Army equipment construction quality management system
By designing the military equipment construction quality management system, the problem that the existing system cannot effectively discover, trace and solve problems has been solved, and the comprehensive monitoring and management of the military equipment construction quality control process has been achieved, and business efficiency and quality management capabilities have been improved.
Patent Information
- Application Number
- CN202510096172.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-06-17
AI Technical Summary
The existing quality management system cannot effectively discover, trace and solve problems in military equipment construction, and cannot meet the ever-changing business needs in military equipment construction.
A military equipment construction quality management system was designed, including the implementation guide management module, the quality control process preparation module, the quality control control module, the quality control analysis module and the system management module. The system realizes comprehensive monitoring and management of the quality control process by storing and configuring management specifications, compiling and executing quality control processes, analyzing and displaying quality control results, and managing users and data.
The system can clarify key links in the business process in the construction of military equipment, strengthen quality control, timely discover, trace and solve problems, improve business efficiency, and meet changing business needs.
Smart Images

Figure CN120163312A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of quality management, and specifically to a quality management system for military equipment construction. Background Art
[0002] The manufacturing of military equipment is different from that of ordinary products, and its particularity requires higher quality management. First of all, the technical requirements of military equipment are usually very high, and some even involve the application of cutting-edge technologies, which requires a rigorous and precise manufacturing process to ensure that the product can meet the design requirements. Secondly, military equipment is usually in a harsh environment during use, such as extreme climates like high temperature, low temperature, high humidity, and complex battlefield conditions, etc. This requires the equipment to work properly under harsh conditions with zero failures; and this also requires strict quality management during the manufacturing process to ensure that each link meets the quality standards; therefore, the quality management system is particularly important in military equipment construction.
[0003] However, the existing quality management system has obvious deficiencies in the application of military equipment construction. It cannot effectively discover, trace, and solve problems, thus unable to meet the changing business needs in military equipment construction. Summary of the Invention
[0004] The purpose of the present invention is to provide a quality management system for military equipment construction to solve the problems raised in the above background art.
[0005] To achieve the above purpose, the present invention provides the following technical solutions: A quality management system for military equipment construction includes an implementation guide management module, a quality control process compilation module, a quality control module, a quality control analysis module, and a system management module; The implementation guide management module is used to store multiple management specifications established based on the quality management system; and configure the management specifications into the corresponding quality control process links for judging the quality control results; and facilitate users to view the configured implementation guide content during the process execution; The quality control process compilation module is used to compile quality control process specifications according to the quality management system, and draw the quality control process in a graphical manner based on the quality control measures and implementation guides in the quality control process specifications; The quality control module is used to start the inspection work of quality control according to the set quality control process, record the corresponding execution results, then judge the quality control situation of the current work based on the execution results, and display the execution results; The quality control analysis module is used to analyze and statistically process the execution situation of the quality control process and the problems occurring during the quality control process, and display them in the form of charts; The system management module is used to manage user information, user role information, and quality control data in the system.
[0006] As a further solution of the present invention: The implementation guide management module consists of an implementation guide management unit and a guide chapter management unit; each implementation guide management unit contains several guide chapter management units, and users upload various types of resources in each guide chapter management unit.
[0007] As a further solution of the present invention: The quality control process compilation module consists of a view customization unit and a quality control flowchart customization unit; The view customization unit is used to define the quality control view; among them, the information defined by the view includes number information, view name information, and note information; The quality control flowchart customization unit is used to customize the quality control process with an intuitive graphical interface and generate a quality control flowchart.
[0008] As a further solution of the present invention: The quality control module consists of a quality control record unit, an execution result entry unit, a completed task management unit, a quality control execution monitoring unit, and a quality control result display unit.
[0009] As a further solution of the present invention: The quality control record unit is used to initiate inspection work according to the set quality control process, record the quality control, and display the current execution stage record and the details of the record; The execution result entry unit is used to enter the execution status of the quality control task; and during the entry process, combined with the implementation guide, guide chapter, quality control point, and risk configured in the quality control process, judge the quality control result; The completed task management unit is used to display the records of the quality control task handling, and specifically display the tasks that the current user has handled and the last handling node; The quality control execution monitoring unit is used for the overall monitoring ability of the quality control process; The quality control result display unit is used to display the completed quality control work, providing retrieval and query.
[0010] As a further solution of the present invention: The quality control analysis module consists of a process execution statistics unit and a problem statistics and analysis unit; The process execution statistics unit is used to analyze and statistically analyze the execution status of all processes; the execution status of the process is displayed using a process execution statistics table, and the execution times of each process in each month are recorded and displayed in detail in the process execution statistics table; The problem statistical analysis unit is used to analyze and count the problems that occur in the quality control process; the items for analysis and statistics include: total problem count, count of processed problems and unprocessed problems, and count of problems at different levels.
[0011] As a further solution of the present invention: The system management module consists of a user management unit, a role management unit, and a data backup unit; The user management unit is used to maintain system user information; including: adding, modifying, and deleting user information; retrieving and quickly searching for user information; enabling and disabling user information; and assigning user role permissions; The role management unit is used to maintain the permission information of user roles in the system; including: adding, modifying, and deleting the permission information of functional user roles; retrieving and quickly searching for the permission information of user roles; assigning permissions to user roles; and data permission management; The data backup unit is used for data backup and recovery.
[0012] Compared with the prior art, the beneficial effects of the present invention are: The present invention helps to clarify the key links in the business process and strengthen quality control in military equipment construction through implementation guidelines, guide chapters, and quality control points; by recording the problems encountered in the business process and providing a tracking function, it helps to timely discover, trace, and solve problems in military equipment construction, improving business efficiency; through custom forms and quality control processes, as well as modular coding methods; it provides a high degree of customization and scalability to meet the changing business needs in military equipment construction. Brief Description of the Drawings
[0013] Figure 1 It is a schematic structural diagram of the quality management system for military equipment construction; Figure 2 It is a schematic flow diagram of quality control point configuration in the quality management system for military equipment construction; Figure 3 It is a schematic flow diagram of quality control process drawing in the quality management system for military equipment construction; Figure 4 It is a schematic flow diagram of quality control process operation in the quality management system for military equipment construction. Detailed Embodiment
[0014] Please refer to Figures 1 to 4 , in the embodiment of the present invention, the quality management system for military equipment construction includes an implementation guideline management module, a quality control process compilation module, a quality control module, a quality control analysis module, and a system management module; The implementation guide management module is used to store multiple management specifications established based on the quality management system; configure the management specifications into the corresponding quality control process links for judging the quality control results; and during the process execution, facilitate users to view the configured implementation guide content, so as to provide a basis for accurately judging the quality control results in the military equipment construction in the future; The quality control process compilation module is used to compile the quality control process specifications according to the quality management system, and draw the quality control process in a graphical way according to the quality control measures and implementation guides in the quality control process specifications; among them, the quality control process contains several working links, and each working link designation needs to follow the implementation guide, guide chapter and set quality control points, and at the same time set the executors and determine whether multiple signatures are required; through the quality control points, it helps to clarify the key links in the business process in the military equipment construction and strengthen the quality control; As Figure 2 shown, the method for configuring the quality control points is as follows: S11. Select the applicable guide from the pre-maintained implementation guide; S12. Further select the specific chapter in the selected implementation guide; S13. The system will display all the quality control points configured in the past for this chapter and the risk information that may be generated by them; by querying the historical records, evaluate whether the existing quality control points meet the current requirements; S14. If the historical quality control points do not meet the current requirements, perform the maintenance of the quality control points and the risks they will generate; this includes adding new quality control points, updating the descriptions or standards of the existing quality control points, and defining the risks associated with these quality control points; S15. If the historical configuration meets the requirements, or meets the requirements after maintenance, perform the configuration of the current quality control points, select the quality control points to be configured through the quality control point list, and specify the risks that may be generated by this quality control point; in order to achieve risk traceability, it is necessary to associate the various links; by associating the pre-existing risks, the risks of the previous link are associated to the current link and become the risks that may be generated by the current link, thus constructing a complete risk traceability chain.
[0015] The quality control module is used to start the inspection work of quality control according to the set quality control process, record the corresponding execution results, then judge the quality control situation of the current work based on the execution results, and display the execution results; The quality control analysis module is used to analyze and statistically process the execution situation of the quality control process and the problems that occur during the quality control process, and display them in the form of charts; The system management module is used to manage the user information, user role information and quality control data in the system.
[0016] Preferably, the implementation guide management module consists of an implementation guide management unit and a guide chapter management unit; each implementation guide management unit contains several guide chapter management units, and users upload various types of resources, such as pictures, videos, and slides, in each guide chapter management unit to enrich and improve the guide content.
[0017] Preferably, the quality control process compilation module consists of a view customization unit and a quality control flowchart customization unit; among them, The view customization unit is used to define the quality control view; among them, the information defined by the quality control view includes number information, view name information, and note information; and provides a flexible component selection method to meet the diverse view customization needs; The quality control flowchart customization unit is used to customize the quality control process with an intuitive graphical interface and generate a quality control flowchart, so as to clearly display the execution links of the quality control process; this quality control flowchart customization unit can also perform operations such as process replication and process suspension and activation. Through process replication, it is convenient for users to quickly create similar processes; the created similar processes can be further configured; through the process suspension and activation operations, it is ensured that only the activated processes can be put into actual execution; among them, process configuration is used to configure the information of the drawn quality control process, such as the implementation guide and guide chapters that need to be followed; at the same time, the quality control points of this operation step and the risks that may occur in subsequent links can be configured; subsequent links can be associated and bound with the risks generated by the quality control points of the previous link; when the binding is completed, it is regarded that a problem occurs at a certain quality control point in the previous link and has not been processed, and a corresponding risk will occur in this subsequent link, so that the risk can be traced back to the link and cause where the risk occurs; all configured implementation guide chapters, quality control points, and risks will be displayed during the execution of the quality control process, so as to provide reference for task handlers; after the configuration is completed, a preview of the quality control process can be performed, the quality control points and risks of the links can be viewed, and a risk source traceability test can be performed to ensure the accuracy and reliability of the process.
[0018] Such as Figure 3 shown, the steps of drawing the quality control process are as follows: S21. Create a quality control process. You can choose to create a new process: start from scratch and customize the entire quality control process according to actual needs; or copy an existing process: select an existing quality control process as a template and copy all its configurations; the copied process allows modification and adjustment according to needs; S22. After the creation is completed, perform process arrangement. Use a graphical tool to intuitively customize each link of the quality control process; this includes determining the order of the process, the relationship between links, and the specific content of each link; S23. After the arrangement is completed, perform process configuration according to requirements. Select specific links in the process and configure the corresponding implementation guide chapters for them; ensure that each link has clear guidance and standards; configure the corresponding quality control points according to the selected chapters; quality control points are key inspection points in the process to ensure the achievement of quality standards; configure the personnel or roles responsible for handling the links. S24. After the configuration is completed, you can choose to preview the process; the preview function allows you to view the visual effect and operation logic of the entire process to ensure that there are no omissions or errors; if you are satisfied with the preview result, proceed to the next step; if not, return to the process arrangement or configuration stage and make corresponding adjustments according to the preview result. S25. After confirming that the process is correct, activate it to an available state; the activated process will be used for actual quality control work; for processes that are no longer needed, you can choose to suspend them; suspended processes will no longer participate in quality control work but can be reactivated when needed.
[0019] As Figure 4 shown, the steps for the operation of the quality control process are as follows: S31. Select the currently arranged and activated process to initiate the quality control task. S32. After the task is initiated, it is the responsibility of the pre-configured handler or role to handle it; the handler needs to handle the task according to the implementation guide, quality control points, and risks configured in the process. S33. During the handling process, if any problems or abnormal situations are encountered, they need to be recorded in a timely manner; this helps to track, solve, and summarize the problems later; if no problems are found during the handling process, the task continues to execute until it ends; after the task ends, the task needs to be archived for subsequent reference and statistics. S34. After archiving, perform statistics and analysis on the executed process and the problems recorded in the process; this helps to understand the execution situation and existing problems of the process and provides a basis for subsequent improvement. S35. In the quality control analysis module, display the statistical results in the form of charts; this helps to intuitively understand the overall situation and key indicators of the quality control process.
[0020] Preferably, the quality control module consists of a quality control record unit, an execution result input unit, a completed task management unit, a quality control execution monitoring unit, and a quality control result display unit; among them, The quality control record unit is used to initiate inspection work according to the set quality control process, record quality control, and at the same time display the records and details of the current execution stage. The execution result entry unit is used to enter the situation of the quality control task execution; and during the entry process, in combination with the implementation guidelines, guideline chapters, quality control points and risks configured in the quality control process, judge the quality control results; this execution result entry unit can also submit, return, and terminate the entry operation of the quality control execution, support online filling of abnormal problems, and record the specific problems encountered during the execution; at the same time, for the convenience of multi-person collaboration, users can also upload scanned pictures signed by multiple people as vouchers; The completed task management unit is used to display the records of the quality control task handling, and specifically display the tasks that the current user has handled and the last handling node. For unfinished tasks, the operation of withdrawing the handling can be performed; The quality control execution monitoring unit is used for the overall monitoring ability of the quality control process; it can view the execution situation of all quality control processes, including the start time, process status and current link; thus helping the administrator to discover and solve problems in the process execution in a timely manner, ensuring the smooth progress of the quality control work; it can also perform the termination operation on the out-of-control process; The quality control result display unit is used to display the completed quality control work, provide retrieval and query; it can view the specific execution situation of the quality control work and the details of related problems; thus not only helping users to comprehensively understand the progress and results of the quality control work, but also providing strong data support for subsequent quality control analysis and improvement.
[0021] Preferably, the quality control analysis module consists of a process execution statistics unit and a problem statistics and analysis unit; among them, The process execution statistics unit is used to analyze and statistically analyze the execution situation of all processes. For example, it statistically analyzes the process execution situation by month, and details the number of processes that end normally, pass abnormally and terminate abnormally each month, providing an overview of the process performance for users in the time dimension; the execution situation of the process is displayed using a process execution statistics table, and the execution times of each process in each month are recorded and displayed in detail in the process execution statistics table, so as to facilitate users to deeply analyze the process execution efficiency and rules; The problem statistics and analysis unit is used to analyze and statistically analyze the problems that occur during the quality control process; the items of analysis and statistics include: total problem statistics, statistics of the number of processed and unprocessed problems, statistics of the number of problems at different levels, such as minor problems, general problems and serious problems; the problems that occur during the quality control process are displayed using a problem statistics list and a problem high-incidence guideline chapter ranking chart. In the problem statistics list, all problems and their associated tasks, corresponding standards and clauses are displayed in detail, facilitating users to trace the root cause of the problems; in the problem high-incidence guideline chapter ranking chart, several clauses with the highest problem occurrence frequency and their corresponding problem quantities are intuitively displayed, such as the top ten clauses with the highest problem frequency, thus providing valuable data support for users to optimize the quality control process.
[0022] Preferably, the system management module consists of a user management unit, a role management unit, and a data backup unit; among them, The user management unit is used to maintain system user information; including: adding, modifying, and deleting user information; retrieving and quickly searching for user information; enabling and disabling user information, and users cannot log in after being disabled; assigning user role permissions, and after authorizing the role, processing user permissions according to the role information; The role management unit is used to maintain the permission information of user roles in the system; including: adding, modifying, and deleting the permission information of functional user roles; retrieving and quickly searching for the permission information of user roles; assigning the permissions of user roles, which can achieve quick authorization of user roles, and after the user authorization is completed, the system can load information according to the role permissions when logging in; data permission management, which can perform permission control on the department data accessible by user roles, or select a pre-defined data range for quick selection; The data backup unit is used for data backup and recovery; it can transfer data between different computers by encrypting data packets in a non-network running mode; the data backup is a full backup, and only the administrator can access it; after the data backup, the backup records are displayed in the interface list, and by selecting the backup records in the interface list, data recovery or exporting data packets can be performed; after importing the data packets generated by this system, data recovery can be performed to ensure data security and integrity.
[0023] The above is only the preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present invention, according to the technical solution and inventive concept of the present invention, making equivalent substitutions or changes should be covered within the protection scope of the present invention.
Claims
1. Military equipment construction quality management system, characterized by: It includes implementation guide management module, quality control process compilation module, quality control module, quality control analysis module and system management module; The implementation guide management module is used to store multiple management specifications established based on the quality management system; And configure the management specifications into the corresponding quality control process links to judge the quality control results; It also makes it easy for users to view the configured implementation guide content during process execution; The quality control process preparation module is used to prepare quality control process specifications according to the quality management system, and to draw out the quality control process in a graphical manner according to the quality control measures and implementation guidelines in the quality control process specification work; The quality control module is used to start the quality control inspection work according to the set quality control process, and record the corresponding execution results, and then judge the quality control status of the current work according to the execution results, and display the execution results; The quality control analysis module is used to analyze and count the quality control process execution and the problems that arise during the quality control process, and display them in the form of charts; The system management module is used to manage user information, user role information and quality control data in the system.
2. The military equipment construction quality management system according to claim 1 is characterized in that: The implementation guide management module is composed of an implementation guide management unit and a guide chapter management unit; each of the implementation guide management units includes a plurality of guide chapter management units, and the user uploads multiple types of resources in each guide chapter management unit.
3. The military equipment construction quality management system according to claim 1 is characterized in that: The quality control process compilation module is composed of a view customization unit and a quality control flow chart customization unit; The view customization unit is used to define a quality control view; wherein the view definition information includes number information, view name information and remark information; The quality control flow chart customization unit is used to customize the quality control process with an intuitive graphical interface and generate a quality control flow chart.
4. The military equipment construction quality management system according to claim 1 is characterized in that: The quality control module is composed of a quality control recording unit, an execution result input unit, a completed task management unit, a quality control execution monitoring unit and a quality control result display unit.
5. The military equipment construction quality management system according to claim 4 is characterized in that: The quality control recording unit is used to initiate inspection work according to the set quality control process, record the quality control, and display the current execution stage record and the details of the record; The execution result input unit is used to input the execution status of the quality control task; During the data entry process, the quality control results are judged in combination with the implementation guidelines, guideline chapters, quality control points and risks configured in the quality control process; The completed task management unit is used to display the records of quality control task handling, and specifically displays the tasks that the current user has handled and the last handling node; The quality control execution monitoring unit is used for the all-round monitoring capability of the quality control process; The quality control result display unit is used to display the completed quality control work and provide retrieval and query.
6. The military equipment construction quality management system according to claim 1 is characterized in that: The quality control analysis module consists of a process execution statistics unit and a problem statistics analysis unit; The process execution statistics unit is used to analyze and count the execution status of all processes; The process execution status is displayed using the process execution statistics table, which records and displays in detail the number of times each process is executed in each month; The problem statistical analysis unit is used to analyze and count the problems that occur during the quality control process; The analysis and statistical items include: statistics on the total number of problems, statistics on the number of solved problems and unsolved problems, and statistics on the number of problems at different levels.
7. The military equipment construction quality management system according to claim 1 is characterized in that: The system management module consists of a user management unit, a role management unit, and a data backup unit; The user management unit is used to maintain system user information; including: adding, modifying and deleting user information; retrieving and quickly finding user information; enabling and disabling user information; and assigning user role permissions; The role management unit is used to maintain the permission information of user roles in the system; including: adding, modifying and deleting the permission information of functional user roles; retrieving and quickly finding the permission information of user roles; allocating permissions of user roles; and managing data permissions; The data backup unit is used for backing up and restoring data.