Automatic pipe jacking machine for pipe jacking construction
By designing an automatic pipe hoisting machine, combining high-strength main frame, multi-push rod propulsion module and intelligent control module, the problems of low construction efficiency and easy equipment damage under complex geological conditions are solved, and efficient and accurate construction results are achieved.
Patent Information
- Application Number
- CN202510071253.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-04-22
AI Technical Summary
The traditional pipe hoisting construction method has problems such as manpower-intensive, low construction efficiency, and difficult equipment to adapt to under complex geological conditions, which can easily lead to propulsion lag, equipment offset or damage.
An automatic pipe header is designed, including a high-strength main frame, a multi-push rod propulsion module, a guide module, a drill head and an intelligent control module. The head of the excavation head uses carbide cutting tools and screw conveyors. The control module monitors and adjusts the thrust, propulsion speed and cutting speed in real time through the PLC controller and sensor.
It realizes efficient adaptation of the pipe hoisting machine under complex geological conditions, improves construction accuracy and reliability, reduces construction risks and equipment damage probability, and significantly improves construction efficiency and equipment economy.
Smart Images

Figure CN119860239A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, in particular to an automatic pipe jacking machine used for pipe jacking construction. Background Art
[0002] With the acceleration of urbanization, the demand for underground pipeline construction is growing, such as water supply pipelines, drainage pipelines, gas pipelines and communication lines. However, the traditional pipe jacking construction method mainly relies on manual operation and semi-mechanized equipment, which has the following shortcomings: Traditional pipe jacking construction methods require a lot of manpower, and construction efficiency is limited by human factors. At the same time, manual operation has limited precision, and it often requires multiple reworks to meet construction requirements, further delaying the construction progress.
[0003] Under complex geological conditions (such as soft soil, hard rock, sand layers and water-bearing strata), traditional pipe jacking machines are difficult to adapt to soil changes due to the lack of intelligent adjustment functions, and are prone to problems such as advancement jams, equipment offsets or pipe deformations, leading to construction interruptions or even failures.
[0004] The mechanical structure design of traditional equipment is relatively simple, and the propulsion force is insufficient and unevenly distributed, which can easily lead to damage of the equipment due to overload or excessive local force. In addition, errors in manual operation may cause the equipment to deviate from the designed path, increasing construction risks. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides an automatic pipe jacking machine for pipe jacking construction, which solves the problem that the traditional pipe jacking construction method easily causes equipment damage due to overload or excessive local force.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: an automatic pipe jacking machine for pipe jacking construction, comprising: The main frame is made of high-strength steel and can withstand the thrust applied by the pipe jacking machine during operation; The propulsion module includes multiple thrusters with a maximum thrust of 80 tons; The guide module is set on both sides of the main frame and consists of a guide frame and a base, which enables the pipe jacking machine to maintain linear motion during the construction process; The tunneling head is installed in front of the propulsion module and includes a cutting tool and a screw conveyor. The cutting tool is made of carbide and the screw conveyor is used to transport the soil produced by cutting to the ground. The power module is installed inside the tunneling head and uses a diesel engine with a power of 150kW to provide continuous power for the tunneling head; The control module is arranged inside the main frame and fixedly mounted on the side wall of the main frame. It can monitor the equipment operating parameters in real time and automatically adjust the thrust, propulsion speed and cutting speed of the tunneling head according to the preset program.
[0007] Preferably, the multiple push rods include push rod 1, the outer wall of push rod 1 is connected to the outer wall of the main frame, the output end of push rod 1 is connected to sliding bracket 1, push rod 2 is arranged inside the sliding bracket 1, and the output end of push rod 2 is connected to sliding bracket 2.
[0008] Preferably, the outer wall of the guide frame is fixedly connected to the outer wall of the main frame, the lower surface of the base is fixedly connected to the upper surface of the main frame, the inner parts of the sliding bracket 1 and the sliding bracket 2 are slidably connected to the outer wall of the guide frame, and the lower surfaces of the sliding bracket 1 and the sliding bracket 2 are slidably connected to the upper surface of the base.
[0009] Preferably, the tunneling head includes a main shell, the interior of the main shell is arranged on the outer wall of the sliding bracket 2, the outer wall of the main shell is slidably connected to the upper surface of the base, the cutting tool is arranged inside the main shell, and the screw conveyor is arranged inside the main shell.
[0010] Preferably, the control module includes the following components: PLC controller, used to receive and process signals from various sensors, execute predetermined programs, and control various working modules of the pipe jacking machine; Sensors, including pressure sensors, angle sensors and soil detection sensors, for real-time monitoring of thrust, thrust angle, soil hardness and moisture parameters; The display is used to display the equipment operating status in real time, including propulsion speed, thrust, soil parameters and equipment fault information.
[0011] Preferably, the control module also includes the following components: Communication unit, used to exchange data with external terminal devices via wireless network or wired connection, supporting remote monitoring and adjustment; The abnormal alarm unit is used to monitor the working status of the equipment and send out an alarm signal when an abnormality occurs, automatically stopping or adjusting the equipment operation.
[0012] Preferably, the PLC controller is fixedly mounted on the inner side wall of the main frame, and transmits signals with the propulsion module, the tunneling head and the power module through cables or wireless connections; The pressure sensor is installed on the oil cylinder of the propulsion module to monitor the thrust; The angle sensor is installed between the main frame and the propulsion module to monitor the direction and tilt angle of the pipe jacking machine; The soil detection sensor is installed near the tunneling head and is used to detect soil hardness and moisture information in real time; The display is installed at the external top of the main frame, which is convenient for the operator to observe real-time data and equipment operation status.
[0013] Preferably, the communication unit is installed at the rear of the main frame and performs real-time data transmission with an external terminal device via a wireless or wired connection; The abnormality alarm unit is installed on the top of the main frame, and automatically triggers the alarm system when a fault or abnormality occurs.
[0014] Preferably, a method for operating an automatic pipe jacking machine for pipe jacking construction comprises the following steps: S1. Preparation: Transport the pipe jacking machine to the construction site and inspect and clean the equipment; determine the starting and ending positions of the pipe jacking machine and mark the construction path; install the guide rails straight and firmly; S2. Equipment installation: Install the main frame, propulsion module, guide module, tunneling head and power module in order, so that each module is firmly connected and the equipment can operate normally; S3, control module connection: Install the control module, connect the PLC controller, sensor and display correctly, and collect soil hardness, thrust and angle parameters through sensors to monitor the equipment operation status; S4. Equipment debugging: Start the power module and check whether it is working properly; start the control module and check whether the sensors and displays feedback accurate equipment operation data; adjust the thrust and extension speed of multiple push rods in the propulsion module according to the preset program, and debug the coordination of the propulsion module, guide module, tunneling head and power module; S5. Start jacking operation: Start the propulsion module, automatically adjust the thrust and extension speed of multiple push rods through the PLC controller, and start the jacking operation; monitor the data on the display in real time; use sensors to detect soil hardness and moisture data in real time, and adjust the cutting speed and thrust of the tunneling head; S6. Monitoring and adjustment: The operator can view the working status of the equipment in real time through the display and make adjustments as needed; S7, end the operation: When the pipe jacking machine is pushed to the predetermined position, the pushing operation is stopped and the power module is turned off; the control module is turned off and the equipment operation data is saved.
[0015] Preferably, in step S5, when push rod 1 is pushed, sliding bracket 1 is pushed to slide on the outer wall of the guide frame, and when push rod 2 is pushed, sliding bracket 2 and the tunneling head are pushed on the outer wall of the guide frame and the upper surface of the base.
[0016] The present invention provides an automatic pipe jacking machine for pipe jacking construction. It has the following beneficial effects: 1. The present invention realizes the precise adaptation of the pipe jacking machine to complex geological conditions such as soft soil, hard soil, sandy soil and gravel through the design of the tunneling head of cemented carbide cutting tools and efficient screw conveyor, combined with the intelligent control module for real-time monitoring of soil parameters. The multi-push rod high thrust design of the propulsion module and the high-strength structure of the main frame ensure that the equipment maintains stable operation in high-resistance or uneven soil. At the same time, the propulsion parameters are optimized through the automatic dynamic adjustment system, which significantly improves the reliability of the equipment. In addition, the intelligent monitoring and early warning system can effectively avoid equipment displacement or damage caused by geological mutations, greatly reduce construction risks, and ensure operation safety and efficiency.
[0017] 2. The present invention optimizes the mechanical structure design of the propulsion module and the guide module, and combines the real-time data collection and dynamic adjustment functions of the intelligent control system, so that the pipe jacking machine can accurately control the thrust, propulsion speed and excavation direction according to the construction path and soil conditions, significantly improving the jacking accuracy. At the same time, the cooperation of automatic adjustment and efficient power transmission system reduces manual intervention and resource waste, ensures the efficient operation of the equipment under various complex geological conditions, and greatly improves the construction efficiency.
[0018] 3. The present invention significantly extends the service life of key components and reduces the replacement frequency and maintenance times of the equipment by adopting highly wear-resistant carbide cutting tools and optimized multi-push rod propulsion module design. At the same time, the introduction of intelligent control systems reduces the reliance on manual operation and reduces the manpower and time costs in the maintenance process. The modular design simplifies the production and assembly process of the equipment and further reduces the manufacturing cost. These improvements significantly improve the overall economy of the equipment, making it more suitable for wide promotion and application to meet the needs of different construction environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A three-dimensional diagram of an automatic pipe jacking machine for pipe jacking construction according to the present invention; Figure 2 It is a front view of an automatic pipe jacking machine used for pipe jacking construction of the present invention; Figure 3 It is a partial structural schematic diagram of the main frame of the present invention; Figure 4 It is a structural schematic diagram of the base of the present invention; Figure 5 It is a schematic diagram of the partial structure of the sliding bracket 1 of the present invention; Figure 6 It is a partial structural schematic diagram of the main housing of the present invention; Figure 7 It is a partial structural schematic diagram of the screw conveyor of the present invention; Figure 8 The present invention is a flow chart of an operation method of an automatic pipe jacking machine used for pipe jacking construction.
[0020] Among them, 1. Main frame; 2. Propulsion module; 21. Push rod 1; 22. Sliding bracket 1; 23. Push rod 2; 24. Sliding bracket 2; 3. Guide module; 31. Guide frame; 32. Base; 4. Excavation head; 41. Main shell; 42. Cutting tool; 43. Screw conveyor; 5. Power module. DETAILED DESCRIPTION
[0021] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] Please see attached Figure 1 -Attached Figure 7 The embodiment of the present invention provides an automatic pipe jacking machine for pipe jacking construction, comprising: The main frame 1 is made of high-strength steel and can withstand the thrust applied by the pipe jacking machine during operation; Propulsion module 2, including multiple push rods with a maximum thrust of 80 tons; The guide module 3 is arranged on both sides of the main frame 1 and is composed of a guide frame 31 and a base 32, so that the pipe jacking machine can maintain linear motion during the construction process; The tunneling head 4 is installed in front of the propulsion module 2, and includes a cutting tool 42 and a screw conveyor 43. The cutting tool 42 is made of hard alloy material, and the screw conveyor 43 is used to transport the soil produced by cutting to the ground; The power module 5 is arranged inside the tunneling head 4 and uses a diesel engine with a power of 150 kW to provide continuous power for the tunneling head 4; The control module is arranged inside the main frame 1 and fixedly mounted on the side wall of the main frame 1. It can monitor the equipment operation parameters in real time and automatically adjust the thrust, propulsion speed and cutting speed of the tunneling head 4 according to a preset program.
[0023] Specifically, it improves the adaptability and reliability of pipe jacking machines under complex geological conditions and effectively reduces construction risks: Comprehensive adaptability to complex geological conditions: High-efficiency tunneling head 4 design: The tunneling head 4 is equipped with a carbide cutting tool 42 and a screw conveyor 43. The cutting tool 42 has extremely high wear resistance and cutting ability, and can adapt to various complex geological conditions, such as soft soil, hard soil, sandy soil and mixed strata containing gravel. The screw conveyor 43 efficiently discharges the soil generated by cutting to avoid soil accumulation affecting advancement.
[0024] Automatic dynamic adjustment: The PLC controller in the control module can analyze the soil data such as hardness and moisture provided by the sensor in real time, and dynamically adjust the thrust of the propulsion module 2, the cutting speed of the tunneling head 4 and the power output of the power module 5 to ensure that the pipe jacking machine can operate stably under different geological conditions.
[0025] The guide module 3 ensures linear propulsion: The guide module 3 ensures that the pipe jacking machine can maintain linear propulsion under high resistance conditions through precise coordination between the guide frame 31 and the sliding bracket, thereby avoiding equipment deviation problems caused by uneven soil.
[0026] Significant improvement in reliability: High-strength main frame 1: The main frame 1 is made of high-strength steel and has extremely strong rigidity and durability. It can withstand high thrust under complex geological conditions and high vibration during equipment operation, ensuring the overall reliability of the equipment.
[0027] Multi-push rod propulsion system: Propulsion module 2 adopts a distributed propulsion design with multiple push rods, with a thrust of up to 80 tons, which can evenly distribute the propulsion force and avoid equipment damage caused by excessive force at a single point.
[0028] Intelligent monitoring and early warning system: The equipment operating status is monitored in real time through pressure sensors, angle sensors and soil detection sensors. Once an abnormality occurs (such as excessive thrust, soil abnormality, etc.), the control module will immediately trigger an alarm and automatically adjust parameters to protect the equipment from damage.
[0029] Please see attached Figure 3 and attached Figure 5 The plurality of push rods include a push rod 21, an outer wall of the push rod 21 is connected to an outer wall of the main frame 1, an output end of the push rod 21 is connected to a sliding bracket 22, a push rod 23 is arranged inside the sliding bracket 22, and an output end of the push rod 23 is connected to a sliding bracket 24.
[0030] Specifically, the propulsion module 2 includes multiple push rods, each of which has a maximum thrust of 80 tons. The design of the propulsion module 2 ensures that it can provide stable thrust under different soil conditions to push the pipe jacking machine along a predetermined trajectory. The push rod part provides thrust through a hydraulic cylinder, and the pressure and stroke of the cylinder can be adjusted in real time through the control module to meet the needs of different soil types. The reasonable distribution of multiple push rods ensures that the pipe jacking machine is pushed more evenly and stably, avoiding the construction instability problem that may be caused by uneven local thrust.
[0031] The multiple push rod design of the propulsion module 2 provides an efficient and stable thrust source, which can adjust the thrust in different construction environments, ensure the smooth propulsion process of the pipe jacking machine, reduce thrust fluctuations during construction, and improve the accuracy and safety of construction.
[0032] Please see attached Figure 3 -Attached Figure 4 The outer wall of the guide frame 31 is fixedly connected to the outer wall of the main frame 1, the lower surface of the base 32 is fixedly connected to the upper surface of the main frame 1, the inner parts of the sliding bracket 1 22 and the sliding bracket 2 24 are slidably connected to the outer wall of the guide frame 31, and the lower surfaces of the sliding bracket 1 22 and the sliding bracket 2 24 are slidably connected to the upper surface of the base 32.
[0033] Specifically, the guide module 3 is arranged on both sides of the main frame 1, and is composed of a guide frame 31 and a base 32, to ensure that the pipe jacking machine maintains linear motion during the construction process. The outer wall of the guide frame 31 is fixedly connected to the outer wall of the main frame 1, and the lower surface of the base 32 is fixedly connected to the upper surface of the main frame 1. The design of the guide module 3 ensures that the pipe jacking machine can still maintain precise direction control under complex geological conditions, avoiding deviation caused by uneven soil or obstacles.
[0034] The guide module 3 ensures that the pipe jacking machine always maintains a straight line during the construction process through precise guide design, reducing the risk of directional deviation and improving the accuracy and efficiency of construction. This design enables the pipe jacking machine to adapt to more complex construction environments, especially in underground pipeline construction, and has significant advantages in directional control under complex geological conditions.
[0035] Please see attached Figure 6 and attached Figure 7 The tunneling head 4 includes a main shell 41, the interior of the main shell 41 is arranged on the outer wall of the sliding bracket 24, the outer wall of the main shell 41 is slidably connected to the upper surface of the base 32, the cutting tool 42 is arranged inside the main shell 41, and the screw conveyor 43 is arranged inside the main shell 41.
[0036] Specifically, the tunneling head 4 is installed in front of the propulsion module 2, and includes a main housing 41, a cutting tool 42 and a screw conveyor 43. The cutting tool 42 is made of cemented carbide material, which has strong wear resistance and can meet the cutting requirements of various hard soils. The screw conveyor 43 transports the soil produced by cutting to the ground through rotation, avoiding the construction difficulty caused by soil accumulation. The design of the tunneling head 4 ensures efficient operation under various soil conditions through optimized cutting angles and screw conveying systems.
[0037] The tunneling head 4 uses a combination of carbide cutting tools 42 and an efficient screw conveyor 43, which ensures efficient cutting and soil transportation under complex geological conditions, significantly improving the efficiency of pipe jacking construction. Its wear resistance and high cutting performance make the equipment have a longer service life and can still work stably in harder soil.
[0038] Please see attached Figure 1 and attached Figure 7 , the control module includes the following components: PLC controller, used to receive and process signals from various sensors, execute predetermined programs, and control various working modules of the pipe jacking machine; Sensors, including pressure sensors, angle sensors and soil detection sensors, for real-time monitoring of thrust, thrust angle, soil hardness and moisture parameters; The display is used to display the equipment operating status in real time, including propulsion speed, thrust, soil parameters and equipment fault information.
[0039] The control module also includes the following components: Communication unit, used to exchange data with external terminal devices via wireless network or wired connection, supporting remote monitoring and adjustment; The abnormal alarm unit is used to monitor the working status of the equipment and send out an alarm signal when an abnormality occurs, automatically stopping or adjusting the equipment operation.
[0040] Specifically, the control module is installed inside the main frame 1 and fixed on the side wall of the main frame 1. The control module includes a PLC controller, a sensor, a display, etc., which is used to monitor the equipment operating parameters in real time and automatically adjust the thrust, propulsion speed and cutting speed of the tunneling head 4 according to a preset program. The PLC controller receives signals from various sensors, performs data analysis, and optimizes the equipment working status in real time.
[0041] The control module realizes the automatic management and real-time adjustment of the pipe jacking machine through the intelligent control system, which significantly improves the construction efficiency and accuracy. Through the dynamic adjustment of each key component, the equipment can maintain a stable operating state under different soil conditions, reducing the intervention of human operation and ensuring the efficiency and safety of the construction process.
[0042] The PLC controller is fixedly mounted on the inner wall of the main frame 1, and transmits signals with the propulsion module 2, the tunneling head 4 and the power module 5 through cables or wireless connections; The pressure sensor is installed on the oil cylinder of propulsion module 2 to monitor the thrust; The angle sensor is installed between the main frame 1 and the propulsion module 2 to monitor the direction and tilt angle of the pipe jacking machine; The soil detection sensor is installed near the tunneling head 4 to detect soil hardness and moisture information in real time; The display is installed at the top of the main frame 1 to facilitate the operator to observe real-time data and equipment operating status.
[0043] Specifically, the sensors include pressure sensors, angle sensors and soil detection sensors, which are used to monitor thrust, propulsion angle, soil hardness and humidity parameters in real time. The pressure sensor is installed on the oil cylinder of the propulsion module 2, the angle sensor is installed between the main frame 1 and the propulsion module 2, and the soil detection sensor is installed near the tunneling head 4. The display shows the equipment operation status in real time, including propulsion speed, thrust, soil parameters and equipment fault information, to help the operator monitor and adjust the equipment status in real time.
[0044] The configuration of sensors provides comprehensive real-time monitoring functions, allowing the equipment to make dynamic adjustments based on real-time data, thereby ensuring the efficiency and safety of the pipe jacking construction process. The real-time data feedback function of the display enables the operator to understand the working status of the equipment at any time, quickly respond, and improve work efficiency.
[0045] The communication unit is installed at the rear of the main frame 1 and performs real-time data transmission with external terminal equipment through wireless or wired connection; The abnormal alarm unit is installed on the top of the main frame 1, and when a fault or abnormality occurs, the alarm system is automatically triggered.
[0046] Specifically, the communication unit is used to exchange data with external terminal devices through a wireless network or wired connection, supporting remote monitoring and adjustment. The abnormal alarm unit is used to monitor the working status of the equipment and send out an alarm signal when an abnormality occurs, automatically stopping or adjusting the equipment operation. The communication unit is installed at the rear of the main frame 1, and the abnormal alarm unit is installed on the top of the main frame 1. When the equipment fails or is abnormal, the alarm system is automatically triggered.
[0047] The design of the communication unit and abnormal alarm unit enables the pipe jacking machine to be remotely monitored and adjusted, improving the intelligence level of the equipment. In addition, the alarm system can promptly remind the operator and automatically adjust the equipment when a fault occurs, avoiding further expansion of equipment failure and ensuring construction safety.
[0048] Please see attached Figure 8 , an operation method of an automatic pipe jacking machine for pipe jacking construction, comprising the following steps: S1. Preparation: Transport the pipe jacking machine 1 to the construction site and inspect and clean the equipment; determine the starting and ending positions of the pipe jacking machine 1 and mark the construction path; install the guide rail 3 straight and firmly; S2. Equipment installation: Install the main frame 1, propulsion module 2, guide module 3, tunneling head 4 and power module 5 in sequence, so that each module is firmly connected and the equipment can operate normally; S3, control module connection: Install the control module 6, ensure that the PLC controller 61, the sensor 62 and the display 63 are correctly connected, and collect soil hardness, thrust and angle parameters through the sensor 62 to monitor the operation status of the equipment; S4. Equipment debugging: Start the power module 5 and check whether it works normally; start the control module 6 and check whether the sensor 62 and the display 63 feedback accurate equipment operation data; adjust the thrust and extension speed of multiple push rods in the propulsion module 2 according to the preset program, and debug the coordination of the propulsion module 2, the guide module 3, the tunneling head 4 and the power module 5; S5. Start jacking operation: Start the propulsion module 2, automatically adjust the thrust and extension speed of multiple push rods through the PLC controller 61, and start the jacking operation; monitor the data on the display 63 in real time; detect the soil hardness and moisture data in real time through the sensor 62, and adjust the cutting speed and thrust of the tunneling head 4; S6. Monitoring and adjustment: The operator can view the working status of the equipment in real time through the display 63 and make adjustments as needed; S7, end the operation: When the pipe jacking machine 1 is pushed to a predetermined position, the pushing operation is stopped and the power module 5 is turned off; the control module is turned off and the equipment operation data is saved.
[0049] In step S5, when push rod 1 21 is pushed, it pushes sliding bracket 1 22 to slide on the outer wall of guide frame 31, and when push rod 23 is pushed, it pushes sliding bracket 2 24 and tunneling head 4 to slide on the outer wall of guide frame 31 and the upper surface of base 32.
[0050] Specifically, S1. Preparation: Equipment cleaning and inspection: After transporting the pipe jacking machine 1 to the construction site, first clean the equipment thoroughly, especially the hydraulic system, electrical connectors, oil cylinder, sensors and other parts to prevent dust or debris accumulated during transportation from affecting the normal operation of the equipment. At the same time, check whether the hydraulic oil, fuel, batteries and other consumables are sufficient to ensure that the equipment is in the best working condition.
[0051] Through thorough cleaning and inspection, performance degradation caused by foreign matter or hydraulic failure during the initial operation of the equipment is avoided, the startup stability and working efficiency of the equipment are improved, and the probability of failure is reduced.
[0052] S2. Equipment installation: Module docking accuracy: During the installation process, the docking of each module needs to be adjusted with high-precision tools to ensure that the connection interface position is accurate and correct to avoid operation deviation caused by unstable connection. Especially when installing between the main frame 1 and the propulsion module 2 and the guide module 3, attention should be paid to the accuracy and stability of the docking to avoid deviation or looseness during the construction process.
[0053] Precise docking ensures the stability of the equipment after installation, enables the equipment to maintain a stable operating direction during construction, avoids performance fluctuations caused by installation errors, and enhances the adaptability and reliability of the pipe jacking machine under complex geological conditions.
[0054] S3, control module connection: Signal transmission and data synchronization: The control module 6 transmits data synchronously with each sensor 62 and the PLC controller 61 through a high-precision cable or wireless system. During signal transmission, anti-interference technology is used to avoid the influence of external electromagnetic interference on data collection and transmission, ensuring that the equipment can stably obtain various parameters such as soil hardness, thrust, angle, etc.
[0055] Anti-interference technology ensures the accuracy of data collection and transmission, and ensures that the equipment can maintain real-time monitoring and dynamic adjustment capabilities during high-load operations, thereby improving the stability of the automatic control system and the operating accuracy of the equipment.
[0056] S4. Equipment debugging: Load test in debugging: During the equipment debugging process, in addition to adjusting the thrust and extension speed of multiple push rods in the propulsion module 2, a load test is also required to simulate different geological conditions that may be encountered during the actual construction process to ensure that the equipment can still operate normally under the thrust limit. During the test, the PLC controller 61 automatically adjusts the propulsion speed and thrust to ensure that the equipment will not fail due to excessive load.
[0057] Beneficial effects: Load testing ensures that the equipment can still operate stably under high load conditions. It can simulate the changes brought about by different soil types during the construction process, identify potential problems in advance, improve the comprehensiveness and reliability of equipment debugging, and provide sufficient guarantee for subsequent construction.
[0058] S5. Start jacking operation: Automatic thrust adjustment: After the propulsion module 2 is started, the PLC controller 61 will automatically adjust the thrust and extension speed of the push rod according to the real-time feedback data of the soil. For example, when pushing in hard soil, the PLC controller will increase the thrust; in soft soil, the system will reduce the thrust and increase the propulsion speed, ensuring that the pipe jacking machine can maintain efficient operation under various soil conditions.
[0059] Automated thrust adjustment can optimize the propulsion strategy in real time according to soil conditions, avoiding damage to equipment or pipelines caused by excessive or insufficient thrust, and improving the adaptability and operating efficiency of the pipe jacking machine in complex geological environments.
[0060] S6. Monitoring and adjustment: Data feedback and real-time adjustment: Through the sensor 62, key parameters such as soil hardness, moisture, thrust, etc. are fed back to the control module 6 in real time. The operator can view these data in real time through the display 63 and can make fine adjustments through the control module when necessary. For example, if the sensor detects that the soil moisture is too high, which may cause increased equipment resistance, the operator can immediately adjust the cutting speed or thrust of the tunneling head 4 to reduce the burden on the equipment.
[0061] The real-time monitoring and feedback mechanism enables the operator to respond quickly to any changes during the construction process, adjust the operating parameters in time, and avoid the equipment operating under unsuitable soil conditions, thus ensuring the safety, efficiency of the operation and the long life of the equipment.
[0062] S7, end the operation: Run data storage and subsequent analysis: After the pipe jacking operation is completed, the control module 6 will store the equipment's operating data, including thrust, propulsion speed, soil parameters, working time, etc. These data will play an important role in subsequent equipment maintenance, performance analysis and optimization.
[0063] By storing and analyzing operating data, valuable information can be provided for the later maintenance and optimization of equipment, and possible equipment failures can be predicted in advance, thereby extending the service life of the equipment, reducing the failure rate, and improving construction efficiency.
[0064] Push rod operation in step S5: Coordination of the putter: In step S5, the coordinated work of push rod 1 21 and push rod 2 23 not only relies on the high efficiency of the hydraulic drive system, but also relies on the precise mechanical structure design. The push rod 1 21 and push rod 2 23 achieve stable relative motion through the sliding bracket 1 22 and the sliding bracket 2 24, ensuring that the push rod is evenly stressed during the advancement process, avoiding system instability caused by deflection.
[0065] The precise coordination of the push rods makes the advancement process smoother, avoids tilting or jamming caused by uneven thrust, ensures efficient advancement of the pipe jacking machine, and significantly improves the stability and accuracy during the construction process.
[0066] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An automatic pipe jacking machine for pipe jacking construction, characterized in that: include: The main frame (1) is made of high-strength steel and is capable of withstanding the thrust applied by the pipe jacking machine during operation; A propulsion module (2), comprising a plurality of push rods and having a maximum thrust of 80 tons; The guide module (3) is arranged on both sides of the main frame (1), and is composed of a guide frame (31) and a base (32), so that the pipe jacking machine can maintain linear motion during the construction process; The tunneling head (4) is installed in front of the propulsion module (2), and includes a cutting tool (42) and a screw conveyor (43). The cutting tool (42) is made of hard alloy material, and the screw conveyor (43) is used to transport the soil generated by cutting to the ground. A power module (5) is arranged inside the tunneling head (4) and uses a diesel engine with a power of 150 kW to provide continuous power for the tunneling head (4); The control module is arranged inside the main frame (1) and fixedly mounted on the side wall of the main frame (1), and is capable of monitoring the equipment operating parameters in real time and automatically adjusting the thrust, propulsion speed and cutting speed of the tunneling head (4) according to a preset program.
2. The automatic pipe jacking machine for pipe jacking construction according to claim 1, characterized in that: The plurality of push rods include a push rod 1 (21), the outer wall of the push rod 1 (21) being connected to the outer wall of the main frame (1), the output end of the push rod 1 (21) being connected to a sliding bracket 1 (22), a push rod 2 (23) being arranged inside the sliding bracket 1 (22), and the output end of the push rod 2 (23) being connected to a sliding bracket 2 (24).
3. The automatic pipe jacking machine for pipe jacking construction according to claim 2, characterized in that: The outer wall of the guide frame (31) is fixedly connected to the outer wall of the main frame (1), the lower surface of the base (32) is fixedly connected to the upper surface of the main frame (1), the interior of the sliding bracket 1 (22) and the sliding bracket 2 (24) are slidably connected to the outer wall of the guide frame (31), and the lower surfaces of the sliding bracket 1 (22) and the sliding bracket 2 (24) are slidably connected to the upper surface of the base (32).
4. The automatic pipe jacking machine for pipe jacking construction according to claim 2, characterized in that: The tunneling head (4) comprises a main shell (41), the interior of the main shell (41) is arranged on the outer wall of the sliding bracket (24), the outer wall of the main shell (41) is slidably connected to the upper surface of the base (32), the cutting tool (42) is arranged inside the main shell (41), and the screw conveyor (43) is arranged inside the main shell (41).
5. The automatic pipe jacking machine for pipe jacking construction according to claim 1, characterized in that: The control module includes the following components: PLC controller, used to receive and process signals from various sensors, execute predetermined programs, and control various working modules of the pipe jacking machine; Sensors, including pressure sensors, angle sensors, and soil detection sensors, for real-time monitoring of thrust, thrust angle, soil hardness, and moisture parameters; The display is used to display the equipment operating status in real time, including propulsion speed, thrust, soil parameters and equipment fault information.
6. The automatic pipe jacking machine for pipe jacking construction according to claim 1, characterized in that: The control module also includes the following components: Communication unit, used to exchange data with external terminal devices via wireless network or wired connection, supporting remote monitoring and adjustment; The abnormal alarm unit is used to monitor the working status of the equipment and send out an alarm signal when an abnormality occurs, automatically stopping or adjusting the operation of the equipment.
7. The automatic pipe jacking machine for pipe jacking construction according to claim 5, characterized in that: The PLC controller is fixedly mounted on the inner wall of the main frame (1) and performs signal transmission with the propulsion module (2), the tunneling head (4) and the power module (5) via cables or wireless connections; The pressure sensor is mounted on the oil cylinder of the propulsion module (2) and is used to monitor the thrust; The angle sensor is installed between the main frame (1) and the propulsion module (2) and is used to monitor the direction and tilt angle of the pipe jacking machine; The soil detection sensor is installed near the tunneling head (4) and is used to detect soil hardness and moisture information in real time; The display is installed at the top of the main frame (1) to facilitate the operator to observe real-time data and equipment operating status.
8. The automatic pipe jacking machine for pipe jacking construction according to claim 6, characterized in that: The communication unit is installed at the rear of the main frame (1) and performs real-time data transmission with an external terminal device via a wireless or wired connection; The abnormality alarm unit is installed on the top of the main frame (1), and automatically triggers the alarm system when a fault or abnormality occurs.
9. An operating method of an automatic pipe jacking machine for pipe jacking construction, characterized in that: The automatic pipe jacking machine for pipe jacking construction according to any one of claims 1 to 8 comprises the following steps: S1. Preparation: Transport the pipe jacking machine (1) to the construction site and inspect and clean the equipment; determine the starting and ending positions of the pipe jacking machine (1) and mark the construction path; and install the guide rail (3) in a straight and firm manner; S2. Equipment installation: The main frame (1), the propulsion module (2), the guide module (3), the tunneling head (4) and the power module (5) are installed in sequence, so that each module is firmly connected and the equipment can operate normally; S3, control module connection: Install the control module (6) so that the PLC controller (61), the sensor (62) and the display (63) are properly connected, and collect soil hardness, thrust and angle parameters through the sensor (62) to monitor the operating status of the equipment; S4. Equipment debugging: Starting the power module (5) and checking whether it is working properly; starting the control module (6) and checking whether the sensor (62) and the display (63) feedback accurate equipment operation data; adjusting the thrust and extension speed of multiple push rods in the propulsion module (2) according to a preset program, and debugging the coordination of the propulsion module (2), the guide module (3), the tunneling head (4) and the power module (5); S5. Start jacking operation: Starting the propulsion module (2), automatically adjusting the thrust and extension speed of the plurality of push rods through the PLC controller (61), and starting the jacking operation; monitoring the data on the display (63) in real time; detecting the soil hardness and moisture data in real time through the sensor (62), and adjusting the cutting speed and thrust of the tunneling head (4); S6. Monitoring and adjustment: The operator can view the working status of the equipment in real time through the display (63) and make adjustments as needed; S7, end the operation: When the pipe jacking machine (1) is pushed to a predetermined position, the pushing operation is stopped and the power module (5) is turned off; the control module is turned off and the equipment operation data is saved.
10. The method for operating an automatic pipe jacking machine for pipe jacking construction according to claim 9, characterized in that: In the step S5, when the push rod 1 (21) is pushed forward, the sliding bracket 1 (22) is pushed to slide on the outer wall of the guide frame (31), and when the push rod 2 (23) is pushed forward, the sliding bracket 2 (24) and the tunneling head (4) are pushed on the outer wall of the guide frame (31) and the upper surface of the base (32).
Citation Information
Cited By
Pipe jacking machine and joint device of pipe jacking machine
CN121630463A
Device for preventing twisting of tube push bench body entering hole
CN122148332A
Device for preventing twisting of tube push bench body entering hole
CN224244885U