Helium balloon transportation control device and method for material transportation in mountainous area

By designing a helium balloon transportation control device and using vertical lifting and horizontal movement control devices, the automation of material transportation in mountainous areas is achieved, solving the problem of helium balloons easily getting out of control during transportation in mountainous areas, and improving transportation efficiency and safety.

CN120630965APending Publication Date: 2025-09-12STEJT GRID ELEKTRIK PAUER INZHINIRING RISERCH INSTITYUT KO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510743168.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-05
Publication Date
2025-09-12

AI Technical Summary

Technical Problem

The existing technology lacks helium balloon control devices suitable for transporting materials in mountainous areas, which makes helium balloon transportation easily affected by weather and geographical factors, resulting in loss of control.

Method used

A helium balloon transportation control device was designed, including a vertical lifting control device and a horizontal movement control device. The deployment and traction of the cable were coordinated by the control terminal to realize the automated transportation of helium balloons in mountainous terrain with large elevation differences.

Benefits of technology

It has improved the automation level of material transportation construction equipment in mountainous areas, reduced the labor intensity of construction workers, reduced the impact of weather and geographical factors on transportation equipment, avoided the loss of control of helium balloons, and achieved safe transportation of materials from the loading point at the foot of the mountain to the unloading point at the top of the mountain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120630965A_ABST
    Figure CN120630965A_ABST
Patent Text Reader

Abstract

The invention discloses a helium balloon transportation control device and method for material transportation in a mountainous area, and relates to the technical field of power transmission line construction. Comprising a helium balloon, a plurality of horizontal movement control devices connected with the helium balloon through inhaul cables and located in different directions, a vertical lifting control device connected with the helium balloon through inhaul cables, and a control terminal in control connection with the vertical lifting control device and the horizontal movement control devices. The vertical lifting control device and the control terminal are fixed to a feeding point. The plurality of horizontal movement control devices are correspondingly fixed on the plurality of different unloading points respectively; the control terminal controls the vertical lifting control device to pull or unfold the inhaul cable to drive the helium balloon to move in the vertical direction; the control terminal cooperatively controls a plurality of horizontal movement control devices to pull or unfold the inhaul cables to drive the helium balloons to move to a to-be-unloaded point in the horizontal direction; the automation degree of mountain material transportation is improved, the influence of weather and geographical factors on transportation is reduced, and the situation that the helium balloon is out of control during transportation is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission line construction, and in particular to a helium balloon transportation control device and method for transporting materials in mountainous areas. Background Art

[0002] With the development of power grid construction, the number of overhead transmission line construction sites located in complex terrain and harsh environments is increasing. Currently, due to environmental protection and other constraints, conventional material transport equipment is unable to meet the requirements of mountainous areas. Helium balloons offer advantages such as long airborne time, large coverage area, low energy consumption, and environmental friendliness, making them suitable for material transport in mountainous environments with high environmental requirements and harsh terrain.

[0003] However, there is currently no helium balloon transportation control device suitable for transporting materials in mountainous areas, and the helium balloons used in the prior art are easily affected by weather and geographical factors during transportation, which may cause the helium balloons to lose control.

[0004] In summary, the prior art does not have effective control over the helium balloons used in mountain material transportation, which can be easily affected, leading to loss of control of the helium balloons. Summary of the Invention

[0005] In order to solve the problem that the existing technology has no effective control over the helium balloons used in mountain material transportation, which is easily affected and causes the helium balloons to lose control.

[0006] The purpose of the present invention is to adopt the following technical solutions to achieve:

[0007] In a first aspect, the present invention provides a helium balloon transport control device for transporting materials in mountainous areas, comprising a helium balloon, a plurality of horizontal movement control devices connected to the helium balloon by cables and located in different directions, a vertical lifting control device connected to the helium balloon by cables, and a control terminal connected to the vertical lifting control device and the plurality of horizontal movement control devices;

[0008] The vertical lifting control device and the control terminal are fixed on the loading point; a plurality of the horizontal movement control devices are respectively fixed on a plurality of different unloading points;

[0009] The control terminal controls the vertical lifting control device to pull or release the cable to drive the helium balloon to move in the vertical direction;

[0010] The control terminal cooperatively controls a plurality of the horizontal movement control devices to pull or release the cable to drive the helium balloon to move horizontally to a point to be unloaded.

[0011] Preferably, the vertical lifting control device and the horizontal movement control device are both winding systems.

[0012] Furthermore, the winding system includes a motor, a transmission, a reel and a controller; the output shaft of the motor is connected to the rotating shaft of the reel through the transmission, the cable is fixed on the reel, and the cable is driven to be wound around the reel by the rotation of the reel, and the controller controls the start and stop and speed of the motor; the control terminal is communicatively connected to the controller.

[0013] Furthermore, a tension sensor is fixed on the reel to measure the tension of the cable; the tension sensor is communicatively connected with the controller.

[0014] Furthermore, a speed sensor is provided on the rotating shaft of the reel to measure the pulling speed of the helium balloon; the speed sensor is in communication connection with the controller.

[0015] Preferably, a positioning device is fixed on the helium balloon, and the positioning device measures the position coordinates of the helium balloon; the positioning device is communicatively connected with the control terminal.

[0016] Preferably, a wind speed measuring instrument is fixed on the helium balloon, and the wind speed measuring instrument measures the wind speed of the helium balloon when transporting materials. The wind speed measuring instrument is communicatively connected with the control terminal.

[0017] In a second aspect, the present invention provides a method for controlling helium balloon transportation for mountain material transportation, which is implemented based on any of the above-mentioned helium balloon transportation control devices for mountain material transportation, and includes:

[0018] The vertical lifting control device is controlled by the control terminal to extend the cable in the vertical direction, so that the helium balloon moves in the vertical direction;

[0019] The control terminal cooperatively controls a plurality of horizontal movement control devices to pull the cable in the horizontal direction to move the helium balloon in the horizontal direction;

[0020] The vertical lifting control device and the horizontal movement control device work synchronously and cooperatively to pull or release the cable, thereby controlling the helium balloon to complete the transportation of materials in mountainous areas.

[0021] Preferably, after controlling the horizontal movement control device to move horizontally by the control terminal, the method further comprises:

[0022] When the helium balloon reaches the highest vertical point, the control terminal controls the horizontal movement control device to pull the cable horizontally toward the unloading point, and at the same time, the horizontal movement control devices at the remaining unloading points extend or pull the cable horizontally.

[0023] The control terminal controls the horizontal displacement of the helium balloon by adjusting the horizontal traction force and traction speed according to the monitoring data, and pulls the helium balloon to the material unloading point to complete the unloading operation;

[0024] The monitoring data includes traction speed, traction force, wind speed and position coordinates.

[0025] Furthermore, after controlling the helium balloon to complete the mountain material transportation, the method further includes:

[0026] After unloading is completed, the control terminal controls several horizontal movement control devices to unfold or pull the cables in the horizontal direction, and controls the horizontal displacement of the helium balloon by the horizontal traction force and traction speed, so that the helium balloon is unfolded from the unloading point and returned to above the loading point; when the helium balloon reaches the highest vertical point, the control terminal controls the vertical lifting control device to pull the cables in the vertical direction, and controls the vertical displacement of the helium balloon by the vertical traction force and traction speed, so that the helium balloon is pulled back to the loading point.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] The present invention provides a helium balloon transport control device and method for transporting materials in mountainous areas. A control terminal controls a vertical lift control device and several horizontal movement control devices to synchronously pull or deploy cables, driving the helium balloon to transport materials in mountainous terrain with large elevation differences. The helium balloon is transported from a loading point at the bottom of the mountain to a mountaintop unloading point, completing mountain material transportation. The control terminal automatically controls the vertical and horizontal movement of the helium balloon based on monitoring data. When transporting materials toward one unloading point, the horizontal movement control devices at the remaining unloading points deploy cables horizontally to limit lateral displacement of the helium balloon caused by weather and geographical factors. The present invention can improve the automation level of mountain material transportation construction equipment, reduce the labor intensity of construction personnel, effectively control the transport device, reduce the impact of weather and geographical factors on the transport device, and prevent the helium balloon from losing control. The device of the present invention can automatically control the vertical and horizontal movement of the helium balloon, achieving material transportation from a loading point at the bottom of the mountain to a mountaintop unloading point in mountainous terrain with large elevation differences, thereby reducing damage to the mountainous environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic diagram of a helium balloon transportation control device for transporting materials in mountainous areas in Example 1 of the present invention;

[0030] In the figure: 1 is the vertical lifting control device; 2 is the horizontal movement control device, 3 is the auxiliary anchoring device; 4 is the control terminal; 5 is the helium balloon; 6 is the cable. DETAILED DESCRIPTION

[0031] Hereinafter, only certain exemplary embodiments are briefly described. As will be appreciated by those skilled in the art, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and description are to be considered as illustrative in nature and not restrictive.

[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like to indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0033] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of the technical features being referred to. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of such features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.

[0034] In the present invention, unless otherwise expressly specified or limited, terms such as "mounted," "connected," "connect," and "fixed" should be understood broadly. For example, they may refer to fixed connection, detachable connection, or integration; mechanical connection, electrical connection, or communication; direct connection or indirect connection through an intermediate medium; and internal communication between two components or interaction between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on specific circumstances.

[0035] In the present invention, unless otherwise expressly specified or limited, a first feature being "above" or "below" a second feature may include the first and second features being in direct contact, or may include the first and second features being in contact not directly but through another feature between them. Furthermore, a first feature being "above," "above," and "above" a second feature may include the first feature being directly above or obliquely above the second feature, or may simply mean that the first feature is higher in level than the second feature. A first feature being "below," "below," and "below" a second feature may include the first feature being directly above or obliquely above the second feature, or may simply mean that the first feature is lower in level than the second feature.

[0036] It will be understood that when used in this specification and the appended claims, the terms “comprises” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof.

[0037] It should also be understood that the terms used in the present specification are only for the purpose of describing particular embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, the singular forms "a", "an", and "the" are intended to include the plural forms unless the context clearly indicates otherwise.

[0038] It should be further understood that the term "and / or" used in the present description and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.

[0039] The accompanying drawings illustrate various schematic diagrams of structures according to embodiments disclosed herein. These figures are not drawn to scale; for clarity, some details are exaggerated and some details may be omitted. The shapes of the various regions and layers shown in the figures, as well as their relative sizes and positional relationships, are merely exemplary and may deviate in practice due to manufacturing tolerances or technical limitations. Those skilled in the art may design regions / layers with different shapes, sizes, and relative positions as needed.

[0040] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0041] Example 1:

[0042] A helium balloon transport control device for transporting materials in mountainous areas in an embodiment of the present invention includes a vertical lifting control device 1 fixed at a loading point, horizontal movement control devices 2 respectively fixed at several unloading points, a control terminal 4 fixed at the loading point, and a helium balloon 5 respectively fixedly connected to the vertical lifting control device 1 and several of the horizontal movement control devices 2 via a cable 6.

[0043] The control terminal 4 is respectively connected to the vertical lifting control device 1 and the plurality of horizontal movement control devices 2 for control.

[0044] The vertical lifting control device 1 pulls or releases the cable 6 to drive the helium balloon 5 to move in the vertical direction; the plurality of horizontal movement control devices 2 pull or release the cable 6 to drive the helium balloon 5 to move in the horizontal direction.

[0045] The present invention provides a helium balloon transport control device and method for transporting materials in mountainous areas. A control terminal controls a vertical lift control device and a horizontal movement control device to synchronously pull or deploy a cable, driving the helium balloon to transport materials in mountainous terrain with large elevation differences. The helium balloon is transported from a loading point at the bottom of the mountain to a mountaintop unloading point, completing mountain material transportation. The control terminal automatically controls the vertical and horizontal movement of the helium balloon based on monitoring data. When transporting materials toward one unloading point, the horizontal movement control devices at the remaining unloading points deploy cables horizontally to limit lateral displacement of the helium balloon caused by weather and geographical factors. The present invention can improve the automation level of mountain material transportation construction equipment, reduce the labor intensity of construction personnel, effectively control the transport device, reduce the impact of weather and geographical factors on the transport device, and prevent the helium balloon from losing control. The device of the present invention can automatically control the vertical and horizontal movement of the helium balloon, achieving material transportation from a loading point at the bottom of the mountain to a mountaintop unloading point in mountainous terrain with large elevation differences, thereby reducing damage to the mountainous environment.

[0046] Specifically, such as Figure 1 As shown, a helium balloon transportation control device for mountain material transportation in an embodiment of the present invention takes three unloading points as an example, and mainly includes a vertical lifting control device 1, a horizontal movement control device 2 respectively fixed at the three unloading points, an auxiliary anchoring device 3, a control terminal 4, a helium balloon 5 and a cable 6.

[0047] The present invention adopts a vertical lifting control device 1 and a horizontal movement control device 2 fixed at three unloading points to connect with a helium balloon 5 through a cable 6 to realize the transportation control of materials in the vertical and horizontal directions.

[0048] The control terminal 4 controls the vertical lifting control device 1 fixed on the loading point to extend the cable 6 in the vertical direction, so that the helium balloon 5 is displaced in the vertical direction.

[0049] When the helium balloon 5 reaches the highest vertical point, the control terminal 4 controls the horizontal movement control device 2 to pull the rope 6 horizontally toward the unloading point. At the same time, the horizontal movement control devices 2 at the other two unloading points extend the rope 6 horizontally; the horizontal movement control devices 2 at the three unloading points work together to pull the helium balloon 5 to the material unloading point to complete the unloading operation.

[0050] Specifically, the vertical lifting control device 1 and the horizontal movement control device 2 in the embodiment of the present invention are both winding systems; the winding system includes a motor, a transmission, a reel and a controller; the output shaft of the motor is connected to the rotating shaft of the reel through the transmission, and the cable 6 is fixed on the reel, and the cable 6 is driven to be wound around the reel by the rotation of the reel, and the controller controls the start and stop and speed of the motor; the control terminal 4 is connected to the controller for communication.

[0051] It should be further explained that the transmission in the embodiment of the present invention can be a continuously variable transmission. The output shaft of the motor is in transmission connection with the input shaft of the continuously variable transmission, which in turn is in transmission connection with the rotating shaft of the drum. The transmission connection can be achieved using a conventional mechanical structure such as a coupling. One end of the cable 6 can be fixed to the drum by welding or other fixing methods. The cable 6 is wound around the drum, and the other end of the cable 6 is fixedly connected to the helium balloon 5.

[0052] Specifically, in the embodiment of the present invention, a tension sensor is fixed on the reel to measure the tension of the cable 6; the tension sensor is in communication connection with the controller.

[0053] It should be further explained that the tension sensor of the embodiment of the present invention can determine the fixed position according to the sensor type. For example, the bolt-type tension sensor can be connected in series to the rotating shaft or transmission system of the reel, and indirectly reflect the tension of the cable by measuring the tensile deformation of the shaft.

[0054] Specifically, in the embodiment of the present invention, a speed sensor is provided on the rotating shaft of the reel to measure the pulling speed of the helium balloon 5; the speed sensor is in communication connection with the controller.

[0055] It should be further explained that the speed sensor of the embodiment of the present invention can be installed at a position determined according to the type of sensor. The speed sensor can be an incremental encoder, an absolute encoder, or a photoelectric speed sensor.

[0056] Specifically, in the embodiment of the present invention, a positioning device is fixed to the helium balloon 5 to measure the position coordinates of the helium balloon 5; the positioning device is in communication with the control terminal 4. The positioning device can be a cellular network positioning device, a GPS positioning device, or a Beidou positioning device, depending on the transportation distance in mountainous areas.

[0057] Specifically, in the embodiment of the present invention, a wind speed measuring instrument is fixed on the helium balloon 5 , and the wind speed measuring instrument measures the wind speed of the helium balloon 5 when transporting materials. The wind speed measuring instrument is in communication connection with the control terminal 4 .

[0058] The vertical lifting control device 1 is used to control the vertical retraction and extension of the helium balloon for transporting materials. It has the functions of start and stop, vertical traction / expansion, and stepless speed change. It can also be equipped with a real-time digital display module to display the control terminal 4 to dynamically monitor data such as traction, speed, wind speed, and position coordinates.

[0059] The horizontal movement control device 2 is used to control the horizontal retraction and deployment of the helium balloon used to transport materials. It has start-stop, horizontal traction / deployment, and infinitely variable speed functions. It can also be equipped with a real-time digital display module for displaying data such as traction force, speed, wind speed, and position coordinates dynamically monitored by the control terminal 4. Specifically, in the embodiment of the present invention, the auxiliary anchoring device 3 is used to anchor and secure the helium balloon. The auxiliary anchoring device 3 can be an anchor rod, etc., which is used to secure the helium balloon 5 at the loading point. The loading point can be compacted using tools such as a roller or rammer, or surface-hardened with concrete to increase the stability of the anchor rod fixation.

[0060] Specifically, in the embodiment of the present invention, the control terminal 4 is used to remotely and synchronously control the vertical control device 1 and the horizontal movement control device 2, and has spatial positioning, posture adjustment and emergency braking functions, and synchronously controls the vertical control device 1 and the horizontal movement control device 2 to start, stop, pull, unfold, and adjust the operating speed, thereby realizing automated control of the helium balloon for transporting materials.

[0061] It should be further explained that in this embodiment of the present invention, the control terminal 4 may also be equipped with a display panel. This panel displays data such as the lift altitude, the hull attitude and pressure of the helium balloon 5, traction speed, traction force, wind speed, and position coordinates. This panel allows real-time control of the traction force and speed of the vertical lift control device 1 and the horizontal movement control device 2 to adjust the position of the helium balloon for transporting materials. The hull attitude of the helium balloon 5 is measured using an inertial navigation system installed in the pod platform. Pressure measurements are typically made using two pressure differential flanges, one corresponding to the primary and secondary bladders of the helium balloon 5. The pressure is measured in real time via differential pressure tubes inserted into the measurement and control computer.

[0062] The present invention provides a helium balloon transportation control device and method for transporting materials in mountainous areas. By synchronously coordinating the traction and deployment of a cable through a vertical lifting control device and a horizontal movement control device, the helium balloon can be used to transport materials from a loading point at the bottom of the mountain to an unloading point at the top of the mountain in a mountainous terrain environment with a large elevation difference. The helium balloon can be automatically moved in the vertical and horizontal directions according to data such as traction speed, traction force, wind speed, and position coordinates, thereby improving the degree of automation of mountain material transportation construction equipment and reducing the labor intensity of construction personnel.

[0063] Specifically, the helium balloon transportation control device for mountain material transportation in the embodiment of the present invention can be used to control the material transportation helium balloon to transport mountain materials from a loading point at the bottom of the mountain to a unloading point at the top of the mountain. The specific process includes:

[0064] The locations of the loading point and multiple unloading points are determined based on the on-site topography of the mountainous terrain. A vertical lift control device 1 is installed at the cableway loading point, and horizontal movement control devices 2 are installed at each of the multiple unloading points. Auxiliary anchoring devices 3 are buried to anchor a helium balloon 5 to the loading point. Multiple cables 6 are connected to the helium balloon at one end and to the vertical lift control device 1 and multiple horizontal movement control devices 2 at the other end. The number of horizontal movement control devices 2 can be one or more; in actual implementation, the specific number and distribution of these devices will be determined by the mountainous environment and weather conditions.

[0065] A control terminal 4 is arranged at the cableway loading point. The control terminal 4 controls the vertical lifting control device 1 to extend the cable 6 in the vertical direction. The vertical displacement is controlled by the vertical traction force and traction speed to transport the material transport helium balloon 5 to the top of the loading point. When the material transport helium balloon 5 reaches the highest vertical point, the control terminal 4 controls one or more horizontal movement control devices 2 to pull or extend the cable 6 in the horizontal direction (that is, the horizontal movement control device 2 at the unloading point mainly plays a traction role, and the horizontal movement control devices 2 at the other unloading points extend the cable 6 to limit the displacement). The horizontal displacement is controlled by the horizontal traction force and traction speed to pull the material transport helium balloon 5 to the material unloading point, completing the unloading operation.

[0066] Further explanation is needed. Figure 1 Taking the three horizontal motion control devices 2 in the example, one master horizontal motion control device (i.e., the horizontal motion control device 2 at the unloading point) is used to pull the helium balloon 5 horizontally to the unloading point, and two slave horizontal motion control devices (i.e., the horizontal motion control devices 2 at the remaining unloading points) are used to limit the lateral displacement of the helium balloon 5 caused by strong winds. The control terminal 4 displays real-time monitoring data such as pulling speed, pulling force, wind speed, and position coordinates, and controls the vertical lifting control device 1 and the horizontal motion control device 2 in real time to adjust the position of the helium balloon 5 for transporting materials.

[0067] After unloading is complete, the control terminal 4 controls one or more horizontal movement control devices 2 based on monitoring data to deploy the cable 6 horizontally. The horizontal displacement is controlled by the horizontal traction force and traction speed, and the helium balloon 5 transporting the material is deployed from the unloading point back to above the material loading point. When the helium balloon 5 transporting the material reaches its highest vertical point, the control terminal 4 controls the vertical lifting control device 1 to pull the cable 6 vertically. The vertical displacement is controlled by the vertical traction force and traction speed, and the helium balloon 5 transporting the material is pulled back to the material loading point.

[0068] It needs to be further explained that when there is only one horizontal movement control device 2, the positions of the loading point and the unloading point are determined, the vertical lifting control device 1 is arranged at the loading point, the horizontal movement control device 2 is fixed at the unloading point, one end of the rope 6 is connected to the helium balloon, and the other end is connected to the vertical lifting control device 1 and the horizontal movement control device 2 respectively.

[0069] The control terminal 4 controls the vertical lifting control device 1 to extend the cable 6 in the vertical direction. The vertical displacement is controlled by the vertical traction force and traction speed, and the transport material helium balloon 5 is transported to the top of the loading point. When the transport material helium balloon 5 reaches the highest vertical point, the control terminal 4 controls the horizontal movement control device 2 to pull the cable 6 in the horizontal direction. The horizontal displacement is controlled by the horizontal traction force and traction speed, and the transport material helium balloon 5 is pulled to the material unloading point, completing the unloading operation.

[0070] In another embodiment, when the number of horizontal movement control devices 2 is four, the positions of the loading point and the four unloading points are determined, the horizontal movement control devices 2 are arranged at the four unloading points respectively, and the auxiliary anchoring device 3 is buried to anchor and fix the helium balloon 5 at the loading point, and one end of the five cables 6 is connected to the helium balloon 5, and the other end is connected to a vertical lifting control device 1 and four horizontal movement control devices 2 respectively.

[0071] The vertical lifting control device 1 is controlled by the control terminal 4 to extend the cable 6 in the vertical direction, and the vertical displacement is controlled by the vertical traction force and traction speed to transport the helium balloon 5 for transporting materials to the top of the loading point.

[0072] When the material transport helium balloon 5 reaches the highest vertical point, the control terminal 4 controls the horizontal movement control device 2 at the unloading point to pull the rope 6 in the horizontal direction to control the horizontal displacement through the horizontal traction force and traction speed, and pulls the material transport helium balloon 5 to the material unloading point; at the same time, the horizontal movement control devices 2 at the other three unloading points extend the rope 6 to limit the displacement of the helium balloon 5. The four horizontal movement control devices 2 cooperate to control the pulling of the material transport helium balloon 5 to the material unloading point to complete the unloading operation.

[0073] The present invention provides a helium balloon transport control device for mountain material transportation. This device integrates vertical and horizontal retraction and deployment, anchoring, and wireless remote control functions. This device enables helium balloons to transport materials from a loading point at the bottom of a mountain to a mountaintop unloading point in mountainous terrain with large elevation differences, minimizing environmental damage. This device addresses the challenges of difficult mountain transportation operations and stringent environmental regulations, enabling the transport of helium balloons with a load capacity of 2,000 kg. This device addresses the challenges of difficult mountain transportation operations and stringent environmental regulations, improving the automation and efficiency of mountain material transportation.

[0074] The device of the present invention can display data such as the traction speed, traction force, wind speed, position coordinates, etc. of the material transportation helium balloon in real time, and through the vertical lifting control device and the horizontal movement control device, synchronously and collaboratively control the traction and deployment cables to complete the automatic movement control of the helium balloon in the vertical and horizontal directions, thereby improving the degree of automation of material transportation construction equipment and reducing the labor intensity of construction personnel.

[0075] Example 2:

[0076] The present invention based on the same inventive concept also provides a helium balloon transportation control method for mountain material transportation, comprising:

[0077] The vertical lifting control device 1 is controlled by the control terminal 4 to extend the cable 6 in the vertical direction, so that the helium balloon 5 moves in the vertical direction;

[0078] The control terminal 4 controls the horizontal movement control device 2 to pull the cable 6 in the horizontal direction to move the helium balloon 5 in the horizontal direction;

[0079] The vertical lifting control device 1 and the horizontal movement control device 2 work together synchronously to pull or release the cable 6, thereby controlling the helium balloon 5 to complete the transportation of materials in the mountainous area.

[0080] Specifically, in the embodiment of the present invention, controlling the horizontal movement control device 2 to move horizontally by the control terminal 4 further includes:

[0081] When the helium balloon 5 reaches the highest vertical point, the control terminal 4 controls the horizontal movement control device 2 to pull the cable 6 horizontally toward the unloading point. At the same time, the horizontal movement control devices 2 at the remaining unloading points extend the cable 6 horizontally.

[0082] The control terminal 4 controls the horizontal displacement of the helium balloon 5 by adjusting the horizontal traction force and traction speed according to the monitoring data, and pulls the helium balloon 5 transporting the material to the material unloading point to complete the unloading operation;

[0083] The monitoring data includes traction speed, traction force, wind speed and position coordinates.

[0084] Specifically, in the embodiment of the present invention, after controlling the helium balloon 5 to complete the transportation of materials in the mountainous area, the method further includes:

[0085] After unloading is completed, the horizontal movement control device 2 is controlled by the control terminal 4 to extend the cable 6 in the horizontal direction, and the helium balloon 5 is controlled to move in the horizontal direction through the horizontal traction force and traction speed, so that the helium balloon 5 for transporting materials is extended from the unloading point and returned to above the loading point; when the helium balloon 5 reaches the vertical highest point, the vertical lifting control device 1 is controlled by the control terminal 4 to pull the cable 6 in the vertical direction, and the helium balloon 5 is controlled to move in the vertical direction through the vertical traction force and traction speed, so that the helium balloon 5 for transporting materials is pulled back to the loading point.

[0086] Specifically, the complete process of a helium balloon transportation control method for mountain material transportation in an embodiment of the present invention includes:

[0087] A vertical lifting control device 1 is arranged at the cableway loading point, a horizontal movement control device 2 is arranged at the unloading point, and an auxiliary anchoring device 3 is buried to anchor and fix the helium balloon 5 at the loading point. One end of the cable 6 is connected to the helium balloon 5, and the other end is connected to the vertical lifting control device 1 and the horizontal movement control device 2 respectively.

[0088] A control terminal 4 is located at the cableway loading point. This control terminal 4 controls the vertical lifting control device 1 to vertically deploy the cable 6. Vertical traction and speed are used to control vertical displacement, transporting the material helium balloon 5 to directly above the loading point. Once the material helium balloon 5 reaches its highest vertical point, the control terminal 4 controls one or more horizontal movement control devices 2 to horizontally pull the cable 6. Horizontal traction and speed are used to control horizontal displacement, pulling the material helium balloon 5 to the material unloading point, completing the unloading operation. The control terminal 4 displays monitoring data such as traction speed, traction force, wind speed, and position coordinates in real time, and controls the vertical lifting control device 1 and the horizontal movement control device 2 in real time to adjust the position of the helium balloon 5 for transporting materials. The vertical lifting control device 1 is used to realize the vertical movement of the helium balloon 5. According to the span and height difference between the loading point and the unloading point, the main horizontal movement control device (i.e., the horizontal movement control device 2 at the position of the unloading point) is used to realize the horizontal movement of the helium balloon 5 when the helium balloon 5 reaches the highest vertical point. The lateral displacement of the helium balloon 5 caused by strong wind is limited by the slave horizontal movement control device (i.e., the horizontal movement control device 2 at the remaining unloading points).

[0089] After unloading is complete, the control terminal 4 controls one or more horizontal movement control devices 2 based on monitoring data to deploy the cable 6 horizontally. The horizontal displacement is controlled by the horizontal traction force and traction speed, and the helium balloon 5 transporting the material is deployed from the unloading point back to above the material loading point. When the helium balloon 5 transporting the material reaches its highest vertical point, the control terminal 4 controls the vertical lifting control device 1 to pull the cable 6 vertically. The vertical displacement is controlled by the vertical traction force and traction speed, and the helium balloon 5 transporting the material is pulled back to the material loading point.

[0090] The device, which uses a vertical lift control device and a horizontal movement control device to automatically and synchronously control the traction and deployment cables, moves the helium balloon vertically and horizontally, thereby transporting materials from the loading point to the unloading point. The device measures and displays data such as lift altitude, boat attitude, boat pressure, traction speed, traction force, wind speed, and position coordinates in real time. It also controls the traction force and speed of the vertical lift control device and the horizontal movement control device in real time to adjust the position of the helium balloon for transporting materials.

[0091] In addition, it should be understood that although this specification describes the embodiments, not every embodiment contains only one independent technical solution. This description is for clarity only. Those skilled in the art should consider the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art. The above content is only for the purpose of illustrating the technical concept of the present invention and cannot be used to limit the scope of protection of the present invention. Any changes made based on the technical solution in accordance with the technical concept proposed by the present invention fall within the scope of protection of the claims of the present invention.

Claims

1. A helium balloon transport control device for mountain material transportation, characterized in that: The device comprises a helium balloon (5), a plurality of horizontal movement control devices (2) connected to the helium balloon (5) via a cable (6) and located in different directions, a vertical lifting control device (1) connected to the helium balloon (5) via a cable (6), and a control terminal (4) connected to the vertical lifting control device (1) and the plurality of horizontal movement control devices (2); The vertical lifting control device (1) and the control terminal (4) are fixed on the loading point; a plurality of the horizontal movement control devices (2) are respectively fixed on a plurality of different unloading points; The control terminal (4) controls the vertical lifting control device (1) to pull or release the cable (6) to drive the helium balloon (5) to move in the vertical direction; The control terminal (4) cooperatively controls a plurality of the horizontal movement control devices (2) to pull or release the cable (6) to drive the helium balloon (5) to move horizontally to a point to be unloaded.

2. A helium balloon transport control device for mountain material transportation according to claim 1, characterized in that: The vertical lifting control device (1) and the horizontal movement control device (2) are both winding systems.

3. A helium balloon transportation control device for mountain material transportation according to claim 2, characterized in that: The winding system includes a motor, a transmission, a reel and a controller; the output shaft of the motor is connected to the rotating shaft of the reel through the transmission, the cable (6) is fixed on the reel, and the cable (6) is driven to be wound around the reel by the rotation of the reel, and the controller controls the start and stop and the speed of the motor; the control terminal (4) is connected to the controller for communication.

4. A helium balloon transportation control device for mountain material transportation according to claim 3, characterized in that: A tension sensor is fixed on the reel to measure the tension of the cable (6); the tension sensor is in communication connection with the controller.

5. A helium balloon transportation control device for mountain material transportation according to claim 3, characterized in that: A speed sensor is provided on the rotating shaft of the reel to measure the pulling speed of the helium balloon (5); the speed sensor is in communication connection with the controller.

6. A helium balloon transportation control device for mountain material transportation according to claim 1, characterized in that: A positioning device is fixed on the helium balloon (5), and the positioning device measures the position coordinates of the helium balloon (5); the positioning device is in communication connection with the control terminal (4).

7. A helium balloon transportation control device for mountain material transportation according to claim 1, characterized in that: A wind speed measuring instrument is fixed on the helium balloon (5), and the wind speed measuring instrument measures the wind speed of the helium balloon (5) when transporting materials. The wind speed measuring instrument is in communication connection with the control terminal (4).

8. A method for controlling the transportation of materials in mountainous areas by using a helium balloon, characterized in that: The helium balloon transportation control device for mountain material transportation according to any one of claims 1 to 7 is implemented, comprising: The vertical lifting control device (1) is controlled by the control terminal (4) to extend the cable (6) in the vertical direction, so that the helium balloon (5) is displaced in the vertical direction; The control terminal (4) cooperatively controls a plurality of horizontal movement control devices (2) to pull a cable (6) in a horizontal direction to move the helium balloon (5) in a horizontal direction; The vertical lifting control device (1) and the horizontal movement control device (2) work synchronously and cooperatively to pull or deploy a cable (6), thereby controlling the helium balloon (5) to complete the transportation of materials in mountainous areas.

9. A helium balloon transportation control method for mountain material transportation according to claim 8, characterized in that: After the horizontal movement control device (2) is controlled to move in the horizontal direction by the control terminal (4), the method further comprises: When the helium balloon (5) reaches the highest vertical point, the control terminal (4) controls the horizontal movement control device (2) to pull the cable (6) in the horizontal direction toward the unloading point, and at the same time, the horizontal movement control devices (2) at the other unloading points extend or pull the cable (6) in the horizontal direction; The control terminal (4) controls the horizontal displacement of the helium balloon (5) by adjusting the horizontal traction force and the traction speed according to the monitoring data, and pulls the helium balloon (5) to the material unloading point to complete the unloading operation; The monitoring data includes traction speed, traction force, wind speed and position coordinates.

10. A helium balloon transportation control method for mountain material transportation according to claim 9, characterized in that: After controlling the helium balloon (5) to complete the mountain material transportation, the method further includes: After unloading is completed, the control terminal (4) controls several of the horizontal movement control devices (2) to unfold or pull the cable (6) in the horizontal direction, and controls the displacement of the helium balloon (5) in the horizontal direction by the horizontal traction force and the traction speed, and unfolds the helium balloon (5) from the unloading point to above the loading point; when the helium balloon (5) reaches the vertical highest point, the control terminal (4) controls the vertical lifting control device (1) to pull the cable (6) in the vertical direction, and controls the displacement of the helium balloon (5) in the vertical direction by the vertical traction force and the traction speed, and pulls the helium balloon (5) back to the loading point.