A method for controlling safe mining at the boundary of slopes in landslide risk areas
By dividing the slope into landslide risk zones and non-landslide risk zones, and adopting a dual support control approach of localized transverse mining and replacement with localized lateral support, combined with longitudinal and transverse mining methods, the problem of lagging landslide risk zone management was solved, achieving safe slope boundary and efficient resource recovery.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- LIAO NING GONG CHENG JI SHU DA XUE E ER DUO SI YAN JIU YUAN
- Filing Date
- 2025-09-01
- Publication Date
- 2026-05-26
AI Technical Summary
Existing technologies have failed to effectively address the issues of slope management and boundary demarcation in landslide-prone areas, resulting in delayed landslide risk zone management, the covering of large amounts of resources, and impacts the safety and resource recovery efficiency of open-pit mines.
By dividing the slope into landslide risk zone P1 and non-landslide risk zone P2, a dual support control system of local lateral mining and replacement and local lateral lining is adopted. Combined with longitudinal and lateral mining methods, the slope morphology is designed, and the Morgenstern method is used to determine whether the stability coefficient meets the safety reserve coefficient, thereby determining the slope morphology and parameters at each stage.
Effective management of landslide risk areas has been achieved, ensuring the safety of slopes to the boundary, avoiding delays in landslide risk area management, and improving the safety and resource recovery efficiency of open-pit coal mines.
Smart Images

Figure CN120867754B_ABST