Automatic discharging method and system for ship pipe sections
By using dynamic programming nesting algorithms and real-time data-driven automated material cutting methods, processing instructions are generated, solving the problems of low pipe processing efficiency and material waste in shipbuilding, and realizing efficient automated control and data closed-loop management.
Patent Information
- Application Number
- CN202510938365.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-08
- Publication Date
- 2025-10-28
AI Technical Summary
In the existing technology, the pipe processing efficiency in the shipbuilding process is low, the reliance on manual material nesting leads to a high material waste rate, and the lack of real-time data-driven full-process automation and data closed-loop management affects production progress and material utilization.
By acquiring real-time dispatch data and historical data to generate task packages, using dynamic programming nesting algorithms and preset management algorithms to generate nesting schemes, automatically selecting processing instructions and performing material unloading, and combining temporary stop strategies and coding processing, the entire process is automated.
It improved pipe utilization, reduced material waste, optimized workflow, enabled efficient implementation of automated pipe section feeding and real-time data updates, and solved the problems of data isolation and chaotic inkjet printing positions.
Smart Images

Figure CN120851464A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power systems, and more particularly to an automated method and system for unloading ship pipe sections. Background Art
[0002] During shipbuilding, the pipes required at the production site need to be nested, processed, and sorted according to their specifications and models. This involves the overall data of pipe materials and sections. If all of this is done by workers, it will result in a large workload, low work efficiency, high labor intensity, and affect the production schedule. The production data required for cutting cannot be obtained quickly, and the production performance data cannot be updated and returned to the upstream management system in real time, making information sharing and data query inconvenient. The early implementation and effective prevention of pipe control that affects production needs cannot well meet the increasing demands of automated, intelligent, and lean shipbuilding.
[0003] Problems existing in the technology include: the production progress cannot be dynamically updated due to the lack of real-time interaction between the cutting data and the MES system, resulting in low utilization of leftover materials; the reliance on traditional manual nesting experience leads to high pipe waste rate; the lack of automatic decomposition function for multi-specification pipe sections results in the inability to achieve full-process automation driven by real-time work dispatch data (from nesting to cutting, coding and end feedback); and the lack of real-time data closed-loop management. Summary of the Invention
[0004] This invention provides an automated material unloading method and system for ship pipe sections, which can solve the technical problems of existing technologies that cannot achieve full-process automation driven by real-time dispatch data and lack real-time data closed-loop management, and realize efficient and collaborative intelligent automated production.
[0005] This invention provides an automated method for unloading ship pipe sections, comprising:
[0006] Obtain current real-time work assignment data, historical nesting operation data, and basic business data, and obtain the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data;
[0007] The nesting scheme is obtained based on the current task package and the preset management algorithm, and the target nesting scheme is obtained based on the nesting scheme and the dynamic programming nesting algorithm. The nesting processing instructions are then obtained based on the target nesting scheme.
[0008] Based on the nesting instructions and nesting scheme, the material cutting process is carried out, and the nesting operation data is acquired to complete the automated material cutting process.
[0009] This invention provides an automated material cutting method for ship pipe sections. First, it acquires current real-time work dispatch data, historical nesting operation data, and basic business data to generate a current task package. Then, based on this task package and a preset management algorithm, it obtains a nesting scheme. A dynamic programming nesting algorithm is used to automatically select the optimal nesting scheme, generating a target nesting scheme and corresponding nesting processing instructions. Finally, the material cutting process is executed according to the processing instructions and the nesting scheme, while simultaneously acquiring nesting operation data, completing the fully automated material cutting process. This method, driven by real-time work dispatch data, achieves fully automated control from data acquisition and scheme generation to processing execution. By using a preset data management algorithm and a dynamic programming nesting algorithm to automatically select the optimal nesting scheme and generate corresponding nesting processing instructions for automatic material cutting, it effectively improves pipe utilization, reduces raw material waste, optimizes workflow, and increases production efficiency, achieving highly efficient implementation of automated pipe section material cutting.
[0010] Furthermore, a nesting scheme is obtained based on the current task package and a preset management algorithm, and a target nesting scheme is obtained based on the nesting scheme and a dynamic programming nesting algorithm. Nesting processing instructions are then obtained based on the target nesting scheme, including: obtaining the nesting scheme and a surplus material list based on the current task package and the preset management algorithm; and performing one-dimensional nesting optimization based on the nesting scheme, the surplus material list, the dynamic programming nesting algorithm, and preset constraints to obtain the target nesting scheme. The calculation process satisfies the following formula:
[0011]
[0012] j≤j o
[0013] In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o Represents the maximum number of preset combinations; obtains processing decomposition tasks based on the target nesting scheme and preset processing decomposition methods; obtains nesting processing instructions based on the processing decomposition tasks.
[0014] In the above scheme, the dynamic programming nesting algorithm automatically selects the best nesting scheme under preset constraints, so as to effectively improve the utilization rate of pipe materials, reduce raw material waste, optimize the workflow and improve production efficiency.
[0015] Furthermore, the nesting scheme and surplus material list are obtained based on the current task package and the preset management algorithm, including: obtaining pipe segment data based on the current task package and the preset sorting method; obtaining the longest available pipe segment based on the current task package; and obtaining the nesting scheme and surplus material list based on the longest available pipe segment, the obtained pipe segment data, and the current task package.
[0016] In the above scheme, the processing tasks are decomposed step by step according to the preset management algorithm, and a nesting scheme and a list of surplus materials are generated, providing a control basis for the automated material unloading process.
[0017] Furthermore, it also includes: obtaining parameter threshold ranges based on preset constraints; marking the current surplus pipe as unusable surplus material when the current surplus pipe does not meet the parameter threshold range based on the surplus material list; marking the current surplus pipe as usable surplus material when the current surplus pipe meets the parameter threshold range based on the surplus material list; and obtaining an updated surplus material list based on usable and unusable surplus materials.
[0018] In the above scheme, timely data updates are ensured through the updating of the surplus material list data, which prepares a data foundation for subsequent sustainable material cutting. By updating and adding reusable pipes to the database through parameter threshold ranges, pipes that meet the reusability conditions can be reused. Those that do not meet the conditions are marked as unusable to avoid processing obstacles, which effectively improves the efficiency of pipe utilization.
[0019] Furthermore, the material cutting process is performed based on the nesting processing instructions and nesting scheme, and nesting operation data is obtained, including: performing material cutting processing based on the nesting processing instructions and nesting scheme to obtain the target pipe and processing data; obtaining the target pipe code based on the target pipe and the preset coding method; and obtaining the nesting operation data based on the target pipe, processing data, and target pipe code.
[0020] In the above scheme, the pre-processed pipes are coded to facilitate the entry, updating, and sorting of pipe data, ensuring the timeliness and accuracy of the data and guaranteeing the safe and correct handling of the material cutting process.
[0021] Furthermore, it also includes: obtaining a temporary stop command, stopping the material feeding and processing action based on the temporary stop command and the preset breakpoint resume processing algorithm, obtaining the current pipe data, and using the current pipe data as the nesting operation data.
[0022] In the above solution, a temporary stop function is set according to the preset breakpoint resume processing algorithm to achieve continuous triggering of the material feeding process, thereby preventing data loss, low completion rate of processing tasks, and waste of resources.
[0023] Furthermore, it also includes: obtaining current production progress and pipe utilization rate reports based on nesting operation data, and performing visualization processing based on the current production progress and pipe utilization rate reports.
[0024] Furthermore, the process of cutting material based on nesting instructions and nesting schemes, and obtaining nesting operation data to complete the automated cutting material process, also includes: when the nesting operation data determines that nesting has failed, automatically triggering a reassignment instruction to obtain an updated task package based on the reassignment instruction.
[0025] In the above scheme, the stable and accurate implementation of the processing nesting process is ensured by setting an anomaly handling strategy.
[0026] This invention provides an automated material cutting method for ship pipe sections. It optimizes the processing scheme by combining dynamic programming nesting algorithms with constraints, and processes leftover materials, enabling automatic updating of leftover material data, disposal or reuse of leftover materials, and real-time updates of nesting and leftover material data to form a closed-loop management system. This solves the problems of existing traditional technologies that rely on manual dispatching, nesting, and cutting, resulting in isolated data and delayed feedback. Furthermore, by encoding the produced pipe sections, it addresses the issues of chaotic inkjet printing positions and subsequent sorting difficulties in existing technologies. Combined with a temporary stop strategy, it solves the problems of manual resetting after cutting interruptions and high material scrap rates in existing technologies, significantly improving pipe utilization and achieving automated control of the processing process.
[0027] This invention provides an automated material handling system for ship pipe sections, used to implement the aforementioned automated material handling method for ship pipe sections, comprising a data layer, an application logic layer, an equipment control layer, and a foundation layer, wherein:
[0028] The data layer is used to obtain current real-time work assignment data, historical nesting operation data, and basic business data, so as to obtain the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data;
[0029] The application logic layer is used to obtain nesting schemes based on the current task package and preset management algorithms, and to obtain target nesting schemes based on nesting schemes and dynamic programming nesting algorithms, so as to obtain nesting processing instructions based on target nesting schemes;
[0030] The equipment control layer is used to control the corresponding equipment to perform material unloading processing based on the nesting processing instructions and nesting scheme, and to acquire nesting operation data to complete the automated unloading process;
[0031] The base layer includes the corresponding equipment.
[0032] This invention provides an automated material cutting system for ship pipe sections. First, the data layer acquires real-time dispatch data, historical nesting operation data, and basic business data to generate a current task package. Then, the application logic layer obtains a nesting scheme based on this task package and a preset management algorithm. A dynamic programming nesting algorithm automatically selects the optimal nesting scheme, generating a target nesting scheme and corresponding nesting processing instructions. Finally, the equipment control layer executes the material cutting process according to the processing instructions and the nesting scheme, simultaneously acquiring nesting operation data to complete the fully automated material cutting process. This method, driven by real-time dispatch data, achieves fully automated control from data acquisition and scheme generation to processing execution. By using a preset data management algorithm and a dynamic programming nesting algorithm to automatically select the optimal nesting scheme and generate corresponding nesting processing instructions for automatic material cutting, it effectively improves pipe utilization, reduces raw material waste, optimizes workflow, and increases production efficiency, achieving highly efficient implementation of automated pipe section material cutting.
[0033] Furthermore, the application logic layer includes a nesting management module, a dynamic programming module, a processing decomposition module, and an instruction generation module. Specifically: the nesting management module obtains the nesting scheme and surplus material list based on the current task package and a preset management algorithm; the dynamic programming module performs one-dimensional nesting optimization based on the nesting scheme, surplus material list, dynamic programming nesting algorithm, and preset constraints to obtain the target nesting scheme. Its calculation process satisfies the following formula:
[0034]
[0035]
[0036] j≤j o
[0037] In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o The maximum number of preset combinations is represented; the processing decomposition module is used to obtain processing decomposition tasks based on the target nesting scheme and the preset processing decomposition method; the instruction generation module is used to obtain nesting processing instructions based on the processing decomposition tasks.
[0038] In the above scheme, the nesting scheme and surplus material list are first obtained through the nesting management module as the basic data for the next step of optimization. Then, the dynamic programming module uses the dynamic programming nesting algorithm to automatically select the best nesting scheme under preset constraints, so as to effectively improve the utilization rate of pipe materials, reduce raw material waste, optimize the workflow and improve production efficiency.
[0039] Furthermore, the nesting management module is used to obtain nesting schemes and surplus material lists based on the current task package and preset management algorithms, including: obtaining pipe segment data based on the current task package and preset sorting method; obtaining the longest available pipe segment based on the current task package; and obtaining nesting schemes and surplus material lists based on the longest available pipe segment, obtained pipe segment data, and the current task package.
[0040] In the above scheme, the nesting management module decomposes the processing tasks step by step according to the preset management algorithm and generates nesting schemes and surplus material lists, providing a control basis for the automated material unloading process.
[0041] Furthermore, the application logic layer also includes a result feedback module, which is used to obtain real-time nesting data based on the target nesting scheme and the surplus material list, and to feed the real-time nesting data back to the data layer.
[0042] In the above solution, the result feedback module enables real-time synchronous updates of data, avoiding problems such as data isolation.
[0043] Furthermore, the equipment control layer includes a material feeding control module, a coding control module, and an operation data processing module. Specifically: the material feeding control module is used to perform material feeding processing based on nesting processing instructions and nesting schemes, and to obtain the target pipe and processing data; the coding control module is used to obtain the target pipe code based on the target pipe and a preset coding method; and the operation data processing module is used to obtain nesting operation data based on the target pipe, processing data, and target pipe code, and to feed the nesting operation data back to the data layer.
[0044] In the above solution, the pre-processed pipes are coded by the inkjet control module to facilitate the input, updating, and sorting of pipe data, ensuring the timeliness and accuracy of the data and guaranteeing the safe and correct handling of the material feeding process.
[0045] Furthermore, the equipment control layer also includes a temporary stop module, which is used to obtain a temporary stop command, stop the material cutting and processing action based on the temporary stop command and a preset breakpoint resume processing algorithm, obtain the current pipe data, and use the current pipe data as breakpoint running data, so that the application logic layer generates a resume command based on the breakpoint running data, and then the equipment control layer controls the corresponding equipment to perform material cutting and processing based on the resume command and the nesting scheme, and obtains the nesting running data to complete the automated material cutting process.
[0046] In the above solution, the temporary stop module sets the temporary stop function according to the preset breakpoint resume processing algorithm, so as to realize the continuous triggering of the material feeding process and prevent data loss, low completion of processing tasks, and waste of resources.
[0047] Furthermore, it also includes a presentation layer, which is used to obtain current production progress and pipe utilization reports based on nesting operation data, and to perform visualization processing based on the current production progress and pipe utilization reports.
[0048] In the above solution, visualization is achieved through a presentation layer, enabling the acquisition, viewing, and timely monitoring of data during the material cutting process, thereby helping to avoid processing errors.
[0049] Furthermore, the equipment control layer also includes an exception handling module, which is used to automatically trigger a reassignment instruction when the nesting operation data determines that the nesting has failed, so as to obtain an updated task package based on the reassignment instruction.
[0050] In the above scheme, the exception handling strategy of the exception handling module ensures the stable and accurate implementation of the machining nesting process.
[0051] This invention provides an automated material feeding system for ship pipe sections. By applying a dynamic programming nesting algorithm at the logic layer combined with constraints, the system optimizes the processing scheme and handles leftover materials. It automatically updates leftover material data, discards or reuses leftover materials, and updates nesting and leftover material data in real time, forming a closed-loop management system. This solves the problems of existing traditional technologies that rely on manual dispatching, nesting, and cutting, as well as isolated data and delayed feedback. By encoding the produced pipe sections at the equipment control layer, the system solves the problems of chaotic inkjet printing positions and subsequent sorting difficulties in existing technologies. Furthermore, by incorporating a temporary stop strategy, the system addresses the issues of manual resetting after cutting interruptions and high material scrap rates in existing technologies. This significantly improves pipe utilization and achieves automated and flexible control of the processing process. Attached Figure Description
[0052] To more clearly illustrate the technical solution of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0053] Figure 1 This is a schematic diagram of an automated material unloading method for ship pipe sections provided in this embodiment;
[0054] Figure 2 This is a schematic diagram of a five-layer architecture automated material handling management system for ship pipe sections provided in this embodiment;
[0055] Figure 3 This is a schematic diagram of the business operation process of a material feeding management system provided in this embodiment;
[0056] Figure 4This is a schematic diagram of a breakpoint resume and real-time inkjet printing process based on an automated material unloading system for ship pipe sections, provided in this embodiment. Detailed Implementation
[0057] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions of this application will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0058] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.
[0059] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0060] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0061] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following related objects have an "or" relationship.
[0062] In the description of the embodiments of this application, the term "multiple" refers to two or more (including two), similarly, "multiple sets" refers to two or more (including two sets), and "multiple pieces" refers to two or more (including two pieces).
[0063] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.
[0064] Example 1:
[0065] This embodiment provides an automated material unloading method for ship pipe sections, such as... Figure 1 As shown, it includes:
[0066] S1. Obtain current real-time work assignment data, historical nesting operation data, and basic business data to obtain the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data;
[0067] S2. Obtain the nesting scheme based on the current task package and the preset management algorithm, and obtain the target nesting scheme based on the nesting scheme and the dynamic programming nesting algorithm, so as to obtain the nesting processing instruction based on the target nesting scheme;
[0068] S3. Based on the nesting instructions and nesting scheme, perform material cutting processing, acquire nesting operation data, and complete the automated material cutting process.
[0069] This embodiment provides an automated material cutting method for ship pipe sections. First, it acquires current real-time work dispatch data, historical nesting operation data, and basic business data to generate a current task package. Then, based on this task package and a preset management algorithm, it obtains a nesting scheme. A dynamic programming nesting algorithm is used to automatically select the optimal nesting scheme, generating a target nesting scheme and corresponding nesting processing instructions. Finally, the material cutting process is executed according to the processing instructions and the nesting scheme, while simultaneously acquiring nesting operation data, completing the fully automated material cutting process. This method, driven by real-time work dispatch data, achieves fully automated control from data acquisition and scheme generation to processing execution. By using a preset data management algorithm and a dynamic programming nesting algorithm to automatically select the optimal nesting scheme and generate corresponding nesting processing instructions for automatic material cutting, it effectively improves pipe utilization, reduces raw material waste, optimizes workflow, and increases production efficiency, achieving highly efficient implementation of automated pipe section material cutting.
[0070] Optionally, a nesting scheme is obtained based on the current task package and a preset management algorithm, and a target nesting scheme is obtained based on the nesting scheme and a dynamic programming nesting algorithm. Nesting processing instructions are then obtained based on the target nesting scheme. This includes: obtaining the nesting scheme and a list of surplus materials based on the current task package and the preset management algorithm; and performing one-dimensional nesting optimization based on the nesting scheme, the list of surplus materials, the dynamic programming nesting algorithm, and preset constraints to obtain the target nesting scheme. The calculation process satisfies the following formula:
[0071]
[0072]
[0073] j≤j o
[0074] In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o Represents the maximum number of preset combinations; obtains processing decomposition tasks based on the target nesting scheme and preset processing decomposition methods; obtains nesting processing instructions based on the processing decomposition tasks.
[0075] In the specific implementation process, the current real-time work dispatch data includes weekly plans, process batches, quota working hours, and information on the allocation of construction personnel and equipment, and the synchronization cycle with the logic layer data is ≤1 minute. The preset constraints used in this embodiment are: single pipe residual length ≤200mm, and maximum combination number ≤5 sections / pipe.
[0076] Optionally, the nesting scheme and surplus material list are obtained based on the current task package and a preset management algorithm, including: obtaining pipe segment data based on the current task package and a preset sorting method; obtaining the longest available pipe segment based on the current task package; and obtaining the nesting scheme and surplus material list based on the longest available pipe segment, the obtained pipe segment data, and the current task package.
[0077] In the specific implementation process, the processing tasks are gradually decomposed according to the preset management algorithm, and a nesting scheme and a list of surplus materials are generated, providing a control basis for the automated material unloading process.
[0078] Optionally, it also includes: obtaining parameter threshold ranges based on preset constraints; marking the current surplus pipe as unusable surplus material when the current surplus pipe does not meet the parameter threshold range based on the surplus material list; marking the current surplus pipe as usable surplus material when the current surplus pipe meets the parameter threshold range based on the surplus material list; and obtaining an updated surplus material list based on usable and unusable surplus materials.
[0079] In the specific implementation process, parameter settings are used to set the basic parameters for nesting calculation, such as the maximum number of combinations (the maximum number of pipe segments that can be nested from one pipe), the standard for the length of remaining material (remaining material shorter than this value will no longer be nested), the minimum remaining length (the minimum length of remaining material to be retained from one pipe segment), the nesting mode (nesting from short to long, nesting from long to short), the calculation order of nesting, and the parameter threshold range of preset constraints.
[0080] The parameter threshold range used in this embodiment is as follows: when the length of the leftover material is <200mm, it is marked as unusable leftover material; when the length of the leftover material is ≥200mm, it is marked as usable leftover material, automatically stored in the leftover material library, and preferentially called in subsequent nesting.
[0081] Optionally, the material cutting process is performed based on the nesting processing instructions and nesting scheme, and nesting operation data is obtained, including: performing material cutting processing based on the nesting processing instructions and nesting scheme to obtain the target pipe and processing data; obtaining the target pipe code based on the target pipe and the preset coding method; and obtaining the nesting operation data based on the target pipe, processing data and target pipe code.
[0082] In the specific implementation process, the inkjet printing, i.e. the coding content, includes the pipe section number, length, material and the number of the corresponding nesting unit, and the inkjet printing position is ≤50mm from the pipe end.
[0083] Optionally, it also includes: obtaining a temporary stop command, stopping the material feeding and processing action based on the temporary stop command and a preset breakpoint resume processing algorithm, obtaining the current pipe data, and using the current pipe data as the nesting operation data.
[0084] In the specific implementation process, by setting a temporary stop function according to the preset breakpoint resume processing algorithm, the material feeding process can be continuously triggered, preventing data loss, low completion rate of processing tasks, and waste of resources.
[0085] Optionally, it also includes: obtaining current production progress and pipe utilization reports based on nesting operation data, and performing visualization processing based on the current production progress and pipe utilization reports.
[0086] Optionally, the material cutting process is performed based on the nesting processing instructions and nesting scheme, and nesting operation data is obtained to complete the automated material cutting process. It also includes: when the nesting operation data determines that nesting has failed, an automatic reassignment instruction is triggered to obtain an updated task package based on the reassignment instruction.
[0087] In the specific implementation process, the MES-based automated material cutting process for ship pipe sections adopted in this embodiment includes: receiving MES dispatch data and generating nesting units according to process batches; calling dynamic programming algorithm to perform nesting calculations, constraining the remaining material length to ≤200mm; pushing the nesting results to the cutting machine PLC in JSON format and monitoring the cutting accuracy (error ≤0.5mm); and providing real-time feedback on the pipe section cutting status to the MES system to update the production progress.
[0088] This embodiment provides an automated material cutting method for ship pipe sections. It optimizes the processing scheme by combining dynamic programming nesting algorithms with constraints, and processes leftover materials, enabling automatic updating of leftover material data, disposal or reuse of leftover materials, and real-time updates of nesting and leftover material data to form a closed-loop management system. This solves the problems of existing traditional technologies that rely on manual dispatching, nesting, and cutting, as well as isolated data and delayed feedback. Furthermore, by encoding the produced pipe sections, it addresses the issues of chaotic inkjet printing positions and subsequent sorting difficulties in existing technologies. Combined with a temporary stop strategy, it solves the problems of manual resetting after cutting interruptions and high material scrap rates in existing technologies, greatly improving pipe utilization and achieving automated control of the processing process.
[0089] Example 2:
[0090] This embodiment provides an automated ship pipe section unloading system to implement the aforementioned automated ship pipe section unloading method. It includes a data layer, an application logic layer, an equipment control layer, and a foundation layer, wherein:
[0091] The data layer is used to obtain current real-time work assignment data, historical nesting operation data, and basic business data, so as to obtain the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data;
[0092] The application logic layer is used to obtain nesting schemes based on the current task package and preset management algorithms, and to obtain target nesting schemes based on nesting schemes and dynamic programming nesting algorithms, so as to obtain nesting processing instructions based on target nesting schemes;
[0093] The equipment control layer is used to control the corresponding equipment to perform material unloading processing based on the nesting processing instructions and nesting scheme, and to acquire nesting operation data to complete the automated unloading process;
[0094] The base layer includes the corresponding equipment.
[0095] This embodiment provides an automated material cutting system for ship pipe sections. First, the data layer acquires current real-time dispatch data, historical nesting operation data, and basic business data to generate a current task package. Then, the application logic layer obtains a nesting scheme based on this task package and a preset management algorithm. A dynamic programming nesting algorithm is used to automatically select the optimal nesting scheme, generating a target nesting scheme and corresponding nesting processing instructions. Finally, the equipment control layer executes the material cutting process according to the processing instructions and the nesting scheme, simultaneously acquiring nesting operation data to complete the fully automated material cutting process. This method, driven by real-time dispatch data, achieves fully automated control from data acquisition and scheme generation to processing execution. By using a preset data management algorithm and a dynamic programming nesting algorithm to automatically select the optimal nesting scheme and generate corresponding nesting processing instructions for automatic material cutting, it effectively improves pipe utilization, reduces raw material waste, optimizes workflow, and increases production efficiency, achieving highly efficient implementation of automated pipe section material cutting.
[0096] In practical implementation, the data layer integrates MES dispatch data (current real-time dispatch data), pipeline design data, and a SQL Server database containing nesting results, and pushes current task packages in JSON format to the logic layer in real time. The application logic layer is divided into the application layer and the logic layer in actual application. The logic layer implements a dynamic planning nesting algorithm based on the WinForm platform, supporting automatic optimization for material lengths ≤200mm. The equipment control layer interacts with the cutting machine PLC via TCP / IP protocol, supporting breakpoint resume command issuance and dynamic updating of inkjet printing content, with a cutting accuracy error ≤0.5mm. The foundation layer provides hardware and software environment support, such as servers, CNC cutting machines, laser length measuring instruments, and operating system environments.
[0097] Specifically, the current task package in JSON format contains the following fields:
[0098] {
[0099] "Kit unit number":"NT-2023-001",
[0100] "List of Pipes":[{"Number":"P001","Length":12000,"Material":"304 Stainless Steel"}],
[0101] "Pipeline Segment Requirements":[{"Number":"S001","Length":3500},{"Number":"S002","Length":2800}],
[0102] "Surplus material handling strategy": "Material ≥200mm is stored in the warehouse, material <200mm is discarded."
[0103] }
[0104] Specifically, the data layer is hosted on an SQL Server and stores four types of data, including MES dispatch data: weekly plans, process batches, pipe segment numbers requiring material cutting, quota hours, construction personnel, cutting equipment, etc.; pipeline design data: ship number, pallet number, pipeline code, pipe segment code, pipe segment length, pipe segment material, pipe segment model and specifications, etc.; historical nesting operation data, including nesting result data and equipment operation data, where nesting result data includes: pipe number, pipe length, pipe nesting segment information, pipe material residue, etc.; equipment operation data includes: cutting records, inkjet printing content, PLC status, etc.; and basic business data, including: organizational structure, personnel information, equipment resources, ship information, etc.
[0105] Optionally, the application logic layer includes a nesting management module, a dynamic programming module, a processing decomposition module, and an instruction generation module. The nesting management module obtains the nesting scheme and surplus material list based on the current task package and a preset management algorithm. The dynamic programming module performs one-dimensional nesting optimization based on the nesting scheme, surplus material list, dynamic programming nesting algorithm, and preset constraints to obtain the target nesting scheme. Its calculation process satisfies the following formula:
[0106]
[0107] j≤j o
[0108] In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o The maximum number of preset combinations is represented; the processing decomposition module is used to obtain processing decomposition tasks based on the target nesting scheme and the preset processing decomposition method; the instruction generation module is used to obtain nesting processing instructions based on the processing decomposition tasks.
[0109] In the specific implementation process, the logic layer is built on the WinForm visual programming environment platform, including a nesting unit management module (nesting management module), which is used to automatically decompose nesting units according to the process batch and pipe specifications of the MES work order. It also supports importing external pipeline cutting data through Excel, obtains data from the data layer through the application and presentation layers, and returns the results to the data layer after logical calculation. The information is then displayed in the user and presentation layers. It contains the logical algorithms necessary for the implementation of various system functions to support the implementation of various functions and data processing. Its core functions include: dynamic planning nesting engine, executing one-dimensional optimization algorithms; nesting unit management: decomposing tasks by batch; and equipment instruction generator: converting nesting results into JSON instructions. The application layer is built on the application output by the WinForm visual programming environment platform. The main functions of the application layer include: nesting unit management, nesting calculation, execution of cutting, parameter setting, data statistics, and other modules. The nesting unit management module supports filtering MES dispatch data by vessel number, weekly plan, and pipe model and specifications, and automatically generates nesting unit numbers (rule: vessel number + batch + date, such as "CV001-B01-20231001").
[0110] In practical applications, the data layer and the logic layer transmit nesting instructions in JSON format, as shown in the following example:
[0111] {"Kit unit number":"NT-2023-001",
[0112] "List of Pipes":[{"Number":"P001","Length":12000,"Material":"304 Stainless Steel"}],
[0113] "Pipeline Segment Requirements":[{"Number":"S001","Length":3500},{"Number":"S002","Length":2800}]
[0114] }
[0115] Optionally, the nesting management module is used to obtain nesting schemes and surplus material lists based on the current task package and a preset management algorithm, including: obtaining pipe segment data based on the current task package and a preset sorting method; obtaining the longest available pipe segment based on the current task package; and obtaining nesting schemes and surplus material lists based on the longest available pipe segment, obtained pipe segment data, and the current task package.
[0116] In practical implementation, the application-layer nesting unit management is used to reorganize nesting units according to process batches based on the WJ (work order) dispatch data issued from the pipe MES. Functions include adding nesting units and viewing related information, such as: nesting unit number, vessel number, MES process batch, material, model specifications, corresponding WJ (work order), construction status, nesting time, and utilization rate. Nesting units can be filtered from the pipe MES based on vessel number, batch, weekly plan, pipe model specifications, etc., to select pipe sections requiring nesting, and are automatically decomposed into different nesting units based on specifications. Nesting units can automatically group required pipe sections by specifications to generate nesting units (e.g., "CV001-B01-20231001"). Nesting unit data can also be imported from external data in Excel format to form nesting units. The nesting calculation module is applied to nesting operations, with functions including: pipe material management, executing nesting, and exporting nesting lists. Pipe material management functions include adding and deleting pipe materials. Adding pipes can be done by default with the pipe model and specifications, manually adding pipes one by one or in batches for nesting, or by entering pipes of variable length on site one by one through the laser length measuring unit. The system will preliminarily calculate the number of pipes based on the length of commonly used pipes, making it convenient for nesting personnel to add pipes. To delete a pipe, you can select the pipe to delete, and it will not be included in the nesting. The nesting module is used to nest all pipe segments in the current nesting unit with pipes from the pipe library, and list the pipe segment number, pipe utilization rate, status and other information for each pipe segment. The nesting is performed using a one-dimensional nesting algorithm that minimizes the number of raw materials used and the minimum remaining material of a single pipe. The dynamic programming nesting algorithm process is as follows: (1) Input: MES dispatch data (pipe segment requirements) + pipe inventory data. (2) Constraints: The remaining material length of a single pipe is ≤200mm; a single pipe can be cut into a maximum of 5 segments, or can be set by the user; when the remaining material is ≥200mm, it is stored in the remaining material library. (3) Execution based on preset management algorithm: Step ①: Sort by pipe segment length in descending order; Step ②: Traverse the pipe library and match the longest available pipe segment; Step ③: Calculate the remaining material and update the inventory; Step ④: Generate the nesting scheme and remaining material list. (4) Output: Optimal nesting result (JSON format), pushed to the equipment control layer. Exporting the nesting list is used to export the nesting result in Excel format, which can be used for manual material cutting.
[0117] Optionally, the application logic layer also includes a result feedback module, wherein: the result feedback module is used to obtain real-time nesting data based on the target nesting scheme and the surplus material list, and to feed the real-time nesting data back to the data layer.
[0118] In the specific implementation process, the results feedback module enables real-time synchronous updates of data, avoiding problems such as data isolation.
[0119] Optionally, the equipment control layer includes a material feeding control module, a coding control module, and an operation data processing module, wherein: the material feeding control module is used to perform material feeding processing based on nesting processing instructions and nesting schemes, and to obtain target pipe and processing data; the coding control module is used to obtain target pipe code based on target pipe and preset coding method; the operation data processing module is used to obtain nesting operation data based on target pipe, processing data and target pipe code, and to feed the nesting operation data back to the data layer.
[0120] In the specific implementation process, the equipment control layer is set up at the CNC equipment end, and sends instructions to the cutting machine PLC via TCP / IP protocol, supporting breakpoint resumption (e.g., restarting from the Nth segment after cutting is interrupted). All pipe segment numbers and cutting lengths are sent at once according to the pipe material. After receiving the data, the control layer starts the cutting operation, sets the current pipe segment and sets the pipe segment to be ready for inkjet printing. After receiving the pipe segment's ready-for-inkjet status, the application and display layer pushes the inkjet content of the current pipe segment to the equipment control layer. The control layer receives the inkjet content, executes the inkjet printing, and cuts the pipe segment. After completing the cutting of the current pipe segment, it sets the next pipe segment as the current pipe segment, sets the pipe segment to be ready for inkjet printing, and repeats this process until the current pipe material is cut. The equipment control layer receives all pipe segment numbers and length information for the current pipe material at once. It receives the pipe segment's inkjet printing content and executes the cutting according to the pipe segment's ready-for-inkjet status. The interaction flow of the equipment control layer is as follows: Step ①: The logic layer generates a JSON instruction package, example:
[0121] {"Pipe part number":"P001",
[0122] "cut sequence":[
[0123] {"Pipe segment number":"S001","Length":3500,"Inkjet printing content":"CV001-S001"},
[0124] {"Pipe segment number":"S002","Length":2800,"Coding content":"CV001-S002"} ]
[0126] }
[0127] Step ②: Send the command to the cutting machine PLC via TCP / IP protocol; Step ③: After receiving the command, the PLC executes feeding, coding, and cutting sequentially; Abnormal handling: If cutting is interrupted (e.g., power failure), the PLC records the current pipe segment number and remaining length; after restarting, cutting continues from the interrupted position to avoid material waste. After cutting is completed, the PLC sends the actual cutting length, coding content, and remaining material information back to the data layer; the data layer updates the MES production progress and generates a pipe utilization rate report (example: 93.2%).
[0128] Optionally, the equipment control layer also includes a temporary stop module, wherein: the temporary stop module is used to obtain a temporary stop command, stop the material cutting processing action based on the temporary stop command and a preset breakpoint resume processing algorithm, obtain the current pipe data, and use the current pipe data as breakpoint running data, so that the application logic layer generates a resume command based on the breakpoint running data, and then the equipment control layer controls the corresponding equipment to perform material cutting processing based on the resume command and the nesting scheme, and obtains nesting running data to complete the automated material cutting process.
[0129] In the actual implementation process, when the cutting is interrupted, the PLC records the current pipe segment number, the length already cut, and the remaining pipe length, and feeds it back to the logic layer to generate a resume instruction.
[0130] Optionally, a presentation layer may also be included, wherein: the presentation layer is used to obtain the current production progress and pipe utilization rate report based on the nesting operation data, and to perform visualization processing based on the current production progress and pipe utilization rate report.
[0131] In practical implementation, the application layer and presentation layer are jointly built on the application output by the WinForm visual programming environment platform, forming the application and presentation layers. This provides the user interface for various user operations and data display. A data viewing module is included, which can be used for data viewing and calculating pipe utilization rates for cost analysis and surplus material management. The pipe utilization rate statistics module calculates and displays the current batch utilization rate in real time (formula: Precision is retained to one decimal place.
[0132] Optionally, the equipment control layer also includes an exception handling module, wherein: the exception handling module is used to automatically trigger a reassignment instruction when the nesting operation data determines that the nesting has failed, so as to obtain an updated task package based on the reassignment instruction.
[0133] In practical implementation, the application layer executes the unloading function to send pipe segment information to the central control system of the CNC unloading equipment, return the unloading results, modify the pipe material and pipe segment unloading status, and finally feed the results back to the pipe MES system. Data for each pipe segment is sent to the cutting machine according to the pipe material being fed, controlling the cutting machine to cut the pipe. Each cut pipe segment is then marked with a corresponding code for subsequent sorting and other processes. Unloading is performed sequentially by pipe material, and its functions include connecting to the equipment, starting the unloading process, stopping the process, and saving cutting data. The connecting equipment is used to connect to the CNC unloading equipment via parameters such as IP address, port, coding user area, and PLC channel, performing equipment connection checks and initializing the equipment interface. The application layer's unloading function pushes the pipe segment code, pipe segment length, and coding content to the corresponding storage address of the unloading equipment according to the pipe segment sequence formed by nesting. After receiving the data, the equipment starts operations such as feeding, coding, clamping, cutting, and feedback. The stop function is for temporary shutdown of operations and can be triggered to resume operation. During the processing, cutting data is saved, including the start time, end time, and pipe code of the current pipe cutting, which are then saved to the database for performance analysis.
[0134] Optionally, after a cutting interruption, the equipment control layer can restart the cutting operation from the breakpoint based on the current pipe segment number and length stored in the PLC.
[0135] This embodiment provides an automated material feeding system for ship pipe sections. By applying a dynamic programming nesting algorithm at the logic layer combined with constraints, the system optimizes the processing scheme and handles leftover materials. It automatically updates leftover material data, discards or reuses leftover materials, and updates nesting and leftover material data in real time, forming a closed-loop management system. This solves the problems of existing traditional technologies that rely on manual dispatching, nesting, and cutting, as well as isolated data and delayed feedback. By encoding the produced pipe sections through the equipment control layer, the system solves the problems of chaotic inkjet printing positions and subsequent sorting difficulties in existing technologies. Furthermore, by combining a temporary stop strategy, the system solves the problems of manual resetting after cutting interruptions and high material scrap rates in existing technologies. This greatly improves the utilization rate of pipe materials and realizes automated and flexible control of the processing process.
[0136] Example 3:
[0137] like Figure 2As shown, this embodiment constructs a five-layer architecture automated material handling management system for ship pipe sections. From bottom to top, the layers are: foundation layer, data layer, logic layer, application and display layer, and equipment control layer. The data layer includes central control system data, pipeline design data, basic information, WJ dispatch data, and pipe section nesting data. The logic layer is used to receive WJ dispatch data, receive pipe section data, perform data read and write operations, and perform nesting calculations. The application and display layer is used for parameter setting, nesting unit management, nesting calculation, material handling execution, and data query. The equipment control layer is used to connect equipment, issue material handling data, and issue pipe section inkjet printing information.
[0138] Optionally, the business operation process of this material feeding management system is as follows: Figure 3 As shown, it includes:
[0139] S31. Create nesting units based on process batch and piping design data;
[0140] S32. Add pipes based on pipe number and laser length measurement data;
[0141] S33. Perform nesting calculations according to nesting units;
[0142] S34. Connect the feeding equipment;
[0143] S35. Issue cutting instructions and inkjet printing information one by one according to pipe sections;
[0144] S36. Perform cutting and provide feedback on the pipe section feeding status.
[0145] This embodiment automates the entire process of work assignment, nesting, cutting, coding, and feedback through a five-layer architecture system; it is synchronized with the MES system in real time, ensuring that cutting status and residual material data are updated every minute, forming a closed-loop management system. This solves the problems of existing traditional technologies that rely on manual work assignment, nesting, and cutting, resulting in isolated data and delayed feedback. This embodiment uses a one-dimensional dynamic programming nesting algorithm to automatically store and reuse materials when the residual material length is ≥200mm, increasing pipe utilization to over 93% and reducing raw material waste. A breakpoint resume function is employed, allowing the PLC to record the interruption location (such as pipe segment number and remaining length) in the event of power outages or emergency stops, and automatically resume cutting upon restart. This solves the problem of existing technologies requiring manual resetting after cutting interruptions and resulting in high material scrap rates. Laser calibration cutting is used: the error is ≤0.5mm, meeting the requirements of high-precision shipbuilding. The content includes pipe segment number, material, and length, with a uniform position ≤50mm from the pipe end, solving the problems of inconsistent coding positions and subsequent sorting difficulties in existing technologies.
[0146] In the specific implementation process, the overall interface diagram of the application layer display layer of the pipe cutting central control system usually includes a status bar, function menu, pipe data display, and nesting data display window; the cutting interface of the pipe cutting central control system application layer data sending to the cutting machine usually includes a status bar, current cutting pipe segment, basic information of the cutting pipe segment, data connection information, data waiting to be sent, control functions, and a display window showing the pipe cutting status.
[0147] Example 4:
[0148] Optionally, if the nesting fails (no matching pipe is available), the MES will automatically reassign the work or prompt manual intervention.
[0149] This embodiment provides a process for resuming interrupted data transmission and real-time coding based on an automated ship pipe section unloading system, such as... Figure 4 As shown, it includes:
[0150] S41, Logic layer generates JSON instructions;
[0151] S42, TCP / IP sent to PLC;
[0152] S43. Perform the processing steps of feeding, coding, and cutting;
[0153] S44. Determine if the processing is successful: If yes, proceed to step S45; if no, it is considered an interruption and proceed to step S46.
[0154] S45, Feedback status to the data layer;
[0155] S46. Record breakpoint information;
[0156] S47. Restart the system;
[0157] S48. The logic layer reads the breakpoint data and generates a resume instruction, and returns to step S42 based on the resume instruction.
[0158] Example 5:
[0159] Based on the above-described embodiment of an automated ship pipe section cutting method, another embodiment of the present invention provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements an automated ship pipe section cutting method according to any embodiment of the present invention.
[0160] For example, in this embodiment, the computer program can be divided into one or more modules, which are stored in the memory and executed by the processor to complete the present invention. The one or more modules may be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of the computer program in the terminal device.
[0161] The terminal device may be a desktop computer, laptop, handheld computer, or cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.
[0162] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor. The processor is the control center of the terminal device, connecting all parts of the terminal device via various interfaces and lines.
[0163] Based on the above-described method embodiments, another embodiment of the present invention provides a computer-readable storage medium including a stored computer program, wherein, when the computer program is executed, it controls the device where the computer-readable storage medium is located to execute the automated material feeding method for ship pipe sections described in any of the above-described method embodiments of the present invention.
[0164] The modules / units integrated in the device / terminal equipment, if implemented as software functional units and sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the above embodiments of the present invention can also be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include: any entity or device capable of carrying the computer program code, recording media, USB flash drives, portable hard drives, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.
[0165] The above description represents the preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of the present invention, and these improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. An automated method for unloading ship pipe sections, characterized in that, include: Obtain current real-time work assignment data, historical nesting operation data, and basic business data, and obtain the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data; The nesting scheme is obtained based on the current task package and the preset management algorithm, and the target nesting scheme is obtained based on the nesting scheme and the dynamic programming nesting algorithm, so as to obtain the nesting processing instruction based on the target nesting scheme; Based on the nesting instructions and nesting scheme, the material cutting process is carried out, and nesting operation data is acquired to complete the automated material cutting process.
2. The automated material feeding method for ship pipe sections as described in claim 1, characterized in that, The process of obtaining a nesting scheme based on the current task package and a preset management algorithm, obtaining a target nesting scheme based on the nesting scheme and a dynamic programming nesting algorithm, and obtaining nesting processing instructions based on the target nesting scheme includes: Based on the current task package and the preset management algorithm, obtain the nesting scheme and the list of remaining materials; Based on the nesting scheme, the surplus material list, the dynamic programming nesting algorithm, and the preset constraints, one-dimensional nesting optimization is performed to obtain the target nesting scheme. The calculation process satisfies the following formula: j≤j o In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o This represents the preset maximum number of combinations; Based on the target nesting scheme and the preset processing decomposition method, the processing decomposition task is obtained; Based on the aforementioned processing decomposition task, nesting processing instructions are obtained.
3. The automated material feeding method for ship pipe sections as described in claim 2, characterized in that, The process of obtaining the nesting scheme and surplus material list based on the current task package and the preset management algorithm includes: Obtain pipe segment data based on the current task package and the preset sorting method; The longest available pipe segment is obtained based on the current task package; Based on the longest available pipe segment, obtain the pipe segment data and the current task package to obtain the nesting scheme and the remaining material list.
4. The automated material feeding method for ship pipe sections as described in claim 2, characterized in that, Also includes: The parameter threshold range is obtained based on preset constraints; If, based on the surplus material list, it is determined that the current surplus material pipe does not meet the parameter threshold range, the current surplus material pipe is marked as unusable surplus material. When the current surplus material pipe meets the parameter threshold range based on the surplus material list, the current surplus material pipe is marked as usable surplus material; An updated list of surplus materials is obtained based on the available and unavailable surplus materials.
5. The automated material feeding method for ship pipe sections as described in claim 1, characterized in that, The step of performing material cutting processing based on the nesting processing instructions and nesting scheme, and acquiring nesting operation data, includes: Based on the nesting instructions and nesting scheme, the material cutting process is carried out to obtain the target pipe and processing data; The target pipe code is obtained based on the target pipe material and the preset coding method; Based on the target pipe material, processing data, and target pipe material code, the nesting operation data is obtained.
6. The automated material feeding method for ship pipe sections as described in claim 5, characterized in that, Also includes: Obtain a temporary stop command, stop the material cutting process based on the temporary stop command and the preset breakpoint resume processing algorithm, obtain the current pipe data, and use the current pipe data as the nesting operation data.
7. The automated material feeding method for ship pipe sections as described in claim 6, characterized in that, Also includes: Based on the material handling operation data, obtain the current production progress and pipe utilization rate report, and perform visualization processing based on the current production progress and pipe utilization rate report.
8. The automated material feeding method for ship pipe sections as described in claim 1, characterized in that, The process of performing material cutting based on the nesting instructions and nesting scheme, and acquiring nesting operation data to complete the automated material cutting process, further includes: When the nesting operation data determines that the nesting has failed, a reassignment instruction is automatically triggered to obtain an updated task package based on the reassignment instruction.
9. An automated material handling system for ship pipe sections, characterized in that, A method for implementing an automated material cutting method for ship pipe sections as described in any one of claims 1 to 8, comprising a data layer, an application logic layer, an equipment control layer, and a foundation layer, wherein: The data layer is used to acquire current real-time work assignment data, historical nesting operation data, and basic business data, so as to acquire the current task package based on the current real-time work assignment data, historical nesting operation data, and basic business data; The application logic layer is used to obtain a nesting scheme based on the current task package and a preset management algorithm, and to obtain a target nesting scheme based on the nesting scheme and a dynamic programming nesting algorithm, so as to obtain nesting processing instructions based on the target nesting scheme; The equipment control layer is used to control the corresponding equipment to perform material unloading processing based on the nesting processing instructions and nesting scheme, and to acquire nesting operation data to complete the automated material unloading process; The base layer includes corresponding devices.
10. The automated material handling system for ship pipe sections as described in claim 9, characterized in that, The application logic layer includes a nesting management module, a dynamic programming module, a processing decomposition module, and an instruction generation module, wherein: The nesting management module is used to obtain nesting schemes and surplus material lists based on the current task package and preset management algorithm; The dynamic programming module is used to perform one-dimensional nesting optimization based on the nesting scheme, the surplus material list, the dynamic programming nesting algorithm, and preset constraints to obtain the target nesting scheme. Its calculation process satisfies the following formula: j≤j o In the formula: L 管材 Represents the length of the pipe. The length of the j-th target pipe to be processed is represented by , i represents the ith pipe, N represents the nesting processing data, and l o j represents the preset maximum excess length. o This represents the preset maximum number of combinations; The processing decomposition module is used to obtain processing decomposition tasks based on the target nesting scheme and the preset processing decomposition method; The instruction generation module is used to obtain nesting instructions based on the processing decomposition task.
11. The automated material handling system for ship pipe sections as described in claim 10, characterized in that, The nesting management module is used to obtain nesting schemes and surplus material lists based on the current task package and a preset management algorithm, including: Obtain pipe segment data based on the current task package and the preset sorting method; The longest available pipe segment is obtained based on the current task package; Based on the longest available pipe segment, obtain the pipe segment data and the current task package to obtain the nesting scheme and the remaining material list.
12. The automated material handling system for ship pipe sections as described in claim 10, characterized in that, The application logic layer also includes a result feedback module, wherein: The result feedback module is used to obtain real-time nesting data based on the target nesting scheme and the surplus material list, and to feed the real-time nesting data back to the data layer.
13. The automated material handling system for ship pipe sections as described in claim 9, characterized in that, The equipment control layer includes a material feeding control module, a coding control module, and an operation data processing module, wherein: The material cutting control module is used to perform material cutting processing based on the nesting processing instructions and nesting scheme, and to obtain the target pipe and processing data. The inkjet printing control module is used to obtain the target pipe code based on the target pipe material and a preset coding method; The operation data processing module is used to obtain nesting operation data based on the target pipe, processing data and target pipe code, and to feed the nesting operation data back to the data layer.
14. The automated material handling system for ship pipe sections as described in claim 9, characterized in that, The device control layer also includes a temporary stop module, wherein: The temporary stop module is used to obtain a temporary stop command, stop the material cutting process based on the temporary stop command and a preset breakpoint resume processing algorithm, obtain the current pipe data, and use the current pipe data as breakpoint running data. This enables the application logic layer to generate a resume command based on the breakpoint running data, and then enables the equipment control layer to control the corresponding equipment to perform material cutting processing based on the resume command and the nesting scheme, and obtain nesting running data to complete the automated material cutting process.
15. The automated material handling system for ship pipe sections as described in claim 9, characterized in that, It also includes a presentation layer, in which: The display layer is used to obtain the current production progress and pipe utilization rate report based on the nesting operation data, and to perform visualization processing based on the current production progress and pipe utilization rate report.
16. The automated material handling system for ship pipe sections as described in claim 9, characterized in that, The device control layer also includes an exception handling module, wherein: The exception handling module is used to automatically trigger a reassignment instruction when the nesting operation data determines that the nesting has failed, so as to obtain an updated task package based on the reassignment instruction.