BIM (Building Information Modeling)-based electromechanical pipeline installation method, equipment, medium and product

By performing collision detection and layout adjustment in the BIM model, the electromechanical pipelines are split and encoded, and the problems of high cost, low efficiency and low accuracy in the existing technology are solved, and efficient, accurate and low-cost electromechanical pipeline installation is achieved.

CN120012336AInactive Publication Date: 2025-05-16CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD +1

Patent Information

Application Number
CN202510488202.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-18
Publication Date
2025-05-16
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing electromechanical pipeline installation methods have problems of high cost, low installation efficiency and low accuracy.

Method used

By performing collision detection and layout adjustment in the BIM model, the electromechanical pipelines are split and each section of the pipe fitting is encoded, including specifications, lengths, connection methods, installation locations and unique identity identification, prefabricated processing and on-site assembly are realized.

Benefits of technology

It significantly shortens construction time, improves construction efficiency and accuracy, reduces time costs, and achieves more efficient, high-precision and low-cost electromechanical pipeline installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120012336A_ABST
    Figure CN120012336A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM-based electromechanical pipeline installation method and device, a medium and a product, and the method comprises the steps that a BIM model is created, and the BIM model comprises a target building structure and electromechanical pipelines arranged in the target building structure; performing collision detection on the BIM model, and if a collision detection result represents that collision exists, performing layout adjustment on electromechanical pipelines in the BIM model until the collision detection result represents that no collision exists; after the collision detection result shows that no collision exists, electromechanical pipelines in a target building area in the BIM model are split; and each section of pipe fitting obtained through splitting is coded, and the code of each section of pipe fitting comprises the specification, the length, the connection mode, the installation position and the unique identity label, so that a prefabrication processing factory produces real pipe fittings according to the specification, the length and the connection mode in the code of each section of pipe fitting and marks the code on the produced pipe fittings. According to the invention, more efficient, high-precision and low-cost electromechanical pipeline installation is realized.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • An assembled construction method of electromechanical pipelines based on the BIM technology

    CN109543233A

  • Building engineering application method based on BIM, electronic equipment and readable medium

    CN117216861A

  • Building collision detection method and system based on BIM (Building Information Modeling), computer equipment and medium

    CN118797949A

Cited By

  • Automatic pipeline connection method and device in building information model

    CN120337474A

  • Rail transit mechanical and electrical installation method based on BIM, point cloud scanning and lofting robot

    CN121389229A