Multi-path water quality purification control method and system based on coal gangue
By constructing a multi-path water purification system based on coal gangue, real-time detection of coal gangue distribution and sewage flow path, identification of sub-purification nodes, optimization of main purification and branch purification paths, and introduction of collaborative purification measures, the accuracy of dynamic purification systems and optimization problems of abnormal areas in existing technologies are solved, and efficient purification effects are achieved.
Patent Information
- Application Number
- CN202511156412.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-19
- Publication Date
- 2025-10-28
AI Technical Summary
In the existing technology, the sewage purification path at the distribution location of coal gangue has only a single dimension, ignoring the influence of the main purification path and the branch purification path, and unable to introduce microbial collaborative purification measures and filter collaborative purification measures, which affects the accuracy of the dynamic purification system and the optimization of abnormal purification areas.
By real-time detection of the distribution of coal gangue and the flow path of sewage, a multi-path purification system is constructed, multiple sub-purification nodes are identified, the main purification path and branch purification paths are determined, and coordinated purification measures of microorganisms and filters are introduced to optimize abnormal purification areas.
It improves the accuracy of the dynamic purification system and the degree of optimization of abnormal purification areas, realizes the overall consideration of the main purification path and branch purification path, is compatible with the purification data and sewage discharge of multiple paths, and improves the purification effect.
Smart Images

Figure CN120841777A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the technical field of multi-path water quality purification and control methods, and in particular to a multi-path water quality purification and control method and system based on coal gangue. Background Technology
[0002] With the development of technology, coal gangue is being used in people's lives and can effectively adsorb pollutants such as suspended solids and heavy metal ions in water. Coal gangue can filter sewage. Coal gangue is distributed in different locations. In the existing technology, a corresponding sewage purification path is constructed according to the distribution location of coal gangue. This sewage purification path only has a single-dimensional trajectory, ignoring the influence of the main purification path and branch purification paths, which affects the accuracy of the dynamic purification system. It is impossible to introduce microbial synergistic purification measures and filter screen synergistic purification measures, which affects the precise optimization of abnormal purification areas. Summary of the Invention
[0003] The purpose of this invention is to overcome the shortcomings of the prior art. This invention provides a multi-path water quality purification and control method and system based on coal gangue.
[0004] This invention provides a multi-path water quality purification and control method based on coal gangue, comprising: The distribution of coal gangue is determined by real-time monitoring of its distribution area, and a purification path of coal gangue for wastewater is constructed based on the distribution of coal gangue and the flow path of wastewater. Multiple sub-purification nodes are determined based on the traversal of the purification path, and the purification load of multiple sub-purification paths is determined based on the purification data of multiple sub-purification nodes, node locations, and real-time discharge of wastewater. The main purification path and multiple branch purification paths are determined based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes. The dynamic purification system is determined based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of wastewater after purification. In the dynamic purification system, abnormal purification areas are identified based on the main purification path and multiple branch purification paths, and the corresponding purification capacity level is determined based on the purification data of the abnormal purification areas. Based on the purification capacity level and the purification measure matching table, purification synergy measures are determined; based on the identification of purification synergy measures, microbial synergy purification measures and filter screen synergy purification measures are determined to construct an optimized purification area.
[0005] This invention provides a multi-path water quality purification and control system based on coal gangue. This system is applied to the aforementioned multi-path water quality purification and control method based on coal gangue. The multi-path water quality purification and control system includes: The purification path module is used to determine the distribution of coal gangue based on real-time detection of the distribution area of coal gangue, and to construct the purification path of coal gangue on wastewater based on the distribution of coal gangue and the flow path of wastewater. The purification load module is used to determine multiple sub-purification nodes based on the traversal of the purification path, and to determine the purification load of multiple sub-purification paths based on the purification data of multiple sub-purification nodes, node positions and real-time sewage discharge. The dynamic purification system module is used to determine the main purification path and multiple branch purification paths based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes. The dynamic purification system is determined based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of wastewater after purification. The purification capacity level module is used to identify abnormal purification areas in a dynamic purification system based on the identification of the main purification path and multiple branch purification paths, and to determine the corresponding purification capacity level based on the purification data of the abnormal purification areas. The optimization module is used to determine synergistic purification measures based on the purification capacity level and the purification measure matching table; based on the identification of synergistic purification measures, it determines microbial synergistic purification measures and filter synergistic purification measures to construct an optimized purification area.
[0006] Compared with the prior art, the present invention has the following beneficial effects: In this embodiment of the invention, the purification load of multiple sub-purification paths is determined based on the purification data, node locations, and real-time wastewater discharge of multiple sub-purification nodes using the method described in this embodiment. A main purification path and multiple branch purification paths are determined based on the purification load of multiple sub-purification nodes, the purification paths, and the corresponding purification areas. A dynamic purification system is determined based on the purification data of the main purification path, the purification data of the multiple branch purification paths, and the wastewater discharge after purification. The introduction of a main purification path and multiple branch purification paths, along with a comprehensive consideration of the purification data of the main purification path, the purification data of the multiple branch purification paths, and the wastewater discharge after purification, improves the accuracy of the dynamic purification system.
[0007] Therefore, in the dynamic purification system, abnormal purification areas are identified based on the main purification path and multiple branch purification paths, and the corresponding purification capacity level is determined based on the purification data of the abnormal purification areas. Purification synergy measures are then determined based on this purification capacity level and a purification measure matching table. Based on the identification of these synergy measures, microbial synergy purification measures and filter synergy purification measures are determined to construct an optimized purification area. The introduction of synergy measures achieves a holistic consideration of microbial and filter synergy purification measures, ensuring the optimization degree of the optimized purification area and enabling precise optimization of abnormal purification areas. Attached Figure Description
[0008] Figure 1 This is a schematic flowchart of the multi-path water quality purification and control method based on coal gangue in an embodiment of the present invention. Figure 2 This is a flowchart illustrating step S11 in the multi-path water quality purification and control method based on coal gangue in this embodiment of the invention. Figure 3 This is a flowchart illustrating step S12 in the multi-path water purification and control method based on coal gangue in an embodiment of the present invention. Figure 4 This is a flowchart illustrating step S13 in the multi-path water quality purification and control method based on coal gangue in an embodiment of the present invention. Figure 5 This is a flowchart illustrating step S14 in the multi-path water purification and control method based on coal gangue in this embodiment of the invention. Figure 6 This is a flowchart illustrating step S15 in the multi-path water quality purification and control method based on coal gangue in this embodiment of the invention. Figure 7 This is a schematic diagram of the structural composition of the multi-path water quality purification and control system based on coal gangue in an embodiment of the present invention. Detailed Implementation
[0009] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0010] Please see Figures 1 to 7 A multi-path water quality purification and control method based on coal gangue is proposed and applied to multi-path water quality purification and control scenarios. The multi-path water quality purification and control method based on coal gangue includes: Step S11: Determine the distribution of coal gangue based on real-time detection of the distribution area of coal gangue, and construct the purification path of coal gangue for wastewater based on the distribution of coal gangue and the flow path of wastewater. Step S12: Determine multiple sub-purification nodes based on the traversal of the purification path, and determine the purification load of multiple sub-purification paths based on the purification data, node location and real-time discharge of sewage of the multiple sub-purification nodes. Step S13: Determine the main purification path and multiple branch purification paths based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes, and determine the dynamic purification system based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of wastewater after purification. Step S14: In the dynamic purification system, abnormal purification areas are identified based on the identification of the main purification path and multiple branch purification paths, and the corresponding purification capacity level is determined based on the purification data of the abnormal purification areas. Step S15: Determine synergistic purification measures based on the purification capacity level and purification measure matching table; determine microbial synergistic purification measures and filter synergistic purification measures based on the identification of synergistic purification measures, so as to construct an optimized purification area; refer to Figure 2 In step S11, the specific steps are as follows: S111: Collect the distribution location of coal gangue, determine the distribution area of coal gangue based on the distribution location and extension direction of coal gangue, and perform real-time detection of the distribution area of coal gangue. At this time, multiple sub-distribution areas are determined based on the detection of the distribution area of coal gangue. S112: Collect real-time weight data from multiple sub-distribution areas, and determine the distribution of coal gangue based on the real-time weight data from multiple sub-distribution areas, the regional location of multiple sub-distribution areas, and the regional morphology of the areas. S113: Collect the flow path of sewage, determine multiple overlapping parts based on the distribution of coal gangue and the flow path of sewage, and construct the purification path of coal gangue on sewage sequentially along the positions of multiple overlapping parts.
[0011] In the embodiments of this application, the precise coordinates of the coal gangue pile are collected through a GPS positioning system, drone aerial photography, or ground sensor network; the collection frequency can be set according to actual needs, such as once per hour or once per day; the data content includes basic geographic information such as latitude and longitude coordinates, altitude, and coverage area; through terrain analysis and historical data, the natural extension direction of the coal gangue (such as extending along valleys, rivers, or slopes) is determined, and spatial interpolation algorithms (such as Kriging interpolation) are used to predict the potential distribution range of the coal gangue; combined with location data and extension direction, a polygonal area of coal gangue distribution is drawn to determine the overall distribution range.
[0012] An IoT sensor network, including weight sensors, humidity sensors, and image recognition devices, is deployed to monitor changes in the coal gangue area in real time. Dynamic data such as changes in coal gangue volume, humidity, and surface morphology are introduced. Preliminary data processing is performed through edge computing devices, and key information is transmitted to the central control system. Clustering algorithms (such as K-means or DBSCAN) are used to divide the entire distribution area into multiple sub-regions. The division is based on characteristics such as coal gangue density, thickness, and composition. The boundary coordinates, area, and characteristic parameters of each sub-region are collected, and a unique identifier is assigned to each sub-region to establish a sub-region database.
[0013] Furthermore, a high-precision weight sensor or pressure sensor network is deployed in each sub-distribution area. The sensors transmit data to the central control system wirelessly. The sampling frequency can be set according to the coal gangue activity, typically once every 15-30 minutes. The data includes parameters such as the real-time total weight, weight change rate, and weight distribution uniformity of each sub-distribution area. Noise is removed through data filtering algorithms, a time series database is established to record weight change trends, and a multi-parameter evaluation model is established. Real-time weight data, regional location coordinates, and regional morphological characteristics are comprehensively analyzed. Spatial statistical methods are used to analyze the clustering and dispersion characteristics of coal gangue distribution. A comprehensive distribution index is calculated for each sub-region using a weighted scoring method, generating a coal gangue distribution heat map and resource assessment report.
[0014] The system not only determined the quantity of coal gangue in each sub-region, but also identified its distribution characteristics and applicability through comprehensive analysis, providing a precise resource distribution basis for the construction of subsequent purification paths. This method of determining distribution based on multiple parameters can more scientifically guide the design and operation of the purification system.
[0015] Therefore, by collecting the flow path of sewage, determining multiple overlapping parts based on the distribution of coal gangue and the flow path of sewage, and sequentially constructing the purification path of coal gangue on sewage along the positions of multiple overlapping parts, the overall consideration of the distribution of coal gangue and the flow path of sewage is taken into account, ensuring the accuracy of multiple overlapping parts.
[0016] At this point, the flow path of sewage is collected. Through devices such as flow velocity sensors, flow direction sensors, and pressure sensors, the flow trajectory of sewage in the treatment system is monitored in real time. A three-dimensional coordinate system (x, y, z) is used to record the sewage flow trajectory, forming a continuous flow path curve. A sensor network is deployed at key nodes of the sewage treatment system to collect parameters such as flow velocity, flow direction, and pressure at each node in real time. Through data fusion algorithms, a complete sewage flow path model is constructed, and the flow path data is stored in the system for subsequent analysis.
[0017] Based on preliminary surveys and system design drawings, the spatial distribution, density, and morphology of coal gangue in the treatment system are determined. Spatial overlay analysis is performed between the wastewater flow path and the coal gangue distribution map to identify the overlapping areas where wastewater flows through coal gangue. The overlap coefficient of each overlapping area is calculated to assess the sufficiency of contact between coal gangue and wastewater. At this point, coal gangue distribution data (location, density, morphology) is acquired, and the wastewater flow path is spatially overlaid with the coal gangue distribution map to identify overlapping areas. The overlap coefficient is calculated, and areas with an overlap coefficient greater than a threshold are selected as valid overlapping parts.
[0018] Based on the location and characteristics of the overlapping parts, the optimal purification path sequence is designed; considering factors such as purification efficiency, energy consumption, and maintenance convenience, the purification path is optimized; according to the spatial location of the overlapping parts, the node sequence of the purification path is determined, and the optimal connection method between adjacent nodes is calculated; factors considered include: distance, slope, flow velocity, coal gangue density, etc.; optimization objectives: maximize purification efficiency, minimize energy consumption, and construct a complete purification path network: main purification path: the core path connecting the main overlapping parts; branch purification paths: auxiliary paths connecting the secondary overlapping parts.
[0019] refer to Figure 3 In step S12, the specific steps are as follows: S121: Traverse the purification path and determine the purification events at each node position during the traversal. Based on the purification events at each node position and the relative positions between each node position, determine multiple child purification nodes and mark the purification events corresponding to the multiple child purification nodes. S122: Determine the purification data of multiple sub-purification nodes based on the identification of purification events corresponding to multiple sub-purification nodes; determine the first sub-load based on the purification data and node location of multiple sub-purification nodes; determine the second sub-load based on the purification data and real-time discharge of sewage of multiple sub-purification nodes; and determine the purification load of multiple sub-purification paths based on the first sub-load, the second sub-load, and the type of coal gangue.
[0020] In the embodiments of this application, depth-first search (DFS) or breadth-first search (BFS) algorithms from graph theory are used to systematically traverse the constructed purification path; during the traversal, the characteristic parameters of each point visited are recorded; a path topology graph is established, abstracting the purification path into a graph structure for easier subsequent analysis and calculation; water quality sensors are deployed at each path node to monitor changes in water quality parameters in real time; when water quality parameters change significantly, a purification event is triggered; a purification event threshold is set, and when the monitored data exceeds the threshold, it is automatically recorded as a valid purification event.
[0021] Clustering algorithms are used to group adjacent nodes with similar purification events into sub-purification nodes. Spatial distance and purification effect similarity between nodes are considered. Data content includes sub-purification node groups, node group center coordinates, group influence range, etc. The original nodes are divided into several sub-purification node groups by K-means clustering or hierarchical clustering methods.
[0022] A purification event file is established for each sub-purification node to record the main purification characteristics and effects of the node group. The data content includes the main purification event types, purification efficiency, stability rating, applicable pollutant types, etc. A multi-label classification method is used to label the corresponding purification event characteristics of each sub-purification node.
[0023] Specifically, suppose a mining area has a water purification path based on coal gangue. The path is 2.5 kilometers long and has multiple coal gangue purification points along the way. Using the BFS algorithm, we traverse the path from the starting point and identify 15 original nodes. We record the coordinates of each node (e.g., node 1: X=120.5, Y=35.2; node 2: X=120.6, Y=35.3, etc.). We then establish a node connection graph and determine the distance between nodes (e.g., the distance between node 1 and node 2 is 100 meters).
[0024] Water quality sensors were deployed at each node to monitor data in real time. Node 1: pH value increased from 6.8 to 7.2, turbidity decreased by 45%, recorded as a "pH adjustment event"; Node 3: cadmium removal rate reached 65%, recorded as a "heavy metal removal event"; Node 5: COD decreased by 30%, recorded as an "organic matter degradation event"; Node 7: ammonia nitrogen removal rate reached 50%, recorded as a "nitrogen removal event"; similar records were made at other nodes, and a total of 12 effective purification events were identified.
[0025] K-means clustering algorithm was applied, with the number of clusters K=4. The similarity of cleanup events and spatial distance (threshold set to 200 meters) were considered. Clustering results: Sub-cleanup node A: contains nodes 1, 2, and 3, with center coordinates (120.55, 35.25); Sub-cleanup node B: contains nodes 4, 5, and 6, with center coordinates (120.70, 35.40); Sub-cleanup node C: contains nodes 7, 8, and 9, with center coordinates (120.85, 35.55); Sub-cleanup node D: contains node 1... 0, 11, 12, 13, 14, 15, center coordinates (121.00, 35.70); Sub-purification node A: mainly marked as "pH adjustment" and "heavy metal removal" events, purification efficiency rating is high; Sub-purification node B: mainly marked as "organic matter degradation" event, purification efficiency rating is medium; Sub-purification node C: mainly marked as "nitrogen removal" event, purification efficiency rating is medium-high; Sub-purification node D: mainly marked as "comprehensive purification" event, including multiple purification mechanisms, purification efficiency rating is high.
[0026] Furthermore, the purification data of multiple sub-purification nodes is determined based on the identification of purification events corresponding to multiple sub-purification nodes. The first sub-load is determined based on the purification data and node location of multiple sub-purification nodes. The second sub-load is determined based on the purification data and real-time discharge of wastewater of multiple sub-purification nodes. The purification load of multiple sub-purification paths is determined based on the first sub-load, the second sub-load, and the type of coal gangue. This comprehensive consideration of the first sub-load, the second sub-load, and the type of coal gangue ensures the accuracy of the purification load of multiple sub-purification paths.
[0027] At this point, machine learning algorithms are used to perform pattern recognition on the marked purification events, extract key purification parameters, and time series analysis methods are used to process historical purification data to establish a purification effect prediction model. Core purification parameters such as purification efficiency, processing capacity, pollutant removal rate, and reaction rate of each sub-purification node are collected, and a purification event-purification data mapping relationship library is established. Purification data is obtained by looking up tables or predicting using models.
[0028] The first sub-load is determined based on the cleanup data and node locations. At this point, a spatial weight allocation algorithm is used, taking into account the spatial distribution characteristics and mutual influence of node locations, and spatial analysis is performed using a Geographic Information System (GIS). The data content includes spatial parameters such as distance between nodes, spatial influence factors, and location weight coefficients. The spatial influence weight is calculated through a distance decay function, and the first sub-load is calculated in combination with the cleanup data.
[0029] The second sub-load is determined based on the purification data and real-time sewage discharge. At this point, a dynamic flow-load relationship model is established to monitor changes in sewage discharge in real time. An adaptive control algorithm is used to adjust the load calculation parameters. The data includes flow parameters such as real-time sewage flow, pollutant concentration, and discharge fluctuation coefficient. The second sub-load is calculated by combining the flow-load conversion function with the purification data.
[0030] Specifically, data was collected from four sub-purification nodes. Sub-purification node A (pH adjustment and heavy metal removal): Purification efficiency: heavy metal removal rate 85%, pH adjustment capability 90%; Processing capacity: 500 m³ / hour; Reaction rate constant: Pollutant removal rate: , , Sub-cleanup node B (organic matter degradation).
[0031] Purification efficiency: COD removal rate 75%, BOD removal rate 80%; Processing capacity: 400 m³ / hour; Reaction rate constant: Pollutant removal rates: organic matter 78%, suspended solids 85%; Sub-purification node C (nitrogen removal): Purification efficiency: ammonia nitrogen removal rate 70%, total nitrogen removal rate 65%; Processing capacity: 450 m³ / hour; Reaction rate constant: Pollutant removal rate: TN 68%; Sub-purification node D (integrated purification): Purification efficiency: Integrated pollutant removal rate 82%; Processing capacity: 600 m³ / hour; Reaction rate constant: Pollutant removal rate: 80% on average for multiple types of pollutants.
[0032] Sub-cleanup node A: Central position, spatial influence weight 1.0; Sub-cleanup node B: Upstream position, spatial influence weight 0.9; Sub-cleanup node C: Midstream position, spatial influence weight 0.95; Sub-cleanup node D: Downstream position, spatial influence weight 0.85; Calculation results of the first sub-load: Sub-cleanup node A: 500×1.0×0.85=425 load units; Sub-cleanup node B: 400×0.9×0.78=280.8 load units; Sub-cleanup node C: 450×0.95×0.70=299.25 load units; Sub-cleanup node D: 600×0.85×0.82=418.2 load units.
[0033] Real-time emission monitoring: Current total emissions: 1800 m³ / hour; Emission fluctuation coefficient: 1.2 (peak period); Pollutant concentrations: COD 300 mg / L, ammonia nitrogen 50 mg / L, heavy metals 20 mg / L; Second sub-load calculation results: Sub-purification node A: 500 × (1800 / 2000) × 1.2 × 0.88 = 475.2 load units; Sub-purification node B: 400 × (1800 / 2000) × 1.2 × 0.78 = 336.96 load units; Sub-purification node C: 450 × (1800 / 2000) × 1.2 × 0.70 = 340.2 load units; Sub-purification node D: 600 × (1800 / 2000) × 1.2 × 0.82 = 531.36 load units.
[0034] The purification load is determined based on the first sub-load, the second sub-load, and the type of coal gangue. A multi-factor comprehensive evaluation method is adopted to establish a comprehensive calculation model for the load. Considering the influence of the physicochemical properties of coal gangue on the purification effect, material characteristic parameters such as coal gangue type, composition analysis, specific surface area, porosity, and adsorption capacity are introduced. The final purification load is calculated by weighted comprehensive scoring method combined with material characteristic coefficients.
[0035] Specifically, the characteristics of different types of coal gangue are as follows: Sub-purification node A: High-sulfur coal gangue, adsorption coefficient 1.2, reactivity 0.9; Sub-purification node B: Low-sulfur coal gangue, adsorption coefficient 0.8, reactivity 1.1; Sub-purification node C: Medium-sulfur coal gangue, adsorption coefficient 1.0, reactivity 1.0; Sub-purification node D: Mixed coal gangue, adsorption coefficient 1.1, reactivity 0.95; Calculation of final purification load: Sub-purification node A: (42 5+475) / 2×1.2×0.9=447.9 load units; Sub-cleaning node B: (280.8+337) / 2×0.8×1.1=271.8 load units; Sub-cleaning node C: (299.25+340) / 2×1.0×1.0=319.625 load units; Sub-cleaning node D: (418.2+531) / 2×1.1×0.95=495.957 load units.
[0036] refer to Figure 4 In step S13, the specific steps are as follows: S131: Collect the node positions of multiple sub-purification nodes, determine the corresponding purification path based on the tracing of the node positions of multiple sub-purification nodes, and determine the corresponding purification area based on the purification path corresponding to the sub-purification node; at the same time, determine the purification priority of multiple sub-purification nodes based on the purification load of multiple sub-purification nodes. S132: Determine the first path form based on the purification load and purification path of multiple sub-purification nodes, determine the second path form based on the purification load and corresponding purification area of multiple sub-purification nodes, and determine the main purification path and multiple branch purification paths based on the first path form, the second path form and the purification priority of multiple sub-purification nodes. S133: Collect purification data from the main purification path and multiple branch purification paths, and monitor the discharge volume of wastewater after purification in real time. Determine the dynamic purification system based on the purification data of the main purification path, the purification data of multiple branch purification paths, and the discharge volume of wastewater after purification. At this time, the dynamic purification system adjusts the purification direction between multiple sub-purification nodes to perform path control on the main purification path and multiple branch purification paths.
[0037] In the embodiments of this application, the node positions of multiple sub-purification nodes are collected, and the corresponding purification path is determined by tracing the node positions of multiple sub-purification nodes. The corresponding purification area is determined based on the purification path corresponding to the sub-purification node. The purification priority of multiple sub-purification nodes is determined based on the purification load of multiple sub-purification nodes, which takes into account the overall consideration of the purification load of multiple sub-purification nodes and ensures the accuracy of the purification priority of multiple sub-purification nodes.
[0038] At this point, high-precision GPS devices or ground sensor networks are used to locate each sub-cleanup node. The sensor network can include RFID, Bluetooth Low Energy (BLE) tags, etc., to achieve real-time and accurate location data acquisition, and the longitude, latitude, altitude, and timestamp of each node are introduced. Geographic Information System (GIS) software is used to import the collected node location data, and the cleanup path to which each node belongs is traced through spatial analysis functions. This can be achieved through path backtracking algorithms, taking into account the spatial relationships and connectivity between nodes, and collecting the cleanup path number or name corresponding to each node, as well as the start and end points of the path.
[0039] In GIS software, using polygon drawing tools or automatic boundary recognition functions, the purification area corresponding to each purification path is drawn according to the direction and coverage of the purification path. The area is corrected by considering factors such as terrain and water flow direction. Based on the purification load of each sub-purification node calculated in the previous step S122, the purification priority of each node is determined by combining an expert system or decision tree model. The priority can be divided into three levels: high, medium and low, or a numerical scoring system can be used.
[0040] Specifically, location data for five sub-cleaning nodes A, B, C, D, and E were collected using GPS devices, and GIS software analysis was used to determine that these nodes belong to three cleanup paths P1, P2, and P3, respectively. Further calculations showed that the cleanup areas covered by these paths were 5000 square meters, 3000 square meters, and 1500 square meters, respectively. Based on the cleanup load of each node, we assessed nodes A and E as high priority, nodes B and C as medium priority, and node D as low priority. This information provided an important basis for subsequent cleanup path optimization and resource allocation.
[0041] Furthermore, a first path shape is determined based on the purification load and purification path of multiple sub-purification nodes, and a second path shape is determined based on the purification load and corresponding purification area of multiple sub-purification nodes. The main purification path and multiple branch purification paths are determined based on the first path shape, the second path shape, and the purification priority of multiple sub-purification nodes. This approach takes into account the overall consideration of the first path shape, the second path shape, and the purification priority of multiple sub-purification nodes, ensuring the accuracy of the main purification path and multiple branch purification paths.
[0042] At this point, the first path configuration is determined based on the purification load and purification path of multiple sub-purification nodes. The purification load refers to the total amount of pollutants that each sub-purification node needs to treat, and the unit can be kilograms per hour (kg / h) or other suitable dimensions. The purification path refers to the connection relationship between nodes, including path length, flow direction, node sequence, etc. By analyzing the correlation between node load and path, the "load-path" characteristics of the path are determined, such as the load concentration and distribution uniformity of the path. Common methods include: grouping nodes according to load and observing the load distribution pattern on the path; calculating the standard deviation of the node load on the path to determine whether the load is uniformly distributed.
[0043] Specifically, assume there are three sub-purification nodes A, B, and C, with purification loads of 120 kg / h, 80 kg / h, and 60 kg / h respectively. The connection order of path P1 is A→B→C. The total load of path P1 is 260 kg / h, with node A having the highest load share (46%), indicating that the load is concentrated at the beginning of the path. The standard deviation of the node load is 24.5 kg / h, indicating uneven load distribution. First path type: Path P1 is a "high load at the starting point" path, with the load decreasing from the starting point to the ending point.
[0044] The second path configuration is determined based on the purification load and corresponding purification area of multiple sub-purification nodes. This involves introducing the purification load and corresponding purification area of multiple sub-purification nodes, where the purification area refers to the geographical area covered by each sub-purification node, measured in square meters (m²). By analyzing the relationship between node load and purification area, the "load-area" characteristics of the path are determined, such as load intensity per unit area and area utilization rate. Common methods include: load per unit area = node load / purification area. The area utilization efficiency of each node on the path is analyzed to determine whether there is resource waste or insufficiency.
[0045] Specifically, using the load data of nodes A, B, and C above, assuming their purification areas are 500m², 300m², and 200m² respectively; the load per unit area is calculated as follows: Node A: 120kg / h / 500m² = 0.24kg / h / m²; Node B: 80kg / h / 300m² = 0.27kg / h / m²; Node C: 60kg / h / 200m² = 0.30kg / h / m²; Node C has the highest load per unit area (0.30kg / h / m²), indicating that its area utilization efficiency is the highest; Node A has the lowest utilization rate (0.24kg / h / m²); Second path type: Path P1 is a "high load intensity at the endpoint" path, with the load intensity increasing from the starting point to the endpoint.
[0046] The main purification path and multiple branch purification paths are determined based on the first path form, the second path form, and the purification priorities of multiple sub-purification nodes. The first path form reflects the load distribution characteristics of the path (e.g., high load at the starting point); the second path form reflects the load intensity characteristics of the path (e.g., high load intensity at the end point). For purification priorities, a priority processing order is determined based on factors such as node load and purification efficiency (e.g., node A is high priority, node C is medium priority). The main purification path is the path with the largest load and highest priority. Branch purification paths use other paths as auxiliary paths to share the load or treat specific pollutants. Combining the first and second path forms, the path with the largest load and highest priority is selected. The remaining nodes are then assigned to branch paths based on their load and priority.
[0047] Specifically, assuming the following path and node information: Path P1: A→B→C (First path form: high load type at the starting point; Second path form: high load intensity type at the ending point); Path P2: D→E (First path form: uniform load type; Second path form: high load intensity type at the starting point); Node priorities: A (high), B (medium), C (medium), D (high), E (low); Main purification path determination: The total load of path P1 (260kg / h) is higher than that of path P2 (180kg / h), and node A is a high priority, so P1 is selected as the main purification path; Branch purification path determination: Path P2 is used as a branch path to share the load; Further optimization: Transfer part of the load of node E (low priority) to node D (high priority) to improve overall efficiency; Final path structure: Main purification path: P1 (A→B→C), responsible for handling the main pollutants; Branch purification path: P2 (D→E), assisting in the handling of remaining pollutants, and diverting them from the main path when necessary.
[0048] Therefore, purification data from the main purification path and multiple branch purification paths are collected, and the discharge volume of wastewater after purification is monitored in real time. Based on the purification data of the main purification path, the purification data of multiple branch purification paths, and the discharge volume of wastewater after purification, a dynamic purification system is determined. At this time, the dynamic purification system adjusts the purification direction between multiple sub-purification nodes to perform path control on the main purification path and multiple branch purification paths. This system takes into account the purification data of the main purification path, the purification data of multiple branch purification paths, and the discharge volume of wastewater after purification, ensuring the accuracy of the dynamic purification system. The introduction of the main purification path and multiple branch purification paths, and the overall consideration of the purification data of the main purification path, the purification data of multiple branch purification paths, and the discharge volume of wastewater after purification, improves the accuracy of the dynamic purification system.
[0049] At this time, data is collected in real time by sensors (such as water quality sensors, flow sensors, pressure sensors, etc.) deployed on each purification node; the data includes parameters such as pollutant concentration (such as COD, BOD, ammonia nitrogen, etc.), treatment flow rate, treatment efficiency, energy consumption, etc.; wireless transmission technology (such as LoRa, NB-IoT, 5G, etc.) is used to upload the data to the central control system to ensure the real-time performance and accuracy of the data.
[0050] Specifically, assume there are three nodes A, B, and C on the main purification path P1, and two nodes D and E on the branch purification path P2; the collected purification data are as follows: Main purification path P1: Node A: COD removal rate 70%, processing flow rate 100 m³ / h, energy consumption 5 kW; Node B: COD removal rate 60%, processing flow rate 80 m³ / h, energy consumption 4 kW; Node C: COD removal rate 50%, processing flow rate 60 m³ / h, energy consumption 3 kW; Branch purification path P2: Node D: COD removal rate 65%, processing flow rate 50 m³ / h, energy consumption 2.5 kW; Node E: COD removal rate 55%, processing flow rate 40 m³ / h, energy consumption 2 kW.
[0051] The system monitors the discharge volume of purified wastewater in real time. Flow meters and water quality sensors are installed at the outlet of the purification system to monitor the flow rate and water quality of the purified wastewater. Edge computing devices are used to preprocess the real-time data to reduce transmission latency and improve system response speed. A dynamic adjustment model is established based on the real-time data, and optimization algorithms (such as genetic algorithms and particle swarm optimization) are used to calculate the optimal purification path and load distribution. The main path, branch paths, and discharge volume data are fused and analyzed to evaluate the current system operation status and purification effect. Based on the analysis results, the processing flow rate and purification direction of each node are dynamically adjusted to ensure efficient system operation.
[0052] Specifically, the following data was detected at the purification system outlet: discharge flow rate: 180 m³ / h; COD concentration: 30 mg / L (lower than the emission standard of 50 mg / L); pH value: 7.2 (compliant with emission standards 6-9); turbidity: 5 NTU (lower than the emission standard of 10 NTU). Based on the collected data and detection results, the system performed the following analysis: the total processing flow rate of the main purification path P1 is 240 m³ / h, the total processing flow rate of the branch purification path P2 is 90 m³ / h, and the total system processing capacity is 330 m³ / h; the current discharge flow rate is 180 m³ / h, and the system load rate is... The COD removal rate was 54.5% (180 / 330), indicating a medium load. The purification effect assessment showed an average COD removal rate of 60%, meeting the discharge water quality standards. However, node C had a lower removal rate (50%), becoming a bottleneck. Dynamic purification system decisions included increasing the processing flow rate of branch path P2 from 90 m³ / h to 120 m³ / h to reduce the load on the main path P1; transferring part of the flow rate (20 m³ / h) from node C to node D to improve overall purification efficiency; after the adjustment, the processing flow rate of the main path P1 decreased to 220 m³ / h, while the processing flow rate of branch path P2 increased to 120 m³ / h.
[0053] The dynamic purification system adjusts the purification direction between multiple sub-purification nodes to regulate the main purification path and multiple branch purification paths. By controlling equipment such as valves and pumps, it changes the flow direction and flow distribution of sewage. Based on the decision of the dynamic purification system, the operating parameters of the main path and branch paths are adjusted in real time. Through a closed-loop control system, the effect of the adjustment is continuously monitored to ensure the stable operation of the system.
[0054] Specifically, based on the dynamic purification system's decisions, the system performs the following adjustments: Main purification path P1: The processing flow rate of node A is reduced from 100 m³ / h to 90 m³ / h; the processing flow rate of node B is reduced from 80 m³ / h to 70 m³ / h; the processing flow rate of node C is reduced from 60 m³ / h to 60 m³ / h (unchanged, but some flow is transferred to the branch path); Branch purification path P2: The processing flow rate of node D is increased from 50 m³ / h to 70 m³ / h; the processing flow rate of node E is increased from 40 m³ / h to 50 m³ / h; Purification direction adjustment: Open the bypass valve from node C to node D to transfer 20 m³ / h of flow from the main path to the branch path; Adjust the pump speed to ensure that the flow rate of branch path P2 is stable at 120 m³ / h.
[0055] Effects after adjustment: The total system processing flow rate remains at 180 m³ / h, but the load distribution is more balanced; the load rate of the main path P1 decreased from 72.7% to 66.7%, while the load rate of the branch path P2 increased from 66.7% to 80%; Purification effect: COD removal rate increased to 65%, and the quality of discharged water was further optimized.
[0056] refer to Figure 5 In step S14, the specific steps are as follows: S141: The dynamic purification system monitors the main purification path and multiple branch purification paths in real time, collects real-time purification data of the main purification path and multiple branch purification paths, and determines multiple abnormal purification data based on the filtering of real-time purification data of the main purification path and multiple branch purification paths. S142: Determine the preliminary abnormal region based on the sub-cleaning nodes corresponding to multiple abnormal cleanup data and the abnormal data volume of multiple abnormal cleanup data; determine the related part between multiple abnormal cleanup data based on the identification of the preliminary abnormal region, and determine the abnormal cleanup region by traversing the abnormal part along the related part. S143: Monitor abnormal purification areas in real time, determine multiple key purification data based on the purification data of abnormal purification areas, and determine the corresponding purification capacity level based on the data matching coefficient between multiple key purification data and the purification capacity coefficient corresponding to multiple key purification data.
[0057] In the embodiments of this application, the dynamic purification system monitors the main purification path and multiple branch purification paths in real time, collects real-time purification data of the main purification path and multiple branch purification paths, and determines multiple abnormal purification data based on the filtering of the real-time purification data of the main purification path and multiple branch purification paths. This system takes into account the overall consideration of filtering the real-time purification data of the main purification path and multiple branch purification paths, and ensures the accuracy of multiple abnormal purification data.
[0058] At this point, the purification process is continuously monitored by a sensor network (such as water quality sensors, flow sensors, pressure sensors, etc.) deployed on the main purification path and branch purification paths. The monitoring frequency is set according to system requirements, usually once every 5-15 minutes to ensure the real-time performance and accuracy of the data. The monitoring content includes parameters such as pollutant concentration (such as COD, BOD, ammonia nitrogen, etc.), treatment flow rate, treatment efficiency, and energy consumption.
[0059] The system collects real-time purification data from each node through a sensor network, including pollutant concentration, treatment flow rate, and energy consumption; it also uploads the data to the central control system using wireless transmission technologies (such as LoRa, NB-IoT, and 5G); and stores the collected data in a database for subsequent analysis and processing. By setting thresholds or using machine learning algorithms (such as Isolation Forest, Support Vector Machine, etc.) to analyze real-time data, data points that exceed the normal range are identified; normal ranges for each parameter are set based on historical data and expert experience, such as a normal range of 50%-80% for COD removal rate; when real-time data exceeds the normal range, it is judged as abnormal data.
[0060] Specifically, in a coal gangue purification area, there are three nodes A, B, and C on the main purification path P1, and two nodes D and E on the branch purification path P2. The dynamic purification system achieves real-time monitoring in the following ways: Main purification path P1: Node A: COD removal rate 70%, processing flow rate 100 m³ / h, energy consumption 5 kW; Node B: COD removal rate 60%, processing flow rate 80 m³ / h, energy consumption 4 kW; Node C: COD removal rate 30%, processing flow rate 60 m³ / h, energy consumption 3 kW; Branch purification path P2: Node D: COD removal rate 65%, processing flow rate 50 m³ / h, energy consumption 2.5 kW; Node E: COD removal rate 55%, processing flow rate 40 m³ / h, energy consumption 2 kW.
[0061] The real-time purification data collected by the dynamic purification system is as follows: Main purification path P1: Node A: COD removal rate 70%, processing flow rate 100 m³ / h, energy consumption 5 kW; Node B: COD removal rate 60%, processing flow rate 80 m³ / h, energy consumption 4 kW; Node C: COD removal rate 30%, processing flow rate 60 m³ / h, energy consumption 3 kW; Branch purification path P2: Node D: COD removal rate 65%, processing flow rate 50 m³ / h, energy consumption 2.5 kW; Node E: COD removal rate 55%, processing flow rate 40 m³ / h, energy consumption 2 kW.
[0062] The dynamic purification system filters abnormal purification data in the following ways: Main purification path P1: Node A: COD removal rate 70% (normal), processing flow rate 100m³ / h (normal), energy consumption 5kW (normal); Node B: COD removal rate 60% (normal), processing flow rate 80m³ / h (normal), energy consumption 4kW (normal); Node C: COD removal rate 30% (abnormal, below 50%), processing flow rate 60m³ / h (normal), energy consumption 3kW (normal); Branch purification path P2: Node D: COD removal rate 65% (normal), processing flow rate 50m³ / h (normal), energy consumption 2.5kW (normal); Node E: COD removal rate 55% (normal), processing flow rate 40m³ / h (normal), energy consumption 2kW (normal). Through screening, it was found that the COD removal rate of Node C was abnormally low (30%), and it was determined to be abnormal purification data.
[0063] Furthermore, preliminary abnormal regions are determined based on the sub-cleaning nodes corresponding to multiple abnormal cleanup data and the amount of abnormal data in the multiple abnormal cleanup data. Based on the identification of the preliminary abnormal regions, the related parts between multiple abnormal cleanup data are determined, and the abnormal cleanup regions are determined by traversing the abnormal parts along the related parts. This approach is compatible with the overall consideration of the identification of the preliminary abnormal regions and ensures the accuracy of the related parts between multiple abnormal cleanup data.
[0064] At this point, a preliminary abnormal area is determined based on the sub-purification nodes corresponding to multiple abnormal purification data and the abnormal data volume of multiple abnormal purification data. Abnormal purification data refers to data that exceeds the normal range, such as pollutant removal rate below the threshold or abnormal fluctuations in processing flow. Sub-purification nodes refer to specific processing units on the purification path, such as coal gangue filter tanks and sedimentation tanks. Abnormal data volume refers to the severity of abnormal data, which can be expressed as a percentage or absolute value deviating from the normal value. Based on the nodes where the abnormal data is located and the degree of abnormality, the problematic areas are initially delineated.
[0065] Specifically, in a certain coal gangue purification area, the following abnormal purification data were found through step S141: Node C: COD removal rate 30% (normal range 50%-80%), abnormal data volume -20% (deviating from the lower limit of normal); Node E: COD removal rate 45% (normal range 50%-80%), abnormal data volume -5% (deviating from the lower limit of normal); Node B: processing flow rate suddenly dropped from 80 m³ / h to 40 m³ / h, abnormal data volume -50%. Based on these abnormal data and their corresponding nodes, three abnormal areas were initially identified: Area 1: the area where Node C is located (severely abnormal COD removal rate); Area 2: the area where Node E is located (slightly abnormal COD removal rate); Area 3: the area where Node B is located (severely abnormal processing flow rate).
[0066] Based on the initial identification of abnormal regions, the correlation between multiple abnormal cleanup data is determined. By analyzing the temporal correlation, spatial correlation, and causal correlation between abnormal data, the correlation between abnormal data is determined. The correlation refers to the regions or links where abnormal data have common causes or mutual influence. Starting from the correlation, along the direction of the cleanup path, the relevant nodes and connecting parts are systematically examined to determine the complete scope of the anomaly's impact. Abnormal cleanup area: the finally determined abnormal area that needs to be focused on and handled.
[0067] Specifically, correlation analysis was performed on the three preliminary abnormal areas mentioned above: Temporal correlation analysis: The abnormal flow rate at node B occurred at 10:00 AM; the abnormal COD removal rate at node C occurred at 10:30 AM; and the abnormal COD removal rate at node E occurred at 11:00 AM. The time series shows that the abnormalities occurred in sequence. Spatial correlation analysis: Nodes B and C are located on the main purification path P1, with node B upstream of node C. Node E is located on the branch purification path P2, merging with the main path P1 at node A. Causal correlation analysis: The decrease in flow rate at node B leads to a decrease in the treatment effect of downstream node C. The decrease in the treatment effect of node C affects node E after merging. Through correlation analysis, the correlation between the abnormal data was determined to be: the pipeline connection between node B and node C; and the merging part at node A.
[0068] Anomaly traversal was performed along the above-mentioned related sections: the pipe connection from node B to node C: inspection revealed partial blockage in the pipe, resulting in a decrease in flow; the blockage material was a mixture of coal gangue fragments and impurities; the confluence section at node A: inspection revealed improper adjustment of the diversion valve at the confluence, resulting in uneven flow distribution between the main path P1 and the branch path P2.
[0069] Further investigation of the affected areas revealed the following: Node C: Due to a decrease in upstream flow, the hydraulic retention time of the coal gangue filter layer was insufficient, leading to a decrease in COD removal rate; Node E: Due to uneven flow distribution at the confluence, the treatment load increased, resulting in a slight decrease in COD removal rate; The finally identified abnormal purification areas included: Primary abnormal area: the pipeline from node B to node C (blockage issue); Secondary abnormal area: the confluence section at node A (diverter valve adjustment issue); Affected areas: nodes C and E (decreased treatment effect).
[0070] Therefore, by monitoring abnormal purification areas in real time and determining multiple key purification data based on the purification data of abnormal purification areas, the corresponding purification capacity level is determined based on the data matching coefficient between multiple key purification data and the purification capacity coefficient corresponding to multiple key purification data. This approach takes into account both the data matching coefficient between multiple key purification data and the purification capacity coefficient corresponding to multiple key purification data, ensuring the accuracy of the corresponding purification capacity level.
[0071] At this time, the abnormal area is continuously monitored by a sensor network (such as water quality sensors, flow sensors, pressure sensors, etc.) deployed in the abnormal purification area; purification data includes parameters such as pollutant concentration (such as COD, BOD, ammonia nitrogen, etc.), treatment flow rate, treatment efficiency, and energy consumption; key purification data refers to the core data that can reflect the purification status of the abnormal area, which usually includes: pollutant removal rate (such as COD removal rate); treatment flow rate; energy consumption; hydraulic retention time; coal gangue adsorption capacity, etc.
[0072] The corresponding purification capacity level is determined based on the data matching coefficient between multiple key purification data and the purification capacity coefficient corresponding to multiple key purification data. The data matching coefficient reflects the consistency and coordination between key purification data, and is calculated as: Data matching coefficient = 1 - Σ(actual value - theoretical value) / theoretical value / n; where n is the number of key data points, and the theoretical value is the value under ideal conditions. The purification capacity coefficient reflects the processing capacity of a single key purification data point, and is calculated as: Purification capacity coefficient = actual value / standard value; where the standard value is the value required by the design or specifications. The purification capacity level is determined based on a comprehensive score, typically divided into: High (comprehensive score ≥ 0.8), Medium (0.5 ≤ comprehensive score < 0.8), and Low (comprehensive score < 0.5).
[0073] Specifically, in the abnormal purification area identified in step S142 (the confluence of the pipeline from node B to C and node A), the system performs real-time monitoring and collects the following purification data: Pipeline from node B to C: COD removal rate: 30% (normal range 50%-80%); Processing flow rate: 40 m³ / h (normal range 60-100 m³ / h); Hydraulic retention time: 1.5 hours (normal range 2-3 hours); Coal gangue adsorption capacity: 60% (normal range 70%-90%); Confluence of node A: Split ratio: 3:7 (normal range 4:6-5:5); Pressure loss: 0.8 bar (normal range 0.3-0.6 bar). From this data, the system determines the following key purification data: COD removal rate (30%); Processing flow rate (40 m³ / h); Hydraulic retention time (1.5 hours); Split ratio (3:7).
[0074] Based on the above key purification data, the data matching coefficient was calculated as follows: Matching COD removal rate with treatment flow rate: Theoretically, the removal rate should increase when the flow rate decreases, but in reality, the opposite is true, resulting in a low matching degree; Matching hydraulic retention time with treatment flow rate: The retention time should increase when the flow rate decreases, but the actual retention time is still insufficient, resulting in a low matching degree; Matching split ratio with pressure loss: Uneven split ratio leads to increased pressure loss, resulting in a low matching degree; The comprehensive calculation yielded a data matching coefficient of 0.4 (relatively low matching degree).
[0075] Purification capacity coefficient calculation: COD removal rate capacity coefficient: 30% / 60%=0.5; Treatment flow rate capacity coefficient: 40m³ / h / 80m³ / h=0.5; Hydraulic retention time capacity coefficient: 1.5 hours / 2.5 hours=0.6; Diversion ratio capacity coefficient: 3:7 / 4:6=0.75; Average purification capacity coefficient = (0.5 + 0.5 + 0.6 + 0.75) / 4 = 0.59; Purification capacity level determination: Comprehensive score = (data matching coefficient + purification capacity coefficient) / 2 = (0.4 + 0.59) / 2 = 0.495; According to the scoring standard, 0.495 < 0.5, therefore the purification capacity level of this abnormal purification area is determined to be "low".
[0076] refer to Figure 6 In step S15, the specific steps are as follows: S151: Collect the location and shape of the abnormal purification area, and determine the purification measure matching table based on the location, shape and purification database of the abnormal purification area. The purification measure matching table presents the mapping relationship between purification capacity level and purification measure. S152: Determine synergistic purification measures based on the matching of the purification capacity level and the purification measure matching table. At the same time, collect abnormal events in abnormal purification areas. Determine corresponding microbial synergistic purification measures and filter synergistic purification measures based on the synergistic purification measures, the location of abnormal purification areas, and the abnormal events in abnormal purification areas. S153: Based on the identification of microbial synergistic purification measures and filter screen synergistic purification measures, determine the microbial synergistic purification amount and filter screen synergistic purification amount. Based on the microbial synergistic purification amount, filter screen synergistic purification amount and the purification capacity level of the abnormal purification area, determine the optimized purification capacity level. If the optimized purification capacity level exceeds the preset purification capacity level threshold, complete the optimization of the abnormal purification area and output the optimized purification area.
[0077] In the embodiments of this application, the location and shape of the abnormal purification area are collected, and a purification measure matching table is determined based on the location, shape and purification database of the abnormal purification area. The purification measure matching table presents a mapping relationship between purification capacity level and purification measures, which takes into account the overall consideration of the location, shape and purification database of the abnormal purification area, and ensures the accuracy of the purification measure matching table.
[0078] At this point, the precise location of the abnormal purification area within the overall purification system is determined using a GPS positioning system or an internal coordinate system. The location information includes three-dimensional coordinates (X, Y, Z) and relative positional relationships. The geometric characteristics of the abnormal area are obtained through three-dimensional laser scanning, ultrasonic detection, or system layout diagrams, including: shape characteristics: straight, curved, T-shaped, Y-shaped, etc.; dimensional parameters: length, width, height, diameter, cross-sectional area, etc.; structural characteristics: pipe wall thickness, material type, connection method, etc.; spatial layout: horizontal / vertical angle, slope, bending radius, etc.
[0079] Based on the location, morphology, and purification database of the abnormal purification area, a purification measure matching table is determined. The purification database contains historical operational data, abnormal handling records, and purification measure effectiveness evaluations, and is organized according to the following structure: Area Feature Library: stores characteristic parameters of areas with different locations and morphologies; Measure Effectiveness Library: records the implementation effects of various purification measures under different conditions; Capability Level Library: defines the judgment criteria and thresholds for different purification capability levels.
[0080] Matching Algorithm: A multi-parameter weighted matching algorithm is used to calculate the similarity between regional features and historical cases: Location similarity weight: 30%; Morphological similarity weight: 40%; Historical effect weight: 30%; Cleanup Measures Matching Table: A table generated based on the matching results, including: Cleanup Capacity Level: Low, Medium, High, Extremely High; Corresponding Cleanup Measures: Specific technical solutions and operating parameters; Expected Effects: Predicted implementation effects of each measure.
[0081] Specifically, based on the characteristics of the aforementioned abnormal areas, the system performs the following matching process: Location matching: querying historical cases in the eastern area, approximately 50m from the main inlet; Morphological matching: querying historical cases with a horizontal straight line shape and a diameter of approximately 0.5m; Effect evaluation: extracting purification measures and effect data from similar cases; Similarity calculation: Location similarity: 85% (highly matches the location of historical case A); Morphological similarity: 92% (almost identical in shape to historical case B); Historical effect: 78% (similar case C showed good treatment results); Overall similarity: 85%×30%+92%×40%+78%×30%=85.7%; A purification measure matching table was collected, as shown in Table 1.
[0082]
[0083] By using this precise matching method based on regional location, morphology, and historical data, the system can provide the most suitable purification measures for abnormal purification areas, greatly improving the pertinence and effectiveness of abnormal handling and laying a solid foundation for the determination and optimization of subsequent collaborative purification measures.
[0084] Furthermore, purification synergy measures are determined based on the matching of the purification capacity level and the purification measure matching table. Abnormal events in abnormal purification areas are collected. Based on the purification synergy measures, the location of abnormal purification areas, and the abnormal events in abnormal purification areas, corresponding microbial synergy purification measures and filter screen synergy purification measures are determined. This approach takes into account the overall consideration of purification synergy measures, the location of abnormal purification areas, and the abnormal events in abnormal purification areas, ensuring the accuracy of the corresponding microbial synergy purification measures and filter screen synergy purification measures.
[0085] At this point, synergistic purification measures are determined based on the purification capacity level and the purification measure matching table. The purification capacity level is the value calculated in step S143 (e.g., 0.495), corresponding to "low," "medium," or "high" levels. The purification measure matching table contains comprehensive purification measure schemes corresponding to different purification capacity levels. By looking up the table or using algorithm matching, the combination of synergistic purification measures for the current purification capacity level is determined. Input the current purification capacity level (e.g., "low"); query the purification measure matching table to obtain the corresponding measure combination. The measure combination typically includes: microbial enhancement measures; physical filtration measures; chemical treatment measures; and process parameter adjustment measures.
[0086] Specifically, for an abnormal area in a coal gangue purification system with a purification capacity level of "low" (0.495): Purification capacity level input: 0.495 (low level); Matching table query results: Microbial enhancement: Specific bacterial groups need to be added; Physical filtration: The filtration system needs to be upgraded; Chemical treatment: The pH value needs to be adjusted; Process parameters: The treatment flow rate needs to be reduced; Determined purification synergistic measures: Microbial synergy: Add nitrifying and denitrifying bacteria; Filtration synergy: Add a multi-stage filtration system; Chemical synergy: Add alkaline substances to adjust the pH; Parameter synergy: Reduce the flow rate from 60 m³ / h to 40 m³ / h.
[0087] Anomalies in the abnormal purification area are collected. Anomalies refer to specific problems or phenomena occurring in the abnormal purification area. They are obtained through various methods such as sensor monitoring, manual inspection, and image analysis. Anomalies are classified as follows: Microbiological: decreased bacterial activity, bacterial imbalance, biofilm abnormalities, etc.; Physical: blockage, damage, deformation, leakage, etc.; Chemical: abnormal pH, insufficient dissolved oxygen, abnormal pollutant concentration, etc.; Process: flow fluctuations, abnormal pressure, abnormal temperature, etc.
[0088] Based on the synergistic purification measures, regional location, and abnormal events, the synergistic purification measures for microorganisms and filters are determined. The determination of synergistic purification measures for microorganisms involves: considering the microbial issues in the abnormal events, the environmental conditions of the regional location (temperature, light, space, etc.), and combining this with the microbial enhancement scheme in the synergistic purification measures to determine the specific types, dosages, and methods of microorganisms. The determination of synergistic purification measures for filters involves: considering the physical filtration issues in the abnormal events, the morphological characteristics of the regional location (size, shape, material, etc.), and combining this with the physical filtration scheme in the synergistic purification measures to determine the type, specifications, and installation method of the filters.
[0089] Specifically, for the abnormal areas of the aforementioned coal gangue purification system, the abnormal events collected included: microbiological abnormalities: decreased nitrifying bacteria activity (detected value: 40% of normal); uneven biofilm thickness (0.5-3mm, normal should be 1-2mm); physical abnormalities: increased deposits on the inner wall of pipes (thickness increased by 2mm); filter screen breakage rate 15% (normal should be <5%); chemical abnormalities: low pH value (6.2, normal range 6.5-7.5); insufficient dissolved oxygen (3.2mg / L, normal should be >4mg / L); process-related abnormalities: large fluctuations in influent flow rate (±15%, normal should be <±5%); high system pressure (0.35MPa, normal should be <0.3MPa).
[0090] Based on synergistic purification measures, regional location, and abnormal events, microbial synergistic purification measures and filter synergistic purification measures are determined. The determination of microbial synergistic purification measures involves: considering the microbial issues identified in the abnormal event; taking into account the environmental conditions of the regional location (temperature, light, space, etc.); combining this with the microbial enhancement scheme in the synergistic purification measures; and determining the specific microbial species, dosage, and application method. The determination of filter synergistic purification measures involves: considering the physical filtration issues identified in the abnormal event; taking into account the morphological characteristics of the regional location (size, shape, material, etc.); combining this with the physical filtration scheme in the synergistic purification measures; and determining the filter type, specifications, and installation method.
[0091] Specifically, for the abnormal area of the aforementioned coal gangue purification system (location: East section pipeline, coordinates (125.3, 78.6, 2.5) to (135.3, 78.6, 2.5)): Microbial synergistic purification measures were determined as follows: Abnormal event analysis: decreased nitrifying bacteria activity and uneven biofilm; Area location considerations: Pipeline ambient temperature 25℃, no light, flowing state; Synergistic measures combination: Nitrifying bacteria and denitrifying bacteria need to be added; Specific measures determined: Microbial species: Nitrifying Bacillus and Pseudomonas; Dosage: 50g of bacterial agent per cubic meter of treated water; Dosage method: Continuous addition through pipeline dosing points for 72 hours; Auxiliary measures: Adding biofilm promoters to accelerate biofilm formation.
[0092] Filter-based synergistic purification measures determined: Abnormal event analysis: high filter breakage rate, excessive deposits on the inner wall of the pipe; Area location considerations: horizontal straight pipe, 0.5m diameter, PVC material; Synergistic measures combination: multi-stage filtration system needs to be added; Specific measures determined: Filter type: stainless steel woven mesh + activated carbon composite filter; Specifications: main filter 150 mesh, pre-filter 80 mesh; Installation method: install pre-filter at the pipe inlet, and install main filter in abnormal areas; Maintenance measures: set up an automatic backwashing system, backwashing once every 8 hours.
[0093] By using this method of determining coordinated measures based on purification capacity level, regional location, and abnormal events, the system can provide precise coordinated solutions for microbial and physical filtration in areas with abnormal purification, effectively solving complex water purification problems and laying the foundation for subsequent purification capacity calculation and optimization level assessment.
[0094] Therefore, the synergistic purification amounts of microorganisms and filters are determined based on the identification of synergistic purification measures. The optimized purification capacity level is then determined based on these amounts, along with the purification capacity level of the abnormal purification area. If the optimized purification capacity level exceeds a preset threshold, the abnormal purification area is optimized, resulting in an optimized purification area. This approach considers the overall factors of synergistic purification amounts of microorganisms, filters, and the purification capacity level of the abnormal purification area, ensuring the accuracy of the optimized purification capacity level. By introducing synergistic purification measures, the overall consideration of synergistic purification measures of microorganisms and filters is achieved, guaranteeing the optimization degree of the optimized purification area and enabling precise optimization of the abnormal purification area.
[0095] At this point, the synergistic purification capacity of microorganisms and the synergistic purification capacity of filters are determined based on the identification of synergistic purification measures of microorganisms and filters. Synergistic purification capacity of microorganisms refers to the ability of microorganisms to treat pollutants per unit time, usually expressed in g / (m³·h) or kg / (m³·d). Synergistic purification capacity of filters refers to the ability of filters to retain pollutants per unit time, usually expressed in g / (m²·h) or kg / (m²·d). Purification capacity calculation is based on the type of measure, system parameters, and historical data, and is obtained through mathematical model calculation.
[0096] Specific calculation methods: Microbial synergistic purification capacity calculation: Q_m = k_m × A_m × C_m × T_m; where: Q_m: microbial synergistic purification capacity; k_m: microbial activity coefficient (0.8-1.2); A_m: microbial dosage; C_m: pollutant concentration; T_m: treatment time; Filter screen synergistic purification capacity calculation: Q_f = k_f × A_f × C_f × T_f; where: Q_f: filter screen synergistic purification capacity; k_f: filtration efficiency coefficient (0.7-1.0); A_f: filtration area; C_f: influent pollutant concentration; T_f: filtration time.
[0097] Specifically, for the abnormal area of a certain coal gangue purification system: Microbial synergistic purification measures: Adding *Nitrifying Bacillus* and *Pseudomonas* inoculants at a dosage of 50 g / m³; microbial activity coefficient k_m = 0.9; pollutant concentration C_m = 120 mg / L; treatment time T_m = 24 hours; calculation result: Q_m = 0.9 × 50 × 120 × 24 = 129.6 g / (m³·d); Filter synergistic purification measures: Installing a 150-mesh stainless steel woven mesh activated carbon composite filter system, with a filter area A_f = 10 m²; filtration efficiency coefficient k_f = 0.85; influent pollutant concentration C_f = 120 mg / L; filtration time T_f = 24 hours; calculation result: Q_f = 0.85 × 10 × 120 × 24 = 244.8 g / (m²·d).
[0098] The optimized purification capacity level is determined based on the synergistic purification capacity of microorganisms, the synergistic purification capacity of the filter screen, and the purification capacity level of the abnormal purification area. The optimization model is a multi-parameter weighted evaluation model. The weight allocation is as follows: microorganism purification capacity weight 0.4, filter screen purification capacity weight 0.4, and original purification capacity level weight 0.2. The optimized purification capacity level is calculated by normalization and weighted calculation.
[0099] Calculation: P_opt = 0.4 × (Q_m / Q_m_max) + 0.4 × (Q_f / Q_f_max) + 0.2 × P_orig; where: P_opt: optimized purification capacity level; Q_m_max: maximum theoretical purification capacity of microorganisms; Q_f_max: maximum theoretical purification capacity of the filter; P_orig: original purification capacity level.
[0100] Specifically, the parameter settings are as follows: maximum theoretical purification capacity of microorganisms Q_m_max = 150 g / (m³·d); maximum theoretical purification capacity of the filter Q_f_max = 300 g / (m²·d); original purification capacity level P_orig = 0.495; calculation process: normalized purification capacity of microorganisms: 129.6 / 150 = 0.864; normalized purification capacity of the filter: 244.8 / 300 = 0.816; Optimized purification capacity level: P_opt = 0.4 × 0.864 + 0.4 × 0.816 + 0.2 × 0.495 = 0.771; Interpretation of results: After optimization, the purification capacity level increased from 0.495 to 0.771; the purification capacity level increased from "low" to "medium-high".
[0101] If the optimized purification capacity level exceeds the preset purification capacity level threshold, the optimization of the abnormal purification area is completed, and the optimized purification area is output. The purification capacity level threshold is set according to system requirements, typically 0.7 (above average). The optimized purification capacity level is compared with the threshold. If the conditions are met, the optimized purification area parameters and operating plan are output. At this point, the threshold comparison is as follows: set the threshold P_threshold = 0.7; compare P_opt with P_threshold; if P_opt ≥ P_threshold, the optimization is considered successful. Optimization completion indicators: the system generates an optimization report; updates the purification area parameters; adjusts the operating control strategy; and enters normal monitoring mode.
[0102] Specifically, threshold comparison: set threshold P_threshold=0.7; optimized purification capacity level P_opt=0.771; comparison: 0.771>0.7, meeting the optimization conditions; optimization completion and output: optimization success judgment: optimization of abnormal purification area completed; output optimized purification area parameters: microbial dosage: 50g / m³ (mixed agent of nitrifying bacteria and pseudomonas); filtration system: 150 mesh stainless steel woven mesh activated carbon composite filter; treatment flow rate: 40m³ / h; expected COD removal rate: 65%; system pressure: 0.25MPa.
[0103] An optimization report is generated: "Optimization of the abnormal area is complete: the synergistic purification capacity of microorganisms is 129.6 g / (m³·d), and the synergistic purification capacity of the filter is 44.8 g / (m²·d). The purification capacity level has increased from 0.495 to 0.771, exceeding the threshold of 0.7, indicating successful optimization. The system has been adjusted to the optimized operating parameters and has entered normal monitoring mode." Subsequent monitoring: The system continuously monitors the operating status of the optimized area; the purification effect is evaluated every 24 hours; if new anomalies are found, the optimization process is restarted.
[0104] Please see Figure 7 , Figure 7 This is a schematic diagram of the structural composition of a multi-path water quality purification and control system based on coal gangue according to an embodiment of the present invention; the multi-path water quality purification and control system based on coal gangue includes: The purification path module 21 is used to determine the distribution of coal gangue based on real-time detection of the distribution area of coal gangue, and to construct the purification path of coal gangue for sewage based on the distribution of coal gangue and the flow path of sewage. The purification load module 22 is used to determine multiple sub-purification nodes based on the traversal of the purification path, and to determine the purification load of multiple sub-purification paths based on the purification data of multiple sub-purification nodes, node positions and real-time discharge of sewage. The dynamic purification system module 23 is used to determine the main purification path and multiple branch purification paths based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes, and to determine the dynamic purification system based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of sewage after purification. The purification capacity level module 24 is used to determine abnormal purification areas in a dynamic purification system based on the identification of the main purification path and multiple branch purification paths, and to determine the corresponding purification capacity level based on the purification data of the abnormal purification areas. The optimization module 25 is used to determine synergistic purification measures based on the purification capacity level and the purification measure matching table; and to determine microbial synergistic purification measures and filter synergistic purification measures based on the identification of synergistic purification measures, so as to construct an optimized purification area.
[0105] The technical features of the above embodiments can be combined arbitrarily. For the sake of brevity, not all combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
Claims
1. A multi-path water quality purification and control method based on coal gangue, characterized in that, include: The distribution of coal gangue is determined by real-time monitoring of its distribution area, and a purification path of coal gangue for wastewater is constructed based on the distribution of coal gangue and the flow path of wastewater. Multiple sub-purification nodes are determined based on the traversal of the purification path, and the purification load of multiple sub-purification paths is determined based on the purification data of multiple sub-purification nodes, node locations, and real-time discharge of wastewater. The main purification path and multiple branch purification paths are determined based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes. The dynamic purification system is determined based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of wastewater after purification. In the dynamic purification system, abnormal purification areas are identified based on the main purification path and multiple branch purification paths, and the corresponding purification capacity level is determined based on the purification data of the abnormal purification areas. Based on the purification capacity level and the purification measure matching table, purification synergy measures are determined; based on the identification of purification synergy measures, microbial synergy purification measures and filter screen synergy purification measures are determined to construct an optimized purification area.
2. The multi-path water quality purification and control method based on coal gangue according to claim 1, characterized in that, The process involves determining the distribution of coal gangue based on real-time monitoring of its distribution area, and constructing a wastewater purification path using coal gangue based on the distribution of coal gangue and the flow path of wastewater, including: The distribution location of coal gangue is collected, and the distribution area of coal gangue is determined based on the distribution location and the extension direction of coal gangue. The distribution area of coal gangue is then monitored in real time, and multiple sub-distribution areas are determined based on the monitoring of the distribution area of coal gangue. Real-time weight data of multiple sub-distribution areas are collected, and the distribution of coal gangue is determined based on the real-time weight data of multiple sub-distribution areas, their regional location, and regional morphology. The flow path of wastewater is collected, and multiple overlapping parts are determined based on the distribution of coal gangue and the flow path of wastewater. The purification path of coal gangue on wastewater is constructed sequentially along the positions of multiple overlapping parts.
3. The multi-path water quality purification and control method based on coal gangue according to claim 1, characterized in that, The process of determining multiple sub-purification nodes based on the traversal of the purification path, and determining the purification load of multiple sub-purification paths based on the purification data, node locations, and real-time wastewater discharge of the multiple sub-purification nodes, includes: The purification path is traversed, and the purification events at each node position are determined during the traversal. Multiple child purification nodes are determined based on the purification events at each node position and the relative positions between each node position, and the purification events corresponding to the multiple child purification nodes are marked. The purification data of multiple sub-purification nodes is determined by identifying the purification events corresponding to multiple sub-purification nodes. The first sub-load is determined based on the purification data and node location of multiple sub-purification nodes. The second sub-load is determined based on the purification data and real-time discharge of sewage of multiple sub-purification nodes. The purification load of multiple sub-purification paths is determined based on the first sub-load, the second sub-load, and the type of coal gangue.
4. The multi-path water quality purification and control method based on coal gangue according to claim 1, characterized in that, The process of determining the main purification path and multiple branch purification paths based on the purification load, purification path, and corresponding purification area of multiple sub-purification nodes, and determining the dynamic purification system based on the purification data of the main purification path, the purification data of the multiple branch purification paths, and the discharge volume of wastewater after purification, includes: The node positions of multiple sub-purification nodes are collected, and the corresponding purification path is determined by tracing the node positions of multiple sub-purification nodes. The corresponding purification area is determined based on the purification path corresponding to the sub-purification node. At the same time, the purification priority of multiple sub-purification nodes is determined based on the purification load of multiple sub-purification nodes. The first path shape is determined based on the purification load and purification path of multiple sub-purification nodes. The second path shape is determined based on the purification load and corresponding purification area of multiple sub-purification nodes. The main purification path and multiple branch purification paths are determined based on the first path shape, the second path shape and the purification priority of multiple sub-purification nodes.
5. The multi-path water quality purification and control method based on coal gangue according to claim 4, characterized in that, The process of determining the main purification path and multiple branch purification paths based on the purification load, purification path, and corresponding purification area of multiple sub-purification nodes, and determining the dynamic purification system based on the purification data of the main purification path, the purification data of the multiple branch purification paths, and the discharge volume of wastewater after purification, further includes: The system collects purification data from the main purification path and multiple branch purification paths, and monitors the discharge volume of wastewater after purification in real time. Based on the purification data of the main purification path, the purification data of multiple branch purification paths, and the discharge volume of wastewater after purification, a dynamic purification system is determined. At this time, the dynamic purification system adjusts the purification direction between multiple sub-purification nodes to perform path control on the main purification path and multiple branch purification paths.
6. The multi-path water quality purification and control method based on coal gangue according to claim 1, characterized in that, In the dynamic purification system, abnormal purification areas are identified based on the main purification path and multiple branch purification paths, and the corresponding purification capacity level is determined based on the purification data of the abnormal purification areas, including: The dynamic purification system monitors the main purification path and multiple branch purification paths in real time, collects real-time purification data of the main purification path and multiple branch purification paths, and identifies multiple abnormal purification data based on the filtering of real-time purification data of the main purification path and multiple branch purification paths. The initial abnormal region is determined based on the sub-cleaning nodes corresponding to multiple abnormal cleanup data and the amount of abnormal data in the multiple abnormal cleanup data; the related parts between multiple abnormal cleanup data are determined based on the identification of the initial abnormal region, and the abnormal cleanup region is determined by traversing the abnormal parts along the related parts.
7. The multi-path water quality purification and control method based on coal gangue according to claim 6, characterized in that, In the dynamic purification system, the process of identifying abnormal purification areas based on the main purification path and multiple branch purification paths, and determining the corresponding purification capacity level based on the purification data of the abnormal purification areas, further includes: Real-time monitoring of abnormal purification areas, and determination of multiple key purification data based on the purification data of abnormal purification areas. The corresponding purification capacity level is determined based on the data matching coefficient between multiple key purification data and the purification capacity coefficient corresponding to multiple key purification data.
8. The multi-path water quality purification and control method based on coal gangue according to claim 1, characterized in that, The purification synergy measures are determined based on the purification capacity level and the purification measure matching table; based on the identification of the purification synergy measures, microbial synergy purification measures and filter synergy purification measures are determined to construct an optimized purification area, including: The location and shape of the abnormal purification area are collected. Based on the location, shape and purification database of the abnormal purification area, a purification measure matching table is determined. This purification measure matching table presents the mapping relationship between purification capacity level and purification measure.
9. The multi-path water quality purification and control method based on coal gangue according to claim 8, characterized in that, The process of determining synergistic purification measures based on the purification capacity level and purification measure matching table, and determining microbial synergistic purification measures and filter synergistic purification measures based on the identification of synergistic purification measures to construct an optimized purification area, further includes: Purification synergy measures are determined based on the matching of the purification capacity level and the purification measure matching table. At the same time, abnormal events in abnormal purification areas are collected. Based on the purification synergy measures, the location of abnormal purification areas, and the abnormal events in abnormal purification areas, the corresponding microbial synergy purification measures and filter screen synergy purification measures are determined. The synergistic purification capacity of microorganisms and the synergistic purification capacity of filters are determined based on the identification of synergistic purification measures of microorganisms and filters. Based on the synergistic purification capacity of microorganisms, the synergistic purification capacity of filters, and the purification capacity level of abnormal purification areas, the optimized purification capacity level is determined. If the optimized purification capacity level exceeds the preset purification capacity level threshold, the optimization of abnormal purification areas is completed, and the optimized purification area is output.
10. A multi-path water quality purification and control system based on coal gangue, characterized in that, The coal gangue-based multi-path water quality purification and control system is applied to the coal gangue-based multi-path water quality purification and control method as described in any one of claims 1-9, wherein the coal gangue-based multi-path water quality purification and control system comprises: The purification path module is used to determine the distribution of coal gangue based on real-time detection of the distribution area of coal gangue, and to construct the purification path of coal gangue on wastewater based on the distribution of coal gangue and the flow path of wastewater. The purification load module is used to determine multiple sub-purification nodes based on the traversal of the purification path, and to determine the purification load of multiple sub-purification paths based on the purification data of multiple sub-purification nodes, node positions and real-time sewage discharge. The dynamic purification system module is used to determine the main purification path and multiple branch purification paths based on the purification load, purification path and corresponding purification area of multiple sub-purification nodes. The dynamic purification system is determined based on the purification data of the main purification path, the purification data of multiple branch purification paths and the discharge volume of wastewater after purification. The purification capacity level module is used to identify abnormal purification areas in a dynamic purification system based on the identification of the main purification path and multiple branch purification paths, and to determine the corresponding purification capacity level based on the purification data of the abnormal purification areas. The optimization module is used to determine synergistic purification measures based on the purification capacity level and the purification measure matching table; based on the identification of synergistic purification measures, it determines microbial synergistic purification measures and filter synergistic purification measures to construct an optimized purification area.
Citation Information
Patent Citations
Experimental method for actual measurement of mine water purification of coal mining goaf gangue
CN106226495A
Path simulation system and method for purifying slime water from coal gangue in goaf
CN119757685A
Abnormality detection device for sewage purification equipment
JP3976072B1
