Novel quickly-constructed trestle abutment structure and construction method

By adopting floating pier, pier group, stabilizing platform group and positioning components in the pier structure of the trest bridge, the problems of difficult construction and easy corrosion in the existing pier structure are solved, and the effects of rapid floating and stable support are achieved.

CN119900216AActive Publication Date: 2025-04-29CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202510206449.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-25
Publication Date
2025-04-29
Estimated Expiration
2045-02-25

AI Technical Summary

Technical Problem

现有栈桥墩台结构在施工难度大,柱墩容易下沉和腐蚀,且在不使用时难以折除。

Method used

The new and fast-constructed trestle pier structure is adopted, including floating pier, bridge pier group, stabilizing platform group, positioning assembly and water level sensing rod. The buoyancy is adjusted through the buoyant water tank and the pump, and the stabilizing platform group and positioning assembly are used to improve support stability.

Benefits of technology

The rapid floating and stable support of the pier structure on the water surface is realized, the construction difficulty is reduced, the column pier sinking and corrosion are avoided, and the removal and maintenance are facilitated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119900216A_ABST
    Figure CN119900216A_ABST
Patent Text Reader

Abstract

The invention provides a novel rapidly-constructed trestle abutment structure and a construction method, and belongs to the technical field of trestle abutment structures, the structure comprises an abutment structure, a bridge frame is arranged on the top surface of the abutment structure, trestle deck frames are transversely arranged on the top surface of the bridge frame, and every two adjacent trestle deck frames are movably spliced with each other; the pier structure comprises a pier set, two stabilizing table sets and two positioning assemblies are transversely arranged on the front side and the rear side of the top face of the pier set, the trestle pier structure rapid to construct is formed, the pier structure directly floats on the water surface during construction, and through the hollow sealing design of the buoyancy water tank and the mounting chamber on the floating pier, the pier structure can be conveniently and rapidly constructed. The floating pier structure does not need to be inserted into mud to be installed, the main structure is made of plastic, corrosion resistance is high, the whole trestle is not prone to deformation, assembly and disassembly construction is convenient and efficient, and the service life is long.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a novel quick-construction trestle pier structure and a construction method, belonging to the technical field of trestle pier structures. Background Art

[0002] The Pier It refers to a bridge built on rivers, lakes and other water bodies for people to pass through. The Pier It is a bridge built by plank roads on both sides of the river. The existing pier structure generally uses steel or wooden columns directly inserted into the water, and then fixed between the columns. The bridge deck is built in this way Built The trestle bridge, The construction of the pier is difficult and In use During the process, The piers are prone to sinking and corrosion damage. The entire trestle is deformed. In addition, when the trestle is not in use, When using The piers of the trestle are difficult to dismantle. In view of the above-mentioned shortcomings, the present invention proposes a novel and quick-construction pier structure and a construction method. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention aims to provide a novel and quick-construction trestle pier structure and construction method to solve the existing problems.

[0004] In order to achieve the above-mentioned purpose, the present invention is realized through the following technical scheme: a new type of quick-construction pier structure and construction method, which structure includes a pier structure, and a bridge frame is arranged on the top surface of the pier structure, and a pier deck frame is arranged horizontally on the top surface of the bridge frame, and two adjacent pier deck frames are movably spliced ​​with each other, the pier structure includes a pier platform group, and two stabilizing platform groups and two positioning components are arranged horizontally on the front and rear sides of the top surface of the pier platform group, and the left and right sides of the positioning components extend to the left and right sides of the stabilizing platform group, a water level sensor rod is vertically arranged on one side of the front end of the pier platform group, and an operating table is arranged on the right side of the bridge frame, and the pier platform group, two stabilizing platform groups, two positioning components, and the water level sensor rod are movably electrically connected to the operating table; The bridge pier group includes a floating pier, and a horizontal platform is arranged on the top surface of the floating pier, and a water pump is arranged in the floating pier cavity, and the water outlet of the water pump extends to the outside of the upper end of the right side of the floating pier, and a plurality of moving wheels are arranged on the bottom surface of the floating pier, and the floating pier, the horizontal platform and each moving wheel are made of plastic; The two stabilizing platform groups include a bidirectional telescopic device, and the left and right telescopic ends of the bidirectional telescopic device are symmetrically connected with a first float group and a second float group, and an air pump is connected between the first float group and the second float group through an air hose.

[0005] A further improvement is that a buoyancy water tank and an installation room are provided in sealed partitions at the upper and lower ends of the floating pier cavity. The buoyancy water tank is composed of a main water tank and two side water tanks. The water pump is fixed in the installation room, and the water inlet end of the water pump extends to the lower end of the main water tank cavity through a water inlet pipe.

[0006] A further improvement is that a water inlet pipe is connected to the bottom surface of the main water tank, and a waterproof solenoid valve is connected to the water inlet pipe, and a water hole is opened on the lower side between the main water tank and the side water tank.

[0007] A further improvement is that the first float group includes a driven transverse thrust group, and a swing arm assembly is engaged on the bottom surface of the left end of the driven transverse thrust group, and a supporting float connected to the air pump is provided at the lower end of the swing arm assembly. The first float group has the same structure as the second float group.

[0008] As a further improvement, the driven transverse thrust group includes a slide seat, and a slide rod is transversely sleeved in the slide seat, and the cross section of the slide rod is square, and a rack is provided on the bottom surface of the left end of the slide rod.

[0009] A further improvement is that the swing arm assembly includes a swing arm body, and an anchor cross arm is laterally arranged on the left side of the swing arm body, and a gear plate meshing with the rack is arranged on the rear side of the upper end of the swing arm body, and a rotating shaft is embedded on the front side of the upper end of the swing arm body, and the swing arm body and the anchor cross arm are both made of plastic.

[0010] A further improvement is that the positioning assembly includes a winch, and the first anchor and the second anchor are synchronously wound on the left and right sides of the winch; The first anchor comprises a steel wire rope, and a first guide wheel and a second guide wheel are arranged on the steel wire rope at intervals, and an anti-slip pressure wheel is fitted in the gap above the second guide wheel. An anchor head is arranged at the tail of the other end of the steel wire rope, and the first anchor has the same structure as the second anchor.

[0011] A further improvement is that the bridge frame and the trestle bridge deck frame are all existing technologies, and the structures are not described one by one here.

[0012] A further improvement is that the buoyancy water tank and the installation chamber are both sealed structures.

[0013] A further improvement is that the length of each section of the trestle bridge deck is 3-5m.

[0014] A further improvement is that the operating table is also externally connected to a mobile power source.

[0015] In addition, the present invention also provides a construction method for the novel and quick-construction pier structure of the trestle, and the construction method is as follows: S1: First, assemble the bridge pier group, two stabilizing platform groups, two positioning components, and water level sensor rods in advance to form a pier structure, and move the pier structure to the waterside, and then install the trestle bridge deck frame on the top surface of the bridge frame; S2: Then, a section of the pier structure is hoisted into the water by a hoisting machine. At this time, the supporting buoys are inflated and adjusted to a horizontal alignment state, which provides stable support for the floating pier during towing. Then, the tugboat is used to pull it to the installation area, and then the two adjacent pier deck frames are spliced; S3: After all the trestle bridge decks are spliced, first adjust each supporting float to completely sink into the water obliquely, then fill the buoyancy water tank with water to lower the floating pier, and refer to the water level sensor rod to adjust the height of the trestle bridge deck so that the first and last trestle bridge decks can be flush with the road surface; S4: Then, the anchor heads on the first anchor and the second anchor are pulled to the four sides away from the floating pier by a tugboat and put into the water. Then, the anchor heads are reeled in by a winch so that they are tightened and inserted into the soil to position the pier structure in the water. Then, the operating platform is removed to complete the construction.

[0016] The beneficial effects of the present invention are: The present invention provides a novel pier platform structure and construction method for a trestle bridge with quick construction. The pier platform structure composed of a pier platform group, two stabilizing platform groups and two positioning components is combined with the bridge frame and the bottom surface of the trestle bridge deck frame to form a pier platform structure for quick construction. The pier platform structure floats directly on the water surface during construction, and the buoyancy of the floating pier platform is increased by the hollow sealing design of the buoyancy water tank and the installation room on the floating pier platform. The buoyancy lifting and lowering adjustment of the floating pier platform is realized by the water inlet of the waterproof electromagnetic valve and the drainage of the water pump. The stabilizing valve is also provided. The platform group expands the auxiliary buoyancy adjustable support on the left and right sides of the floating pier, so that the floating pier floats in the water and supports the trestle bridge deck frame more stably. In addition, a positioning component is provided to anchor the floating pier, so that the floating pier floats in the water and will not shift, thereby improving the stability of the trestle bridge deck frame. The final construction splicing and locking between the trestle bridge deck frames enables each pier structure to be connected into a whole, effectively reducing the shaking of the trestle bridge deck frame. The pier structure of the present invention does not need to be inserted into the mud for installation, and the main structural material is plastic, which has strong corrosion resistance. The overall trestle is not easy to deform The folding construction is convenient and efficient, and the service life is long. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of a new type of pier structure that can be quickly constructed according to the present invention; Figure 2 This is a schematic diagram of the structure of the bridge pier assembly of the present invention; Figure 3 This is a schematic diagram of the structure of the stabilizing platform assembly of the present invention; Figure 4This is a schematic diagram of the structure of the first float group of the present invention; Figure 5 This is a schematic diagram of the structure of the positioning component of the present invention; DETAILED DESCRIPTION

[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0019] See also Figure 1-Figure 5 The present invention provides a novel and fast-constructed pier structure and construction method: the structure includes a pier structure, and a bridge frame 4 is arranged on the top surface of the pier structure, and a pier deck frame 5 is arranged horizontally on the top surface of the bridge frame 4, and two adjacent pier deck frames 5 are movably spliced ​​with each other, the pier structure includes a pier platform group 1, and two stabilizing platform groups 2 and two positioning components 3 are arranged horizontally on the front and rear sides of the top of the pier platform group 1, and the left and right sides of the positioning components 3 extend to the left and right sides of the stabilizing platform group 2, a water level sensor rod 6 is vertically arranged on one side of the front end of the pier platform group 1, and an operating table 7 is arranged on the right side of the bridge frame 4, the pier platform group 1, the two stabilizing platform groups 2, and the two positioning components 3 are arranged horizontally on the front and rear sides of the pier platform group 1. , the water level sensor rod 6 is electrically connected to the operating table 7, the pier platform group 1 includes a floating pier platform 11, and a horizontal platform 12 is arranged on the top surface of the floating pier platform 11, and a water pump 13 is arranged in the cavity of the floating pier platform 11, and the water outlet end of the water pump 13 extends to the outside of the upper end of the right side of the floating pier platform 11, and a plurality of moving wheels 14 are arranged on the bottom surface of the floating pier platform 11, and the floating pier platform 11, the horizontal platform 12, and each moving wheel 14 are made of plastic. The two stable platform groups 2 include a two-way telescopic device 21, and the left and right telescopic ends of the two-way telescopic device 21 are symmetrically connected with a first float group 22 and a second float group 23, and an air pump 24 is connected between the first float group 22 and the second float group 23 through an air hose.

[0020] The floating pier 11 has sealed partitions at both ends, with a buoyancy water tank and an installation chamber 113. The buoyancy water tank is composed of a main water tank 111 and two side water tanks 112. The water pump 13 is fixed in the installation chamber 113, and the water inlet end of the water pump 13 extends to the lower end of the main water tank 111 through an inlet pipe.

[0021] The bottom surface of the main water tank 111 is connected to a water inlet pipe 114 , and the water inlet pipe 114 is connected to a waterproof solenoid valve 115 . A water hole 116 is provided on the lower side between the main water tank 111 and the side water tank 112 .

[0022] The first float group 22 includes a driven transverse thrust group 221, and a swing arm assembly 222 is engaged on the bottom surface of the left end of the driven transverse thrust group 221, and a supporting float 223 connected to the air pump 24 is provided at the lower end of the swing arm assembly 222. The first float group 22 and the second float group 23 have the same structure.

[0023] The driven transverse thrust group 221 includes a slide seat 2211 , and a slide rod 2212 is transversely sleeved in the slide seat 2211 . The cross section of the slide rod 2212 is square-shaped, and a rack 2213 is disposed on the bottom surface of the left end of the slide rod 2212 .

[0024] The swing arm assembly 222 includes a swing arm body 2221, and an anchor cross arm 2222 is laterally arranged on the left side of the swing arm body 2221, and a gear plate 2223 meshing with the rack 2213 is arranged on the rear side of the upper end of the swing arm body 2221, and a rotating shaft 2234 is embedded on the front side of the upper end of the swing arm body 2221. The swing arm body 2221 and the anchor cross arm 2222 are both made of plastic.

[0025] The positioning assembly 3 includes a winch 31, and the first anchor 32 and the second anchor 33 are synchronously wound on the left and right sides of the winch 31. The first anchor 32 includes a steel wire rope 321, and the steel wire rope 321 is alternately penetrated by a first guide wheel 322 and a second guide wheel 323, and an anti-slip pressure wheel 324 is fitted in the gap above the second guide wheel 323. An anchor head 325 is provided at the other end of the steel wire rope 321. The first anchor 32 and the second anchor 33 have the same structure.

[0026] Working principle: The construction method is as follows: S1: First, assemble the bridge pier assembly 1, two stabilizing platform assemblies 2, two positioning components 3, and a water level sensor rod 6 in advance to form a pier structure, and move the pier structure to the waterside, and then install the trestle bridge deck frame 5 on the top surface of the bridge frame 4; It should be noted that after S1 is installed, it will be electrically connected to the operating table 7 first, and the supporting floats 223 on the first float group 22 and the second float group 23 will be inflated by the air pump 24. The angles of the supporting floats 223 on the first float group 22 and the second float group 23 will also be adjusted to make the swing arm body 2221 on the supporting float 223 in a horizontally aligned state. This is to prevent the pier structure from completely tipping over in the water due to the unilateral stress on the pier deck frame 5 when the pier structure is subsequently towed in the water.

[0027] S2: Then, a section of the trestle overall structure is hoisted into the water by a hoisting machine. At this time, the supporting buoy 223 has been inflated and adjusted to a horizontal alignment state, which provides stable support for the floating pier 11 during towing. Then, the tugboat is used to pull it to the installation area, and then the two adjacent trestle deck frames 5 are spliced; It should be noted that before the entire structure of the pier is hoisted into the water, the operating platform 7 must be folded down first. This is to prevent the floating pier 11 from tilting at a small angle when being towed, which would cause water ingress and damage to the operating platform 7. In addition, the splicing of the two adjacent pier deck frames 5 is simply fixed at this stage and is not completely spliced ​​and locked. In this way, when the buoyancy height of the floating pier 11 is adjusted later, the pier deck frames 5 can move between each other, and a single floating pier 11 will not be unable to be adjusted in sequence.

[0028] S3: After all the trestle bridge deck frames 5 are spliced, first adjust each supporting float 223 to completely enter the water obliquely, then fill the buoyancy water tank with water to lower the floating pier 11, and refer to the water level sensor rod 6 to adjust the height of the trestle bridge deck frame 5 so that the first and last trestle bridge deck frames 5 can be flush with the road surface; It should be noted that the floating pier 11 needs to sink to a certain water level, and the optimal water level is to the lower edge of the horizontal platform 12, so that the oblique angle required for the support float 223 to complete the immersion in the water can be smaller, so that the support area range of the pier structure formed by the support float 223 and the floating pier 11 in the water can be maximized. In addition, through the advance height measurement design of the bridge frame 4, the main support height of the trestle bridge deck frame 5 and the road surface is made on the bridge frame 4, and the pier structure only plays a fine-tuning role; In addition, the angle adjustment of the first float group 22 and the second float group 23 is achieved by the two-way telescopic device 21 extending in both directions, and the left and right push-pull slide rods 2212 slide on the slide seat 2211 synchronously, and the rack 2213 is engaged with the gear plate 2223, so that the swing arm body 2221 swings up and down on the rotating shaft 2234, thereby achieving the height adjustment of the supporting float 223.

[0029] S4: Then, the anchor heads 325 on the first anchor 32 and the second anchor 33 are pulled to the four sides away from the floating pier 11 by a tugboat and put into the water. Then, the anchor heads 325 are reeled in by the winch 31 so that they are tightened and inserted into the soil to position the pier structure in the water. Then, the operating platform 7 is removed to complete the construction.

[0030] When the floating pier 11 is in use, if the trestle deck frame 5 shakes left and right significantly when walking, the supporting float 223 can be inflated again by the air pump 24 to increase the volume of the supporting float 223 and increase the buoyancy on the left and right sides of the floating pier 11, thereby reducing the left and right shaking of the trestle deck frame 5. In addition, after the first anchor 32 and the second anchor 33 are fixed, the water in the main water tank 111 and the side water tank 112 can be pumped out by the water pump 13, thereby increasing the upward buoyancy force of the floating pier 11 in the water, which can reduce the degree of descent of the floating pier 11 when people walk on the trestle deck frame 5.

[0031] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0032] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A new type of pier pier structure with quick construction, which comprises a pier structure, a bridge frame (4) is arranged on the top surface of the pier structure, and a pier deck frame (5) is arranged transversely on the top surface of the bridge frame (4), and two adjacent pier deck frames (5) are movably spliced ​​with each other, characterized in that: The pier structure comprises a pier group (1), and two stabilizing platform groups (2) and two positioning components (3) are transversely arranged on the front and rear sides of the top of the pier group (1), and the left and right sides of the positioning components (3) extend to the outside of the left and right sides of the stabilizing platform group (2), a water level sensor rod (6) is vertically arranged on one side of the front end of the pier group (1), and an operating table (7) is arranged on the right side of the bridge frame (4), and the pier group (1), the two stabilizing platform groups (2), the two positioning components (3), the water level sensor rod (6) and the operating table (7) are movably electrically connected; The bridge pier group (1) comprises a floating pier (11), a horizontal platform (12) is arranged on the top surface of the floating pier (11), and a water pump (13) is arranged in the cavity of the floating pier (11), the water outlet of the water pump (13) extends to the outside of the upper end of the right side of the floating pier (11), and a plurality of moving wheels (14) are arranged on the bottom surface of the floating pier (11), and the floating pier (11), the horizontal platform (12), and the moving wheels (14) are all made of plastic material; The two stabilizing platform groups (2) include a bidirectional telescopic device (21), and the left and right telescopic ends of the bidirectional telescopic device (21) are symmetrically connected to a first floating ball group (22) and a second floating ball group (23), and an air pump (24) is connected between the first floating ball group (22) and the second floating ball group (23) via an air hose.

2. A new type of pier structure with quick construction according to claim 1, characterized in that: The floating pier (11) has sealed partitions at the upper and lower ends of the cavity to provide a buoyancy water tank and an installation chamber (113). The buoyancy water tank is composed of a main water tank (111) and two side water tanks (112). The water pump (13) is fixed in the installation chamber (113), and the water inlet end of the water pump (13) extends to the lower end of the cavity of the main water tank (111) through a water inlet pipe.

3. A new type of pier structure with quick construction according to claim 2, characterized in that: The bottom surface of the main water tank (111) is connected to a water inlet pipe (114), and the water inlet pipe (114) is connected to a waterproof electromagnetic valve (115). A water hole (116) is provided on the lower side between the main water tank (111) and the side water tank (112).

4. A new type of pier structure with quick construction according to claim 3, characterized in that: The first float group (22) comprises a driven transverse thrust group (221), a swing arm assembly (222) is meshed with the bottom surface of the left end of the driven transverse thrust group (221), and a supporting float (223) connected to the air pump (24) is arranged at the lower end of the swing arm assembly (222), and the first float group (22) and the second float group (23) have the same structure.

5. A new type of pier structure with quick construction according to claim 4, characterized in that: The driven transverse push group (221) comprises a slide seat (2211), a slide rod (2212) is transversely sleeved in the slide seat (2211), and the cross section of the slide rod (2212) is square-shaped. A rack (2213) is provided on the bottom surface of the left end of the slide rod (2212).

6. A new type of pier structure with quick construction according to claim 5, characterized in that: The swing arm assembly (222) comprises a swing arm body (2221), an anchor cross arm (2222) is transversely arranged on the left side of the swing arm body (2221), a toothed disc (2223) meshing with the rack (2213) is arranged on the rear side of the upper end of the swing arm body (2221), a rotating shaft (2234) is embedded on the front side of the upper end of the swing arm body (2221), and the swing arm body (2221) and the anchor cross arm (2222) are both made of plastic.

7. A new type of pier structure with quick construction according to claim 6, characterized in that: The positioning assembly (3) comprises a winch (31), and a first anchor (32) and a second anchor (33) are synchronously wound on the left and right sides of the winch (31); The first anchor (32) comprises a steel wire rope (321), and a first guide wheel (322) and a second guide wheel (323) are arranged on the steel wire rope (321) at intervals, and an anti-slip pressure wheel (324) is fitted in the gap above the second guide wheel (323), and an anchor head (325) is arranged at the tail of the other end of the steel wire rope (321). The first anchor (32) and the second anchor (33) have the same structure.

8. A construction method for a new type of quick-construction pier structure according to claim 7, characterized in that: The construction method is as follows: S1: First, assemble the bridge pier assembly (1), two stabilizing platform assemblies (2), two positioning components (3), and a water level sensor rod (6) in advance to form a pier structure, and move the pier structure to the waterside, and then install a trestle bridge deck frame (5) on the top surface of the bridge frame (4); S2: Then, a section of the whole trestle structure is hoisted into the water by a hoisting machine. At this time, the supporting buoy (223) has been inflated and adjusted to a horizontal alignment state, which provides stable support for the floating pier (11) during towing. Then, the tugboat is used to pull it to the installation area, and then two adjacent trestle deck frames (5) are spliced; S3: After all the trestle bridge deck frames (5) are spliced, first adjust each supporting buoy (223) to completely sink into the water in an oblique direction, then fill the buoyancy water tank with water to lower the floating pier (11), and refer to the water level sensor rod (6) to adjust the height of the trestle bridge deck frame (5) so that the first and last trestle bridge deck frames (5) can be flush with the road surface; S4: Then, the anchor heads (325) on the first anchor member (32) and the second anchor member (33) are pulled to the four sides away from the floating pier (11) by a tugboat and placed into the water. Then, the anchor heads (325) are reeled in by a winch (31) so that they are tightened and inserted into the soil to position the pier structure in the water. Then, the operating platform (7) is removed to complete the construction.

Citation Information

Patent Citations

  • Integrated assembling floating transportation lifting arch bridge and construction method thereof

    CN105603861A

  • Coast-floating trestle

    CN106436552A

  • Moving temporary pier for incremental launching construction of bridge

    CN108221708A

  • Water-washed damaged bridge pier composite reinforcing structure and reinforcing method thereof

    CN108755453A

  • Dry installation process of water piers based on water-stop structure of sitting bottom cofferdam

    CN109137751A