Drilling jig, drilling system and drilling method
By providing a drilling mold system including the first and second drilling molds, the hole position interference and low accuracy problems caused by the small hole spacing on the workpiece are solved, and efficient and accurate hole processing is achieved.
Patent Information
- Application Number
- CN202311431068.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-31
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2043-10-31
AI Technical Summary
During the aircraft assembly process, the small spacing between the holes on the workpiece leads to interference in the drilling mold hole position. The hole position deviation is prone to occur during the replacement of the AB drilling template of the prior art, the processing accuracy is low, and the frequent replacement leads to low working efficiency.
A drilling mold system is provided, including a first drilling mold and a second drilling mold, to achieve all hole processing on the workpiece by connecting or disassembly. The first drilling template is provided with a first guide hole and a through-cutting hole, and the second guide hole is provided with a second guide hole, and the distribution position corresponds to the through-cutting hole, for the drilling device to penetrate the cutter head.
By reducing the number of installation and disassembly of the workpiece and the second drilling template, avoiding hole position deviation, improving the machining accuracy of the holes on the workpiece, and improving working efficiency.
Smart Images

Figure CN119910218A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hole processing, and in particular to a drilling jig, a drilling system and a drilling method. Background Art
[0002] During the aircraft assembly process, different parts are connected mainly by rivets and bolts, which requires the processing of a large number of connection holes. When processing the connection holes, it is necessary to use a drilling jig for auxiliary processing to improve the drilling efficiency and reduce the technical requirements of the workers.
[0003] In the actual processing process, there are many holes with small hole spacing on the workpiece, which causes the corresponding hole positions on the drilling template to interfere with each other. In the prior art, the hole position design is usually carried out using the AB drilling template. The hole positions of the AB drilling template are staggered. When processing the required workpiece, the A plate is first connected to the workpiece to be processed, and the workpiece is drilled according to the hole position design of the A plate. After the processing is completed, the A plate is disassembled, and the B plate is connected to the workpiece to be processed, and the workpiece is drilled according to the hole position design of the B plate. In the process of disassembling the A plate and replacing the B plate, it is easy to cause hole position deviation when drilling through the B plate, the processing accuracy is low, which has a great impact on the assembly, and the drilling template is frequently replaced, and the work efficiency is low. Summary of the invention
[0004] The purpose of the present invention is to provide a drilling template, a drilling system and a drilling method to solve the problems of low machining accuracy of holes on workpieces and difficulty in replacing the drilling template.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] In one aspect, a drilling template is provided, comprising:
[0007] a first drilling template, wherein the first drilling template is provided with a first guide hole and a tool hole, wherein the first guide hole is used for connecting with a workpiece and for a tool head of a drilling device to pass through;
[0008] The second drilling template is detachably connected to the first drilling template. The second drilling template is provided with second guide holes. The distribution positions of the second guide holes correspond to the tool holes. The second guide holes are used for the tool head of the drilling device to pass through.
[0009] Preferably, the drilling template further comprises a connecting assembly, one end of which is provided with the first guide hole for connecting the first drilling template to the workpiece.
[0010] Preferably, the first guide hole is a tapered hole, and the diameter of the upper end of the first guide hole along the drilling direction of the drilling device is larger than the diameter of the lower end of the first guide hole; the connecting assembly includes a first connecting member and a second connecting member, the first connecting member is placed in the first guide hole, the first connecting member includes a side wall and a bottom surface, the bottom surface of the first connecting member is provided with an opening for the rod of the second connecting member to pass through, the side wall shape of the first connecting member matches the hole wall shape of the first guide hole, and the head of the second connecting member abuts against the bottom surface of the first connecting member.
[0011] Preferably, the outer circumferences of the first guide hole and the second guide hole are both provided with engaging grooves, and the engaging grooves are used for engaging the drilling device.
[0012] Preferably, the first drilling template and the second drilling template are respectively provided with a chip groove on the side opposite to the side connected to the drilling device, and the chip groove passes through the end surface of the first drilling template or the second drilling template.
[0013] Preferably, the first drilling template is provided with a first connecting hole, and the second drilling template is provided with a second connecting hole, and the first connecting hole and the second connecting hole are used to detachably connect the first drilling template and the second drilling template.
[0014] On the other hand, a drilling system is provided, comprising a drilling device and any one of the drilling templates described above, wherein the drilling device can be engaged with the first drilling template or the second drilling template.
[0015] Preferably, the drilling device includes a fixing member and a drill, one end of the fixing member is connected to the drill, and the other end of the fixing member is provided with a clamping member, and the clamping member is used to clamp with a clamping groove on the first drilling template or the second drilling template.
[0016] Preferably, the fixing member has a channel along its axial direction, and the end of the fixing member connected to the first drilling template or the second drilling template is provided with a knife end, the knife end can penetrate the first guide hole or the second guide hole and have a clearance fit with the first guide hole or the second guide hole, the knife end has a through hole at one end of which is connected to the channel, and the channel and the through hole are for the knife head of the drill to penetrate.
[0017] On the other hand, a drilling method is provided, which is applied to the drilling system, and the drilling method comprises:
[0018] connecting the workpiece to the first drilling template at a portion of the first guide hole of the first drilling template;
[0019] Connecting the first drilling template with the second drilling template so that the second guide hole and the through-hole are arranged correspondingly;
[0020] Controlling the tool head of the drilling device to pass through the second guide hole and the through hole in sequence, and processing the first group of holes on the workpiece;
[0021] disassembling the second drilling template;
[0022] Controlling the tool head of the drilling device to pass through the first guide hole to process a second group of holes on the workpiece;
[0023] Replacing the connection position between the first drilling template and the workpiece;
[0024] The tool head of the drilling device is controlled to pass through the first guide hole corresponding to the unmachined hole of the workpiece, and the third group of holes is machined on the workpiece.
[0025] Beneficial effects of the present invention:
[0026] The drilling template provided by the present invention comprises a first drilling template and a second drilling template. All holes on a workpiece can be processed by connecting or disassembling the first drilling template and the second drilling template. A first guide hole and a through-tool hole are provided on the first drilling template. The first guide hole is used to connect the workpiece and the tool head of a drilling device is inserted therethrough. A second guide hole is provided on the second drilling template. The second guide hole is used to insert the tool head of the drilling device and the distribution position corresponds to the through-tool hole. The first drilling template is connected to the workpiece, and the second drilling template is connected to the first drilling template. The workpiece is processed according to the positions of the second guide hole and the through-tool hole. Then the second drilling template is disassembled, the drilling device is connected to the first drilling template, the workpiece is processed according to the position of the first guide hole preset on the first drilling template, and finally the connection position of the workpiece and the first drilling template is changed, and the unprocessed holes on the workpiece are processed, thereby completing the processing of all holes on the workpiece. During the entire processing process, the workpiece does not need to be installed or disassembled on the second drilling template. The workpiece is always connected to the first drilling template, which reduces the number of times the workpiece is disassembled and assembled, and the processed hole position is not prone to deviation, thereby improving the processing accuracy of the holes on the workpiece.
[0027] The drilling system provided by the present invention comprises the drilling jig and the drilling device provided by the present invention, and can improve the machining accuracy of the holes on the workpiece.
[0028] The drilling method provided by the present invention avoids the workpiece from being installed or disassembled on the second drilling template during drilling, reduces the number of times the workpiece is disassembled and assembled, makes the processed hole position less likely to deviate, and improves the processing accuracy of the hole on the workpiece. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 is a schematic diagram of the assembly of a drilling system provided by a specific embodiment of the present invention;
[0030] Figure 2It is a structural schematic diagram of a first drilling template provided by a specific embodiment of the present invention;
[0031] Figure 3 It is a structural schematic diagram of a second drilling template provided by a specific embodiment of the present invention;
[0032] Figure 4 is a cross-sectional view of a connection structure between a workpiece and a first drilling template provided by a specific embodiment of the present invention;
[0033] Figure 5 is a structural schematic diagram of a first connecting member provided in a specific embodiment of the present invention;
[0034] Figure 6 It is a structural schematic diagram of a drill and a fixing member provided in a specific embodiment of the present invention;
[0035] Figure 7 It is a structural schematic diagram of the back side of the second drilling template provided by a specific embodiment of the present invention;
[0036] Figure 8 It is an assembly schematic diagram of other embodiments provided by a specific embodiment of the present invention.
[0037] In the figure:
[0038] 1. First drilling template; 11. First guide hole; 12. Cutting hole;
[0039] 2. The second drilling template; 21. The second guide hole;
[0040] 3. Workpiece;
[0041] 4. Drilling device; 41. Drill; 42. Fixing member; 421. Snap-fit member; 422. Cutting end;
[0042] 5. first connecting member; 51. side wall; 52. bottom surface;
[0043] 6. Second connecting member; 61. Connecting bolt; 62. Connecting nut;
[0044] 7. Card slot;
[0045] 8. Chip removal groove;
[0046] 91. First connecting hole; 92. Second connecting hole. DETAILED DESCRIPTION
[0047] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0048] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0050] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0051] The present invention provides a drilling jig, a drilling system and a drilling method. During the process of aircraft assembly, the drilling jig, the drilling system and the drilling method provided by the present invention are used to improve the efficiency of drilling and facilitate the operation of workers.
[0052] like Figure 1 As shown, the drilling system provided by the specific embodiment of the present invention includes a drilling jig and a drilling device 4. The drilling jig is provided with a guide hole. During the processing of the workpiece 3, the drilling system needs to fix the drilling device 4 to the drilling jig, and the workpiece 3 is processed through the position of the preset hole on the drilling jig.
[0053] like Figure 1-3As shown, the drilling template includes a first drilling template 1 and a second drilling template 2. The first drilling template 1 is provided with a first guide hole 11 and a through-hole 12. The first guide hole 11 is used to connect with the workpiece 3 and for the tool head of the drilling device 4 to pass through. The second drilling template 2 is detachably connected to the first drilling template 1. The second drilling template 2 is provided with a second guide hole 21. The distribution position of the second guide hole 21 corresponds to the through-hole 12. The second guide hole 21 is used for the tool head of the drilling device 4 to pass through. Specifically, when the holes to be processed on the workpiece 3 are too dense, on the premise of meeting the processing requirements of the holes on the workpiece 3, the aperture of the through-hole 12 is smaller than the aperture of the first guide hole 11, so as to avoid interference between the through-hole 12 and the first guide hole 11. The positions and numbers of the first guide hole 11, the second guide hole 21 and the through-hole 12 are all adapted to the positions and numbers of the holes to be processed on the workpiece 3. The diameter of the through-hole 12 is larger than the diameter of the hole to be processed, so that the through-hole 12 can pass the tool head of the drilling device 4 without affecting the size of the hole to be processed on the workpiece 3.
[0054] The first drilling template 1 is connected to the workpiece 3, and the second drilling template 2 is connected to the first drilling template 1. The workpiece 3 is processed according to the positions of the second guide hole 21 and the through-hole 12, and then the second drilling template 2 is disassembled, and the drilling device 4 is connected to the first drilling template 1. The workpiece 3 is processed according to the position of the first guide hole 11 preset on the first drilling template 1. Finally, the connection position of the workpiece 3 and the first drilling template 1 is changed, and the unprocessed holes on the workpiece 3 are processed, thereby completing the processing of all the holes on the workpiece 3. During the entire processing process, there is no need to install or disassemble the workpiece 3 on the second drilling template 2. The workpiece 3 is always connected to the first drilling template 1, which reduces the number of times the workpiece 3 is disassembled and assembled, and the processed hole position is not prone to deviation, thereby improving the processing accuracy of the holes on the workpiece 3.
[0055] like Figure 4-5 As shown, during the processing of the workpiece 3 , the workpiece 3 needs to be connected to the first drilling template 1 . The first drilling template 1 and the workpiece 3 are connected via a connecting assembly, which includes a first connecting member 5 and a second connecting member 6 .
[0056] In order to ensure that the first connecting member 5 does not loosen, that is, to ensure the stability of the connection between the first drilling template 1 and the workpiece 3, the first guide hole 11 is a tapered hole, and the aperture of the upper end of the first guide hole 11 along the penetration direction of the drilling device 4 is larger than the aperture of the lower end of the first guide hole 11; the first connecting member 5 is placed in the first guide hole 11, and the first connecting member 5 includes a side wall 51 and a bottom surface 52, and the bottom surface 52 of the first connecting member 5 is provided with an opening for the rod portion of the second connecting member 6 to penetrate, and the shape of the side wall 51 of the first connecting member 5 matches the shape of the hole wall of the first guide hole 11, and the head of the second connecting member 6 abuts against the bottom surface 52 of the first connecting member 5. The first connecting member 5 is used to fix the second connecting member 6. The first guide hole 11 is a tapered hole that is wide at the top and narrow at the bottom, so that the first connecting member 5 cannot move downward after being placed in the first guide hole 11, and plays a role in fixing the first connecting member 5. The head of the second connecting member 6 abuts against the bottom surface 52 of the first connecting member 5 to avoid the head of the second connecting member 6 being exposed to the first drilling template 1, resulting in interference between the second connecting member 6 and the drilling device 4 provided at the first guide hole 11 or the through-hole 12. Specifically, in this embodiment, the second connecting member 6 is a connecting bolt 61, and is equipped with a connecting nut 62 to lock and fix the second connecting member 6.
[0057] like Figure 1-3 As shown, during the processing of the workpiece 3, the second drilling template 2 needs to be connected to the first drilling template 1. The first drilling template 1 is provided with a first connection hole 91, and the second drilling template 2 is provided with a second connection hole 92. The first connection hole 91 and the second connection hole 92 are used to detachably connect the first drilling template 1 and the second drilling template 2. In this embodiment, the first connection holes 91 are respectively opened at the four corners of the first drilling template 1, and the second connection holes 92 are respectively opened at the four corners of the second drilling template 2, so that the connection between the first drilling template 1 and the second drilling template 2 is more stable. Specifically, the first connection holes 91 and the second connection holes 92 are penetrated by bolts to realize the connection between the first drilling template 1 and the second drilling template 2, and are locked and fixed by nuts.
[0058] like Figure 1-3 and Figure 6 As shown, during the process of machining the workpiece 3 , the drilling device 4 needs to be connected to the first drilling template 1 (not shown in the figure) or the drilling device 4 needs to be connected to the second drilling template 2 .
[0059] In order to connect the drilling device 4 with the first drilling template 1 or the second drilling template 2, the outer peripheral sides of the first guide hole 11 and the second guide hole 21 are provided with a clamping groove 7, and the clamping groove 7 is used to clamp the drilling device 4. Adaptively, the drilling device 4 includes a fixing member 42 and a drill 41, one end of the fixing member 42 is connected to the drill 41, and the other end of the fixing member 42 is provided with a clamping member 421, and the clamping member 421 is used to clamp with the clamping groove 7 on the first drilling template 1 or the second drilling template 2.
[0060] Furthermore, in order to allow the cutter head of the drill 41 to smoothly penetrate and act on the workpiece 3, the fixing member 42 has a channel along its axial direction, and the end of the fixing member 42 connected to the first drilling template 1 or the second drilling template 2 is provided with a cutter end 422, and the cutter end 422 can penetrate the first guide hole 11 or the second guide hole 21 and have a clearance fit with the first guide hole 11 or the second guide hole 21, and the cutter end 422 has a through hole at one end of which is connected to the channel, and the channel and the through hole are provided for the cutter head of the drill 41 to penetrate.
[0061] Specifically, in this embodiment, one end of the fixing member 42 connected to the knife end 422 is a round head, and the other end is a square head. The square head end of the fixing member 42 is connected to the drill 41, and the knife end 422 is loosely matched with the first guide hole 11 or the second guide hole 21. The clamping member 421 is a combination of a cylindrical head and a cylindrical rod. Accordingly, the clamping groove 7 includes a circular hole for the cylindrical head of the clamping member 421 to pass through and a slide rail for clamping the cylindrical head and sliding the cylindrical rod. The clamping groove 7 is an arc groove arranged around the axis direction of the first guide hole 11 or the second guide hole 21, and two clamping grooves 7 are arranged along the circumference of each of the first guide hole 11 and the second guide hole 21. The two clamping grooves 7 are arranged with the center of the circle of the first guide hole 11 or the second guide hole 21 as the symmetry center, and are arranged in a central symmetric manner, so that the clamping is more stable. The clamping groove 7 is arranged in an arc shape so that the clamping groove 7 can match the shape of the first guide hole 11 and the second guide hole 21. When clamping, the cutting end 422 of the fixing piece 42 is passed through the first guide hole 11 or the second guide hole 21, the cylindrical head of the clamping piece 421 is aligned with the hole on the clamping groove 7, the cylindrical head of the fixing piece 42 is pushed into the circular hole of the clamping groove 7 and rotated along the arc direction of the clamping groove 7, and the fixing piece 42 is tightened and fixed to the first drilling template 1 or the second drilling template 2 by rotating and sliding the clamping piece 421 in the clamping groove 7.
[0062] Furthermore, if Figure 1-3 and Figure 7 As shown, in order to remove the waste chips after processing and make the processing process smoother, the first drilling template 1 and the second drilling template 2 are respectively provided with a chip removal groove 8 on the side opposite to the connecting drilling device 4, and the chip removal groove 8 passes through the end surface of the first drilling template 1 or the second drilling template 2. Specifically, in this embodiment, the chip removal groove 8 is configured as a plurality of interconnected grooves distributed horizontally or vertically along the first drilling template 1 or the second drilling template 2, which is conducive to the formation of airflow and ensures smooth chip removal.
[0063] like Figure 8 As shown, in other embodiments, there is no limitation on the size specifications of the first drilling template 1 and the second drilling template 2. Two or more first drilling templates 1 and one or more second drilling templates 2 can also be used in combination and connected to the workpiece 3 for drilling holes in the workpiece 3.
[0064] This embodiment also provides a drilling method, which is applied to the above-mentioned drilling system.
[0065] The following is a description of the drilling method provided in this specific embodiment:
[0066] Drilling methods include:
[0067] Connecting the workpiece 3 to the first drilling template 1 at a portion of the first guide hole 11 of the first drilling template 1;
[0068] Connect the first drilling template 1 with the second drilling template 2 so that the second guide hole 21 is arranged corresponding to the through-hole 12;
[0069] Control the tool head of the drilling device 4 to pass through the second guide hole 21 and the through hole 12 in sequence, and process the first group of holes on the workpiece 3;
[0070] Disassemble the second drilling template 2;
[0071] Controlling the tool head of the drilling device 4 to pass through the first guide hole 11 to process the second group of holes on the workpiece 3;
[0072] Replace the connection position between the first drilling template 1 and the workpiece 3;
[0073] The tool head of the drilling device 4 is controlled to pass through the first guide hole 11 corresponding to the unmachined hole of the workpiece 3, so as to machine the third group of holes on the workpiece 3.
[0074] Specifically, the drilling method comprises the following steps:
[0075] Step 1, perform preparatory work, including determining the positions of the first guide hole 11 and the through-hole 12 according to the distribution of the holes to be processed on the workpiece 3 and the size of the drilling device 4 to avoid interference during the processing, and then determining the position of the second guide hole 21 according to the positions of the remaining holes to be processed on the workpiece 3. Some of the holes to be processed on the workpiece 3 will be made into temporary holes for connection with the drilling jig. The diameter of the temporary holes is smaller than the diameter of the holes to be processed. At this time, the preparatory work is completed.
[0076] Step 2: Install the workpiece 3 on the first drilling template 1.
[0077] Specifically, the connecting component is placed in the first guide hole 11 corresponding to the temporary hole on the first drilling template 1 and the workpiece 3, the connecting component penetrates the first guide hole 11 and the temporary hole of the workpiece 3, and the workpiece 3 is installed on the first drilling template 1 through the connecting component.
[0078] Step 3: Connect the first drilling template 1 and the second drilling template 2 so that the second guide hole 21 and the through-hole 12 are arranged correspondingly.
[0079] Specifically, one or more first connection holes 91 are provided on the first drilling template 1, and corresponding second connection holes 92 are provided on the second drilling template 2. The first drilling template 1 and the second drilling template 2 can be connected by connecting members such as bolts and nuts.
[0080] Step 4: fix the drilling device 4 on the second drilling template 2, and make the tool head of the drilling device 4 face the second guide hole 21 and the through-tool hole 12.
[0081] Specifically, the drilling device 4 is fixed to the second drilling template 2 by clamping the clamping piece 421 and the clamping groove 7 , and the tool head of the drilling device 4 is arranged opposite to the second guide hole 21 and the tool hole 12 .
[0082] Step five: start the drilling device 4 to process the first group of holes on the workpiece 3 , that is, process the workpiece 3 according to the positions of the second guide holes 21 preset on the second drilling template 2 .
[0083] Step 6: Repeat steps 4 and 5 until all the first group of holes to be processed on the workpiece 3 are processed.
[0084] Step 7: Disassemble the second drilling template 2, fix the drilling device 4 on the first drilling template 1, and make the tool head of the drilling device 4 face the first guide hole 11.
[0085] Specifically, the drilling device 4 is disassembled from the second drilling template 2, and the second drilling template 2 is disassembled from the first drilling template 1. At this time, the first drilling template 1 is still connected to the workpiece 3. The drilling device 4 is fixed on the first drilling template 1, and the tool head of the drilling device 4 is arranged opposite to the first guide hole 11.
[0086] Step eight, start the drilling device 4 to process the second group of holes on the workpiece 3 , that is, process the workpiece 3 according to the positions of the first guide holes 11 preset on the first drilling template 1 .
[0087] Step nine, repeating step seven to arrange the tool head of the drilling device 4 opposite to the first guide hole 11 and step eight, until all the second group of holes to be processed on the workpiece 3 are processed.
[0088] Step nine: replace the connection position between the first guide hole 11 and the workpiece 3 so that the tool head of the drilling device 4 faces the first guide hole 11 corresponding to the unprocessed hole of the workpiece 3, and process the third group of holes in the workpiece 3.
[0089] Specifically, the connecting assembly is disassembled, and the connecting assembly is placed in the first guide hole 11 corresponding to the hole that has been processed on the workpiece 3, and the second connecting member 6 is replaced with a connecting bolt 61 of other specifications to adapt to and penetrate the hole on the processed workpiece 3, so as to reconnect the workpiece 3 with the first drilling template 1. The tool head of the drilling device 4 is aligned with the position of the remaining unprocessed holes on the workpiece 3, and the third group of holes is processed on the workpiece 3.
[0090] In the above steps 5, 7 and 8, the drilling device 4 needs to be sequentially engaged with the engaging groove 7 on the peripheral side of each first guide hole 11 or second guide hole 21 during drilling, so as to complete the processing of all holes on the workpiece 3. In other embodiments, if the drilling device 4 has enough tool bits, multiple tool bits on the drilling device 4 can be simultaneously inserted into multiple first guide holes 11 or second guide holes 21 of the first drilling template 1 or the second drilling template 2, and multiple holes to be processed on the workpiece 3 can be processed at the same time.
[0091] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A drilling template, characterized in that: include: A first drilling template (1), wherein the first drilling template (1) is provided with a first guide hole (11) and a tool hole (12), wherein the first guide hole (11) is used for connecting with a workpiece (3) and for allowing a tool head of a drilling device (4) to pass through; The second drilling template (2) is detachably connected to the first drilling template (1), and the second drilling template (2) is provided with a second guide hole (21). The distribution position of the second guide hole (21) corresponds to the tool hole (12), and the second guide hole (21) is used for the tool head of the drilling device (4) to pass through.
2. The drilling template according to claim 1, characterized in that: The drilling template also includes a connecting component, one end of which is provided with the first guide hole (11) for connecting the first drilling template (1) with the workpiece (3).
3. The drilling template according to claim 2, characterized in that: The first guide hole (11) is a tapered hole, and the diameter of the upper end of the first guide hole (11) along the drilling direction of the drilling device (4) is larger than the diameter of the lower end of the first guide hole (11); the connecting assembly comprises a first connecting member (5) and a second connecting member (6), the first connecting member (5) is arranged in the first guide hole (11), the first connecting member (5) comprises a side wall (51) and a bottom surface (52), the bottom surface (52) of the first connecting member (5) is provided with an opening for the rod of the second connecting member (6) to pass through, the shape of the side wall (51) of the first connecting member (5) matches the shape of the hole wall of the first guide hole (11), and the head of the second connecting member (6) abuts against the bottom surface (52) of the first connecting member (5).
4. The drilling template according to claim 1, characterized in that: The outer circumferences of the first guide hole (11) and the second guide hole (21) are both provided with a clamping groove (7), and the clamping groove (7) is used to clamp the drilling device (4).
5. The drilling template according to claim 1, characterized in that: The first drilling template (1) and the second drilling template (2) are respectively provided with a chip removal groove (8) on the side opposite to the side connected to the drilling device (4), and the chip removal groove (8) passes through the end surface of the first drilling template (1) or the second drilling template (2).
6. The drilling template according to claim 1, characterized in that: The first drilling template (1) is provided with a first connecting hole (91), and the second drilling template (2) is provided with a second connecting hole (92), and the first connecting hole (91) and the second connecting hole (92) are used to detachably connect the first drilling template (1) and the second drilling template (2).
7. A drilling system, characterized in that: It comprises a drilling device (4) and the drilling template described in any one of claims 1 to 6, wherein the drilling device (4) can be engaged with the first drilling template (1) or the second drilling template (2).
8. The drilling system according to claim 7, characterized in that The drilling device (4) comprises a fixing member (42) and a drill (41), one end of the fixing member (42) is connected to the drill (41), and the other end of the fixing member (42) is provided with a clamping member (421), and the clamping member (421) is used to clamp with a clamping groove (7) on the first drilling template (1) or the second drilling template (2).
9. The drilling system according to claim 8, characterized in that The fixing member (42) has a channel along its axial direction. The end of the fixing member (42) connected to the first drilling template (1) or the second drilling template (2) is provided with a knife end (422). The knife end (422) can penetrate the first guide hole (11) or the second guide hole (21) and is loosely matched with the first guide hole (11) or the second guide hole (21). The knife end (422) has a through hole at one end of which is connected to the channel. The channel and the through hole are for the knife head of the drill (41) to penetrate.
10. A drilling method, applied to the drilling system according to any one of claims 7 to 9, characterized in that: The drilling method comprises: Connecting the workpiece (3) to the first drilling template (1) at a portion of the first guide hole (11) of the first drilling template (1); The first drilling template (1) is connected to the second drilling template (2) so that the second guide hole (21) and the cutter hole (12) are arranged correspondingly; Controlling the tool head of the drilling device (4) to pass through the second guide hole (21) and the tool hole (12) in sequence, and processing the first group of holes on the workpiece (3); Disassembling the second drilling template (2); Controlling the tool head of the drilling device (4) to pass through the first guide hole (11) to process a second group of holes on the workpiece (3); Replacing the connection position between the first drilling template (1) and the workpiece (3); The tool head of the drilling device (4) is controlled to pass through the first guide hole (11) corresponding to the unmachined hole of the workpiece (3), so as to machine a third group of holes on the workpiece (3).
Citation Information
Patent Citations
Method for forming mold for drilling high-strength bolt holes for coke dry quenching body frame structure
CN101758372A
Drill jig tool for machining long-distance hole on common drilling machine
CN114083025A
Movable drill plate
CN202263960U
Double-station drilling clamp
CN210305885U
Detachable laminated drill jig suitable for wrap angle of cargo hold door of airplane
CN218396071U