Plastering-free masonry wall surface anti-cracking process for building wall surface construction

Through the process of plastering mortar with high-precision masonry and paddle plastering equipment, the problem of quality defects in the existing wall plastering process is solved, and the wall is smooth, strength and aesthetically improved.

CN119860075AActive Publication Date: 2025-04-22GUANGDONG TONGRUI ENG CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510356288.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-25
Publication Date
2025-04-22
Estimated Expiration
2045-03-25

AI Technical Summary

Technical Problem

The wall plastering process of existing buildings has quality defects, such as hollowing, cracking, falling off and uneven surfaces, which affect the project acceptance and use effect.

Method used

Wall masonry is used to ensure the flatness and perpendicularity of the wall base surface. Then, mortar is smeared with a paddle device to form a surface decorative layer, and alkali-resistant grid cloth is embedded in the putty layer to strengthen the structure.

Benefits of technology

Through plaster-free treatment, improve the quality of the wall, avoid cracks and falls, and ensure the smooth, strong and beautiful wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119860075A_ABST
    Figure CN119860075A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building wall surface construction processes, and particularly relates to a plastering-free masonry wall surface anti-cracking process for building wall surface construction, which comprises the following steps: S1, adopting a high-precision masonry to operate according to masonry requirements, controlling the perpendicularity and flatness of a masonry wall body to be good, and then rolling and brushing an adhesion agent on the surface of the wall body; s2, mortar is prepared and smeared to the surface of the wall body through a mortar smearing device, and a surface decoration layer is formed; s3, after the mortar is smeared on the wall body, alkali-resistant gridding cloth is hung on the wall surface subjected to mortar smearing; the wall body is built through the high-precision masonry, the flatness and perpendicularity of the base plane of the wall body are good, so that the wall body is free of plastering treatment, meanwhile, the structure of the putty layer on the surface of the wall body is connected and reinforced through the multiple layers of gridding cloth, the wall surface is prevented from cracking and falling off, and the wall surface quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building wall construction technology, in particular to a plaster-free masonry wall anti-cracking technology for building wall construction. Background Art

[0002] Since the walls of existing buildings are all completed by manual plastering, this plastering layer has many quality defects due to insufficient materials and construction technology, such as hollowing, cracking, falling off, uneven surface, etc., and cracking and falling off of the walls at the joints of concrete and masonry. These quality problems often cause disputes, which not only affect the completion acceptance of the project, but also affect its use and appearance. Summary of the invention

[0003] In order to make up for the shortcomings of the prior art, the wall is built by high-precision masonry to ensure good flatness and verticality of the wall base, so that the wall does not need to be plastered. At the same time, the structure of the putty layer on the wall surface is connected and strengthened by multi-layer mesh cloth to avoid cracking and falling off of the wall and improve the quality of the wall. The present invention proposes an anti-cracking process for plaster-free masonry wall in building wall construction.

[0004] The technical solution adopted by the present invention to solve the technical problem is: the anti-cracking process of the plaster-free masonry wall in the construction of the building wall of the present invention comprises the following steps: S1: Use high-precision masonry to operate according to masonry requirements, control the verticality and flatness of the masonry wall, and then roll the interface agent on the wall surface; S2: Prepare the mortar and apply it to the wall surface using a smearing device to form a surface decorative layer; S3: After applying the mortar to the wall, hang an alkali-resistant mesh cloth on the wall surface after applying the mortar; Wherein, the surface decoration layer at least includes a bottom anti-cracking putty layer, a surface putty layer, and a finishing layer. In the step S3, the anti-alkali mesh cloth is pressed into the bottom anti-cracking putty layer and the surface putty layer, and the anti-alkali mesh cloths are connected and fixed to each other by fixing nails; Wherein, the paddle device in step S2 includes a bottom plate, a fixed column is installed on the bottom plate, a movable block driven by a motor is installed on the fixed column, a mounting plate is installed on the movable block, a scraper is installed on the mounting plate, a material storage trough is provided on the mounting plate, a material discharge port is provided on the scraper, and the material discharge port is communicated with the opening of the material storage trough; A slurry barrel is installed on the bottom plate, and the slurry in the slurry barrel is transported to the storage tank through a slurry pump; A collecting plate is installed below the mounting plate, and the collecting plate is in contact with the wall surface. The smearing device smears the wall surface from top to bottom through a scraper.

[0005] Preferably, a contact roller is installed on one end of the collecting plate close to the wall, and the contact roller is in contact with the wall surface; An elastic deformation layer is installed on the surface of the contact roller, and the distance between the collection surface of the collection plate for receiving the fallen mortar and the contact roller is less than or equal to the thickness of the elastic deformation layer; A recovery pump is installed on the bottom plate, and the recovery pump is connected to the slurry cylinder through a connecting pipe. A recovery pipe is installed between the recovery pump and the collecting plate. A common central pipe is installed on the collecting surface of the collecting plate. A soft auger is installed in the central pipe, and the soft auger extends into the recovery pipe.

[0006] Preferably, an elastic sheet is installed at the opening of the material storage trough, and the elastic sheet covers the opening of the material storage trough.

[0007] Preferably, the elastic sheets are provided in a plurality of groups, the elastic sheets are independent of each other, and a limiting rod is also installed at the opening of the material storage trough, and the limiting rod is located between the elastic sheet and the scraper.

[0008] Preferably, a connecting cavity is provided in the mounting plate, and the slurry pump delivers the slurry into the connecting cavity through a delivery pipe; The communicating cavity is provided with a discharge port connected to the material storage tank, and the discharge ports are arranged in multiple groups, and the discharge ports are evenly distributed in the material storage tank.

[0009] Preferably, an elastic connection layer is installed between the scraper and the mounting plate, and the elastic connection layer is divided into two parts at the upper and lower sides of the discharge port.

[0010] Preferably, the elasticity of the elastic connecting layer above the discharge port is greater than that of the elastic connecting layer below the discharge port, and the thickness of the elastic connecting layer above the discharge port is greater than that of the elastic connecting layer below the discharge port.

[0011] Preferably, a fixing frame is installed on the lower surface of the base plate, a telescopic rod is installed on the fixing frame, a shielding layer is installed on the telescopic rod, the shielding layer is sleeved on the telescopic rod, and one end of the telescopic rod and the shielding layer away from the base plate contacts the wall surface.

[0012] The beneficial effects of the present invention are as follows: 1. The present invention discloses a method for preventing cracks in masonry walls without plastering during construction of building walls. By providing a mounting plate, a material storage trough, a scraper and a collecting plate, the wall is plastered from top to bottom to avoid interference of overflowing and dripping mortar on the already plastered part of the wall and scratching the already plastered part of the wall to affect the surface flatness. At the same time, gravity is used to collect the overflowing and dripping slurry on the collecting plate to avoid contamination of the ground and waste of slurry.

[0013] 2. The present invention discloses a method for preventing cracks in plaster-free masonry walls during building wall construction. By providing a collecting plate, a contact roller, a concentrating pipe and a soft auger, the overflowed and dripped slurry can be fully collected. At the same time, the collected slurry can be pushed by a soft auger to avoid excessive accumulation of slurry on the collecting plate, which would affect the normal use of the collecting plate.

[0014] 3. The present invention discloses a method for preventing cracks in plaster-free masonry walls during building wall construction. High-precision masonry blocks are used to build walls so that the surface quality of the wall base is good and the wall surface does not need to be plastered. Afterwards, a putty layer is applied to the wall by a smearing device, and multiple layers of mesh cloth are used to strengthen and connect the putty layer, thereby further improving the structural strength of the putty layer and preventing cracks and falling off of the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention will be further described below in conjunction with the accompanying drawings.

[0016] Figure 1 is a three-dimensional diagram of the paddle-wiping device of the present invention; Figure 2 It is a schematic diagram of the position between the paddle device and the wall surface when working in the present invention; Figure 3 It is a schematic diagram of the structure of the fixed column, the scraper and the collecting plate on the paddle device of the present invention; Figure 4 is a cross-sectional view of a collecting plate on the paddle wiping device of the present invention; Figure 5 It is a structural schematic diagram of a mounting plate on a paddle-wiping device in the present invention; Figure 6 yes Figure 1 A partial enlarged view of the middle part; Figure 7 yes Figure 2 A partial enlarged view of point B in the middle; Figure 8 yes Figure 3 A partial enlarged view of point C in the middle; Fig. 9 It is a flowchart of the steps of the anti-cracking process in the present invention; In the figure: base plate 1, slurry barrel 11, slurry pump 12, recovery pump 13, connecting pipe 14, conveying pipe 15, recovery pipe 16, fixed column 2, screw 21, movable block 211, motor 22, mounting plate 3, storage trough 31, discharge port 311, connecting cavity 32, discharge port 321, elastic sheet 33, limiting rod 34, scraper 4, elastic connecting layer 41, collecting plate 5, contact roller 51, concentrating pipe 52, soft auger 521, collecting surface 53, shielding layer 6, telescopic rod 61, fixing frame 62, wall 7, surface decoration layer 71. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0018] like Figures 1 to 9 As shown, the present invention provides a plaster-free masonry wall anti-cracking process for building wall construction, and the anti-cracking process includes the following steps: S1: Use high-precision masonry to operate according to masonry requirements, control the verticality and flatness of the masonry wall 7 to be good, and then roll the interface agent on the surface of the wall 7; S2: Prepare the mortar and apply it to the surface of the wall 7 using a smearing device to form a surface decoration layer 71; S3: After applying the mortar to the wall 7, hang an alkali-resistant mesh cloth on the wall surface after applying the mortar; Wherein, the surface decoration layer 71 at least includes a bottom anti-cracking putty layer, a surface putty layer, and a finishing layer. In the step S3, the anti-alkali mesh cloth is pressed into the bottom anti-cracking putty layer and the surface putty layer, and the anti-alkali mesh cloths are connected and fixed to each other by fixing nails; Wherein, the paddle device in step S2 includes a bottom plate 1, a fixed column 2 is installed on the bottom plate 1, a movable block 211 driven by a motor 22 is installed on the fixed column 2, a mounting plate 3 is installed on the movable block 211, a scraper 4 is installed on the mounting plate 3, a material storage trough 31 is provided on the mounting plate 3, a material discharge port 311 is provided on the scraper 4, and the material discharge port 311 is communicated with the opening of the material storage trough 31; A slurry barrel 11 is installed on the bottom plate 1, and the slurry in the slurry barrel 11 is transported to the storage tank 31 through a slurry pump 12; A collecting plate 5 is installed below the mounting plate 3, and the collecting plate 5 is in contact with the surface of the wall 7. The squeegee device squeegees the wall surface from top to bottom through the scraper 4; The fixed columns 2 on the bottom plate 1 are symmetrically arranged, and a mounting groove is provided on the fixed columns 2. A screw 21 is rotatably installed in the mounting groove, and a movable block 211 is installed on the screw 21. The screw 21 is driven by a motor 22 installed on the lower surface of the bottom plate 1, and the two screws 21 are synchronously rotated through a transmission structure. At the same time, the slurry barrel 11 and the slurry pump 12 are connected through a connecting pipe 14, and the slurry pump 12 and the storage tank 31 are connected through a delivery pipe 15, so as to stably and quantitatively deliver the prepared slurry in the slurry barrel 11 to the storage tank 31; Use high-precision blocks to build the wall 7, so that the verticality and flatness of the wall 7 surface are good, and the wall 7 surface meets the quality standards of the decorative surface layer of the building wall 7, eliminating the need for a plaster layer, thereby achieving the purpose of reducing the construction cost of the anti-cracking agent; After the wall 7 is built, the uneven parts of the wall 7 are polished and smoothed, and the corners and recesses of the wall 7 are filled and repaired to make the wall surface meet the flatness requirements. After that, the oil stains, floating dust, etc. on the surface of the wall 7 are cleaned to ensure that the surface of the wall 7 is clean, which is convenient for the subsequent rolling of the interface agent to ensure that the interface agent has a good brushing effect. After that, the staff prepares the mortar to be used, such as the bottom anti-cracking putty or the surface putty, and adds it to the paddle liquid cylinder in the paddle device. The mortar is evenly and evenly applied to the surface of the wall 7 through the paddle device, thereby completing the construction of the surface decoration layer 71; At the same time, during the construction process, the anti-alkali mesh cloth is pressed into the bottom anti-cracking putty layer and the surface putty layer, and the stability of the anti-alkali mesh cloth's own structure is used to improve the structural strength of each putty layer after smearing, thereby avoiding cracks on each putty layer. At the same time, since the anti-alkali mesh cloths are interconnected and fixed by fixing nails, the anti-alkali mesh cloths in different putty layers are further interconnected to form a whole, thereby improving the structural strength of the connection between each putty layer and between the putty layer and the wall 7 surface, thereby performing anti-cracking reinforcement on the surface decoration layer 71 on the wall 7 surface and improving the anti-cracking effect of the wall surface; At the same time, when plastering the wall, the mortar prepared by the staff is added into the slurry barrel, and then the staff pushes the plastering device to move to the wall to be constructed, so that the scraper 4 can be closely attached to the surface of the wall 7, and then the controller controls the motor 22 to run and drive the screw 21 to rotate, so that the scraper 4 moves to a high position, thereby plastering the wall from top to bottom; When plastering the wall, the slurry pump 12 extracts mortar from the slurry barrel 11 through the connecting pipe 14, and then delivers the extracted mortar to the storage tank 31 through the delivery pipe 15, so that the mortar is covered on the wall from the outlet of the storage tank 31 and the outlet 311 on the scraper 4. After that, as the scraper 4 moves, the plastering operation is completed, so that the wall surface after plastering is flat and smooth. At the same time, the storage tank 31 provided on the mounting plate 3 allows the delivered mortar to be temporarily stored, and allows the mortar to fill the discharge port 311 on the scraper 4, so that when the scraper 4 is smearing the wall surface, the mortar can be evenly applied to the wall surface, thereby ensuring that the surface decoration layer 71 on the wall surface is flat and uniform, and improving the construction quality of the surface decoration layer 71; At the same time, when the scraper 4 applies the mortar to the wall, the mortar may overflow and drip downwards. The collecting plate 5 installed under the mounting plate 3 is used to collect the overflowing and dripping mortar to prevent this part of the slurry from falling onto the ground and contaminating the ground and wall, making subsequent cleaning difficult, and causing mortar waste, thereby increasing construction costs.

[0019] As an embodiment of the present invention, a contact roller 51 is installed on one end of the collecting plate 5 close to the wall 7, and the contact roller 51 is in contact with the surface of the wall 7; An elastic deformation layer is installed on the surface of the contact roller 51, and the distance between the collection surface 53 of the collection plate 5 for receiving the fallen mortar and the contact roller 51 is less than or equal to the thickness of the elastic deformation layer; A recovery pump 13 is installed on the bottom plate 1, and the recovery pump 13 is connected to the slurry barrel 11 through a connecting pipe 14. A recovery pipe 16 is installed between the recovery pump 13 and the collecting plate 5. A common centralizing pipe 52 is installed on the collecting surface 53 of the collecting plate 5. A soft auger 521 is installed in the centralizing pipe 52, and the soft auger 521 extends into the recovery pipe 16. When the scraper 4 is wiping the wall from top to bottom, the collecting plate 5 located below the mounting plate 3 collects the slurry overflowing and falling from the scraper 4 and between the scraper 4 and the wall. At the same time, when the collecting plate 5 moves downward together with the scraper 4, the contact roller 51 on the collecting plate 5 rotates counterclockwise, that is, as the contact roller 51 rotates, the dripping slurry close to the wall is gradually rotated to the collecting surface 53 of the collecting plate 5, thereby improving the collection effect of the overflowing and falling slurry and reducing the possibility of the slurry dripping to the ground or adhering to the wall below. At the same time, the elastic deformation layer on the surface of the contact roller 51 allows the contact roller 51 to be closely attached to the wall surface, thereby avoiding a gap between the contact roller 51 and the wall surface, causing the fallen slurry to slide from the gap. At the same time, the distance between the collecting surface 53 and the contact roller 51 is less than the thickness of the elastic deformation layer, so that the collecting surface 53 is closely attached to and squeezed on the elastic deformation layer, further eliminating the gap between the contact roller 51 and the collecting surface 53, so that the slurry falling on the contact roller 51 can be fully scraped onto the collecting surface 53, thereby avoiding the slurry from contacting the wall surface again or dripping onto the ground as the contact roller 51 rotates, causing ground pollution, slurry waste, and subsequent difficulty in cleaning. At the same time, after the overflowed or fallen slurry is collected on the collecting plate 5, the slurry will flow under the action of the inclined collecting surface 53 and then contact the collecting pipe 52. At this time, the recovery pump 13 on the bottom plate 1 will drive the recovery pipe 16 and the soft auger 521 in the collecting pipe 52 to rotate, and push the slurry contacting the collecting pipe 52, so that the collected slurry can be taken away from the collecting plate 5 and returned to the slurry barrel 11, so as to improve the utilization rate of the slurry and avoid slurry waste. At the same time, by moving the slurry on the collecting plate 5 through the soft auger 521, it can also avoid too much slurry on the collecting plate 5, which affects the slurry collection effect.

[0020] As an embodiment of the present invention, an elastic sheet 33 is installed at the opening of the material storage tank 31, and the elastic sheet 33 covers the opening of the material storage tank 31; The opening of the storage tank 31 is blocked by the elastic sheet 33, so that the mortar entering the storage tank 31 needs to fill the storage tank 31 or be evenly distributed in the storage tank 31 before it can be discharged from the opening of the storage tank 31, and then wait for the scraper 4 to evenly spread it on the wall. In this process, the elastic sheet 33 blocks the opening, and the slurry can be distributed to the opening of the storage tank 31 as evenly as possible, and then when the slurry passes through the opening and contacts the wall, the slurry is distributed relatively evenly on the wall, which is convenient for the scraper 4 to smooth the slurry on the wall, avoiding the uneven distribution of the slurry when the slurry contacts the wall, and further avoiding the scraper 4 from scraping and smoothing the unevenly distributed slurry, and the scraper 4 scraping the concentrated slurry too far and the scraping force on the slurry is too large, resulting in slurry overflowing and falling in the concentrated distribution area, and poor slurry smoothing effect in the area where the slurry is too little distributed.

[0021] As an embodiment of the present invention, the elastic sheets 33 are provided in multiple groups, and the elastic sheets 33 are independent of each other. A limiting rod 34 is also installed at the opening of the material storage trough 31, and the limiting rod 34 is located between the elastic sheet 33 and the scraper 4; The limit position of the elastic sheet 33 when it is deformed is limited by the limit rod 34, so as to avoid excessive deformation of the elastic sheet 33 after excessive squeezing of the material in the storage tank 31, which would cause uneven distribution of the slurry discharged from the discharge port 311 and affect the smearing effect of the smearing device on the wall. At the same time, because the elastic sheets 33 are independent of each other, when the elastic sheets 33 are squeezed and pushed by the mortar in the storage tank 31, the deformations of the elastic sheets 33 are independent of each other, so as to avoid the elastic sheets 33 driving each other and affecting the shielding effect of the elastic sheets 33 on the opening of the storage tank 31.

[0022] As an embodiment of the present invention, a connecting cavity 32 is provided in the mounting plate 3, and the slurry pump 12 delivers the slurry into the connecting cavity 32 through the delivery pipe 15; The communication cavity 32 is provided with a discharge port 321 connected to the material storage tank 31. The discharge ports 321 are provided in multiple groups and are evenly distributed in the material storage tank 31. By setting evenly distributed discharge ports 321 in the storage tank 31, the slurry entering the storage tank 31 can be relatively evenly distributed, avoiding the slurry being concentrated at a certain place in the storage tank 31, resulting in uneven distribution of the slurry at the discharge port 311 when it contacts the wall surface, affecting the effect of the smearing device on the wall surface, and affecting the flatness and quality of the surface decoration layer 71 on the wall surface; At the same time, the discharge port 321 is set to evenly distribute the slurry in the storage tank 31. When the slurry is discharged from the outlet, the slurry can be better and more easily affected by the elastic sheet 33, and further the slurry can evenly contact the wall surface from the discharge port 311, thereby improving the flatness and quality of the surface decoration layer 71 on the wall surface after smearing.

[0023] As an embodiment of the present invention, an elastic connection layer 41 is installed between the scraper 4 and the mounting plate 3, and the elastic connection layer 41 is divided into two parts on the upper and lower sides of the discharge port 311; By setting the elastic connecting layer 41, the scraper 4 and the wall surface can be buffered and deformed when in contact with each other, thereby improving the quality of the scraper 4 on the wall surface, ensuring the flatness and quality of the surface decoration layer 71 on the wall surface. At the same time, the elastic connecting layer 41 is set to support and fill the gap between the scraper 4 and the mounting plate 3 at the discharge port 311, ensuring that the slurry can smoothly contact the wall surface from the discharge port 311 on the scraper 4, thereby facilitating the scraper 4 to smooth the slurry on the wall surface.

[0024] As an embodiment of the present invention, the elasticity of the elastic connection layer 41 above the discharge port 311 is greater than that of the elastic connection layer 41 below the discharge port 311, and the thickness of the elastic connection layer 41 above the discharge port 311 is greater than that of the elastic connection layer 41 below the discharge port 311; Since the elasticity of the elastic connecting layer 41 above and below the discharge port 311 is inconsistent, the elastic force acting on the scraper 4 near the bottom is relatively small, thereby facilitating the slurry discharged from the discharge port 311 to move toward and be stored near the bottom, thereby cooperating with the movement of the scraper 4 from top to bottom, thereby improving the effect of smearing the wall and the flatness and quality of the wall after smearing.

[0025] As an embodiment of the present invention, a fixing frame 62 is installed on the lower surface of the bottom plate 1, a telescopic rod 61 is installed on the fixing frame 62, a shielding layer 6 is installed on the telescopic rod 61, and the shielding layer 6 is sleeved on the telescopic rod 61. The ends of the telescopic rod 61 and the shielding layer 6 away from the bottom plate 1 are in contact with the surface of the wall 7. When the smearing device applies the mortar to the wall, the telescopic rod 61 under the base plate 1 will also abut against the bottom of the wall. Through the shielding layer 6 made of plastic sleeved on the telescopic rod 61, an interception layer is set at the position of the wall 7 close to the ground, so as to intercept and collect the slurry that cannot be collected by the collecting plate 5 above, the contaminated slurry that rolls down the wall, and the mixed slurry that falls on the wall, so as to prevent the ground near the wall 7 from being contaminated and difficult to clean.

[0026] The specific workflow is as follows: After the wall 7 is built, the uneven parts of the wall 7 are polished and smoothed, and the corners and recesses of the wall 7 are filled and repaired. Then, the oil stains and floating dust on the wall 7 are cleaned, and the interface agent is subsequently rolled and brushed. After that, the staff prepares the mortar to be used, such as the bottom anti-cracking putty or the surface putty, and adds it to the paddle liquid cylinder in the paddle device. The mortar is evenly and evenly applied to the surface of the wall 7 through the paddle device, thereby completing the construction of the surface decoration layer 71; At the same time, during the construction process, the anti-alkali mesh cloth is pressed into the bottom anti-cracking putty layer and the surface putty layer, and the anti-alkali mesh cloths are connected and fixed to each other by fixing nails; At the same time, when plastering the wall, the mortar prepared by the staff is added into the slurry barrel, and then the staff pushes the plastering device to move to the wall to be constructed, so that the scraper 4 can be closely attached to the surface of the wall 7, and then the controller controls the motor 22 to run and drive the screw 21 to rotate, so that the scraper 4 moves to a high position, thereby plastering the wall from top to bottom; When applying mortar to the wall, the mortar pump 12 extracts mortar from the mortar barrel 11 through the connecting pipe 14, and then delivers the extracted mortar to the storage tank 31 through the delivery pipe 15, so that the mortar is covered on the wall from the outlet of the storage tank 31 and the outlet 311 on the scraper 4. After that, the mortar applying operation is completed as the scraper 4 moves. At the same time, the storage tank 31 opened on the mounting plate 3 allows the delivered mortar to be temporarily stored, and allows the mortar to fill the discharge port 311 on the scraper 4, so that the scraper 4 can evenly apply the mortar to the wall when smearing the wall. At the same time, when the scraper 4 applies the mortar to the wall, the mortar may overflow and drip downwards. The overflowing and dripping mortar is collected by the collecting plate 5 installed under the mounting plate 3. When the scraper 4 is wiping the wall from top to bottom, the collecting plate 5 located below the mounting plate 3 collects the slurry overflowing and falling from the scraper 4 and between the scraper 4 and the wall. At the same time, when the collecting plate 5 moves downward with the scraper 4, the contact roller 51 on the collecting plate 5 rotates counterclockwise, that is, the slurry dripping and close to the wall is gradually rotated to the collecting surface 53 of the collecting plate 5 as the contact roller 51 rotates; At the same time, the elastic deformation layer on the surface of the contact roller 51 allows the contact roller 51 to be closely attached to the wall surface, thereby avoiding a gap between the contact roller 51 and the wall surface. At the same time, the distance between the collecting surface 53 and the contact roller 51 is smaller than the thickness of the elastic deformation layer, so that the collecting surface 53 is closely attached to and squeezed on the elastic deformation layer, so that the slurry falling on the contact roller 51 can be fully scraped onto the collecting surface 53. At the same time, after the overflowed or dropped slurry is collected on the collecting plate 5, the slurry will flow under the action of the inclined collecting surface 53 and then contact the centralizing pipe 52. At this time, the recovery pump 13 on the bottom plate 1 will drive the recovery pipe 16 and the soft auger 521 in the centralizing pipe 52 to rotate, pushing the slurry contacting the centralizing pipe 52, so that the collected slurry can be taken away from the collecting plate 5 and returned to the slurry barrel 11. The opening of the material storage tank 31 is shielded by the elastic sheet 33, so that the mortar entering the material storage tank 31 needs to fill the material storage tank 31 or be evenly distributed in the material storage tank 31 before it can be discharged from the opening of the material storage tank 31, and then wait for the scraper 4 to evenly apply it to the wall surface. In this process, the elastic sheet 33 shields the opening, so that the slurry can be relatively evenly distributed to the opening of the material storage tank 31 as much as possible, and then when the slurry passes through the opening and contacts the wall surface, the slurry is relatively evenly distributed on the wall surface; The limit position of the elastic sheet 33 when deformed is limited by the limit rod 34, so as to prevent the elastic sheet 33 from being deformed too much after excessive extrusion of the material in the storage tank 31, resulting in uneven distribution of the slurry discharged from the discharge port 311. At the same time, since the elastic sheets 33 are independent of each other, when the elastic sheets 33 are squeezed and pushed by the slurry in the storage tank 31, the deformation of the elastic sheets 33 is independent of each other, so as to prevent the elastic sheets 33 from driving each other. By providing evenly distributed discharge ports 321 in the storage tank 31, the slurry entering the storage tank 31 can be relatively evenly distributed, thereby preventing the slurry from being concentrated in a certain place in the storage tank 31, resulting in uneven distribution of the slurry at the discharge port 311 when it contacts the wall surface; At the same time, the slurry is evenly distributed in the storage tank 31 through the provided discharge port 321. When the slurry is discharged from the outlet, the slurry can be better and more easily affected by the elastic sheet 33, and further the slurry is evenly contacted to the wall surface from the discharge port 311. The elastic connection layer 41 is provided to buffer and deform the scraper 4 when in contact with the wall surface. At the same time, the elastic connection layer 41 is provided to support and fill the gap between the discharge port 311 of the scraper 4 and the mounting plate 3, so as to ensure that the slurry can smoothly contact the wall surface from the discharge port 311 on the scraper 4. Since the elasticity of the elastic connection layer 41 above and below the discharge port 311 is inconsistent, the elastic force on the scraper 4 near the bottom is relatively small, so that the slurry discharged from the discharge port 311 is conveniently moved to and stored near the bottom, and then cooperates with the movement of the scraper 4 from top to bottom, thereby improving the effect of wiping the wall surface and the flatness and quality of the wall surface after wiping. When the smearing device applies the mortar to the wall, the telescopic rod 61 under the base plate 1 will also abut against the bottom of the wall. Through the shielding layer 6 made of plastic sleeved on the telescopic rod 61, an interception layer is set at the position of the wall 7 close to the ground, so as to intercept and collect the slurry that cannot be collected by the collecting plate 5 above, the contaminated slurry that rolls down the wall, and the mixed slurry that falls on the wall, so as to prevent the ground near the wall 7 from being contaminated and difficult to clean.

[0027] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A plaster-free masonry wall anti-cracking process for building wall construction, characterized by: The anti-cracking process comprises the following steps: S1: using high-precision masonry to operate according to masonry requirements, controlling the verticality and flatness of the masonry wall (7) to be good, and then rolling and brushing the interface agent on the surface of the wall (7); S2: Prepare the mortar and apply the mortar to the surface of the wall (7) using a smearing device to form a surface decoration layer (71); S3: After applying the mortar to the wall (7), hang an alkali-resistant mesh cloth on the wall surface after applying the mortar; The surface finishing layer (71) comprises at least a bottom anti-cracking putty layer, a surface putty layer, and a finishing layer. In step S3, the alkali-resistant mesh cloth is pressed into the bottom anti-cracking putty layer and the surface putty layer, and the alkali-resistant mesh cloths are connected and fixed to each other by fixing nails. In the step S2, the paddle device comprises a bottom plate (1), a fixed column (2) is mounted on the bottom plate (1), a movable block (211) driven by a motor (22) is mounted on the fixed column (2), a mounting plate (3) is mounted on the movable block (211), a scraper (4) is mounted on the mounting plate (3), a material storage trough (31) is provided on the mounting plate (3), a material discharge port (311) is provided on the scraper (4), and the material discharge port (311) is communicated with an opening of the material storage trough (31); A slurry barrel (11) is installed on the bottom plate (1), and the slurry in the slurry barrel (11) is transported to the storage tank (31) through a slurry pump (12); A collecting plate (5) is installed below the mounting plate (3), the collecting plate (5) and the surface of the wall (7) are in contact with each other, and the smearing device smears the wall surface from top to bottom through the scraper (4).

2. According to claim 1, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: A contact roller (51) is installed on one end of the collecting plate (5) close to the wall (7), and the contact roller (51) is in contact with the surface of the wall (7); An elastic deformation layer is installed on the surface of the contact roller (51), and the distance between the collection surface (53) on the collection plate (5) for receiving the fallen mortar and the contact roller (51) is less than or equal to the thickness of the elastic deformation layer; A recovery pump (13) is installed on the bottom plate (1), and the recovery pump (13) is connected to the slurry barrel (11) via a connecting pipe (14). A recovery pipe (16) is installed between the recovery pump (13) and the collecting plate (5). A common centralizing pipe (52) is installed on the collecting surface (53) of the collecting plate (5), and a soft auger (521) is installed in the centralizing pipe (52), and the soft auger (521) extends into the recovery pipe (16).

3. According to claim 1, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: An elastic sheet (33) is installed at the opening of the material storage trough (31), and the elastic sheet (33) covers the opening of the material storage trough (31).

4. According to claim 3, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: The elastic sheets (33) are provided in multiple groups, and the elastic sheets (33) are independent of each other. A limiting rod (34) is also installed at the opening of the material storage trough (31), and the limiting rod (34) is located between the elastic sheet (33) and the scraper (4).

5. According to claim 4, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: A communication cavity (32) is provided in the mounting plate (3), and the slurry pump (12) delivers slurry into the communication cavity (32) through a delivery pipe (15); The communication cavity (32) is provided with a discharge port (321) connected to the material storage tank (31), and a plurality of groups of the discharge ports (321) are provided, and the discharge ports (321) are evenly distributed in the material storage tank (31).

6. According to claim 1, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: An elastic connection layer (41) is installed between the scraper (4) and the mounting plate (3), and the elastic connection layer (41) is divided into two parts at the upper and lower sides of the discharge port (311).

7. According to claim 6, a plaster-free masonry wall anti-cracking process for building wall construction, characterized in that: The elasticity of the elastic connection layer (41) above the discharge port (311) is greater than that of the elastic connection layer (41) below the discharge port (311), and the thickness of the elastic connection layer (41) above the discharge port (311) is greater than that of the elastic connection layer (41) below the discharge port (311).

8. According to claim 1, a plaster-free masonry wall anti-cracking process for building wall construction is characterized by: A fixing frame (62) is mounted on the lower surface of the bottom plate (1), a telescopic rod (61) is mounted on the fixing frame (62), a shielding layer (6) is mounted on the telescopic rod (61), the shielding layer (6) is sleeved on the telescopic rod (61), and ends of the telescopic rod (61) and the shielding layer (6) away from the bottom plate (1) are in contact with the surface of the wall (7).

Citation Information

Patent Citations

  • Building wall surface plastering-free anti-crack technology

    CN106193485A

  • Dry-type plastering and coating construction process for building inner wall surface

    CN116791860A

  • Plastering equipment for indoor decoration

    CN217998813U

  • Construction method for high-ductility masonry wall having reinforced joint mortar layer

    WO2019153808A1