4G base station dismantling judgment method and system

The dismantling of 4G base stations is determined through the southward interface and engineering parameters. Combined with the busy time load and MR grid situation of both parties of the Power Unit, the low cost and high efficiency problems of base station demolition in 4G network construction are solved, intelligent operation and maintenance are achieved, and operators' operation and maintenance costs are saved.

CN120475409APending Publication Date: 2025-08-12中邮建技术有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510552985.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-29
Publication Date
2025-08-12

AI Technical Summary

Technical Problem

In the process of 5G network construction, how to improve the construction of 4G network at a low cost, reduce the operating and maintenance costs of base stations, and improve the utilization rate of wireless equipment. At the same time, while ensuring network coverage and capacity, reasonably remove 4G base stations to revitalize equipment resources.

Method used

Through the southbound interface, the operator network management is connected to the operator, and the 4G cell network load and MR grid layer are automatically extracted. Combined with the busy load and MR grid situation of the Power Unit, a 4G base station demolition judgment is made, and the engineering parameters are used to judge whether the site can be demolished, including site co-address confirmation, network coverage and capacity analysis, and the scoring module output demolition priority.

Benefits of technology

The automation and intelligence of 4G base station demolition judgments have been realized, which improves work efficiency, saves labor costs, reduces operators' operation and maintenance expenses, and improves the automated operation and maintenance capabilities of mobile communication networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120475409A_ABST
    Figure CN120475409A_ABST
Patent Text Reader

Abstract

The invention discloses a 4G base station dismantling judgment method and system, and relates to the technical field of computer communication, and the system judges the co-station condition of 4G stations of China Telecom and China Unicom through engineering parameters, is connected with a network manager of an operator through a southbound interface, and automatically extracts the network load and MR grid layer of a 4G cell. And judging whether the 4G station can be dismounted or not by combining busy-hour load conditions and MR grid layer conditions of both parties of electric connection. According to the method, the removal of the 4G site can be judged through the southbound interface and the engineering parameters, the efficiency is improved, the labor is saved, the operation and maintenance cost of an operator is saved, the automatic operation and maintenance capability of a mobile communication network is improved, and intelligent operation and maintenance are assisted to be realized.
Need to check novelty before this filing date? Find Prior Art