A prefabricated ecological bamboo foundation for garden landscape and its construction method
By using a combination of long bamboo tubes, short bamboo tubes, and positioning ribs in prefabricated buildings for garden landscapes, and wrapping them with FRP fabric to form a through-hole pattern, the problem of concrete use damaging the ecosystem is solved, achieving the effect of reducing concrete usage and enhancing building stability.
Patent Information
- Application Number
- CN202510630632.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-16
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2045-05-16
AI Technical Summary
The extensive use of concrete in prefabricated buildings for garden landscapes is detrimental to vegetation growth, damages the original ecosystem, and is not conducive to optimizing the garden landscape, thus reducing the overall aesthetic experience.
It adopts a combination structure of long bamboo tube body, short bamboo tube body and positioning ribs, with FRP cloth wrapped on the outer wall and a through-type pattern formed by long screws. Combined with positioning ribs and cast iron fasteners, it uses grip bolts and tie bolts to resist pull-out and settlement, reduce concrete usage, and enhance corrosion resistance and stability.
It effectively reduces concrete usage, protects the ecosystem, improves the vegetation growth environment, enhances the building's resistance to uplift and settlement, and improves the aesthetic experience.
Smart Images

Figure CN120384541B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of prefabricated buildings, specifically to a prefabricated ecological bamboo foundation for garden landscapes and its construction method. Background Technology
[0002] Landscape architecture refers to the creation of a spatial environment with aesthetic, ecological, and functional value through the transformation of the natural environment and the design of artificial facilities. It involves the organic combination of elements such as plants, topography, water bodies, architecture, and decoration, aiming to create a natural or artificial environment that is both beautiful and practical. Most landscape architecture adopts prefabricated construction, which is a construction method in which building components (such as wall panels, floor slabs, beams, and columns) are prefabricated in a factory and then transported to the construction site for assembly. Compared with traditional cast-in-place construction, this method has multiple advantages such as high efficiency, energy saving, and environmental protection.
[0003] However, when prefabricated buildings are applied in garden landscapes, a large amount of concrete is required during the conversion process. Traditional foundation concrete is used in large quantities and is poured on-site, which is not friendly to the surrounding environment, is not conducive to vegetation growth, and damages the original ecosystem. On-site pouring is time-consuming, greatly affected by the weather, and relatively difficult to demolish. After demolition, a large amount of construction waste will be generated. Furthermore, the large amount of concrete used is not conducive to the optimization of garden landscapes and reduces the overall viewing experience.
[0004] In conclusion, the extensive use of concrete in the aforementioned structures during actual use is detrimental to vegetation growth, damages the original ecosystem, and is also detrimental to the optimization of the garden landscape, reducing the overall aesthetic experience. Summary of the Invention
[0005] Based on this, the purpose of this invention is to provide a prefabricated ecological bamboo foundation for garden landscapes and its construction method, so as to solve the technical problems that the extensive use of concrete is not conducive to vegetation growth, damages the original ecosystem, and is not conducive to the optimization of garden landscapes, thus reducing the overall viewing experience.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a prefabricated ecological bamboo foundation for garden landscape, comprising a long bamboo tube body, a short bamboo tube body and positioning ribs, wherein the positioning ribs are located inside the long bamboo tube body, the outer walls of the long bamboo tube body and the short bamboo tube body are wrapped with FRP cloth, and through-holes are made on both the long bamboo tube body and the short bamboo tube body, and long screws are installed through the holes to form a special through-hole pattern;
[0007] The bottom end of the outer wall of the positioning rib is symmetrically provided with slots, wherein the slots extend to the top of the long bamboo tube body, and the outer wall of the positioning rib is wrapped with multiple sets of steel binding wires at the slots.
[0008] By adopting the above technical solution, the FRP fabric itself has strong corrosion resistance, which can resist the erosion of groundwater on the long bamboo tube body and the short bamboo tube body. At the same time, the gaps between the FRP fabric, the long bamboo tube body and the short bamboo tube body are filled with filler to extend the corrosion resistance of the bamboo tube. Then, a long screw is inserted and tightened to form a special through-hole pattern, which plays a basic role in resisting pull-out and settlement of the entire device. When the concrete expands due to thermal expansion and contraction or water evaporation, the positioning ribs deform inward through the grooves, effectively preventing stress from being released outward and thus preventing the long bamboo tube body from cracking.
[0009] The invention is further configured such that the bottom end of the long bamboo tube body is connected to a pile tube, wherein the outer wall of the pile tube is provided with a first bolt hole and a first through hole respectively, and a cast iron fastener is detachably provided inside the pile tube by a positioning rib. The cast iron fastener is provided with a second bolt hole that mates with the first through hole, and an array of gripping bolts is provided on the outer wall of the cast iron fastener, with the other end of the gripping bolt penetrating the pile tube.
[0010] Preferably, the cast iron fastener is inserted into the pile pipe using positioning ribs, aligning the second bolt hole on the cast iron fastener with the first through hole. Then, workers insert one end of each gripping bolt through the first through hole and fix it to the second bolt hole on the cast iron fastener using a threaded connection. Viewed from above, the gripping bolts form a cross pattern. The prepared pile pipe is then driven into the ground by a machine until the gripping bolts touch the ground. Finally, the long bamboo tube body is inserted into the pile and tie bolts are inserted. During this process, the gripping bolts contribute to the overall foundation's pull-out and settlement resistance, thus improving the overall practicality of the device.
[0011] The invention is further configured such that a tie bolt is provided on the outer wall of the pile pipe at the first bolt hole, wherein the long bamboo tube body and the short bamboo tube body are provided with openings for the tie bolt to pass through.
[0012] Preferably, the tie bolts ensure the stability of the long bamboo tube body inside the pile pipe, effectively preventing the long bamboo tube body from shifting position inside the pile pipe, and the tie bolts also fix the connection between the pile pipe and the long bamboo tube body.
[0013] The present invention is further configured such that an inner groove is provided at the middle position of the cast iron fastener, and a second through hole that cooperates with the positioning rib is opened in the inner groove. A positioning steel pipe is detachably provided at the top of the second through hole, wherein the outer diameter of the positioning steel pipe is larger than the inner diameter of the second through hole.
[0014] Preferably, the cast iron fastener can be fitted onto the outer wall of the positioning rib through the second through hole. After installing a set of gripping bolts, the worker can fit the positioning steel pipe onto the positioning rib. Since the outer diameter of the positioning steel pipe is larger than the inner diameter of the second through hole, the positioning steel pipe will remain in the inner groove at the top of the cast iron fastener. At this time, the worker can fit another set of cast iron fasteners onto the outer wall of the positioning rib. At this time, the top of the positioning steel pipe will support the bottom of the cast iron fastener. Then, the worker can install the second set of gripping bolts. During this process, the setting of multiple sets of gripping bolts improves the pull-out resistance and settlement resistance of the foundation where the pile pipe is located inside the soil.
[0015] The present invention is further configured such that the outer wall of the FRP fabric is provided with a nut that cooperates with the long screw, and the nut contacts the outer wall of the FRP fabric.
[0016] Preferably, the nut facilitates the limiting of the upper screw, and at the same time, it works in conjunction with the long bamboo tube body and the short bamboo tube body to limit and compress the FRP cloth, preventing the FRP cloth from becoming loose on the outer wall of the long bamboo tube body and the short bamboo tube body.
[0017] The present invention is further configured such that there is a gap between the steel binding wires, and the gap is smaller than the outer diameter of the concrete particles being poured.
[0018] Preferably, when workers pour concrete into the long bamboo tube, the gaps between the steel wires can effectively prevent concrete from seeping into the inner wall of the positioning reinforcement, ensuring that the positioning reinforcement can release stress inward when the concrete expands.
[0019] The present invention is further configured such that the contact surface between the inner wall of the second through hole and the outer wall of the positioning rib is smooth.
[0020] Preferably, the smooth surface reduces the sliding friction between the second through hole and the positioning rib, ensuring that the cast iron fastener can slide stably inward. This process prevents the cast iron fastener from tilting inside the pile pipe, ensuring the normal installation and connection of the subsequent gripping bolts.
[0021] The present invention is further configured such that a blocking block is provided at the bottom end of the positioning rib, and the blocking block itself is threadedly connected to the bottom of the positioning rib.
[0022] Preferably, the blocking block prevents the cast iron fasteners inside the pile pipe from falling off, ensuring the stability of the cast iron fasteners inside the pile pipe.
[0023] The present invention is further configured such that both the first through hole and the second bolt hole are inclined downwards.
[0024] Preferably, the inclined rural setting facilitates the precision of the connection between the gripping bolts and the soil when the pile pipe is driven into the ground, further ensuring that the device as a whole plays a role in resisting pull-out and settlement.
[0025] A construction method for prefabricated ecological bamboo foundations used in garden landscapes includes the following steps:
[0026] Step 1: The staff arranges the long bamboo tube and the short bamboo tube according to the pre-set position, then wraps the outer wall with FRP cloth, inserts long screws and tightens them with nuts to form a special through-through pattern.
[0027] Step 2: The staff then inserts the positioning ribs into the long bamboo tube body to facilitate the connection of the subsequent upper structure, and pours concrete into the long bamboo tube body. At the same time, the gaps between the FRP cloth, the long bamboo tube body and the short bamboo tube body are filled with filler. After the internal concrete and filler form a reliable solid, the production is completed.
[0028] Step 3: The staff buried the entire device in the soil, with the pre-buried height higher than the short bamboo tube body. Then, the staff backfilled the soil and compacted it to completely bury the short bamboo tube body.
[0029] By adopting the above technical solution, the outer walls of the long and short bamboo tubes are wrapped with FRP cloth, which has strong corrosion resistance. This process greatly reduces the amount of concrete used, meeting the needs of modern ecological buildings. It can also effectively mitigate the environmental impact of traditional materials. Furthermore, the bamboo tubes are perforated and long screws are inserted and tightened to form a special perforation pattern, which plays a role in basic pull-out resistance and settlement resistance of the entire device.
[0030] In summary, the present invention has the following main beneficial effects:
[0031] 1. This invention arranges long and short bamboo tubes in a pre-set position, then wraps the outer walls of the long and short bamboo tubes with FRP cloth, which has strong corrosion resistance, can resist the erosion of groundwater by the long and short bamboo tubes, and can also enhance the overall load-bearing capacity and improve seismic performance. Then, positioning bars are placed inside the long bamboo tubes and filled with concrete. At the same time, the gaps between the FRP cloth, the long bamboo tubes and the short bamboo tubes are filled with filler to extend the corrosion resistance of the bamboo tubes. This process greatly reduces the amount of concrete used, meets the needs of modern ecological buildings, and can also effectively alleviate the environmental impact of traditional materials. Furthermore, the bamboo tubes are drilled through and long screws are inserted and tightened to form a special through-hole pattern, which plays a basic role in resisting pull-out and settlement of the entire device.
[0032] 2. This invention features symmetrical slots at the lower end of the outer wall of the positioning ribs, with multiple sets of steel wires wrapped around the outer wall of the slots. When concrete is poured into the long bamboo tube, heat may be generated during the curing process of the concrete. At this time, the volume of the concrete will expand due to thermal expansion and contraction or water evaporation, which will squeeze the internal positioning ribs. This causes the positioning ribs to deform inward through the slots, effectively preventing stress from being released outward and thus preventing the long bamboo tube from cracking. This improves the overall service life of the device.
[0033] 3. In this invention, the cast iron fastener is inserted into the pile pipe through a positioning rib, aligning the second bolt hole on the cast iron fastener with the first through hole. At this time, the workers pass one end of the gripping bolt through the first through hole one by one, and then fix it to the second bolt hole on the cast iron fastener by means of threaded connection. The gripping bolts form a cross arrangement when viewed from above. The prepared pile pipe is driven into the ground by a machine until the gripping bolt touches the ground. Then, the long bamboo tube body is inserted into the pile pipe and the tie bolt is inserted. During this process, the gripping bolt completes the overall function of the foundation to resist pull-out and anti-settlement, thereby improving the overall practicality of the device. Attached Figure Description
[0034] Figure 1 This is a schematic diagram of the structure in the conversion state of the present invention;
[0035] Figure 2 This is a schematic diagram of the positioning rib installation structure of the present invention;
[0036] Figure 3 This is a schematic diagram of the first assembly position structure of the long bamboo tube and the short bamboo tube of the present invention;
[0037] Figure 4 This is a sectional view of the positioning rib of the present invention in its installed state;
[0038] Figure 5 For the present invention Figure 4 Enlarged view of A in the middle;
[0039] Figure 6 This is a top view of the present invention;
[0040] Figure 7 This is a schematic diagram of the second assembly position structure of the long bamboo tube and the short bamboo tube of the present invention;
[0041] Figure 8 For the present invention Figure 7 Top view in the current state;
[0042] Figure 9 This is a schematic diagram of the structure of the second embodiment of the present invention;
[0043] Figure 10 This is a schematic diagram of the pile-pipe structure of the present invention;
[0044] Figure 11 This is a cross-sectional view of the pile pipe in the installation state of the positioning bar according to the present invention;
[0045] Figure 12 This is a perspective view of the cast iron fastener of the present invention;
[0046] Figure 13 This is a schematic diagram of the positioning rib structure in the second embodiment of the present invention;
[0047] Figure 14 For the present invention Figure 11 A magnified view of B in the middle.
[0048] Explanation of reference numerals in the attached figures:
[0049] 1. Long bamboo tube body; 2. Short bamboo tube body; 3. Positioning rib; 4. Long screw; 5. Nut; 6. FRP cloth; 7. Groove; 8. Steel tie wire; 9. Pile pipe; 10. Tie bolt; 11. Grounding bolt; 12. First bolt hole; 13. First through hole; 14. Cast iron fastener; 15. Inner groove; 16. Second bolt hole; 17. Second through hole; 18. Positioning steel pipe. Detailed Implementation
[0050] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0051] The embodiments of the present invention will now be described.
[0052] First embodiment:
[0053] Please see Figures 1-8 The invention illustrates a prefabricated ecological bamboo foundation for garden landscapes and its construction method. The foundation includes long bamboo tube bodies 1, short bamboo tube bodies 2, positioning ribs 3, connecting mechanisms, limiting mechanisms, and crack-prevention mechanisms. Workers arrange four sets of long bamboo tube bodies 1 to wrap around five sets of short bamboo tube bodies 2, forming a square arrangement from top to bottom with the bottoms at the same horizontal level. Then, FRP cloth 6 is wrapped around the outer walls of the long bamboo tube bodies 1 and short bamboo tube bodies 2. The FRP cloth 6 has strong corrosion resistance, preventing groundwater erosion of the long bamboo tube bodies 1 and short bamboo tube bodies 2, and also enhancing the overall load-bearing capacity and improving seismic performance. Simultaneously, through-holes are drilled in each long bamboo tube body 1 and short bamboo tube body 2, and long screws 4 are inserted through the long bamboo tube bodies 1 and short bamboo tube bodies 2, forming a special through-hole pattern that provides basic pull-out and anti-settlement protection for the entire device.
[0054] Subsequently, the staff inserted the positioning rib 3 into the long bamboo tube body 1 and poured concrete into it. Since grooves 7 are symmetrically cut at the bottom of the outer wall of the positioning rib 3, extending beyond the top of the long bamboo tube body 1, and multiple sets of steel wires 8 are wrapped around the outer wall of the positioning rib 3 at the grooves 7, the concrete may generate heat during its curing process. This expansion, due to thermal expansion and contraction or water evaporation, will compress the internal positioning rib 3, causing it to deform inwards through the grooves 7. This effectively prevents stress from being released outwards, thus preventing the long bamboo tube body 1 from cracking, and improves the overall service life of the device. Furthermore, filler material is injected into the gaps between the FRP cloth 6, the long bamboo tube body 1, and the short bamboo tube body 2 to extend the corrosion resistance of the bamboo tubes. This process significantly reduces the amount of concrete used, meeting the needs of modern ecological architecture and effectively mitigating the environmental impact of traditional materials.
[0055] For details regarding the above embodiments, please refer to [link / reference]. Figure 1 The outer wall of the FRP cloth 6 is provided with a nut 5 that cooperates with the long screw 4, and the nut 5 contacts the outer wall of the FRP cloth 6. Under the action of the nut 5, the long screw 4 is easily limited. At the same time, it cooperates with the long bamboo tube body 1 and the short bamboo tube body 2 to limit and squeeze the FRP cloth 6, preventing the FRP cloth 6 from becoming loose on the outer wall of the long bamboo tube body 1 and the short bamboo tube body 2.
[0056] For details regarding the above embodiments, please refer to [link / reference]. Figure 4 and Figure 5 A gap is provided between the steel binding wires 8, and the gap is smaller than the outer diameter of the concrete particles being poured. When the workers pour concrete into the long bamboo tube, the gap between the steel binding wires 8 can effectively prevent the concrete from penetrating into the inner wall of the positioning bar 3, ensuring that the positioning bar 3 can release stress inward when the concrete expands.
[0057] For details regarding the above embodiments, please refer to [link / reference]. Figure 7 and Figure 8 The long bamboo tube body 1 has three sets, while the short bamboo tube body 2 has four sets. The long bamboo tube body 1 is wrapped around the short bamboo tube body 2. This arrangement greatly reduces the installation of the long screw 4, lowers the overall installation cost, and ensures the stability between the long bamboo tube body 1 and the short bamboo tube body 2.
[0058] Second embodiment:
[0059] Please see Figures 9-14The above describes a prefabricated ecological bamboo foundation for garden landscape and its construction method. The overall structure is similar to that of Embodiment 1. The bamboo tube bundle is formed by arranging long bamboo tube body 1 and short bamboo tube body 2 and then wrapping it tightly with FRP cloth 6. In this embodiment, in addition to horizontal wrapping, there is also vertical cross wrapping. The short bamboo tube body 2 is located in the middle of the long bamboo tube body 1, which facilitates the subsequent insertion of the long bamboo tube body 1 and the pile tube 9. The bottom end of the long bamboo tube body 1 is connected to the pile tube 9. The outer wall of the pile tube 9 is provided with a first bolt hole 12 and a first through hole 13. The pile tube 9 is pre-drilled and a cast iron fastener 14 is detachably installed in the pile tube 9 through a positioning rib 3. In this embodiment, a blocking block is provided at the bottom end of the positioning rib 3, and the blocking block itself is threaded at the bottom of the positioning rib 3. The setting of the blocking block prevents the cast iron fastener 14 in the pile tube 9 from falling off, ensuring the stability of the cast iron fastener 14 in the pile tube 9.
[0060] A second bolt hole 16 is provided on the cast iron fastener 14 to mate with the first through hole 13. At the same time, an array of gripping bolts 11 are provided on the outer wall of the cast iron fastener 14, and the other end of the gripping bolt 11 passes through the pile tube 9. The cast iron fastener 14 is sent into the pile tube 9 through the positioning rib 3, so that the second bolt hole 16 on the cast iron fastener 14 is aligned with the first through hole 13. At this time, the workers pass one end of the gripping bolt 11 through the first through hole 13 one by one, and then fix it in the second bolt hole 16 on the cast iron fastener 14 by threaded connection. The gripping bolts 11 form a cross arrangement when viewed from above. The prepared pile tube 9 is driven into the ground by a machine until the gripping bolt 11 touches the ground. Then the long bamboo tube body 1 is inserted into the pile tube 9 and the tie bolt 10 is inserted. In this process, the gripping bolt 11 completes the overall function of basic pull-out resistance and anti-settlement, thereby improving the overall practicality of the device.
[0061] For details regarding the above embodiments, please refer to [link / reference]. Figure 9 and Figure 10 A tie bolt 10 is provided on the outer wall of the pile pipe 9 at the first bolt hole 12. The long bamboo tube body 1 and the short bamboo tube body 2 are provided with openings for the tie bolt 10 to pass through. Under the action of the tie bolt 10, the stability of the long bamboo tube body 1 in the pile pipe 9 is ensured, and the position of the long bamboo tube body 1 in the pile pipe 9 is effectively prevented from shifting. The tie bolt 10 also plays a role in fixing the connection between the pile pipe 9 and the long bamboo tube body 1.
[0062] For details regarding the above embodiments, please refer to [link / reference]. Figure 11 and Figure 12The cast iron fastener 14 has an inner groove 15 at its middle position, and a second through hole 17 that mates with the positioning rib 3 is opened in the inner groove 15. A positioning steel pipe 18 is detachably installed on the top of the second through hole 17, and the outer diameter of the positioning steel pipe 18 is larger than the inner diameter of the second through hole 17. The cast iron fastener 14 can be fitted onto the outer wall of the positioning rib 3 through the second through hole 17. After installing a set of gripping bolts 11, the worker can fit the positioning steel pipe 18 onto the positioning rib 3. Since the outer diameter of the positioning steel pipe 18 is larger than the inner diameter of the second through hole 17, the positioning steel pipe 18 will stay in the inner groove 15 at the top of the cast iron fastener 14. At this time, the worker can refit another set of cast iron fasteners 14 onto the outer wall of the positioning rib 3. At this time, the top of the positioning steel pipe 18 will support the bottom of the cast iron fastener 14. The worker can then install the second set of gripping bolts 11. During this process, the setting of multiple sets of gripping bolts 11 improves the pull-out resistance and settlement resistance of the pile pipe 9 located inside the soil.
[0063] In practical operation, the invention is used by arranging the long bamboo tube body 1 and the short bamboo tube body 2 according to a pre-set position. Then, the outer walls of the long bamboo tube body 1 and the short bamboo tube body 2 are wrapped with FRP cloth 6, which has strong corrosion resistance. Then, the workers make holes in the long bamboo tube body 1 and the short bamboo tube body 2, and insert the long screw 4 through them to form a special through-hole pattern. Under the action of the nut 5, the screw 4 is fixed and limited. The through-hole arrangement of the long screw 4 plays a basic role in resisting pull-out and settlement of the device. Then, the workers put the positioning rib 3 into the long bamboo tube body 1 and pour concrete into it. At the same time, the gaps between the FRP cloth 6, the long bamboo tube body 1 and the short bamboo tube body 2 are filled with filler to extend the corrosion resistance of the bamboo tube.
[0064] Meanwhile, the concrete may generate heat during its curing process. At this time, the concrete will expand due to thermal expansion and contraction or water evaporation. Since the lower end of the outer wall of the positioning rib 3 is symmetrically provided with slots 7, the slots 7 allow the positioning rib 3 to deform and compress inward during the expansion of the concrete, effectively preventing stress from being released outward and causing the long bamboo tube body 1 to crack. This improves the overall service life of the device. In addition, multiple sets of steel wires 8 are wrapped around the outer wall of the slots 7. During the pouring of concrete into the long bamboo tube body 1, the steel wires 8 can prevent the concrete from flowing into the inner wall of the positioning rib 3, so that the positioning rib 3 can release stress inward when the concrete expands in the future.
[0065] Although embodiments of the present invention have been shown and described, these specific embodiments are merely explanations of the invention and are not intended to limit it. The specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions, and variations to the embodiments as needed without departing from the principles and spirit of the invention, but such modifications, substitutions, and variations are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A prefabricated ecological bamboo foundation for garden landscapes, comprising a long bamboo tube body (1), a short bamboo tube body (2), and positioning ribs (3), wherein the positioning ribs (3) are located inside the long bamboo tube body (1), characterized in that: The long bamboo tube body (1) is wrapped around the short bamboo tube body (2). The long bamboo tube body (1) and the short bamboo tube body (2) are arranged to form a bamboo tube bundle, and wrapped tightly with FRP cloth (6). The positioning rib (3) is inserted into the long bamboo tube body (1) to facilitate the connection of the subsequent upper structure. Concrete is poured into the long bamboo tube body (1), and the gaps between the FRP cloth (6), the long bamboo tube body (1) and the short bamboo tube body (2) are filled with filler. Holes are drilled through the long bamboo tube body (1) and the short bamboo tube body (2), and long screws (4) are installed through the holes to form a special through-hole pattern. The bottom end of the outer wall of the positioning rib (3) is symmetrically provided with a groove (7), wherein the groove (7) is the top end of the long bamboo tube body (1) extending out, and the outer wall of the positioning rib (3) is wrapped with multiple sets of steel binding wires (8) at the groove (7).
2. The prefabricated ecological bamboo foundation for garden landscapes according to claim 1, characterized in that: The bottom end of the long bamboo tube body (1) is connected to a pile tube (9), wherein the outer wall of the pile tube (9) is provided with a first bolt hole (12) and a first through hole (13). The pile tube (9) is provided with a cast iron fastener (14) detachably through a positioning rib (3). The cast iron fastener (14) is provided with a second bolt hole (16) that cooperates with the first through hole (13). The outer wall of the cast iron fastener (14) is provided with an array of gripping bolts (11), and the other end of the gripping bolts (11) passes through the pile tube (9).
3. The prefabricated ecological bamboo foundation for garden landscapes according to claim 2, characterized in that: The outer wall of the pile pipe (9) is provided with a tie bolt (10) at the first bolt hole (12), wherein the long bamboo tube body (1) and the short bamboo tube body (2) are provided with openings for the tie bolt (10) to pass through.
4. The prefabricated ecological bamboo foundation for garden landscapes according to claim 2, characterized in that: The cast iron fastener (14) has an inner groove (15) at the middle position, and a second through hole (17) that cooperates with the positioning rib (3) is opened in the inner groove (15). A positioning steel pipe (18) is detachably provided on the top of the second through hole (17), wherein the outer diameter of the positioning steel pipe (18) is larger than the inner diameter of the second through hole (17).
5. The prefabricated ecological bamboo foundation for garden landscapes according to claim 1, characterized in that: The outer wall of the FRP cloth (6) is provided with a nut (5) that cooperates with the long screw (4), and the nut (5) contacts the outer wall of the FRP cloth (6).
6. The prefabricated ecological bamboo foundation for garden landscapes according to claim 1, characterized in that: The steel wires (8) are spaced apart, and the gaps are smaller than the outer diameter of the concrete particles being poured.
7. A prefabricated ecological bamboo foundation for garden landscapes according to claim 4, characterized in that: The inner wall of the second through hole (17) and the outer wall of the positioning rib (3) are set in a smooth shape.
8. A prefabricated ecological bamboo foundation for garden landscapes according to claim 2, characterized in that: The bottom end of the positioning rib (3) is provided with a blocking block, and the blocking block itself is located at the bottom of the positioning rib (3) and is threaded.
9. A prefabricated ecological bamboo foundation for garden landscapes according to claim 4, characterized in that: The first through hole (13) and the second bolt hole (16) are both inclined downwards.
10. A construction method for prefabricated ecological bamboo foundations for garden landscapes, as described in claim 1, characterized in that: Includes the following steps: Step 1: The staff arranges the long bamboo tube and the short bamboo tube according to the pre-set position, then wraps the outer wall with FRP cloth, inserts long screws and tightens them with nuts to form a special through-through pattern. Step 2: The staff then inserts the positioning ribs into the long bamboo tube body to facilitate the connection of the subsequent upper structure, and pours concrete into the long bamboo tube body. At the same time, the gaps between the FRP cloth, the long bamboo tube body and the short bamboo tube body are filled with filler. After the internal concrete and filler form a reliable solid, the production is completed. Step 3: The staff buried the entire device in the soil, with the pre-buried height higher than the short bamboo tube body. Then, the staff backfilled the soil and compacted it to completely bury the short bamboo tube body.
Citation Information
Patent Citations
Binding type bamboo pile foundation and construction method
CN117166453A
Round bamboo support
CN210134708U