of traversing the operation record grouping sequence according to the scoring items in the answer to obtain multiple answer sequences includes the following:

[0016] According to the order of the scoring items in the answer, the operation records for the answer question content are selected in the operation record grouping sequence and combined to generate a complete answer sequence. If there are multiple operation records for the same answer content, an answer sequence is generated for each operation record.

[0017] Furthermore, if there is no operation record for a certain scoring item corresponding to the answer question content, the operation record corresponding to the scoring item in the answer sequence is set to empty.

[0018] Furthermore, after collecting the operation records of the candidates' answers and recording the operation time, if there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold. If it is less than the threshold, the redundant operation records and their operation time are eliminated, and only one operation record and its operation time are retained.

[0019] In addition, the present invention also provides a shield tunneling machine simulation practical operation test scoring system, comprising:

[0020] The test question and answer acquisition module is used to obtain the current test question and answer;

[0021] A rating item classification module is used to classify all rating items in the answer to obtain multiple rating item categories;

[0022] An operation record collection module is used to collect the operation records of the examinees' answers and record the operation time to obtain an operation record sequence;

[0023] An operation record grouping module is used to group the operation record sequence according to the type of scoring item and remove invalid operation records to obtain an operation record grouping sequence;

[0024] An answer sequence generation module is used to traverse the operation record grouping sequence according to the scoring items in the answer sequence to obtain multiple answer sequences;

[0025] The candidate score scoring module is used to score each answer sequence and select the highest score as the candidate score.

[0026] Furthermore, the operation record collection module is also used to deduplicate the operation records after collecting the operation records of the examinees' answers and recording the operation time. If there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold. If it is less than the threshold, redundant operation records and their operation times are eliminated, and only one operation record and its operation time are retained.

[0027] In addition, the present invention also provides an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the above method by calling the computer program stored in the memory.

[0028] In addition, the present invention also provides a computer-readable storage medium for storing a computer program for scoring a shield tunneling machine simulation practical examination, and the computer program executes the steps of the method described above when running on a computer.

[0029] The present invention has the following beneficial effects:

[0030] The shield tunneling machine simulation practical test scoring method of the present invention classifies all scoring items in the answer to obtain multiple scoring item types, then groups the operation record sequence according to the scoring item type, and traverses the operation record grouping sequence according to the scoring item order to generate multiple answer sequences, so that the operation records of the examinee's answers are grouped, arranged, and combined to form multiple answer sequences, and redundant operations are accurately eliminated. Even if irrelevant operations occur when the examinee answers the questions or the examinee finds an operation error and then answers the question again from a certain step, the examinee's answer results can still be accurately scored, and instant scoring can be achieved after each question is completed, without human intervention, thereby improving scoring efficiency.

[0031] In addition, the shield tunneling machine simulation practical operation test scoring system of the present invention also has the above advantages.

[0032] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0034] Figure 1 It is a flowchart of a shield tunneling machine simulation practical operation test scoring method according to a preferred embodiment of the present application;

[0035] Figure 2 is a schematic diagram of test questions and answers collected in one embodiment of the present application;

[0036] Figure 3 yes Figure 2 A schematic diagram of the scoring item types obtained after the answers in the question are classified into scoring items;

[0037] Figure 4 is a schematic diagram of an operation record sequence collected in an embodiment of the present application;

[0038] Figure 5 yes Figure 4 A schematic diagram of an operation record grouping sequence obtained after the operation record sequence in is grouped and invalid operation records are removed;

[0039] Figure 6 is based on Figure 5 A schematic diagram of multiple answer sequences generated by the operation record grouping sequence in;

[0040] Figure 7 Yes Figure 6 Schematic diagram of the scoring result of scoring the nth answer sequence in ;

[0041] Figure 8 It is a schematic diagram of the module structure of a shield tunneling machine simulation practical examination scoring system according to another embodiment of the present application. DETAILED DESCRIPTION

[0042] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0043] Reference Figure 1 The preferred embodiment of the present application provides a shield tunneling machine simulation practical test scoring method, including the following contents:

[0044] Step S1: Get the current test questions and answers;

[0045] Step S2: classify all scoring items in the answer to obtain multiple scoring item categories;

[0046] Step S3: Collect the operation records of the examinee's answers and record the operation time to obtain an operation record sequence;

[0047] Step S4: grouping the operation record sequence according to the type of scoring item, and removing invalid operation records to obtain an operation record grouping sequence;

[0048] Step S5: traverse the operation record grouping sequence according to the scoring items in the answer to obtain multiple answer sequences;

[0049] Step S6: Score each answer sequence and select the highest score as the candidate's score.

[0050] It can be understood that the shield tunneling machine simulation practical test scoring method of this embodiment, after obtaining the current test question and answer, first classifies all the scoring items in the answer to obtain multiple scoring item types; then after collecting the operation record sequence, the operation record sequence is grouped according to the scoring item type, and invalid operation records are eliminated to obtain the operation record grouping sequence; then, the operation record grouping sequence is traversed according to the scoring item order to generate multiple answer sequences; finally, each answer sequence is scored, and the highest score is selected as the candidate's score. Therefore, the shield tunneling machine simulation practical test scoring method of the present invention, by classifying all the scoring items in the answer to obtain multiple scoring item types, then grouping the operation record sequence according to the scoring item type, and traversing the operation record grouping sequence according to the scoring item order to generate multiple answer sequences, so that the operation records of the candidate's answer form multiple answer sequences in a grouping, arrangement, and combination manner, accurately eliminating redundant operations, even if the candidate has irrelevant operations when answering the question or finds an operation error and then answers the question again from a certain step, the candidate's answer score can still be accurately scored, and each question can be scored immediately after the test is completed, without human intervention, thereby improving the scoring efficiency.

[0051] It can be understood that in step S1, the current test questions and answers of the examinee are obtained from the shield tunneling machine simulation practical test system. For example, in one embodiment of the present invention, the current test questions and answers of the examinee are as follows: Figure 2 As shown, the test question is: start the cutterhead, the cutterhead rotates forward, starts at a low speed of 0.5r / min~1r / min, and finally runs stably at 3r / min. That is, the examinee needs to perform simulation operations on the shield tunneling machine simulation practical test system to start the cutterhead of the shield tunneling machine at a speed of 0.5r / min~1r / min, and make the cutterhead rotate forward, and finally control the cutterhead to run stably at a speed of 3r / min; and the answer to this test question includes eight operating steps, each of which is scored 1 point, which are switching to the cutterhead interface, starting the water pump, starting the gear oil, setting the cutterhead speed to 0.5r / min~1r / min, selecting gear 1, switching the cutterhead rotation direction to forward, starting the motor and setting the cutterhead speed to 3r / min.

[0052] It can be understood that in step S2, the answer includes multiple scoring items, some of which have the same answer content and may appear multiple times, but the corresponding parameters are different each time. For example, Figure 2 The scoring item - cutter speed setting appears twice, but the speeds are different. Therefore, the present invention first classifies all scoring items, removes duplicate scoring items, and obtains multiple scoring item types, for example, Figure 2 After the answers in the answer are classified into rating items, the types of rating items obtained are as follows Figure 3 shown.

[0053] It can be understood that in step S3, the operation records of the examinee operating all the test units in the shield tunneling machine simulation practical test system are collected, and the operation time corresponding to each operation record is recorded to obtain an operation record sequence. For example, in one embodiment of the present invention, the collected operation record sequence is as follows: Figure 4 shown.

[0054] Optionally, in step S3, after collecting the operation records of the examinee's answers and recording the operation time, if there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold, for example, less than 5s. If it is less than the threshold, it is considered that the examinee has made an erroneous operation or repeated operation in a short period of time. In this case, redundant operation records and their operation time are eliminated, and only one operation record and its operation time are retained to reduce the number of subsequent operation record permutations and combinations, thereby reducing the amount of calculation, which is conducive to improving scoring efficiency.

[0055] It can be understood that in step S4, the operation record sequence collected in step S3 is grouped according to the scoring item types obtained by classification in step S2, and invalid operation records are removed, wherein invalid operation records refer to operation records that are not included in the scoring item types, thereby obtaining an operation record grouping sequence. Figure 3 The rating item types in Figure 4 After grouping the operation record sequence collected in , and removing invalid operation records, the obtained operation record grouping sequence is as follows Figure 5 shown.

[0056] It can be understood that in step S5, the operation record grouping sequence is traversed according to the scoring items in the answer, so that the operation records of the examinee's answer are grouped, arranged, and combined to form multiple answer sequences. The process of traversing the operation record grouping sequence according to the scoring items in the answer to obtain multiple answer sequences includes the following:

[0057] According to the order of the scoring items in the answer, the operation records for the answer question content are selected in the operation record grouping sequence and combined to generate a complete answer sequence. If there are multiple operation records for the same answer content, an answer sequence is generated for each operation record.

[0058] Specifically, for Figure 5 The operation records in the grouping sequence are based on Figure 2 The order of scoring items for the answers is Figure 5In the answer question, select and combine the operation records of the answer question content in turn to generate a complete answer sequence as the scoring sequence. Among them, if there are multiple operation records for the same answer question content, each operation record will generate an answer sequence. For example, if the answer question content "starting gear oil" corresponds to two operation records (with different operation times), two answer sequences will be generated; or, if the answer question content "knife head speed setting" corresponds to three operation records, three answer sequences will be generated. Finally, the multiple scoring sequences obtained are as follows Figure 6 shown.

[0059] In addition, if there is no operation record for a certain scoring item corresponding to the answer question content, the operation record corresponding to the scoring item in the answer sequence is set to empty.

[0060] It can be understood that in step S6, for the multiple answer sequences obtained in step S5, i.e., the scoring sequences, each answer sequence is scored, and the highest score is selected as the candidate's score. The process of scoring each answer sequence includes the following:

[0061] The order of operation records in each answer sequence is determined based on the operation time, and then the score of each operation record is determined based on the scoring criteria of the scoring item, and the scores of all operation records are added together to obtain the score of the answer sequence. Among them, in the scoring criteria of the scoring items, if the scoring criteria of a scoring item do not have a sequence requirement, the corresponding operation record can be scored; if the scoring criteria of a scoring item have a sequence requirement, the operation record must meet the operation sequence requirement to score, and if the operation sequence does not meet the requirement, no score will be scored; if the scoring criteria of a scoring item also includes a parameter setting range, the parameters in the operation record must also meet the requirement to score.

[0062] For example, for Figure 6 When scoring the scoring sequence n in , the scoring result is as follows Figure 7 As shown, the details are as follows:

[0063] 1) Switch to the knife disk interface, answer the questions in the required content and order, and get 1 point;

[0064] 2) Press the "Start Water Pump" button. If the answer content and order meet the requirements, you will get 1 point;

[0065] 3) Press the "Gear Oil Start" button. If the answer content and order meet the requirements, you will get 1 point;

[0066] 4) The cutter speed is set to 0.8r / min, which meets the parameter setting range of 0.5-1r / min, and the sequence meets the requirements, and 1 point is awarded;

[0067] 5) If the gear switch is turned to gear 1 and the answer content and order meet the requirements, 1 point will be awarded;

[0068] 6) The direction of rotation of the cutter head is switched to forward rotation. The answer content meets the requirements, but the answer order is not satisfied, and 0 points are awarded;

[0069] 7) Press the "Start Motor" button. If the answer content and order meet the requirements, you will get 1 point;

[0070] 8) The cutter speed is set to 3r / min, which meets the 3r / min parameter setting requirements, and the order meets the requirements, and 1 point is awarded;

[0071] 9) Calculate the sequence score. The answer sequence score is 7 points.

[0072] It can be understood that the present invention forms multiple answer sequences by grouping, arranging and combining the operation records of the examinees' answers, and then scores each answer sequence. This method is compatible with the scoring of sequential practical examinations and the scoring of non-sequential practical examinations, thereby improving the applicability of the scoring algorithm.

[0073] like Figure 8 As shown, another embodiment of the present invention further provides a shield tunneling machine simulation practical operation test scoring system, preferably using the shield tunneling machine simulation practical operation test scoring method as described above, the system comprising:

[0074] The test question and answer acquisition module is used to obtain the current test question and answer;

[0075] A rating item classification module is used to classify all rating items in the answer to obtain multiple rating item categories;

[0076] An operation record collection module is used to collect the operation records of the examinees' answers and record the operation time to obtain an operation record sequence;

[0077] An operation record grouping module is used to group the operation record sequence according to the type of scoring item and remove invalid operation records to obtain an operation record grouping sequence;

[0078] An answer sequence generation module is used to traverse the operation record grouping sequence according to the scoring items in the answer sequence to obtain multiple answer sequences;

[0079] The candidate score scoring module is used to score each answer sequence and select the highest score as the candidate score.

[0080] It can be understood that the shield tunneling machine simulation practical test scoring system of this embodiment, after obtaining the current test question and answer, first classifies all the scoring items in the answer to obtain multiple scoring item types; then after collecting the operation record sequence, the operation record sequence is grouped according to the scoring item type, and invalid operation records are eliminated to obtain the operation record grouping sequence; then, the operation record grouping sequence is traversed according to the scoring item order to generate multiple answer sequences; finally, each answer sequence is scored, and the highest score is selected as the candidate's score. Therefore, the shield tunneling machine simulation practical test scoring system of the present invention, by classifying all the scoring items in the answer to obtain multiple scoring item types, then grouping the operation record sequence according to the scoring item type, and traversing the operation record grouping sequence according to the scoring item order to generate multiple answer sequences, so that the operation records of the candidate's answer form multiple answer sequences in a grouping, arrangement, and combination manner, accurately eliminating redundant operations, even if the candidate has irrelevant operations when answering the question or finds an operation error and then answers the question again from a certain step, the candidate's answer score can still be accurately scored, and instant scoring can be achieved after each question is completed, without human intervention, thereby improving scoring efficiency.

[0081] In addition, the operation record collection module is also used to deduplicate the operation records after collecting the operation records of the examinees' answers and recording the operation time. If there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold. If it is less than the threshold, the redundant operation records and their operation time are eliminated, and only one operation record and its operation time are retained.

[0082] In addition, another embodiment of the present invention further provides an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the above method by calling the computer program stored in the memory.

[0083] In addition, another embodiment of the present invention further provides a computer-readable storage medium for storing a computer program for scoring a shield tunneling machine simulation practical examination, wherein the computer program executes the steps of the method described above when running on a computer.

[0084] The general form of computer readable storage media includes: floppy disk, flexible disk, hard disk, magnetic tape, any other magnetic medium, CD-ROM, any other optical medium, punch cards, paper tape, any other physical medium with a pattern of holes, random access memory (RAM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), flash erasable programmable read-only memory (FLASH-EPROM), any other memory chip or cartridge, or any other medium that can be read by a computer. The instructions can further be transmitted or received by a transmission medium. The term transmission medium can include any tangible or intangible medium that can be used to store, encode or carry instructions for execution by a machine, and includes digital or analog communication signals or other intangible media that facilitate the communication of the above instructions. Transmission media include coaxial cables, copper wires and optical fibers, which include the wires of a bus used to transmit a computer data signal.

[0085] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.

[0086] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0087] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0088] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0089] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0090] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A shield tunneling machine simulation practical test scoring method, characterized in that: Includes the following: Get the current test questions and answers; Classify all scoring items in the answer to obtain multiple scoring item categories; Collect the operation records of the examinees answering questions and record the operation time to obtain the operation record sequence; The operation record sequence is grouped according to the type of scoring item, and invalid operation records are eliminated to obtain the operation record grouping sequence; Traverse the operation record grouping sequence according to the scoring items in the answer order to obtain multiple answer sequences; Each answer sequence is scored and the highest score is selected as the candidate's score.

2. The shield tunneling machine simulation practical test scoring method according to claim 1, characterized in that: The process for scoring each answer sequence consists of the following: The order of operation records in each answer sequence is determined according to the operation time, and then the score of each operation record is determined according to the scoring criteria of the scoring item. The scores of all operation records are added together to obtain the score of the answer sequence.

3. The shield tunneling machine simulation practical test scoring method according to claim 2, characterized in that: If the scoring criteria for a scoring item do not have a sequence requirement, points can be obtained as long as there is a corresponding operation record; if the scoring criteria for a scoring item have a sequence requirement, the operation record must meet the operation sequence requirement to get points; if the scoring criteria for a scoring item also includes a parameter setting range, the parameters in the operation record must also meet the requirement to get points.

4. The shield tunneling machine simulation practical test scoring method according to claim 1, characterized in that: The process of traversing the operation record grouping sequence according to the scoring items in the answer to obtain multiple answer sequences includes the following: According to the order of the scoring items in the answer, the operation records for the answer question content are selected in the operation record grouping sequence and combined to generate a complete answer sequence. If there are multiple operation records for the same answer content, an answer sequence is generated for each operation record.

5. The shield tunneling machine simulation practical test scoring method according to claim 4, characterized in that: If there is no operation record for a certain scoring item corresponding to the answer question content, the operation record corresponding to the scoring item in the answer sequence is set to empty.

6. The shield tunneling machine simulation practical test scoring method according to claim 1, characterized in that: After collecting the operation records of the candidates' answers and recording the operation time, if there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold. If it is less than the threshold, the redundant operation records and their operation time are eliminated, and only one operation record and its operation time are retained.

7. A shield tunneling machine simulation practical operation test scoring system, characterized in that: include: The test question and answer acquisition module is used to obtain the current test question and answer; A rating item classification module is used to classify all rating items in the answer to obtain multiple rating item types; An operation record collection module is used to collect the operation records of the examinees' answers and record the operation time to obtain an operation record sequence; An operation record grouping module is used to group the operation record sequence according to the type of scoring item and remove invalid operation records to obtain an operation record grouping sequence; An answer sequence generation module is used to traverse the operation record grouping sequence according to the scoring items in the answer sequence to obtain multiple answer sequences; The candidate score scoring module is used to score each answer sequence and select the highest score as the candidate score.

8. A shield tunneling machine simulation practical operation test scoring system as claimed in claim 7, characterized in that: The operation record collection module is also used to deduplicate the operation records after collecting the operation records of the examinees' answers and recording the operation time. If there are multiple operation records corresponding to the same answer content, it is determined whether the time difference between the multiple operation records is less than a threshold. If it is less than the threshold, the redundant operation records and their operation time are eliminated, and only one operation record and its operation time are retained.

9. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the method according to any one of claims 1 to 6 by calling the computer program stored in the memory.

10. A computer-readable storage medium for storing a computer program for scoring a shield tunneling machine simulation practical test, characterized in that: When the computer program is run on a computer, the steps of the method according to any one of claims 1 to 6 are executed.

Citation Information

Patent Citations

  • A shield tunneling machine simulation training system and method

    CN105513451B

  • A gas operation training and assessment device and assessment method thereof

    CN110634346B

  • Simulation training system and method for shield tunneling machine

    CN105513451A

  • Automatic assessment method for substation operation training simulation

    CN108172082A

  • Simulated training system for shield tunneling machine

    CN109697914A