Rail type hanging basket system on building slope and application method
The design of the track-type hanging basket system solves the problem of supporting and conveniently moving the hanging basket on the inclined floor surface, and realizes the stable installation and efficient movement of the hanging basket, which is suitable for sloping building construction.
Patent Information
- Application Number
- CN202511110633.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-08
- Publication Date
- 2025-09-19
AI Technical Summary
On the inclined floor surface, it is difficult to support and move the hanging basket conveniently, and the existing fixing method is not applicable.
The rail-type hanging basket system is adopted, which includes a hanging basket, a hanging unit, a base unit and a rail unit. The support and movement of the hanging basket are achieved through detachable connections and sliding connections. The design of the hanging movable rod and the base assembly ensures that the hanging basket can be easily installed and disassembled.
The hanging basket can be easily installed and moved on the sloping building, ensuring the stable support and fixed position of the hanging basket and improving the construction efficiency.
Smart Images

Figure CN120666903A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of hanging basket installation, and particularly relates to an on-track hanging basket system on a building slope and an application method thereof. Background Art
[0002] During building construction, a hanging basket is a commonly used construction device. The hanging basket is generally installed on the top of the roof through a support frame and fixed by counterweights, or fixed and installed by combining wall-attached components and a support frame. However, when the hanging basket is in use, if the structure's roof or floor surface is obliquely designed, it is not easy to fix and support the hanging basket on the roof, and targeted settings are required to ensure installation and convenient movement on the inclined building. Summary of the Invention
[0003] The present invention provides an on-track hanging basket system on a building slope and an application method thereof to solve technical problems such as the support, mobility, and convenient installation and disassembly of the support member of the hanging basket on an inclined floor surface.
[0004] To achieve the above object, the present invention adopts the following technical solutions: An on-track hanging basket system on a building slope includes a hanging basket, a floor structure above the hanging basket, a hanging unit connected between the hanging basket and the floor structure, a base unit connected to the floor structure and detachably connected to the hanging unit, and a track unit connected to the floor structure and slidably connected to the end of the base unit; the floor structure is obliquely arranged; The hanging unit includes a hanging frame and a hanging movable rod provided on the hanging frame; The base unit includes a main base component adjacent to the track unit and a sub-base component away from the track unit; The main base component includes two parallel main base frames, main base frame connecting plates vertically connected between the two main base frames and arranged at intervals in the longitudinal direction of the main base frames, a main base hoop cylinder connected to the top of the main base frame connecting plates, and a main base sliding component connected to the main base frame connecting plate near the track unit; The sub-base component is detachably arranged from the main base component. The sub-base component includes a sub-base support seat and a sub-base backing plate on the top of the sub-base support seat; the main base hoop cylinder and the sub-base backing plate are detachably connected to the hanging frame The track unit includes a track connection head, a track back connection part integrally connected to one side of the track connection head, and a track bayonet arranged at the connection of the track connection head and the track back connection part; The track connection head is correspondingly slidably connected to the main base sliding component.
[0005] Furthermore, the hanging frame is a U-shaped member, the upper horizontal part of which is detachably connected to the base unit, the vertical part is set with a height adapted to the designed height of the hanging basket, and the lower horizontal part is set corresponding to the designed horizontal position of the hanging basket.
[0006] Furthermore, the hanging frame includes a hanging main frame of a shape, a hanging movable hook provided at the bottom end of the vertical portion, a hanging main stopper provided at the bottom of the hanging movable hook, a hanging auxiliary stopper provided at the notch at the top of the hanging movable hook, and a hanging hook pulling hole provided on the hanging movable hook and located on the side of the bent hook; The bottom end of the vertical portion of the hanging main frame and the lower horizontal portion are hingedly connected and are fixed by a hanging movable hook.
[0007] Furthermore, the main base frame is made of two parallel H-shaped steels; the main base frame is connected with a steel main base frame connecting plate; a notch is provided on the top of the main base frame connecting plate, and the notch corresponds to the main base hoop for fixed connection; The outer side of the main base frame connecting plate away from the track unit side can be detachably connected with a main base caster, and the main base caster is arranged corresponding to the floor structure.
[0008] Furthermore, the auxiliary base support seat is a triangular support seat, the bottom of the triangular support seat is provided with casters and the top is provided with a recess, and the recess is provided with an auxiliary base pad; the auxiliary base pad is an arc plate, and the arc plate is provided corresponding to the horizontal part of the hanging main frame.
[0009] Furthermore, the base sliding assembly includes a main base sliding main board vertically connected to the two ends of the main base frame connecting plate in the long direction and arranged in an inverted U shape with the main base frame connecting plate, a main base sliding concave plate connected to the outer edge of each main base sliding main board, a main base sliding roller connected to the middle and lower parts of each main base sliding main board, a main base sliding plug plate connected to the middle and lower parts of each main base sliding main board and located between the middle and lower main base sliding rollers, and a main base sliding stopper arranged at the protruding end of the middle main base sliding roller on the main base sliding main board downstream in the sliding direction.
[0010] Furthermore, the main base sliding concave plate is a rectangular plate and is provided with a notch on the side, and the notch is provided corresponding to the rail joint portion; The main base sliding stopper is a crescent-shaped wedge-shaped piece hingedly connected to the main base sliding roller, and the crescent-shaped wedge-shaped piece is correspondingly clamped and fixed in the track clamping mouth.
[0011] Furthermore, the rail joint portion is a ring-shaped member with a horizontal opening, and the opening is directed outward, and the opening is correspondingly connected to the main base sliding plate; The track back connection part is a vertical plate with a T-shaped notch, and the T-shaped notch is detachably connected to the adapter assembly by bolts; the connection between the track joint part and the track back connection part is a horizontal plate; the horizontal plate is provided with track bayonet holes at intervals; The track clip is a rectangular hole, which corresponds to the main base sliding stopper.
[0012] Furthermore, an adapter assembly is provided, the adapter assembly comprising an L-shaped adapter plate and an adapter bolt provided on the adapter plate; The vertical portion of the adapter plate is detachably connected to the track back connection portion through adapter bolts, and the horizontal portion is detachably connected to the embedded part through adapter bolts.
[0013] Furthermore, the application method of the track-type hanging basket system on the building slope is as follows: Step 1: Pre-construct the floor structure, complete the main construction of the floor structure and the construction of the embedded parts corresponding to the curtain wall keel on the floor; lay the track unit according to the designed length of the hanging basket required to be installed on the floor; Step 2: Fix the track unit to the embedded part through the adapter assembly, and measure the installed track unit to ensure it meets the design position requirements. If not, adjust it in time until it meets the design requirements. Step 3: Assemble the base unit on the floor structure, where the main base assembly and the auxiliary base assembly are separately arranged and can be assembled simultaneously; connect the main base sliding concave plate and the main base sliding plug plate of the main base sliding assembly in the main base assembly to the corresponding track joints, and use the main base sliding rollers to roll the track joints; when the main base assembly is slid to the designed position on site, the main base sliding stopper extends into the track bayonet to limit the position; then install the auxiliary base assembly accordingly; Step 4: Install the hanging unit on the base unit. When the hanging frame is initially installed, the whole is located on the floor structure. The lower horizontal part of the hanging frame is pushed out horizontally by the hanging movable rod, and the hanging frame is vertically downward in an inverted L shape. Then, the vertical lower horizontal part is pulled to a horizontal state by lifting the hanging movable rod. At the same time, the hanging movable hook in the hanging frame hooks the hanging main stop rod and combines with the hanging auxiliary stop rod to synchronously fix and limit. When disassembling the hook unit, the hook is pulled by the pull rope provided at the hook hook hole, and the hook movable hook will be separated from the hook main gear lever and away from the hook auxiliary gear lever, so that the lower cross section of the hook frame will return to the vertical state, and then the hook movable rod is adjusted to rotate the lower cross section of the hook frame to the horizontal state, and then adjusted to the initial installation state for disassembly; Step 5. After installing the hanging unit, install the hanging basket on the lower horizontal part of the hanging frame, thus completing the overall installation of the track-type hanging basket system on the building slope; when it is necessary to move to the next point in the track, first rotate the main base sliding stopper backward to disengage from the track bayonet and then use the winch and manual labor to pull the base unit to move, and then rotate the main base sliding stopper again to enter the track bayonet to limit it after reaching the designed position, thus completing the mobile construction of the track-type hanging basket system on the building slope.
[0014] The beneficial effects of the present invention are embodied in: 1) The present invention facilitates the installation and support of the hanging basket by providing the hanging unit, and ensures convenient installation and disassembly of the hanging main frame by providing the hanging movable hook in the hanging unit; The present invention 2) The present invention facilitates the support and reception of the hanging unit by providing a base unit; and the provision of a main base assembly in the base unit and its sliding connection with the track unit ensure convenient construction during the movement of the hanging basket; 3) The present invention not only provides a transfer basis for the final connection of the hanging basket with the embedded parts through the provision of the track unit, but also provides a basis for the sliding of the hanging basket through the provision of the track. The provision of the track bayonet can effectively ensure the limited fixation of the hanging basket after positioning on the building slope.
[0015] Other features and advantages of the present invention will be described in the following description, and in part will become apparent from the description, or may be understood by practicing the present invention; the main purpose and other advantages of the present invention can be realized and obtained through the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a three-dimensional schematic diagram of the track-type hanging basket system on the building slope; Figure 2 It is a schematic diagram of the hanging unit, base unit, track unit and their connection structure; Figure 3 It is a schematic diagram of the connection structure of the track unit, transition assembly and embedded parts; Figure 4 This is a partial diagram of the connection structure of the track unit, adapter assembly and embedded parts. Figure 1 ; Figure 5 This is a partial diagram of the connection structure of the track unit, adapter assembly and embedded parts. Figure 2 ; Figure 6 is a schematic diagram of the base unit structure; Figure 7 It is a partial schematic diagram of the main base assembly; Figure 8 This is a diagram showing the connection between the main base assembly and the track unit. Figure 1 ; Figure 9 This is a diagram showing the connection between the main base assembly and the track unit. Figure 2 ; Figure 10 It is a schematic diagram of the initial state of the hook unit; Figure 11 This is the deployment diagram of the attachment unit Figure 1 ; Figure 12 This is the deployment diagram of the attachment unit Figure 2 ; Figure 13 It is a schematic diagram of the vertical setting of the hook unit; Figure 14 It is a schematic diagram of the folding of the hitch unit; Figure 15 It is a schematic diagram of the supporting state of the hanging unit; Figure 16 It is a schematic diagram of the hanging state of the hanging movable hook; Figure 17 It is a schematic diagram of the hanging movable hook and its connection structure.
[0017] Reference numerals: 1 - hanging basket, 2 - floor structure, 3 - hanging unit, 31 - hanging frame, 311 - main hanging frame, 312 - hanging movable hook, 313 - main hanging stop bar, 314 - hanging hook pulling hole, 315 - auxiliary hanging stop bar, 32 - hanging movable rod, 4 - base unit, 41 - main base assembly, 411 - main base frame, 412 - main base connecting plate, 413 - main base hoop cylinder, 414 - main base sliding assembly, 4141 - main base sliding main board, 4142 - main base sliding concave board, 4143 - main base sliding stop piece, 4144 - main base sliding roller, 4145 - main base sliding insertion plate, 415 - main base caster, 42 - auxiliary base assembly, 421 - auxiliary base support seat, 422 - auxiliary base cushion plate, 5 - track unit, 51 - track connection part, 52 - track back connection part, 53 - track bayonet, 6 - adapter assembly, 61 - adapter plate, 62 - adapter bolt, 7 - embedded part. Detailed implementation manners
[0018] Taking a certain inclined building as an example, the outer cantilever slab of its floor is designed in an inclined style. To ensure the effective installation and convenient use of the hanging basket during construction, as Figures 1 to 17 shown, a track - type hanging basket system on a building slope includes a hanging basket 1, a floor structure 2 above the hanging basket 1, a hanging unit 3 connected between the hanging basket 1 and the floor structure 2, a base unit 4 connected to the floor structure 2 and detachably connected to the hanging unit 3, and a track unit 5 connected to the floor structure 2 and slidably connected to the end of the base unit 4; the floor structure 2 is arranged obliquely.
[0019] In this embodiment, the hanging unit 3 includes a hanging frame 31 and a hanging movable rod 32 arranged on the hanging frame 31; the hanging frame 31 is a U - shaped member, the upper horizontal part of which is detachably connected to the base unit 4, the vertical part is set according to the designed height of the hanging basket 1, and the lower horizontal part is set according to the designed horizontal position of the hanging basket 1. The hanging frame 31 includes a U - shaped main hanging frame 311, a hanging movable hook 312 arranged at the bottom end of the vertical part, a main hanging stop bar 313 arranged at the bottom of the hanging movable hook 312, an auxiliary hanging stop bar 315 arranged in the top notch of the hanging movable hook 312, and a hanging hook pulling hole 314 arranged on the hanging movable hook 312 and on the side of the hook; the bottom end of the vertical part and the lower horizontal part of the main hanging frame 311 are hinged and fixed by the hanging movable hook 312.
[0020] In this embodiment, the base unit 4 includes a main base assembly 41 adjacent to the track unit 5 and a sub-base assembly 42 away from the track unit 5. The main base assembly 41 includes two parallel main base frames 411, a main base frame connecting plate 412 vertically connecting the two main base frames 411 and spaced apart in the longitudinal direction of the main base frames 411, a main base hoop 413 connected to the top of the main base frame connecting plate 412, and a main base sliding assembly 414 connected to the main base frame connecting plate 412 adjacent to the track unit 5. The auxiliary base assembly 42 is separately arranged from the main base assembly 41 , and the auxiliary base assembly 42 includes an auxiliary base support seat 421 and an auxiliary base pad 422 on the top of the auxiliary base support seat 421 ; the main base hoop 413 and the auxiliary base pad 422 are detachably connected to the hanging frame 31 .
[0021] In this embodiment, the main base frame 411 is made of two parallel H-shaped steels; the main base frame 411 is connected to the steel main base frame connecting plate 412; a notch is provided on the top of the main base frame connecting plate 412, and the notch corresponds to the fixed connection main base hoop 413; the outer side of the main base frame connecting plate 412 away from the side of the track unit 5 can also be detachably connected with the main base caster 415, and the main base caster 415 is provided corresponding to the floor structure 2.
[0022] The auxiliary base support seat 421 is a triangular support with casters at the bottom and a recess at the top, on which an auxiliary base pad 422 is provided. The auxiliary base pad 422 is an arc plate, which is arranged corresponding to the upper horizontal portion of the main frame 311.
[0023] In this embodiment, the base sliding assembly includes a main base sliding main plate 4141 vertically connected to the long ends of the main base frame connecting plate 412 and arranged in an inverted U shape with the main base frame connecting plate 412, a main base sliding concave plate 4142 connected to the outer edge of each main base sliding main plate 4141, a main base sliding roller 4144 connected to the middle and lower parts of each main base sliding main plate 4141, a main base sliding plug plate 4145 connected to the middle and lower parts of each main base sliding main plate 4141 and located between the middle and lower main base sliding rollers 4144, and a main base sliding stopper 4143 arranged at the protruding end of the middle main base sliding roller 4144 on the main base sliding main plate 4141 downstream in the sliding direction.
[0024] In this embodiment, the rail unit 5 includes a rail joint portion 51, a rail back connection portion 52 integrally connected to one side of the rail joint portion 51, and a rail bayonet 53 arranged at the connection between the rail joint portion 51 and the rail back connection portion 52; the rail joint portion 51 corresponds to the main base sliding component 414 that can be slidably connected.
[0025] In this embodiment, the main base sliding recessed plate 4142 is a rectangular plate and is provided with a notch on the side, and the notch is provided corresponding to the rail joint portion 51; the main base sliding stopper 4143 is a crescent-shaped wedge-shaped piece hingedly connected to the main base sliding roller 4144, and the crescent-shaped wedge-shaped piece is correspondingly clamped and fixed in the rail clamping groove 53.
[0026] In this embodiment, the rail joint part 51 is a ring-shaped part with a horizontal opening, and the opening direction is outward, and the opening corresponds to the main base sliding plug plate 4145; the rail back connection part 52 is a vertical plate and is provided with a T-shaped notch, and the T-shaped notch is detachably connected to the adapter assembly 6 through the adapter bolt 62, and the connection between the rail joint part 51 and the rail back connection part 52 is a horizontal plate; the horizontal plate is provided with rail clips 53 at intervals; the rail clips are rectangular holes, and the rectangular holes correspond to the main base sliding stopper 4143.
[0027] In this embodiment, an adapter assembly 6 is also provided, which includes an L-shaped adapter plate 61 and an adapter bolt 62 arranged on the adapter plate 61; the vertical portion of the adapter plate 61 is detachably connected to the rail back connection portion 52 through the adapter bolt 62, and the horizontal portion is detachably connected to the embedded part 7 through the adapter bolt 62.
[0028] like Figures 1 to 17 The following further illustrates the application method of the track-type hanging basket system on the building slope. The specific steps are as follows: Step 1: Pre-construct the floor structure 2, complete the main construction of the floor structure 2 and the construction of the embedded parts 7 corresponding to the curtain wall keel on the floor; lay the track unit 5 according to the designed length of the hanging basket 1 required for installation on the floor.
[0029] Step 2: Fix the track unit 5 on the embedded part 7 through the adapter assembly 6, and measure the installed track unit 5 to ensure it meets the design position requirements. If it does not meet the requirements, adjust it in time until it meets the design requirements.
[0030] Step 3. Assemble the base unit 4 on the floor structure 2, wherein the main base assembly 41 and the auxiliary base assembly 42 are separately arranged and can be assembled synchronously; connect the main base sliding concave plate 4142 and the main base sliding plug plate 4145 of the main base sliding assembly 414 in the main base assembly 41 to the corresponding rail joint part 51, and connect the rail joint part 51 by rolling the main base sliding roller 4144; wait for the main base assembly 41 to slide to the designed position on site, and extend the main base sliding stopper 4143 into the rail bayonet 53 for limiting; then install the auxiliary base assembly 42 accordingly.
[0031] Step 4. Install the hanging unit 3 on the base unit 4. When the hanging frame 31 is initially installed, the whole is located on the floor structure 2. The lower horizontal part of the hanging frame 31 is pushed out horizontally through the hanging movable rod 32, and the hanging frame 31 is vertically downward in an inverted L shape; then the vertical lower horizontal part is lifted to a horizontal state by lifting the hanging movable rod 32. At the same time, the hanging movable hook 312 in the hanging frame 31 hooks the hanging main stop rod 313 and is combined with the hanging auxiliary stop rod 315 to perform synchronous fixed limit.
[0032] When the hanging unit 3 is disassembled, the hanging hook 312 is pulled by the pull rope provided at the hanging hook hole 314, and the hanging movable hook 312 will be separated from the hanging main gear 313 and away from the hanging auxiliary gear 315, so that the lower horizontal part of the hanging frame 31 will return to the vertical state, and then the hanging movable rod 32 is adjusted to make the lower horizontal part of the hanging frame 31 rotate to the horizontal state, and then adjusted to the initial installation state for disassembly.
[0033] Step 5. After installing the hanging unit 3, install the hanging basket 1 on the lower horizontal part of the hanging frame 31, thereby completing the overall installation of the track-type hanging basket system on the building slope; when it is necessary to move to the next point in the track, first rotate the main base sliding stopper 4143 backward to disengage from the track bayonet 53 and then use the winch and manual labor to pull the base unit 4 to move it, and then rotate the main base sliding stopper 4143 again to enter the track bayonet 53 to limit it after reaching the designed position, thereby completing the mobile construction of the track-type hanging basket system on the building slope.
[0034] The above description is only a preferred specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that a person skilled in the art can conceive within the technical scope disclosed in the present invention should be included in the scope of protection of the present invention.
Claims
1. A track-type hanging basket system on a building slope, characterized in that: It includes a hanging basket, a floor structure above the hanging basket, a hanging unit connected between the hanging basket and the floor structure, a base unit connected to the floor structure and detachably connected to the hanging unit, and a track unit connected to the floor structure and slidably connected to the end of the base unit; the floor structure is obliquely arranged; The hanging unit includes a hanging frame and a hanging movable rod provided on the hanging frame; The base unit includes a main base component adjacent to the track unit and a sub-base component away from the track unit; The main base component includes two parallel main base frames, main base frame connecting plates vertically connected between the two main base frames and arranged at intervals in the longitudinal direction of the main base frames, a main base hoop cylinder connected to the top of the main base frame connecting plates, and a main base sliding component connected to the main base frame connecting plates near the track unit; The sub-base component is detachably arranged from the main base component. The sub-base component includes a sub-base support seat and a sub-base cushion plate on the top of the sub-base support seat; the main base hoop cylinder and the sub-base cushion plate are detachably connected to the hanging frame; The track unit includes a track connection head, a track back connection part integrally connected to one side of the track connection head, and a track bayonet arranged at the connection of the track connection head and the track back connection part; The track connection head is correspondingly slidably connected to the main base sliding component.
2. A track-type hanging basket system on a building slope as claimed in claim 1, characterized in that: The hanging frame is a U-shaped member, the upper horizontal part of which is detachably connected to the base unit, the vertical part is set with a height adapted to the designed height of the hanging basket, and the lower horizontal part is set corresponding to the designed horizontal position of the hanging basket.
3. A track-type hanging basket system on a building slope as claimed in claim 2, characterized in that: The hanging frame includes a U-shaped hanging main frame, a hanging movable hook arranged at the bottom end of the vertical part, a main hanging stop rod arranged at the bottom of the hanging movable hook, a sub-hanging stop rod arranged at the notch at the top of the hanging movable hook, and a hanging hook pulling hole arranged on the hanging movable hook and on the side of the hook; The bottom end of the vertical part of the hanging main frame and the lower horizontal part are hinged and fixed by the hanging movable hook.
4. A track-type hanging basket system on a building slope as claimed in claim 3, characterized in that: The main base frame is made of two parallel H-shaped steels; the main base frame is penetrated with a steel main base frame connecting plate; a notch is arranged at the top of the main base frame connecting plate, and the notch is correspondingly fixedly connected to the main base hoop cylinder; On the outer side of the main base frame connecting plate on the side away from the track unit, a main base caster is also detachably connected, and the main base caster is arranged corresponding to the floor structure.
5. The track-type hanging basket system on a building slope as claimed in claim 4, characterized in that: The sub-base support seat is a triangular support, with casters arranged at the bottom of the triangular support and a notch arranged at the top, and a sub-base cushion plate is arranged on the notch; the sub-base cushion plate is an arc plate, and the arc plate is arranged corresponding to the upper horizontal part of the hanging main frame.
6. A track-type hanging basket system on a building slope as claimed in claim 5, characterized in that: The base sliding component includes main base sliding main plates vertically connected to the two ends in the longitudinal direction of the main base frame connecting plate and arranged in an inverted U shape with the main base frame connecting plate, main base sliding concave plates connected to the outer sides of each main base sliding main plate, main base sliding rollers connected to the middle and lower parts of each main base sliding main plate, main base sliding insertion plates connected to the middle and lower parts of each main base sliding main plate and located between the middle and lower main base sliding rollers, and a main base sliding stop member arranged at the outer extension end of the middle main base sliding roller on the main base sliding main plate downstream in the sliding direction.
7. A track-type hanging basket system on a building slope as claimed in claim 6, characterized in that: The main base sliding concave plate is a rectangular plate and is provided with a notch on the side, and the notch is arranged corresponding to the track connection head; The main base sliding stop member is a crescent-shaped wedge member and is hinged to the main base sliding roller, and the crescent-shaped wedge member is correspondingly clamped and fixed in the track bayonet.
8. The track-type hanging basket system on a building slope as claimed in claim 7, characterized in that: The rail joint part is a ring-shaped part with a horizontal opening, and the opening is outward, and the opening is correspondingly connected to the main base sliding plate; The track back connection part is a vertical plate with a T-shaped notch, and the T-shaped notch is detachably connected to the adapter assembly by bolts; the connection between the track joint part and the track back connection part is a horizontal plate; the horizontal plate is provided with track bayonet holes at intervals; The track clip is a rectangular hole, which corresponds to the main base sliding stopper.
9. The track-type hanging basket system on a building slope as claimed in claim 8, characterized in that: An adapter assembly is also provided, the adapter assembly comprising an L-shaped adapter plate and an adapter bolt provided on the adapter plate; The vertical portion of the adapter plate is detachably connected to the track back connection portion through adapter bolts, and the horizontal portion is detachably connected to the embedded part through adapter bolts.
10. A method for applying the track-type hanging basket system on a building slope as claimed in claim 9, characterized in that: The specific steps are as follows: Step 1: Pre-construct the floor structure, complete the main construction of the floor structure and the construction of the embedded parts corresponding to the curtain wall keel on the floor; lay the track unit according to the designed length of the hanging basket required to be installed on the floor; Step 2: Fix the track unit to the embedded part through the adapter assembly, and measure the installed track unit to ensure it meets the design position requirements. If not, adjust it in time until it meets the design requirements. Step 3: Assemble the base unit on the floor structure, where the main base assembly and the auxiliary base assembly are separately arranged and can be assembled simultaneously; connect the main base sliding concave plate and the main base sliding plug plate of the main base sliding assembly in the main base assembly to the corresponding track joints, and use the main base sliding rollers to roll the track joints; when the main base assembly is slid to the designed position on site, the main base sliding stopper extends into the track bayonet to limit the position; then install the auxiliary base assembly accordingly; Step 4: Install the hanging unit on the base unit. When the hanging frame is initially installed, the whole is located on the floor structure. The lower horizontal part of the hanging frame is pushed out horizontally by the hanging movable rod, and the hanging frame is vertically downward in an inverted L shape. Then, the vertical lower horizontal part is pulled to a horizontal state by lifting the hanging movable rod. At the same time, the hanging movable hook in the hanging frame hooks the hanging main stop rod and combines with the hanging auxiliary stop rod to synchronously fix and limit. When disassembling the hook unit, the hook is pulled by the pull rope provided at the hook hook hole, and the hook movable hook will be separated from the hook main gear lever and away from the hook auxiliary gear lever, so that the lower cross section of the hook frame will return to the vertical state, and then the hook movable rod is adjusted to rotate the lower cross section of the hook frame to the horizontal state, and then adjusted to the initial installation state for disassembly; Step 5. After installing the hanging unit, install the hanging basket on the lower horizontal part of the hanging frame, thus completing the overall installation of the track-type hanging basket system on the building slope; when it is necessary to move to the next point in the track, first rotate the main base sliding stopper backward to disengage from the track bayonet and then use the winch and manual labor to pull the base unit to move, and then rotate the main base sliding stopper again to enter the track bayonet to limit it after reaching the designed position, thus completing the mobile construction of the track-type hanging basket system on the building slope.
Citation Information
Patent Citations
Construction method and device for two-track movable electric basket and lifting hoist
CN103711301A
Curtain wall unconventional hanging basket mounting structure and using method
CN119737040A
Movable steel box girder wing plate welding hanging basket
CN219862423U
Ring rail for hanging basket
CN220036085U
Building construction hanging basket
CN222456750U