Sandbox for blocking river levee breach and method for blocking breach by using sandbox
Through the sandbox sealing method, the design of barbing and reinforcement of the substrate is solved, and the problem of difficulty in sealing the river bank is achieved with a more efficient sealing effect.
Patent Information
- Application Number
- CN202510435412.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-09
- Publication Date
- 2025-06-13
AI Technical Summary
The existing technology is difficult to effectively block the river bank's breach, and stones or sand are easily washed away by floods, resulting in difficulties in blocking and the problems of widening the breach.
The sandbox sealing method is adopted, and the sandboxes are hooked to form reinforced substrates and arched pre-intercepting embankments to reduce flood impact pressure and improve the sealing success rate.
Through the barbing of the sandbox and the formation of reinforced substrate, the sandbox is effectively prevented from being washed away by floods, preventing the expansion of the breach, and improving the success rate of river bank breach sealing.
Smart Images

Figure CN120139147A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency plugging engineering for river embankments after being breached by floods. Specifically, it relates to a sand box for plugging river embankment breaches and a method for plugging early breaches using such a sand box. Background Art
[0002] Under the current situation, when a flood breaks through a river embankment or dam to form a breach and directly uses materials such as stones or sand and gravel to plug the breach, the stones or sand and gravel are easily washed away by the strong impact force of the flood, making it very difficult to plug the breach. Sometimes the breach will also quickly expand, causing huge losses of life and property. Summary of the Invention
[0003] (1) Technical Problems to be Solved
[0004] Aiming at the deficiencies of the prior art, the present invention provides a sand box for plugging river embankment breaches and a method for plugging breaches using such a sand box. The sand boxes are randomly hooked together through barbs, effectively preventing the sand boxes from being washed away by the flood, improving the plugging efficiency; the reinforcement matrix can prevent the breach from continuing to expand; the arched pre-intercepting dam can reduce the impact pressure and water flow of the flood, improving the success rate of plugging the breach. Thus, it solves the problem that when directly using materials such as stones or sand and gravel to plug the breach, the stones or sand and gravel are easily washed away by the strong impact force of the flood, making it very difficult to plug the breach.
[0005] (2) Technical Solutions
[0006] The specific technical solution adopted by the present invention is as follows: It includes a box body and a box cover. Fixed hinges I and hinge II are provided at the connection between the box cover and the box body. Hinge II is a detachable pin type. The box body and the box cover are connected through two fixed hinges I, and the box body and the box cover are used to open and close the box cover through two detachable pin hinges II. The box body is filled with filling materials. Arrays of barbs are provided on all six sides of the sand box, and the arrays of barbs are complementarily arranged on the surface of the sand box.
[0007] Further, the internal filling material of the box body is any one or a combination of stones, sand, and soil.
[0008] Further, a direction marking arrow for stacking is provided on the box cover.
[0009] Further, positioning grooves for stacking are provided at the upper end of the box cover and the bottom of the box body.
[0010] Further, the barb is a multi-headed hook.
[0011] Further, when the sand box is stored and stacked or transported by vehicle, a partition is provided. A hole groove for pulling out is provided at the end of the partition, and the partition is an L-shaped plate.
[0012] The specific steps to block the breach of the river embankment with the sandboxes are as follows:
[0013] Step 1: When the river embankment breaches in the early stage, stack and throw sandboxes on both sides of the breach in the riverbed. The sandboxes are hooked to each other through barbs. A large number of sandboxes are stacked on both sides of the breach to form a reinforcement matrix, and the reinforcement matrix prevents the breach from expanding further.
[0014] Step 2: After the reinforcement matrices on both sides are formed, continue to stack and throw sandboxes in the expected direction based on the reinforcement matrices. The sandboxes are hooked to each other through barbs to prevent the sandboxes from being washed away by the flood. Stack and throw sandboxes from the two sides of the reinforcement matrices in an arch direction to form an arch-shaped pre-intercepting dam, and the pre-intercepting dam reduces the water pressure and water flow of the flood.
[0015] Step 3: After the arch-shaped pre-intercepting dam is formed, the water pressure and water flow are reduced, and the breach is blocked with materials such as sand, stones, and soil.
[0016] Furthermore, during the construction of stacking and throwing sandboxes in the above solution, L-shaped partitions can be used to stack the sandboxes orderly in the carriage of the dump truck, which is convenient for transporting a large number of sandboxes quickly. Before stacking and throwing, the partitions are pulled out, and the sandboxes are thrown into the designated position at one time by the dump truck; alternatively, manual handling and throwing of sandboxes can be selected according to the on-site environment.
[0017] (III) Beneficial effects
[0018] Compared with the prior art, the present invention provides a sandbox for blocking the breach of a river embankment and a method for blocking the breach with this sandbox, having the following beneficial effects:
[0019] By filling the sandboxes with emergency materials such as stones, sand and gravel, and soil to increase the weight, and throwing the sandboxes into the breach, the sandboxes can be easily hooked to each other through barbs to prevent being washed away by the flood. After the reinforcement matrix is formed by stacking and throwing sandboxes on both sides of the breach, the reinforcement matrix can reduce the impact of the flood on the dam and prevent the breach from expanding further. The sandboxes are thrown and stacked to form a pre-intercepting dam, and the pre-intercepting dam can reduce the impact pressure of the flood and improve the success rate of blocking the breach. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required to be used in the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.
[0021] Figure 1 is the structural schematic diagram of the present invention;
[0022] Figure 2 is the structural schematic diagram of the partition 7 in the present invention;
[0023] Figures 3 - 5 This is the schematic diagram of the use of the present invention.
[0024] In the figure: box body 1, box cover 2, fixed hinge 1 3, hinge 2 4, barb 5, positioning groove 6, partition board 7, hole groove 71. Specific embodiments
[0025] To further illustrate the embodiments, the present invention provides accompanying drawings, which are part of the disclosure of the present invention. They are mainly used to illustrate the embodiments and can be combined with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, those of ordinary skill in the art should be able to understand other possible embodiments and the advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are usually used to represent similar components.
[0026] According to an embodiment of the present invention, there is provided a sand box for plugging a breach in a river embankment and a method for plugging the breach using this sand box.
[0027] Now, the present invention will be further described in conjunction with the accompanying drawings and specific embodiments. As Figures 1 - 5 shown, a sand box for plugging a breach in a river embankment according to an embodiment of the present invention includes a box body 1 and a box cover 2. A fixed hinge 1 3 and a hinge 2 4 are provided at the connection between the box cover 2 and the box body 1. The hinge 2 4 is a detachable pin type. The box body 1 and the box cover 2 are connected by two fixed hinges 1 3. The box body 1 and the box cover 2 are used to open and close the box cover 2 through two detachable pin hinges 2 4. The box body 1 is filled with fillers. Arrays of barbs 5 are provided on all six sides of the sand box. The arrays of barbs 5 are arranged in a complementary manner on the outer surface of the sand box. The box body 1 is filled with emergency materials such as stones, sand, and soil to increase the weight. The sand boxes are thrown into the breach, and the sand boxes can be easily hooked together through the barbs 5 to prevent being washed away by the flood. The sand boxes are thrown and stacked to form an arched pre-interception dam. The sand boxes inside the pre-interception dam are hooked to each other through the barbs, with high anti-impact strength. The pre-interception dam can reduce the impact pressure and water flow of the flood.
[0028] In one embodiment, the internal filler of the box body 1 is filled with any one or a combination of stones, sand, and soil.
[0029] In one embodiment, a direction identification arrow for stacking is provided on the box cover 2.
[0030] In one embodiment, positioning grooves 6 for stacking are provided at the upper end of the box cover 2 and the bottom of the box body 1.
[0031] In one embodiment, the barb 5 is a multi-headed hook.
[0032] In one embodiment, a partition 7 is provided when the sand box is stored in a stack or transported by vehicle. A hole groove 71 for pulling out is provided at the end of the partition 7, and the partition 7 is an L-shaped plate. When stacking and storing or stacking and transporting, it is separated by the L-shaped plate.
[0033] A method for plugging a breach with a sand box includes the following steps:
[0034] Step 1, as Figure 3 shown,
[0035] After the river embankment breaches, sand boxes are stacked on both sides of the breach in the riverbed. The sand boxes are hooked to each other through barbs. A large number of sand boxes are stacked on both sides of the breach to form a reinforcement matrix. The sand boxes inside the reinforcement matrix are hooked to each other through barbs, with high anti-impact strength. The reinforcement matrix prevents the breach from continuing to expand.
[0036] Step 2, as Figure 4 shown,
[0037] After the reinforcement matrices on both sides are formed, sand boxes are continuously stacked towards the breach direction based on the reinforcement matrices. The sand boxes are hooked to each other through barbs to prevent the sand boxes from being washed away by the flood. Sand boxes are stacked from the two-sided reinforcement matrices in an arch direction to form an arch-shaped pre-interception dam. The sand boxes inside the pre-interception dam are hooked to each other through barbs, with high anti-impact strength. The pre-interception dam reduces the water pressure and water flow of the flood.
[0038] Step 3, as Figure 5 shown, after the arch-shaped pre-interception dam is formed, the breach is plugged with materials such as sand, stones, and soil.
[0039] In this embodiment, the sand boxes are stacked in an orderly manner in the dump truck compartment using the stacking positioning groove 6 and the partition 7, and a large number of sand boxes are transported quickly. Before placing, the partition 7 is pulled out, and the sand boxes are placed at the designated position at one time using the dump truck.
[0040] In the present invention, unless otherwise clearly specified and limited, terms such as "installation", "setting", "connection", "fixation", "swivel connection", etc. should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or integrated; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication of two components or the interaction relationship between two components. Unless otherwise clearly limited, for those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] The above are only the preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A sandbox for blocking a river bank breach, characterized in that: The invention comprises a box body (1) and a box cover (2), wherein a fixed hinge (3) and a second hinge (4) are arranged at the connection between the box cover (2) and the box body (1), wherein the second hinge (4) is a detachable pin shaft type, wherein the box body (1) and the box cover (2) are connected via two fixed hinges (3), wherein the box body (1) and the box cover (2) are used to open and close the box cover (2) via two detachable pin shaft hinges (4), wherein the box body (1) is filled with a filler, and arrays of barbs (5) are arranged on the six sides of the sandbox, wherein the arrays of barbs (5) are arranged on the surface of the sandbox in a complementary manner.
2. A sandbox for blocking a river bank breach according to claim 1, characterized in that: The internal filling material of the box body (1) is any one of gravel, sand and soil or a combination thereof.
3. A sandbox for blocking a riverbank breach according to claim 1, characterized in that: The box cover (2) is provided with a direction identification arrow for stacking.
4. A sandbox for blocking a riverbank breach according to claim 1, characterized in that: The upper end of the box cover (2) and the bottom of the box body (1) are provided with positioning grooves (6) for stacking.
5. A sandbox for blocking a river bank breach according to claim 1, characterized in that: The barb (5) is a multi-headed hook.
6. A sandbox for blocking a riverbank breach according to claim 1, characterized in that: The sandbox is provided with a partition (7) when being stored, stacked or transported on a vehicle. The end of the partition (7) is provided with a hole groove (71) for pulling out. The partition (7) is an L-shaped plate.
7. A method for sealing a breach with a sandbox, comprising the following steps: Step 1: When the river bank breaches in the early stage, sand boxes are piled on both sides of the breach in the riverbed to form a reinforcement matrix to prevent the breach from further expanding; Step 2: After the reinforcement matrix on both sides is formed, sand boxes are continuously piled toward the breach direction based on the reinforcement matrix to form an arched pre-interception dam, which reduces the water pressure and water flow of the flood; Step 3: After the arch pre-interception dam is formed, the breach is sealed with sand, stone, soil and other materials.
8. A method for sealing a breach with a sandbox according to claim 7, characterized in that: During the construction of sealing the breach, the sandboxes are stacked in an orderly manner using the stacking positioning grooves (6) and the partitions (7). The sandboxes can be transported and placed manually or by dump trucks according to the on-site environment.