Device and method for fixing distance between segment reinforcement cages
By designing a spacing fixing device for steel cages, the combination of fixed plates, support frames and fixed rods is used to solve the problem that existing devices cannot fix the spacing between the middle position of steel bars, and efficient steel cage welding is achieved, reducing workers' labor intensity and reducing production costs.
Patent Information
- Application Number
- CN202510204565.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-24
- Publication Date
- 2025-04-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing steel cage welding positioning device cannot effectively fix the intermediate position spacing of the steel bars, resulting in wasted welding time, high technical requirements for workers and high labor intensity, which increases production costs.
A steel cage spacing fixing device including a base, a support mechanism, a fixed plate, a support frame, a first support plate, a second support plate and a fixed rod is designed. The installation of the inner layer of the steel cage through the cooperation of the fixed plate and the first support plate is realized; the installation of the outer layer of the steel cage through the cooperation of the second support plate and the fixed rod is realized, thereby ensuring the intermediate position spacing of the steel bars.
The device is simple in structure and easy to manufacture, which reduces workers' labor intensity, improves work efficiency, ensures the processing quality of steel cages, and reduces the production cost of construction.
Smart Images

Figure CN119870854A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel cage welding, and in particular to a device and method for fixing the spacing of steel cages for pipe segments. Background Art
[0002] The steel cage can restrain the prefabricated segment concrete, enabling it to withstand a certain horizontal force and improve its tensile performance. It is widely used in construction and tunnel and underground engineering fields. When making the steel cage, workers generally use iron wire to make a steel cage skeleton, and then use carbon dioxide shielded welding to weld the steel bars. However, when welding the existing steel cage, the steel bars are prone to shaking, and multiple workers are required to hold the steel bars steady while welding. Therefore, it brings great inconvenience to the workers and consumes physical and manpower.
[0003] The prior art CN116713677A discloses a steel bar fixing device for welding steel bar cages, which is implemented by placing the steel bar cage on the lower support seat, and then rotating the corresponding upper fixing seat to clamp the steel bar cage, and controlling the electric push rod to extend and retract so that the hook is clamped into the clamping seat, thereby achieving fixed clamping of the steel bar cage, ensuring that the steel bar cage remains stable during the welding process, which is beneficial to improving the welding effect, and the rotating shaft is driven to rotate by the first double-headed motor, and the rotating shaft drives the first bidirectional screw to rotate through the cooperation of the first bevel gear and the second bevel gear, and the first bidirectional screw drives the corresponding sliding plate to slide, and the sliding plate drives the bearing plate to move up and down through the connecting plate and the connecting seat, so as to facilitate the adjustment of the height of the lower support seat and the fixed steel bar cage, which is beneficial to the staff to weld the steel bar cage and improve the welding work efficiency, and is beneficial to the staff to put the steel bar cage into the lower support seat or remove it from the lower support seat, further improving the work efficiency.
[0004] However, when the above-mentioned positioning device is used to weld the steel cage, the steel bar spacing is generally fixed by the support plates on both sides of the base above the base. This method can only ensure the spacing at the bottom and both sides of the steel bars, but cannot ensure the spacing in the middle of the steel bars. In addition, it greatly wastes welding time during welding, has particularly high technical requirements for workers, and has high labor intensity and is prone to fatigue, which increases the processing and production costs. Summary of the invention
[0005] The purpose of the present invention is to provide a device and method for fixing the spacing of steel cages for pipe segments, which solves the problem that when welding the steel cages, the existing positioning device generally fixes the steel spacing through the support plates on both sides of the base above the base. This method can only ensure the spacing at the bottom and both sides of the steel bars, but cannot ensure the spacing in the middle of the steel bars. In addition, it greatly wastes welding time during welding, has particularly high technical requirements for workers, and has high labor intensity and easy fatigue, which increases the processing and production costs.
[0006] To achieve the above-mentioned objectives, the present invention provides a device for fixing the spacing of segment reinforcement cages, comprising a base, and also comprising a supporting mechanism, a fixing plate, a supporting frame, a first supporting plate, a second supporting plate and a fixing rod, wherein the supporting mechanism is located on the base and is used to support the fixing plate, the number of the fixing plates is two, and they are symmetrically arranged on the left and right sides above the base, the supporting frame is evenly arranged on the base, the first supporting plate is arranged on the supporting frame, the number of the first supporting plates is two, and they are symmetrically arranged on the left and right sides above the base, and the two first supporting plates are located between the two fixing plates, the second supporting plates are evenly distributed on the first supporting plate, and a plurality of fixing rods are arranged outside each of the second support plates.
[0007] Wherein, the support mechanism includes a mounting plate and a support rod, the mounting plate is arranged on the base, the support rod is detachably arranged between two opposite and adjacent mounting plates, and the support rod is arranged below the fixing plate.
[0008] Wherein, the mounting plate and the support rod are connected via a limiting member, so that the support rod can be disassembled to achieve the purpose of disassembling the fixing plate.
[0009] Among them, the limiting part includes a limiting bolt and a limiting nut, the limiting bolt is detachably connected to the mounting plate and the support rod respectively, and passes through the mounting plate and the support rod respectively, and the limiting nut is detachably connected to the limiting bolt and is sleeved outside the limiting bolt.
[0010] The fixing rod is fixed to the outside of the second support plate by welding, and the fixing rod is used to support the steel bars when the steel cage is manufactured.
[0011] Among them, a plurality of first steel bar grooves are evenly distributed on the fixed plate and the first supporting plate, the number of the first steel bar grooves of the fixed plate and the first steel bar grooves of the first supporting plate are the same, and the positions of the first steel bar grooves of the fixed plate and the first steel bar grooves of the first supporting plate correspond one to one.
[0012] The present invention also provides a method for fixing the spacing of steel cages for pipe segments, comprising the following steps:
[0013] Inserting a support rod between two opposite and adjacent mounting plates, when the support rod contacts the base, the through hole of the support rod is aligned with the through hole of the mounting plate;
[0014] At this time, insert the limiting bolts into the through holes of the support rod and the mounting plate, and then gradually tighten the limiting nuts outside the limiting bolts to achieve the installation of the fixing plate on the base;
[0015] After the fixing plate is installed, the steel bars are sequentially inserted into the first steel bar grooves at several corresponding positions on the fixing plate and the first support plate to achieve the installation of the inner layer of the steel cage;
[0016] After the inner layer of the steel cage is installed, the other steel bars are passed through the inner layer of the steel cage and inserted into the plurality of second steel bar grooves of the second support plate in sequence to install the outer layer of the steel cage;
[0017] The steel cage is manufactured by installing the inner layer and the outer layer of the steel cage. During the manufacturing process, the spacing at the bottom, both sides and the middle of the steel bars is ensured by the coordinated use of the fixing plate, the first support plate and the second support plate.
[0018] The present invention discloses a device and method for fixing the spacing of steel cages of pipe segments. The fixing plate and the first supporting plate are used to support the steel bars together, so that the inner layer of the steel cage can be installed. The second supporting plate and the fixing rod are used to support the steel bars together, so that the outer layer of the steel cage can be installed. During the installation of the steel cage, the fixing plate, the first supporting plate and the second supporting plate are used in coordination to ensure the spacing at the bottom, both sides and the middle of the steel bars. At the same time, the structure of the steel cage spacing fixing device is simple, easy to manufacture, safe and reliable, thereby reducing the labor intensity of workers and improving work efficiency, thereby ensuring the processing quality of the steel cage and improving the work efficiency of construction. The existing positioning device generally fixes the steel cage spacing through the two side supporting plates of the base above the base when welding the steel cage. This method can only ensure the spacing at the bottom and both sides of the steel bars, but cannot ensure the spacing at the middle of the steel bars. Moreover, the welding time will be greatly wasted during welding, the technical requirements for workers are particularly high, and the labor intensity is high and fatigue is easy, which increases the processing and production costs. Technical problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0020] Figure 1 It is a schematic diagram of the overall structure of a device for fixing the spacing of steel cages for pipe segments according to the first embodiment of the present invention.
[0021] Figure 2 It is a schematic diagram of the connection between the fixing rod and the second supporting plate according to the first embodiment of the present invention.
[0022] Figure 3 It is a cross-sectional schematic diagram along the base of the first embodiment of the present invention.
[0023] Figure 4 It is a flow chart of the steps of a method for fixing the spacing of segment reinforcement cages according to the second embodiment of the present invention.
[0024] In the figure: 101-base, 102-fixing plate, 103-support frame, 104-first support plate, 105-second support plate, 106-fixing rod, 107-mounting plate, 108-support rod, 109-limiting bolt, 110-limiting nut, 111-plug-in slot, 112-first steel bar slot, 113-second steel bar slot. DETAILED DESCRIPTION
[0025] Embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be construed as limiting the present invention.
[0026] First embodiment:
[0027] See also Figures 1 to 3 The present invention provides a device for fixing the spacing of a segment reinforcement cage, comprising a base 101, a supporting mechanism, a fixing plate 102, a supporting frame 103, a first supporting plate 104, a second supporting plate 105 and a fixing rod 106, wherein the supporting mechanism comprises a mounting plate 107 and a supporting rod 108, wherein the mounting plate 107 and the supporting rod 108 are connected by a limiting member, and the limiting member comprises a limiting bolt 109 and a limiting nut 110.
[0028] In this embodiment, the steel bars are supported by the fixing plate 102 and the first supporting plate 104, so that the inner layer of the steel cage can be installed. The steel bars are supported by the second supporting plate 105 and the fixing rod 106, so that the outer layer of the steel cage can be installed. During the installation of the steel cage, the fixing plate 102, the first supporting plate 104 and the second supporting plate 105 are used in coordination to ensure the spacing at the bottom, both sides and the middle of the steel bars. At the same time, the steel cage spacing fixing device has a simple structure, is easy to manufacture, safe and reliable, thereby reducing the labor intensity of workers and improving work efficiency, thereby ensuring the processing quality of the steel cage and improving the work efficiency of construction. The existing positioning device generally fixes the steel cage spacing by the two side support plates of the base 101 above the base 101 when welding the steel cage. This method can only ensure the spacing at the bottom and both sides of the steel bars, but cannot ensure the spacing at the middle of the steel bars. In addition, it will greatly waste welding time during welding, and the technical requirements for workers are particularly high. In addition, the labor intensity is high and fatigue is easy, which increases the processing and production costs. Technical problems.
[0029] Among them, the supporting mechanism is located on the base 101, and is used to support the fixed plate 102. The number of the fixed plates 102 is two, and they are symmetrically arranged on the left and right sides above the base 101. The supporting frame 103 is evenly arranged on the base 101. The first supporting plate 104 is arranged on the supporting frame 103. The number of the first supporting plates 104 is two, and they are symmetrically arranged on the left and right sides above the base 101, and the two first supporting plates 104 are located between the two fixed plates 102. The second supporting plates 105 are evenly distributed on the first supporting plates 104, and each of the second supporting plates 105 is provided with a plurality of fixing rods 106.
[0030] Secondly, a plurality of insertion slots 111 are evenly distributed on the first support plate 104 , and the second support plate 105 is inserted into each of the insertion slots 111 , so as to achieve the purpose of installing or removing the second support plate 105 on the first support plate 104 .
[0031] Again, the mounting plate 107 is arranged on the base 101, and the support rod 108 is disassembled and arranged between two opposite and adjacent mounting plates 107, and the support rod 108 is arranged below the fixed plate 102. The mounting plate 107 and the support rod 108 are connected by a limit piece to realize the disassembly of the support rod 108, so as to achieve the purpose of disassembling the fixed plate 102.
[0032] At the same time, the limiting bolt 109 is detachably connected to the mounting plate 107 and the support rod 108 , and passes through the mounting plate 107 and the support rod 108 , respectively; the limiting nut 110 is detachably connected to the limiting bolt 109 , and is sleeved outside the limiting bolt 109 .
[0033] In addition, the fixing rod 106 is fixed to the outside of the second support plate 105 by welding. The fixing rod 106 is used to support the steel bars when the steel cage is manufactured. A plurality of second steel bar grooves 113 are distributed on the second support plate 105, and a fixing rod 106 is arranged near each of the second steel bar grooves 113.
[0034] Finally, a plurality of first steel bar grooves 112 are evenly distributed on the fixed plate 102 and the first support plate 104, the number of the first steel bar grooves 112 of the fixed plate 102 and the first support plate 104 are the same, and the positions of the first steel bar grooves 112 of the fixed plate 102 and the first steel bar grooves 112 of the first support plate 104 correspond one to one, and the same steel bar is inserted into the first steel bar grooves 112 at the corresponding positions of the fixed plate 102 and the first support plate 104.
[0035] When using the device for fixing the spacing of the steel cage of the pipe segment according to the present embodiment, a plurality of the support rods 108 are inserted in sequence between the two oppositely and adjacently arranged mounting plates 107 at corresponding positions. When the support rods 108 are in contact with the base 101, the through holes of the support rods 108 will be aligned with the through holes of the mounting plates 107 at corresponding positions. At this time, the limiting bolts 109 are inserted into the through holes of the support rods 108 and the mounting plates 107, and then the limiting nuts 110 are sleeved outside the limiting bolts 109, so that the limiting nuts 110 move along the trajectory of the threads outside the limiting bolts 109, so that the limiting nuts 110 can be tightened outside the limiting bolts 109, so that the support rods 108 can be limited and fixed in the mounting plates 107 at corresponding positions, and then the fixing plates 102 can be limited and fixed above the base 101, thereby realizing the installation of the fixing plates 102 on the base 101.
[0036] After installing the fixing plate 102, several steel bars are sequentially inserted into the first steel bar grooves 112 at several corresponding positions on the fixing plate 102 and the first support plate 104, so as to realize the installation of the inner layer of the steel cage. After installing the inner layer of the steel cage, several other steel bars are allowed to surround the inner layer of the steel cage, and are sequentially inserted into several second steel bar grooves 113 of the second support plate 105, so as to realize the installation of the outer layer of the steel cage. By installing the inner layer and the outer layer of the steel cage, the steel cage can be manufactured. During the entire manufacturing process of the steel cage, the fixing plate 102, the first support plate 104 and the second support plate 105 are used in coordination to ensure the spacing at the bottom, both sides and the middle position of the steel bars.
[0037] In summary, the steel bars are supported by the fixing plate 102 and the first supporting plate 104, so that the inner layer of the steel cage can be installed. The steel bars are supported by the second supporting plate 105 and the fixing rod 106, so that the outer layer of the steel cage can be installed. During the installation of the steel cage, the spacing at the bottom, both sides and the middle of the steel bars is guaranteed by the coordinated use of the fixing plate 102, the first supporting plate 104 and the second supporting plate 105. At the same time, the steel cage spacing fixing device has a simple structure, is easy to manufacture, safe and reliable, thereby reducing the labor intensity of workers and improving work efficiency, thereby ensuring the processing quality of the steel cage and improving the work efficiency of construction. The existing positioning device generally fixes the steel cage spacing by the two side support plates of the base 101 above the base 101 when welding the steel cage. This method can only ensure the spacing at the bottom and both sides of the steel bars, but cannot ensure the spacing at the middle of the steel bars. Moreover, it will greatly waste welding time during welding, and the technical requirements for workers are particularly high. In addition, the labor intensity is high and fatigue is easy, which increases the processing and production costs. Technical problems.
[0038] Second embodiment:
[0039] Based on the first embodiment, please refer to Figure 4 The present invention also provides a method for fixing the spacing of steel cages for pipe segments, comprising the following steps:
[0040] S101 , inserting a support rod 108 between two opposite and adjacent mounting plates 107 , when the support rod 108 contacts the base 101 , the through hole of the support rod 108 is aligned with the through hole of the mounting plate 107 .
[0041] S102 , at this time, insert the limiting bolt 109 into the through holes of the support rod 108 and the mounting plate 107 , and then gradually tighten the limiting nut 110 outside the limiting bolt 109 to achieve the installation of the fixing plate 102 on the base 101 .
[0042] Specifically, several of the support rods 108 are inserted in sequence between two opposite and adjacent mounting plates 107 at corresponding positions. When the support rods 108 contact the base 101, the through holes of the support rods 108 will be aligned with the through holes of the mounting plates 107 at corresponding positions. At this time, the limiting bolts 109 are inserted into the through holes of the support rods 108 and the mounting plates 107, and then the limiting nuts 110 are sleeved outside the limiting bolts 109, so that the limiting nuts 110 move along the trajectory of the threads outside the limiting bolts 109, so that the limiting nuts 110 can be tightened outside the limiting bolts 109, so that the support rods 108 can be limited and fixed in the mounting plates 107 at corresponding positions, and then the fixing plates 102 can be limited and fixed above the base 101, thereby realizing the installation of the fixing plates 102 on the base 101.
[0043] S103, after the fixing plate 102 is installed, the steel bars are sequentially inserted into the first steel bar grooves 112 at several corresponding positions on the fixing plate 102 and the first support plate 104 to achieve the installation of the inner layer of the steel cage.
[0044] S104, after the inner layer of the steel cage is installed, the other steel bars are passed through the inner layer of the steel cage and inserted into the plurality of second steel bar grooves 113 of the second support plate 105 in sequence to install the outer layer of the steel cage.
[0045] S105. The steel cage is manufactured by installing the inner layer and the outer layer of the steel cage. During the manufacturing process, the spacing at the bottom, both sides and the middle of the steel bars is ensured by the coordinated use of the fixing plate 102, the first support plate 104 and the second support plate 105.
[0046] Specifically, after installing the fixing plate 102, several steel bars are sequentially inserted into the first steel bar grooves 112 at several corresponding positions on the fixing plate 102 and the first support plate 104, so as to realize the installation of the inner layer of the steel cage. After installing the inner layer of the steel cage, several other steel bars are allowed to surround the inner layer of the steel cage and are sequentially inserted into several second steel bar grooves 113 of the second support plate 105, so as to realize the installation of the outer layer of the steel cage. By installing the inner layer and the outer layer of the steel cage, the steel cage can be manufactured. During the entire manufacturing process of the steel cage, the fixing plate 102, the first support plate 104 and the second support plate 105 are used in coordination to ensure the spacing at the bottom, both sides and the middle position of the steel bars.
[0047] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A device for fixing the spacing of steel cages for pipe segments, comprising a base, characterized in that: It also includes a supporting mechanism, a fixing plate, a supporting frame, a first supporting plate, a second supporting plate and a fixing rod. The supporting mechanism is located on the base and is used to support the fixing plate. The number of the fixing plates is two and they are symmetrically arranged on the left and right sides above the base. The supporting frame is evenly arranged on the base. The first supporting plate is arranged on the supporting frame. The number of the first supporting plates is two and they are symmetrically arranged on the left and right sides above the base. The two first supporting plates are located between the two fixing plates. The second supporting plates are evenly distributed on the first supporting plates. A number of fixing rods are arranged outside each of the second supporting plates.
2. The device for fixing the spacing of steel cages for pipe segments according to claim 1, characterized in that: The support mechanism comprises a mounting plate and a support rod, wherein the mounting plate is arranged on the base, the support rod is detachably arranged between two mounting plates which are arranged oppositely and adjacently, and the support rod is arranged below the fixing plate.
3. The device for fixing the spacing of steel cages for pipe segments according to claim 2, characterized in that: The mounting plate and the support rod are connected via a limiting member, so that the support rod can be disassembled to achieve the purpose of disassembling the fixing plate.
4. The device for fixing the spacing of steel cages for pipe segments according to claim 3, characterized in that: The limiting member includes a limiting bolt and a limiting nut. The limiting bolt is detachably connected to the mounting plate and the support rod respectively and passes through the mounting plate and the support rod respectively. The limiting nut is detachably connected to the limiting bolt and is sleeved outside the limiting bolt.
5. The device for fixing the spacing of steel cages for pipe segments according to claim 1, characterized in that: The fixing rod is fixed to the outside of the second support plate by welding, and the fixing rod is used to support the steel bars when the steel cage is manufactured.
6. The device for fixing the spacing of steel cages for pipe segments according to claim 1, characterized in that: A plurality of first steel bar grooves are evenly distributed on the fixed plate and the first supporting plate, the number of the first steel bar grooves of the fixed plate and the first steel bar grooves of the first supporting plate are the same, and the positions of the first steel bar grooves of the fixed plate and the first steel bar grooves of the first supporting plate correspond one to one.
7. A method for fixing the spacing of steel cages for pipe segments, applied to the device for fixing the spacing of steel cages for pipe segments as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: Inserting a support rod between two opposite and adjacent mounting plates, when the support rod contacts the base, the through hole of the support rod is aligned with the through hole of the mounting plate; At this time, insert the limiting bolts into the through holes of the support rod and the mounting plate, and then gradually tighten the limiting nuts outside the limiting bolts to achieve the installation of the fixing plate on the base; After the fixing plate is installed, the steel bars are sequentially inserted into the first steel bar grooves at several corresponding positions on the fixing plate and the first support plate to achieve the installation of the inner layer of the steel cage; After the inner layer of the steel cage is installed, the other steel bars are passed through the inner layer of the steel cage and inserted into the plurality of second steel bar grooves of the second support plate in sequence to install the outer layer of the steel cage; The steel cage is manufactured by installing the inner layer and the outer layer of the steel cage. During the manufacturing process, the spacing at the bottom, both sides and the middle of the steel bars is ensured by the coordinated use of the fixing plate, the first support plate and the second support plate.
Citation Information
Patent Citations
Steel bar bending device for building construction
CN215746080U
Positioning device for forming shield segment reinforcement cage
CN218192317U
Portable reinforcing mesh processing device
CN221209719U
An oversized diameter bored pile reinforcement cage construction device
DE202023102720U1