Sealing waterproof treatment equipment for mounting prefabricated building component and use method of sealing waterproof treatment equipment

By designing sealed waterproofing treatment equipment for installation of prefabricated building components, and using mechanized components to achieve automatic application and smoothing of waterproof glue, the problem of manual application increasing labor intensity and difficulty in applying gaps at high places is solved, and the efficiency and safety of waterproofing treatment are improved.

CN120291731APending Publication Date: 2025-07-11CHINA COAL JIANGNAN MUNICIPAL CONSTR (GUANGDONG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510560913.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-30
Publication Date
2025-07-11

AI Technical Summary

Technical Problem

In the prior art, the application of waterproof glue at the connections of prefabricated building components mainly relies on manual operations, which increases the labor intensity of workers and makes it difficult to efficiently apply high-level gaps, affecting the efficiency of waterproofing treatment.

Method used

A sealed waterproof treatment equipment for installation of prefabricated building components is designed, including supporting base, universal wheel, rotating rod, motor-driven threaded screw and scraper, etc., to apply and smooth waterproof glue through mechanization to reduce manual operation.

Benefits of technology

It reduces the labor intensity of workers and improves the efficiency of waterproofing treatment, especially effectively applying high gaps, improving the quality and safety of waterproofing treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120291731A_ABST
    Figure CN120291731A_ABST
Patent Text Reader

Abstract

The invention discloses sealing waterproof treatment equipment for prefabricated building component installation and a using method thereof, and belongs to the technical field of sealing waterproof treatment.The sealing waterproof treatment equipment comprises a supporting base, a supporting stand column is fixedly connected to the supporting base, a plurality of universal wheels are installed below the supporting base, and a rotating rod is rotationally connected to the supporting base; and the rotating rod is fixedly connected with a holding rod. According to the waterproof glue leveling device, a rotating curved push rod pushes a cross plate to slide on a supporting plate in a reciprocating mode, then an electric push rod is started to push a brush plate, the brush plate makes contact with a building wall, and therefore waterproof glue at gaps is leveled, a first motor can drive a threaded lead screw to rotate, and a guide sleeve is in threaded fit with the threaded lead screw; and the mounting plate can move in the guide sliding groove along the threaded lead screw, the mounting plate is promoted to drive the brush plate to ascend and descend, so that gaps at high positions are smeared, the labor intensity of workers is relieved, and the waterproof treatment efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of sealing and waterproof treatment, and specifically relates to a sealing and waterproof treatment device for prefabricated building component installation and its usage method. Background Art

[0002] Prefabricated building components refer to building structural components prefabricated in a factory, such as beams, walls, slabs, columns, etc. These components have the characteristics of standardization and modularization and can be assembled as needed to form a complete building structure. The main types of prefabricated components include concrete prefabricated components, steel prefabricated components, and wooden prefabricated components, etc. Prefabricated building components are widely used in residential buildings, commercial buildings, public buildings, and factory workshops and other fields.

[0003] When splicing prefabricated building walls, gaps are inevitably generated at the joints. At this time, workers need to carry out waterproof treatment, which includes applying waterproof glue. Usually, the application of waterproof glue is carried out manually, which increases the labor intensity of workers, and it is also difficult for manual labor to apply to the gaps at high places, thus affecting work efficiency. Summary of the Invention

[0004] In order to overcome the above defects, the present invention provides a sealing and waterproof treatment device for prefabricated building component installation and its usage method, which solves the problem that the application of waterproof glue is usually carried out manually, which increases the labor intensity of workers, and it is also difficult for manual labor to apply to the gaps at high places, thus affecting the waterproof treatment efficiency.

[0005] To achieve the above object, the present invention provides the following technical solution: A sealing and waterproof treatment device for prefabricated building component installation, including a support base, a support column is fixedly connected to the support base, a plurality of universal wheels are installed below the support base, a rotating rod is rotatably connected to the support base, a grip rod is fixedly connected to the rotating rod, support legs are fixedly connected to both ends of the rotating rod, a special-shaped strip is fixedly connected to the rotating rod, a guiding chute is opened on the support column, and a first motor is fixedly installed above the support column;

[0006] The output shaft of the first motor is connected to a threaded lead screw, an installation plate is installed on the threaded lead screw, a guiding sleeve is connected to the installation plate, a connecting plate is fixedly connected below the installation plate, a storage tank is fixedly installed on the installation plate, a filling pipe is fixedly connected to one side above the storage tank, a pump body is installed below the storage tank, the storage tank is connected to a discharge pipe through the pump body, and a second motor is fixedly installed above the storage tank;

[0007] The output shaft of the second motor is connected to a rotating rod, a scraping plate is fixedly connected to the rotating rod, a third motor is fixedly installed on the connecting plate, support plates are fixedly connected to both sides of the connecting plate, a cross plate is slidably connected to the support plates, electric push rods are fixedly connected to both sides of the cross plate, a brush plate is fixedly connected to the movable end of the electric push rod, and a curved push rod is connected to the output shaft of the third motor.

[0008] As a further solution of the present invention: There are two support bases in total, which are respectively fixedly connected to both sides of the support column. There are four universal wheels in total, which are evenly distributed in a rectangular array below the two support bases. An anti-slip rubber layer is provided on the outer contour of the universal wheels.

[0009] As a further solution of the present invention: A strip-shaped groove is provided on the cross plate, the strip-shaped groove is vertically arranged on the cross plate, one end of the curved push rod slides in the strip-shaped groove, and bristles are provided above, below and on the side away from the electric push rod of the brush plate.

[0010] As a further solution of the present invention: The scraping plate is integrally designed in a U shape, and the scraping plate is in close contact with the inner wall of the storage tank. A plurality of stirring plates are fixedly connected to the inner side of the scraping plate, the stirring plates are inclined, and the rotating rod is rotatably connected to the storage tank.

[0011] As a further solution of the present invention: A connection through hole is provided on the mounting plate, the threaded lead screw is rotatably connected in the guiding chute, and the guiding sleeve is in threaded cooperation with the threaded lead screw.

[0012] As a further solution of the present invention: Two guiding rods are fixedly connected in the guiding chute, the two guiding rods are distributed on both sides of the threaded lead screw, and the guiding rods are in sliding cooperation with the connection through hole.

[0013] As a further solution of the present invention: The support legs are connected to the rotating rod at an angle of 45° in the vertical direction, and rubber pads are connected to the support legs. A jack is provided on the support base. The special-shaped strip is designed in a C shape and one end is connected with a rubber block, and the rubber block is inserted into the jack.

[0014] A use method of a sealing and waterproof treatment device for prefabricated building component installation, the use method includes the following steps:

[0015] The staff fills the waterproof glue into the storage tank through the filler pipe. At this time, the second motor drives the rotating rod to rotate, so that the rotating rod drives the scraper to rotate in the storage tank, prompting the multiple stirring plates on the scraper to stir the waterproof glue in the storage tank. The scraper in contact with the inner wall of the storage tank can scrape off the waterproof glue sticking to the inner wall of the storage tank during rotation, thus avoiding residue waste. Then, the staff rolls the support column to the connection of two prefabricated building walls through the grip rod and the universal wheels. When moving to the working position, the staff rotates the rotating rod downward through the grip rod;

[0016] At this time, the rotating rod drives the support leg and the special-shaped strip to rotate together, so that the rubber block at one end of the special-shaped strip disengages from the jack, and prompts the support leg to contact the ground, so that the support leg cooperates with the universal wheel to support and fix the support base. The operation is simple and convenient. When working, start the pump body, and use the discharge pipe to spray the waterproof glue in the storage tank to the connection of two building walls. Then, start the first motor to drive the threaded lead screw to rotate, so that the mounting plate moves up and down along the threaded lead screw in the guiding chute through the threaded fit of the guiding sleeve and the threaded lead screw, so as to adjust the working height to smear the high gaps. When the mounting plate moves;

[0017] Start the electric push rod to push the brush plate, so that the brush plate contacts the building wall. The third motor can drive the curved push rod to rotate. One end of the rotating curved push rod slides in the strip groove and pushes the cross plate, prompting the cross plate to slide back and forth horizontally on the support plate. The cross plate can drive the brush plate to move synchronously, and then the sprayed waterproof glue is leveled by the brush plate, so that the waterproof glue is smeared more evenly.

[0018] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0019] 1. In the present invention, by setting the threaded lead screw, guiding sleeve, mounting plate, support plate, cross plate, strip groove, curved push rod, electric push rod and brush plate, the staff starts the third motor to drive the curved push rod to rotate, prompting one end of the curved push rod to slide in the strip groove. As the curved push rod rotates, the cross plate is pushed by the curved push rod, prompting the cross plate to slide back and forth horizontally on the support plate. The sliding cross plate can drive the brush plate to move synchronously. Then, start the electric push rod to push the brush plate, so that the brush plate contacts the building wall, so as to level the waterproof glue at the gap. The first motor can drive the threaded lead screw to rotate. Using the threaded fit of the guiding sleeve and the threaded lead screw, the mounting plate can move along the threaded lead screw in the guiding chute, prompting the mounting plate to drive the brush plate to move up and down, so as to smear the high gaps, reducing the labor intensity of workers and improving the efficiency of waterproof treatment.

[0020] 2. In the present invention, by providing universal wheels, rotating rods, gripping rods, support legs, special-shaped strips, rubber pads, rubber blocks and jacks, when it is necessary to fix the position of the support base, the staff can push the gripping rod downward to cause the rotating rod to rotate. As the rotating rod rotates, the support legs will gradually come into contact with the ground, and the rubber pads will be squeezed until they fit the ground, so that the support legs can support and position the support base to prevent the support base from sliding accidentally. When it is necessary to move, by pushing the gripping rod upward, the support legs are made to move away from the ground. At this time, the rotating rod will drive the special-shaped strip to rotate, causing the rubber block to be inserted into the jack, thereby fixing the rotating rod to prevent the support legs from rotating when moving the support base.

[0021] 3. In the present invention, by providing a second motor, a rotating rod, a scraping plate and a stirring plate, the staff can start the second motor, and the second motor drives the scraping plate to rotate through the rotating rod. As the scraping plate rotates, the multiple stirring plates on the scraping plate can stir the waterproof glue in the storage tank to keep the waterproof glue flowing, and the scraping plate in contact with the inner wall of the storage tank can scrape off the waterproof glue adhering to the inner wall of the storage tank during rotation, thus avoiding residue and waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a schematic diagram of the three-dimensional structure of the present invention;

[0023] Figure 2 is a schematic diagram of the three-dimensional structure of the support base of the present invention;

[0024] Figure 3 is a schematic diagram of the cross-sectional structure of the support column of the present invention;

[0025] Figure 4 is a schematic diagram of the cross-sectional structure of the mounting plate and the storage tank of the present invention;

[0026] Figure 5 is a schematic diagram of the three-dimensional structure of the cross plate of the present invention;

[0027] Figure 6 is a schematic diagram of the three-dimensional structure of the rotating rod of the present invention;

[0028] In the figure: 1. Support base; 2. Support column; 3. Universal wheel; 4. Rotating rod; 5. Gripping rod; 6. Support leg; 7. Special-shaped strip; 8. Guide chute; 9. First motor; 10. Threaded lead screw; 11. Mounting plate; 12. Guide sleeve; 13. Connecting plate; 14. Storage tank; 15. Filler pipe; 16. Pump body; 17. Discharge pipe; 18. Second motor; 19. Rotating rod; 20. Scraping plate; 21. Third motor; 22. Support plate; 23. Cross plate; 24. Electric push rod; 25. Brush plate; 26. Curved push rod; 27. Strip-shaped groove; 28. Stirring plate; 29. Connecting through hole; 30. Guide rod; 31. Rubber pad; 32. Jack; 33. Rubber block. Specific embodiments

[0029] The technical solution of the present application will be further described in detail below in conjunction with specific embodiments.

[0030] As Figures 1-6 shown, the present invention provides a technical solution: a sealing and waterproof treatment device for installing prefabricated building components, including a support base 1, a support column 2 fixedly connected to the support base 1, and a plurality of universal wheels 3 installed below the support base 1. There are two support bases 1 in total, which are respectively fixedly connected to both sides of the support column 2. There are four universal wheels 3 in total, which are evenly distributed in a rectangular array below the two support bases 1. An anti-slip rubber layer is provided on the outer contour of the universal wheels 3. By rolling the universal wheels 3, it is convenient for the staff to push the support base 1, so that the support base 1 can be moved to the working position, improving the flexibility and practicability of use. Moreover, the anti-slip rubber layer on the outer contour of the universal wheels 3 can increase the contact friction with the ground and prevent accidental sliding during work.

[0031] A rotating rod 4 is rotatably connected to the support base 1. A grip rod 5 is fixedly connected to the rotating rod 4. Support legs 6 are fixedly connected to both ends of the rotating rod 4. A special-shaped strip 7 is fixedly connected to the rotating rod 4. The support legs 6 are connected to the rotating rod 4 at an angle of 45° in the vertical direction, and a rubber pad 31 is connected to the support legs 6. A jack 32 is opened on the support base 1. The special-shaped strip 7 is designed in a C shape and one end is connected with a rubber block 33. The rubber block 33 is inserted into the jack 32. By rotating the rotating rod 4 through the grip rod 5, during the process of the rubber block 33 being inserted into the jack 32, the rubber block 33 will be extruded and deformed, so that when it enters the jack 32, it will be in close contact with the inner wall of the jack 32, thereby fixing the rotating rod 4 and preventing the rotating rod 4 from accidentally rotating when the support base 1 is pushed to move, and avoiding the support legs 6 contacting the ground and affecting the movement.

[0032] A guiding chute 8 is opened on the support column 2. Two guiding rods 30 are fixedly connected in the guiding chute 8. The two guiding rods 30 are distributed on both sides of the threaded screw rod 10. The guiding rods 30 are slidably matched with the connecting through holes 29. Through the connecting through holes 29, the mounting plate 11 can slide along the guiding rods 30. Thus, when the threaded screw rod 10 rotates and the mounting plate 11 moves, the two guiding rods 30 can guide, so that the mounting plate 11 can move smoothly in the guiding chute 8 and avoid sliding deviation.

[0033] Above the support column 2, a first motor 9 is fixedly installed. The output shaft of the first motor 9 is connected to a threaded lead screw 10. An installation plate 11 is installed on the threaded lead screw 10. A guide sleeve 12 is connected to the installation plate 11. A connection through hole 29 is provided on the installation plate 11. The threaded lead screw 10 is rotatably connected in the guide chute 8. The guide sleeve 12 is in threaded cooperation with the threaded lead screw 10. By rotating the threaded lead screw 10 with the first motor 9, the installation plate 11 can move along the direction of the threaded lead screw 10 through the guide sleeve 12, so as to adjust the working height and apply waterproof glue to the connection gap at a high place, without the need for workers to climb to high places, improving the safety of the work.

[0034] A connecting plate 13 is fixedly connected below the installation plate 11. A storage tank 14 is fixedly installed on the installation plate 11. One side above the storage tank 14 is fixedly connected with a filler pipe 15. A pump body 16 is installed below the storage tank 14. The storage tank 14 is connected with a discharge pipe 17 through the pump body 16. A second motor 18 is fixedly installed above the storage tank 14. The output shaft of the second motor 18 is connected to a rotating rod 19. A scraping plate 20 is fixedly connected to the rotating rod 19. The scraping plate 20 is integrally designed in a U shape, and the scraping plate 20 is in close contact with the inner wall of the storage tank 14. A plurality of stirring plates 28 are fixedly connected to the inner side of the scraping plate 20. The stirring plates 28 are inclined. The rotating rod 19 is rotatably connected to the storage tank 14. By rotating the rotating rod 19 with the second motor 18, the scraping plate 20 can scrape off the waterproof glue sticking to the inner wall of the storage tank 14, avoiding the residue of the waterproof glue and reducing waste. The stirring plates 28 rotating with the scraping plate 20 can stir the waterproof glue to keep the waterproof glue flowing.

[0035] A third motor 21 is fixedly installed on the connecting plate 13. Support plates 22 are fixedly connected to both sides of the connecting plate 13. A cross plate 23 is slidably connected to the support plates 22. A strip-shaped groove 27 is provided on the cross plate 23. The strip-shaped groove 27 is vertically arranged on the cross plate 23. One end of a curved push rod 26 slides in the strip-shaped groove 27. Brush hairs are provided above, below and on the side away from the electric push rod 24 of the brush plate 25. Electric push rods 24 are fixedly connected to both sides of the cross plate 23. The movable ends of the electric push rods 24 are fixedly connected to a brush plate 25. The output shaft of the third motor 21 is connected to a curved push rod 26. By rotating the curved push rod 26 with the third motor 21, the curved push rod 26 is urged to push the cross plate 23 to slide back and forth, so as to drive the brush plate 25 to move through the cross plate 23, enabling the brush plate 25 to smooth the waterproof glue at the gap, so that the waterproof glue is applied more evenly to improve the sealing and waterproof effect.

[0036] A usage method of a sealing and waterproof treatment device for prefabricated building component installation, the usage method includes the following steps:

[0037] The staff fills the waterproof glue into the storage tank 14 through the filling pipe 15. At this time, the second motor 18 drives the rotating rod 19 to rotate, so that the rotating rod 19 drives the scraper 20 to rotate in the storage tank 14, prompting the multiple stirring plates 28 on the scraper 20 to stir the waterproof glue in the storage tank 14. The scraper 20 in contact with the inner wall of the storage tank 14 can scrape off the waterproof glue adhering to the inner wall of the storage tank 14 during rotation, thus avoiding residue and waste. Then, the staff rolls the support column 2 to the connection of the two prefabricated building walls through the grip rod 5 and the universal wheels 3. When moving to the working position, the staff rotates the rotating rod 4 downward through the grip rod 5;

[0038] At this time, the rotating rod 4 drives the support leg 6 and the special-shaped strip 7 to rotate together, so that the rubber block 33 at one end of the special-shaped strip 7 disengages from the jack 32, and prompts the support leg 6 to contact the ground, so that the support leg 6 cooperates with the universal wheels 3 to support and fix the support base 1. The operation is simple and convenient. When working, start the pump body 16, and use the discharge pipe 17 to spray and squeeze the waterproof glue in the storage tank 14 to the connection of the two building walls. Then, start the first motor 9 to drive the threaded lead screw 10 to rotate, so that the mounting plate 11 moves up and down along the threaded lead screw 10 in the guiding chute 8 through the threaded fit of the guiding sleeve 12 and the threaded lead screw 10, so as to adjust the working height to apply to the high gap. When the mounting plate 11 moves;

[0039] By starting the electric push rod 24 to push the brush plate 25, the brush plate 25 contacts the building wall. The third motor 21 can drive the curved push rod 26 to rotate. One end of the rotating curved push rod 26 slides in the strip-shaped groove 27 and pushes the cross plate 23, prompting the cross plate 23 to slide back and forth horizontally on the support plate 22. The cross plate 23 can drive the brush plate 25 to move synchronously, and then level the sprayed waterproof glue through the brush plate 25, so that the waterproof glue is applied more evenly.

[0040] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation to the present invention.

[0041] In addition, the terms "first" and "second" are for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present invention, "a plurality of" means two or more unless otherwise specifically defined.

[0042] In the present invention, unless otherwise clearly defined and limited, terms such as "mounted", "connected", "coupled", "fixed", etc. shall be construed in a broad sense. For example, it may be a fixed connection, a detachable connection, or integrated; it may be a mechanical connection, an electrical connection, or a communication connection; it may be directly connected, or indirectly connected through an intermediate medium, and may be the internal communication of two components or the interaction relationship between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] In the present invention, unless otherwise clearly defined and limited, the first feature being "on" or "under" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to terms such as "one solution", "some solutions", "example", "specific example", or "some examples", etc. means that the specific features, structures, materials, or characteristics described in connection with the solution or example are included in at least one solution or example of the present invention. In this specification, the schematic descriptions of the above terms do not necessarily refer to the same solution or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in a suitable manner in any one or more solutions or examples.

Claims

1. A sealing and waterproof treatment device for the installation of prefabricated building components, comprising a support base (1), characterized in that: A support base (1) is fixedly connected with a support column (2). A plurality of universal wheels (3) are installed below the support base (1). A rotating rod (4) is rotatably connected to the support base (1). A grip rod (5) is fixedly connected to the rotating rod (4). Support legs (6) are fixedly connected to both ends of the rotating rod (4). A special-shaped strip (7) is fixedly connected to the rotating rod (4). A guiding chute (8) is formed on the support column (2). A first motor (9) is fixedly installed above the support column (2). The output shaft of the first motor (9) is connected with a threaded lead screw (10). A mounting plate (11) is installed on the threaded lead screw (10). A guiding sleeve (12) is connected to the mounting plate (11). A connecting plate (13) is fixedly connected below the mounting plate (11). A storage tank (14) is fixedly installed on the mounting plate (11). A filling pipe (15) is fixedly connected to one side above the storage tank (14). A pump body (16) is installed below the storage tank (14). The storage tank (14) is connected with a discharge pipe (17) through the pump body (16). A second motor (18) is fixedly installed above the storage tank (14). The output shaft of the second motor (18) is connected with a rotating rod (19). A scraper (20) is fixedly connected to the rotating rod (19). A third motor (21) is fixedly installed on the connecting plate (13). Support plates (22) are fixedly connected to both sides of the connecting plate (13). A cross plate (23) is slidably connected to the support plates (22). Electric push rods (24) are fixedly connected to both sides of the cross plate (23). A brush plate (25) is fixedly connected to the movable end of the electric push rod (24). The output shaft of the third motor (21) is connected with a curved push rod (26).

2. The sealing and waterproof treatment equipment for prefabricated building component installation according to claim 1, characterized in that: There are two support bases (1) respectively fixedly connected to both sides of the support column (2). There are four universal wheels (3) evenly distributed in a rectangular array below the two support bases (1). An anti-slip rubber layer is provided on the outer contour of the universal wheels (3).

3. A sealing and waterproof treatment device for prefabricated building component installation according to claim 1, characterized in that: A strip-shaped groove (27) is formed on the cross plate (23). The strip-shaped groove (27) is vertically arranged on the cross plate (23). One end of the curved push rod (26) slides in the strip-shaped groove (27). Brush hairs are provided above, below and on the side away from the electric push rod (24) of the brush plate (25).

4. A sealing and waterproofing treatment device for prefabricated building component installation according to claim 1, characterized in that: The scraper (20) is designed in an overall U shape and is in close contact with the inner wall of the storage tank (14). A plurality of stirring plates (28) are fixedly connected to the inner side of the scraper (20). The stirring plates (28) are designed to be inclined. The rotating rod (19) is rotatably connected to the storage tank (14).

5. A sealing and waterproofing treatment device for prefabricated building component installation according to claim 1, characterized in that: A connecting through hole (29) is formed on the mounting plate (11). The threaded lead screw (10) is rotatably connected in the guiding chute (8). The guiding sleeve (12) is in threaded cooperation with the threaded lead screw (10).

6. The sealing and waterproof treatment equipment for prefabricated building component installation according to claim 5, characterized in that: Two guide rods (30) are fixedly connected inside the guiding chute (8). The two guide rods (30) are distributed on both sides of the threaded lead screw (10), and the guide rods (30) are in sliding fit with the connecting through holes (29).

7. A sealing and waterproofing treatment device for prefabricated building component installation according to claim 1, characterized in that: The support leg (6) is connected to the rotating rod (4) at an angle of 45° in the vertical direction, and a rubber pad (31) is connected to the support leg (6). A jack (32) is formed on the support base (1). The special-shaped strip (7) is designed in a C shape and a rubber block (33) is connected to one end. The rubber block (33) is inserted into the jack (32).

8. A method of using a sealing and waterproofing treatment device for installing precast building components, according to any one of claims 1-7, a sealing and waterproofing treatment device for installing precast building components, characterized in that: The usage method includes the following steps: The staff fills the waterproof glue into the storage tank (14) through the filler pipe (15). At this time, the second motor (18) drives the rotating rod (19) to rotate, so that the rotating rod (19) drives the scraper (20) to rotate in the storage tank (14), prompting the multiple stirring plates (28) on the scraper (20) to stir the waterproof glue in the storage tank (14). The scraper (20) in contact with the inner wall of the storage tank (14) can scrape off the waterproof glue sticking to the inner wall of the storage tank (14) during rotation, thus avoiding residue and waste. Then, the staff rolls the support column (2) towards the joint of the two prefabricated building walls through the grip rod (5) and the universal wheels (3). When moving to the working position, the staff rotates the rotating rod (4) downward through the grip rod (5); At this time, the rotating rod (4) drives the support leg (6) and the special-shaped strip (7) to rotate together, causing the rubber block (33) at one end of the special-shaped strip (7) to disengage from the jack (32), and prompting the support leg (6) to contact the ground, so that the support leg (6) cooperates with the universal wheels (3) to support and fix the support base (1). The operation is simple and convenient. When working, the pump body (16) is started, and the waterproof glue in the storage tank (14) is sprayed and extruded to the joint of the two building walls through the discharge pipe (17). Then, the first motor (9) is started to drive the threaded lead screw (10) to rotate, so that the mounting plate (11) moves up and down along the threaded lead screw (10) in the guiding chute (8) through the threaded fit between the guiding sleeve (12) and the threaded lead screw (10), thereby adjusting the working height to smear the high gap. When the mounting plate (11) moves; The electric push rod (24) is started to push the brush plate (25) so that the brush plate (25) contacts the building wall. The third motor (21) can drive the curved push rod (26) to rotate. One end of the rotating curved push rod (26) slides in the strip-shaped groove (27) and pushes the cross plate (23), prompting the cross plate (23) to slide reciprocally in the horizontal direction on the support plate (22). The cross plate (23) can drive the brush plate (25) to move synchronously, and then the sprayed waterproof glue is leveled through the brush plate (25), so that the waterproof glue is smeared more evenly.