TOB boundary upgrading method and system and storage medium

By obtaining and processing the initial boundary and boundary upgrade instructions for isolating and handing over, creating upgrade boundaries and performing upgrade processing, the problem of inconvenience in the upgrade of TOB boundary in the existing technology is solved, and the optimization of boundary information and maintenance costs are achieved.

CN119941183APending Publication Date: 2025-05-06CGN CANGNAN NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510107669.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-05-06

AI Technical Summary

Technical Problem

During the isolation and handover, the prior art is not convenient to achieve optimization management of the expansion and upgrading of TOB boundaries during isolation implementation, resulting in an increase in maintenance workload and cost during information deployment.

Method used

By obtaining the initial version boundary of the isolated handover and the boundary upgrade instructions for the first version boundary, an upgrade boundary based on the first version boundary is created, and the upgrade boundary is upgraded according to the boundary upgrade instructions to achieve the upgrade and expansion of the first version boundary.

Benefits of technology

The optimization of TOB boundary information has been achieved, the information maintenance costs have been reduced, and the diversity and flexibility of the initial boundary upgrade processing has been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119941183A_ABST
    Figure CN119941183A_ABST
Patent Text Reader

Abstract

The invention provides a TOB boundary upgrading method and system and a storage medium, and relates to the technical field of nuclear power site isolation handover, and the boundary upgrading method comprises the following steps: obtaining a primary version boundary of isolation handover and a boundary upgrading instruction for the primary version boundary; and creating a version raising boundary based on the initial version boundary, and performing upgrading processing on the version raising boundary by the initial version boundary according to the boundary upgrading instruction. According to the boundary upgrading method and system and the storage medium provided by the invention, the diversity and flexibility of the upgrading processing mode of the initial version boundary to the version upgrading boundary are ensured, so that the optimization of TOB boundary information is realized, and the informatization maintenance cost is also reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power site isolation handover, and in particular to a TOB (Transfer Over Isolation) boundary upgrade method, system and storage medium. Background Art

[0002] TOB isolation handover refers to the transfer of isolation management responsibilities for the system when the system is transferred from installation to commissioning. When non-operation personnel perform work that requires a work permit at the isolation office on a system or equipment that has been TOB but not TOTO (temporary operation handover), the operation department can apply for a work permit for them at the request of the person in charge of the work. The work permit indicates that the safety conditions required for the work are in place and the powers and responsibilities between the person in charge of the work and the operation department have been clearly defined.

[0003] The existing isolation transfer is not convenient for optimizing the management of the expansion and upgrade of the TOB boundary during the isolation implementation process, thereby increasing the maintenance workload and cost during information deployment. Summary of the invention

[0004] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide a TOB boundary upgrade method, system and storage medium, which are used to solve the problem that in the prior art, it is not convenient to realize the optimization management of the expansion and upgrade of the TOB boundary during the isolation implementation process when performing isolation handover, thereby increasing the maintenance workload and cost during information deployment.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a TOB boundary upgrade method, comprising the following steps: obtaining the first edition boundary for isolation and transfer and the boundary upgrade instruction for the first edition boundary; creating an upgrade boundary based on the first edition boundary, and upgrading the first edition boundary to the upgrade boundary according to the boundary upgrade instruction.

[0006] In one embodiment of the present invention, before obtaining the preliminary version boundary for isolation and transfer, the method includes: creating the preliminary version boundary for isolation and transfer, and controlling the preliminary version boundary data of the preliminary version boundary to be isolated and implemented.

[0007] In one embodiment of the present invention, the boundary upgrade instruction for the first edition boundary includes: a modification upgrade instruction for directly upgrading the boundary based on the current first edition boundary, and an upgrade upgrade instruction for merging the current first edition boundary with other first edition boundaries.

[0008] In one embodiment of the present invention, an upgrade boundary based on the first edition boundary is created, and according to the boundary upgrade instruction, the first edition boundary is upgraded to the upgrade boundary, including: according to the modification upgrade instruction, the boundary state of the first edition boundary is imported into the upgrade boundary, and the boundary state of the first edition boundary is modified to obtain the boundary state of the upgrade boundary.

[0009] In one embodiment of the present invention, the boundary state of the first edition boundary is modified to obtain the boundary state of the upgraded edition boundary, including: a boundary instruction to modify the boundary state of the first edition boundary so that the first edition boundary is upgraded to obtain the upgraded edition boundary; wherein the boundary instruction to modify the boundary state includes boundary instructions to delete, change and add boundary states, and the boundary instruction includes a function location code and device status information.

[0010] In one embodiment of the present invention, an upgrade boundary based on the initial edition boundary is created, and according to the boundary upgrade instruction, the initial edition boundary is upgraded to the upgrade boundary, including: according to the upgrade instruction, the initial edition boundary at the time of TOB transfer of the current device and other initial edition boundaries at the time of TOB transfer of other devices are merged and the boundary status is modified, and imported into the upgrade boundary to obtain the boundary status of the upgrade boundary.

[0011] In one embodiment of the present invention, the initial version boundary at the time of TOB handover of the current device and other initial version boundaries at the time of TOB handover of other devices are merged and the boundary status is modified, and imported into the upgraded version boundary to obtain the boundary status of the upgraded version boundary, including: boundary instructions for modifying the boundary status of the initial version boundary at the time of TOB handover of the current device and other initial version boundaries at the time of TOB handover of other devices, so that the boundary range of the obtained upgraded version boundary at least includes the boundary range of the initial version boundary at the time of TOB handover of the current device and the boundary range of other initial version boundaries at the time of TOB handover of other devices; wherein, the boundary instructions for modifying the boundary status include boundary instructions for deleting, changing and adding the boundary status, and the boundary instructions include function location codes and device status information.

[0012] In one embodiment of the present invention, after the initial edition boundary is upgraded to the upgraded edition boundary, the method includes: obtaining all modification instructions for upgrading from the initial edition boundary to the upgraded edition boundary, and controlling the printing of all modification instructions.

[0013] The present invention also provides a TOB boundary upgrade system, including: a first edition acquisition unit, which acquires the first edition boundary of the isolated transfer and the boundary upgrade instruction for the first edition boundary; and an upgrade control unit, which creates an upgrade boundary based on the first edition boundary, and upgrades the first edition boundary to the upgrade boundary according to the boundary upgrade instruction.

[0014] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method.

[0015] Beneficial effects of the present invention: The present invention proposes a TOB boundary upgrade method, system and storage medium. The boundary upgrade method, system and storage medium can modify the boundary state of the first edition boundary based on the boundary upgrade instruction according to the created first edition boundary and the boundary upgrade instruction of the first edition boundary during the isolation and handover stage, thereby realizing flexible adjustment of the upgrade scheme of the first edition boundary to the upgraded edition boundary, thereby realizing the upgrade processing of the first edition boundary to the upgraded edition boundary. Specifically, when it comes to directly modifying the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries, the upgrade processing of the first edition boundary to the upgraded edition boundary can be completed according to the boundary upgrade instruction by performing the modification involving the direct modification of the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries, thereby ensuring the diversity and flexibility of the first edition boundary upgrade processing, thereby realizing the optimization of TOB boundary information and reducing the information maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The flowchart of the boundary upgrading method of the present invention is shown in FIG.

[0017] Figure 2 It is a flowchart of the boundary upgrade process in a preferred embodiment of the present invention.

[0018] Figures 3 to 19 It is a schematic diagram of specific interface operations during boundary upgrade in a preferred embodiment of the present invention.

[0019] Fig. 20 It is an architecture diagram of the boundary upgrade system of the present invention. DETAILED DESCRIPTION

[0020] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0021] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0022] In the following description, numerous details are discussed to provide a more thorough explanation of the embodiments of the present invention. However, it is obvious to those skilled in the art that the embodiments of the present invention can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present invention difficult to understand.

[0023] In one embodiment of the present invention, boundary management is a part of debugging management. The SAP information system needs to provide an information support platform for debugging management, and use information technology to implement process management of boundary management and debugging process, so that the interface relationship is clearer, the work is more standardized, and the management efficiency is more efficient; at the same time, through the various modules of the debugging management information system, the main processes involved in the debugging work and the main interfaces between the sub-processes are clarified.

[0024] See also Figure 1 In one embodiment of the present invention, the present invention provides a TOB boundary upgrade method, comprising the following steps: obtaining an isolated and transferred first edition boundary and a boundary upgrade instruction for the first edition boundary; creating an upgrade boundary based on the first edition boundary, and upgrading the first edition boundary to the upgrade boundary according to the boundary upgrade instruction.

[0025] In this embodiment, the steps are as follows: obtaining the isolated and handed over preliminary edition boundary and the boundary upgrade instruction for the preliminary edition boundary. It can be seen that after the TOB boundary is created, the isolated and handed over preliminary edition boundary is obtained, and the preliminary edition boundary includes the boundary device with the isolated boundary and the boundary state corresponding to the boundary device. When the TOB boundary is upgraded according to the preliminary edition boundary, the preliminary edition boundary is first acquired, including the boundary device with the isolated boundary and the boundary state corresponding to the boundary device. It is also necessary to further obtain the boundary upgrade instruction for upgrading the preliminary edition boundary, so that the preliminary edition boundary can modify the boundary state according to the corresponding boundary upgrade instruction to achieve the purpose of upgrading the preliminary edition boundary. Specifically, since when upgrading the preliminary edition boundary, it may involve directly modifying the preliminary edition boundary, and of course, there may be a merger and modification of the current preliminary edition boundary with other preliminary edition boundaries, therefore, before upgrading, it is necessary to perform specific upgrade processing through the boundary upgrade instruction. The steps are as follows: creating an upgraded version boundary based on the preliminary edition boundary, and upgrading the upgraded version boundary of the preliminary edition boundary according to the boundary upgrade instruction. It can be seen that when the first edition boundary and the boundary upgrade instruction are obtained for upgrading, the upgrade boundary is established according to the first edition boundary. And according to the boundary upgrade instruction, the first edition boundary is upgraded to obtain the upgrade boundary. Specifically, according to the boundary upgrade instruction, that is, when it involves directly modifying the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries, the upgrade processing of the first edition boundary to the upgrade boundary can be completed by respectively involving directly modifying the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries. Through the above steps, it is possible to flexibly adjust the upgrade scheme of the first edition boundary to the upgrade boundary according to different types of first edition boundaries, thereby realizing the upgrade processing of the first edition boundary to upgrade and expand the version. Among them, upgrading can refer to directly modifying the first edition boundary to upgrade to the upgrade boundary. Expanding can refer to merging and modifying the current first edition boundary with other first edition boundaries to upgrade to the upgrade boundary.

[0026] In one embodiment of the present invention, before obtaining the preliminary version boundary, it is necessary to create the preliminary version boundary. Specifically, before obtaining the preliminary version boundary for isolation and transfer, it includes: creating the preliminary version boundary for isolation and transfer, and controlling the preliminary version boundary data of the preliminary version boundary to be isolated and implemented.

[0027] In this embodiment, a TOB boundary is pre-established during the isolation handover phase. Different boundary states are set in the TOB boundary according to the boundary devices. For example, the boundary devices may be switches, valves, pumps, etc., that is, switches and valves are used to control the opening or closing of the isolation boundary, or the pump is started and shut down to control the delivery or stop of the pump, etc., to achieve boundary isolation processing, that is, to set different boundary states.

[0028] In one embodiment of the present invention, the boundary state includes the functional location coding state and the equipment state. The functional location coding is a coding method for describing the location information of each device in the nuclear power isolation handover. Each device can be assigned a unique functional location code, which can be used to identify the location information of a certain device, that is, the functional location state coding state. For example, the current state information such as the production line, workshop, warehouse, etc. can also be used to identify the factory, department, etc. to which the device belongs. The functional location code and the equipment code are different, but there is also a connection between them. In boundary management, the functional location code and the equipment code can cooperate with each other to better manage boundary equipment resources. For example, when the device needs to be debugged, the basic information such as the device model can be quickly located through the equipment code, and then the location of the device can be determined through the functional location code, so that the person in charge of debugging can quickly debug the device. The equipment state can be the open or closed state of the isolation boundary. For example, the opening or closing is controlled by the boundary device. The boundary device can be a switch, a valve, a pump, etc., that is, the opening or closing of the isolation boundary is controlled by the switch and the valve, or the pump is started and closed to realize the boundary isolation processing such as controlling the delivery or stopping of the pump.

[0029] In one embodiment of the present invention, when performing an upgrade process on the first edition boundary, the upgrade process can be performed by using a corresponding boundary upgrade instruction. Specifically, the boundary upgrade instruction for the first edition boundary includes: a modification upgrade instruction for directly upgrading the boundary based on the current first edition boundary, and an upgrade upgrade instruction for merging the current first edition boundary with other first edition boundaries.

[0030] In this embodiment, the boundary upgrade instruction mainly includes a modification upgrade instruction for directly upgrading the boundary based on the current first edition boundary and an upgrade upgrade instruction for merging the current first edition boundary with other first edition boundaries. The modification upgrade instruction for directly upgrading the boundary based on the current first edition boundary refers to the instruction processing that can directly modify the first edition boundary, such as adding, changing, deleting boundary instructions, to achieve the purpose of upgrading and obtain the upgraded version boundary. Of course, the upgrade upgrade instruction for merging the current first edition boundary with other first edition boundaries refers to the instruction processing that merges and modifies the current first edition boundary with other first edition boundaries within the same isolation boundary range to achieve the purpose of expanding the version and obtain the upgraded version boundary.

[0031] In one embodiment of the present invention, when upgrading the upgrade boundary based on the first edition boundary, the upgrade can be completed by modifying the boundary upgrade instruction of the upgrade instruction. Specifically, creating the upgrade boundary based on the first edition boundary, and upgrading the first edition boundary to the upgrade boundary according to the boundary upgrade instruction, including: according to the modification upgrade instruction, importing the boundary state of the first edition boundary into the upgrade boundary, and modifying the boundary state of the first edition boundary to obtain the boundary state of the upgrade boundary.

[0032] In this embodiment, the control of the upgrade instruction can be modified to import the initial edition boundary into the upgrade edition boundary, and then further based on the boundary upgrade instruction, the upgrade edition boundary is modified, such as adding, changing, deleting boundary instructions, etc., to complete the upgrade of the initial edition boundary to the upgrade edition boundary. Of course, it is also possible to directly complete the modification, such as adding, changing, deleting boundary instructions, etc., at the initial edition boundary stage according to the boundary upgrade instruction. And after the instruction processing is completed, the modified initial edition boundary is further imported into the upgrade edition boundary.

[0033] In one embodiment of the present invention, when modifying the boundary state of the first edition boundary, it is mainly performed by modifying the boundary instruction. Specifically, modifying the boundary state of the first edition boundary to obtain the boundary state of the upgraded edition boundary includes: modifying the boundary instruction of the boundary state of the first edition boundary to upgrade the first edition boundary to obtain the upgraded edition boundary; wherein the boundary instruction of modifying the boundary state includes deleting, changing and adding boundary instructions of the boundary state, and the boundary instruction includes the function position code and the device status information.

[0034] In this embodiment, the boundary state is adjusted by modifying the boundary instruction corresponding to the boundary state of the initial version boundary, thereby realizing the upgrading of the initial version boundary to the upgraded version boundary. Specifically, the boundary instruction for modifying the boundary state may be the deletion, modification or addition of the boundary instruction to adjust the boundary state of the boundary device. The device status information may be the on, off and other states of the device. For example, when the boundary device of the initial version boundary is a boundary valve, the valve that was originally processed in the open state may be modified to a closed boundary state through the boundary instruction "close valve". Among them, the functional location code is a coding method used to describe the location information of each device in the nuclear power isolation handover, and each device can be assigned a unique functional location code.

[0035] In one embodiment of the present invention, when upgrading the upgrade boundary based on the initial edition boundary, the upgrade can also be completed through the boundary upgrade instruction of the upgrade instruction. Specifically, the upgrade boundary based on the initial edition boundary is created, and according to the boundary upgrade instruction, the upgrade process of the initial edition boundary to the upgrade boundary includes: according to the upgrade instruction, the initial edition boundary at the time of the TOB transfer of the current device and other initial edition boundaries at the time of the TOB transfer of other devices are merged and the boundary state is modified, and imported into the upgrade boundary to obtain the boundary state of the upgrade boundary.

[0036] In this embodiment, when upgrading the upgraded version boundary from the initial edition boundary according to the upgrade instruction, the initial edition boundary of the current isolation device for isolation and transfer and other initial edition boundaries of other isolation devices for isolation and transfer are first merged and the boundary status is modified according to the upgrade instruction, so as to merge the original initial edition boundary with at least one other initial edition boundary and import them into the upgraded version boundary, so as to realize the expansion processing and obtain the boundary status of the merged upgraded version boundary.

[0037] Specifically, the initial edition boundary at the time of TOB handover of the current device and other initial edition boundaries at the time of TOB handover of other devices are merged and the boundary status is modified, and imported into the upgraded version boundary to obtain the boundary status of the upgraded version boundary, including: boundary instructions for modifying the boundary status of the initial edition boundary at the time of TOB handover of the current device and other initial edition boundaries at the time of TOB handover of other devices, so that the boundary range of the obtained upgraded version boundary at least includes the boundary range of the initial edition boundary at the time of TOB handover of the current device and the boundary range of other initial edition boundaries at the time of TOB handover of other devices; wherein, the boundary instructions for modifying the boundary status include boundary instructions for deleting, changing and adding the boundary status, and the boundary instructions include function location codes and device status information.

[0038] In one embodiment of the present invention, when the initial version boundary and other initial version equipment are merged and expanded, the upgraded version boundary includes the boundary range of the initial version boundary when the current equipment TOB is transferred and the boundary range of other initial version boundaries when other equipment TOB is transferred. And it also supports the corresponding modification of boundary instructions for boundary status in the obtained new boundary range. Specifically including boundary instructions for deleting, changing and adding boundary status. Among them, the equipment status information can be the status of the equipment such as open and closed. For example, when the boundary device of the initial version boundary is a boundary valve, the boundary instruction "close valve" can be used to modify the valve originally processed in the open state to a closed boundary state. Among them, the functional location code is a coding method used to describe the location information of each device in the nuclear power isolation transfer, and each device can be assigned a unique functional location code.

[0039] In one embodiment of the present invention, after the upgrade process of the initial edition boundary to the upgraded edition boundary, it includes: obtaining all modification instructions for upgrading from the initial edition boundary to the upgraded edition boundary, and controlling the printing of all modification instructions.

[0040] In this embodiment, after the upgrade of the initial version boundary is completed to obtain the upgraded version boundary, the upgraded version boundary is not isolated and implemented, and all modification instructions after the upgrade of the upgraded version boundary from the initial version boundary are printed.

[0041] See also Figure 2In a preferred embodiment, the first edition boundary may be TOB1, and the upgraded edition boundary may be TOB2, that is, TOB2 is an upgraded and expanded version of TOB1. After TOB1 is created and is in the implemented state, the boundary state is isolated and confirmed. If it is necessary to expand the TOB1 boundary, a TOB2 may be created first. There is a certain association between TOB2 and TOB1. It may be a TOB2 obtained by directly modifying TOB1, or it may be a TOB2 obtained by merging and modifying TOB1 with other first edition boundaries. The obtained TOB2 is not isolated for implementation, and all modification instructions can be printed.

[0042] See also Figures 3 to 19 In a preferred embodiment, Figure 3 In the step, create TOB A version, change the job application type to TB (a short name for TOB job application type), and get the following Figure 4 The boundary information shown. Figure 5 In the process, use the copy and create work permit function to create TOB B version. After the plan and operation approval, the following is obtained: Figure 6 As shown in the boundary instructions. Figure 7 In the shortcut panel, click "Extension Tool" or enter the transaction code to enter the expansion tool, enter the device function code and click query. Figure 8 As shown, double-click the "Work Content" of version B on the right screen, and the comparison results will be displayed on the lower screen. Add and delete instructions for version A TOB according to the displayed content. Fig. 9 As shown, click the TOBA version WCD (operation order) number below to automatically jump to the corresponding WCD page and add line items by canceling the WCD. Fig.10 As shown, click the "Back" button to return to the WCD header page. Figures 11 to 14 As shown, click "Work Permit", then click the WCA number to enter the WCA interface to cancel the WCA preparation. After canceling the preparation, click the "Return" button to save. Fig.15 As shown, click the "√" key to enter the WCD header and prepare to cancel the WCD preparation. Fig.16 As shown, add the boundary and click Save. Fig.17 and Fig.18 As shown, set up WCD preparation and perform isolation preparation, such as Fig.19 After the label is printed, the isolation is confirmed. After the isolation is confirmed, after further verification, the upgrade of TOB version A to TOB version B is completed.

[0043] like Fig. 20As shown, in one embodiment of the present invention, the present invention also provides a TOB boundary upgrade system, including: a first edition acquisition unit, the first edition acquisition unit acquires the first edition boundary of the isolated transfer and the boundary upgrade instruction for the first edition boundary; and an upgrade control unit, the upgrade control unit creates an upgrade boundary based on the first edition boundary, and upgrades the first edition boundary to the upgrade boundary according to the boundary upgrade instruction.

[0044] In this embodiment, during the TOB boundary upgrade process, the primary edition acquisition unit is used to obtain the relevant data of the primary edition boundary after the primary edition boundary is created, and the boundary upgrade instruction of the primary edition boundary is obtained, so as to complete the upgrade of the primary edition boundary according to the boundary upgrade instruction. The upgrade control unit is used to first create the upgrade boundary, and then further complete the upgrade of the primary edition boundary according to the boundary upgrade instruction to obtain the upgraded upgrade boundary after the upgrade processing. In addition, the upgrade scheme of the primary edition boundary to the upgrade boundary can be flexibly adjusted according to different primary edition boundaries, so as to realize the upgrade processing of the upgrade and expansion of the primary edition boundary.

[0045] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method. The computer-readable storage medium may be included in the electronic device described in the above embodiment, or may exist independently without being assembled into the electronic device.

[0046] In summary, the present invention can modify the boundary state of the first edition boundary based on the boundary upgrade instruction according to the created first edition boundary and the boundary upgrade instruction of the first edition boundary during the isolation and transfer stage, thereby realizing flexible adjustment of the upgrade scheme of the first edition boundary to the upgraded edition boundary, thereby realizing the upgrade processing of the first edition boundary to the upgraded edition and the expanded edition. Specifically, when it comes to directly modifying the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries, the first edition boundary can be upgraded to the upgraded edition boundary according to the boundary upgrade instruction, by directly modifying the first edition boundary, or merging and modifying the current first edition boundary with other first edition boundaries, thereby ensuring the diversity and flexibility of the first edition boundary upgrade processing, thereby realizing the optimization of TOB boundary information and reducing the information maintenance cost. Therefore, the present invention effectively overcomes various shortcomings in the prior art and has a high industrial utilization value.

[0047] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A TOB boundary upgrade method, characterized in that: The steps include: Obtaining a preliminary version boundary of the isolation handover and a boundary upgrade instruction for the preliminary version boundary; An upgrade boundary based on the initial edition boundary is created, and the initial edition boundary is upgraded to the upgrade boundary according to the boundary upgrade instruction.

2. The TOB boundary upgrade method according to claim 1, characterized in that: Before obtaining the first version of the boundary for isolation handover, including: A preliminary version boundary for isolation and transfer is created, and the preliminary version boundary data of the preliminary version boundary is controlled to be isolated and implemented.

3. The TOB boundary upgrade method according to claim 1, characterized in that: The boundary upgrade instructions for the first edition boundary include: modification upgrade instructions for directly upgrading the boundary based on the current first edition boundary, and upgrade upgrade instructions for merging the current first edition boundary with other first edition boundaries.

4. The TOB boundary upgrade method according to claim 3, characterized in that: Creating an upgrade boundary based on the initial edition boundary, and upgrading the initial edition boundary to the upgrade boundary according to the boundary upgrade instruction, including: According to the modification and upgrading instruction, the boundary state of the first edition boundary is imported into the upgraded edition boundary, and the boundary state of the first edition boundary is modified to obtain the boundary state of the upgraded edition boundary.

5. The TOB boundary upgrade method according to claim 4, characterized in that: Modifying the boundary state of the first edition boundary to obtain the boundary state of the upgraded edition boundary includes: The boundary instruction for modifying the boundary state of the initial version boundary is used to upgrade the initial version boundary to obtain the upgraded version boundary; wherein the boundary instruction for modifying the boundary state includes boundary instructions for deleting, changing and adding the boundary state, and the boundary instruction includes a function location code and device status information.

6. The TOB boundary upgrade method according to claim 3, characterized in that: Creating an upgrade boundary based on the initial edition boundary, and upgrading the initial edition boundary to the upgrade boundary according to the boundary upgrade instruction, including: According to the upgrade instruction, the initial edition boundary at the time of TOB transfer of the current device and other initial edition boundaries at the time of TOB transfer of other devices are merged and the boundary status is modified, and imported into the upgrade boundary to obtain the boundary status of the upgrade boundary.

7. The TOB boundary upgrade method according to claim 6, characterized in that: The initial version boundary when the current device TOB is transferred and other initial version boundaries when other devices TOB are transferred are merged and the boundary status is modified, and imported into the upgrade version boundary to obtain the boundary status of the upgrade version boundary, including: Respectively modify the boundary instructions of the boundary status of the initial edition boundary at the time of TOB handover of the current device and other initial edition boundaries at the time of TOB handover of other devices, so that the boundary range of the upgraded version boundary at least includes the boundary range of the initial edition boundary at the time of TOB handover of the current device and the boundary range of other initial edition boundaries at the time of TOB handover of other devices; wherein, the boundary instructions for modifying the boundary status include boundary instructions for deleting, changing and adding the boundary status, and the boundary instructions include function location codes and device status information.

8. The TOB boundary upgrade method according to claim 1, characterized in that: After upgrading the initial version boundary to the upgraded version boundary, it includes: Acquire all modification instructions for upgrading from the first edition boundary to the upgraded edition boundary, and control printing of all the modification instructions.

9. A TOB boundary upgrade system, characterized in that: include: A first edition acquisition unit, the first edition acquisition unit acquires the first edition boundary of the isolated handover and a boundary upgrade instruction for the first edition boundary; as well as An upgrade control unit is configured to create an upgrade boundary based on the first edition boundary and upgrade the first edition boundary to the upgrade boundary according to the boundary upgrade instruction.

10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is used to execute the method according to any one of claims 1 to 8.