Integrated equipment for adhesive tape production and production method

Through the integrated slicing machine and winding machine, equipped with automated roller disassembly and conveying components, the displacement components are used to improve equipment flexibility, solving the problems of complex operation and low production efficiency of existing tape production equipment, and achieving efficient and automated tape production.

CN119911725AInactive Publication Date: 2025-05-02JIANGSU JI TENG NEW MATERIALS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510165360.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-14
Publication Date
2025-05-02
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing tape production equipment has problems such as complex operation, low production efficiency and high entrepreneurial threshold in the entrepreneurial environment, especially during the slitting and winding process, which requires frequent disassembly and assembly and handling, which leads to heavy burden on the operators.

Method used

An integrated equipment for tape production is designed. By integrating the slitting machine and winding machine on the workbench, and equipped with roller disassembly and assembly components and roller conveying components, the automatic loading and unloading of the roller body is realized. The displacement component is used to allow the roller disassembly and assembly components to serve multiple machines, reducing the cost of equipment purchase and application.

Benefits of technology

It improves the degree of production automation, reduces the work burden of operators, improves production efficiency, reduces equipment costs and operational complexity, and is suitable for tape production needs in an entrepreneurial environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119911725A_ABST
    Figure CN119911725A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of adhesive tape production, in particular to integrated equipment for adhesive tape production and a production method.The integrated equipment comprises a splitting machine table and a winding machine table, a workbench is connected to the bottom between the splitting machine table and the winding machine table, and a roller conveying assembly used for feeding and discharging of a roller body is arranged on the workbench; the two guide rail beams are respectively provided with two groups of roller disassembly and assembly assemblies for assembling and disassembling roller bodies, and the top beam is provided with a displacement assembly for driving the roller disassembly and assembly assemblies to change positions between the splitting machine table and the winding machine table. The slitting machine table and the winding machine table are integrated on the workbench, automatic feeding and discharging of roller bodies are achieved through the roller dismounting and mounting assembly and the roller conveying assembly, the automation degree is improved, the manual participation degree is reduced, and therefore the workload of operators is relieved, and the production efficiency is improved. And one set of roller dismounting and mounting assembly can serve a splitting machine table and a winding machine table through the displacement assembly, so that the purchasing requirements of entrepreneurs are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of adhesive tape production, and in particular to an integrated device and a production method for adhesive tape production. Background Art

[0002] As a common and practical material, tape is widely used in all walks of life. Its production is popular among entrepreneurs because of its broad market demand, low entrepreneurial threshold and high profit margin.

[0003] In the production of tape in an entrepreneurial environment, entrepreneurs will mainly purchase slitting machines and winding machines to complete the two main processes of slitting and winding to produce tape products for sale. This further lowers the threshold for entrepreneurship. However, in the actual production process, slitting machines and winders need to frequently disassemble and assemble the rollers carrying the substrate or tape, and need to carry them back and forth, resulting in a heavy workload for operators and low production efficiency. Fully automated production equipment often uses complex control systems, robots and other high-cost equipment, which will greatly increase the threshold for entrepreneurship and is not conducive to use in an entrepreneurial environment.

[0004] To this end, an integrated device and a production method for adhesive tape production are proposed. Summary of the invention

[0005] In order to overcome the deficiencies of the prior art, the present invention provides an integrated device and a production method for adhesive tape production.

[0006] To solve the above technical problems, the present invention provides the following technical solutions: an integrated equipment for producing adhesive tape, comprising a slitting machine and a winding machine, the slitting machine and the winding machine are arranged relative to each other with an operating space left between them, the slitting machine and the winding machine are connected to each other through a top beam at the top, both ends of the two top beams are connected with guide rail beams, a workbench is connected to the bottom between the slitting machine and the winding machine, a roller conveying assembly for loading and unloading a roller body is arranged on the workbench, the number of the roller conveying assemblies is two groups and they correspond to the slitting machine and the winding machine respectively, two groups of roller disassembly and assembly assemblies for installing and disassembling the roller body are arranged on the two guide rail beams respectively, and a displacement assembly for driving the roller disassembly and assembly assembly to change its position between the slitting machine and the winding machine is arranged on the top beam.

[0007] As a preferred technical solution of the present invention, the roller disassembly and assembly assembly includes a slider, which is slidably installed on the guide rail beam, the bottom end of the slider is connected to a fixed platform, the bottom end of the fixed platform is provided with a slide rod and is slidably connected to a conveying arm through the slide rod, a scheduling motor is installed on the outer side of the conveying arm, the transmission shaft of the scheduling motor passes through the conveying arm and is connected to the guide rail frame, a grabbing rod is inserted into the guide rail frame, a pneumatic clamp is provided on the rear side of the grabbing rod, and the clamping end of the pneumatic clamp is connected to a clamp adapted to the shape of the roller shaft at both ends of the roller body, the roller disassembly and assembly assembly also includes a pitch adjusting motor, the guide rail frame is connected to a motor frame, the pitch adjusting motor is installed on the motor frame, the transmission shaft of the pitch adjusting motor is connected to a pitch adjusting gear, and the top surface of the guide rail frame is provided with a gear for the pitch adjusting gear to pass through. The top surface of the grabbing rod is provided with gear teeth and meshes with the pitch adjusting gear at the corresponding position. The roller disassembly and assembly assembly also includes a reset magnet. A rotating rod is provided at the end of the grabbing rod, and a rotating plate is connected to the rotating rod. The pneumatic clamp is installed on the rotating plate. The rotating plate enables the pneumatic clamp to have the ability to rotate laterally. The corresponding surfaces of the pneumatic clamp and the grabbing rod are connected to the reset magnet. The two reset magnets at the corresponding positions attract each other. The bottom surface of the fixed table is connected with a resistance plate on the inner side of the conveying arm. A pushing cylinder is installed on the outer side of the conveying arm. The transmission shaft of the pushing cylinder passes through the conveying arm and resists the resistance plate. Two sets of guide rail frames, grabbing rods, pneumatic clamps, fixtures, pitch adjusting motors, pitch adjusting gears and reset magnets are provided on the conveying arm, and the positions are staggered front and back.

[0008] As a preferred technical solution of the present invention, the position shifting assembly includes a connecting frame, the two ends of the connecting frame are respectively connected to two sliders, the center thread of the connecting frame is connected to a screw rod, a position shifting motor is installed on the workbench, and the transmission shaft of the position shifting motor is connected to the screw rod through the transmission assembly.

[0009] As a preferred technical solution of the present invention, the roller conveying assembly includes a conveying platform 1, which is connected to the workbench and is provided with a conveying belt 1. The roller conveying assembly also includes a conveying platform 2, which is arranged on the workbench and is provided with a conveying belt 2. The conveying platform 2 is provided with a motor and a transmission roller for driving the conveying belt 2 to operate. The conveying platform 2 is closer to the lateral center of the workbench than the conveying platform 1, and the conveying belt 1 and the conveying belt 2 are arranged close to each other. A limiting frame for preventing the roller body from falling from one side is arranged on the away side of the conveying platform 1 and the conveying platform 2, a sliding hole is opened at the bottom of the workbench corresponding to the position of the conveying platform 2, a connecting plate is connected to the bottom surface of the conveying platform 2, a telescopic cylinder is installed at the bottom of the workbench, and the drive shaft of the telescopic cylinder is connected to the connecting plate.

[0010] A method for producing an adhesive tape based on the above-mentioned adhesive tape production equipment, characterized in that it comprises the following steps:

[0011] S1. The operator stands on one side of the workbench and places the roller body loaded with several turns of substrate on the conveyor belt 2 close to the winding machine side. The telescopic cylinder pulls the conveyor belt 2 to move to the workbench and corresponds to the conveyor belt 1. The conveyor belt 2 and the conveyor belt convey a pair of roller bodies to transport the roller body to one end of the conveyor belt 1. The scheduling motor drives the guide frame to rotate so that the clamp faces downward, and the grabbing rod extends from the guide frame. The clamp clamps the roller body on the conveyor belt 1, and the grabbing rod is retracted to extract the roller body. The scheduling motor rotates to make the clamp correspond to the winding machine side, and the grabbing rod on one side extends first to change the roller body. The pneumatic clamp rotates on the grabbing rod to adapt the angle of the roller body, and then the push cylinder drive shaft on one side extends out to push the conveying arm to move in the inclined direction, and then the roller shaft at one end of the roller body is inserted into the roller shaft installation position on one side of the slitting machine or the winding machine. Then the grabbing rod on the other side is extended through the distance adjusting motor to straighten the roller body and reset the pneumatic clamp. Then the push cylinder drive shaft on the other side is extended out to push the conveying arm to reset. Then the clamp clamps the roller body to allow the roller shaft to be inserted into the roller shaft installation position on the other side of the slitting machine or the winding machine to achieve the installation of the roller body.

[0012] S2. During the waiting period of tape winding, the position shifting motor starts to drive the screw to move to the side close to the slitting machine. The scheduling motor controls the guide frame to rotate so that the clamp corresponds to the side of the slitting machine. The roller loaded with the long substrate is placed on the conveyor belt 2 close to the side of the slitting machine, and loaded onto the slitting machine according to the steps of S1.

[0013] S3. After the slitting is completed, the roller body is disassembled and placed on conveyor belt 1 through the opposite action of the roller body installation step. Conveyor belt 1 and conveyor belt 2 run in opposite directions to move the roller body to the side of conveyor belt 2, and then the telescopic cylinder pushes out conveyor belt 2. The operator unloads the substrate on the roller body after slitting from one side of the workbench.

[0014] S4. Repeat steps S2 and S3.

[0015] S5. When the tape is wound, the position motor starts to drive the screw to move to the side close to the winding machine. The scheduling motor controls the guide frame to rotate so that the clamp corresponds to the side of the winding machine. The roller is disassembled through the opposite action of the roller installation step, and the roller with the wound tape is placed on conveyor belt 1. Conveyor belts 1 and 2 run in opposite directions to move the roller to the side of conveyor belt 2, and then the telescopic cylinder pushes out conveyor belt 2. The operator unloads the tape on the wound roller from one side of the workbench.

[0016] S6. Repeat step S1.

[0017] Compared with the prior art, the present invention can achieve the following beneficial effects:

[0018] 1. By integrating the slitting machine and the winding machine on the workbench, and through the roller disassembly and assembly components and the roller conveying components, the automatic loading and unloading of the roller body is realized, the degree of automation is improved, and the degree of manual participation is reduced, thereby reducing the workload of the operator. Through the displacement component, a set of roller disassembly and assembly components can serve the slitting machine and the winding machine, avoiding the problems of excessively high equipment purchase cost and operation and maintenance costs and high operation requirements, and meeting the purchasing needs of entrepreneurs. At the same time, the machine part of this equipment can be replaced by disassembly and assembly with the workbench to form a modular function. When a single machine fails, it can be temporarily disassembled and replaced to avoid affecting production operations, making this equipment have a good market prospect.

[0019] 2. Through the setting of the shifting component, during the waiting period of winding, the roller disassembly and assembly component is controlled by the shifting component to automatically perform the substrate slitting action to provide raw materials for the winding machine, thereby integrating the winding and slitting steps, which helps to improve the production efficiency of the tape.

[0020] 3. Through the roller conveyor assembly, the loading and unloading of the roller body are concentrated on the center side of the workbench, so that the operator can load the substrate and unload the tape at a fixed position, thereby eliminating the need for unnecessary reciprocating movement, further reducing the workload of the operator and improving production efficiency.

[0021] 4. Through the structural setting of the roller disassembly and assembly components, the slitting machine and winding machine can be applied to the conventional roller installation methods on the market, which improves the applicability, and the structure and control program are simple and easy to control.

[0022] 5. Through two sets of guide rail frames and other structures for disassembling and assembling the roller body, it can adapt to the slitting machine models and winding machine models on the market that can perform two sets of winding and slitting actions, and through two sets of guide rail frames and other structures for disassembling and assembling the roller body, two roller bodies can be installed and disassembled on the machine at the same time, thereby further improving work efficiency. The front and back staggered setting can take the roller body separately when vertical, further improving the clamping efficiency.

[0023] 6. Through the transmission of conveyor belt 1 and conveyor belt 2, the roller body can be transferred to the center position close to the slitting machine side, the winding machine side or the workbench 14 to realize the transmission of the roller body. When the roller body is located on the conveyor table 2, the telescopic cylinder can drive the conveyor belt 1 to extend from the workbench through the pulling of the transmission shaft, so that the loading and unloading position of the roller body can be realized on the outside of the workbench, thereby facilitating the operator to load and unload the roller body, improving efficiency and further reducing the workload. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the top structure of the present invention;

[0025] Figure 2 It is a schematic diagram of the bottom structure of the present invention;

[0026] Figure 3 It is a structural schematic diagram of the upper component of the guide rail beam of the present invention;

[0027] Figure 4 It is a schematic diagram of the inner side structure of the roller disassembly and assembly assembly of the present invention;

[0028] Figure 5 It is a schematic diagram of the outer side structure of the roller disassembly and assembly assembly of the present invention.

[0029] Among them: 10. Slitting machine; 11. Winding machine; 12. Top beam; 13. Guide rail beam; 14. Workbench; 15. Slider; 16. Fixed table; 17. Conveyor arm; 18. Scheduling motor; 19. Guide frame; 20. Grabbing rod; 21. Pneumatic gripper; 22. Clamp; 23. Pitch-adjusting motor; 24. Pitch-adjusting gear; 25. Reset magnet; 26. Push cylinder; 27. Contact plate; 28. Connecting frame; 29. ​​Screw; 30. Positioning motor; 31. Conveyor platform 1; 32. Conveyor belt 1; 33. Conveyor platform 2; 34. Conveyor belt 2; 35. Limit frame; 36. Telescopic cylinder; 37. Connecting plate. DETAILED DESCRIPTION

[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the scope of protection of the present invention. The experimental methods in the following embodiments, unless otherwise specified, are conventional methods, and the materials, reagents, etc. used in the following embodiments, unless otherwise specified, can be obtained from commercial channels.

[0031] Embodiment: Figure 1-5As shown, an integrated equipment for producing adhesive tape includes a slitting machine 10 and a winding machine 11, characterized in that the slitting machine 10 and the winding machine 11 are arranged relative to each other. It should be noted that both the slitting machine 10 and the winding machine 11 adopt a roller rotation structure design, which is a known technology. It has a turntable with a replaceable roller. When a single roller is wound or slid, the roller on the other side of the turntable can be left idle for disassembly and loading and unloading. It will not be described in detail here. A certain operating space is left between the slitting machine 10 and the winding machine 11. The slitting machine 10 and the winding machine are arranged in a rotating manner. The machines 11 are connected to each other through the top beams 12 on the top, and the two ends of the two top beams 12 are connected with guide rail beams 13. The bottom between the slitting machine 10 and the winding machine 11 is connected with a workbench 14, and the workbench 14 is provided with a roller conveying assembly for loading and unloading the roller body. The number of roller conveying assemblies is two groups and corresponds to the slitting machine 10 and the winding machine 11 respectively. Two groups of roller disassembly assemblies for installing and disassembling the roller body are respectively provided on the two guide rail beams 13, and a displacement assembly for driving the roller disassembly assembly to change the position between the slitting machine 10 and the winding machine 11 is provided on the top beam 12.

[0032] Specifically, first, on the winding machine 11 side, a stick body loaded with a plurality of circles of adhesive tape substrate is placed on the side of the roller conveying assembly close to the center of the workbench 14 on the slitting machine 10 side, and is transferred to the clamping position of the roller disassembly and assembly assembly through the roller conveying assembly, and the roller body is clamped by the roller disassembly and assembly assembly and installed on the winding machine 11. Then, in the tape winding waiting section, the displacement assembly shifts the roller disassembly and assembly assembly to the slitting machine 10 side, and on the slitting machine 10 side, a stick body loaded with a long circle of adhesive tape substrate is installed and placed on the side of the roller conveying assembly close to the center of the workbench 14, and is transferred to the clamping position of the roller disassembly and assembly assembly through the roller conveying assembly, and the roller body is clamped by the roller disassembly and assembly assembly and installed on the slitting machine 10, after the slitting is completed, the slitting machine 10 rotates the roller body, and the roller disassembly and assembly assembly disassembles the slitting roller body and places it on the roller conveying assembly, and the roller conveying assembly transports the roller body to the center side for the operator to obtain and unload the substrate after slitting, and then when the winding is almost completed, the shifting assembly moves the roller disassembly and assembly assembly to the side close to the winding machine 11, and after the winding machine 11 rotates the roller body, the roller disassembly and assembly assembly disassembles the roller body loaded with the finished tape and transports it to the center side through the roller conveying assembly for unloading, and then repeats the above steps. It should be noted that the motion position control of the structure of the present application can be achieved by adding sensors, which is a prior art known technology and will not be elaborated here.

[0033] like Figure 1 , Figure 3 , Figure 4 and Figure 5As shown, the roller disassembly assembly includes a slider 15, which is slidably mounted on the guide rail beam 13. Rollers with multiple angles are rotatably mounted on the slider 15 and the rollers are in contact with the guide rail beam 13. The friction generated by the slider 15 sliding on the guide rail beam 13 is reduced by the rotation of the rollers. The bottom end of the slider 15 is connected to a fixed platform 16, and a sliding rod is provided at the bottom end of the fixed platform 16 and is slidably connected to a conveying arm 17 through the sliding rod. A scheduling motor 18 is installed on the outer side of the conveying arm 17. It should be noted that The outer side refers to the side away from the vertical center line of the workbench 14. The transmission shaft of the dispatching motor 18 passes through the conveying arm 17 and is connected to the guide rail frame 19. A grabbing rod 20 is inserted into the guide rail frame 19. The grabbing rod 20 can slide back and forth in the guide rail frame 19. A pneumatic clamp 21 is provided on the rear side of the grabbing rod 20. The pneumatic clamp 21 is a known technology and will not be described in detail here. The clamping end of the pneumatic clamp 21 is connected to a clamp adapted to the shape of the roller shaft at both ends of the roller body. The roller disassembly and assembly assembly also includes a distance adjustment The motor 23 is connected to the guide rail frame 19 with a motor frame, the pitch-adjusting motor 23 is mounted on the motor frame, the transmission shaft of the pitch-adjusting motor 23 is connected to the pitch-adjusting gear 24, the top surface of the guide rail frame 19 is provided with a through hole for the pitch-adjusting gear 24 to pass through, the top surface of the grabbing rod 20 is provided with gear teeth and meshes with the pitch-adjusting gear 24 at the corresponding position, the roller disassembly and assembly assembly also includes a reset magnet 25, a rotating rod is provided at the end of the grabbing rod 20, and a rotating plate is connected to the rotating rod, the pneumatic clamp 21 is installed on the rotating plate, and the rotating plate The pneumatic clamp 21 has the ability to rotate laterally. The corresponding surfaces of the pneumatic clamp 21 and the grab rod 20 are connected to the reset magnet 25. The two reset magnets 25 at corresponding positions attract each other. The reset magnet 25 is used to reset the pneumatic clamp 21 by magnetic attraction after it rotates. The bottom surface of the fixed platform 16 is connected to a contact plate 27 on the inner side of the conveying arm 17. A pushing cylinder 26 is installed on the outer side of the conveying arm 17. The transmission shaft of the pushing cylinder 26 passes through the conveying arm 17 and contacts the contact plate 27.

[0034] Specifically, by rotating the dispatching motor 18, the guide rail frame 19 and other structures can be driven to adjust the longitudinal angle, so that when approaching the slitting machine 10 side or the winding machine 11 side, the angle of the clamp 22 is adjusted to the position corresponding to the slitting machine 10 side or the winding machine 11 side, and the distance adjusting motor 23 drives the distance adjusting gear 24 to rotate. The distance adjusting gear 24 drives the grabbing rod 20 to slide back and forth in the guide rail frame 19 by engaging with the grabbing rod 20, thereby further adjusting the extension length of the clamp 22 for clamping the roller conveying assembly or the roller body on the slitting machine 10 and the winding machine 11. In addition, by pushing the transmission shaft of the cylinder 26 to extend, the reaction force of the resistance plate 27 can push the conveying arm 17 to adjust the direction of one side. After the roller disassembly and assembly of the rollers on both sides clamp the roller body, the different directions of the transmission shafts of the pushing cylinders 26 on both sides can be synchronously driven The conveying arm 17 is connected to the roller body to move horizontally left and right. When installing the roller body, the grabbing rod 20 on one side is extended first to change the horizontal length of the roller body. At this time, the pneumatic clamp 21 rotates on the grabbing rod 20 to adapt to the angle of the roller body. Then the driving shaft of the pushing cylinder 26 on one side is extended to push the conveying arm 17 to move in the inclined direction, and then the roller shaft at one end of the roller body is inserted into the roller shaft installation position on one side of the slitting machine 10 or the winding machine 11. Then the grabbing rod 20 on the other side is extended through the distance adjustment motor 23 to straighten the roller body and reset the pneumatic clamp 21. Then the driving shaft of the pushing cylinder 26 on the other side is extended to push the conveying arm 17 to reset. Then the clamp 22 clamps the roller body to allow the roller shaft to be inserted into the roller shaft installation position on the other side of the slitting machine 10 or the winding machine 11 to achieve the installation of the roller body. When disassembling, the above actions can be performed in reverse.

[0035] like Figure 4 As shown, the conveying arm 17 is provided with two sets of guide rail frames 19, a grabbing rod 20, a pneumatic clamp 21, a clamp 22, a pitch-adjusting motor 23, a pitch-adjusting gear 24 and a reset magnet 25, and the positions are staggered front and back.

[0036] Specifically, through two sets of guide frames 19 and other structures for disassembling and assembling the roller bodies, it can adapt to the slitting machine model 10 and the winding machine model 11 on the market that can perform two sets of winding and slitting actions, and through two sets of guide frames 19 and other structures for disassembling and assembling the roller bodies, two roller bodies can be installed and disassembled on the machine at the same time, thereby further improving work efficiency, and the front and rear staggered arrangement can take the roller bodies individually when vertical, further improving the clamping efficiency.

[0037] like Figure 1 and Figure 3As shown, the shifting assembly includes a connecting frame 28, the two ends of the connecting frame 28 are respectively connected to the two sliders 15, the center of the connecting frame 28 is threadedly connected to a screw rod 29, a shifting motor 30 is installed on the workbench 14, and the transmission shaft of the shifting motor 30 is connected to the screw rod 29 through a transmission assembly. The transmission assembly can be one of a chain drive, a belt drive and a gear drive, which are all existing well-known technologies and will not be elaborated here. It should be noted that the scheduling motor 18, the pitch adjusting motor 23 and the shifting motor 30 adopt one of a motor motor and a three-phase asynchronous motor.

[0038] Specifically, the screw rod 29 is driven to rotate by the position changing motor 30, and the connecting frame 28 threadedly connected to the screw rod 29 moves forward and backward along the rotation direction of the screw rod 29, thereby driving the roller disassembly and assembly assembly to adjust its position.

[0039] like Figure 1 and Figure 2 As shown, the roller conveying assembly includes a conveying platform 1 31, which is connected to the workbench 14, and a conveying belt 1 32 is arranged on the conveying platform 1 31. The conveying platform 1 31 is provided with a motor and a transmission roller for driving the conveying belt 1 32 to operate, which is a known technology and is not described in detail here. The roller conveying assembly also includes a conveying platform 2 33, which is arranged on the workbench 14, and a conveying belt 2 34 is arranged on the conveying platform 2 33, and a transmission roller for driving the conveying belt 2 34 to operate is arranged on the conveying platform 2 33. The motor and transmission roller, the conveyor platform 2 33 is closer to the lateral center of the workbench 14 than the conveyor platform 1 31, the conveyor belt 1 32 and the conveyor belt 2 34 are arranged close to each other, and the away sides of the conveyor platforms 1 31 and 2 33 are provided with limit frames 35 for preventing the roller body from falling from one side, and a sliding hole is provided at the bottom of the workbench 14 corresponding to the position of the conveyor platform 2 33, and the bottom surface of the conveyor platform 2 33 is connected to a connecting plate 37, and a telescopic cylinder 36 is installed at the bottom of the workbench 14, and the transmission shaft of the telescopic cylinder 36 is connected to the connecting plate 37.

[0040] Specifically, after placing the roller body on the conveyor platform 1 31 or the conveyor platform 2 33, the roller body can be transferred to the center position close to the slitting machine 10 side, the winding machine 11 side or the workbench 14 through the transmission of the conveyor belt 1 32 and the conveyor belt 2 34, so as to realize the transmission of the roller body. When the roller body is located on the conveyor platform 2 33, the telescopic cylinder 36 can drive the conveyor belt 1 32 to extend from the workbench 14 through the pulling of the transmission shaft, so that the loading and unloading position of the roller body can be realized on the outside of the workbench 14, thereby facilitating the operator's loading and unloading actions of the roller body, improving efficiency and further reducing the workload.

[0041] A method for producing an adhesive tape comprises the following steps:

[0042] S1. The operator stands between the slitting machine 10 and the winding machine 11 on one side of the workbench 14, and places the roller body loaded with several turns of substrate on the conveyor belt 2 34 close to the side of the winding machine 11. The telescopic cylinder 36 pulls the conveyor belt 2 34 to move to the workbench 14 and corresponds to the conveyor belt 1 32. The roller body is transported to one end of the conveyor belt 1 32 through the conveyor belt 2 34 and the conveyor belt 1 32. The dispatching motor 18 drives the guide frame 19 to rotate so that the clamp 22 faces downward, and the grabbing rod 20 extends from the guide frame 19. The clamp 22 clamps the roller body on the conveyor belt 1 32, and the grabbing rod 20 is retracted to extract the roller body. The dispatching motor 18 rotates to transfer the clamp 22 to the side of the winding machine 11. The grabbing rod 20 on one side is extended first to change the lateral length of the roller body. At this time, the pneumatic clamp 21 rotates on the grabbing rod 20 to adapt to the angle of the roller body, and then the transmission shaft of the pushing cylinder 26 on one side is extended to push the conveying arm 17 to move in the inclined direction, and then the roller shaft at one end of the roller body is inserted into the roller shaft installation position on one side of the slitting machine 10 or the winding machine 11, and then the grabbing rod 20 on the other side is extended through the distance adjustment motor 23 to straighten the roller body and reset the pneumatic clamp 21, and then the transmission shaft of the pushing cylinder 26 on the other side is extended to push the conveying arm 17 to reset, and then the clamp 22 clamps the roller body to allow the roller shaft to be inserted into the roller shaft installation position on the other side of the slitting machine 10 or the winding machine 11, so as to realize the installation of the roller body.

[0043] S2. During the waiting period for the tape to be wound, the position shifting motor 30 is started to drive the screw 29 to move to the side close to the slitting machine 10. The scheduling motor 18 controls the guide frame 19 to rotate so that the clamp 22 corresponds to the side of the slitting machine 10. The roller loaded with the long substrate is placed on the conveyor belt 2 34 close to the side of the slitting machine 10, and loaded onto the slitting machine 10 according to the steps of S1.

[0044] S3. After the slitting is completed, the roller body is disassembled and placed on the conveyor belt 1 32 through the opposite action of the roller body installation step. The conveyor belt 1 32 and the conveyor belt 2 34 rotate in reverse to move the roller body to the side of the conveyor belt 2 34. Then the telescopic cylinder 36 pushes the conveyor belt 2 34 out, and the operator unloads the substrate on the roller body after slitting from one side of the workbench 14.

[0045] S4. Repeat steps S2 and S3.

[0046] S5. When the tape winding is completed, the position shifting motor 30 starts to drive the screw 29 to move to the side close to the winding machine 11. The scheduling motor 18 controls the guide frame 19 to rotate so that the clamp 22 corresponds to the side of the winding machine 11. The roller body is disassembled through the opposite action of the roller body installation step, and the roller body with the wound tape is placed on the conveyor belt 1 32. The conveyor belt 1 32 and the conveyor belt 2 34 rotate in reverse to move the roller body to the side of the conveyor belt 2 34, and then the telescopic cylinder 36 pushes the conveyor belt 2 34 out, and the operator unloads the tape on the roller body after winding from one side of the workbench 14.

[0047] S6. Repeat step S1.

[0048] The embodiments of the present invention have been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto, and various changes can be made within the knowledge scope of technicians in the relevant technical field without departing from the purpose of the present invention.

Claims

1. An integrated device for producing adhesive tape, comprising a slitting machine (10) and a winding machine (11), characterized in that: The slitting machine (10) and the winding machine (11) are arranged opposite to each other, and an operating space is reserved between the slitting machine (10) and the winding machine (11). The slitting machine (10) and the winding machine (11) are connected to each other through a top beam (12) at the top. Both ends of the two top beams (12) are connected to guide rail beams (13). A workbench (14) is connected to the bottom between the slitting machine (10) and the winding machine (11). A roller conveying assembly for loading and unloading a roller body is arranged on the workbench (14). The number of roller conveying assemblies is two groups and they correspond to the slitting machine (10) and the winding machine (11) respectively. Two groups of roller disassembly assemblies for installing and disassembling a roller body are arranged on the two guide rail beams (13). A displacement assembly for driving the roller disassembly assembly assembly to change position between the slitting machine (10) and the winding machine (11) is arranged on the top beam (12).

2. The integrated equipment for producing adhesive tape according to claim 1, characterized in that: The roller disassembly and assembly assembly comprises a slider (15), the slider (15) is slidably mounted on the guide rail beam (13), the bottom end of the slider (15) is connected to a fixed platform (16), a sliding rod is provided at the bottom end of the fixed platform (16) and is slidably connected to a conveying arm (17) through the sliding rod, a dispatching motor (18) is installed on the outer side of the conveying arm (17), a transmission shaft of the dispatching motor (18) passes through the conveying arm (17) and is connected to a guide rail frame (19), a grabbing rod (20) is inserted into the guide rail frame (19), a pneumatic clamp (21) is provided on the rear side of the grabbing rod (20), and a clamp adapted to the shape of the roller shaft at both ends of the roller body is connected to the clamping end of the pneumatic clamp (21).

3. The integrated equipment for producing adhesive tape according to claim 2, characterized in that: The roller assembly and disassembly assembly also includes a pitch-adjusting motor (23), a motor frame is connected to the guide rail frame (19), the pitch-adjusting motor (23) is mounted on the motor frame, a transmission shaft of the pitch-adjusting motor (23) is connected to a pitch-adjusting gear (24), a through hole for the pitch-adjusting gear (24) to pass through is provided on the top surface of the guide rail frame (19), and gear teeth are provided on the top surface of the grabbing rod (20) and mesh with the pitch-adjusting gear (24) at a corresponding position.

4. The integrated equipment for producing adhesive tape according to claim 3, characterized in that: The roller disassembly and assembly assembly also includes a reset magnet (25), a rotating rod is provided at the end of the grabbing rod (20), and a rotating plate is connected to the rotating rod, the pneumatic clamp (21) is installed on the rotating plate, and the rotating plate enables the pneumatic clamp (21) to have the ability to rotate laterally, the corresponding surfaces of the pneumatic clamp (21) and the grabbing rod (20) are connected to the reset magnet (25), and the two reset magnets (25) at corresponding positions attract each other, the bottom surface of the fixed platform (16) is connected to a contact plate (27) on the inner side of the conveying arm (17), and a pushing cylinder (26) is installed on the outer side of the conveying arm (17), and the transmission shaft of the pushing cylinder (26) passes through the conveying arm (17) and contacts the contact plate (27).

5. The integrated equipment for producing adhesive tape according to claim 4, characterized in that: The conveying arm (17) is provided with two groups of guide rail frames (19), a grabbing rod (20), a pneumatic clamp (21), a clamp (22), a pitch-adjusting motor (23), a pitch-adjusting gear (24) and a reset magnet (25), and the positions are staggered front and back.

6. The integrated equipment for producing adhesive tape according to claim 4, characterized in that: The position shifting assembly comprises a connecting frame (28), the two ends of the connecting frame (28) are respectively connected to the two sliders (15), the center of the connecting frame (28) is threadedly connected to a screw rod (29), a position shifting motor (30) is installed on the workbench (14), and the transmission shaft of the position shifting motor (30) is connected to the screw rod (29) through the transmission assembly.

7. The integrated equipment for producing adhesive tape according to claim 6, characterized in that: The roller conveying assembly comprises a conveying platform (31), the conveying platform (31) is connected to the workbench (14), and a conveying belt (32) is arranged on the conveying platform (31).

8. The integrated equipment for producing adhesive tape according to claim 7, characterized in that: The roller conveying assembly also includes a conveying platform 2 (33), which is arranged on the workbench (14), a conveying belt 2 (34) is arranged on the conveying platform 2 (33), a motor and a transmission roller for driving the conveying belt 2 (34) to operate are arranged on the conveying platform 2 (33), the conveying platform 2 (33) is closer to the transverse center of the workbench (14) than the conveying platform 1 (31), the conveying belt 1 (32) and the conveying belt 2 (34) are arranged close to each other, a limit frame (35) for preventing the roller body from falling from one side is arranged on the opposite sides of the conveying platform 1 (31) and the conveying platform 2 (33), a sliding hole is opened at the bottom of the workbench (14) at a position corresponding to the conveying platform 2 (33), the bottom surface of the conveying platform 2 (33) is connected to a connecting plate (37), a telescopic cylinder (36) is installed at the bottom of the workbench (14), and the transmission shaft of the telescopic cylinder (36) is connected to the connecting plate (37).

9. A method for producing an adhesive tape based on the above-mentioned adhesive tape production equipment, characterized in that: The steps include: S1. An operator stands on one side of a workbench (14) and places a roller body loaded with several turns of substrate on conveyor belt 2 (34) close to the winding machine (11). The telescopic cylinder (36) pulls conveyor belt 2 (34) to move onto the workbench (14) and correspond to conveyor belt 1 (32). The roller body is transported to one end of conveyor belt 1 (32) by conveyor belt 2 (34) and conveyor belt 1 (32). The dispatching motor (18) drives the guide frame (19) to rotate so that the clamp (22) faces downward. The grabbing rod (20) extends from the guide frame (19). The clamp (22) clamps the roller body on conveyor belt 1 (32). The grabbing rod (20) is retracted to extract the roller body. The dispatching motor (18) rotates so that the clamp (22) corresponds to the winding machine (11). The grabbing rod (20) is first extended to change the lateral length of the roller body. At this time, the pneumatic clamp (21) rotates on the grabbing rod (20) to adapt to the angle of the roller body. Then, the transmission shaft of the pushing cylinder (26) on one side is extended to push the conveying arm (17) to move in the inclined direction, and then the roller shaft at one end of the roller body is inserted into the roller shaft installation position on one side of the slitting machine (10) or the winding machine (11). Then, the grabbing rod (20) on the other side is extended through the pitch adjustment motor (23) to straighten the roller body and reset the pneumatic clamp (21). Then, the transmission shaft of the pushing cylinder (26) on the other side is extended to push the conveying arm (17) to reset. Then, the clamp (22) clamps the roller body to allow the roller shaft to be inserted into the roller shaft installation position on the other side of the slitting machine (10) or the winding machine (11), thereby realizing the installation of the roller body. S2. During the waiting period for the tape to be wound, the position shifting motor (30) is started to drive the screw (29) to move to the side close to the slitting machine (10), and the scheduling motor (18) controls the guide rail frame (19) to rotate so that the clamp (22) corresponds to the side of the slitting machine (10), and the roller body loaded with the long substrate is placed on the second conveyor belt (34) close to the side of the slitting machine (10), and is loaded onto the slitting machine (10) according to the steps of S1; S3, after the slitting is completed, the roller body is disassembled and placed on the conveyor belt 1 (32) through the reverse action of the roller body installation step, the conveyor belt 1 (32) and the conveyor belt 2 (34) are operated in the opposite direction to move the roller body to the side of the conveyor belt 2 (34), and then the telescopic cylinder (36) pushes the conveyor belt 2 (34) out, and the operator unloads the substrate on the roller body after slitting from one side of the workbench (14); S4, repeat steps S2 and S3; S5. When the tape is wound, the position shifting motor (30) starts to drive the screw rod (29) to move to the side close to the winding machine (11). The dispatching motor (18) controls the guide rail frame (19) to rotate so that the clamp (22) corresponds to the side of the winding machine (11). The roller body is disassembled by the opposite action of the roller body installation step, and the roller body with the wound tape is placed on the conveyor belt 1 (32). The conveyor belt 1 (32) and the conveyor belt 2 (34) rotate in the opposite direction to move the roller body to the side of the conveyor belt 2 (34). Then, the telescopic cylinder (36) pushes the conveyor belt 2 (34) out, and the operator unloads the tape on the wound roller body from one side of the workbench (14); S6. Repeat step S1.