A test system and method for verifying and controlling the grid-connected operation of electric vehicles.
By designing a test system for the grid-connected operation and control of electric vehicles, the system simulates the dynamic characteristics of the power grid, electric vehicles, and charging piles, generates data, and loads grid-connected control algorithms. This solves the problem of missing test systems for the grid-connected operation and control of electric vehicles and promotes the development of electric vehicle-grid interaction technology.
Patent Information
- Application Number
- CN202510341829.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-21
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2045-03-21
AI Technical Summary
The lack of a testing and verification system for the grid-connected operation and control of electric vehicles in existing technologies limits the development and application of electric vehicle-grid interaction technologies.
A test system for grid-connected operation and control of electric vehicles was designed, including a grid simulation module, an electric vehicle simulation module, a charging pile simulation module, a monitoring and data acquisition module, and an inspection and testing module connected by communication. By simulating the dynamic characteristics of the power grid, electric vehicles, and charging piles, the system generates data and loads grid-connected control algorithms for testing.
It has improved the electric vehicle testing and evaluation system, promoted the advancement of electric vehicle-grid interaction technology, and is of great significance to the development of the electric vehicle industry.
Smart Images

Figure CN120255469B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of electric vehicle testing technology, specifically relating to a testing system and method for testing the grid-connected operation and control of electric vehicles. Background Technology
[0002] Electric vehicles, as a controllable load resource, can utilize their energy demand margin to respond to fluctuations in renewable energy and the operational needs of the energy system, which is an important component of their regulatory flexibility.
[0003] Designing a test system for the grid-connected operation and control of electric vehicles typically involves multiple aspects, including the interaction technology between electric vehicles and the power grid, energy management, communication protocols, and safety controls. Such systems are of great significance for promoting the development of the electric vehicle industry and improving the stability and efficiency of the power grid.
[0004] The lack of a testing and inspection system for grid-connected operation and control of electric vehicles in the current technology limits the development and application of electric vehicle-grid interaction technology. Summary of the Invention
[0005] To overcome the shortcomings of the prior art, in a first aspect, this invention application proposes an electric vehicle grid-connected operation and control testing system, comprising: a grid simulation module, an electric vehicle simulation module, a charging pile simulation module, a monitoring and data acquisition module, and an inspection and testing module connected by communication.
[0006] The power grid simulation module is used to generate power grid simulation data by simulating a power grid with dynamic characteristics, and to send the power grid simulation data to the monitoring and data acquisition module.
[0007] The electric vehicle simulation module is used to simulate the battery capacity, charging efficiency, and control logic of electric vehicle charging, generate electric vehicle simulation data, and send the electric vehicle simulation data to the monitoring and data acquisition module.
[0008] The charging pile simulation module is used to simulate charging piles, generate charging pile simulation data, and send the charging pile simulation data to the monitoring and data acquisition module.
[0009] The monitoring and data acquisition module is used to send the received power grid simulation data, electric vehicle simulation data and charging pile simulation data as operating data to the inspection and testing module;
[0010] The inspection and testing module is used to load the grid-connected control algorithm based on the operating data to inspect and test the grid-connected operation and control of the electric vehicle.
[0011] Preferably, the inspection and testing module is specifically used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of the electric vehicle, and to verify the stability and response performance of the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm.
[0012] Preferably, the system further includes: a power grid dispatching system, an electric vehicle load aggregation system, an electric vehicle charging service platform, and charging and discharging equipment that are communicatively connected to the monitoring and data acquisition module;
[0013] The electric vehicle load aggregation system is used to acquire the power grid simulation data; generate power grid dispatching requirements for electric vehicles based on the power grid simulation data and send them to the power grid dispatching system; and generate charging pile-level control instructions based on the power grid dispatching requirements and send them to the charging and discharging equipment.
[0014] The power grid dispatching system is used to respond to the power grid dispatching needs of the electric vehicle; based on the power grid dispatching needs, it generates dispatching instructions and sends them to the electric vehicle charging service platform.
[0015] The electric vehicle charging service platform is used to respond to the scheduling command; based on the scheduling command, it generates a power schedule for the electric vehicle and sends it to the charging pile;
[0016] The charging and discharging equipment is used to respond to the charging pile-level control command; according to the charging pile-level control command, it controls the charging pile and adjusts the charging and discharging of the electric vehicle according to the power dispatch of the electric vehicle.
[0017] Preferably, the inspection and testing module includes: a general inspection submodule, a functional inspection submodule, and a performance testing submodule;
[0018] The general testing submodule is used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of electric vehicles.
[0019] The functional verification submodule is used to verify the stability of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm.
[0020] The performance testing submodule is used to verify the response performance of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm.
[0021] Preferably, the general inspection submodule includes: an appearance testing unit, a communication testing unit, an access control testing unit, an access validity testing unit, and an access automatic update request testing unit; the appearance testing unit is communicatively connected to the charging and discharging device, the communication testing unit is communicatively connected to the power grid simulation module, the access control testing unit is communicatively connected to the inspection and testing module, and the access control testing unit, the access validity testing unit, and the access automatic update request testing unit are communicatively connected.
[0022] The appearance testing unit is used to inspect the appearance of the charging and discharging equipment during the inspection and testing of the grid-connected operation and control of electric vehicles.
[0023] The communication test unit is used to test the communication function between the electric vehicle simulation module and the power grid simulation module during the verification and testing of the grid-connected operation and control of electric vehicles.
[0024] The permission control test unit is used to set permissions for the test process of the inspection and test module during the inspection and test of the grid-connected operation and control of electric vehicles, to verify the identity of electric vehicles and authorize grid connection through the permissions, to set the validity period of the permissions and send it to the permission validity test unit, and to set an automatic update request for the permissions and send it to the automatic update request test unit.
[0025] The permission validity period test unit is used to control the electric vehicle charging service platform and the electric vehicle load aggregation system to be unable to access each other when the permission expires, based on the validity period of the permission.
[0026] The automatic permission update request test unit is used to test the automatic permission update request.
[0027] Preferably, the functional testing submodule includes: a charge / discharge adjustable function test unit, a metering function test unit, an instruction consistency test unit, an aggregated data consistency test unit, and a charge / discharge equipment instruction response deviation test unit;
[0028] The adjustable charge / discharge function test unit is used to verify the accuracy of the charge / discharge data of the charging and discharging device based on the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm, generate verification data and send it to the metering function test unit, the instruction consistency test unit and the aggregated acquisition data consistency test unit.
[0029] The metering function test unit is used to verify the accuracy, timeliness, and precision of the charging and discharging adjustment of the charging and discharging equipment based on the verification data, generate verification results, and send them to the charging and discharging equipment command response deviation test unit.
[0030] The instruction consistency test unit is used to check whether there are errors and / or delays in the scheduling instruction sending process based on the verification data.
[0031] The aggregated data consistency test unit is used to verify whether the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data are consistent with the verification data.
[0032] The charging and discharging equipment command response deviation test unit is used to determine the response speed and response accuracy of the charging and discharging equipment to the charging pile-level control command based on the verification results.
[0033] Preferably, the performance testing submodule includes: a power response delay test unit for charging and discharging equipment, a regulating capacity test unit for charging and discharging equipment, a regulating rate test unit for charging and discharging equipment, and a regulating accuracy test unit for charging and discharging equipment.
[0034] The power response delay test unit of the charging and discharging equipment is used to obtain the response time required for the charging and discharging equipment to respond to the charging pile-level control command based on the bidirectional charging and discharging mode control algorithm and send it to the charging and discharging equipment adjustment rate test unit.
[0035] The charging and discharging equipment adjustment capacity test unit is used to test, based on the constant power charging and discharging control algorithm, the maximum capacity adjustment range of electrical energy achieved by the charging and discharging equipment, the electric vehicle charging service platform, and the electric vehicle load aggregation system under ideal conditions, obtain the test results, and send them to the charging and discharging equipment adjustment accuracy test unit.
[0036] The charging and discharging equipment adjustment rate test unit is used to test the response speed of the charging pile when it adjusts the charging and discharging based on the charging pile-level control command, based on the response time.
[0037] The charging and discharging equipment adjustment accuracy test unit is used to verify the availability of the electric vehicle charging service platform in responding to the scheduling command based on the test results.
[0038] Preferably, the electric vehicle simulation module includes: a power battery simulation submodule, a vehicle controller simulation submodule, a communication and information interaction simulation submodule, and an environment and road condition simulation submodule;
[0039] The power battery simulation submodule is used to simulate the battery capacity and charging efficiency of electric vehicles and send the data to the communication and information interaction simulation submodule.
[0040] The vehicle controller simulation submodule is used to simulate the control logic and communication interface for charging the electric vehicle and send it to the communication and information interaction simulation submodule; the communication interface includes: a simulation interface that provides a communication protocol for the interaction between the electric vehicle and external devices;
[0041] The environment and road condition simulation submodule is used to test the adaptability of electric vehicle performance to environmental and driving conditions, simulate the impact of the environment on the electric vehicle's battery and motor, obtain test simulation results, and send them to the communication and information interaction simulation submodule.
[0042] The communication and information interaction simulation submodule is used to simulate the interaction process between the electric vehicle and the external device based on the battery capacity, the charging efficiency, the control logic, the communication interface, and the test simulation results, and to simulate the bidirectional interaction information between the electric vehicle and the power grid to generate electric vehicle simulation data; the bidirectional interaction information between the electric vehicle and the power grid includes: power scheduling and charging time optimization.
[0043] Preferably, the electric vehicle load aggregation system includes: a central control and scheduling module, a data acquisition and analysis module, a communication and interface module, an optimization and load allocation module, and an edge computing module; the central control and scheduling module, the data acquisition and analysis module, the optimization and load allocation module, and the edge computing module are connected to the communication and interface module;
[0044] The data acquisition and analysis module is used to acquire the power grid simulation data, analyze the power grid simulation data using big data analysis tools, generate the power grid dispatch requirements of electric vehicles, and send them to the optimization and load allocation module.
[0045] The optimization and load allocation module is used to collect the grid dispatching requirements and the status of the electric vehicles, generate a load allocation strategy based on the grid dispatching requirements and the status of the electric vehicles, and send it to the edge computing module.
[0046] The edge computing module is used to generate charging pile-level computing tasks according to the load distribution strategy and send them to the central control and scheduling module.
[0047] The central control and scheduling module is used to process the charging pile-level computing tasks using a distributed computing architecture and scheduling algorithm, and obtain the processing results; based on the processing results, it generates charging pile-level control instructions and sends them to the charging and discharging equipment.
[0048] Secondly, this invention application also proposes a test method for the grid-connected operation and control of electric vehicles, comprising:
[0049] The power grid simulation module of the aforementioned testing system generates power grid simulation data by simulating a power grid with dynamic characteristics.
[0050] The electric vehicle simulation module of the aforementioned testing system is used to simulate the battery capacity, charging efficiency, and control logic of electric vehicle charging, thereby generating electric vehicle simulation data.
[0051] The charging pile simulation module of the aforementioned testing system is used to simulate a charging pile and generate charging pile simulation data.
[0052] The monitoring and data acquisition module of the aforementioned testing system is used to collect the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data as operational data.
[0053] The inspection and testing module of the aforementioned inspection and testing system loads the grid-connected control algorithm based on the operating data to inspect and test the grid-connected operation and control of electric vehicles.
[0054] Thirdly, this application also proposes an electronic device, comprising: at least one processor and a memory; wherein the memory and the processor are connected via a bus;
[0055] The memory is used to store one or more programs;
[0056] When the one or more programs are executed by the at least one processor, the above-mentioned method for verifying and testing the grid-connected operation and control of an electric vehicle is implemented.
[0057] Fourthly, this application also proposes a readable storage medium having an executable program stored thereon, wherein when the executable program is executed, it implements the aforementioned method for verifying and testing the grid-connected operation and control of an electric vehicle.
[0058] Compared with the closest prior art, the present invention application has the following beneficial effects:
[0059] This invention discloses a test system and method for verifying and controlling the grid-connected operation of an electric vehicle, comprising: a power grid simulation module, an electric vehicle simulation module, a charging pile simulation module, a monitoring and data acquisition module, and an inspection and testing module, all connected by communication. The power grid simulation module generates power grid simulation data by simulating a power grid with dynamic characteristics and sends the power grid simulation data to the monitoring and data acquisition module. The electric vehicle simulation module simulates the battery capacity, charging efficiency, and control logic of the electric vehicle's charging process, generates electric vehicle simulation data, and sends the electric vehicle simulation data to the monitoring and data acquisition module. The charging pile simulation module simulates a charging pile, generates charging pile simulation data, and sends the charging pile simulation data to the monitoring and data acquisition module. The monitoring and data acquisition module sends the received power grid simulation data, electric vehicle simulation data, and charging pile simulation data as operating data to the inspection and testing module. The inspection and testing module loads a grid-connected control algorithm based on the operating data to verify and test the grid-connected operation and control of the electric vehicle. A test system for grid-connected operation and control of electric vehicles has been constructed, which has improved the testing and inspection system for electric vehicles, promoted the advancement of electric vehicle-grid interaction technology, and is of vital importance to the development of the electric vehicle industry. Attached Figure Description
[0060] Figure 1 The present invention provides an architecture for a test system for grid-connected operation and control of electric vehicles. Figure 1 ;
[0061] Figure 2 The present invention provides an architecture for a test system for grid-connected operation and control of electric vehicles. Figure 2 ;
[0062] Figure 3 A flowchart of a test method for grid-connected operation and control of an electric vehicle provided in this invention application;
[0063] Figure 4 This is a schematic diagram of the operation of an electronic device provided in this invention application. Detailed Implementation
[0064] The specific embodiments of this invention will be further described in detail below with reference to the accompanying drawings.
[0065] Example 1:
[0066] like Figure 1 As shown, this invention application proposes an electric vehicle grid-connected operation and control testing system, including: a power grid simulation module, an electric vehicle simulation module, a charging pile simulation module, a monitoring and data acquisition module, and an inspection and testing module connected by communication.
[0067] The power grid simulation module is used to generate power grid simulation data by simulating a power grid with dynamic characteristics, and to send the power grid simulation data to the monitoring and data acquisition module.
[0068] The electric vehicle simulation module is used to simulate the battery capacity, charging efficiency, and control logic of electric vehicle charging, generate electric vehicle simulation data, and send the electric vehicle simulation data to the monitoring and data acquisition module.
[0069] The charging pile simulation module is used to simulate charging piles, generate charging pile simulation data, and send the charging pile simulation data to the monitoring and data acquisition module.
[0070] The monitoring and data acquisition module is used to send the received power grid simulation data, electric vehicle simulation data and charging pile simulation data as operating data to the inspection and testing module;
[0071] The inspection and testing module is used to load the grid-connected control algorithm based on the operating data to inspect and test the grid-connected operation and control of the electric vehicle.
[0072] The aforementioned power grid simulation module can be a power electronic device that simulates the dynamic characteristics of a real power grid, including grid fluctuations, frequency variations, and harmonic interference. The charging pile simulation module can simulate charging piles of different power levels, including AC slow charging and DC fast charging piles. The monitoring and data acquisition module can collect operational data in real time, including inspection and test data, which may include relevant parameters such as voltage, current, power, and frequency. The inspection and testing module can inspect, load, and test grid-connected control algorithms, including V2G (Vehicle-to-Grid) control algorithms, constant power charging and discharging control algorithms, etc., which can verify the stability and response performance of the algorithms.
[0073] Furthermore, the inspection and testing module is specifically used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of the electric vehicle, and to verify the stability and response performance of the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm.
[0074] Furthermore, the system also includes: a power grid dispatching system, an electric vehicle load aggregation system, an electric vehicle charging service platform, and charging and discharging equipment that are communicatively connected to the monitoring and data acquisition module;
[0075] The electric vehicle load aggregation system is used to acquire the power grid simulation data; generate power grid dispatching requirements for electric vehicles based on the power grid simulation data and send them to the power grid dispatching system; and generate charging pile-level control instructions based on the power grid dispatching requirements and send them to the charging and discharging equipment.
[0076] The power grid dispatching system is used to respond to the power grid dispatching needs of the electric vehicle; based on the power grid dispatching needs, it generates dispatching instructions and sends them to the electric vehicle charging service platform.
[0077] The electric vehicle charging service platform is used to respond to the scheduling command; based on the scheduling command, it generates a power schedule for the electric vehicle and sends it to the charging pile;
[0078] The charging and discharging equipment is used to respond to the charging pile-level control command; according to the charging pile-level control command, it controls the charging pile and adjusts the charging and discharging of the electric vehicle according to the power dispatch of the electric vehicle.
[0079] The system described above may further include: a grid connection interface module; the grid connection interface module is communicatively connected to the power grid simulation module, the electric vehicle simulation module, the charging pile simulation module, the monitoring and data acquisition module, the power grid dispatching system, the electric vehicle load aggregation system, the electric vehicle charging service platform, and the charging and discharging equipment; enabling energy and information interaction; the grid connection interface module may adopt a standard communication protocol; examples of communication protocols may include CAN (Controller Area Network), Ethernet, etc.
[0080] The aforementioned power grid dispatching system includes, but is not limited to, a demand response platform, a load control system, a distribution cloud master station, and a new load management system. The electric vehicle load aggregation system, through advanced information and communication technologies and software systems, can aggregate discrete loads from electric vehicle charging and swapping operations, and purposefully engage in bidirectional information exchange with the power grid dispatching system to respond to power grid dispatching needs. Simultaneously, it possesses the capability for coordinated optimization of load regulation, supporting load aggregators in resource access, grid connection scheduling, operation monitoring, automatic power control, metering and settlement, and statistical analysis. It adopts a modular design, facilitating expansion and maintenance.
[0081] The aforementioned load control system is used to enable electric vehicles to access the power grid through charging piles and actively respond to power grid dispatching needs, participating in power grid dispatching and operation control, including charging power adjustment and charging time shifting.
[0082] As mentioned above, load aggregators need to have power users with adjustable capabilities and provide independent organizations to market operators or purchasers. This not only provides opportunities for small and medium-sized loads to participate in grid regulation, but also allows them to fully explore load resources through professional technical means and provide necessary service products such as demand response, ancillary services, and spot markets.
[0083] The aforementioned automatic power control is a closed-loop control process in which the power grid dispatching system issues real-time adjustment commands or plans to the electric vehicle load aggregation system through information communication and automatic control technology. The electric vehicle load aggregation system then decomposes the adjustment commands and sends them to the charging and discharging equipment through the electric vehicle charging service platform. This completes the charging and discharging of the charging piles and the automatic power adjustment response of the charging piles, thereby achieving a closed-loop control process that meets the real-time safety balance of the power grid and ensures that the frequency regulation is within the deviation range.
[0084] Furthermore, such as Figure 2 As shown, the inspection and testing module includes: a general inspection submodule, a functional inspection submodule, and a performance testing submodule;
[0085] The general testing submodule is used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of electric vehicles.
[0086] The functional verification submodule is used to verify the stability of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm.
[0087] The performance testing submodule is used to verify the response performance of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm.
[0088] Furthermore, the general inspection submodule includes: an appearance testing unit, a communication testing unit, an access control testing unit, an access validity testing unit, and an access automatic update request testing unit; the appearance testing unit is communicatively connected to the charging and discharging device, the communication testing unit is communicatively connected to the power grid simulation module, the access control testing unit is communicatively connected to the inspection and testing module, and the access control testing unit, the access validity testing unit, and the access automatic update request testing unit are communicatively connected.
[0089] The appearance testing unit is used to inspect the appearance of the charging and discharging equipment during the inspection and testing of the grid-connected operation and control of electric vehicles.
[0090] The communication test unit is used to test the communication function between the electric vehicle simulation module and the power grid simulation module during the verification and testing of the grid-connected operation and control of electric vehicles.
[0091] The permission control test unit is used to set permissions for the test process of the inspection and test module during the inspection and test of the grid-connected operation and control of electric vehicles, to verify the identity of electric vehicles and authorize grid connection through the permissions, to set the validity period of the permissions and send it to the permission validity test unit, and to set an automatic update request for the permissions and send it to the automatic update request test unit.
[0092] The permission validity period test unit is used to control the electric vehicle charging service platform and the electric vehicle load aggregation system to be unable to access each other when the permission expires, based on the validity period of the permission.
[0093] The automatic permission update request test unit is used to test the automatic permission update request.
[0094] The aforementioned appearance testing unit can also be used to conduct a comprehensive inspection of the appearance of electric vehicle grid-connected equipment, including the overall structure of the equipment, the integrity of the interfaces, and the clarity of the markings. Through appearance inspection, it is used to preliminarily determine whether the equipment meets the basic production and use standards, ensuring its physical integrity and compliance. In the appearance testing unit, the off-board charger corresponds to the requirements of 5.2.1 in the National Energy Administration's recommended standard NB / T 33008.1-2018, and the AC charging pile corresponds to the requirements of 5.2.1 in the National Energy Administration's recommended standard NB / T 33008.2-2018.
[0095] The aforementioned communication test unit can also be used to test the communication function between the electric vehicle and the power grid, generating charging pile-level control commands using the electric vehicle load aggregation system; the timing can start from the moment the charging pile-level control command is received, and it should arrive at the electric vehicle charging service platform within 500ms. The timing starts from the moment the electric vehicle charging service platform receives and processes the charging pile-level control command within a specified time, and it should forward it to the charging pile or reply with the charging pile-level control command reception result within 200ms.
[0096] The aforementioned access control test unit is also used to test the access management mechanism in the system. By using tokens for authentication and authorization, it ensures that only authorized electric vehicles can access the power grid and exchange energy. Access includes: unassigned or incorrectly assigned tokens between the electric vehicle load aggregation system and the electric vehicle charging service platform; the server rejecting the client's business request; the electric vehicle load aggregation system and the electric vehicle charging service platform assigning the correct token; and the server being able to respond normally to the client's business request.
[0097] The aforementioned permission validity test unit verifies the validity period of the token to ensure the dynamic security of the system and the real-time performance of the data. When the validity period expires, the electric vehicle charging service platform and the electric vehicle load aggregation system should be unable to access each other and should not send any business data.
[0098] The aforementioned automatic permission update request test unit is used to test the automatic token update function in the electric vehicle grid-connected system. After the correctly assigned token between the electric vehicle load aggregation system and the electric vehicle charging service platform exists for at least 2 hours, the token should expire, i.e., enter an unassigned token or token error state. During this time, the electric vehicle charging service platform and the electric vehicle load aggregation system should be unable to access each other, and no business data should be sent. When the token expires between the electric vehicle load aggregation system and the electric vehicle charging service platform, the automatic permission update request test unit should automatically complete the token update request before the client initiates a business request.
[0099] The general inspection submodule may also include: a type test report inspection unit, used to verify whether the design, performance and quality of the electric vehicle grid-connected operation and control system meet the relevant standards and specifications.
[0100] Furthermore, the functional testing submodule includes: a charge / discharge adjustable function test unit, a metering function test unit, an instruction consistency test unit, an aggregated data consistency test unit, and a charge / discharge equipment instruction response deviation test unit;
[0101] The adjustable charge / discharge function test unit is used to verify the accuracy of the charge / discharge data of the charging and discharging device based on the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm, generate verification data and send it to the metering function test unit, the instruction consistency test unit and the aggregated acquisition data consistency test unit.
[0102] The metering function test unit is used to verify the accuracy, timeliness, and precision of the charging and discharging adjustment of the charging and discharging equipment based on the verification data, generate verification results, and send them to the charging and discharging equipment command response deviation test unit.
[0103] The instruction consistency test unit is used to check whether there are errors and / or delays in the scheduling instruction sending process based on the verification data.
[0104] The aggregated data consistency test unit is used to verify whether the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data are consistent with the verification data.
[0105] The charging and discharging equipment command response deviation test unit is used to determine the response speed and response accuracy of the charging and discharging equipment to the charging pile-level control command based on the verification results.
[0106] The aforementioned adjustable charge / discharge function test unit is used to verify the adjustable function of the charging / discharging equipment. The verification is performed using the following steps:
[0107] Step a: The charging and discharging equipment should be connected to an electric vehicle or simulated load, the charging and discharging equipment should have started the charging and discharging process normally, and the power output should be stable.
[0108] Step b: The electric vehicle load aggregation system generates charging pile-level control commands. The range of these commands should be within the charging and discharging power range supported by the charging and discharging equipment. The maximum output power supported by the charging and discharging equipment is:
[0109] P max =min(P 额定 P 请求 ,min(U 输出 U 请求 )*min(I 输出 ,I 请求 ))
[0110] P 请求 =U 请求 ×I 请求
[0111] Among them, P max P represents the maximum output power supported by the charging and discharging device. 额定 This indicates the rated output power (P) indicated on the nameplate of the charging and discharging device. 请求 U represents the requested charging or discharging power from an electric vehicle or simulated load. 输出 This indicates the maximum output voltage indicated on the nameplate of the charging / discharging device, U. 请求 I represents the voltage at which an electric vehicle or simulated load requests charging or discharging. 输出 I represents the maximum output current indicated on the nameplate of the charging and discharging device. 请求 This indicates a request for charging or discharging current from an electric vehicle or simulated load.
[0112] Step c: The electric vehicle load aggregation system issues a charging pile-level control command, which can be transmitted to the charging and discharging equipment via the electric vehicle charging service platform. The charging and discharging equipment should change towards the target value within 1 minute, and the change range should not be less than 70% of the difference between the charging pile-level control command and the current output power.
[0113] The aforementioned metering function test unit, when verifying the accuracy and timeliness of the charging and discharging equipment's metering, ensures the precision of the metering by comparing it with the actual power consumption; the metering test is performed using the following steps:
[0114] Step A: The metering test and inspection personnel check the type test report corresponding to the charging and discharging equipment to determine whether the metering device selected meets the national standard for electricity metering devices, and whether it is put into use after being verified by the electricity metering testing agency.
[0115] Step B: The metering function test unit checks the metering data acquisition cycle of the electric vehicle charging service platform. It should not exceed 3 minutes (preferably 1 minute). The data content includes voltage, current, power, and other data. Metadata should be archived in a timely manner. The archiving sampling cycle should not exceed 15 minutes (preferably 1 minute). The total electricity consumption within the sampling cycle should not exceed the total electricity consumption during that period.
[0116] Step C: The metering function test unit checks the cycle of the electric vehicle load aggregation system uploaded to the electric vehicle charging service platform. It should not exceed 5 minutes (preferably 1 minute). The electric vehicle load aggregation system archives and processes metadata. The sampling cycle of the electric vehicle load aggregation system should be checked and should not exceed 15 minutes (preferably 1 minute). The total electricity consumption within the sampling cycle should not exceed the total electricity consumption during that period. During sampling, the average power, maximum power, and minimum power within that cycle should be recorded.
[0117] It should be noted that when conducting metrological testing in the laboratory, the metrological function should be strictly verified. During on-site testing, the metrological function can be verified by using data collected from the electric vehicle load aggregation system and order data sent from the electric vehicle charging service platform.
[0118] The command consistency test unit is also used to verify the consistency between the generation and issuance of charging pile-level control commands by the electric vehicle load aggregation system. By sending a series of charging pile-level control commands and observing the vehicle's response, it checks whether there are errors or delays in the transmission of charging pile-level control commands, ensuring the reliable execution of the charging pile-level control commands. The command consistency test is performed using the following steps:
[0119] Step a1: The charging and discharging equipment should be connected to an electric vehicle or simulated load, and the charging and discharging equipment should have started the charging (discharging) process normally, with the power output in a stable state.
[0120] Step a2: The power grid dispatching system generates power grid demand instructions or plans and sends them to the electric vehicle load aggregation system. The data parsed by the electric vehicle load aggregation system should be consistent with the values of the power grid demand instructions or plans. The power grid dispatching system generates power grid demand instructions or plans at the platform level and the charging / discharging equipment level.
[0121] Step a3: When the instruction or response plan is at the charging / discharging device level, the electric vehicle load aggregation system sends the instruction or response plan to the corresponding electric vehicle charging service platform. The electric vehicle load aggregation system should only perform protocol conversion and not modify any data. The data parsed and executed by the electric vehicle charging service platform should be consistent with the value sent by the electric vehicle load aggregation system. When the instruction is at the platform level, the electric vehicle load aggregation system should be able to correctly decompose it to each electric vehicle charging service platform. The decomposition result should be consistent with the calculation result provided in the decomposition algorithm description.
[0122] When an electric vehicle charging service platform receives or parses a charging / discharging device-level instruction or response plan, it should issue the plan directly if the plan value is within the power range supported by the charging / discharging device; otherwise, it should adjust the plan downward or upward. When adjusting downward, the lower limit of the power supported by the charging / discharging device should be used for the downward adjustment. When adjusting upward, the plan can be issued directly or the upper limit of the power supported by the charging / discharging device can be used for the upward adjustment.
[0123] It should be noted that during laboratory testing for instruction consistency, the consistency of instructions should be strictly verified. During on-site testing, only steps a1 and a2 need to be checked to assist in the test verification of the electric vehicle load aggregation adjustment accuracy.
[0124] The aggregated data consistency test unit can also be used to verify whether the sum of the metering data fitted by the aggregated unit and the charging / discharging equipment in the electric vehicle load aggregation system and the electric vehicle charging service platform for station fitting is consistent, with an error of no more than 0.5%. Aggregated data consistency means that the sum of the metering data fitted by the aggregated unit and the charging / discharging equipment in the electric vehicle load aggregation system and the electric vehicle charging service platform for station fitting is consistent. The aggregated data consistency test is performed using the following steps:
[0125] Step A1: The electric vehicle charging and swapping service platform and the electric vehicle load aggregation system should fit the station power data, and the fitting result should be consistent with the sum of the power data of the charging and discharging equipment in the station at the same time, with an error of no more than 0.5%. If the power data collected by the charging and discharging equipment is missing, the fitting result should be consistent with the calculation result of the provided power data fitting rules.
[0126] Step A2: The electric vehicle load aggregation system fits the power data of the aggregation unit, and the result should be consistent with the sum of the power data of all charging and discharging devices in the aggregation unit at the same time, with an error of no more than 0.5%. If the power data collected by the charging and discharging devices is missing, the fitting result should be consistent with the calculation result of the provided power data fitting rules.
[0127] The errors in steps A1 and A2 are expressed as follows:
[0128]
[0129] Where err represents the error in fitting the measurement data, P 拟合 P represents the fitted power data of charging and discharging devices within the selected range. i This represents the collected power data or fitted power data of the i-th charging pile within the selected range at the fitting time.
[0130] Step A3: The power data fitting result of the electric vehicle load aggregation system aggregation unit should be consistent with the sum of the fitted power data of all stations in the aggregation unit, and the error should not be greater than 0.5%.
[0131] The charging and discharging equipment command response deviation test unit is used to test the response accuracy of the charging and discharging equipment to commands. By sending precise control commands and measuring the actual response of the equipment, it assesses whether the deviation is within an acceptable range.
[0132] Furthermore, the performance testing submodule includes: a power response delay test unit for charging and discharging equipment, a regulation capacity test unit for charging and discharging equipment, a regulation rate test unit for charging and discharging equipment, and a regulation accuracy test unit for charging and discharging equipment.
[0133] The power response delay test unit of the charging and discharging equipment is used to obtain the response time required for the charging and discharging equipment to respond to the charging pile-level control command based on the bidirectional charging and discharging mode control algorithm and send it to the charging and discharging equipment adjustment rate test unit.
[0134] The charging and discharging equipment adjustment capacity test unit is used to test, based on the constant power charging and discharging control algorithm, the maximum capacity adjustment range of electrical energy achieved by the charging and discharging equipment, the electric vehicle charging service platform, and the electric vehicle load aggregation system under ideal conditions, obtain the test results, and send them to the charging and discharging equipment adjustment accuracy test unit.
[0135] The charging and discharging equipment adjustment rate test unit is used to test the response speed of the charging pile when it adjusts the charging and discharging based on the charging pile-level control command, based on the response time.
[0136] The charging and discharging equipment adjustment accuracy test unit is used to verify the availability of the electric vehicle charging service platform in responding to the scheduling command based on the test results.
[0137] The performance test submodule may further include: an electric vehicle load aggregation adjustment accuracy unit and an electric vehicle load aggregation adjustment rate unit;
[0138] The aforementioned charging and discharging equipment power response delay test unit is also used to verify the time required for the charging and discharging equipment to respond to grid control commands; the charging and discharging equipment regulation capacity test unit is also used to verify the maximum regulation range that the charging and discharging equipment, electric vehicle charging service platform, and electric vehicle load aggregation system can achieve under ideal conditions; the charging and discharging equipment regulation rate test unit is also used to verify the regulation response speed; the charging and discharging equipment regulation accuracy test unit is also used to verify the availability of the charging and discharging equipment in responding to grid dispatch commands; the electric vehicle load aggregation regulation accuracy unit is used to verify the availability and reliability of the regulation function of the electric vehicle load aggregation system; and the electric vehicle load aggregation regulation rate unit is used to verify the regulation response speed of the aggregated resources of the electric vehicle load aggregation system.
[0139] The power response delay test unit for the charging and discharging equipment is used to verify the time required for the charging and discharging equipment to respond to power grid control commands; it can be performed using the following steps:
[0140] Step C1: The charging and discharging equipment should be connected to the electric vehicle or simulated load, the charging and discharging equipment should have started the charging or discharging process normally, and the power output should be stable.
[0141] Step C2: The electric vehicle load aggregation system generates control commands within the charging or discharging power range supported by the charging or discharging equipment, and sends them to the charging or discharging equipment via the electric vehicle charging service platform;
[0142] Step C3: When the charging / discharging device receives the control command, it starts timing. The timeout is the first point in time when the response reaches more than 90% accuracy of the target value of the control command and lasts for more than 5 minutes. The intermediate time should not exceed 20 seconds. The adjustment response accuracy of the charging / discharging device can be expressed as follows:
[0143]
[0144] Δt=t1-t0
[0145] Where acc represents the adjustment response accuracy of the charging and discharging device, and P 实际 P represents the actual output power of the charging and discharging device. 调控 Δt represents the control command value received by the charging and discharging equipment, i.e., the control target value; t represents the adjustment start time of the charging and discharging equipment; t1 represents the first moment when the stable output power of the charging and discharging equipment is above 90% of the control command target value; and t0 represents the moment when the charging and discharging equipment receives the control command.
[0146] It should be noted that when conducting laboratory tests to verify the time required for charging and discharging equipment to respond to grid control commands, the adjustment and start-up time of the charging and discharging equipment should be strictly verified. During on-site tests, the test can be completed by assisting the electric vehicle load aggregation adjustment accuracy, without recording the adjustment and start-up time of the charging and discharging equipment.
[0147] The charging and discharging equipment capacity adjustment test unit performs the following steps to test and verify the maximum capacity adjustment range reached by the charging and discharging equipment, electric vehicle charging service platform, and electric vehicle load aggregation system under ideal conditions:
[0148] Step d1: The charging / discharging equipment should be connected to an electric vehicle or simulated load, and the charging / discharging process should have started normally, with the power reaching full power output. If an electric vehicle or simulated load that meets the maximum power requirement cannot be provided, the maximum stable output power in the type test report should be used as the theoretical maximum load value.
[0149] Step d2: The electric vehicle load aggregation system should generate, or set at least three charging / discharging device-level control commands in a 3-minute cycle, representing 80%, 50%, 30%, 10%, 5%, 3%, 1%, and 0% of the rated power, and then in reverse order to 100%. These commands should be sent to the charging / discharging devices via the electric vehicle charging service platform. For bidirectional charging / discharging devices, charging should be represented by positive values and discharging by negative values. The charging / discharging device-level control commands should be calculated and generated based on 80%, 50%, 30%, 10%, 5%, 3%, 1%, 0%, and 100% of the rated charging power, and 5%, 10%, 30%, 50%, 80%, and 100% of the rated discharging power. Alternatively, at least three charging and discharging device-level control commands should be set separately according to actual needs, and all commands should pass through the 0 power point. During execution, if the minimum output power supported by the charging / discharging device is clearly defined, the generated charging / discharging device-level control commands should start from the minimum power and then in reverse order to 100% of the rated power.
[0150] Without affecting the charging continuity of a single charging order, record the maximum and minimum output power achievable by the charging and discharging equipment, and calculate the regulating capacity of the charging and discharging equipment as follows:
[0151] P 调节容量 =P 最大负荷 -P 最小负荷
[0152] Among them, P 调节容量 P represents the regulating capacity of the charging and discharging equipment. 最大负荷 This indicates the maximum output power that the charging and discharging device can achieve. Refer to the maximum stable output power value in the type test report or the measured value. (P) 最小负荷This indicates the minimum charging power that the charging and discharging equipment can achieve, which should be the minimum stable output power value that can be achieved without affecting the continuity of primary charging orders.
[0153] It is important to note that during laboratory testing, the regulating capacity of the charging and discharging equipment should be rigorously verified, and information maintenance should be properly performed. During on-site testing, the generation of control commands at the charging and discharging equipment level should preferably be no less than 30% of the rated power. Calculated data should not be considered as the regulating capacity data of the charging and discharging equipment and is for reference only.
[0154] The charging / discharging equipment regulation rate test unit is used to verify the regulation response speed; the unit is kW / min, and the following steps are performed to verify the regulation response speed:
[0155] Step e1: The charging and discharging equipment should be connected to an electric vehicle or simulated load, and the output of the charging and discharging equipment should be stable.
[0156] Step e2: During the down-adjustment test, the charging and discharging equipment should reach its rated output power and be in a stable state. The electric vehicle load aggregation system calculates the minimum output power of the charging and discharging equipment according to the adjustment capacity data of the charging and discharging equipment, forms a charging and discharging equipment-level control command, and sends it to the charging and discharging equipment through the electric vehicle charging service platform. During the up-adjustment test, the electric vehicle load aggregation system calculates the minimum output power of the charging and discharging equipment according to the adjustment capacity data of the charging and discharging equipment, and sends it to the charging and discharging equipment as a charging and discharging equipment-level control command. After the charging output power is in a stable state, the electric vehicle load aggregation system uses the rated power of the charging and discharging equipment as the control command value and sends it to the charging and discharging equipment through the electric vehicle charging service platform.
[0157] Step e3: The timing start time is the moment the charging / discharging equipment-level control command is issued. The end time is the first moment when the power reaches 90% of the control command value and stabilizes within the accuracy limit. The charging / discharging equipment adjustment rate is calculated according to the following formula:
[0158]
[0159] Where v represents the adjustment rate of the charging and discharging equipment, in units of kW / min, P 最大 P represents the maximum output power achieved by the charging and discharging device. 最小 This represents the minimum output power achieved by the charging and discharging device, and t represents the time difference between the start and end of the timing.
[0160] It should be noted that when conducting laboratory tests to verify the adjustment response speed, it is advisable to verify the adjustment rate of the charging and discharging equipment. During field tests, if timing conditions permit, the charging (discharging) adjustment rate can be tested; however, the data obtained from such tests are for reference only.
[0161] The charging and discharging equipment adjustment accuracy test unit is also used to test the accuracy of the charging and discharging equipment during the adjustment process. The accuracy test is performed using the following steps:
[0162] Step f1: The charging and discharging equipment should be connected to the electric vehicle or simulated load, and the charging or discharging process should have been started normally, with the power output in a stable state.
[0163] Step f2: The electric vehicle load aggregation system generates charging and discharging equipment-level control commands at 90%, 80%, 50%, and 30% of the rated power of the charging and discharging equipment, respectively. The generated charging and discharging equipment-level control commands should be within the output range of the charging and discharging equipment and are sent to the charging and discharging equipment through the electric vehicle charging service platform.
[0164] Step f3: The charging and discharging equipment periodically uploads its real-time power data, which is then transmitted to the electric vehicle load aggregation system via the electric vehicle charging service platform. The electric vehicle load aggregation system calculates the adjustment accuracy of the charging and discharging equipment. The calculation process for the adjustment accuracy of the discharging equipment satisfies the following formula:
[0165]
[0166] Where Acc represents the adjustment accuracy of the charging and discharging device, and P i,调控 P represents the control command set for time period i. i,平均 The i-th time period represents the actual average power during the set time period, and n represents the total number of power data points collected during the time period.
[0167] When inspecting the adjustment accuracy of charging and discharging equipment, the adjustment accuracy of different types of charging and discharging equipment should meet the following requirements:
[0168] (1) The charging and discharging equipment can be a group-managed and group-controlled charging pile. The group-managed and group-controlled charging pile should be able to receive charging power adjustment instructions issued by the electric vehicle charging service platform or the electric vehicle load aggregation system, and be able to adjust the maximum charging capacity of the group-managed and group-controlled pile or the maximum charging capacity of a single gun. The message content should meet the requirements of the national standard GB / T 27930-2023. During charging, when receiving an instruction that is lower than the power data requested by the electric vehicle or the simulated load, it should be smoothly adjusted to the target value within 1 minute; when the output power reaches more than 30% of the rated power, the adjustment accuracy should be no less than 96%; when the output power reaches less than 30% of the rated power, the adjustment accuracy should be no less than 80%.
[0169] (2) The charging and discharging equipment can be a DC charging pile. The DC charging pile should be able to receive the charging power adjustment command issued by the electric vehicle charging service platform or the electric vehicle load aggregation system. When it receives the command that is lower than the power data requested by the electric vehicle or the simulated load, it should adjust to the target value in a smooth manner within 1 minute. The message content should meet the requirements of the national standard GB / T27930-2023. When the output power reaches more than 30% of the rated power, the adjustment accuracy should be no less than 96%. When the output power reaches less than 30% of the rated power, the adjustment accuracy should be no less than 80%.
[0170] (3) The charging and discharging equipment can be an AC charging pile. The AC charging pile should be able to receive the orderly charging instructions issued by the electric vehicle charging service platform or the electric vehicle load aggregation system. The orderly charging instructions can be PWM signals. The PWM (Pulse Width Modulation) duty cycle should be adjusted within 1 minute. The correspondence between power and duty cycle values and the duty cycle accuracy should meet the requirements of the national standard GB / T 18487.1-2023.
[0171] The electric vehicle load aggregation regulation accuracy unit is also used to verify the availability and reliability of the electric vehicle load aggregation system regulation function. The availability and reliability test is performed using the following steps:
[0172] Step g1: The automatic power adjustment function of the electric vehicle load aggregation system is in operation, the electric vehicle charging (discharging) load aggregation acquisition function is normal, and the data is continuous and uninterrupted;
[0173] Step g2: The power grid dispatching system generates control instructions within the adjustable range of the electric vehicle load aggregation system and issues them to the electric vehicle load aggregation system, or directly sets control instructions within the adjustable range in the electric vehicle load aggregation system;
[0174] Step g3: The electric vehicle load aggregation system decomposes the control instructions according to the electric vehicle charging service platform and the operating status of the charging and discharging equipment, and sends them to the charging and discharging equipment through the electric vehicle charging service platform.
[0175] Based on the data collected by the electric vehicle load aggregation system, the adjustment accuracy of electric vehicle load aggregation should be calculated. The adjustment accuracy for large-scale systems with 2,000 or more piles should be no less than 85%. Aggregation scales with less than 2,000 piles should be considered as not having formed the conditions for electric vehicle load aggregation and are not subject to this provision.
[0176]
[0177] Where Vcc represents the power regulation accuracy during the time period, P j,目标 The total target adjustment power P is set for time period j. j,平均Set the average actual operating power of the total load within the time period j, where m represents the total number of power data points collected within the time period.
[0178] The electric vehicle load aggregation regulation rate unit verifies the regulation response speed of the electric vehicle load aggregation system's aggregated resources, measured in kW / min, and is executed using the following steps:
[0179] Step H1: The automatic power adjustment function of the electric vehicle load aggregation system is in operation, the electric vehicle charging or discharging load aggregation acquisition function is normal, and the data is continuous and uninterrupted.
[0180] Step H2: During the down-adjustment test, the electric vehicle load aggregation system should operate in a stable, uncontrolled state. The power grid dispatching system generates and issues control commands within the adjustable range of the electric vehicle load aggregation system, or directly sets reasonable control command values in the electric vehicle load aggregation system. The target value of the control command should not exceed 95% of the current operating value. During the up-adjustment test, the electric vehicle load resources aggregated by the electric vehicle load aggregation system should be in a stable, low-power controlled operation state. The power grid dispatching system generates and issues control commands within the adjustable range of the electric vehicle load aggregation system, or directly sets reasonable control command values in the electric vehicle load aggregation system. The control command value should not be lower than 80% of the upper limit of the adjustable range of the electric vehicle load aggregation system and should be higher than the current operating data.
[0181] Step H3: The electric vehicle load aggregation system decomposes control instructions according to the electric vehicle charging service platform and the operating status of the charging and discharging equipment, and then sends them to the charging and discharging equipment through the electric vehicle charging service platform.
[0182] Based on the data collected by the electric vehicle load aggregation system, the electric vehicle load aggregation adjustment rate is calculated. The time when the adjustment command is issued is the start time of timing, and the first time point when the adjustment reaches 90% of the commanded adjustment power and stabilizes within the accuracy limit is the end time. The electric vehicle load aggregation adjustment rate is calculated according to the following formula:
[0183]
[0184] Where v represents the electric vehicle load aggregation adjustment rate, with units of kW / min and P. 最大 P represents the maximum stable output power achieved by the electric vehicle load aggregation system during the test. 最小 This represents the minimum output power reached by the electric vehicle load aggregation system during the test, and t represents the time difference between the start and end of the timing.
[0185] It should be noted that the load aggregation adjustment rate of electric vehicles should be tested on-site. Due to the influence of the data collection frequency, the calculated data is for reference only.
[0186] Furthermore, the electric vehicle simulation module includes: a power battery simulation submodule, a vehicle controller simulation submodule, a communication and information interaction simulation submodule, and an environment and road condition simulation submodule;
[0187] The power battery simulation submodule is used to simulate the battery capacity and charging efficiency of electric vehicles and send the data to the communication and information interaction simulation submodule.
[0188] The vehicle controller simulation submodule is used to simulate the control logic and communication interface for charging the electric vehicle and send it to the communication and information interaction simulation submodule; the communication interface includes: a simulation interface that provides a communication protocol for the interaction between the electric vehicle and external devices;
[0189] The environment and road condition simulation submodule is used to test the adaptability of electric vehicle performance to environmental and driving conditions, simulate the impact of the environment on the electric vehicle's battery and motor, obtain test simulation results, and send them to the communication and information interaction simulation submodule.
[0190] The communication and information interaction simulation submodule is used to simulate the interaction process between the electric vehicle and the external device based on the battery capacity, the charging efficiency, the control logic, the communication interface, and the test simulation results, and to simulate the bidirectional interaction information between the electric vehicle and the power grid to generate electric vehicle simulation data; the bidirectional interaction information between the electric vehicle and the power grid includes: power scheduling and charging time optimization.
[0191] The aforementioned power battery simulation submodule is also used to simulate the dynamic performance of electric vehicle battery packs, supporting different battery chemistry characteristics (such as lithium-ion, lithium iron phosphate, solid-state batteries, etc.). It employs a high-precision programmable DC power supply or electronic load device, combined with simulation algorithms to achieve the simulation effect. Dynamic characteristics include: simulating the charging and discharging characteristics of the battery, including constant current and constant voltage modes. It supports dynamic adjustment of SOC (State of Charge) and SOH (State of Health). It also supports simulation of battery fault conditions, such as overcharging, over-discharging, short circuits, and increased internal resistance.
[0192] The aforementioned Vehicle Control Unit (VCU) simulation submodule is used to simulate the logic functions and communication interfaces of the vehicle controller. It is implemented using a real-time control platform or an embedded controller development board. The communication interface includes a simulation structure providing communication protocols for interaction with external devices, simulating the logic functions and communication interfaces of the VCU. It is implemented using a real-time control platform or an embedded controller development board, such as a TI C2000 series microcontroller. The logic functions include: charge / discharge priority allocation and simulated fault diagnosis logic. The communication interface includes: a simulation of communication protocols for interaction with external devices, such as CAN (Controller Area Network) and Ethernet; external devices include charging piles, BMS (Battery Monitoring and Management System), and motor controllers.
[0193] The aforementioned environment and road condition simulation submodule is also used to comprehensively test the adaptability of vehicle performance to environmental and driving conditions, combining a real-time simulation platform and environmental simulation equipment (such as temperature control chambers and humidity generators) to achieve simulation; it simulates the impact of external environmental temperature, humidity, and altitude on the power battery and motor through environmental simulation equipment; it simulates the power demand of vehicles under different road conditions (such as slopes, urban areas, and highways); it provides impact analysis of different vehicle loads; and it tests the performance of electric vehicles under low voltage or frequency fluctuation conditions in conjunction with power grid conditions.
[0194] The aforementioned communication and information interaction simulation submodule is also used to implement industrial-grade communication modules and protocol parsers, such as CANoe (CAN open environment, bus development environment) and the OPAL-RT real-time simulation software platform, supporting remote software upgrades (Over-the-Air Technology, OTA) and diagnostic data upload testing; it is used for the simulation of mainstream communication protocols, such as ISO (International Organization for Standardization) 15118, IEC (International Electrotechnical Commission) 61851, CAN (Controller Area Network, serial communication protocol bus), and Modbus communication protocol, to simulate bidirectional information interaction between electric vehicles and the power grid, including power scheduling and charging time optimization;
[0195] The aforementioned power battery simulation submodule, vehicle controller simulation submodule, communication and information interaction simulation submodule, and environment and road condition simulation submodule can be interconnected through the grid-connected interface module to construct a complete electric vehicle simulation module. This module can dynamically simulate the charging and discharging behavior of the entire vehicle, grid interaction, control logic, and environmental adaptability, thereby providing a high-precision grid-connected operation test platform. The power battery simulation submodule, vehicle controller simulation submodule, communication and information interaction simulation submodule, and environment and road condition simulation submodule respectively simulate the key components and operating characteristics of different functions of an electric vehicle.
[0196] Furthermore, the electric vehicle load aggregation system includes: a central control and scheduling module, a data acquisition and analysis module, a communication and interface module, an optimization and load allocation module, and an edge computing module; the central control and scheduling module, the data acquisition and analysis module, the optimization and load allocation module, and the edge computing module are connected to the communication and interface module;
[0197] The data acquisition and analysis module is used to acquire the power grid simulation data, analyze the power grid simulation data using big data analysis tools, generate the power grid dispatch requirements of electric vehicles, and send them to the optimization and load allocation module.
[0198] The optimization and load allocation module is used to collect the grid dispatching requirements and the status of the electric vehicles, generate a load allocation strategy based on the grid dispatching requirements and the status of the electric vehicles, and send it to the edge computing module.
[0199] The edge computing module is used to generate charging pile-level computing tasks according to the load distribution strategy and send them to the central control and scheduling module.
[0200] The central control and scheduling module is used to process the charging pile-level computing tasks using a distributed computing architecture and scheduling algorithm, and obtain the processing results; based on the processing results, it generates charging pile-level control instructions and sends them to the charging and discharging equipment.
[0201] The aforementioned electric vehicle load aggregation system may further include: a communication and interface module; the communication and interface module serves as the communication interface between the central control and scheduling module, the data acquisition and analysis module, the optimization and load allocation module, and the edge computing module.
[0202] The aforementioned data acquisition and analysis module is used to collect real-time operational data from charging piles, electric vehicles, and the power grid. It configures IoT (Internet of Things) devices to collect information and utilizes big data analytics tools such as the Hadoop Distributed File System and Spark for large-scale data processing. Real-time data analysis specifically includes: 1. Data collection: including voltage, current, state of charge (SOC), location information, load capacity, and owner demand. 2. Data analysis: real-time analysis of load trends, identification of peak load risks, and prediction of future load demand. 3. Anomaly detection: identification of communication failures, hardware failures, or abnormal user operations.
[0203] The aforementioned optimization and load allocation module generates load allocation strategies based on system requirements and the status of electric vehicles. It utilizes a genetic algorithm combined with a machine learning model to predict load demand and vehicle behavior. Specifically, this includes: 1. Load optimization: Optimizing the load distribution of electric vehicles in time and space based on their remaining battery power, location, and charging needs. 2. Dynamic allocation: Adjusting charging and discharging strategies according to real-time changes in the power grid status. 3. Optimization objectives: Including minimizing load fluctuations, reducing peak loads, and supporting frequency regulation. Load allocation commands are prioritized as follows: high priority, medium priority, and low priority are set. 1. High priority: Power grid frequency regulation, emergency load reduction (such as peak-hour demand response). 2. Medium priority: Dynamic load balancing, regional charging strategy adjustment. 3. Low priority: Long-term optimization tasks (such as charging plans for electric vehicles parked for extended periods). The task processing order is dynamically adjusted according to command priority to ensure that high-priority tasks are executed quickly.
[0204] The aforementioned edge computing module utilizes lightweight AI models and control logic deployed on edge devices to offload some computational tasks to these devices near charging stations or electric vehicles, thereby improving command response speed. These edge devices include, for example, NVIDIA Jetson embedded systems and Raspberry Pi computer programming education systems. Their functions include: 1. Localized command processing: reducing communication latency and quickly responding to local scheduling needs. 2. Local prediction: predicting short-term load changes at the charging station or regional level and providing early response. 3. Distributed control: independently managing local loads without relying on a central server. The edge computing module also includes deploying a distributed edge computing architecture, specifically including real-time data processing and real-time task scheduling. Real-time data processing involves distributing computational tasks such as load allocation and strategy optimization to edge computing nodes (such as charging station controllers) at the regional or site level, reducing the computational load on the central server. Strategy optimization employs a hierarchical decision-making mechanism; this hierarchical decision-making can include: 1. Central level: responsible for global optimization, such as large-scale load prediction and cross-regional load allocation. 2. Regional level: responsible for the charging and discharging control and scheduling of electric vehicles within the region. 3. Device Level: Directly responds to changes in the status of a single vehicle or charging station and performs rapid adjustments. Real-time Task Scheduling: Employs an event-driven model, dynamically triggering local optimization tasks by monitoring changes in the power grid and vehicle status.
[0205] The aforementioned central control and scheduling module, employing a distributed computing architecture (such as a microservice architecture) and scheduling algorithms, is the core component of the system, responsible for receiving, analyzing, optimizing, and distributing instructions for global tasks. It supports efficient task processing and uses fast optimization algorithms (such as greedy algorithms and heuristic algorithms) to handle a large number of instruction requests within a short period. For complex problems, it employs hybrid methods, such as using linear programming for long-term strategies and using genetic algorithms for real-time optimization. Specific examples include: (S1) Receiving real-time scheduling instructions from grid operators or the energy market, including requirements for load reduction, load increase, and frequency response, such as those from grid operators like TSOs (Technical Standards Orders) and DSOs (Device Software Optimization). (S2) Formulating optimized charging and discharging strategies based on the aggregated status and geographical distribution of electric vehicles. (S3) Implementing load forecasting, balanced scheduling, and strategy distribution. (S4) Providing real-time monitoring and feedback channels to evaluate the effectiveness of instruction execution. In addition, the central control and scheduling module has high-concurrency task processing capabilities: 1. The central system uses a microservice architecture, modularizing functions such as load optimization, instruction scheduling, and data analysis, supporting multi-threaded concurrent processing. 2. Distributed task queues: Distributed task queues manage instructions; such as Kafka (an open-source stream processing platform) and RabbitMQ (an open-source message broker software), supporting efficient distribution and execution of massive tasks. 3. Containerized deployment: Container technology can be used to achieve rapid module expansion and dynamic load balancing, avoiding system overload; container technologies include Docker (an application container engine).
[0206] The aforementioned communication and interface module is used for interconnection with external devices and supports multiple communication protocols. It utilizes industrial-grade communication modules and edge computing technology to optimize communication efficiency. These industrial-grade communication modules include 5G (5th Generation Mobile Communication Technology), LoRa (Long Range Radio), and PLC (Programmable Logic Controller), employing low-latency protocols to ensure millisecond-level command transmission. Specifically, it supports mainstream protocols such as ISO15118 for EV (Electric Vehicle) and charging station communication, OCPP (Open ChargePoint Protocol) for charging pile backend management, and IEC61850 for grid communication, ensuring system compatibility in complex scenarios and avoiding delays caused by protocol conversion. Furthermore, a data caching system is deployed at edge nodes to store commonly used strategies and real-time status data, reducing the frequency of central server access and improving response speed.
[0207] The practical scenarios in which electric vehicle load aggregation systems can quickly process regulation commands issued by the power grid can be as follows:
[0208] 1. Scenario: The power grid requires frequency response.
[0209] The grid operator sends load adjustment instructions (e.g., reducing the total regional load by 20MW) to the electric vehicle load aggregation system;
[0210] The central control module divides the task into several sub-tasks (such as reducing the load of each charging station by 5kW);
[0211] The communication and interface module sends adjustment commands to the edge nodes (regional charging stations);
[0212] Edge nodes can directly stop charging or adjust the charging power for some vehicles based on the current status of the charging vehicles, with a response time controlled in milliseconds. The electric vehicle load aggregation system generates charging pile-level control commands. The timer starts from the moment the charging pile-level control command is received and reaches the electric vehicle charging service platform within 500ms. The timer starts from the moment the electric vehicle charging service platform receives and processes the charging pile-level control command and forwards it to the charging pile or replies with the command reception result within 200ms.
[0213] 2. Scenario: Peak load management
[0214] The system predicts that the regional load may exceed the grid capacity within the next 10 minutes;
[0215] The optimization and load allocation module generates load allocation schemes in advance to reduce unnecessary high-power charging behavior.
[0216] The communication and interface module sends the optimization plan to the vehicle or charging station and dynamically adjusts the charging strategy, such as delaying charging for low-priority vehicles and speeding up charging for high-priority vehicles.
[0217] 3. Scenario: V2G response of vehicle groups
[0218] The power grid operator issued a regulation order requiring 100 electric vehicles to generate 10MW of power within 5 minutes;
[0219] The central control and scheduling module selects suitable vehicles and generates a list of discharge tasks based on the vehicle's SOC and location.
[0220] The edge node distributes the discharge command to each vehicle, and the vehicle immediately starts discharging and supplying power to the grid. The entire process takes less than 2 minutes.
[0221] Load aggregators should meet the requirements of DL / T 2473.1 7.3 regarding the time required for the decomposition and issuance of regulation commands. The regulation performance of electric vehicle load aggregators, electric vehicle charging service platforms, and charging piles, including regulation accuracy, regulation rate, and response time, should meet the requirements of the power industry's recommended standard DL / T2473.1 7.7.
[0222] The technical effects and advantages of this invention are as follows:
[0223] 1. Ensuring System Compatibility and Safety: The interaction between electric vehicles and the power grid requires a high degree of compatibility and safety. The testing system can verify the charging and discharging functions of electric vehicles and their coordination with the power grid, ensuring that there is no impact on the grid during grid-connected operation, while protecting the safety of vehicles and users. The testing system is used to verify and test the functionality and performance of the adjustable capabilities of electric vehicles when they are used as adjustable load resources.
[0224] 2. Optimize Energy Management: By using a testing system, the efficiency and stability of electric vehicle energy management during grid-connected operation can be evaluated. This includes the performance of charging strategies, discharging strategies, and energy recovery, ensuring that electric vehicles can efficiently utilize grid resources while reducing the burden on the grid.
[0225] 3. Promoting the Development of Smart Grids: Electric vehicle grid-connected operation is an important component of smart grids. Testing and verification systems can test the communication protocols and control strategies between electric vehicles and smart grids, promoting the development of smart grid technology and realizing the intelligence and automation of the power grid.
[0226] 4. Enhance user experience: The testing system can verify the charging performance of electric vehicles under different power grid conditions, ensuring that users can obtain stable and fast charging services anytime and anywhere, thereby improving user satisfaction and the popularity of electric vehicles.
[0227] 5. Promote standards development and compliance: Through the testing and inspection system, relevant standards and specifications can be developed for the grid-connected operation of electric vehicles, ensuring that all electric vehicles and charging facilities can comply with unified technical requirements and promoting the healthy development of the industry.
[0228] 6. Enhanced Operational Reliability: The system enables comprehensive testing of the interaction performance between electric vehicles and the power grid, providing an efficient testing platform for the development and optimization of grid-connected operation control algorithms, and improving the stability and reliability of the coordinated operation of electric vehicles and the power grid. The construction of this testing system includes hardware setup, software development, and system integration and debugging. Building this testing system is crucial for promoting the development of the electric vehicle industry, improving the stability and efficiency of the power grid, and advancing smart grid technology.
[0229] Furthermore, the lack of such systems in existing technologies leads to problems such as low efficiency, inconvenient data acquisition, lack of on-site testing, limited functionality of testing systems, and limitations of testing platforms. These shortcomings restrict the development and application of electric vehicle-grid interaction technology. The proposed verification and testing system is built upon a grid dispatching system, an electric vehicle load aggregation system, and an electric vehicle charging service platform, including hardware construction, software development, and system integration and debugging steps. Hardware construction includes: Step u1, building a grid simulation module: selecting a bidirectional power converter and controller to simulate the dynamic characteristics of the grid; Step u2, integrating the electric vehicle simulation module: designing a power battery model and power electronic interface; Step u3, configuring monitoring and data acquisition equipment, selecting high-precision sensors and high-speed sampling units. Software development includes: developing a control algorithm testing platform that supports loading and real-time debugging of different algorithms, and can also set up a host computer management system, providing a graphical interface and data processing tools. System integration and debugging includes: integrating the hardware and software modules, and verifying the reliability and accuracy of the system through testing. The test system provided by this invention enables comprehensive testing of the interaction performance between electric vehicles and the power grid. It supports simulating various power grid operating conditions, such as faults, short circuits, and voltage drops. It has vehicle-to-grid (V2G) interaction function testing capabilities, including bidirectional energy flow and information exchange. It provides an efficient test platform for the development and optimization of grid-connected operation control algorithms, and can verify charging power optimization, grid-connected stability control, etc., thereby improving the stability and reliability of the coordinated operation of electric vehicles and the power grid.
[0230] Finally, an example of the application of the electric vehicle grid-connected operation and control test system of the present invention is given, specifically including the following steps:
[0231] Step 1: Based on the testing technical specifications, design two testing methods: laboratory testing and field testing;
[0232] Step 2: Laboratory testing uses a sampling method to conduct tests on the same charging pile model, electric vehicle charging service platform, and electric vehicle load aggregation system combination.
[0233] Step 3: On-site inspection: Based on the electric vehicle load aggregation system, conduct full-chain testing and inspection of the "power grid dispatching system - electric vehicle load aggregation system - electric vehicle charging service platform - charging and discharging equipment".
[0234] The inspection and testing of electric vehicles' grid-connected operation and control technical specifications should be carried out after the type test of the charging and discharging pile or battery swapping station has been completed and a type test report is available. The construction of the inspection and testing system for electric vehicles' grid-connected operation and control technical specifications should refer to the provisions of Chapter 4.1 of the National Energy Industry Recommended Standard NB / T 11305.1-2023 "Electric Vehicles Charging and Discharging Two-Way Interaction Part 1: General Principles".
[0235] It should be noted that all tests were conducted under normal atmospheric conditions within the jurisdiction. During the test period for each item, the test environment conditions were as follows: ambient temperature: -20℃~+50℃, relative humidity: not greater than 90%, atmospheric pressure: 86kPa~106kPa.
[0236] Example 2:
[0237] Based on the same inventive concept, such as Figure 3 As shown, the present invention also provides a test method for grid-connected operation and control of electric vehicles, which may include:
[0238] Step X1: Using the power grid simulation module of the aforementioned testing system, power grid simulation data is generated by simulating a power grid with dynamic characteristics;
[0239] Step X2: Using the electric vehicle simulation module of the aforementioned testing system, simulate the battery capacity, charging efficiency, and control logic for charging the electric vehicle to generate electric vehicle simulation data;
[0240] Step X3: Use the charging pile simulation module of the aforementioned testing system to simulate a charging pile and generate charging pile simulation data;
[0241] Step X4: Using the monitoring and data acquisition module of the testing system, the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data are used as operating data;
[0242] Step X5: Using the inspection and testing module of the aforementioned inspection and testing system, based on the operational data, the grid-connected control algorithm is loaded to inspect and test the grid-connected operation and control of the electric vehicle.
[0243] Further, in step X5, the inspection and testing module of the inspection and testing system loads the grid-connected control algorithm based on the operating data to conduct inspection and testing on the grid-connected operation and control of the electric vehicle, including:
[0244] The aforementioned inspection and testing module is used to load a bidirectional charging and discharging mode control algorithm and / or a constant power charging and discharging control algorithm to test the grid-connected operation and control of electric vehicles, and to verify the stability and response performance of the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm.
[0245] Furthermore, the method also includes:
[0246] Step Y1: Using the electric vehicle load aggregation system, acquire the power grid simulation data; based on the power grid simulation data, generate the power grid dispatching demand for electric vehicles; based on the power grid dispatching demand, generate charging pile-level control instructions;
[0247] Step Y2: Use the power grid dispatching system to respond to the power grid dispatching needs of the electric vehicle; generate dispatching instructions based on the power grid dispatching needs;
[0248] Step Y3: Using the electric vehicle charging service platform, respond to the scheduling instruction; based on the scheduling instruction, form a power dispatch for the electric vehicle;
[0249] Step Y4: Using the charging and discharging equipment, respond to the charging pile-level control command; according to the charging pile-level control command, control the charging pile, and adjust the charging and discharging of the electric vehicle according to the power dispatch of the electric vehicle.
[0250] Furthermore, the inspection and testing module is used to load the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm to test the grid-connected operation and control of the electric vehicle, and to verify the stability and response performance of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm, including:
[0251] Step X5.1: Using the general inspection submodule, load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to inspect and test the grid-connected operation and control of the electric vehicle;
[0252] Step X5.2: Use the aforementioned functional verification submodule to verify the stability of the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm;
[0253] Step X5.3: Use the performance test submodule to verify the response performance of the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm.
[0254] Further, in step X5.1, the use of the general testing submodule to load the bidirectional charging / discharging mode control algorithm and / or the constant power charging / discharging control algorithm to test the grid-connected operation and control of the electric vehicle includes:
[0255] Step X5.1.1: Using the aforementioned appearance testing unit, the appearance of the charging and discharging equipment is inspected during the inspection and testing of the grid-connected operation and control of the electric vehicle;
[0256] Step X5.1.2: Using the aforementioned communication test unit, during the verification and testing of the grid-connected operation and control of the electric vehicle, the communication function between the electric vehicle simulation module and the power grid simulation module is tested;
[0257] Step X5.1.3: Using the permission control test unit, during the inspection and testing of the grid-connected operation and control of electric vehicles, permissions are set for the test process of the inspection and testing module. The permissions are used to verify the identity of electric vehicles and authorize grid connection. The validity period of the permissions is set, and the automatic update request of the permissions is set.
[0258] Step X5.1.4: Using the permission validity test unit, based on the validity period of the permission, when the validity period of the permission expires, control the electric vehicle charging service platform and the electric vehicle load aggregation system to prevent access between them;
[0259] Step X5.1.5: Use the automatic permission update request test unit to test the automatic permission update request.
[0260] Further, in step X5.2, the use of the functional verification submodule to verify the stability of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm includes:
[0261] Step X5.2.1: The adjustable charge / discharge function test unit is used to verify the accuracy of the charge / discharge data of the charging / discharge device and generate verification data based on the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm.
[0262] Step X5.2.2: Using the aforementioned metrological function test unit, based on the verification data, verify the accuracy, timeliness, and precision of the charge and discharge adjustment of the charging and discharging equipment, and generate verification results;
[0263] Step X5.2.3: Using the instruction consistency test unit, based on the verification data, check whether there are errors and / or delays in the scheduling instruction sending process;
[0264] Step X5.2.4: Use the aggregated data consistency test unit to verify whether the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data are consistent with the verification data;
[0265] Step X5.2.5: Using the charging and discharging equipment command response deviation test unit, based on the verification results, determine the response speed and response accuracy of the charging and discharging equipment to the charging pile-level control command.
[0266] Further, in step X5.3, the verification of the response performance of the bidirectional charge-discharge mode control algorithm and / or constant power charge-discharge control algorithm using the performance testing submodule includes:
[0267] Step X5.3.1: Using the power response delay test unit of the charging and discharging equipment, based on the bidirectional charging and discharging mode control algorithm, obtain the response time required for the charging and discharging equipment to respond to the charging pile-level control command;
[0268] Step X5.3.2: Using the charging and discharging equipment capacity adjustment test unit, based on the constant power charging and discharging control algorithm, test the maximum capacity adjustment range of electrical energy achieved by the charging and discharging equipment, the electric vehicle charging service platform, and the electric vehicle load aggregation system under ideal conditions, and obtain the test results;
[0269] Step X5.3.3: Using the charging and discharging equipment adjustment rate test unit, based on the response time, verify the response speed of the charging pile when it adjusts the charging and discharging based on the charging pile-level control command;
[0270] Step X5.3.4: Using the charging and discharging equipment adjustment accuracy test unit, based on the test results, verify the availability of the electric vehicle charging service platform in responding to the scheduling command.
[0271] Further, in step X2, the electric vehicle simulation module of the aforementioned testing system simulates the battery capacity, charging efficiency, and control logic for charging the electric vehicle, generating electric vehicle simulation data, including:
[0272] Step X2.1: Use the power battery simulation submodule to simulate the battery capacity and charging efficiency of an electric vehicle;
[0273] Step X2.2: Using the vehicle controller simulation submodule, simulate the control logic and communication interface for charging the electric vehicle; the communication interface includes: a simulation interface that provides a communication protocol for interaction between the electric vehicle and external devices;
[0274] Step X2.3: Using the aforementioned environment and road condition simulation submodule, test the adaptability of the electric vehicle's performance to environmental and driving conditions, simulate the impact of the environment on the electric vehicle's battery and motor, and obtain the test simulation results;
[0275] Step X2.4: Using the communication and information interaction simulation submodule, based on the battery capacity, the charging efficiency, the control logic, the communication interface, and the test simulation results, simulate the interaction process between the electric vehicle and the external device, simulate the bidirectional interaction information between the electric vehicle and the power grid, and generate electric vehicle simulation data; the bidirectional interaction information between the electric vehicle and the power grid includes: power scheduling and charging time optimization.
[0276] Further, in step Y1, the electric vehicle load aggregation system is used to acquire the power grid simulation data; based on the power grid simulation data, the power grid dispatch demand for electric vehicles is generated; based on the power grid dispatch demand, charging pile-level control instructions are generated, including:
[0277] Step Y1.1: Using the data acquisition and analysis module, acquire the power grid simulation data, and use big data analysis tools to analyze the power grid simulation data to generate the power grid dispatching requirements for electric vehicles;
[0278] Step Y1.2: Using the optimization and load allocation module, collect the grid dispatching requirements and status of the electric vehicles, and generate a load allocation strategy based on the grid dispatching requirements and status of the electric vehicles;
[0279] Step Y1.3: Using the edge computing module, generate charging pile-level computing tasks according to the load allocation strategy;
[0280] Step Y1.4: Using the central control and scheduling module, a distributed computing architecture and scheduling algorithm are adopted to process the charging pile-level computing task and obtain the processing result; based on the processing result, a charging pile-level control instruction is generated.
[0281] Example 3:
[0282] like Figure 4As shown, the present invention also provides an electronic device, which may be a computer device, a microcontroller device, a smart mobile device, etc. The electronic device in this embodiment may include a processor, a memory, a transceiver component, etc. The memory, processor, and transceiver component are connected via a bus; the memory can be used to store executable programs, and an exemplary executable program may include instructions; the processor is used to execute the instructions stored in the memory. The memory can also be used to store data, which can be accessed and / or modified when instructions are executed.
[0283] The processor may be a Central Processing Unit (CPU), or it may be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, and it is suitable for implementing one or more instructions. Specifically, it is suitable for loading and executing one or more instructions in the storage medium to realize the corresponding method flow or corresponding function, so as to realize the steps of the electric vehicle grid-connected operation and control test method in the above embodiment.
[0284] Example 4:
[0285] Based on the same inventive concept, this invention also provides a readable storage medium, specifically an electronic device readable storage medium (Memory). This readable storage medium is a memory device within an electronic device used to store programs and data. It is understood that the storage medium here can include both built-in storage media within the electronic device and extended storage media supported by the electronic device. The storage medium provides storage space, which stores the terminal's operating system. Furthermore, this storage space also stores one or more instructions suitable for loading and execution by a processor. These instructions can be one or more executable programs (including program code). It should be noted that the storage medium here can be high-speed RAM or non-volatile memory, such as at least one disk storage device. Loading and executing one or more instructions stored in the storage medium by the processor can implement the steps of the electric vehicle grid-connected operation and control verification test method described in the above embodiments.
[0286] Those skilled in the art will understand that embodiments of this invention can be provided as methods, systems, or computer program products. Therefore, this invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this invention can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0287] This invention application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0288] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0289] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0290] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that after reading the present invention, they can still make various changes, modifications or equivalent substitutions to the specific implementation of the application, but these changes, modifications or equivalent substitutions are all within the protection scope of the claims pending approval.
Claims
1. A test system for grid-connected operation and control of electric vehicles, characterized in that, include: The communication-connected power grid simulation module, electric vehicle simulation module, charging pile simulation module, monitoring and data acquisition module, and inspection and testing module; The power grid simulation module is used to generate power grid simulation data by simulating a power grid with dynamic characteristics, and to send the power grid simulation data to the monitoring and data acquisition module. The electric vehicle simulation module is used to simulate the battery capacity, charging efficiency, and control logic of electric vehicle charging, generate electric vehicle simulation data, and send the electric vehicle simulation data to the monitoring and data acquisition module. The charging pile simulation module is used to simulate charging piles, generate charging pile simulation data, and send the charging pile simulation data to the monitoring and data acquisition module. The monitoring and data acquisition module is used to send the received power grid simulation data, electric vehicle simulation data and charging pile simulation data as operating data to the inspection and testing module; The inspection and testing module is used to load the grid-connected control algorithm based on the operating data to inspect and test the grid-connected operation and control of the electric vehicle. The inspection and testing module is specifically used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of the electric vehicle, and to verify the stability and response performance of the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm. The system further includes: a power grid dispatching system, an electric vehicle load aggregation system, an electric vehicle charging service platform, and charging and discharging equipment that are communicatively connected to the monitoring and data acquisition module; The electric vehicle load aggregation system is used to acquire the power grid simulation data; generate power grid dispatching requirements for electric vehicles based on the power grid simulation data and send them to the power grid dispatching system; and generate charging pile-level control instructions based on the power grid dispatching requirements and send them to the charging and discharging equipment. The power grid dispatching system is used to respond to the power grid dispatching needs of the electric vehicle; based on the power grid dispatching needs, it generates dispatching instructions and sends them to the electric vehicle charging service platform. The electric vehicle charging service platform is used to respond to the scheduling command; based on the scheduling command, it generates a power schedule for the electric vehicle and sends it to the charging pile; The charging and discharging equipment is used to respond to the charging pile-level control command; according to the charging pile-level control command, it controls the charging pile and adjusts the charging and discharging of the electric vehicle according to the power dispatch of the electric vehicle.
2. The system according to claim 1, characterized in that, The inspection and testing module includes: a general inspection submodule, a functional inspection submodule, and a performance testing submodule; The general testing submodule is used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of electric vehicles. The functional verification submodule is used to verify the stability of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm. The performance testing submodule is used to verify the response performance of the bidirectional charge-discharge mode control algorithm and / or the constant power charge-discharge control algorithm.
3. The system according to claim 2, characterized in that, The general inspection submodule includes: an appearance test unit, a communication test unit, an access control test unit, an access validity test unit, and an access automatic update request test unit; the appearance test unit is communicatively connected to the charging and discharging device, the communication test unit is communicatively connected to the power grid simulation module, the access control test unit is communicatively connected to the inspection and testing module, and the access control test unit, the access validity test unit, and the access automatic update request test unit are communicatively connected. The appearance testing unit is used to inspect the appearance of the charging and discharging equipment during the inspection and testing of the grid-connected operation and control of electric vehicles. The communication test unit is used to test the communication function between the electric vehicle simulation module and the power grid simulation module during the verification and testing of the grid-connected operation and control of electric vehicles. The permission control test unit is used to set permissions for the test process of the inspection and test module during the inspection and test of the grid-connected operation and control of electric vehicles, to verify the identity of electric vehicles and authorize grid connection through the permissions, to set the validity period of the permissions and send it to the permission validity test unit, and to set an automatic update request for the permissions and send it to the automatic update request test unit. The permission validity period test unit is used to control the electric vehicle charging service platform and the electric vehicle load aggregation system to be unable to access each other when the permission expires, based on the validity period of the permission. The automatic permission update request test unit is used to test the automatic permission update request.
4. The system according to claim 2, characterized in that, The functional testing submodule includes: a charge / discharge adjustable function test unit, a metering function test unit, an instruction consistency test unit, an aggregated data consistency test unit, and a charge / discharge equipment instruction response deviation test unit. The adjustable charge / discharge function test unit is used to verify the accuracy of the charge / discharge data of the charging and discharging device based on the bidirectional charge / discharge mode control algorithm and / or constant power charge / discharge control algorithm, generate verification data and send it to the metering function test unit, the instruction consistency test unit and the aggregated acquisition data consistency test unit. The metering function test unit is used to verify the accuracy, timeliness, and precision of the charging and discharging adjustment of the charging and discharging equipment based on the verification data, generate verification results, and send them to the charging and discharging equipment command response deviation test unit. The instruction consistency test unit is used to check whether there are errors and / or delays in the scheduling instruction sending process based on the verification data. The aggregated data consistency test unit is used to verify whether the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data are consistent with the verification data. The charging and discharging equipment command response deviation test unit is used to determine the response speed and response accuracy of the charging and discharging equipment to the charging pile-level control command based on the verification results.
5. The system according to claim 2, characterized in that, The performance testing submodule includes: a power response delay test unit for charging and discharging equipment, a regulation capacity test unit for charging and discharging equipment, a regulation rate test unit for charging and discharging equipment, and a regulation accuracy test unit for charging and discharging equipment. The power response delay test unit of the charging and discharging equipment is used to obtain the response time required for the charging and discharging equipment to respond to the charging pile-level control command based on the bidirectional charging and discharging mode control algorithm and send it to the charging and discharging equipment adjustment rate test unit. The charging and discharging equipment adjustment capacity test unit is used to test, based on the constant power charging and discharging control algorithm, the maximum capacity adjustment range of electrical energy achieved by the charging and discharging equipment, the electric vehicle charging service platform, and the electric vehicle load aggregation system under ideal conditions, obtain the test results, and send them to the charging and discharging equipment adjustment accuracy test unit. The charging and discharging equipment adjustment rate test unit is used to test the response speed of the charging pile when it adjusts the charging and discharging based on the charging pile-level control command, based on the response time. The charging and discharging equipment adjustment accuracy test unit is used to verify the availability of the electric vehicle charging service platform in responding to the scheduling command based on the test results.
6. The system according to claim 1, characterized in that, The electric vehicle simulation module includes: a power battery simulation submodule, a vehicle controller simulation submodule, a communication and information interaction simulation submodule, and an environment and road condition simulation submodule; The power battery simulation submodule is used to simulate the battery capacity and charging efficiency of electric vehicles and send the data to the communication and information interaction simulation submodule. The vehicle controller simulation submodule is used to simulate the control logic and communication interface for charging the electric vehicle and send it to the communication and information interaction simulation submodule; the communication interface includes: a simulation interface that provides a communication protocol for the interaction between the electric vehicle and external devices; The environment and road condition simulation submodule is used to test the adaptability of electric vehicle performance to environmental and driving conditions, simulate the impact of the environment on the electric vehicle's battery and motor, obtain test simulation results, and send them to the communication and information interaction simulation submodule. The communication and information interaction simulation submodule is used to simulate the interaction process between the electric vehicle and the external device based on the battery capacity, the charging efficiency, the control logic, the communication interface, and the test simulation results, and to simulate the bidirectional interaction information between the electric vehicle and the power grid to generate electric vehicle simulation data; the bidirectional interaction information between the electric vehicle and the power grid includes: power scheduling and charging time optimization.
7. The system according to claim 1, characterized in that, The electric vehicle load aggregation system includes: a central control and scheduling module, a data acquisition and analysis module, a communication and interface module, an optimization and load allocation module, and an edge computing module; the central control and scheduling module, the data acquisition and analysis module, the optimization and load allocation module, and the edge computing module are connected to the communication and interface module. The data acquisition and analysis module is used to acquire the power grid simulation data, analyze the power grid simulation data using big data analysis tools, generate the power grid dispatch requirements of electric vehicles, and send them to the optimization and load allocation module. The optimization and load allocation module is used to collect the grid dispatching requirements and the status of the electric vehicles, generate a load allocation strategy based on the grid dispatching requirements and the status of the electric vehicles, and send it to the edge computing module. The edge computing module is used to generate charging pile-level computing tasks according to the load distribution strategy and send them to the central control and scheduling module. The central control and scheduling module is used to process the charging pile-level computing tasks using a distributed computing architecture and scheduling algorithm, and obtain the processing results; based on the processing results, it generates charging pile-level control instructions and sends them to the charging and discharging equipment.
8. A method for testing and verifying the grid-connected operation and control of an electric vehicle, employing the electric vehicle grid-connected operation and control testing and verification system as described in any one of claims 1-7, characterized in that, include: The power grid simulation module of the aforementioned testing system generates power grid simulation data by simulating a power grid with dynamic characteristics. The electric vehicle simulation module of the aforementioned testing system is used to simulate the battery capacity, charging efficiency, and control logic of electric vehicle charging, thereby generating electric vehicle simulation data. The charging pile simulation module of the aforementioned testing system is used to simulate a charging pile and generate charging pile simulation data. The monitoring and data acquisition module of the aforementioned testing system is used to collect the power grid simulation data, the electric vehicle simulation data, and the charging pile simulation data as operational data. The inspection and testing module of the aforementioned inspection and testing system, based on the operational data, loads a grid-connected control algorithm to conduct inspection and testing on the grid-connected operation and control of the electric vehicle, including: The inspection and testing module is used to load the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm to test the grid-connected operation and control of electric vehicles, and to verify the stability and response performance of the bidirectional charging and discharging mode control algorithm and / or the constant power charging and discharging control algorithm. The method further includes: The electric vehicle load aggregation system is used to acquire the power grid simulation data; based on the power grid simulation data, the power grid dispatching demand for electric vehicles is generated; based on the power grid dispatching demand, charging pile-level control instructions are generated. The power grid dispatching system is used to respond to the power grid dispatching needs of the electric vehicle; dispatching instructions are generated based on the power grid dispatching needs; The electric vehicle charging service platform is used to respond to the scheduling instructions; based on the scheduling instructions, a power dispatching system for electric vehicles is formed. The charging and discharging equipment is used to respond to the charging pile-level control command; according to the charging pile-level control command, the charging pile is controlled, and the charging and discharging of the electric vehicle is adjusted according to the power dispatch of the electric vehicle.
Citation Information
Patent Citations
Electric vehicle charging load participation power grid interactive simulation method and system
CN114006390A
Grid interactive simulator for electric vehicle
KR1020130046334A