Automatic winder
By using an independently driven second guide unit and cradle operating unit, the problem of reduced operating rate of automatic winding machine caused by yarn not being able to be properly hung on the winding bobbin is solved, achieving efficient yarn splicing and improved production efficiency.
Patent Information
- Application Number
- CN202510311291.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-04-18
- Filing Date
- 2025-03-14
- Publication Date
- 2025-10-24
AI Technical Summary
When the yarn cannot be properly hung on the winding bobbin, the existing automatic winder will cause a decrease in operating rate, requiring manual intervention, which affects production efficiency.
The introduction of a second guide section and a cradle operating section, controlled independently by different drive sources, enables yarn retry processing, ensuring that the yarn can be properly hung on the winding bobbin and retrying when necessary, thus avoiding a decrease in operating rate due to yarn hanging failure.
The independent control of the second guide section and the cradle operation section reduces the decrease in operating rate caused by yarn splicing failure, improves the production efficiency and reliability of the automatic winding machine, and reduces the need for manual intervention.
Smart Images

Figure CN120829082A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to an automatic winder that winds a yarn. BACKGROUND
[0002] The automatic winder disclosed in Patent Literature 1 has a yarn winding unit (hereinafter referred to as a yarn winding unit) that winds a yarn and a doffer. The yarn winding unit winds a yarn that is unwound from a supply bobbin on a winding bobbin to form a package. The yarn winding unit ends winding when a package of a yarn that has been wound to a predetermined length (weight) is formed (i.e., winding of the yarn is completed). The package in which winding is completed is generally referred to as a "full bobbin" or a "package that becomes a full package". Hereinafter, such a package will be referred to as a package that becomes a full package for convenience of explanation. The doffer unloads the package that becomes a full package from the yarn winding unit and mounts an empty winding bobbin on the yarn winding unit. More specifically, when the package becomes a full package, the yarn that is running is cut in the yarn winding unit, and the yarn on the supply bobbin side is guided toward the doffer through a lower yarn guide tube (a first guide portion). The yarn guided through the first guide portion is guided toward the empty winding bobbin through a yarn lead-out arm (a second guide portion) that the doffer has. By hanging the yarn guided toward the winding bobbin on the empty winding bobbin, it is possible to start formation of the next package. The operation of such a doffer is generally referred to as doffing.
[0003] Patent Literature 1: Japanese Patent Application Laid-Open No. 2013-56766
[0004] Although not explicitly described in Patent Literature 1, based on a detection result of a yarn quality measurer (a detection portion) that the yarn winding unit has, it is possible to determine whether the yarn is properly connected between the supply bobbin and the winding bobbin. Here, at the time of doffing, sometimes the yarn cannot be properly hung on the empty winding bobbin due to a reason such as the yarn not being properly caught by the catching portion. In such a case, conventionally, based on the detection result of the detection portion, the operation of the yarn winding unit is stopped. After that, in order to restart the operation of the yarn winding unit so that the doffer can perform doffing again, an operator's response is always required. Therefore, there is a problem that the operating rate of the automatic winder decreases due to a standby time until the operator performs the response and the like. SUMMARY
[0005] An object of the present application is to suppress a decrease in the operating rate of an automatic winder due to a yarn not being properly hung on a winding bobbin.
[0006] The automatic winder of the first invention has a yarn winding unit capable of performing a winding operation of winding a yarn drawn from a supply bobbin on a winding bobbin to form a package, a doffing device capable of performing doffing of replacing the package with an empty winding bobbin, and a control section, characterized in that the yarn winding unit has a supply section that supports the supply bobbin, a winding section on which the winding bobbin is mounted, and a first guide section configured to guide the yarn supplied from the supply bobbin to the doffing device when the doffing is performed, the doffing device has a second guide section configured to perform a receiving guide operation of receiving the yarn from the first guide section, holding a supply yarn that is the yarn on the supply section side among the yarn broken between the supply section and the winding section, and guiding the supply yarn to the winding section, and the control section, after causing the second guide section to perform the receiving guide operation, before causing the yarn winding unit to start the winding operation, performs a retry process including a process of causing the second guide section to perform the receiving guide operation again, when it is determined based on a detection result of a detection section configured to be able to detect the supply yarn that the supply yarn is not normally guided to the winding section through the second guide section.
[0007] According to the invention, in the case where the receiving guide operation fails, a retry process including the receiving guide operation is performed. Therefore, the receiving guide operation can be performed again before the winding operation starts. Thus, it is possible to suppress the occurrence of a case where the winding operation is started in a state where the receiving guide operation has failed. Therefore, it is possible to suppress a decrease in the operation rate of the automatic winder due to the yarn not being normally mounted on the winding bobbin.
[0008] The automatic winder of the second invention, in the first invention, is characterized in that the detection section has a clearer configured to be provided to the yarn winding unit and capable of detecting information related to the quality of the yarn.
[0009] Generally, a clearer is mounted on the yarn winding unit of the automatic winder. Therefore, compared to a case where a detection section is newly provided on the automatic winder, it is possible to suppress an increase in the manufacturing cost of the automatic winder.
[0010] The automatic winder of the third application, in the first application or the second application, is characterized in that the winding section has a creel configured to hold the winding tube so as to be freely rotatable, and configured to mount the yarn to the winding tube by clamping the yarn between the creel and the winding tube, the doffing device has a creel operating section that switches the state of the creel between a release state that releases the winding tube and a holding state that holds the winding tube and can clamp the yarn between the winding tube, the second guide section and the creel operating section are driven by different drive sources from each other.
[0011] In the structure in which the second guide section and the creel operating section are driven by the same drive source, the second guide section and the creel operating section are caused to act, for example, by a proper cam mechanism. Generally, the cam mechanism cannot stop the action and perform other actions from the start to the end of a prescribed series of actions. In this regard, in the present application, the second guide section can act at an arbitrary timing independently of the action of the creel operating section. Therefore, the retry processing can be performed at the optimum timing according to the situation.
[0012] The automatic winder of the fourth application, in the third application, is characterized in that the control section performs the retry processing before controlling the creel operating section to make the state of the creel the holding state.
[0013] In the present application, the retry processing is performed at an earlier timing. Therefore, even in the case where the second guide section fails to receive the yarn from the first guide section, the loss of time until the start of the winding action can be reduced.
[0014] The automatic winder of the fifth application, in the second application, is characterized in that the winding section has a creel configured to hold the winding tube so as to be freely rotatable, and configured to mount the yarn to the winding tube by clamping the yarn between the creel and the winding tube, the doffing device has a creel operating section that switches the state of the creel between a release state that releases the winding tube and a holding state that holds the winding tube and can clamp the yarn between the winding tube, the control section judges whether the supply yarn is normally guided to the winding section by the second guide section after controlling the creel operating section to make the state of the creel the holding state.
[0015] Generally, the yarn clearer is used to detect the yarn connected between the supply bobbin and the winding bobbin. In the present application, by making the state of the creel to be the holding state, the yarn disposed between the supply bobbin and the winding bobbin can be stabilized. In other words, the swing of the yarn guided to the winding portion and the like can be suppressed. Therefore, the yarn can be stably detected by the yarn clearer.
[0016] The automatic winder of the sixth application, in the fifth application, is characterized in that the second guide portion and the creel operating portion are driven by different drive sources from each other.
[0017] In the present application, the second guide portion can act at any timing independently of the operation of the creel operating portion. Therefore, the retry processing can be performed at the optimum timing according to the situation.
[0018] The automatic winder of the seventh application, in the first application, is characterized in that the detection portion is provided on the doffing device.
[0019] In most cases, the automatic winder has a plurality of yarn winding units, and the doffing device is used as a device common to the plurality of yarn winding units. Therefore, in a case where it is necessary to newly provide the detection portion on the automatic winder, if the detection portion is installed on each of the plurality of yarn winding units, a large cost increase can occur. In this regard, in the present application, the number of detection portions can be suppressed to be small. Therefore, an increase in the manufacturing cost of the automatic winder can be suppressed.
[0020] The automatic winder of the eighth application, in the first to seventh applications, is characterized in that the automatic winder has a yarn joining portion configured to be disposed between the supply portion and the winding portion in the traveling direction of the yarn, and capable of joining the broken yarn, and the first guide portion is configured to be capable of guiding the supply yarn to the yarn joining portion.
[0021] In the automatic winder configured such that the first guide portion guides the supply yarn to the yarn joining portion, it is generally difficult to guide the supply yarn to the vicinity of the winding portion by the first guide portion. Therefore, in order to receive the yarn from the first guide portion, at least a part of the second guide portion needs to move a long distance to the vicinity of the yarn joining portion. In such a situation, a long member is generally included in the member constituting the second guide portion. Then, due to the unexpected flexion and the like of the long member, the possibility that the second guide portion fails to receive the yarn from the first guide portion becomes high. In such a structure, the retry processing is particularly effective.
[0022] The automatic winder of the ninth application, in the first application to the eighth application, is characterized in that the control section is configured to be able to set an upper limit value of the number of times of execution of the retry processing, i.e., a maximum number of executions, and after the retry processing is performed the maximum number of executions, the control section ends the retry processing with respect to the yarn winding unit.
[0023] If the number of times of retry processing is too small, the number of times that the operator has to deal with the failure of the action of the doffer increases, and the time and labor of the operator increase. On the other hand, if the number of times of retry processing is too large, the doffer can repeatedly receive the failure of the guiding action for a long time, and the operation rate of the automatic winder can decrease. In the present application, by appropriately setting the maximum number of executions, it is possible to take into account both the reduction of the time and labor of the operator and the suppression of the decrease in the operation rate of the automatic winder.
[0024] The automatic winder of the tenth application, in the first application to the ninth application, is characterized in that the automatic winder has a supply bobbin replacing section configured to be able to replace the supply bobbin supported by the supply section, i.e., a first supply bobbin, with another supply bobbin, i.e., a second supply bobbin, the detection section has a withdrawal detection section able to detect information related to whether the yarn is normally withdrawn from the first supply bobbin, and the control section, before the retry processing, judges whether the yarn is normally withdrawn from the first supply bobbin based on the detection result of the withdrawal detection section, and in the case where it is judged that the yarn is not normally withdrawn from the first supply bobbin, the control section controls the supply bobbin replacing section to replace the first supply bobbin with the second supply bobbin, and then starts the retry processing.
[0025] The state in which the yarn is not normally withdrawn from the first supply bobbin means that the yarn in the supply bobbin is depleted or a state in which the yarn is not properly withdrawn from the supply bobbin occurs. In the present application, the supply bobbin is replaced in the case where the yarn is not normally withdrawn, and thus it is possible to smoothly perform the retry processing.
[0026] The automatic winder of the eleventh application, in the first application to the tenth application, is characterized in that the control section has a unit control section provided to the yarn winding unit and a doffing control section provided to the doffer, and in the case where the supply yarn is not detected by the detection section, the unit control section outputs a detection abnormality signal indicating the case where the supply yarn is not normally detected to the doffing control section.
[0027] Generally, the unit control section and the doffing control section are respectively provided to the automatic winder. Therefore, by exchanging the detection abnormality signal between the unit control section and the doffing control section, it is not necessary to provide a new upper control section.
[0028] The automatic winder of the twelfth application, in the eleventh application, wherein the doffing control section, upon receiving the detection abnormality signal, judges whether to execute the retry processing or to suspend the doffing, in the case of judging to execute the retry processing, outputs a signal indicating the retry processing to the unit control section, and in the case of judging to suspend the doffing, outputs a signal indicating the suspension of the doffing to the unit control section.
[0029] In this case, by exchanging each signal between the unit control section and the doffing control section, it is not necessary to provide a new upper control section.
[0030] The automatic winder of the thirteenth application, in the twelfth application, wherein the unit control section, upon receiving the signal indicating the retry processing, causes the first guide section to catch the supply yarn and guide to the doffing device.
[0031] Thereby, it is possible to promptly execute the retry processing. BRIEF DESCRIPTION OF DRAWINGS
[0032] Figure 1 is a front view of the automatic winder of the present embodiment.
[0033] Figure 2 is a block diagram showing the electrical structure of the automatic winder.
[0034] Figure 3 is a schematic front view of the yarn winding unit.
[0035] Figure 4 is a schematic side view of the yarn winding unit.
[0036] Figure 5 is a plan view of the supply bobbin handling device.
[0037] Figure 6 is a schematic front view of the doffing device.
[0038] Figure 7 is a schematic side view of the doffing device.
[0039] Figure 8 is a view showing the state in which the under yarn catching guide section catches the under yarn at the time of doffing. Figure 9 is a view showing the state in which the piston rod is elongated at the time of doffing.
[0040] Figure 10 is a view showing the halfway passage of doffing.
[0041] Figure 11 is a view showing the state in which the under yarn is drawn upward at the time of doffing.
[0042] Figure 12 is a view showing a state in which the under thread is guided toward the vicinity of the creel at the time of doffing.
[0043] Figure 13 is a view showing a state in which the under thread is guided toward the vicinity of the creel at the time of doffing.
[0044] Figure 14 is a flowchart showing the control of the unit control section at the time of doffing.
[0045] Figure 15 is a flowchart showing the control of the doffing control section at the time of doffing.
[0046] Figure 16 is a schematic side view of a doffing device of a modification.
[0047] Explanation of reference numerals:
[0048] 1: automatic winder
[0049] 2: yarn winding unit
[0050] 3: doffing device
[0051] 4: supply bobbin handling device (supply bobbin changing section)
[0052] 6: machine table control device (control section)
[0053] 11: supply section
[0054] 13: winding section
[0055] 14: unit control section (control section)
[0056] 24: ejector (supply bobbin changing section)
[0057] 31: thread guiding device (unwinding detection section)
[0058] 33: thread receiving device (thread receiving section)
[0059] 34: thread clearer (detection section)
[0060] 35: under thread catching guide section (first guide section)
[0061] 41: creel
[0062] 61: thread catching arm (second guide section)
[0063] 64: creel opener (creel operating section)
[0064] 65: thread detection sensor (detection section)
[0065] 100: doffing control section (control section)
[0066] Bs: supply bobbin
[0067] Bs1: supply bobbin (first supply bobbin)
[0068] Bs2: supply bobbin (second supply bobbin)
[0069] Bw: winding bobbin
[0070] P: package
[0071] Y: yarn
[0072] Y1: lower yarn (supply yarn) DETAILED DESCRIPTION
[0073] Embodiments of the present application will be described. For ease of explanation, as shown in FIG. 1, a direction in which a plurality of yarn winding units 2 to be described later are arranged is taken as a left-right direction. A direction parallel to a vertical direction in which the force of gravity acts is taken as an up-down direction. The left-right direction and the up-down direction are orthogonal to each other. A direction orthogonal to both the left-right direction and the up-down direction is taken as a front-rear direction. Figure 1
[0074] (Outline structure of automatic winder)
[0075] Referring to Figure 1 and Figure 2 the outline structure of the automatic winder 1 of the present embodiment will be described. Figure 1 is a front view of the automatic winder 1. Figure 2 is a block diagram showing the electrical structure of the automatic winder 1. As shown in Figure 1 , the automatic winder 1 has a plurality of yarn winding units 2, a doffing device 3, a supply bobbin carrying device 4, a supply bobbin preparation device 5, and a machine bed control device 6.
[0076] Each of the plurality of yarn winding units 2 is configured to wind a yarn Y drawn from a supply bobbin Bs on a winding bobbin Bw (see Figure 3 ) to form a package P. As shown in Figure 1 , the plurality of yarn winding units 2 are arranged in the left-right direction. The yarn winding unit 2 ends winding when a package P of a yarn wound to a predetermined length (weight) is formed (i.e., when winding of the yarn is completed). The package P after the winding is completed is generally referred to as a "full bobbin" or a "package that becomes a full package". Hereinafter, for ease of explanation, such a package P is referred to as a package P that becomes a full package (or a full package).
[0077] The doffing device 3 is configured to perform a doffing of a package P that has become full from the yarn winding unit 2, and the like. The doffing device 3 is configured to be movable along a rail 3a that extends in the left-right direction. The doffing device 3 moves above the yarn winding unit 2 from which a signal indicating that the package P has become full has been received, and performs the doffing. The doffing device 3 will be described in more detail later. Figure 1 The doffing device 3 is configured to perform a doffing of a package P that has become full from the yarn winding unit 2, and the like. The doffing device 3 is configured to be movable along a rail 3a that extends in the left-right direction. The doffing device 3 moves above the yarn winding unit 2 from which a signal indicating that the package P has become full has been received, and performs the doffing. The doffing device 3 will be described in more detail later.
[0078] The supply bobbin handling device 4 is configured to handle a tray T (see Figure 3 ) that supports a supply bobbin Bs on which the yarn Y is wound, to the yarn winding unit 2. In addition, the supply bobbin handling device 4 is configured to handle the supply bobbin Bs that is ejected from the yarn winding unit 2, to the supply bobbin preparation device 5.
[0079] The supply bobbin preparation device 5 performs a prescribed process (a well-known lead-through process, or the like) on the supply bobbin Bs. Thereby, the supply bobbin Bs becomes in a state in which the yarn Y can be led out in the yarn winding unit 2. The supply bobbin preparation device 5 supplies the supply bobbin Bs on which the prescribed process has been performed, to the supply bobbin handling device 4. The supply bobbin preparation device 5 receives the supply bobbin Bs that is ejected from the yarn winding unit 2, from the supply bobbin handling device 4.
[0080] As shown in Figure 1 , the machine control device 6 is disposed, for example, on the left side of the plurality of yarn winding units 2. The machine control device 6 is electrically connected to the unit control section 14 (see Figure 2 ) of the yarn winding unit 2, the doffing control section 100 (see Figure 2 ) of the doffing device 3, and the like, and communicates with these control sections. The combination of the machine control device 6, the unit control section 14, and the doffing control section 100 corresponds to the control section of the present application. The combination of these can be appropriately changed, and for example, the control section of the present application can be realized by only the combination of the unit control section 14 and the doffing control section 100.
[0081] (Yarn Winding Unit)
[0082] Next, the structure of the yarn winding unit 2 will be described with reference to Figures 2-4 . Figure 3 is a schematic front view of the yarn winding unit 2. Figure 4 is a schematic side view of the yarn winding unit 2.
[0083] As shown in Figure 3As shown, the yarn winding unit 2 has a frame 10, a yarn supply section 11, a yarn processing execution section 12, a winding section 13, and a unit control section 14. The frame 10 is, for example, a hollow member extending in the up-and-down direction. The setting position of the frame 10 is fixed. The yarn supply section 11, the yarn processing execution section 12, and the winding section 13 are provided on the frame 10 and arranged in this order from the upstream to the downstream in the travel direction of the yarn Y. In addition, the yarn supply section 11, the yarn processing execution section 12, and the winding section 13 are arranged in this order from the lower side to the upper side. The unit control section 14 is housed, for example, inside the frame 10.
[0084] The yarn supply section 11 is configured to be able to supply the yarn Y wound on the supply bobbin Bs. The yarn supply section 11 has a supply bobbin support section 21 and a yarn unwinding assisting device 22. The supply bobbin support section 21 supports the tray T on which the supply bobbin Bs is mounted in a substantially upright state. The yarn unwinding assisting device 22 restricts the expansion of the yarn Y when the yarn Y is unwound from the supply bobbin Bs by means of a restriction cylinder 23. The restriction cylinder 23 is configured to move downward as the amount of the yarn Y wound on the supply bobbin Bs decreases, and to keep the size of the above-mentioned expansion constant.
[0085] In addition, the yarn supply section 11 has an ejector 24 (a supply bobbin replacing section of the present application). The ejector 24 is configured to be able to eject the supply bobbin Bs, for which the supply of the yarn Y is ended, from the yarn winding unit 2. The end of the supply of the yarn Y means a state in which the supply bobbin Bs is empty or the yarn Y cannot be drawn from the supply bobbin Bs for some reason.
[0086] The yarn processing execution section 12 is used to execute various processes related to the yarn Y. The yarn processing execution section 12 has a yarn detector 31 (an unwinding detection section of the present application), a tension imparting device 32, a yarn joining device 33 (a yarn joining section of the present application), and a yarn clearer 34 (a detection section of the present application).
[0087] The yarn detector 31 is configured to be able to detect the presence or absence of the yarn Y between the yarn unwinding assisting device 22 and the tension imparting device 32. The yarn detector 31 can have, for example, a publicly known optical sensor of the transmission type or the reflection type.
[0088] The tension imparting device 32 is configured to be able to impart a prescribed tension to the traveling yarn Y. As an example of the tension imparting device 32, a so-called fence type device can be given. As shown in FIG. 2, a plurality of fixed fence bodies 32a and a plurality of movable fence bodies 32b are arranged alternately in the up-and-down direction. By adjusting the positions of the plurality of movable fence bodies 32b in the horizontal direction, a prescribed tension is imparted to the yarn Y traveling between the fixed fence bodies 32a and the movable fence bodies 32b. Figure 3
[0089] The yarn joining device 33 is configured to join the yarn Y on the supply portion 11 side and the yarn Y on the winding portion 13 side when the yarn Y is broken between the supply portion 11 and the winding portion 13. Hereinafter, for the sake of convenience of explanation, the yarn Y on the supply portion 11 side among the broken yarn Y will be referred to as a lower yarn Yl (a supply yarn according to the present application). Also, the yarn Y on the winding portion 13 side (i.e., the yarn Y on the package P side) will be referred to as an upper yarn Y2. As an example of the yarn joining device 33, a compressed air type yarn joining device can be given. The yarn joining device 33 blows compressed air supplied from a not-shown compressed air source to the lower yarn Yl and the upper yarn Y2, and temporarily loosens the yarn ends of the two yarns. Thereafter, the yarn joining device 33 blows the compressed air again to the yarn ends of the two yarns, and joins the yarn ends to each other by winding them around each other.
[0090] A lower yarn catching guide 35 (a first guide according to the present application) configured to be able to catch the lower yarn Yl and guide it toward the yarn joining device 33 is provided on the lower side (upstream side) of the yarn joining device 33. The lower yarn catching guide 35 has a shaft 35a, an arm 35b, and a suction port 35c. The shaft 35a extends, for example, in the left-right direction. The arm 35b is a tubular member rotatable about the shaft 35a. The suction port 35c is provided at the top end portion of the arm 35b. The suction port 35c is configured to be able to suck and catch the yarn end of the lower yarn Yl. The arm 35b is rotationally driven by an arm motor 37.
[0091] An upper yarn catching guide 36 configured to be able to catch the upper yarn Y2 and guide it toward the yarn joining device 33 is provided on the upper side (downstream side) of the yarn joining device 33. The upper yarn catching guide 36 has a shaft 36a, an arm 36b, and a suction port 36c. The shaft 36a extends, for example, in the left-right direction. The arm 36b is a tubular member rotatable about the shaft 36a. The suction port 36c is provided at the top end portion of the arm 36b. The suction port 36c is configured to be able to suck and catch the yarn end of the upper yarn Y2. The arm 36b is rotationally driven by an arm motor 38.
[0092] The lower yarn Yl guided toward the yarn joining device 33 by the lower yarn catching guide 35 and the upper yarn Y2 guided toward the yarn joining device 33 by the upper yarn catching guide 36 are joined by the yarn joining device 33.
[0093] The yarn clearer 34 is configured to be able to acquire information on the quality (specifically, thickness, etc.) of the running yarn Y. The yarn clearer 34 detects a yarn defect on the basis of the information. A cutter 34a is provided in the vicinity of the yarn clearer 34. When the yarn clearer 34 detects a yarn defect, the cutter 34a immediately cuts the yarn Y. At substantially the same time, the yarn clearer 34 outputs a detection signal to the unit control section 14. In addition, the yarn clearer 34 is configured to be able to detect the presence or absence of the yarn Y.
[0094] The winding section 13 is configured to perform a winding operation of winding the yarn Y on the winding bobbin Bw to form a package P. As shown in Figure 3 The winding section 13 has a creel 41, a traverse drum 42, and a drum drive motor 43.
[0095] The creel 41 is configured to hold the winding bobbin Bw (the package P) so as to be freely rotatable. As shown in Figure 3 The creel 41 has, for example, a pair of bobbin holders 41a, 41b and a creel lever 41c. The pair of bobbin holders 41a, 41b is configured to support the winding bobbin Bw on both sides. The bobbin holder 41a is disposed on the right side of the winding bobbin Bw. The bobbin holder 41b is disposed on the left side of the winding bobbin Bw. The creel lever 41c is operated by the doffing device 3. The creel 41 is configured to open and close the pair of bobbin holders 41a, 41b in the left-right direction when the creel lever 41c is operated. For the sake of convenience of explanation, a state when the pair of bobbin holders 41a, 41b is opened (hereinafter, simply referred to as a state when the creel 41 is opened) is referred to as a released state. For the sake of convenience of explanation, a state when the pair of bobbin holders 41a, 41b is closed (hereinafter, simply referred to as a state when the creel 41 is closed) is referred to as a held state.
[0096] The traverse drum 42 is configured to rotate the package P as a driven body, and is configured to traverse the yarn Y in travel. As shown in Figure 3 and Figure 4 The traverse drum 42 is a substantially cylindrical member. The rotational axis direction of the traverse drum 42 is substantially parallel to the left-right direction. A traverse groove 42a for traversing the yarn Y is formed on the outer peripheral surface of the traverse drum 42. The traverse drum 42 rotates in a state of being in contact with the surface of the package P, and rotates the package P as a driven body by the frictional force. At the same time, the traverse drum 42 rotates while passing the yarn Y through the traverse groove 42a, thereby traversing the yarn Y in the left-right direction. Thus, the yarn Y is wound on the winding bobbin Bw while being traversed.
[0097] The drum drive motor 43 is configured to rotationally drive the traverse drum 42. The drum drive motor 43 is capable of rotationally driving the traverse drum 42 in two directions of a forward direction and a reverse direction. The forward direction is the rotational direction of the traverse drum 42 when the yarn Y is wound on the winding bobbin Bw. The reverse direction is the rotational direction of the traverse drum 42 when, for example, the top yarn Y2 is drawn out from the package P at the time of yarn insertion. The drum drive motor 43 is electrically connected to the unit control section 14 (omitted from illustration).
[0098] The unit control section 14 has, for example, a CPU, a ROM, and a RAM, which are not shown. The unit control section 14 controls each section by the CPU according to a program stored in the ROM. More specifically, the unit control section 14 controls the ejector 24 and the arm motor 37 (refer to Figure 2) and the like. In addition, the unit control section 14 receives signals from the yarn detector 31 and the yarn clearer 34 (refer to Figure 2 ) and the like. In addition, the unit control section 14 outputs a signal for requesting doffing to the doffer 3 (hereinafter referred to as a doffing request signal). The doffing request signal is sent from the unit control section 14 to the doffing control section 100.
[0099] In the yarn winding unit 2 having the above structure, the unit control section 14 drives the drum driving motor 43 to rotate the traversing drum 42 in a state where the package P is in contact with the traversing drum 42. Thereby, the yarn Y drawn from the supply bobbin Bs is wound on the winding bobbin Bw, forming the package P (winding operation).
[0100] (Supply bobbin carrying device)
[0101] Referring to Figure 5 The structure of the supply bobbin carrying device 4 will be explained simply. Figure 5 is a plan view of the supply bobbin carrying device 4. The supply bobbin carrying device 4 has a supply path 51, a plurality of independent paths 52 and a discharge path 53. The supply path 51 is a path for moving a plurality of supply bobbins Bs, on which prescribed processing has been performed in the supply bobbin preparation device 5, to the plurality of yarn winding units 2. The supply path 51 extends, for example, in the left-right direction. The plurality of independent paths 52 are provided in correspondence with the plurality of yarn winding units 2, respectively. Each of the plurality of independent paths 52 serves as both a carrying-in path and a carrying-out path for the supply bobbin Bs in the corresponding yarn winding unit 2. The plurality of independent paths 52 are arranged in the left-right direction. Each of the plurality of independent paths 52 branches from the supply path 51. Each independent path 52 extends, for example, in the front-rear direction. Each independent path 52 can also be bent or curved in the left-right direction, for example. Each independent path 52 is connected to the discharge path 53. The discharge path 53 carries the supply bobbins Bs (refer to the discharge bobbin Be shown in Figure 5 to the supply bobbin preparation device 5. The discharge path 53 extends, for example, in the left-right direction. The combination of the supply bobbin carrying device 4 and the above-described ejector 24 corresponds to the supply bobbin replacing section of the present application.
[0102] Structure of doffer
[0103] The specific structure of the doffer 3 will be explained mainly with reference to Figure 6 and Figure 7 The specific structure of the doffer 3 will be explained mainly with reference to Figure 6 is a schematic front view of the doffer 3. Figure 7 is a schematic side view of the doffer 3.
[0104] As Figure 6As shown, the doffing device 3 has a main body 60, a yarn catching arm 61 (the second guide portion of the present invention), a yarn removing guide 62, a chuck 63 and a cradle opener 64 (the cradle operating portion of the present invention). The main body 60 houses the various components of the doffing device 3. The yarn catching arm 61 catches the yarn Y drawn out from the yarn supply bobbin Bs and guides it to the winding section 13 (more specifically, near the cradle 41). The yarn removing guide 62 performs an auxiliary action for the yarn catching arm 61 to guide the yarn Y to the winding section. The chuck 63 holds the empty winding bobbin Bw so that it is located near the cradle 41 (more specifically, between the bobbin holder 41a and the bobbin holder 41b in the left and right directions). The cradle opener 64 opens and closes the cradle 41.
[0105] The main body 60 is a substantially box-shaped member and is configured to be movable along the rail 3 a.
[0106] The yarn catching arm 61 is configured to catch and guide the yarn Y. Figure 6 and Figure 7 As shown, the yarn catching arm 61 includes a swing shaft 61a, an air cylinder 61b, and a clamp cutter 61c. The swing shaft 61a supports the air cylinder 61b so as to be swingable in the front-rear direction.
[0107] The cylinder 61b operates under the pressure of compressed air. Compressed air is supplied to or discharged from the cylinder 61b through a predetermined path. The cylinder 61b extends approximately in the vertical direction. The cylinder 61b has a piston rod 61d (see FIG. 1 ) that can be extended and retracted approximately in the vertical direction. Figure 7 The cylinder 61b is connected to the telescopic drive unit 101 (see Figure 2 ) is driven to extend and retract. More specifically, the telescopic drive unit 101 has, for example, an electromagnetic valve (not shown) that opens and closes the path of compressed air. It is assumed that the drive units having cylinders in other drive units also have electromagnetic valves, and the subsequent description is appropriately omitted. The telescopic drive unit 101 is controlled by the yarn doffing control unit 100.
[0108] The clamp cutter 61c is configured to be able to catch and cut the yarn Y. The clamp cutter 61c is fixed to the top end of the piston rod 61d, for example. The clamp cutter 61c is driven by the clamp cutter drive unit 102 (see Figure 2 ) is opened and closed. The clamp cutter drive unit 102 includes, for example, an air cylinder (not shown) and an electromagnetic valve (not shown) of substantially the same type as the electromagnetic valve of the telescopic drive unit 101. Alternatively, the clamp cutter drive unit 102 may include a motor (not shown).
[0109] The yarn catching arm 61 is driven by the swing drive section 103 (see Figure 2 ) is driven in the forward and backward direction (refer to Figure 7The swing driving section 103 is driven, for example, by a motor (not shown). Alternatively, the swing driving section 103 can be driven by a cylinder (not shown) or the like. The swing driving section 103 is driven, for example, by a motor (not shown). Alternatively, the swing driving section 103 can be driven by a cylinder (not shown) or the like.
[0110] The yarn guide 62 is configured to guide the yarn Y toward the side of the gripping cutter 61c of the yarn catching arm 61. As shown in Figure 6 , the yarn guide 62 has a swing shaft 62a and a lever member 62b. The swing shaft 62a supports the lever member 62b so as to be swingable. The swing shaft 62a extends, for example, in the up-and-down direction. The lever member 62b extends, for example, in the substantially horizontal direction. The lever member 62b is configured to hook the yarn Y at the top end portion thereof. The yarn guide 62 is swing-driven, for example, by a yarn guide driving section 104 (see Figure 2 ). The yarn guide driving section 104 has, for example, a motor (not shown). Alternatively, the yarn guide driving section 104 can have, for example, a cylinder (not shown) or the like.
[0111] The chuck 63 is configured to hold an empty winding bobbin Bw so as to be positioned in the vicinity of the creel 41. Here, the empty winding bobbin Bw is stored, for example, in a storage 44 (see Figure 7 ) disposed directly above the winding section 13. In Figure 7 , only one winding bobbin Bw stored in the storage 44 is shown. However, the present application is not limited thereto. That is, a plurality of winding bobbins Bw can be stored in the storage 44, for example, in the front-and-rear direction. In addition, although not shown, the top end portion of the storage 44 is configured to be able to release the winding bobbin Bw, for example, by being pressed downward by the holding section 63c described later.
[0112] As shown in Figure 6 , the chuck 63 has a swing shaft 63a, an arm 63b, and a holding section 63c. The swing shaft 63a supports the arm 63b so as to be swingable. The swing shaft 63a extends, for example, in the left-and-right direction. The arm 63b extends, for example, obliquely upward and forward as shown in Figure 7 . The holding section 63c is installed at the top end portion of the arm 63b. The arm 63b is swing-driven, for example, by an arm driving section 105. The arm driving section 105 has, for example, a motor (not shown). The holding section 63c is configured to hold the winding bobbin Bw. The holding section 63c is open-and-close-driven, for example, by an open-and-close driving section 106. The open-and-close driving section 106 has, for example, a cylinder (not shown) and an electromagnetic valve (not shown) of substantially the same kind as the electromagnetic valve of the extension-and-retraction driving section 101.
[0113] The cradle opener 64 is configured to open and close the cradle 41. In other words, the cradle opener 64 is configured to switch the state of the cradle 41 between a released state and a held state. The cradle opener 64 has, for example, a swing shaft 64a and an opening lever 64b. The swing shaft 64a supports the openable lever 64b so as to be swingable. The swing shaft 64a extends, for example, in the left-right direction. The opening lever 64b is configured to operate the cradle lever 41c (see FIG. 1). More specifically, the cradle 41 is configured such that the distance between the bobbin holder 41a and the bobbin holder 41b in the left-right direction changes when the cradle lever 41c is operated. The cradle opener 64 is driven, for example, by an opener drive section 107. The opener drive section 107 has, for example, a motor and a cylinder, which are not shown. The opening lever 64b can be swingably driven by a motor, for example, and the opening lever 64b can be driven by a cylinder in a direction in which the cradle lever 41c is pressed, for example. The type of drive source of the opener drive section 107 is not limited to this. Figure 7
[0114] As described above, the yarn catching arm 61, the yarn guiding device 62, the chuck 63, and the cradle opener 64 are driven by different drive sources from each other.
[0115] (Doffing operation)
[0116] Reference Signs Figures 8-13 A simplest series of operations (hereinafter referred to as the shortest operation) in the doffing operation of the doffer 3 will be described. The "shortest operation" is an operation in which no error occurs in the operation of the yarn winding unit 2 and the doffer 3 once from when the package P becomes a full package to when the doffing of the yarn Y to the next bobbin Bw is started. Figures 8-12 is a schematic side view of the yarn winding unit 2 and the doffer 3 for explaining the doffing. Figure 13 is a schematic front view of the vicinity of the cradle 41 for explaining the doffing.
[0117] The unit control section 14 of a certain yarn winding unit 2 (hereinafter referred to as the target yarn winding unit 2) outputs a doffing preparation signal when it is determined that the package P is about to become a full package. The doffing preparation signal is a signal for moving the doffer 3 as necessary. The doffing preparation signal is sent from the unit control section 14 to the doffer control section 100. The doffer control section 100 that has received the doffing preparation signal recognizes that the target yarn winding unit 2 is about to become a full package. The doffer control section 100 moves the doffer 3 above (directly above) the target yarn winding unit 2 in preparation for a doffing request signal in the case where the doffer 3 is stopped, for example.
[0118] The unit control section 14 causes the cutter 34a of the yarn clearer 34 to cut the yarn Y at the timing when the package P becomes full. The yarn Y on the package P side among the cut yarn Y is wound on the package P. In addition, the unit control section 14 stops the rotation of the traversing drum 42. The yarn Y (lower yarn Yl) on the supply bobbin Bs side among the cut yarn Y is sucked and captured by the suction port 35c of the lower yarn capturing guide 35 (refer to Figure 8 ). In addition, the unit control section 14 controls the arm motor 37 to rotate the arm 35b upward in a state where the lower yarn Yl is captured by the suction port 35c (refer to Figure 9 ). Then, the unit control section 14 outputs a doffing request signal and calls the doffing device 3.
[0119] After the doffing device 3 reaches above the target yarn winding unit 2, the doffing control section 100 performs the following control. As an outline, the doffing control section 100 concurrently executes a replacement operation of replacing the full package P with the empty winding bobbin Bw and a receiving guide operation of performing the capturing and guiding of the lower yarn Yl.
[0120] First, the middle of the receiving guide operation is described. The doffing control section 100 controls the extension drive section 101 to extend the piston rod 61d of the yarn capturing arm 61 to lower the gripping cutter 61c (refer to Figure 9 ). Next, the doffing control section 100 controls the swing drive section 103 to swing the gripping cutter 61c to the vicinity of the suction port 35c of the lower yarn capturing guide 35 (refer to Figure 10 ). Next, the doffing control section 100 controls the gripping cutter drive section 102 to cause the gripping cutter 61c to hold and cut the yarn Y. Thereby, the lower yarn Yl is handed over from the lower yarn capturing guide 35 to the gripping cutter 61c. After that, the unit control section 14 rotates the lower yarn capturing guide 35 downward to return to the original position (refer to Figure 11 ). Next, the doffing control section 100 controls the swing drive section 103 to separate the gripping cutter 61c from the lower yarn capturing guide 35. After that, the doffing control section 100 retracts the piston rod 61d to raise the gripping cutter 61c (refer to Figure 11 ). Thereby, the lower yarn Yl is drawn out from the supply bobbin Bs.
[0121] Next, the replacement operation concurrently executed with the receiving guide operation is described. The doffing control section 100 controls the opener drive section 107 to open the cradle opener 64 to open the cradle 41 (refer to Figure 13the full package P is sent to a not-shown recovery passage by its own weight from the tube holders 41a and 41b. Next, the doffing control section 100 controls the arm drive section 105 to swing the arm 63b of the chuck 63, and moves the holding section 63c to the vicinity of the winding tube Bw in the accumulator 44. Next, the doffing control section 100 controls the opening / closing drive section 106 to make the holding section 63c hold the winding tube Bw. Further, the doffing control section 100 controls the arm drive section 105 to swing the arm 63b, and moves the holding section 63c holding the winding tube Bw to the vicinity of the cradle 41 (see Figure 10 ). As described above, the winding tube Bw held by the holding section 63c is released from the accumulator 44 by pressing the top end portion of the accumulator 44 downward by the holding section 63c. The operation up to this point is the replacement operation in the present embodiment.
[0122] Further, the subsequent of the receiving guide operation is described. The doffing control section 100 controls the swing drive section 103 to position the clamp cutter 61c in the vicinity of the cradle 41 (see Figure 12 and Figure 13 ). At the same time, the doffing control section 100 controls the guide finger drive section 104 to make the guide finger 62 assist the clamp cutter 61c in guiding the under yarn Yl (see Figure 13 ). Thus, the top end portion of the under yarn Yl is positioned between the winding tube Bw and the tube holder 41a by the yarn catching arm 61 and the guide finger 62 (see Figure 13 ). Thus, the receiving guide operation is completed.
[0123] After that, the doffing control section 100 controls the opener drive section 107 to close the cradle 41 (see Figure 13 of the double-dot chain line. The above holding state). Thus, the winding tube Bw is held on the cradle 41, and the under yarn Yl is sandwiched between the winding tube Bw and the tube holder 41a. As a result, the yarn Y is mounted on the winding tube Bw. After that, the doffing control section 100 releases the winding tube Bw from the chuck 63. The detailed description of the following is omitted. Normally, the unit control section 14 and the doffing control section 100 cooperate to perform the well-known head yarn winding and tail yarn winding processes on the winding tube Bw.
[0124] As described above, the shortest operation of doffing is completed. Then, the unit control section 14 rotates the traversing roller 42, and thus starts the winding operation.
[0125] However, based on the detection result of the clearer 34 possessed by the yarn winding unit 2, it is possible to determine whether the yarn Y is normally connected between the supply bobbin Bs and the winding bobbin Bw. Here, at the time of doffing, sometimes the yarn Y cannot be normally hooked on the empty winding bobbin Bw due to the reason that the yarn Y cannot be normally caught by the lower yarn catching guide 35, for example. At the time of such an occurrence, in the past, the operation of the yarn winding unit 2 was stopped based on the detection result of the clearer 34 before the winding operation was about to start. After that, in order to make the doffing device 3 perform doffing again, the operation of the yarn winding unit 2 was started again, and the operator's response was always required. Therefore, there was a problem that the operating rate of the automatic winder 1 decreased due to the standby time until the operator's response and the like.
[0126] Therefore, in order to suppress the decrease in the operating rate of the automatic winder 1 due to the yarn Y not being normally hooked on the winding bobbin Bw, the unit control section 14 and the doffing control section 100 of the present embodiment perform the following control. As an outline, the unit control section 14 and the doffing control section 100 are configured to be able to cooperatively perform retry processing (details will be described later) of performing a part of the doffing operation again. The unit control section 14 performs a part of the retry processing as necessary based on the detection result of the clearer 34, and outputs a detection abnormality signal (to be described later) to the doffing control section 100. The doffing control section 100 causes the doffing device 3 to perform a part of the retry processing based on the detection abnormality signal from the unit control section 14, and outputs a signal indicating the retry processing to the unit control section 14 (retry instruction). Alternatively, the doffing control section 100 outputs a signal indicating the suspension of doffing to the unit control section 14 as necessary.
[0127] (Setting in the doffing control section)
[0128] Before specifically describing the retry processing, the setting in the doffing control section 100 will be described. The doffing control section 100 is configured to be able to set an upper limit value of the number of times of performing the retry processing (hereinafter referred to as the maximum number of executions). The maximum number of executions is preferably 1 or more and 3 or less. The doffing control section 100 is configured to be able to count the number of times of performing the retry processing and to be able to reset.
[0129] (Control of the unit control section)
[0130] First, the description will be mainly made with reference to Figure 14the flowchart of Fig. 9, the control executed by the unit control section 14 at the time of doffing (part of the retry process) will be described. The details of the control executed by the doffing control section 100 will be described later. As an initial state, it is assumed that the package P being formed in a certain yarn winding unit 2 becomes a full package state. At this time, the unit control section 14 of this yarn winding unit 2 has completed the output of the doffing preparation signal. Also, in the doffing control section 100, the number of times of execution of the retry process is reset to 0 times.
[0131] First, as described above, the unit control section 14 causes the cutter 34a of the clearer 34 to cut the yarn Y (step S101. Refer to Fig. 9). Figure 14 Figure 8 ). Next, the unit control section 14 causes the lower yarn catching guide 35 to catch the lower yarn Yl and guide it upward (step S102. Refer to Fig. 9). Figure 9 ). After that, the unit control section 14 outputs the above-described doffing request signal (omitted from illustration). Thereafter, the unit control section 14 stands by for a prescribed time (omitted from illustration). The "prescribed time" means, for example, an estimated value of the time required from the execution of the process of step S102 to the switching of the state of the creel 41 to the holding state by the creel opener 64 (step S210 to be described later). The prescribed time can also be stored in advance in the unit control section 14. During the period in which the unit control section 14 stands by, the receiving and guiding of the lower yarn Yl and the like as described above are performed by the doffing device 3. Then, the unit control section 14 causes the lower yarn catching guide 35 to turn downward and return to the original position (refer to Fig. 9). Figure 11
[0132] When the prescribed time has elapsed, the unit control section 14 judges whether or not the lower yarn Yl is detected by the yarn detector 31 (step S103. Hereinafter, for convenience of explanation, this will be referred to as the supply judgment process). The information of the detection result obtained by the yarn detector 31 corresponds to the "information on whether or not the normal withdrawal of the yarn from the supply bobbin is performed" of the present application. The judgment of whether or not the yarn Y is detected by the yarn detector 31 corresponds to the judgment of "whether or not the normal withdrawal of the yarn from the supply bobbin is performed" of the present application. In the case where it is judged that the yarn Y is detected by the yarn detector 31 (step S103: YES), the unit control section 14 judges whether or not the yarn Y is detected by the clearer 34 (step S104. Hereinafter, for convenience of explanation, this will be referred to as the guide judgment process). The detection of the yarn Y by the clearer 34 indicates that the lower yarn Yl is guided normally toward the winding section 13. On the contrary, the non-detection of the yarn Y by the clearer 34 indicates that the lower yarn Yl is not guided normally toward the winding section 13. The guide judgment process is started at a timing after the state of the creel 41 becomes the holding state.
[0133] In the case where it is determined that the yarn Y is detected by the clearer 34 (step S104: YES), the unit control section 14 executes the processing of the head yarn winding and the tail yarn winding (step S105). Then, the unit control section 14 causes the winding operation to start (step S106). The above control is the control at the time of the shortest operation described above.
[0134] The control at the time of the operation other than the shortest operation will be described. For the convenience of description, first, the control in the case where it is determined that the yarn Y is not detected in the lead determination processing (step S104: NO) will be described. The reason that the yarn Y is not detected at the time of the lead determination processing is mostly that the yarn catching arm 61 does not normally receive the lower yarn Yl from the lower yarn catching lead 35. In this case, the unit control section 14 outputs a signal indicating that the yarn Y is not normally detected (hereinafter referred to as a detection abnormality signal) to the doffing control section 100 (step S107). After that, the unit control section 14 determines which of a signal of a retry instruction and a signal of the suspension of the doffing is received from the doffing control section 100 (step S108). In the case where the signal of the retry instruction is received (step S108: retry), the unit control section 14 returns to step S102. The processing of step S102 again is a part of the retry processing on the unit control section 14 side. On the other hand, in the case where the signal of the suspension of the doffing is received (step S108: suspension), the unit control section 14 issues an alarm, for example (step S109), and suspends the doffing.
[0135] In addition, the control in the case where the yarn Y is not detected by the yarn detector 31 in the supply determination processing (step S103: NO) will be described. As the main reason that the yarn Y is not detected in the supply determination processing, the following two reasons can be given. The first reason is that the supply bobbin Bs is empty (that is, the exhaustion of the yarn Y wound on the supply bobbin Bs). The second reason is that the yarn Y is abnormally unwound from the supply bobbin Bs on which the yarn Y is wound due to some reason. In either reason, it becomes a reason that the normal unwinding of the yarn Y from the supply bobbin Bs cannot be performed. In the supply determination processing, in the case where the yarn Y is not detected by the yarn detector 31, the unit control section 14 determines that the normal unwinding of the yarn Y from the supply bobbin Bs is not performed. At this time, the unit control section 14 executes the replacement of the supply bobbin Bs (step S110). More specifically, the unit control section 14 causes the ejector 24 to operate, and discharges the supply bobbin Bsl (refer to Figure 5 from the supply section 11 (refer to Figure 5 ). Thereby, the next supply bobbin Bs2 (refer to Figure 5The second supply bobbin of the present application is supplied to the yarn supply section 11. The process of step S110, like the process of step S102, is part of the retry process on the unit control section 14 side. Thereafter, the unit control section 14 performs the process of step S107 and the determination of step S108 described above.
[0136] The above control is control including the retry process on the unit control section 14 side.
[0137] (Control based on the doffing control section)
[0138] Next, the control performed by the doffing control section 100 at the time of doffing will be described mainly with reference to the flowchart of Figure 15 . As an initial state, a state in which the doffer 3 has reached above the target yarn winding unit 2 is assumed. In the doffing control section 100, the number of times of execution of the retry process is reset to 0 times as described above.
[0139] First, the doffing control section 100 starts the operation based on the doffing of the doffer 3 (step S201 shown in Figure 15 ). The doffing control section 100 performs the above-described changing operation (steps S202 to S205) and the above-described receiving guide operation (steps S206 to S209) in parallel.
[0140] The changing operation will be described again briefly. The doffing control section 100 causes the creel opener 64 to open the creel 41 as described above (step S202). Next, the doffing control section 100 causes the arm 63b of the chuck 63 to swing so that the holding portion 63c is located in the vicinity of the accumulator 44 (step S203). Next, the doffing control section 100 causes the holding portion 63c to hold the empty winding bobbin Bw (step S204). Next, the doffing control section 100 causes the arm 63b to swing so that the holding portion 63c is located in the vicinity of the creel 41 (step S205. Refer to Figure 10 ).
[0141] The receiving guide operation will be described again briefly. The doffing control section 100 causes the piston rod 61d of the yarn catching arm 61 to extend as described above (step S206. Refer to Figure 9 ). Next, the doffing control section 100 causes the clamping cutter 61c to hold and cut the down yarn Yl (step S207). The doffing control section 100 causes the piston rod 61d to contract (step S208. Refer to Figure 11 ). Next, the doffing control section 100 causes the yarn catching arm 61 to swing so that the clamping cutter 61c is located in the vicinity of the creel 41 (step S209. Refer to Figure 12 and Figure 13 ).
[0142] After the replacement operation and the receiving guide operation, the doffing control section 100 causes the creel opener 64 to open the creel 41 (step S210. Refer to Fig. 2). At this time, the yarn Y is held by the gripper 63c and is located in the vicinity of the creel 41. The yarn Y is held by the gripper 63c in the state shown by the two-dot chain line. The yarn Y is held between the creel support 41a and the winding tube Bw and is stabilized. Thereafter, the doffing control section 100 determines whether the detection abnormality signal described above is received (step S211). Figure 13
[0143] In the case where the detection abnormality signal is received (step S211: YES), the doffing control section 100 further determines whether the number of times of execution of the retry processing is smaller than the maximum number of times of execution (step S212). In the case where the number of times of execution of the retry processing is smaller than the maximum number of times of execution (step S212: YES), the doffing control section 100 outputs a signal indicating the retry (step S213). The doffing control section 100 controls the opener drive section 107 to cause the creel opener 64 to open the creel 41 (step S214). In addition, the doffing control section 100 controls the gripper cutter drive section 102 to cause the gripper cutter 61c to open (step S214). In addition, the doffing control section 100 causes the yarn guide 62 to return to the original position (omitted from the drawing). Thereafter, the doffing control section 100 returns to step S206 and executes the receiving guide operation of the replacement operation and the receiving guide operation again. Further, the doffing control section 100 increments the number of times of execution of the retry processing by one (omitted from the drawing). The processing of steps S213 to S215 and the reprocessing of steps S206 to S209 are the retry processing performed on the doffing control section 100 side. In other words, the retry processing includes the processing of executing the receiving guide operation again. Further, during the retry processing, it is preferable to maintain the state in which the gripper 63c holds the winding tube Bw and is located in the vicinity of the creel 41.
[0144] Further, in the case where the yarn Y is held by the gripper cutter 61c before step S214, the yarn Y is released by causing the gripper cutter 61c to open. The case where the retry processing is performed although the yarn Y is held by the gripper cutter 61c is, for example, the case where the yarn Y is just run out when the yarn Y is drawn from the supply tube Bw for the purpose of doffing. In this case, the short yarn Y released is removed by, for example, a waste yarn suction device not shown.
[0145] On the other hand, in the case where the number of times of execution of the retry processing reaches the maximum number of times of execution (step S212: NO), the doffing control section 100 outputs a signal indicating, for example, the suspension of doffing to the unit control section 14 (step S216). Thereby, the doffing control section 100 stops the doffing operation in the yarn winding unit 2 and the doffing device 3. That is, the doffing control section 100 ends the retry processing after the maximum number of times of execution of the retry processing.
[0146] The doffing control section 100, in a case where the detection abnormality signal is not received (step S211: No), cooperates with the unit control section 14 to perform the processing of the head yarn winding and the tail yarn winding (step S217). Thus, the control of the doffing control section 100 ends.
[0147] As described above, in a case where the reception guide operation fails, the retry processing including the reception guide operation is performed. Therefore, the reception guide operation can be performed again before the winding operation starts. Thus, it is possible to suppress the occurrence of a case where the winding operation starts in a state where the reception guide operation fails. Therefore, it is possible to suppress the decrease in the operating rate of the automatic winder due to the fact that the yarn cannot be normally mounted on the winding tube.
[0148] In addition, the guide judgment processing is performed based on the detection result of the clearer 34 that is conventionally provided on the yarn winding unit 2. Therefore, compared with a case where a detection section is newly provided on the automatic winder 1, it is possible to suppress the increase in the manufacturing cost of the automatic winder 1.
[0149] In addition, the yarn catching arm 61 and the cradle opener 64 are driven by different drive sources from each other. Thus, the yarn catching arm 61 can perform the operation at an arbitrary timing independently of the operation of the cradle opener 64. Therefore, it is possible to perform the retry processing at the optimum timing according to the situation.
[0150] In addition, the guide judgment processing is started after the state of the cradle 41 is made into the holding state by the cradle opener 64. Thus, it is possible to stabilize the yarn Y that is disposed between the supply tube Bs and the winding tube. In other words, it is possible to suppress the swing or the like of the yarn Y that is guided to the winding section 13. Therefore, it is possible to stably detect the yarn Y by the clearer 34.
[0151] In addition, the lower yarn catching guide section 35 is configured to be able to guide the lower yarn Yl to the thread receiving device 33. In the automatic winder 1 having such a structure of the yarn winding unit 2, it is generally difficult to guide the lower yarn Yl to the vicinity of the winding section 13 by the lower yarn catching guide section 35. Therefore, at least a part of the yarn catching arm 61 needs to move to the vicinity of the thread receiving device 33 for receiving the yarn Y from the lower yarn catching guide section 35 over a long distance. In such a situation, the possibility that the yarn catching arm 61 fails to receive the yarn Y from the lower yarn catching guide section 35 becomes high. In such a structure, the retry processing is particularly effective.
[0152] Further, after the maximum number of executions of the retry processing is performed, the retry processing ends. If the number of times of the retry processing is too small, the number of times of the operator having to deal with the failure of the action of the doffer 3 increases, and the time and labor of the operator increase. On the other hand, if the number of times of the retry processing is too large, the doffer 3 can repeatedly receive the failure of the guiding action for a long time, and the operating rate of the automatic winder 1 decreases. In the present embodiment, by appropriately setting the maximum number of executions, it is possible to balance the reduction of the time and labor of the operator and the suppression of the decrease in the operating rate of the automatic winder 1.
[0153] Further, the supply judgment processing is performed before the retry processing. In a case where it is judged that the yarn Y is not normally withdrawn from the first supply bobbin, the first supply bobbin is replaced with the second supply bobbin, and thereafter the retry processing is started. The supply bobbin Bs is replaced in a case where the yarn Y is not normally withdrawn, and thus it is possible to smoothly perform the retry processing.
[0154] Next, a modified example in which the above-described embodiment is changed will be described. However, for members having the same structure as the above-described embodiment, the same reference numerals are attached and the description thereof is appropriately omitted.
[0155] (1) In the above-described embodiment, it is assumed that the timing at which the retry processing is performed is a timing after the state of the creel 41 becomes the holding state. However, it is not limited thereto. The unit control section 14 may, for example, perform the retry processing before the state of the creel 41 becomes the holding state. Thereby, the retry processing is performed at an earlier timing. In this case, even in a case where the yarn catching arm 61 fails to receive the lower yarn Y1 from the lower yarn catching guide section 35, it is possible to reduce the loss of time until the winding action starts.
[0156] (2) In the above-described embodiment, it is assumed that the yarn clearer 34 corresponds to the detection section of the present application. However, it is not limited thereto. For example, each of the yarn winding units 2 can have a sensor (not shown) in addition to the yarn clearer 34, the sensor being configured to be able to detect the yarn Y guided to the winding section 13 by the yarn catching arm 61. In this case, the sensor corresponds to the detection section of the present application.
[0157] (3) In the above-described embodiment, it is assumed that each of the yarn winding units 2 has the detection section of the present application. However, it is not limited thereto. For example, the doffer 3 can have the detection section of the present application. More specifically, as Figure 16As shown, the yarn detection sensor 65 configured to be able to detect the yarn Y can also be provided in the vicinity of the clamp cutter 61c of the yarn catching arm 61, for example. Alternatively, the yarn detection sensor 65 can also be provided in the vicinity of the track of the yarn Y guided to the winding section 13 by the yarn catching arm 61 instead of being provided in the vicinity of the clamp cutter 61c. Thus, even in the case where a new detection section needs to be provided in addition to the clearer 34, the number of detection sections can be suppressed to be small. Therefore, an increase in manufacturing cost of the automatic winder 1 can be suppressed.
[0158] (4) In the above-described embodiment, the doffing control section 100 is provided to output the signal of the retry instruction. However, this is not limiting. For example, the unit control section 14 can also output the signal of the retry instruction. In addition, the doffing control section 100 is provided to be configured to be able to set the maximum number of executions. However, this is not limiting. Instead of the doffing control section 100, each of the unit control sections 14 can also be configured to be able to set the maximum number of executions. In this case, the same maximum number of executions can be set among the plurality of yarn winding units 2, or the maximum numbers of executions different from each other can be set. In addition, the doffing control section 100 and the unit control section 14 can also be configured to be able to set the maximum number of executions. For example, the doffing control section 100 (or the unit control section 14) can also be configured to output the instruction signal of the retry process only once in the doffing. Alternatively, the doffing control section 100 (or the unit control section 14) can also be configured to output the signal of the instruction of the retry process a plurality of times until the doffing is successful.
[0159] (5) In the above-described embodiment, the supply bobbin handling device 4 and the ejector 24 of each of the yarn winding units 2 are provided to correspond to the supply bobbin replacing section of the present application. However, this is not limiting. Instead of the supply bobbin handling device 4, a publicly known magazine (not shown) can also be provided in each of the yarn winding units 2, for example. The magazine is configured to be able to store a plurality of supply bobbin Bs and to be able to supply them to the supply section 11 in turn.
[0160] (6) In the above-described embodiment, the unit control section 14 is provided to perform the supply judgment process before the guide judgment process. However, this is not limiting. The unit control section 14 can also perform the supply judgment process only in the case where the yarn Y is not detected in the guide judgment process after the guide judgment process is performed, for example. In this case, as long as the yarn Y is detected in the supply judgment process, the unit control section 14 and the doffing control section 100 can cooperate to perform the retry process.
[0161] (7) In the above-described embodiment, the unit control section 14 is provided to perform the supply judgment process. However, this is not limiting. The unit control section 14 can also not perform the supply judgment process in the doffing process.
[0162] (8) In the above-described embodiment, the handover of the lower yarn Yl is performed between the lower yarn catching guide 35 and the yarn catching arm 61. However, the present application is not limited thereto. An unillustrated mechanism that can guide the lower yarn Yl above the lower yarn catching guide 35 can be provided. In this case, the handover of the lower yarn Yl can be performed between the mechanism and the yarn catching arm 61.
[0163] (9) In the above-described embodiment, the state where the holding portion 63c of the chuck 63 holds the winding bobbin Bw and is located in the vicinity of the creel 41 is maintained during the retry processing. However, the present application is not limited thereto. For example, the doffing control portion 100 can perform processing that separates the holding portion 63c from the creel 41 during the retry processing. Alternatively, for example, the doffing control portion 100 can release the winding bobbin Bw from the chuck 63 at the time of the retry processing.
[0164] (10) In the above-described embodiment, the yarn catching arm 61, the yarn guiding device 62, the chuck 63, and the creel opener 64 are driven by different drive sources from each other. However, the present application is not limited thereto. Each portion of the doffing device 3 can be driven by one drive source (for example, a motor) through an unillustrated cam mechanism, for example. In this case, after a series of actions of the doffing device 3 for doffing is completed, the series of actions can be started again as the retry processing. Further, in this case, the series of actions include the above-described replacement action.
[0165] (11) In the above-described embodiment, the creel opener 64 operates the creel 41, but the present application is not limited thereto. For example, each yarn winding unit 2 can have an opening and closing mechanism (unillustrated) that can open and close the creel 41.
[0166] (12) In the above-described embodiment, the automatic winder 1 has a plurality of yarn winding units 2. However, the present application is not limited thereto. The number of yarn winding units 2 can be one.
Claims
1. An automatic winder having a yarn winding unit capable of performing a winding operation of winding a yarn drawn from a supply bobbin on a winding bobbin to form a package, a doffing device capable of performing a doffing of replacing the package with an empty winding bobbin, and a control section, characterized in that the yarn winding unit has a supply section that supports the supply bobbin, a winding section in which the winding bobbin is installed, and a first guide section configured to be capable of guiding the yarn supplied from the supply bobbin toward the doffing device when the doffing is performed, the doffing device has a second guide section configured to be capable of performing a receiving guide operation of receiving the yarn from the first guide section, holding a supply yarn that is the yarn on the supply section side among the yarns broken between the supply section and the winding section, and guiding the supply yarn toward the winding section, and the control section, after causing the second guide section to perform the receiving guide operation, before causing the yarn winding unit to start the winding operation, performs a retry process including a process of causing the second guide section to perform the receiving guide operation again, when it is judged based on a detection result of a detection section configured to be capable of detecting the supply yarn that the supply yarn is not normally guided toward the winding section through the second guide section.
2. The automatic winder according to claim 1, characterized in that the detection section has a clearer configured to be provided to the yarn winding unit and capable of detecting information related to a quality of the yarn.
3. The automatic winder according to claim 1 or 2, characterized in that the winding section has a creel configured to be capable of holding the winding bobbin so as to be freely rotatable, and configured to be capable of mounting the yarn to the winding bobbin by clamping the yarn between the creel and the winding bobbin, the doffing device has a creel operating section that switches a state of the creel between a release state of releasing the winding bobbin and a holding state of holding the winding bobbin and capable of clamping a yarn between the winding bobbin, and the second guide section and the creel operating section are driven by different drive sources from each other.
4. The automatic winder according to claim 3, characterized in that the control section performs the retry process before controlling the creel operating section to make the state of the creel the holding state.
5. The automatic winder according to claim 2, characterized in that the winding section has a creel configured to be capable of holding the winding bobbin so as to be freely rotatable, and configured to be capable of mounting the yarn to the winding bobbin by clamping the yarn between the creel and the winding bobbin, the doffing device has a creel operating section that switches a state of the creel between a release state of releasing the winding bobbin and a holding state of holding the winding bobbin and capable of clamping a yarn between the winding bobbin, and The control section judges whether the supply yarn is normally guided to the winding section by the second guide section after controlling the creel operating section to make the state of the creel the holding state.
6. The automatic winder according to claim 5, wherein The second guide section and the creel operating section are driven by different drive sources from each other.
7. The automatic winder according to claim 1, wherein The detection section is provided on the doffing device.
8. The automatic winder according to any one of claims 1 to 7, wherein The automatic winder has a yarn joining section configured to be arranged between the supply section and the winding section in the traveling direction of the yarn and capable of joining the broken yarn, The first guide section is configured to be capable of guiding the supply yarn to the yarn joining section.
9. The automatic winder according to any one of claims 1 to 8, wherein The control section is configured to be capable of setting an upper limit value of the number of times of execution of the retry processing, that is, a maximum number of times of execution, The control section ends the retry processing with respect to the yarn winding unit after the maximum number of times of execution of the retry processing.
10. The automatic winder according to any one of claims 1 to 9, wherein The automatic winder has a supply bobbin replacing section configured to be capable of replacing a first supply bobbin, which is the supply bobbin supported by the supply section, with a second supply bobbin, which is another supply bobbin, The detection section has an unwinding detection section capable of detecting information related to whether the yarn is normally unwound from the first supply bobbin, The control section judges whether the yarn is normally unwound from the first supply bobbin based on a detection result of the unwinding detection section before the retry processing, In a case where it is judged that the yarn is not normally unwound from the first supply bobbin, the control section controls the supply bobbin replacing section to replace the first supply bobbin with the second supply bobbin and then starts the retry processing.
11. The automatic winder according to any one of claims 1 to 10, wherein The control section has a unit control section provided to the yarn winding unit and a doffing control section provided to the doffing device, In a case where the supply yarn is not detected by the detection section, the unit control section outputs a detection abnormality signal indicating a case where the supply yarn is not normally detected to the doffing control section.
12. The automatic winder according to claim 11, wherein The doffing control section judges whether to execute the retry processing or to suspend the doffing when receiving the detection abnormality signal, outputs a signal indicating the retry processing to the unit control section in a case where it is judged to execute the retry processing, and outputs a signal indicating suspension of the doffing to the unit control section in a case where it is judged to suspend the doffing.
13. The automatic winder according to claim 12, wherein The unit control section causes the first guide section to capture the supply yarn and guide it to the doffing device upon receiving a signal indicating the retry process.
Citation Information
Patent Citations
Doffing device, and textile machine including the same
JP2013056766A
