Lower hanging protection structure for fourth-generation building large balcony climbing frame

By adding diagonal bracing and flip-plate components to the climbing scaffold, combined with temporary tie-downs, the safety issues of workers in the design of staggered balconies using climbing scaffolds were resolved, achieving a safe and reliable protective effect.

CN223661333UActive Publication Date: 2025-12-12SHAANXI YONGHONG XINGDA ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202422143838.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2025-12-12
Estimated Expiration
2034-09-02

AI Technical Summary

Technical Problem

In existing climbing scaffold designs with staggered balconies, the lack of balcony structures at the odd and even balconies puts formwork workers in a high-risk situation with a lack of effective protection.

Method used

Based on the traditional climbing scaffold, diagonal bracing is added between the lower hanging uprights and the inner and outer uprights, and diagonal bracing is added under the bottom scaffold board. Flip-plate components are used to achieve full sealing, and temporary bracing is added every 4 meters to form an overall safety protection.

Benefits of technology

It provides safety protection for workers, ensures safe and reliable operation, has a neat and uniform appearance, and is completely reliable internally, making it suitable for fourth-generation building balconies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223661333U_ABST
    Figure CN223661333U_ABST
Patent Text Reader

Abstract

The utility model discloses a big balcony climbing frame lower hanging protection structure for a fourth generation building, and relates to the technical field of building climbing frames, the big balcony climbing frame lower hanging protection structure comprises a lower hanging vertical rod, a floor plate and a big balcony, the upper end of the lower hanging vertical rod is provided with an inner vertical rod, one side of the inner vertical rod is provided with an outer vertical rod, a scaffold plate is arranged between the inner vertical rod and the outer vertical rod, and the scaffold plate is connected with the floor plate. Inclined struts are arranged between the outer vertical rods and the lower hanging vertical rods; on the basis that a traditional climbing frame is used, inclined struts are additionally arranged on inner vertical rods and outer vertical rods below scaffold boards on the bottommost layer, vertical rods below the inner vertical rods sink by the height of one floor, a transverse rod and a turning plate assembly are arranged at the bottommost part to achieve full sealing, and meanwhile temporary pulling knots are made every four meters; therefore, an integral safety protection effect is achieved from outside to inside, the appearance is neat and uniform, the interior is completely reliable, and operation of workers is safe, convenient and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building climbing frame technical field especially relates to a kind of for the fourth generation building large balcony climbing frame under hanging protective structure. BACKGROUND

[0002] Climbing frame is also called lifting frame, which is a new type of scaffold system developed by the present application.Climbing frame is composed of support frame, tripod, support panel and other parts, and has the characteristics of no height limit, labor saving, material saving and safety.Climbing frame can be divided into hydraulic type, electric type and manual type according to its power source.

[0003] The existing climbing frame has the problem that if the traditional climbing frame process is used for the design of the large balcony of the staggered floor, the odd and even floors of the large balcony are not protected, and the workers are exposed to high-risk situations at the edge of the balcony without protection.Therefore, the utility model provides a fourth generation building large balcony climbing frame under hanging protective structure. UTILITY MODEL CONTENTS

[0004] In view of the deficiencies of the prior art, the utility model provides a fourth generation building large balcony climbing frame under hanging protective structure to solve the problems raised in the background.

[0005] To achieve the above purpose, the utility model is implemented by the following technical scheme: a fourth generation building large balcony climbing frame under hanging protective structure, comprising a hanging vertical rod, a floor panel and a large balcony, the upper end of the hanging vertical rod is provided with an inner vertical rod, one side of the inner vertical rod is provided with an outer vertical rod, a scaffold panel is arranged between the inner vertical rod and the outer vertical rod, an inclined brace is arranged between the outer vertical rod and the hanging vertical rod, a hanging protective mesh is arranged on the outer side of the hanging vertical rod, a temporary tie is mounted on one side of the hanging vertical rod, a crossbar is arranged on one side of the hanging vertical rod, a cross plate is connected to one side of the crossbar, and a flap assembly is arranged on one side of the cross plate.

[0006] The flap assembly comprises a secondary plate, a flap is arranged on one side of the secondary plate, and a hinge is arranged between the secondary plate and the flap.

[0007] As a further technical scheme of the utility model, the number of the hanging vertical rods and the inner vertical rods is several groups and is arranged in an array, the outer vertical rod and the inner vertical rod are connected by the scaffold panel, and the hanging protective mesh is mounted by bolts between the two groups of hanging vertical rods.

[0008] As a further technical scheme of the utility model, the outer vertical rod and the hanging vertical rod are connected by the inclined brace, the number of the inclined braces is equal to the number of the hanging vertical rods, and the two ends of the temporary tie are connected and fixed to the hanging vertical rod and the large balcony by foundation bolts.

[0009] As a further technical scheme of the utility model, a plurality of groups of the floor plate and the large balcony are integrated structures, the horizontal rod and the lower hanging vertical rod are fixedly connected through bolts, and the horizontal plate and the horizontal rod are connected.

[0010] As a further technical scheme of the utility model, the number of the sub-plates is equal to the number of the turning plates.

[0011] As a further technical scheme of the utility model, the turning plate and the sub-plate are connected through a hinge, and one side of the sub-plate is connected to the horizontal plate.

[0012] The utility model provides a kind of for fourth generation building large balcony climbing frame lower hanging protective structure.Compared with prior art, it has the following beneficial effects:

[0013] The design is a kind of for fourth generation building large balcony climbing frame lower hanging protective structure, which adds diagonal bracing at the inner vertical rod and the outer vertical rod under the bottom layer footboard based on the use of traditional climbing frame, and the inner vertical rod is lowered by one floor height, the bottom is made into horizontal rod and turning plate assembly to realize full sealing, and temporary tie is made every 4 meters, so that a whole safety protection effect is formed from outside to inside, appearance is neat and unified, inside is completely reliable, worker is safe, convenient and reliable to operate. DETAILED DESCRIPTION

[0014] Fig. 1 It is a structural schematic view of a kind of for fourth generation building large balcony climbing frame lower hanging protective structure;

[0015] Fig. 2 It is a side view of a kind of for fourth generation building large balcony climbing frame lower hanging protective structure;

[0016] Fig. 3 It is another view of a kind of for fourth generation building large balcony climbing frame lower hanging protective structure.

[0017] In the drawing: 1, lower hanging vertical rod;2, inner vertical rod;3, outer vertical rod;4, footboard;5, diagonal bracing;6, lower hanging protective screen;7, temporary tie;8, floor plate;9, large balcony;10, horizontal rod;11, turning plate assembly;111, sub-plate;112, turning plate;113, hinge;12, horizontal plate. DETAILED DESCRIPTION

[0018] Clearly, the described embodiments are merely a part of the embodiments of the present application, rather than all the embodiments, and all the other embodiments obtained by those skilled in the art without creative efforts on the basis of the embodiments of the present application shall fall within the scope of the present application.

[0019] Please refer to Figs. 1-3 The utility model provides a kind of for fourth generation building big balcony climbing frame lower hanging protective structure technical scheme: a kind of for fourth generation building big balcony climbing frame lower hanging protective structure, including lower hanging vertical pole 1, floor slab 8 and big balcony 9, the upper end of lower hanging vertical pole 1 is provided with inner vertical pole 2, one side of inner vertical pole 2 is provided with outer vertical pole 3, footboard 4 is provided between inner vertical pole 2 and outer vertical pole 3, diagonal brace 5 is provided between outer vertical pole 3 and lower hanging vertical pole 1, the outside of lower hanging vertical pole 1 is provided with lower hanging protective screen 6, temporary tie 7 is installed in one side of lower hanging vertical pole 1, one side of lower hanging vertical pole 1 is provided with cross bar 10, cross bar 10 is connected with cross plate 12 on one side, one side of cross plate 12 is provided with flap assembly 11;

[0020] Wherein, flap assembly 11 includes vice plate 111, one side of vice plate 111 is provided with flap 112, hinge 113 is provided between vice plate 111 and flap 112.

[0021] As Figs. 1-3 Indicated, the number of lower hanging vertical pole 1 and inner vertical pole 2 is several groups and array distribution, outer vertical pole 3 and inner vertical pole 2 are connected by footboard 4, two groups of lower hanging vertical pole 1 are provided with lower hanging protective screen 6 by bolt, outer vertical pole 3 and lower hanging vertical pole 1 are connected by diagonal brace 5, the number of diagonal brace 5 is equal to the number of lower hanging vertical pole 1, the both ends of temporary tie 7 are connected and fixed between lower hanging vertical pole 1 and big balcony 9 by anchor bolt, to facilitate the support of lower hanging vertical pole 1.

[0022] As Figs. 1-3 Indicated, one group of floor slab 8 and big balcony 9 are integrated structure, cross bar 10 and lower hanging vertical pole 1 are fixedly connected by bolt, cross plate 12 and cross bar 10 are connected, facilitate the installation of cross plate 12.

[0023] As Figs. 1-3 Indicated, the number of vice plate 111 is several groups and array distribution, one side of flap 112 is contacted with the edge of big balcony 9, the number of flap 112 is equal to the number of vice plate 111, flap 112 and vice plate 111 are connected by hinge 113, one side of vice plate 111 and cross plate 12 are connected, to facilitate the use of flap assembly 11, the most bottom does cross bar 10 plus flap assembly 11 realizes full sealing.

[0024] The working principle of the utility model is: on the basis of using traditional climbing frame, add inclined brace 5 at inner stand pole 2 and outer stand pole 3 under the bottom layer footboard 4, hang down stand pole 1 at inner stand pole 2 by one floor height, make horizontal pole 10 at the bottom to realize full sealing with turning plate assembly 11, through the setting of hinge 113, can overturn turning plate 112 along with auxiliary plate 111, at the same time, make temporary tie 7 every 4 meters, fix temporary tie 7 with hanging down stand pole 1 and large balcony 9, form a whole safety protection effect from outside to inside, appearance neat and unified, inside completely reliable, worker operation safe, convenient and reliable, it is the fourth generation high-rise building staggered layer large balcony climbing frame to make a big innovation breakthrough.

[0025] Need to explain, all use hanging down component materials and original climbing frame material specification material quality are unified, deployment is convenient, disassembly and assembly are convenient, appearance neat, inside safe and reliable, is worth promoting.

[0026] The above is only the preferred embodiment of the utility model, it should be pointed out that for the ordinary skilled person in the art, on the premise of not departing from the principle of the utility model, can make a number of improvements and refinements, these improvements and refinements also should be regarded as the protection scope of the utility model. The structure, device and operation method not specifically described and explained in the utility model, are implemented according to conventional means in the art, if no special description and limitation.

Claims

1. A protective structure for a climbing scaffold on a large balcony in fourth-generation buildings, comprising a hanging pole (1), a floor slab (8), and a large balcony (9), characterized in that, An inner upright (2) is provided at the upper end of the lower hanging upright (1), an outer upright (3) is provided on one side of the inner upright (2), a scaffold board (4) is provided between the inner upright (2) and the outer upright (3), a diagonal brace (5) is provided between the outer upright (3) and the lower hanging upright (1), a lower hanging protective net (6) is provided on the outside of the lower hanging upright (1), a temporary tie (7) is installed on one side of the lower hanging upright (1), a horizontal bar (10) is provided on one side of the lower hanging upright (1), a horizontal plate (12) is connected to one side of the horizontal bar (10), and a flip-plate assembly (11) is provided on one side of the horizontal plate (12). The flap assembly (11) includes a sub-plate (111), a flap (112) is provided on one side of the sub-plate (111), and a hinge (113) is provided between the sub-plate (111) and the flap (112).

2. The protective structure for the undercarriage of a climbing scaffold for a fourth-generation building balcony as described in claim 1, characterized in that, The number of the lower hanging poles (1) and the inner poles (2) are several groups and arranged in an array. The outer poles (3) and the inner poles (2) are connected by scaffold boards (4). The lower hanging protective net panels (6) are installed between the two groups of lower hanging poles (1) by bolts.

3. The protective structure for the undercarriage of a climbing scaffold for a fourth-generation building balcony as described in claim 1, characterized in that, The outer upright (3) and the lower hanging upright (1) are connected by diagonal bracing (5). The number of diagonal bracing (5) is equal to the number of lower hanging upright (1). The two ends of the temporary tie (7) are connected and fixed to the lower hanging upright (1) and the large balcony (9) respectively by anchor bolts.

4. The protective structure for the undercarriage of a climbing scaffold for a fourth-generation building balcony as described in claim 1, characterized in that, The floor slab (8) and the large balcony (9) are an integral structure. The horizontal bar (10) and the lower hanging pole (1) are fixedly connected by bolts. The horizontal plate (12) is connected to the horizontal bar (10).

5. A protective structure for the undercarriage of a climbing scaffold for a fourth-generation building balcony as described in claim 1, characterized in that, The number of the sub-plates (111) is several groups and they are arranged in an array. One side of the flip plate (112) is in contact with the edge of the large balcony (9). The number of flip plates (112) is equal to the number of sub-plates (111).

6. A protective structure for the undercarriage of a climbing scaffold for a fourth-generation building balcony as described in claim 1, characterized in that, The flap (112) and the sub-plate (111) are connected by a hinge (113), and one side of the sub-plate (111) is connected to the cross plate (12).

Citation Information

Cited By

  • Climbing frame self-adaptive continuous protection system for spring-storey building and construction method

    CN121700953A